ip wai hung andrew (dr.) - semantic scholar...ip wai hung andrew (dr.) phd, ceng, mhkie, miet,...
TRANSCRIPT
2015-Jul
IP Wai Hung Andrew (Dr.)
PhD, CEng, MHKIE, MIET, MIMechE, SMIEEE, FHKQMA
Associate Professor and Associate Director (IGDS)
Head, RFID Solutions Laboratory
Department of Industrial and Systems Engineering
The Hong Kong Polytechnic University
Publications (in chronological order)
(including Journals, Conferences, Books and Book Chapters)
(a) Journal Papers
Year 2015
1. Lee, C.K.M., Chan, C.Y., Choy, K.L., and Ip, W.H., “Explore the feasibility of adopting crowdsourcing
for innovative problem solving”, Industrial Management & Data Systems, Vol. 115, Iss. 5, pp.803-832
(2015).
2. Wu, C.H., Ho, G.T.S., Lam, C.H.Y., and Ip, W.H., “Franchising decision support system for formulating
a center positioning strategy”, Industrial Management & Data Systems, Vol. 115, Iss. 5, pp.853-882
(2015).
3. Wu, C.H., Ng, C.K., Wang, L.X., Ho, G.T.S., Ip, W.H., and Zhang, J., “Design of a Wireless Sensor
Network Monitoring System for Biological and Pharmaceutical Products”, International Journal of
Distributed Sensor Networks, DOI: 10.1155/2015/760242 (2015).
Year 2014
4. Choy, K.L., Lam, H.Y., Lee, C.K.M., Chin, K.S., Ip, W.H., and Poon, T.C., “A food monitoring system
for preventing product deterioration”, International Journal of Food Safety, Nutrition and Public Health,
Vol. 5, Iss. 1, pp. 54-79 (2014).
5. Jiang, H.M., Kwong, C.K., Liu, Y., and Ip, W.H., “A methodology of integrating affective design with
defining engineering specifications for product design”, International Journal of Production Research,
Vol. 53, No. 8, pp.2472-2488 (2014).
6. Dong, N., Wu, C.H., Ip, W.H., Chen, Z.Q., and Wu, A.G., “Species-based chaotic hybrid optimizing
algorithm and its application in image detection”, Applied Artificial Intelligence: An International Journal,
Vol. 28, Iss. 7, pp.637-674 (2014).
7. Ip, W.H., “Editorial”, International Journal of Engineering Business Management, Vol. 6, Iss. 1, pp. 1-2
(2014).
8. Tan, C.Q., Ip, W.H., and Chen, X.H., “Stochastic multiple criteria decision making with aspiration level
based on prospect stochastic dominance”, Knowledge-Based Systems, Vol. 70, pp. 231-241 (2014).
9. Tan, C.Q., Jiang, Z.Z., Chen, X.H., and Ip, W.H., “Atanassov’s intuitionistic fuzzy Quasi-Choquet
geometric operators and their applications to multicriteria decision making”, Fuzzy Optimization and
Decision Making, DOI: 10.1007/s10700-014-9196-y (2014).
10. Wang, J.W., Wang, H.F., Zhang, W.J., Ip, W.H. and Furuta, K., “On a unified definition of the service
system: what is its identity?”, IEEE Systems Journal, Vol. 8, Iss. 3pp.821-826 (2014).
11. Zhang, S.Z., Lee, C.K.M., Choy, K.L., Ho, W., and Ip, W.H., “Design and development of a hybrid
artificial bee colony algorithm for the environmental vehicle routing problem”, Transportation Research
Part D, Vol. 31 (2014), pp.85-99 (2014).
12. Fan, W., Su, Q.B., and Ip, W.H., “Research on multi-leg inventory control based on passenger choice”,
International Journal of Engineering Business Management, Vol. 6, No. 2, pp.3-8 (2014).
13. Fan, W., Wang, J.W., and Ip, W.H., “Multi-leg seat inventory control based on EMSU and virtual bucket”,
International Journal of Engineering Business Management, Vol. 6, No. 3, pp.9-14 (2014).
2015-Jul
14. Wang, J.W., Liu, D., Ip, W.H., Zhang, W.J., and Deters R., “Integration of system-dynamics, aspect-
programming, and object-orientation in system information modeling”, IEEE Transactions on Industrial
Informatics, Vol. 10, No. 2, pp.847-853 (2014).
15. Tan, C.Q., Jiang, Z.Z., Chen, X.H., and Ip, W.H., “A banzhaf function for fuzzy game”, IEEE
Transaction on Fuzzy Systems, Vol.22, No. 6, pp.1489-2502 (2014).
16. Zou, K.S., Ip, W.H., Wu, C.H., and Chen, Z.Q., Yung, K.L. and Chan, C.Y., “A novel 3D model retrieval
approach using combined shape distribution”, Multimedia Tools and Applications, Vol. 69, Iss. 3, pp.799-
818 (2014).
Year 2013
17. Huang, M., Wu, H.P., Cho, V., Ip, W.H., Wang, X.W. and Ng, C.K., “Single machine problem with
multi-rate-modifying activities under a time-dependent deterioration”, Journal of Applied Mathematics,
DOI: 10.1155/2013/135610 (2013).
18. Ip, W.H., Wang, D.W. and Cho, V., “Aircraft ground service scheduling problems and their genetic
algorithm with hybrid assignment and sequence encoding scheme”, IEEE Systems Journal, Vol. 7, No. 4,
pp.649-657 (2013).
19. Jiang, H.M., Kwong, C.K., Ip, W.H. and Chen, Z.Q., “Chaos-based fuzzy regression approach to
modeling customer satisfaction for product design”, IEEE Transactions on Fuzzy Systems, Vol. 21, No. 5,
pp. 926-936 (2013).
20. Lv, Y.Q., Lee, C.K.M., Wu, Z., Chan, H.K. and Ip, W.H., “Priority-based distributed manufacturing
process modeling via Hierarchical timed color Petri net”, IEEE Transactions on Industrial Informatics,
Vol. 9, No. 4, pp. 1836-1846 (2013).
21. Ting, S.L. and Ip, W.H., “Combating the counterfeits with web portal technology”, Enterprise
Information Systems, Vol. 9, Iss. 7, pp.661-680 (2013).
22. Tseng, K.K., Zeng, F.F., Huang, H.N., Liu, Y., Pan, J.S., Ip, W.H. and Wu, C.H., “A new non-exact aho-
corasick framework for ECG classification”, ACM SIGARCH Computer Architecture News, Vol. 41, No.
2, pp. 41-46 (2013).
23. Wang, D.W. and Ip, W.H., “Survey on modeling and optimization within RFID technology and
applications”, Control Engineering of China, 20 (1), pp. 9-12, 17 (2013).
24. Wang, J.W., Ip, W.H., Muddada, R.R., Huang, J.L. and Zhang, W.J., “On Petri net implementation of
proactive resilient holistic supply chain networks”, The International Journal of Advanced Manufacturing
Technology, Vol. 69, pp.437-437 (2013).
25. Wang, J.W., Wang, H.F., Ding, J.L., Furuta, K., Kanno, T., Ip, W.H. and Zhang, W.J., “On domain
modelling of the service system with its application to enterprise information systems”, Enterprise
Information Systems, DOI: 10.1080/17517575.2013.810784 (2013).
26. Wang, J.W., Wang, H.F., Ip, W.H., Kanno, T. and Zhang, W.J., “Predatory search strategy based on
swarm intelligence for continuous optimization problems”, Mathematical Problems in Engineering, DOI:
10.1155/2013/749256 (2013).
27. Wang, J.W., Wang, H.F., Zhang, W.J., Ip, W.H. and Furuta, K., “Evacuation planning based on the
contraflow technique with consideration of evacuation priorities and traffic setup time”, IEEE
Transactions on Intelligent Transportation Systems, Vol. 14, No. 1, pp. 480-485 (2013).
28. Wang, L.X., Ting, J.S.L. and Ip, W.H., “Design of Supply-chain Pedigree Interactive Dynamic Explore
(SPIDER) for food safety and implementation of Hazard Analysis and Critical Control Points (HACCPs)”,
Computer and Electronics in Agriculture, Vol. 90, pp.14-23 (2013).
Year 2012
29. Chan, S.L., Ip, W.H. and Zhang, W.J., “Integrating failure analysis and risk analysis with quality
assurance in the design phase of medical product development”, International Journal of Production
Research, Vol. 50, No. 8, pp.2190-2203 (2012).
30. Chen, Z.N., Lee, C.K.M., Ip, W.H. and Ho, G.T.S., “Design and evaluation of an integrated inventory and
transportation system”, Transportation Planning and Technology, Vol. 35, No. 4, pp.491-507 (2012).
2015-Jul
31. Chen, Z.Q., Ip, W.H., Wei, Y.F. and Wu, C.H., “Chaos particle swarm algorithm for energy consumption
optimization in wireless sensor networks”, Sensor Letters, Vol. 10, No. 8, pp.1830-1835 (2012).
32. Ting, S.L., Ip, W.H., Tsang, A.H.C., and Ho, G.T.S., “An integrated electronic medical record system
(iEMRS) with decision support capability in medical prescription”, Journal of Systems and Information
Technology, Vol. 14, Iss. 3, pp.236-245 (2012).
33. Dong, H.Y., Huang, M., Ip, W.H. and Wang, X.W., “Improved variable neighbourhood search for
integrated tundish planning in primary steelmaking processes”, International Journal of Production
Research, Vol. 50, No. 20, pp.5747-5761 (2012).
34. Dong, N., Wu, C.H., Ip, W.H., Chen, Z.Q. and Yung, K.L., “Chaotic species based particle swarm
optimization algorithms and its application in PCB components detection”, Expert Systems with
Applications, Vol. 39, No. 16, pp.12501-12511 (2012).
35. Dong, N., Wu, C.H., Ip, W.H., Chen, Z.Q., Chan, C.Y. and Yung, K.L., “An opposition-based chaotic
GA/PSO hybrid algorithm and its application in circle detection”, Computers & Mathematics with
Applications, Vol. 64, No. 6, pp.1886-1902 (2012).
36. Ho, G.T.S., Ip, W.H., Lee, C.K.M. and Mou, W.L., “Customer grouping for better resources allocation
using GA based clustering technique”, Expert Systems with Applications, Vol. 39, No. 2, pp.1979-1987
(2012).
37. Ho, G.T.S., Ip, W.H., Wu, C.H. and Tse, Y.K., “Using a fuzzy association rule mining approach to
identify the financial data association”, Expert Systems with Applications, Vol. 39, No. 10, pp.9054-9063
(2012).
38. Ip, W.H., Yung, K.L. and Wang, D.W., “A chaotic model for advertising diffusion problem with
competition”, International Journal of Systems Science, Vol. 43, No. 8, pp.1545-1554 (2012).
39. Jiang, H.M., Kwong, C.K., Ip, W.H. and Wong, T.C., “Modeling customer satisfaction for new product
development using a PSO-based ANFIS approach”, Applied Soft Computing, Vol. 12, No. 2, pp.726-734
(2012).
40. Lam, C.Y. and Ip, W.H., “An improved spanning tree approach for the reliability analysis of supply chain
collaborative network”, Enterprise Information Systems, Vol. 6, No. 4, pp.405-418 (2012).
41. Lin, Y., Zhang, J., Chung, H.S.H., Ip, W.H. and Shi, Y.H., “An ant colony optimization approach for
maximizing the lifetime of heterogeneous wireless sensor networks”, IEEE Transactions on Systems, Man,
and Cybernetics - Part C: Applications and Reviews, Vol. 42, No. 3, pp.408-420 (2012).
42. Lv, Y.Q., Lee, C.K.M., Chan, H.K. and Ip, W.H., “RFID-based colored Petri net applied for quality
monitoring in manufacturing system”, International Journal of Advanced Manufacturing Technology, Vol.
60, No. 1-4, pp.225-236 (2012).
43. Peng, S.X., Chan, C.K., Luximon, A. and Ip, W.H., “Parametric body model development”, Computer
Technology and Application, Vol. 3, No. 3, pp.206-210 (2012).
44. Ting, S.L., Wang, L.X. and Ip, W.H., “A study of RFID adoption for vehicle tracking in a container
terminal”, Journal of Industrial Engineering and Management, Vol. 5, No. 1, pp.22-52 (2012).
45. Wang, H.F., Yang, S.X., Ip, W.H. and Wang, D.W., “A memetic particle swarm optimisation algorithm
for dynamic multi-modal optimisation problems”, International Journal of Systems Science, Vol. 43, No.
7, pp.1268-1283 (2012).
46. Wang, L.X., Kwok, S.K. and Ip, W.H., “A radio frequency identification-based quality evaluation system
design for the wine industry”, International Journal of Computer Integrated Manufacturing, Vol. 25, No.
1, pp.11-19 (2012).
47. Wang, L.X., Kwok, S.K. and Ip, W.H., “Design of an improved quantum-inspired evolutionary algorithm
for a transportation problem in logistics systems”, Journal of Intelligent Manufacturing, Vol. 23, No. 6,
pp.2227-2236 (2012).
48. Zou, K.S., Chan, C.K., Peng, S.X., Luximon, A., Chen, Z.Q. and Ip, W.H., “Shape-based retrieval and
analysis of 3D models using fuzzy weighted symmetrical depth images” Neurocomputing, Vol. 89,
pp.114-121 (2012).
2015-Jul
Year 2011
49. Chan, S.L. and Ip, W.H., “A dynamic decision support system to predict the value of customer for new
product development”, Decision Support Systems, Vol. 52, No. 1, pp. 178-188 (2011).
50. Chan, S.L., Ip, W.H. and Kwong, C.K., “Closing the loop between design and market for new product
idea screening decisions”, Expert Systems with Applications, Vol. 38, No. 6, pp.7729-7737 (2011).
51. Chen, Z.Q., Zou, K.S., Ip, W.H. and Chan, C.Y., “3D model retrieval based on fuzzy weighted shape
distributions”, Advanced Materials Research, Vol. 201-203, pp.1678-1681 (2011).
52. Chung, S.H., Chan, F.T.S. and Ip, W.H., “Minimization of order tardiness through collaboration strategy
in multifactory production system”, IEEE Systems Journal, Vol. 5, No. 1, pp.40-49 (2011).
53. Dong, N., Wu, C.H., Ip, W.H., Chen, Z.Q., Chan, C.Y. and Yung, K.L., “An improved species based
genetic algorithm and its application in multiple template matching for embroidered pattern inspection”,
Expert Systems with Applications, Vol. 38, No. 12, pp.15172-15182 (2011).
54. Ting, S.L., Ip, W.H., and Tsang, A.H.C., “Is Naïve bayes a good classifier for document classification?”,
International Journal of Software Engineering and its Applications, Vol. 5, Iss. 3, pp.37-46 (2011).
55. Chan, S.L., Ip, W.H., and Chung, R.C.P., “Impacts of project team and innovation process on new
product development”, International Journal of Product Lifecycle Management, Vol. 5, Iss. 2-4, pp.224-
241 (2011).
56. Huang, M., Ip, W.H., Jiang, G., Xu, C., and Wang, X., “A two-level framework for the dynamic risk
evaluation of virtual enterprise”, ICIC Express Letters, Vol. 5, Iss. 5, pp.1717-1723 (2011).
57. Xue, F., Chan, C.Y., Ip, W.H., and Cheung, C.F., “A learning-based variable assignment weighting
scheme for heuristic and exact searching in Euclidean traveling salesman problems”, NETNOMICS:
Economic Research and Electronic Networking, Vol. 12, Iss. 3, pp.183-207 (2011).
58. Ip, W.H. and Wang, D.W., “Resilience and friability of transportation networks: evaluation, analysis and
optimization”, IEEE Systems Journal, Vol. 5, No. 2, pp.189-198 (2011).
59. Ip, W.H., Chan, S.L. and Lam, C.Y. “Modeling supply chain performance and stability”, Industrial
Management & Data Systems, Vol. 111, No. 8, pp.1332-1354 (2011).
60. Jiang, Z.Z., Ip, W.H., Lau, H.C.W. and Fan, Z.P., “Multi-objective optimization matching for one-shot
multi-attribute exchanges with quantity discounts in E-brokerage”, Expert Systems with Applications, Vol.
38, No. 4, pp.4169-4180 (2011).
61. Lam, C.Y. and Ip, W.H., “A customer satisfaction inventory model for supply chain integration”, Expert
Systems with Applications, Vol. 38, No. 1, pp.875-883 (2011).
62. Lam, C.Y. and Ip, W.H., “Constraint priority scheduling using an agent-based approach”, Industrial
Management & Data Systems, Vol. 111, No. 1-2, pp.246-263 (2011).
63. Ng, C.K., Wu, C.H., Ip, W.H., Chan, C.Y. and Ho, G.T.S., “A real time quality monitoring system for the
lighting industry: a practical and rapid approach using computer vision and image processing (CVIP)
tools”, International Journal of Engineering Business Management, Vol. 3, No. 4,pp.14-21 (2011).
64. Ting, J.S.L., Tsang, A.H.C., Ip, A.W.H. and Ho, G.T.S., “RF-MediSys: a radio frequency identification-
based electronic medical record system for improving medical information accessibility and services at
point of care”, Health Information Management Journal, Vol. 40, No. 1, pp.25-32 (2011).
65. Ting, S.L., Ip, W.H., Lam, W.H.K. and Ngai, E.W.T., “A PKI-based track and trace network for cross-
boundary container security”, International Journal of Computer Science Issues, Vol. 8, Iss. 5, No. 1,
pp.20-27 (2011).
66. Ting, S.L., Wang, W.M., Tse, Y.K. and Ip, W.H., “Knowledge elicitation approach in enhancing tacit
knowledge sharing”, Industrial Management & Data Systems, Vol. 111, No. 7, pp.1039-1064 (2011).
67. Wu, C.H., Ip, W.H., Kwok, S.K., Ho, G.T.S. and Chan, C.Y., “Design and development of an RFID-
based HIS - A case study”, International Journal of Engineering Business Management, Vol. 3, No. 1,
pp.1-8 (2011).
68. Wu, C.H., Zheng, Y., Ip, W.H., Chan, C.Y., Yung, K.L. and Lu, Z.M., “A flexible H.264/AVC
compressed video watermarking scheme using particle swarm optimization based dither modulation”,
AEU - International Journal of Electronics and Communications, Vol. 65, No. 1, pp.27-36 (2011).
2015-Jul
69. Wu, C.H., Zheng, Y., Ip, W.H., Lu, Z.M., Chan, C.Y. and Yung, K.L., “Effective hill climbing algorithm
for optimality of Robust watermarking in digital images”, Information Technology Journal, Vol. 10, No. 2,
pp.246-256 (2011).
70. Zou, K.S., Chan, C.K., Peng, S.X., Ip, W.H. and Chen, Z.Q., “Efficient 3D model retrieval by using
symmetrical depth images”, ICIC Express Letters, Part B: Applications: An International Journal of
Research and Surveys, Vol. 5, No. 8, pp.2889-2894 (2011).
71. Zou, K.S., Chen, Z.Q. and Ip, W.H., “3D model retrieval method by using fractal D2 distribution”,
Electronics Letters, Vol. 47, No. 14, pp.796-797 (2011).
72. Zou, K.S., Ip, W.H., Wu, C.H., Chan, C.Y., Yung, K.L. and Chen, Z.Q.,“3D model retrieval approach by
using fuzzy shape distributions”, Scientific Research and Essays, Vol. 6, No. 20, pp.4330-4340 (2011).
73. Zou, K.S., Wu, C.H., Ip, W.H., Chan, C.Y., Yung, K.L. and Chen, Z.Q., “A novel 3D model retrieval
approach based on model-partitioning and fuzzy relevance feedback”, Advanced Materials Research, Vol.
143-144, pp.186-190 (2011).
74. Peng, S.X., Chan, C.K., Peng, S.X., Ip, W.H., and Chen, Z.Q., “Waist-hip section surface profile data
automatic analysing system: WHS”, International Journal of Human Factors Modelling and Simulation, Vol. 2, No. 4, pp.267-275 (2011).
Year 2010
75. Chan, S.L. and Ip, W.H., “A Scorecard-Markov model for new product screening decisions”, Industrial
Management & Data Systems, Vol. 110, No. 7, pp.971-992 (2010).
76. Chan, S.L., Ip, W.H. and Cho, V., “A model for predicting customer value from perspectives of product
attractiveness and marketing strategy”, Expert Systems with Applications, Vol. 37, No. 2, pp.1207-1215
(2010).
77. Chen, Z.Q., Ip, W.H., Chan, C.Y. and Yung, K.L., “Two-level chaos-based video cryptosystem on H.263
codec”, Nonlinear Dynamics, Vol. 62, No. 3, pp.647-664 (2010).
78. Dong, H.Y., Huang, M., Ip, W.H. and Wang, X.W., “On the integrated charge planning with flexible jobs
in primary steelmaking processes”, International Journal of Production Research, Vol. 48, No. 21,
pp.6499-6535 (2010).
79. Tang, J.F., Kong, Y., Lau, H., and Ip, W.H., “A note on "efficient feasibility testing for dial-a-ride
problems", Operation Research Letter, Vol. 38, Iss. 5, pp.405-407 (2010).
80. Wang, D.W., and Ip, W.H., “Evaluation and analysis of resilience and frangibility for transportation
networks”, Control Theory and Applications, Vol. 27, Iss. 7, pp.849-854 (2010). (in Chinese)
81. Zhan, Z.H., Zhang, J., Li, Y., Liu, O., Kwok, S.K., Ip, W.H., and Kaynak, O., “An efficient ant colony
system based on receding horizon control for the aircraft arrival sequencing and scheduling problem”,
IEEE Transactions on Intelligent Transportation Systems, Vol. 11, Iss. 2, pp.399-412 (2010).
82. Ip, W.H., Cho, V., Chung, N. and Ho, G., “A multi agent based model for airport service planning”,
International Journal of Engineering Business Management, Vol. 2, No. 2, pp.93-100 (2010).
83. Ip, W.H., Chung, N. and Ho, G., “Using integer programming for airport service planning in staff
scheduling”, International Journal of Engineering Business Management, Vol.2, No.2, pp.85-92 (2010).
84. Lau, H.C.W., Jiang, Z.Z., Ip, W.H. and Wang, D.W., “A credibility-based fuzzy location model with
Hurwicz criteria for the design of distribution systems in B2C e-commerce”, Computers & Industrial
Engineering, Vol. 59, No. 4, pp.873-886 (2010).
85. Lei, Y.Q., Chau, K.Y., Lu, Z.M. and Ip, W.H., “DCT-domain global feature and DWT-domain least-
squares line fitting based local feature for robust image hashing”, International Journal of Innovative
Computing, Information and Control, Vol. 6, No. 6, pp.2513-2521 (2010).
86. Tang, J.F., Kong, Y.A., Lau, H. and Ip, A.W.H., “A note on ‘Efficient feasibility testing for dial-a-ride
problems’”, Operations Research Letters, Vol. 38, No. 5, pp.405-407 (2010).
87. Wang, H.F., Yang, S.X., Ip, W.H. and Wang, D.W., “A particle swarm optimization based memetic
algorithm for dynamic optimization problems”, Natural Computing, Vol. 9, No. 3, pp.703-725 (2010).
88. Wang, J.W., Gao, F. and Ip, W.H., “Measurement of resilience and its application to enterprise
information systems”, Enterprise Information Systems, Vol. 4, No. 2, pp.215-223 (2010).
2015-Jul
89. Wang, J.W., Ip, W.H. and Zhang, W.J., “An integrated road construction and resource planning approach
to the evacuation of victims from single source to multiple destinations”, IEEE Transactions on Intelligent
Transportation Systems, Vol. 11, No. 2, pp.277-289 (2010).
90. Wang, L.X., Kwok, S.K. and Ip, W.H., “A radio frequency identification and sensor-based system for the
transportation of food”, Journal of Food Engineering, Vol. 101, No. 1, pp.120-129 (2010).
91. Wu, C.H., Dong, N., Ip, W.H., Chan, C.Y., Yung, K.L. and Chen, Z.Q., “Chaotic Hybrid Algorithm and
its application in circle detection”, Lecture Notes in Computer Science, Vol. 6024, pp.302-311 (2010).
92. Wu, C.H., Ip, W.H., Chan, C.Y., Zheng, Y. and Lu, Z.M., “A case study on multimedia e-tailing services:
can watermarks help build customer relationships?”, International Journal of Services, Technology and
Management, Vol. 14, No. 1, pp.58-76 (2010).
93. Wu, W.J., Chen, Z.Q. and Ip, W.H., “Complex nonlinear dynamics and controlling chaos in a Cournot
duopoly economic model”, Nonlinear Analysis: Real World Applications, Vol. 11, No. 5, pp.4363-4377
(2010).
94. Zhan, Z.H., Zhang, J., Li, Y., Liu, O., Kwok, S.K., Ip, W.H. and Kaynak, O., “An efficient ant colony
system based on receding horizon control for the aircraft arrival sequencing and scheduling problem”,
IEEE Transactions on Intelligent Transportation Systems, Vol. 11, No. 2, pp.399-412 (2010).
Year 2009
95. Chan, C.K., Chan, Y.Y. and Ip, W.H., “Authentic knowledge management: the integration of an
organisation’s environment and the autopoietic characteristics of knowledge agents”, International
Journal of Knowledge and Learning, Vol. 5, No. 1, pp.14-25 (2009).
96. Chau, K.Y., Liu, S.B. and Ip, W.H., “Enhancing enterprise information integration using Six Sigma”,
Total Quality Management & Business Excellence, Vol. 20, No. 5, pp.537-546 (2009). (Formerly known
as: Total Quality Management before 2003)
97. Cho, V., Wu, G.P.K. and Ip, W.H., “An aircraft service staff rostering using a hybrid GRASP algorithm”,
International Journal of Engineering Business Management, Vol. 1, No. 2, pp.13-18 (2009).
98. Chung, R.C.P., Ip, W.H. and Chan, S.L., “An ARIMA-Intervention analysis model for the financial crisis
in China's manufacturing industry”, International Journal of Engineering Business Management, Vol. 1,
No. 1, pp.15-18 (2009).
99. Tan, Y., Wang, D.Z., Wang, D.W., Ip, W.H., and Wang, H.F., “Single machine group scheduling
problems with the effects of deterioration and learning”, Acta Automatica Sinica, Vol. 35, Iss. 10,
pp.1290-1295 (2009).
100. Chung, R.C.P., Ip, W.H. and Chan, S.L., “Impacts of the overheating economy on China's manufacturing
industry”, International Journal of Advanced Manufacturing Technology, Vol. 43, No. 11/12, pp.1133-
1143 (2009).
101. Chung, S.H., Lau, H.C.W., Ho, G.T.S. and Ip, W.H., “Optimization of system reliability in multi-factory
production networks by maintenance approach”, Expert Systems with Applications, Vol. 36, No. 6,
pp.10188-10196 (2009).
102. Lin, F.Q., Chen, B.C., Chan, C.Y., Wu, C.H., Ip, W.H., Mai, A., Wang, H.Y. and Liu, W.H., “The design
of a lightweight RFID middleware”, International Journal of Engineering Business Management, Vol. 1,
No. 2, pp. 73-78 (2009).
103. Lam, C.Y., Ip, W.H. and Lau, C.W., “A business process activity model and performance measurement
using a time series ARIMA intervention analysis”, Expert Systems with Applications, Vol. 36, No. 3, Part
2, pp.6986-6994 (2009).
104. Liu, L.L., Wang, D.W. and Ip, W.H., “A permutation-based dual genetic algorithm for dynamic
optimization problems”, Soft Computing, Vol. 13, No. 7, pp.725-738 (2009).
105. Ting, S.L., Wu, C.H., Ng, C.K., Ip, W.H. and Kwok, S.K., “Integration of RFID and video watermarking
techniques for enhancing trace-and-track measures for physical assets”, International Journal of
Information Analysis and Processing, Vol. 2, No. 2, pp.47-53 (2009).
106. Wang, D.W. and Ip, W.H., “Evaluation and analysis of logistic network resilience with application to
aircraft servicing”, IEEE Systems Journal, Vol. 3, No. 2, pp.166-173 (2009).
2015-Jul
107. Wang, D.W., Fung, R.Y.K. and Ip, W.H., “An immune-genetic algorithm for introduction planning of
new products”, Computers & Industrial Engineering, Vol. 56, No. 3, pp.902-917 (2009).
108. Wang, H.F., Yang, S.X., Ip, W.H. and Wang, D.W., “Adaptive primal-dual genetic algorithms in dynamic
environments”, IEEE Transactions on Systems, Man, and Cybernetics - Part B: Cybernetics, Vol. 39, No.
6, pp.1348-1361 (2009).
109. Wang, L.X., Kwok, S.K., Ip, W.H. and Ng, P.H., “Transportation visualization of perishable products
with an RFID and sensor network”, International Journal of Information Analysis and Processing, Vol. 2,
No. 2, pp.35-42 (2009).
110. Wu, C.H., Dong, N., Ip, W.H., Chen, Z.Q. and Yung, K.L., “Applying Chaotic Particle Swarm
Optimization to the template matching problem”, Lecture Notes in Computer Science, Vol. 5821, pp.411-
421 (2009).
111. Wu, C.H., Wang, D.Z., Ip, A., Wang, D.W., Chan, C.Y. and Wang, H.F., “A particle swarm optimization
approach for components placement inspection on printed circuit boards”, Journal of Intelligent
Manufacturing, Vol. 20, No. 5, pp.535-549 (2009).
112. Wu, C.H., Wong, Y.S., Ip, W.H., Lau, H.C.W., Lee, C.K.M. and Ho, G.T.S., “Modeling the cleanliness
level of an ultrasonic cleaning system by using design of experiments and artificial neural networks”,
International Journal of Advanced Manufacturing Technology, Vol. 41, No. 3-4, pp.287-300 (2009).
113. Wu, C.H., Ip, W.H., and Chan, C.Y., “Real-time distributed vision-based network system for logistics
applications”, International Journal of Intelligent Systems Technologies and Applications, Vol. 6, No. 3-4,
pp.309-322 (2007).
Year 2008
114. Ho, G.T.S., Lau, H.C.W., Lee, C.K.M. and Ip, A.W.H., “Real-time process mining system for supply
chain network: OLAP-based fuzzy approach”, International Journal of Enterprise Network Management,
Vol. 2, No. 1, pp.84-103 (2008).
115. Huang, M., Ip, W.H., Yang, H.M., Wang, X.W. and Lau, H.C.W., “A fuzzy synthetic evaluation
embedded tabu search for risk programming of virtual enterprises”, International Journal of Production
Economics, Vol. 116, No. 1, pp.104-114 (2008).
116. Ip, W.H., Chen, B.C., Lau, H.C.W., Choy, K.L. and Chan, S.L., “Modelling a CRM Markov chain
process using system dynamics”, International Journal of Value Chain Management, Vol. 2, No. 4,
pp.420-435 (2008).
117. Lam, C.Y., Chan, S.L., Ip, W.H., and Lau, C.W., “Collaborative supply chain network using embedded
genetic algorithms”, Industrial Management & Data Systems, Vol. 108, No. 8, pp.1101-1110 (2008).
118. Tam, K.F.D., Chan, C.Y., Ip, W.H. and Tang, C.S.J., “In-house development of low cost automatic IC
workcell for BGA solder ball attachment”, Assembly Automation, Vol. 28, No. 3, pp.255-261 (2008).
119. Wang, D.Z., Wu, C.H., Ip, A., Chan, C.Y. and Wang, D.W., “Fast multi-template matching using a
particle swarm optimization algorithm for PCB inspection”, Lecture Notes in Computer Science, Vol.
4974, pp.365-370 (2008).
120. Wu, C.H., Ip, W.H., Yung, K.L., Lu, Z.M. and Wang, D.Z., “Image compression using SPSO Vector
Quantization”, International Journal of Information Analysis and Processing, Vol. 1, No. 1, pp.33-37
(2008).
121. Zheng, Y., Wu, C.H., Lu, Z.M. and Ip, W.H., “Optimal robust image watermarking based on PSO and
HVS in integer DCT domain”, International Journal of Computer Sciences and Engineering Systems, Vol.
2, No. 4, pp.281-287 (2008).
Year 2007
122. Ho, G.T.S., Lau, H.C.W., Lee, C.K.M. and Ip, A.W.H., “A flexible information management system for
supporting manufacturing activities”, International Journal of Computer Applications in Technology, Vol.
28, No. 2/3, pp.190-194 (2007).
123. Ho, G.T.S., Lee, C.K.M., Lau, H.C.W. and Ip, A.W.H., “An online decision support system for inventory
management”, International Journal of Product Development, Vol. 4, No. 3/4, pp.351-365 (2007).
2015-Jul
124. Huang, M., Ip, W.H., Yung, K.L., Wang, X.W. and Wang, D.W., “Simulation study using system
dynamics for a CONWIP-controlled lamp supply chain”, International Journal of Advanced
Manufacturing Technology, Vol. 32, No. 1-2, pp.184-193 (2007).
125. Liu, S., Yung, K.L., and Ip, W.H., “Genetic local search for resource-constrained project scheduling
under uncertainty”, International Journal of Information and Management Sciences, Vol. 18, Iss. 4,
pp.347-363 (2007).
126. Ip, W.H., Huang, M., Yung, K.L., Wang, D.W. and Wang, X.W., “CONWIP based control of a lamp
assembly production line”, Journal of Intelligent Manufacturing, Vol. 18, No. 2, pp.261-271 (2007).
127. Tang, J.F., Yung, K.L., Ip, A.W.H. and Liu, S.X., “Synchronized production and transportation planning
using subcontracted vehicles in a production-distribution network”, Transportation Planning and
Technology, Vol. 30, No. 2-3, pp.113-146 (2007).
128. Yung, K.L., Ip, W.H. and Wang, D.W., “Soft computing based procurement planning of time-variable
demand in manufacturing systems”, International Journal of Automation & Computing, Vol. 4, No. 1,
pp.80-87 (2007).
Year 2006
129. Ho, G.T.S., Lau, H.C.W., Lee, C.K.M., Ip, A.W.H. and Ho, W., “Design and development of an agent-
based information system for process improvement”, International Journal of Information Technology
and Management, Vol. 5, No. 2-3, pp.134-150 (2006).
130. Ho, G.T.S., Lau, H.C.W., Lee, C.K.M., Ip, A.W.H. and Pun, K.F., “An intelligent production workflow
mining system for continual quality enhancement”, International Journal of Advanced Manufacturing
Technology, Vol. 28, No. 7-8, pp.792-809 (2006).
131. Ho, G.T.S., Lee, C.K.M., Lau, H.C.W. and Ip, A.W.H., “A hybrid intelligent system to enhance logistics
workflow: an OLAP-based GA approach”, International Journal of Computer Integrated Manufacturing,
Vol. 19, No. 1, pp.69-78 (2006).
132. Chan, Y.Y., Chan, C.K., and Ip, W.H., “The employers' perspective on the professional knowledge to
enhance employees' productivity in Hong Kong apparel industry”, Taiwan Textile Research Journal, Vol.
16, Iss. 4, pp.18-28 (2006).
133. Huang, M., Ding, J.Q., Ip, W.H., Yung, K.L., Liu, Z.H. and Wang, X.W., “The research on the optimal
control strategy of a serial supply chain based on GA”, Lecture Notes in Computer Science, Vol. 4221,
pp.657-665 (2006).
134. Ip, W.H., Chen, B.C., Lau, H.C.W. and Liang, B., “A functional framework for integrating eCRM with
workflow management based on customer value”, Tsinghua Science and Technology, Vol. 11, No. 1,
pp.65-73 (2006).
135. Lau, H.C.W., Ho, G.T.S., Ip, A.W.H., Lee, C.K.M. and Ning, A., “Development of a responsive logistics
workflow system: an OLAP-based hybrid approach”, International Journal of Services, Technology and
Management, Vol. 7, No. 5-6, pp.568-581 (2006).
136. Lau, H.C.W., Lee, C.K.M., Ho, G.T.S., Ip, W.H., Chan, F.T.S. and Ip, R.W.L., “M-commerce to support
the implementation of a responsive supply chain network”, Supply Chain Management: An International
Journal, Vol. 11, No. 2, pp.169-178 (2006).
137. Wang, Y.W., Wang, D.W. and Ip, W.H., “Optimal design of link structure for e-supermarket website”,
IEEE Transactions on Systems, Man, and Cybernetics - Part A: Systems and Humans, Vol. 36, No. 2,
pp.338-355 (2006).
138. Wong, W.K., Kwong, C.K., Mok, P.Y. and Ip, W.H., “Genetic optimization of JIT operation schedules
for fabric-cutting process in apparel manufacture”, Journal of Intelligent Manufacturing, Vol. 17, No. 3,
pp.341-354 (2006).
139. Yung, K.L., Tang, J.F., Ip, A.W.H. and Wang, D.W., “Heuristics for joint decisions in production,
transportation, and order quantity”, Transportation Science, Vol. 40, No. 1, pp.99-116 (2006).
2015-Jul
Year 2005
140. Chen, B.C. and Ip, W.H., “Markov chain customer relationship management model based on the Hopfield
neural network”, Journal of Tsinghua University (Science and Technology), Vol. 45, No. 12, pp.1696-
1699 (2005). (in Chinese)
141. Chen, B.C., Ip, W.H., Li, Y.J. and Sheng, P., “The analyzing and modeling to the customer relationship
chain management”, Systems Engineering - Theory & Practice, Vol. 25, No. 4, pp.42-54 (2005). (in
Chinese)
142. 陳伯成, 葉偉雄, 繩鵬, “應用Markov鏈方法分析銷售策略”, 運籌與管理, 第 14卷, 第 2期, 19-25頁
(2005). // Chen, B.C., Yie, W.X. and Sheng, P., “Applying Markov chain method to analyzing sales
strategies”, Operations Research and Management Science, Vol. 14, No. 2, pp.19-25 (2005). (in Chinese)
143. Cheung, A., Ip, W.H. and Lu, D.W., “Expert system for aircraft maintenance services industry”, Journal
of Quality in Maintenance Engineering, Vol. 11, No. 4, pp.348-358 (2005).
144. Cheung, A., Ip, W.H., Lu, D.W. and Lai, C.L., “An aircraft service scheduling model using genetic
algorithms”, Journal of Manufacturing Technology Management, Vol. 16, No. 1, pp.109-119 (2005).
(Formerly known as: Integrated Manufacturing Systems before 2004)
145. Ho, G.T.S., Lau, H.C.W., Lee, C.K.M. and Ip, A.W.H., “An intelligent forward quality enhancement
system to achieve product customization”, Industrial Management & Data Systems, Vol. 105, No. 3,
pp.384-406 (2005).
146. Ip, W.H., Huang, M., Yung, K.L., Kwong, C.K. and Wang, D., “A model of production line flexible
combination for one of a kind product”, Annual Journal of IIE (HK), Vol. 25, pp.26-34 (2005).
147. Lau, H.C.W., Lee, C.K.M., Ip, W.H., Chan, F.T.S. and Leung, R.W.K., “Design and implementation of a
process optimizer: a case study on monitoring molding operations”, Expert Systems, Vol. 22, No. 1,
pp.12-21 (2005).
148. Lau, H.C.W., Ning, A., Pun, K.F., Chin, K.S. and Ip, W.H., “A knowledge-based system to support
procurement decision”, Journal of Knowledge Management, Vol. 9, No. 1, pp.87-100 (2005).
149. Lee, C.K.M., Lau, H.C.W., Yu, K.M. and Ip, W.H., “A generic model to support rapid product
development: an XML schema approach”, International Journal of Product Development, Vol. 1, No. 3/4,
pp.323-340 (2005).
150. Lee, C.K.M., Lau, H.C.W., Yu, K.M. and Ip, W.H., “Enhancement of product development through
product information mark-up language”, Journal of Engineering Design, Vol. 16, No. 1, pp.91-110 (2005).
151. Wang, D.W. and Ip, W.H., “Ant search based control optimisation strategy for a class of chaotic system”,
International Journal of Systems Science, Vol. 36, No. 15, pp.951-959 (2005).
152. Wang, Q., Yung, K.L. and Ip, W.H., “An order dispatcher for dispersed manufacturers solved by a mixed-
variable hybrid genetic algorithm”, International Journal of Computer Integrated Manufacturing, Vol. 18,
No. 1, pp.41-52 (2005).
153. Wong, W.K., Kwong, C.K., Mok, P.Y., Ip, W.H. and Chan, C.K., “Optimization of manual fabric-cutting
process in apparel manufacture using genetic algorithms”, International Journal of Advanced
Manufacturing Technology, Vol. 27, No. 1-2, pp.152-158 (2005).
Year 2004
154. Chen, B.C., Ip, W.H., Zhou, Y.B. and Liang, B., “The integrated process model analysis on an extended
ERP software for MSE”, Systems Engineering - Theory & Practice, Vol. 24, No. 7, pp.38-45,110 (2004).
(in Chinese)
155. Liu, Y.Q., Zhang, Y., Wang, D.W., and Ip, W.H., “Model and algorithm of reliability evaluation for
complex device networks”, Journal of Northeastern University, Vol. 25, Iss. 6, pp. 539-542 (2004).
156. Ho, G.T.S., Lau, H.C.W., Ip, W.H. and Ning, A., “An intelligent information infrastructure to support the
streamlining of integrated logistics workflow”, Expert Systems, Vol. 21, No. 3, pp.123-137 (2004).
157. Ip, W.H. and Chen, B., “An enterprise model and the organisation of ERP”, International Journal of
Computer Applications in Technology, Vol. 21, No. 3, pp.79-86 (2004).
2015-Jul
158. Ip, W.H., Chen, B.C., Lau, H. and Sunjing, W.Q., “An object-based relational data base system using re-
configurable finance and material objects”, Journal of Manufacturing Technology Management, Vol. 15,
No. 8, pp.779-786 (2004). (Formerly known as: Integrated Manufacturing Systems before 2004)
159. Ip, W.H., Lai, C.L. and Lau, C.W., “A web-based training model of enterprise resources planning for the
manufacturing industry”, International Journal of Engineering Education, Vol. 20, No. 5, pp.733-741
(2004).
160. Ip, W.H., Yung, K.L. and Wang, D.W., “A branch and bound algorithm for sub-contractor selection in
agile manufacturing environment”, International Journal of Production Economics, Vol. 87, No. 2,
pp.195-205 (2004).
161. Lau, H.C.W., Ning, A., Ip, W.H. and Choy, K.L., “A decision support system to facilitate resources
allocation: an OLAP-based neural network approach”, Journal of Manufacturing Technology
Management, Vol. 15, No. 8, pp.771-778 (2004). (Formerly known as: Integrated Manufacturing Systems
before 2004)
162. Tang, J.F., Yung, K.L. and Ip, A.W.H., “Heuristics-based integrated decisions for logistics network
systems”, Journal of Manufacturing Systems, Vol. 23, No. 1, pp.1-13 (2004).
163. Wang, Q., Yung, K.L. and Ip, W.H., “A hierarchical multi-view modeling for Networked Joint
Manufacturing System”, Computers in Industry, Vol. 53, No. 1, pp.59-73 (2004).
164. Lau, H.C.W., Lee, C.K.M., Choy, K.L., Ip, W.H., Chan, F.T.S., and Ip, R.W.L., “Implementation of
logistics information system to support reverse logistics: a case study”, International Journal of Logistics
Systems and Management, Vol. 1, No. 1, pp. 1742-7967 (2004).
Year 2003
165. Chan, W.M., Chan, C.Y. and Ip, W.H., “A heuristic algorithm for machine assignment in cellular layout”,
Computers & Industrial Engineering, Vol. 44, No. 1, pp.49-73 (2003).
166. Cheung, A.H.W., Lu, D.W. and Ip, W.H., “Integrated management decision support system for aircraft
maintenance services industry”, Annual Journal of IIE (HK), Vol. 24, pp.11-15 (2003).
167. Fung, R.Y.K., Au, A.Y.M. and Ip, A.W.H., “Petri Net-based workflow management systems for in-
process control in a plastic processing plant”, Journal of Materials Processing Technology, Vol. 139, No.
1-3, pp.302-309 (2003).
168. Ip, W.H., Chan, J.S.F. and Choi, A.C.K., “An integrated problem-based learning model for engineering
education”, International Journal of Engineering Education, Vol. 19, No. 5, pp.734-737 (2003).
169. Ip, W.H., Huang, M., Yung, K.L. and Wang, D.W., “Genetic algorithm solution for a risk-based partner
selection problem in a virtual enterprise”, Computers & Operations Research, Vol. 30, No. 2, pp.213-231
(2003).
170. Keung, K.W., Ip, W.H. and Yuen, D., “An intelligent hierarchical workstation control model for FMS”,
Journal of Materials Processing Technology, Vol. 139, No. 1-3, pp.134-139 (2003).
171. Lai, C.L., Lee, W.B. and Ip, W.H., “A study of system dynamics in just-in-time logistics”, Journal of
Materials Processing Technology, Vol. 138, No. 1-3, pp.265-269 (2003).
172. Ng, J.K.C. and Ip, W.H., “Web-ERP: the new generation of enterprise resources planning”, Journal of
Materials Processing Technology, Vol. 138, No. 1-3, pp.590-593 (2003).
173. Wang, D.W., Ip, W.H. and Yung, K.L., “Advertising strategy analysis for enterprise in duopoly”, Control
Engineering of China, Vol. 10, No. 1, pp.29-32 (2003). (in Chinese)
174. Chen, B.C., Ip, W.H., Sun, J., and Wang, Q., “ERP software for simplified process integration model”,
Journal of Tsinghua University (Science and Technology), Vol. 43, No. 6, pp. 721-724, 728 (2003).
175. Chen, B.C., Ip, W.H., Sun, J., and Wang, Q., “Analysis and modeling on ERP software process model”,
Computer Integrated Manufacturing Systems-Beijing, Vol. 9, No. 3, pp.224-230 (2003).
Year 2002
176. Chan, D.C.K., Yung, K.L. and Ip, A.W.H., “An application of fuzzy sets to process performance
evaluation”, Integrated Manufacturing Systems, Vol. 13, No. 4, pp.237-246 (2002). (Currently known as:
Journal of Manufacturing Technology Management since 2004)
2015-Jul
177. Chan, Y.K., Gaffney, P., Neailey, K. and Ip, W.H., “Achieving breakthrough performance improvement:
results of implementing a fit-for-purpose total management system”, The TQM Magazine, Vol. 14, No. 5,
pp.293-296 (2002). (Currently known as: The TQM Journal since 2008)
178. Chan, Y.K., Kam, J., Neailey, K. and Ip, W.H., “How IMS can achieve ISO 9001:2000 certification”, The
TQM Magazine, Vol. 14, No. 6, pp.345-349 (2002). (Currently known as: The TQM Journal since 2008)
179. Fung, R.Y.K., Tam, W.T., Ip, A.W.H. and Lau, H.C.W., “Software process improvement strategy for
enterprise information systems development”, International Journal of Information Technology and
Management, Vol. 1, No. 2-3, pp.225-241 (2002).
180. Ip, W.H. and Chen, B.C., “Organisation structure and enterprise modelling in ERP realisation”,
International Journal of Networking and Virtual Organisations, Vol. 1, No. 2, pp.170-183 (2002).
181. Ip, W.H., Chau, K.Y. and Chan, S.F., “Implementing ERP through continuous improvement”,
International Journal of Manufacturing Technology and Management, Vol. 4, No. 6, pp.465-478 (2002).
182. Ip, W.H., Yung, K.L., Huang, M. and Wang, D.W., “A CONWIP model for FMS control”, Journal of
Intelligent Manufacturing, Vol. 13, No. 2, pp.109-117 (2002).
183. Kwong, C.K., Ip, W.H. and Chan, J.W.K., “Combining scoring method and fuzzy expert systems
approach to supplier assessment: a case study”, Integrated Manufacturing Systems, Vol. 13, No. 7,
pp.512-519 (2002). (Currently known as: Journal of Manufacturing Technology Management since 2004)
184. Wang, C.Y., Wang, D.W., Ip, W.H. and Yuen, D.W., “The single machine ready time scheduling problem
with fuzzy processing times”, Fuzzy Sets and Systems, Vol. 127, No. 2, pp.117-129 (2002).
185. Wang, D.W., Yung, K.L. and Ip, W.H., “Partner selection model and soft computing approach for
dynamic alliance of enterprises”, Science in China Series F: Information Sciences, Vol. 45, No. 1, pp.68-
80 (2002). (Currently known as: Science China - Information Sciences)
186. Chen, B.C., and Ip, W.H., “Organization Structure in ERP and Analysis of BPR Realization”, Computer
Integrated Manufacturing Systems-Beijing, Vol. 8, No. 5, pp.404-408 (2002).
187. Cheung, A., Ip, W.H., Lai, A., and Cheung, E., “An optimization model for aircraft service logistics”,
Journal of Xiamen University (Natural Science), Vol. 41, No. S1, pp.252 (2002).
Year 2001
188. 陳伯成, 葉偉雄, “對實施 ERP 項目人員的思考”, 軟科學, 第 15 卷, 第 6 期, 82-85,90 頁 (2001). //
Chen, B.C. and Yie, W.X., “Thoughts on who should implement ERP projects”, Soft Science, Vol. 15, No.
6, pp.82-85,90 (2001). (in Chinese)
189. Keung, K.W., Ip, W.H. and Chan, C.Y., “An enhanced MPS solution for FMS using GAs”, Integrated
Manufacturing Systems, Vol. 12, No. 5, pp.351-359 (2001). (Currently known as: Journal of
Manufacturing Technology Management since 2004)
190. Keung, K.W., Ip, W.H. and Lee, T.C., “A genetic algorithm approach to the multiple machine tool
selection problem”, Journal of Intelligent Manufacturing, Vol. 12, No. 4, pp.331-342 (2001).
191. Keung, K.W., Ip, W.H. and Lee, T.C., “The solution of a multi-objective tool selection model using the
GA approach”, International Journal of Advanced Manufacturing Technology, Vol. 18, No. 11, pp.771-
777 (2001).
192. Lai, C.L., Ip, W.H. and Lee, W.B., “The system dynamics model for engineering services”, Managing
Service Quality, Vol. 11, No. 3, pp.191-199 (2001).
193. Ng, K.C. and Ip, W.H., “A model for global manufacturing excellence”, Work Study, Vol. 50, No. 2,
pp.63-68 (2001). (Currently known as: International Journal of Productivity and Performance
Management since 2004)
194. Wang, D.W., Yung, K.L. and Ip, W.H., “A heuristic genetic algorithm for subcontractor selection in a
global manufacturing environment”, IEEE Transactions on Systems, Man, and Cybernetics - Part C:
Applications and Reviews, Vol. 31, No. 2, pp.189-198 (2001).
195. Wong, W.K., Chan, C.K. and Ip, W.H., “A hybrid flowshop scheduling model for apparel manufacture”,
International Journal of Clothing Science and Technology, Vol. 13, No. 2, pp.115-131 (2001).
2015-Jul
196. Wong, W.K., Chan, C.K., Ip, W.H. and Huang, M., “Evaluation of optimum combinations of spreading
and cutting machines in a garment factory”, International Journal of Advanced Manufacturing
Technology, Vol. 18, No. 1, pp.62-66 (2001).
Year 2000
197. Chan, Y.K., Brown, M., Neailey, K. and Ip, W.H., “One-stop-shop information mall – MTR’s
experience”, Managing Service Quality, Vol. 10, No. 2, pp.92-97 (2000).
198. Ip, W.H., Kwong, C.K. and Fung, R., “Design of maintenance system in MRPII”, Journal of Quality in
Maintenance Engineering, Vol. 6, No. 3, pp.177-191 (2000).
199. Ip, W.H., Lee, K.C., Yung, K.L. and Yam, R., “SCADA in an integrated maintenance management
system”, Journal of Quality in Maintenance Engineering, Vol. 6, No. 1, pp.6-19 (2000).
200. Ip, W.H., Li, Y., Man, K.F. and Tang, K.S., “Multi-product planning and scheduling using genetic
algorithm approach”, Computers & Industrial Engineering, Vol. 38, No. 2, pp.283-296 (2000).
201. Lee, A.K.C., Ip, W.H. and Yung, K.L., “Inheritance and polymorphism in real-time monitoring and
control systems”, Journal of Intelligent Manufacturing, Vol.11, No.3, pp.285-294 (2000).
202. Li, Y., Man, K.F., Tang, K.S., Kwong, S. and Ip, W.H., “Genetic algorithm to production planning and
scheduling problems for manufacturing systems”, Production Planning & Control, Vol. 11, No. 5,
pp.443-458 (2000).
203. Tam, S.M., Kwong, C.K. and Ip, W.H., “A hybrid artificial intelligence system for optical lens design”,
International Journal of Computer Applications in Technology, Vol. 13, No. 3/4/5, pp.229-236 (2000).
204. Wang, D.W., Tang, Z.W., Ip W.H. and Fung, R.Y.K., “A human-computer interactive approach based on
activity-section analysis for BPR”, Production Planning & Control, Vol. 11, No. 8, pp.789-796 (2000).
205. Wong, W.K., Chan, C.K. and Ip, W.H., “Effects of spreading-table quantities on the spreading-table
planning of computerized fabric-cutting system”, Research Journal of Textile and Apparel, Vol. 4, No. 1,
pp.25-36 (2000).
206. Ng, J.K.C., and Ip, W.H., “The strategic design and development of ERP and RTMS”, International
Journal of Computer Applications in Technology, Vol. 13, Iss. 3-5, pp.138-150 (2000).
207. Wong, W.K., Chan, C.K. and Ip, W.H., “Optimization of spreading and cutting sequencing model in
garment manufacturing”, Computers in Industry, Vol. 43, No. 1, pp.1-10 (2000).
Year 1999
208. Chan, D.C.K., Yung, K.L. and Ip, W.H., “The implementation of a model for integration of MRP II and
TQM”, Integrated Manufacturing Systems, Vol. 10, No. 5, pp.298-305 (1999). (Currently known as:
Journal of Manufacturing Technology Management since 2004)
209. Choi, C.K. and Ip, W.H., “A comparison of MTM and RTM”, Work Study, Vol. 48, No. 2, pp.57-61
(1999). (Currently known as: International Journal of Productivity and Performance Management since
2004)
210. Fung, R.Y.K., Law, D.S.T. and Ip, W.H., “Design targets determination for inter-dependent product
attributes in QFD using fuzzy inference”, Integrated Manufacturing Systems, Vol. 10, No. 6, pp.376-383
(1999). (Currently known as: Journal of Manufacturing Technology Management since 2004)
211. Ip, W.H., “ERP re-engineering”, Plastic Network, Vol. 6, pp.36-40 (1999). (in Chinese)
212. Ip, W.H., Chau, K.Y. and Yam, R.C.M., “Enhancing manufacturing information management through
TQM”, Logistics Information Management, Vol. 12, No. 4, pp.315-324 (1999). (Currently known as:
Journal of Enterprise Information Management since 2004)
213. Ip, W.H., Fung, R. and Keung, K.W., “An investigation of stochastic analysis of flexible manufacturing
systems simulation”, International Journal of Advanced Manufacturing Technology, Vol. 15, No. 4,
pp.244-250 (1999).
214. Ip, W.H., Ng, K.C., Lee, T.C. and Tseng, C., “Manufacturing integration: a systems engineering
perspective”, International Journal of Business Performance Management, Vol. 1, No. 3, pp.265-278
(1999).
2015-Jul
215. Keung, K.W. and Ip, W.H., “The application of GA in FMS tool selection problem”, CIRP Journal of
Manufacturing Systems, Vol. 29, No. 3, pp.225-227 (1999).
216. Ng, J.K.C., Ip, W.H. and Lee, T.C., “A paradigm for ERP and BPR integration”, International Journal of
Production Research, Vol.37, No.9, pp.2093-2108 (1999).
217. Tseng, H.C., Ip, W.H. and Ng, K.C., “A model for an integrated manufacturing system implementation in
China: a case study”, Journal of Engineering and Technology Management, Vol. 16, No. 1, pp.83-101
(1999).
218. Wang, W., Wang, D.W. and Ip, W.H., “JIT production planning approach with fuzzy due date for OKP
manufacturing systems”, International Journal of Production Economics, Vol. 58, No. 2, pp.209-215
(1999).
219. Wong, W.K., Chan, C.K. and Ip, W.H., “Optimization of using computer cutting system in the garment
industry”, Textile Asia: the Asian Textile & Apparel Monthly, Vol. 30, No. 1, pp.29-31 (1999).
220. Yip, W.M., Man, H.C. and Ip, W.H., “Optimisation of Nd-YAG laser welding of superduplex stainless
steel by parameter design”, Science and Technology of Welding and Joining, Vol. 4, No. 4, pp.226-232
(1999).
Year 1998
221. Chan, Y.K. and Ip, W.H., “A methodology for integrated management system”, Transactions of Nanjing
University of Aeronautics & Astronautics, Vol. 5, No. 1, pp.111-115 (1998).
222. Chan, Y.K., Gaffney, P., Neailey, K. and Ip, W.H., “The establishment of an integrated management
system - a paradigm for railway engineering management”, The TQM Magazine, Vol. 10, No. 6, pp.420-
424 (1998). (Currently known as: The TQM Journal since 2008)
223. Chan, Y.K., Neailey, K. and Ip, W.H., “ISO9004-2 quality management system - the way to world-class
service”, Managing Service Quality, Vol. 8, No. 6, pp.395-401 (1998).
224. Tang, J.F., Wang, D.W., Ip, A., and Fung, R.Y.K., “A hybrid genetic algorithm for a type of nonlinear
programming problem”, Computers & Mathematics with Applications, Vol. 36, Iss. 5, pp.11-21 (1998).
225. Huang, M., Wang, D.W. and Ip, W.H., “A simulation and comparative study of the CONWIP, Kanban
and MRP production control systems in a cold rolling plant”, Production Planning & Control, Vol. 9, No.
8, pp.803-812 (1998).
226. Huang, M., Wang, D.W. and Ip, W.H., “Simulation study of CONWIP for a cold rolling plant”,
International Journal of Production Economics, Vol. 54, No. 3, pp.257-266 (1998).
227. Ip, W.H. and Kam, K.W., “An education and training model for manufacturing resources planning”,
International Journal of Engineering Education, Vol. 14, No. 4, pp.248-256 (1998).
228. Ip, W.H. and Yam, R.C.M., “The successful implementation of MRPII via a hierarchical modelling
approach”, Logistics Information Management, Vol. 11, No. 3, pp.160-170 (1998). (Currently known as:
Journal of Enterprise Information Management since 2004)
229. Ip, W.H., “Manufacturing integration strategy using MRP II and RTMs: a case study in South China”,
Integrated Manufacturing Systems, Vol. 9, No. 1, pp.41-49 (1998). (Currently known as: Journal of
Manufacturing Technology Management since 2004)
230. Li, Y., Ip, W.H. and Wang, D.W., “Genetic algorithm approach to earliness and tardiness production
scheduling and planning problem”, International Journal of Production Economics, Vol. 54, No. 1,
pp.65-76 (1998).
231. Li, Y., Wang, D.W. and Ip, W.H., “Earliness/Tardiness production scheduling and planning, and
solutions”, Production Planning & Control, Vol. 9, No. 3, pp.275-285 (1998).
232. Ng, J.K.C. and Ip, W.H., “The strategic design and development of ERP and RTMS”, Computers &
Industrial Engineering, Vol. 34, No. 4, pp.777-791 (1998).
233. Ng, J.K.C., Ip, W.H. and Lee, T.C., “The development of an enterprise resources planning system using a
hierarchical design pyramid”, Journal of Intelligent Manufacturing, Vol. 9, No. 5, pp.385-399 (1998).
234. Tang, J.F., Wang, D.W., Ip, A. and Fung, R.Y.K., “A hybrid genetic algorithm for a type of nonlinear
programming problem”, Computers & Mathematics with Applications, Vol. 36, No. 5, pp.11-21 (1998).
2015-Jul
235. Yung, K.L., Ip, A.W.H. and Chan, D.C.K., “A mechanism for the integration of TQM and MRPII”,
Computer Integrated Manufacturing Systems, Vol. 11, No. 4, pp.291-296 (1998). (Incorporated into
Robotics and Computer-Integrated Manufacturing since 1999)
Year 1997
236. Ip, W.H., “An integrated curriculum for engineering management education in Hong Kong and China”,
AEESEAP Journal of Engineering Education, Vol. 26, No. 1-2, pp.3-7 (1997).
237. Ip, W.H., “Rule-based ARIMA models for FMS”, Journal of Materials Processing Technology, Vol. 66,
No. 1-3, pp.240-243 (1997).
238. Lo, Y.F., Ip, W.H. and Yung, K.L., “A structural approach to the development and implementation of
MRPII”, Journal of The Institution of Engineers, Singapore, Vol. 37, No. 4, pp.56-67 (1997).
2015-Jul
(b) Conference Papers
Year 2014
1. Wu, C.H., Ng, C.K., Leung, P.P.L., Lau W.Y., Ho. G.T.S., and Ip, W.H., “Design of a EHS module for an
intelligent automobile parking platform”, In: Proceedings of the 2014 Second International Conference on
Enterprise Systems, Shanghai, China, 2-3 August, pp.184-189 (2014).
2. Ng, C.K., Wu, C.H., Wang, L.X., Ip, W.H., and Zhang, J., “A RFID-enabled Wireless Sensor Network
(WSN) monitoring system for biological and pharmaceutical products”, In: Proceedings of the 2014
International Symposium on Computer, Consumer and Control, Taichung, Taiwan, 10-12 June, pp.757 –
760 (2014).
3. Wu, C.H., Ho, G.T.S., Tseng, K.K., Ip, W.H., and Mou, W.L., “Studying learning performance using a m-
learning approach”, In: 2014 The Forth National Conference on Web Intelligence and Applications,
PengHu, Taiwan, 2-3 May, IS15-04 (2014). (in CD-ROM Format)
Year 2013
4. Wu, H., Huang, M., Cho, V., Ip, W.H., and Wang, X., “Due-date assignment on a single machine
scheduling problem with nonlinear deterioration function”, In: Proceedings of 2013 International
Conference on Intelligent System, Applied Materials and Control Technology, Taiyuan, Shanxi, China; 13
- 15 January 2013, pp. 280-284 (2013).
5. Jiang, H., Kwong, C.K., Law, M.C., and Ip, W.H., “Development of customer satisfaction models for
affective design using rough set and ANFIS approaches”, In: Proceedings of 17th International
Conference in Knowledge Based and Intelligent Information and Engineering Systems, Kitakyushu, Japan,
9 - 11 September 2013, pp.104-112 (2013).
6. Wang, D., and Ip, W.H., “Review on modeling and optimization problems about RFID technology and
applications”, In: Proceedings of 25th Chinese Control and Decision Conference, Guiyang, China, 25 - 27
May 2013, pp.1258-1263 (2013).
7. Ng, C.K., Wu, C.H., Wei, Y.F., Ip, W.H., Chen, Z.Q. and Zhang, J., “Optimal energy consumption in
wireless sensor networks using a PSO-based approach”, In: Proceedings of 2013 Conference on
Information Technology and Applications in Outlying Islands, Kinmen, Taiwan and Xiamen, China, 24-
26 May, pp.1086-1090 (2013).
Year 2012
8. Chan, Y.Y., Chan, C.K. and Ip, W.H., “Knowledge agent formation for organizational learning: A
multiple-case study in a stochastic demand industry”, In: Proceedings of 5th Annual EuroMed Conference
of the EuroMed Academy of Business: Building New Business Models for Success through
Competitiveness and Responsibility, Montreux, Switzerland, 4-5 October, pp.279-288 (2012).
9. Chan, C.Y., Xue, F., Ip, W.H., and Cheung, C.F., “A hyper-heuristic inspired by pearl hunting”, In:
Proceedings of 6th International Conference on Learning and Intelligent Optimization, Paris, France, 16 -
20 January 2012, pp.349-353 (2012).
Year 2011
10. Ng, K.K.W., Lau, W.S., Ip, W.H., Ting, S.L. and Lam, H.K., “Intelligent cabinet with automatic
adjustment by mean of radio frequency identification”, In: Supplementary Proceedings of the 14th
International Manufacturing Conference in China, Tianjin, China, 13-15 October, pp.6-10 (2011).
11. Ting, S.L., Tsang, A.H.C. and Ip, W.H., “COHEALS: A context-aware healthcare learning system for
medical equipments usage education”, In: Proceedings of the 5th International Technology, Education and
Development Conference (INTED 2011), Valencia, Spain, 7-9 March, pp. 001928-001932 (2011)
2015-Jul
12. Peng, S.X., Chan, C.K., Ip, W.H. and Luximon, A., “3D parametric body model based on Chinese female
anhtropometric analysis”, In: Proceedings of the Third International Conference on Digital Human
Modeling, Vol. 6777, Orlando, USA, 9-14 July, pp.22-29 (2011).
13. Wu, C.H., Ip, W.H., Dong, N. and Chen, Z.Q., “A chaotic hybrid algorithm approach for micro gear
inspection”, In: Supplementary Proceedings of the 14th International Manufacturing Conference in China,
Tianjin, China, 13-15 October, pp.11-14 (2011).
14. Chen, Z.Q., Zou, K.S., Ip, W.H., and Chan, C.Y., “Model retrieval based on fuzzy weighted shape
distributions”, In: Proceedings of 2nd International Conference on Manufacturing Science and
Engineering, Guilin, China, 9 - 11 April 2011, pp.1678-1681 (2011).
15. Chan, Y.Y., Chan, C.K., and Ip, W.H., “Quality management model of qualitative research for university-
industry cooperation”, In: Proceedings of 3rd International Conference on Education and New Learning
Technologies, Barcelona, Spain, 4-6 July, pp.5834-5843 (2011).
16. Xue, F., Chan, C.Y., Ip, W.H., and Cheung, C.F., “Pearl hunter: a cross-domain hyper-heuristic that
compiles iterated local search algorithms”, In: Proceedings of OR53 Annual Conference, East Midlands
Conference Centre, University of Nottingham, United Kingdom, 6-8 September (2011).
17. Wang, L.X. and Ip, W.H., “A Soft Case-based Reasoning System for Travelling Time Estimation”, In:
Proceedings of the 3rd International Conference on Future Computational Technologies and Applications,
Rome, Italy, 25 - 30 September, pp. 69-74 (2011).
Year 2010
18. Huang, M., Bo, G., Wang, X. and Ip, W.H., “The optimization of routing in fourth-party logistics with
soft time windows using harmony search”, In: Proceedings of International Conference on Natural
Computation (ICNC), Yantai, China, 10-12 August, pp.4344-4348 (2010).
19. Zhang, Z., Tong, J., Chen, Z., Ip, W.H., Chan, C.Y., and Yung, K.L., “Application of chaos in network
video security”, In: Proceedings of 1st International Conference on Information Computing and
Applications, Tangshan, China, 15 - 18 October 2010, pp.229-236 (2010).
20. Pego-Guerra, M.A., Zhang, W.J., and Ip, W.H., “Robust management of Virtual Enterprises”, In:
Proceedings of ASME 2010 International Design Engineering Technical Conferences and Computers and
Information in Engineering Conference, Montreal, QC, Canada, 15 - 18 August 2010, pp.299-306 (2010).
21. Lam, C.Y., Ip, W.H., Wu, C.H., and Chan, S.L., “Agent-based scheduling with a learning effect model”,
In: Proceedings of IEEE International Conference on Industrial Engineering and Engineering
Management, Macao, China, 7 - 10 December 2010, pp.1702-1705 (2010).
22. Huang, M., Bo, G., Wang, X., and Ip, W.H., “The optimization of routing in fourth-party logistics with
soft time windows using harmony search”, In: Proceedings of 6th International Conference on Natural
Computation, Yantai, Shandong, China, 10 - 12 August 2010, pp.4344-4348 (2010).
23. Mo, J.H., and Ip, W.H., “A Pull Strategy in Manufacturing using Fuzzy Logic”, In: Proceedings of the
Ninth International Conference on Information and Management Sciences, Ü rümchi, Xinjiang, China, 11
August (2010)
24. Chung, R.C.P., Chan, S.L., and Ip, W.H., “A Study of Cross-Functional Teams in the New Product
Development Process”, In: Proceedings of the 6th CIRP-Sponsored International Conference on Digital
Enterprise Technology, Hong Kong, China, 14-16 December, pp.385-397 (2010).
25. Xue, F., Chan, C.Y., Ip, W.H., and Cheung, C.F., “Towards a learning-based heuristic searching reform
scheme”, In: Proceedings of 24th European Conference on Operational Research (EURO XXIV), Lisbon,
Portugal, 11-14 July (2010).
26. Xue, F., Chan, C.Y., Ip, W.H., and Cheung, C.F., “A learning-based variables assignment weighting
scheme for heuristic and exact searching”, In: Proceedings of 1st International Conference on
Computational Logistics (ICCL2010), Shanghai, China, September 20-22 (2010).
2015-Jul
Year 2009
27. Bo, G., Huang, M., Ip, W.H. and Wang, X., “The harmony search for the routing optimization in fourth
party logistics with time windows”, In: Proceedings of IEEE Congress on Evolutionary Computation,
IEEE, Trondheim, Norway, 18-21 May, pp.962-967 (2009).
28. Huang, M., Cui, Y., Xu, X., Ip, W.H. and Wang, X.W., “Model and algorithm for the multi-task routing
optimization problem in 4PL”, In: Proceedings of the Chinese Control and Decision Conference (CCDC),
Guilin, China, 17-19 June, pp.3094-3098 (2009).
29. Huang, M., Dong, H.Y., Wang, X.W., Zheng, B.L. and Ip, W.H., “Guided variable neighborhood
harmony search for integrated charge planning in primary steelmaking processes”, In: Proceedings of the
1st ACM/SIGEVO Summit on Genetic and Evolutionary Computation (GEC), Shanghai, China, 12-14
June, pp.231-238 (2009).
30. Ip, W.H. and Wang, D.W., “Resilience evaluation approach of transportation networks”, In: Proceedings
of International Joint Conference on Computational Sciences and Optimization, Vol. 2, IEEE Computer
Society, Sanya, China, 24-26 April, pp.618-622 (2009).
31. Chan, Y.Y., Chan, C.K., and Ip, W.H., “Knowledge acquisition and understanding through students' self-
organised learning activities is indifferent to organisational learning”, In: Proceedings of 3rd International
Technology, Education and Development Conference (INTED2009), Valencia, Spain, 9-11 March, pp.
3728-3738 (2009).
32. Huang, M., Tong, W., Ip, W.H., and Wang, X.W., “A Routing Optimization Method for Single Point to
Multipoint Fourth Party Logistics”, In: Proceedings of 8th International Conference on Information and
Management Sciences (IMS09), Kunming & Banna, China, 20-28 July, pp.884-888 (2009).
Year 2008
33. Chan, S.L. and Ip, W.H., “A markov chains repurchasing model for CRM using system dynamics”, In:
Proceedings of 19th IASTED International Conference on Modelling and Simulation (MS), Quebec,
Canada, 26-28 May, pp.353-357 (2008).
34. Wang, D.Z., Wu, C.H., Ip, A., Chan, C.Y., and Wang, D.W., “Fast multi-template matching using a
particle swarm optimization algorithm for PCB inspection”, In: Proceedings of European Workshops on
the Theory and Applications of Evolutionary Computation, EvoWorkshops 2008 , Naples, Italy, 26 - 28
March 2008, pp.365-370 (2008).
35. Zhan, R.X., Chau, K.Y., Lu, Z.M., Liu, B.B., and Ip, W.H., “Robust image hashing for image
authentication based on DCT-DWT composite domain”, In: Proceedings of 8th International Conference
on Intelligent Systems Design and Applications, Kaohsiung, Taiwan, 26 - 28 November 2008, pp.119-122
(2008).
36. Chen, B., Liu, W.H., Li, Y.J., Yang, D., Ip, W.H., and Chen, G.Y. “The analysis to lead-time difference
of exporting containers between Hong Kong and Yantian port”, In : Proceedings of 2008 IEEE
International Conference on Service Operations and Logistics, and Informatics, Beijing, China, 12 - 15
October 2008, pp.2415-2419 (2008).
37. Huang, M., Bo, G., Tong, W., Ip, W.H. and Wang, X.W., “A hybrid immune algorithm for solving fourth
party logistics routing optimization problem”, In: Proceedings of IEEE Congress on Evolutionary
Computation (IEEE CEC), Hong Kong, China, 1-6 June, pp.286-291 (2008).
38. Huang, M., Jiang, G.J., Chen, K.G., Ip, W.H. and Wang, X.W., “Research on GA/CPM/MarKov
integrated programming of dynamic risk for virtual enterprise”, In: Proceedings of the 3rd International
Conference on Innovative Computing Information and Control (ICICIC), IEEE Computer Society, Dalian,
China, 18-20 June, pp.227 (2008).
39. Lam, C.Y., Ip, W.H. and Wang, L., “Simulation and analysis using a process centric activity model to
achieve business process excellence”, In: Proceedings of the 19th IASTED International Conference on
Modelling and Simulation (MS), Quebec, Canada, 26-28 May, pp.253-257 (2008).
40. Wang, D., Wu, C.H., Ip, A., Wang, D. and Yan, Y., “Parallel multi-population particle swarm
optimization algorithm for the uncapacitated facility location problem using OpenMP”, In: Proceedings of
2015-Jul
IEEE Congress on Evolutionary Computation (IEEE CEC), Hong Kong, China, 1-6 June, pp.1214-1218
(2008).
41. Wang, L.X., Ip, W.H. and Lee, C.K.M., “Resource constrained project scheduling of construction
engineering with genetic algorithm”, In: Proceedings of Chinese Control and Decision Conference,
Shandong, China, 2-4 July, pp.1466-1470 (2008).
Year 2007
42. Chen, B.C., Ip, W.H., and Li, Y.J., “The study and application of CPFR model and its analysis in China”,
In: Proceedings of 2006 International Conference on Service Systems and Service Management, Troyes,
France, 25 - 27 October 2006, pp.745-749 (2007).
43. Jiang, Z., Wang, D., and Ip, W.H., “Fuzzy programming model and algorithm for optimal design of
distribution centers for B2C e-commerce”, In: Proceedings of the IEEE International Conference on
Automation and Logistics, Jinan, China, 18 - 21 August 2007, pp.1533-1539 (2007).
44. Wang, Q., Yung, K.L., and Ip, W.H., “A generic reconfigurable agent model for distributed
manufacturing system”, In: Proceedings of the IEEE International Conference on Control Applications,
Munich, Germany, 4 - 6 October 2006, pp.1438-1443 (2007).
Year 2006
45. Wang, Q., Yung, K.L. and Ip, W.H., “A genetic reconfigurable agent model for distributed manufacturing
system”, In: Proceedings of the 2006 IEEE International Conference on Control Applications, Vol. 1-4,
Munich, 4-6 October, pp.891-896 (2006).
46. Ding, J., Liu, Z., Ip, W.H., Yung, K.L., and Wang, X., “Optimization of control strategy of a serial supply
chain based on pheromone evolutionary algorithm”, In: Proceedings of 2006 IEEE Congress on
Evolutionary Computation, Vancouver, BC, Canada, 16 - 21 July 2006, pp.2707-2712 (2006).
47. Huang, M., Wu, X., Wang, X., Ip, W.H., and Yung, K.L., “PSO based single strategy risk programming
problem for virtual enterprise”, In: Proceedings of the American Control Conference, Minneapolis, MN,
United States, 14 - 16 June 2006, pp.4506-4510 (2006).
48. Huang, M., Jiang, G.J., Liu, Z.H., Ip, W.H., and Wang, X.W., “Research on SA/CPM/MarKov integrated
programming of dynamic risk of virtual enterprise”, In: Proceedings of 2006 1st IEEE Conference on
Industrial Electronics and Application, Singapore, Singapore, 24 - 26 May 2006, pp.1-6 (2006).
49. Huang, M., Wu, X., Wang, X., Ip, W.H., and Yung, K.L., “The risk programming of virtual enterprises
based on algorithms of Min / Max / Mean / Random-PSO”, In: Proceedings of 2006 1st IEEE Conference
on Industrial Electronics and Applications, Singapore, Singapore, 24 - 26 May 2006, pp.1-7 (2006).
Year 2005
50. Chan, Y.K., Neailey, K. and Ip, W.H., “Effects of implementing a customized management system model
on organizational performance”, In: Proceedings of the 1st International Conference on Quality
Management and Six Sigma, Vol. 1, Hong Kong, China, 14-15 January, pp.16-21 (2005).
51. Huang, M., Xu, F., Wang, X., and Ip, W.H., “CBR based risk management for virtual organization”, In:
Proceedings of 5th International Conference on Electronic Business, Hong Kong, China, 5 - 9 December
2005, pp.662-666 (2005).
52. Chen, B., and Ip, W.H., “The study on the two characters in a kind of Markov chain's CRM model”, In:
Proceedings of 2005 International Conference on Services Systems and Services Management,
Chongquing, China, 13 - 15 June 2005, pp.230-232 (2005).
53. Chen, B.C., and Ip, W.H., “The study on a kind of supply chain integrated process model-an analysis
based on CPFR model”, In: Proceedings of the 4th International Conference on Quality and Reliability,
Beijing, China, August (2005).
2015-Jul
Year 2004
54. Chen, B., Ip, W.H., Peng, S. and Yu, H.L., “Analyzing and modeling the CRM chain - the basis of SCM”,
In: Proceedings of the 8th World Multi-conference on Systemics, Cybernetics and Informatics, Vol. IV,
Orlando, U.S.A., 18-21 July, pp.364-368 (2004).
55. Cheung, A., Ip, W.H. and Lai, C.L., “Staff rostering and scheduling using AI in the aircraft service
industry”, In: Proceedings of HKIE CAI Symposium, Hong Kong, China, April, pp.57-65 (2004).
56. Huang, W., Wang, X., Wang, D., Ip, W.H., and Kwong, C.K., “The system dynamic in the simulation
analysis of a CONWIP controlled lamp production line”, In: Proceedings of 2004 IEEE Conference on
Robotics, Automation and Mechatronics, Singapore, Singapore, 1 - 3 December 2005, Vol. 1, pp.277-280
(2004).
57. Chen, B.C., Ip, W.H., and Peng, S., “Customer relationship modeling and analysis”, In: Proceedings of
the International Conference on Service Systems and Service Management, Beijing, China, July (2004).
58. Chen, B.C., Ip, W.H., Zhou, Y.B., and Yu, H.L., “The design of a lean CRM software process model”, In:
Proceedings of The 4th International Conference on Electronic Business (ICEB2004), Beijing, China, 5-9
December, pp.335-339 (2004).
59. Chen, B.C., Ip, W.H., Zhou, Y.B., and Yu, H.L., “Comparing sales strategies using the markov chain
relationship model”, In: Proceedings of The 4th International Conference on Electronic Business
(ICEB2004), Beijing, China, 5-9 December, pp.266-271 (2004).
60. Huang, M., Yang, H.M., Wang, X.W., Ip, W.H., and Yung, K.L., “Virtual enterprises risk management
DSS under electronic commerce”, In: Proceedings of The 4th International Conference on Electronic
Business (ICEB2004), Beijing, China, 5-9 December, pp.718-721 (2004).
61. Huang, M., Xu, F., Wang, X.W., Ip, W.H., and Yung, K.L., “A risk identification method of virtual
enterprise”, In: Proceedings of The 4th International Conference on Electronic Business (ICEB2004),
Beijing, China, 5-9 December, pp.687-691 (2004).
62. Huang, M., Li, F.G., Wang, X.W., and Ip, W.H., “Risk sorting for enterprise under EC environments”, In:
Proceedings of The 4th International Conference on Electronic Business (ICEB2004), Beijing, China, 5-9
December, pp.708-712 (2004).
63. Huang, M., Yang, H.M., Wang, X.W., Ip, W.H., and Wang, D.W., “Risk evaluation for virtual enterprise”,
In: Proceedings of The 4th International Conference on Electronic Business (ICEB2004), Beijing, China,
5-9 December, pp.702-707 (2004).
Year 2003
64. Liu, Y., Ip, W.H., Yung, K.L., Zhang, Y. and Wang, D.W., “A reliability model for multi-state networks
with link-capacities of production line”, In: Proceedings of International IEEE Conference on the
Business of Electronic Product Reliability and Liability, Hong Kong, China, January, pp.80-84 (2003).
65. Wang, Q., Yung, K.L., and Ip, W.H., “A pattern-based evolving mechanism for genetic algorithm to solve
combinatorial optimization problems”, In: Proceedings of the 2003 IEEE International Workshop on Soft
Computing in Industrial Applications, Binghamton, U.S.A., 23-25 June, pp.97-101 (2003).
Year 2002
66. Huang, M., Yung, K.L., Wang, X.W. and Ip, W.H., “The system dynamic based simulation analysis of a
virtual enterprise”, In: Proceedings of the 2002 International Conference on Control and Automation
(ICCA), Vol. 1, Xiamen, China, 16-19 June, pp.177 (2002).
Year 2001
67. Wong, W.K., Chan, C.K. and Ip, W.H., “Application of fuzzy concept in the apparel industry”, In:
Proceeding of Joint 9th IFSA World Congress and 20th NAFIPS International Conference, Vol. 5,
Vancouver, Canada, 25-28 July, pp.2547-2550 (2001).
2015-Jul
68. Wong, W.K., Chan, C.K. and Ip, W.H., “Earliness and tardiness production planning and scheduling in
apparel manufacture”, In: Proceedings of the 6th Asian Textile Conference, Hong Kong, China, 22-24
August (2001). (in VCD format)
Year 2000
69. Wang, Q., Yung, K.L. and Ip, W.H., “Simulation of object-oriented methodology on manufacturing
execution system”, In: Proceedings of the 6th Guangdong - Hong Kong Symposium on Advances in
Mechatronic Research and Industrial Development, Wuhan, China, 25 November, pp.237-247 (2000).
70. Wong, W.K., Chan, C.K. and Ip, W.H., “Architecture of capacity planning model for apparel manufacture
considering machine breakdown”, In: Proceedings of International Manufacturing Conference in China,
Vol. II, Hong Kong, China, 16-17 August, pp.149-150 (2000).
Year 1999
71. Wong, C.W.K., Chan, C.K. and Ip, A., “Genetic algorithm approach to cutting scheduling and planning of
computerised cutting system in clothing manufacturing”, In: Proceedings of World Congress on Textiles
in the Milliennium, Huddersfield, U.K., 6-7 July, pp.273-283 (1999).
Year 1998
72. Chan, C.Y., Fang, S.L., Ip, W.H. and Qi, G.N., “Research on the methodology of concurrent engineering”,
In: Proceedings of the 5th Guangdong - Hong Kong Symposium in Advance in Mechatronic Research and
Industrial Development, Zhuhai, China, June, pp.195-206 (1998).
73. Fang, S.L., Chan, C.Y., Wu, H.F. and Ip, W.H., “Extended product data management”, In: Proceedings of
the 5th Guangdong - Hong Kong Symposium in Advance in Mechatronics Research and Industrial
Development, Zhuhai, China, June, pp.184-194 (1998).
74. Lee, K.C., Ip, W.H. and Yung, K.L., “Data acquisition and MRPII”, In: Proceedings of the 98 Conference
on System Automation and Computer Integrated Engineering, Hong Kong, China, June, pp.S33-S36
(1998).
75. Wong, W.K., Chan, C.K. and Ip, W.H., “Application of genetic algorithm on the spreading operation in
garment manufacturing”, In: Proceedings of the International Conference on Nonlinear Programming
and Variational Inequalities, Hong Kong, China, 15-18 December, pp.52-54 (1998).
76. Wong, W.K., Chan, C.K. and Ip, W.H., “Efficiency of computerized cutting system”, In: Proceedings of
the 4th International Conference on Advanced in Materials and Processing Technologies, Kuala Lumpur,
Malaysia, 24-28 August, (1998).
77. Wong, W.K., Chan, C.K. and Ip, W.H., “Preparation and installation of computerized cutting system”, In:
Proceedings of the 27th Textile Research Symposium, Shizuoka, Japan, 3-5 August, pp.240-247 (1998).
Year 1997
78. Gao, J.X. and Ip, W.H., “A systematic analysis and re-design of the logistics of a world-wide
manufacturing network”, In: Proceedings of CIRP International Symposium on Advanced Design and
Manufacture in the Global Manufacturing Era, Hong Kong, China, 21-22 August, pp.448-454 (1997).
79. Gao, J.X. and Ip, W.H., “Computer aided assembly planning and process modeling”, In: Proceedings of
the International Conference on Manufacturing Automation (ICMA), Vol. 2, Hong Kong, China, 28-30
April, pp.1173-1178 (1997).
80. Kam, K.W. and Ip, W.H., “MRPII system training for management studies”, In: Proceedings of the 5th
International Conference on Modern Industrial Training, Jinan, China, 26-29 October, pp.587-592 (1997).
81. Keung, W.K. and Ip, W.H., “The application of genetic algorithm in the planning of FMS system”, In:
Proceedings of the International Conference on Manufacturing Automation (ICMA), Vol. 1, Hong Kong,
China, 28-30 April, pp.542-547 (1997).
2015-Jul
82. Lee, K.C., Ip, W.H. and Yung, K.L., “Hierarchical object-orientated supervisory monitoring and control
for manufacturing enterprises”, In: Proceedings of the Advances in Industrial Engineering Applications
and Practice II, Vol. 2, San Diego, U.S.A., 12-15 November, pp.1241-1246 (1997).
83. Lee, K.C., Ip, W.H. and Yung, K.L., “Intelligent supervisory monitoring and control system for
automated manufacturing”, In: Proceedings of the 4th International Conference on Manufacturing
Technology in Hong Kong, Hong Kong, China, 30 November - 3 December (1997). (in CDROM format)
84. Ng, K.C. and Ip, W.H., “The design and implementation of an intelligent enterprises information system”,
In: Proceedings of the International Conference on Manufacturing Automation (ICMA), Vol.2, Hong
Kong, China, 28-30 April, pp.838-844 (1997).
85. Ng, K.C., Ip, W.H. and Lee, T.C., “The design and implementation of MRPII system for global
manufacturing”, In: Proceedings of the Advances in Industrial Engineering Applications and Practice II,
Vol. 2, San Diego, U.S.A., 12-15 November, pp.823-828 (1997).
86. Tsang, H.C. and Ip, W.H., “Managing integrated manufacturing through real-time monitoring and TQM”,
In: Proceedings of the International Conference on Manufacturing Automation (ICMA), Vol. 2, Hong
Kong, China, 28-30 April, pp.971-977 (1997).
Year 1996
87. Gao, J.X. and Ip, W.H., “Manufacturing capability modelling for product design”, In: Proceedings of the
7th International Machine Design and Production Conference, Ankara, Turkey, 11-13 September, pp.95-
101 (1996).
88. Ip, W.H., “Integration of simulation analysis and time series models for production rule-based
knowledge”, In: Proceedings of the 2nd International Conference on Managing Integrated Manufacturing,
Leicester, U.K., 26-28 June, pp.177-182 (1996).
89. Li, Y., Ip, W.H. and Wang, D.W., “MRPII and JIT integration using earliness/tardiness scheduling
approach”, In: Proceedings of the 2nd International Conference on Managing Integrated Manufacturing,
Leicester, U.K., 26-28 June, pp.247-253 (1996).
90. Lo, V., Ip, W.H. and Yung, K.L., “A methodology for MRPII and FMS integration”, In: Proceedings of
the 2nd International Conference on Managing Integrated Manufacturing, Leicester, U.K., 26-28 June,
pp.255-260 (1996).
91. Tsang, H.C. and Ip, W.H., “An integrated approach to the design and implementation of a manufacturing
system”, In: Proceedings of the 2nd International Conference on Managing Integrated Manufacturing,
Leicester, U.K., 26-28 June, pp.401-406 (1996).
92. Tsang, H.C. and Ip, W.H., “Manufacturing strategy implementation through a real-time control and
monitoring system”, In: Proceedings of the 2nd International Conference on Managing Integrated
Manufacturing, Leicester, U.K., 26-28 June, pp.51-57 (1996).
93. Yip, W.M., Man, H.C., and Ip, W.H., “Application of Taguchi method in Nd: YAG laser welding of super
duplex stainless steel”, In: Proceedings of the Laser Materials Processing Conference (ICALEO 96), Vol.
81, Detroit, U.S.A., 14-17 October, pp.D74-D83 (1996).
94. Yung, K.L., Ip, W.H., Yung, K.C. and Chan, C.K., “The integration of MRPII with quality in mind”, In:
Proceedings of the 2nd International Conference on Managing Integrated Manufacturing, Leicester, U.K.,
26-28 June, pp.195-200 (1996).
Year 1995
95. Choi, C.K. and Ip, W.H., “Estimation of robotics assembly time”, In: Proceedings of the 6th International
Conference on Manufacturing Engineering, Melbourne, Australia, 29 November - 1 December, pp.325-
328 (1995).
96. Choy, K.L., Ip, W.H. and Wong, W.C., “Application of genetic algorithms aided simulation in production
resource planning”, In: Proceedings of the 3rd International Conference on Manufacturing Technology,
Chiang Chen Industrial Charity Foundation, Hong Kong, China, December, pp.511-520 (1995).
2015-Jul
97. Ip, W.H. and Choy, K.L., “Computer-aided design of production line”, In: Proceedings of the 11th
International Conference on Computer-aided Production Engineering, Institution of Mechanical
Engineers, London, U.K., 20-21 September (1995). (Poster Session).
98. Ip, W.H. and Choy, K.L., “Maintenance productivity management information system”, In: Proceedings
of the 1st International Conference on Quality and Reliability, Vol. 2, Hong Kong, China, April, pp.313-
317 (1995).
99. Ip, W.H. and Lo, V., “A structural analysis on the implementation of MRPII system”, In: Proceedings of
the 3rd International Conference on Manufacturing, Chiang Chen Industrial Chairty Foundaion, Hong
Kong, China, December, pp.618-623 (1995).
100. Ip, W.H., “Integration of simulation and expert system through intervention modeling”, In: Proceedings
of the 3rd International Conference in Computer Integrated Manufacturing, Vol. 2, Singapore, 11-14 July,
pp.920-924 (1995).
101. Ip, W.H., Cheung, S.W. and Choi, C.K., “Implementation of statistical process control in PCB
manufacturing”, In: Proceedings of the 1st International Conference on Quality and Reliability, Vol. 2,
Hong Kong, China, April, pp.409-413 (1995).
102. Ip, W.H., Choy, K.L. and Lee, H.B., “Application of structural design and development methodology in
logistic modelling”, In: Proceedings of the 3rd International Conference on Manufacturing Technology,
Chiang Chen Industrial Charity Foundation, Hong Kong, China, December, pp.641-645 (1995).
103. Kam, K.W. and Ip, W.H., “Implementation of MRPII system in a model factory”, In: Proceedings of the
7th International Manufacturing Conference in China (IMCC), Vol. 2, Harbin, China, 19-21 October,
pp.333-336 (1995).
104. Lee, S.Y., Ip, W.H. and Chu, K.F., “Strategic implementation of JIT: a case study in China”, In:
Proceedings of the 3rd International Conference on Manufacturing Technology, Chiang Chen Industrial
Charity Foundation, Hong Kong, China, December, pp.613-617 (1995).
105. Lee, S.Y., Ip, W.H. and Frankland, S., “A comparison of the psychophysical approach to determine
manual material handling safety limit with the biomechanical approach”, In: Proceedings of the 7th
International Manufacturing Conference in China, Vol. 2, Harbin, China, 19-21 October, pp.521-525
(1995).
106. Lo, Y.F., Ip, W.H. and Yung, K.L., “Manufacturing integration using a generic MRPII model”, In:
Proceedings of the 7th International Manufacturing Conference in China, Vol. 2, Harbin, China, 19-21
October, pp.327-332 (1995).
107. Tsang, H.C. and Ip, W.H., “Manufacturing strategy formulation and implementation in China”, In:
Proceedings of the 7th International Manufacturing Conference in China, Vol. 2, Harbin, China, 19-21
October, pp.291-294 (1995).
108. Tsang. H.C. and Ip, W.H., “Total quality management through effective change management in China”,
In: Proceedings of the 7th International Manufacturing Conference in China, Vol. 2, Harbin, China, 19-
21 October, pp.269-274 (1995). (Keynote)
109. Yung, K.C. and Ip, W.H., “Productivity scheme as competitive edge in manufacturing at China”, In:
Proceedings of the 7th International Manufacturing Conference in China, Vol. 2, Harbin, China, 19-21
October, pp.301-305 (1995).
110. Yung, K.L., Ip, W.H., Yung, K.C. and Chan, C.K., “Engineering change execution for TQM”, In:
Proceedings of the 7th International Manufacturing Conference in China, Vol. 2, Harbin, China, 19-21
October, pp.417-421 (1995).
Year 1994
111. Choy, K.L., Ip, W.H. and Wong, W.C., “Application of computer simulation technique to solve capacity
planning problem”, In: Proceedings of the 3rd International Conference on Automation Technology,
Taipei, Taiwan, 6-9 July, pp.201-204 (1994).
112. Ip, W.H. and Bing, Y., “The application of time series models in analyzing dynamic behavior of complex
manufacturing systems”, In: Proceedings of the 10th International Conference on Systems Engineering,
Vol. 1, Coventry, U.K., 6-8 September, pp.519-526 (1994).
2015-Jul
113. Ip, W.H. and Choy, K.L., “Analyzing the dynamic behavior of production line using time series
intervention models”, In: Proceedings of the 3rd International Conference on Automation Technology,
Taipei, Taiwan, 6-9 July, pp.187-191 (1994).
114. Ip, W.H. and Lee, S.Y., “Productivity measurement system in a maintenance department”, In:
Proceedings of the 3rd International Conference on Automation Technology, Taipei, Taiwan, 6-9 July,
pp.93-97 (1994).
115. Yung, K.C. and Ip, W.H., “Productivity and motivation strategy in manufacturing”, In: Proceedings of the
3rd International Conference on Automation Technology, Taipei, Taiwan, 6-9 July, pp.111-115 (1994).
116. Yung, K.C. and Ip, W.H., “Productivity improvement in manufacturing: the new challenge in China”, In:
Proceedings of the 1st Asia-Pacific International Conference on Progress of Cutting and Grinding,
Shanghai, China, 26-28 September, pp.18-24 (1994).
Year 1993
117. Cheung, S.W. and Ip, W.H., “Simulation modeling using hierarchical, modular design and state space
analysis”, In: Proceedings of the 6th International Manufacturing Conference with China, Vol. 2, Hong
Kong, China, 10-13 March, pp.535-539 (1993).
118. Choy, K.L. and Ip, W.H., “Optimizing scheduling using simulation and rule-based expert system as an
experimental design tool”, In: Proceedings of the 9th International Conference in Computer-aided
Production Engineering, Nanjing, China, July, pp.280-284 (1993).
119. Ip, W.H. and Fok, C.M., “Implementation of a just-in-time material control system: a case study of a
China manufacturing plant”, In: Proceedings of the 9th International Conference in Computer-aided
Production Engineering, Nanjing, China, July, pp.74-79 (1993).
120. Ip, W.H. and Ho, K.C., “Implementation of MRP system: a problem solving approach”, In: Proceedings
of the 9th International Conference in Computer-aided Production Engineering, Nanjing, China, July,
pp.53-58 (1993).
121. Ip, W.H. and Lee, S.Y., “Implementation of modular quick response production system in a garment
factory”, In: Proceedings of the 2nd International Conference on Manufacturing Technology, Chiang
Industrial Charity Foundation, Hong Kong, China, December, pp.461-463 (1993).
122. Ip, W.H. and Popplewell, K., “Modeling of manufacturing systems using state space and ARIMA
methods”, In: Proceedings of the 6th International Manufacturing Conference with China, Vol. 2, Hong
Kong, China, 10-13 March, pp.507-513 (1993).
123. Ip, W.H., Choy, K.L. and Wong, W.C., “Implementation of MRP in a machinery manufacturing
company”, In: Proceedings of the 2nd International Conference on Manufacturing Technology, Chiang
Chen Industrial Charity Foundation, Hong Kong, China, December, pp.457-460 (1993).
124. Ip, W.H., Lau, W.S. and Popplewell, K., “Analyzing manufacturing systems simulation using time series
methods”, In: Proceedings of the 9th International Conference in Computer-aided Production
Engineering, Nanjing, China, July, pp.11-16 (1993).
125. Lau, K.H. and Ip, W.H., “Implementation of an MRP system: a case study of a Hong Kong manufacturing
company”, In: Proceedings of the 6th International Manufacturing Conference with China, Vol. 2, Hong
Kong, China, 10-13 March, pp.555-560 (1993).
126. Lee, S.Y. and Ip, W.H., “Application of the NIOSH prediction equation; biomechanical model, in job
safety analysis and pre-employment worker job tolerance determination”, In: Proceedings of the 9th
International Conference in Computer-aided Production Engineering, Nanjing, China, July, pp.411-416
(1993).
127. Yeung, V.W.S., Ip, W.H. and Cheung, Y.W., “SPC for multilayer PCB: a case study”, In: Proceedings of
the 9th International Conference in Computer-aided Production Engineering, Nanjing, China, July,
pp.174-180 (1993).
2015-Jul
Year 1992
128. Ip, W.H., Lau, W.S. and Popplewell, K., “Analyzing MRP simulation using ARIMA models”, In:
Proceedings of International Conference of Manufacturing Automation, Hong Kong, China, 10-12 August,
pp.506-511 (1992).
129. Ip, W.H., Lau, W.S. and Popplewell, K., “Modeling MRP simulation using transfer function analysis”, In:
Proceedings of the 2nd International Conference on Automation Technology, Vol. 4, Taipei, Taiwan, 5-8
July, pp.113-119 (1992).
2015-Jul
(c) Books / Book Chapters / Thesis
1. 葉偉雄, RFID/物聯網技術於智慧城市的應用與案例研究. 香港:宏亞印務有限公司 (2014). // Ip,
W.H., RFID/IoT Application and Case Study in a Smart City, Hong Kong SAR: Aisa One Printing
Limited (2014). (in Chinese) (ISBN: 978-962-367-784-4)
2. 葉偉雄, 曾國坤, 曾賦賦, 胡鎮浩, 生醫物聯網技術與系統設計. 台中市:長高科技股份有限公司
(2014). // Ip, W.H., Tseng, K.K., Zeng, F.F. and Wu, C.H., System Design and Technology of Biomedical
Internet of Things. Taichung City: DMATEK (2014). (in Chinese) (ISBN: 978-986-84784-7-3)
3. Wong, W.K., Kwong, C.K., Mok, P.Y., and Ip, W.H., Optimizing fabric spreading and cutting schedules
in apparel production using genetic algorithms and fuzzy set theory. In: Optimizing Decision Making in
the Apparel Supply Chain Using Artificial Intelligence (AI). Witney/Oxford/UK: Woodhead Publishing,
pp.131-152 (2013). (ISBN: 978-0-85709-779-8)
4. Lam, C.Y., Chan, S.L. and Ip, W.H., A Structural Reliability Business Process Modelling with System
Dynamics Simulation. In: Shkelzen Cakaj ed. Modeling Simulation and Optimization - Focus on
Applications. Rijeka/Croatia: InTech, pp. 259-267 (2010). (ISBN: 978-953-307-055-1)
5. Ho, G.T.S., Lau, H.C.W., Chung, N.S.H., and Ip, W.H., Fuzzy measurement in quality management
systems. In: Production Engineering and Management under Fuzziness. Berlin/Heidelberg: Springer,
pp.515-536 (2010). (ISBN: 978-3-642-12051-0)
6. Bo, G.H., Huang, M., Ip, W. H. and Wang, X.W., The application of Harmony Search in fourth-party
logistics routing problems. In: Z.W. Geem, ed. Recent Advances in Harmony Search Algorithm.
Berlin/Heidelberg: Springer, pp.135-145 (2010). (ISBN: 978-3-642-04316-1)
7. Chan, C.K., Chan, Y.Y. and Ip, W.H., Knowledge agent theory and its autopoietic characteristics for
authentic knowledge management. In: M.D. Lytras, ed. The Open Knowledge Society: A Computer
Science and Information Systems Manifesto. Berlin/Heidelberg: Springer, pp 507-512 (2008). (ISBN:
978-3-540-87782-0)
8. Ip, W.H., The Application of Time Series Models in MRP Simulation, Ph.D., Loughborough University of
Technology (1993). (EThOS Persistent ID: uk.bl.ethos.359393)