ip uk destination development - uttarakhand · modern high-end luxury, this project comes as a...
TRANSCRIPT
Tourism & HospitalityGovernment of Uttarakhand
DestinationDevelopment
Page 2
Contents
Tourism Scenario In India
Uttarakhand – Key Credentials
Uttarakhand Overview
Uttarakhand – Competitive Advantage
Project 1 - Development of Wellness Resort atMarchula
Project 2 – Development & Operation of Motel cumWayside Amenities
Project 3 – Operation & Maintenance of Auli Ski Resort
Project 4 – Operation, Maintenance and Managementof North Corbett Resort, Kotdwar
Project 5 – International Convention Centre & WellnessCentre
Policies, Schemes & Incentives
Key Contacts
Page 3
TOURISM SCENARIOIN INDIA (1/2)
► 7th Largest Tourism Economy in the World.
► 9th Largest in cultural resources and business travel in the world
► Direct contribution of travel & tourism to GDP is forecasted to become USD194.7bn in FY2028
► Travel & Tourism investment expected to rise to USD 85.2bn in FY 2028
► 58.5% growth forecast in Foreign Tourist Arrivals on e-Tourist Visa
► Increase in Tourism employment opportunities by 2.1% pa in next ten years
ECONOMIC SCENARIO
Emerging Tourism segments in India
RuralTourism
AdventureTourism
MedicalTourism
FilmTourism
GreenTourism
Source: WTTC - TRAVEL & TOURISM ECONOMIC IMPACT 2018 INDIAwww.InvestIndia.gov.in
Growth Drivers of the Tourism industry
► Geographic and cultural diversity
► Rise in domestic household expenditure on tourism
► Improved Infrastructure
► E - Facilitation for Travel and Stay
► Government Initiatives - Medical visa or M visa, Visa – on – Arrival (VOA), Incredible Indiacampaign
Page 4
Different Components of Travel & Tourism
12.80%
87.20%
Domestic vs. Foreign Visitor Spendingin 2017
Foreign visitorspending
Domestic Spending
94.60%
5.40%
Leisure vs. Business SpendingIn 2017
Leisure Spending Business Spending
Tourism Scenario in IndiaForeign tourist arrivals into the country is forecast to increase at a CAGR of 7.1per cent during 2005–27
Source: WTTC - TRAVEL & TOURISM ECONOMIC IMPACT 2018 INDIAwww.InvestIndia.gov.in
0
2
4
6
8
10
12
14
16
18
20
2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2027
CAGR: 7.1%
TOURISM SCENARIOIN INDIA (2/2)
Years
Fore
ign
tour
ists
arriv
ing
inIn
dia
(Mill
ion)
Page 5
Uttarakhand –Key Credentials
INDIAN AND FOREIGN TOURIST ARRIVALS
Figures In lakhs
105.4
345.8
0
50
100
150
200
250
300
350
400
Tourist Arrival in Uttarakhand - Indian
2001 2017
0.54
1.42
0
0.2
0.4
0.6
0.8
1
1.2
1.4
1.6
Total Arrival in uttarakhand - Foreign
2001 2017
DELHI
55 min
6 hr
4 hr(240 km)
Chinyalisaur
Pantnagar
Gauchar
Pithoragarh
Dehradun
CONNECTIVITY - UTTARAKHAND
Page 6
UTTARAKHAND OVERVIEW
► The State of Uttarakhand was formed on 9th November 2000 as the 27th State of India, when
it was carved out of northern Uttar Pradesh
► The State is close to the National Capital Region (NCR) and has excellent connectivity with its
neighbouring states
► With levels of literacy rate* (78.80%) higher than the national average and the presence of
institutes of international repute, the State has abundant availability of quality human resources
► GSDP of the state stood at INR 2,17,609 Million with a growth rate of 11.23% (FY 2017-18)*
► The state offers a wide range of benefits in terms of interest incentives, financial assistance,
subsidies and concessions
► The Tertiary sector in the state contributes around 38.41% to the Gross State Domestic
Product (GSDP: 2016-17)**
Acknowledged for Ease of Doing Business & Peace of Doing Business…
01
Uttarakhand: The IdealInvestment Destination
02
03
04
05
10
06
08
07
09
Availability of Cheapand Reliable Power
Abundant Availability ofGood Water Resources
Transparent LandAllotment with Land
Availability atCompetitive Prices
Skilled Manpower Availability
World Class IntegratedIndustrial Estates
Good Law & Order; Statewith one of the lowest man-days lost due to industrialstrife in India
Sector Specific Policies providingfiscal & Non fiscal incentives
Proximity to NCR and withininfluence region of AKIC
Handholding ThroughInvestment Promotion &Facilitation Centre
Well performing state in ‘Easeof Doing Business’, with acompliance of 98.10%**
Sources: *Uttarakhand at a glance 2016, DES, GoUK** CSO & Directorate of Economics & Statistics, GoUK*** Evaluation of BRAP 2017 Reform Evidence, DIPP
Page 7
Project 1. Development ofWellness Resort at Marchula
PROJECT AT A GLANCE
► The proposed project is a wellness resort that provides an extensive range of treatments with
world class amenities would be a suitable project.
► Offering a unique blend of traditional skills and practices passed on by generations with
modern high-end luxury, this project comes as a perennial choice for an enriching holiday
with benefits of Ayurveda, yoga and meditation. Offering a unique Ayurveda experience to its
guests from pan India and across the world, the retreat provides perfect location.
► The Ayurveda centre has trained doctors and therapists who provide the right treatments and
services whereas the Yoga centre is perfect for practicing various postures and breathing
exercises. This hotel also provides indoor and outdoor recreational activities.
► Marchula has serene environment with beautiful views will be the appropriate location for the
project.
► The proposed project is envisaged to be a wellness resort with top end services.
Page 8
Project OutlineDevelopment of Wellness Resortat Marchula
Deluxe Room - 50 keysPremium Rooms30 KeysFamily Suite – 20 keys
Multipurpose Hall200 pax
Restaurants (includingkitchen & storage) – 30pax
Panchkarma, Naturopathy,Yoga and Mediation Halland Treatment Centre – 4Nos.
Yoga and Meditation Hall(2 Halls) – 75 pax
Gym / Spa / Steam /Sauna/ Jacuzzi
Pool with NaturalSurrounding– 1 No.
Fitness and Gaming Zone
PROJECT COMPONENTS
Land Available 36 Acres
Project TimelinesConcession period – 30 years (with scope of additionalconcession period of 30 Years)Construction Period – 36 Months
Total Project Cost(Indicative) INR 25.6 crore
Page 9
Financial Assumptions (1/2)Development of Wellness Resortat Marchula
PROJECT COMPONENTS
Construction Cost Cost (INR crore)
Y-to-Y increase 2.0%
Construction Phasing Year 130%
Year 230%
Year 340%
Funding for Construction Expenses
Equity 40%
Debt 60%
Debt Repayment
Total Debt 15.34 INR crores
Debt repayment period 8 years
Rate of interest 10%
Moratorium period 3 years
Revenue
Room Tariff INR 4000 – 8000 INR/ day/ room
Occupancy assumptionOccupancy in1st Year40%
Y-to-Yincrease2%
Maximumoccupancy70%
Y-to-Y increase in revenue 5%
Conference revenue 10% of room revenue
Wellness treatment revenue 40% of room revenue
Revenue from F&B 40% of the room revenue
Cost of F&B 50% of the F&B revenue
Page 10
Financial Assumptions (2/2)Development of Wellness Resortat Marchula
Cost of F&B 60% of F&B revenue
Operating Expenses
Operating expenses 40% of Total Revenue
Wellness treatment operation cost 30% of Wellness revenue
Other Cost 10% of Conference revenue
Maintenance cost 10 % of Total Revenue
Payment to Government
Annual Lease Rent for the Project 0.2 INR Crore
Y-to-Y increase 5%
Royalty 5%
Equity IRR 19.44%
Project IRR 16.65%
Total project cost and revenue (Indicative)
Page 11
Land LayoutDevelopment of Wellness Resortat Marchula
Land layout of the proposed site
Video link of the proposed site
Page 12
Project DetailsDevelopment of Wellness Resortat Marchula
► Marchula is a small tourist spot in the Ramnagar
town of Uttaranchal state, it is the central hub to
the Jim Corbett National Park
► The forest area of Marchula is covered in trees
of pine, sal and fir. The massive Himalayan
peaks can be witnessed easily from Marchula.
Marchula Falls in District Nainital
► Tourist Footfall in 2017 - District Nainital
9,10,323 (Domestic), 8329 (Foreign)
PROJECT SITE – MARCHULA
Nearby Tourist Destination
Sonanadi Wildlife SanctuaryJim Corbett National Park
Air
RoadRail
CONNECTIVITY TO THE PROJECT SITE
Nearest railway station:Ramnagar 36.8 KmPirumadara 45.5 Km
New Delhi - 333 KmHaridwar - 203 KmDehradun – 256 KmRishikesh - 223 KmMussoorie - 287 Km
Nearest Domestic AirportJolly Grant Airport, Dehradun, 244 KmNew Delhi – 307 Km
Latitude: 29.6058766, Longitude 79.0836696
Link to locate the proposed location on Google Map
Page 13
Project - 2Development and Operation of Motelcum Wayside AmenitiesWayside Amenities
First-aid Restaurants
Parking lots Shopping area Souvenir shops
Rest rooms Telephone booths
Petrol pumps
Short stay
Repair shops
Key advantages
These complexes are planned to be located at frequent intervals across major roadways, providingbasic services and amenities, to ensure safe and convenient journey for long-distance travellers.
Wayside amenities are envisaged as complexes on National/State Highways and other districtroads, providing a variety of services.
► Would act as a support infrastructure to facilitate larger tourist segment moving across the
► road network, even for lesser known locations or destinations
► Expected to generate additional revenue for the government
► Potentially give an impetus to economic activities, including trade and employment
► Help reduce the incidence of accidents and improve road safety, by providing drivers (especially
truckers) a comfortable place to rest
Page 14
Project OutlineDevelopment and Operation of Motelcum Wayside Amenities
Luxury Rooms 20 keys Multi cuisine Restaurant –1 Nos
Food Court45 tables
Kitchen and Storage
Open Parking for Bus andCars Garden Green Area
PROJECT COMPONENTS (INDICATIVE)
Proposed Land 2 Acre
Concession Period Concession period of 30 years (with scope of additionalconcession period of 30 Years)Construction Period : 2 years
Total Project Cost 9.1 crores
Other Amenities► Toilets► Rest Rooms for short stay► First aid► Minor Auto repair shop (optional)► Landscaping
Page 15
Financial Assumptions (1/2)Development and Operation of Motelcum Wayside Amenities
PROJECT COMPONENTS
Construction phasing
No. of years of construction 2 Years
Year to year increase 3%
Construction Phasing Year 140%
Year 260%
Funding of construction expense
Equity 40%
Debt 60%
Debt repayment
Total Debt 5.4 INR Crore
Debt repayment period 8 years
Rate of interest 10%
Moratorium period 2 years
Page 16
Financial Assumptions (2/2)Development and Operation of Motelcum Wayside Amenities
Revenue
Occupancy Assumptions (Rooms) Occupancy in Year 130%
Y-to-Y increase2%
MaximumOccupancy70%
Occupancy Assumptions (Tables) Occupancy in Year 160%
Y-to-Y increase2%
MaximumOccupancy95%
Revenue from Room 2,000 INR/ Room
Revenue per Table 500 INR / Table
Y-to-Y increase in revenue 5%
No. of Shops 15
Rent from Shops 20,000 INR / Month
Y-to-Y increase in revenue 5%
Operating Expenses
Operating expense of motel 40% of Room revenue
F& B cost 50% of Restaurant Revenue
Operating cost of shops 10% of Shop revenue
Maintenance cost 20% of the Total revenue
Payment to Government
Annual Lease Rent for the Project 0.2 INR Crores
Royalty 5%
Year to Year Increase in revenue 5%
Equity IRR 18.82%
Project IRR 16.59%
Page 17
Project DetailsDevelopment and Operation of Motelcum Wayside Amenities
► Udham Singh Nagar district was carved out of
Nainital district
► The district is also called as the 'Gateway to
Kumaon hills'.
► The prosperous district is endowed with a very
fertile land.
► Tourist Footfall in 2017 - 484339 (Domestic)
(District Rudrapur
PROJECT SITE – UDHAM SINGH NAGAR
Nearby Tourist Destination
KashipurRudrapur
Air
RoadRail
CONNECTIVITY TO THE PROJECT SITE
Nearest railway station:Kichha, Pantnagar New Delhi - 309Km
Haridwar - 220 KmDehradun – 273 KmRishikesh - 240 KmMussoorie - 304 Km
Nearest Domestic AirportJolly Grant Airport, Dehradun, 89 KmNew Delhi – 321 KmPant Nagar (305 Km)(will be operational shortly)
Latitude: 28.9610° N, Longitude 79.5154° E
Link to locate the proposed location on Google Map
Page 18
Project 3Operation & Maintenance of AuliSki resort
The project site provides immense opportunities for adventure sports like skiing and thrilling water
sports which make Uttarakhand an ideal venue for adventure seekers which makes Auli as perfect
location for the Ski resort.
The large slopes of Garhwal and Kumaon covered with seasonal snow becomes an ideal place for
skiing in the winter months. With their wide open spaces above the snowline, Garhwal and Kumaon
offer yet another exciting possibility - ski touring amongst the glaciers. For the avid skier, cross-
country runs of 10-20 km are now available, with the added advantage of fresh powder snow, away
from criss-crossing streams of skiers that overtake the slopes of the European Alps. Because of their
height and spread, Garhwal and Kumaon, like other sectors of the Himalayas, are in position to offer
the thrills of exploratory long distance skiing round the year.
Government of Uttarakhand proposes to open the investment opportunity for the Operation,
Maintenance and Transfer Auli Ski resort.
Page 19
Auli Ski ResortSuper Deluxe Rooms – 3 Nos.Deluxe Rooms – 23 Nos.Semi-Deluxe Rooms – 8 Nos.Economy Rooms – 10 Nos.Eco Hut – 8 hutsDormitory – 12 Bed
Bar Room – 01Games Room - 01
Restaurant – 02 Nos.
Nandadevi EcoHutsSuper Deluxe4 Nos.Family Hut4 Nos.
Ski Shop
Project OutlineOperation & Maintenance of Auli Ski Resort
PROJECT COMPONENTS
Proposed Land 3.19 Acres
Project Timelines Concession period – 30 years (with scope of additionalconcession period of 30 Years)
AVAILABLE INFRASTRUCTURE AT PROJECT SITE
Snow beater-02 Huski Snow groomer Everest Prenoth GroomingMachine
Ski Doo Snow Scooter - 02Chairlift – 800 m length, 16chairs (4 seats each chair),Tower-5
POMA Ski LiftLength: 600 m
Lift on ropeway tower No. 08& 10 Glass House – 9 Small, 1 Big
Page 20
Financial Assumptions (1/2)Operation & Maintenance of Auli Ski resort
No of months of operation 7 Months
Number of days in an year 365 Days
Revenue
Revenue from rooms(Family hut, Super, Deluxe, Semi DeluxeRooms)
3,000 – 5,000 INR/ Day/ Room
Revenue from rooms(Economy) 1,500 – 2,500 INR / Day / Room
Eco Huts 2,000 – 3,000 INR / Day / Room
Dormitory 200 INR/ Day/ Bed
Y-to-Y increase in revenue 5%
Occupancy AssumptionsOccupancy in1st Year40%
Y-to-Y increase2%
Maximumoccupancy70%
Other rental revenue
Rent from Shop (3 Nos.) 10000 INR / Shop / Month
Y-to-Y increase in revenue 3%
Skiing Revenue 500 INR / Person
Y-to-Y increase in revenue 2%
Annual Tourist Footfall 1 Lakh
Tourist using Skiing facilityOccupancy in 1stYear30%
Y-to-Yincrease2%
Maximumoccupancy60%
Revenue from F&B 50% of the room revenue
Cost of F&B 60% of the room revenue
Operating Expenses
Operating expenses 40% of Total Revenue
Skiing cost 40% of Skiing Revenue
Other cost 20% of Rent from shop
Repair and maintenance 10% of construction cost
Construction cost 11.3 INR Crore
Page 21
Financial Assumptions (2/2)Operation & Maintenance of Ski Resort at Auli
Payment to Government
Annual lease rent 0.4 crore
Year to year increase 5%
Royalty 5% of the Total revenue
Equity IRR 18.44%
Project IRR 18.44%
It is assumed that no Debt has been taken by the investor in this project, resulting into same Equityand Project IRR
Goo
gle
Map
ofAu
li
Latitude: 30.9494° N, Longitude 77.7478° E
Link to locate the proposed location on Google Map
Page 22
Project DetailsOperation & Maintenance of Auli Ski Resort
► Auli is the only FIS (Federation of International Skiing) approved slopes in India► The project location is 3050 m above sea level, Near the holy pilgrimage destination of
Badrinath. Auli Hosted the first South Asian Winter Games in 2011► Existing world-class infrastructure in the form of artificial snow making system, ski lifts,
chair lifts, ice rinks; presents a lucrative business opportunity for the investors► The entire 4 Km of slopes and the adjoining areas to be developed into a world class Ski
Resort & a Summer Vacation Destination due to its cool weather even during peaksummers
► Tourist Footfall in 2017 – 85134, This destination has seen 50% increase in tourist footfallover FY 2016.
PROJECT SITE – AULI
Nearby Tourist Destination
Badrinath
Air
RoadRail
CONNECTIVITY TO THE PROJECT SITE
Nearest railway station:Haridwar 273 km Delhi : 336km
Dehradun : 99 kmRishikesh – 45 kmHaridwar – 93
Nearest Domestic AirportJolly Grant Airport, Dehradun, 279 Km
Joshimath Chattrakund
Kwani Bugyal Chenab Lake
Page 23
Project - 4Operation, Maintenance andManagement of North Corbett Resort
PROJECT AT A GLANCE
► To promote Kotdwar as an entry point to Jim Corbett National Park.
► Providing new interest among the tourists, thereby holding visitors in the region for longerduration resulting increase of revenue.
► Enhanced quality of natural and cultural tourist attractions
► Livelihood opportunities at local community level
► Strengthen capacity building of concerned sector agencies and local communities for planning,development, Management and marketing of tourist destinations and attractions.
OBJECTIVE OF THE PROJECT
► Operate, maintain and manage the project and related services including procurement of theassociated material, equipment, articles and necessary inventories from the reputed vendors /manufacturers.
► Recruitment, management and training of staff required for operation of the project as perNational / International standards of the industry.
► Revenue Collection – Selected operator is free to fix and revise Room tariff.
► Management of the entire facilities and related services
► Avoid unauthorized usage of project infrastructure
► Timely payment of License Fee and Royalty
► Facility Management Housekeeping - Full range of cleaning/housekeeping activities, Kitchenand restaurant, Food and beverages service, Minor maintenance service, Provision ofadequate supplies of linen and toiletries and other consumables, Operation of facilitiesinclusive of the business centre, customer service centre
SCOPE OF THE PROJECT
► The proposed opportunity is for the Operation, Maintenance and Management of North CorbettResort, Kotdwar, Uttarakhand
► The proposed property is developed as a state of the art North Corbett Resort on 11 acre landalong with visitor facilitation /information and an interpretation centre.
Page 24
► Landscaping & Garden Maintenance - Landscaping and maintenance of garden/green areasincluding cleaning and sweeping, removal of weeds, application of soil, manure and chemicalfertilizers, cutting of hedges, shrubs, trees, moving of lawn mower, daily watering to totalgarden etc.
► Customer Service Help Desk
► Tour Booking Information, Hotel Booking Information, Promotion of North Entry CorbettResort as an alternative entry point to Corbett National park, Tourism Destination relatedqueries & information, All the information related to Uttarakhand Tourism
► Revenue Generation – Parking, Levy of Tariffs for Accommodation, Revenue from leasing ofCafeteria/kiosks, Revenue from Tour Operations, Conferences, Events & Exhibitions,Branding
► Environmental Management
► Brand Building and Marketing
Project DetailsOperation, Maintenance andManagement of North Corbett Resort
Map of KotdwarLatitude: 29.7524° N, Longitude 78.5269°
ELink to locate the proposed location on Google Map
Page 25
Project OutlineOperation, Maintenance and Management ofNorth Corbett Resort
Luxury Rooms 9 NoCottages 16 No.
Conference hall200 capacity
Food Court200 capacity
Visitor facilitation/Information centreand an Interpretationcentre
Children Park &Parking and Utilities Artificial Climbing Wall
Musical & DancingFountain
Souvenir Shop (1No.)
AVAILABLE PROJECT COMPONENTS
Proposed Land 11 Acre
Concession Period 30 years (with scope of additional concession period of 30years)
Page 26
Financial Assumptions (1/2)Operation, Maintenance and Management ofNorth Corbett Resort
Stay Area
Deluxe Room 9 Rooms
Premium Room 16 Rooms
Occupancy AssumptionsOccupancy in 1stYear30%
Y-to-Y increase2%
Maximum occupancy60%
Room tariff INR 3000 – 5000 INR/ day/ room
Y-to-Y increase in revenue 5%
Other rental revenue
Rents from shops 15000 INR/ shop/ month Year to year increase inrevenue 3%
Total Annual Capacity ofArtificial Climbing wall 18250
Artificial Climbing wall 500 INR / person Year to year increase inrevenue 3%
Tourist using the ArtificialClimbing wall
Occupancy in1st Year30%
Y-to-Yincrease2%
Maximum occupancy50%
Revenue from F&B 40 % of room revenue
Cost of F&B 60% of F&B revenue
FINANCIAL COMPONENTS
Page 27
Financial Assumptions (2/2)Operation, Maintenance and Management ofNorth Corbett Resort
Operating expenses
Operating Expense 40.0% of Total revenue
Artificial Wall climbing- Operation expenses 40.0% of Artificial Wall revenue
Maintenance Expense 8.0% Construction Cost
Construction cost of property 11.97 crores
Payment to Government
Annual Lease Rent for the Project 0.15 Crores
Y-to-Y increase 5%
Royalty 5%
Royalty Start Year 1st Year
Equity IRR 18.74%
Project IRR 18.74%
It is assumed that no Debt has been taken by the investor in this project, resulting into same Equityand Project IRR
FINANCIAL COMPONENTS
Page 28
Project InformationOperation, Maintenance and Management ofNorth Corbett Resort
► Kotdwar or Kotdwara is a small, busy and beautiful town in the Pauri Garhwal District ofUttarakhand India► Tourist Arrivals (2015) in Pauri Garwal district - 3,95,882 (National), 21,162 (Foreign)► It is an upcoming centre of trade and commerce in Uttarakhand. It was also known as the'Gateway to the hills'.► Kotdwara is well - connected by bus and rail and can also be the starting point of the Char DhamYatra.
►
PROJECT SITE – KOTDWAR
NEARBY TOURIST DESTINATION
Jim Corbett National Park
Air
Road
Rail
CONNECTIVITY TO THE PROJECT SITE
Nearest railway station:Kotdwar Junction Delhi : 248 km
Dehradun : 120 kmRishikesh – 85 kmHaridwar – 65 km
Nearest Domestic AirportJolly Grant Airport, Dehradun, 105 Km
Lansdowne
Kanvashram –Birthplace of Bharat
Siddhbali Temple
Durgadevi Temple
Page 29
Project 5Development of InternationalConvention Centre & Wellness Centre
► Government of Uttarakhand has proposed an investment to develop state of the art, world
class International Convention centre and Wellness Centre in Rishikesh on PPP Mode.
► The state has total area of 800 Acres (IDPL Factory Complex) land available at Virbhadra
Area, Rishikesh for this project.
► The project has been divided into two parts
► Part 1 - International Convention Centre – Proposed Land (11 Acre)
► Part 2 - International Wellness Centre – Proposed Land (150 Acres)
PROJECT AT A GLANCE
Source: Uttarakhand Tourism Development Board
Ø World - Class Convention CentreØ AYUSH and Wellness Centres Hyderabad International Convention Centre
Page 30
LOCATION - RISHIKESH
NEARBY TOURIST DESTINATION
CONNECTIVITY TO THE PROJECT SITE
Air
Road
RailNearest railway station:Rishikesh
Delhi – 263.2 km, Dehradun -45 kmHaridwar – 19 km
Nearest Domestic AirportJolly Grant Airport, 37 km
Project LocationDevelopment of InternationalConvention Centre & Wellness Centre
Chamba Dhanaulti
► Rishikesh is popularly known as Yoga Capital of the World► The proposed location is surrounded by hills and bisected by the wide and sluggish Ganges. It
is an excellent place to meditate and study yoga.► The adventure activities such as trekking, wellness and water activities form a backbone to
drive the tourism activities in Rishikesh► Tourist Arrivals (2017) – 673226 (Domestic), 4815 (Foreign)
Page 31
ConnectivityDevelopment of InternationalConvention Centre & Wellness Centre
Commercial Exploration of Rishikesh
Link to locate the proposed location on Google Map
Latitude : 30.087160, Longitude : 78.268112
Page 32
MICE TOURISM
MICE (Meetings, Incentives, Conferences and Exhibitions) is an acronym used in relation of typeof tourism which includes business events and activities. It is the fastest growing segment intourism market. The convention industry provides immense benefits to the broader economy asit generates on an average a higher spending level, creates jobs and retains work forces,attracts global expertise, promotes investment trade, communication, technology.
MICE tourism is a service industry which brings under one roof a host of products and services.As an essential pre-requisite, a destination willing to promote itself as a MICE Tourism shouldhave the following issues addressed as depicted in the diagram below.
Source: India Inbound MICE Tourism, May 2016, FICCI
Part 1 - Development ofInternational Convention Centre
Page 33
Part 1 - Development ofInternational Convention Centre
Convention Hall Auditorium
Meeting Halls Hotel – 150 RoomKeys
Reception, Foyerand Circulation
Dining Hall andKitchen
AdministrationArea
Open andLandscaped Area
PROJECT COMPONENTS OF CONVENTION CENTRE
► The State of Uttarakhand is well positioned as a tourist destination and is desirous of pioneering
in the high value tourism market segment of Meetings Incentives, Conventions and Exhibitions
(MICE)
► With the help of technology and cutting edge design, proposed Rishikesh International
Convention centre (RICC) is proposed to be an integrated complex with a host of
complementary facilities such as multi-purpose convention centre, meeting facilities, auditorium,
at site 5 star hotel and complementary retail and commercial spaces
Page 34
Financial AssumptionsDevelopment of International ConventionCentre
Particulars Units (INR Crore)
Total Project Cost 122
Contingencies 1.2
Consultancy/ Technical Studies 6.7
Preliminary and pre-operative expenses 13.6
Interest during construction 16.8
Total construction cost 160
Proposed Land 11 Acres
Project Timelines
Concession period – 30 years (with scope of additionalconcession period of 30 Years)
Construction Period – 36 Months
Total Project Cost (Indicative) INR 122 crore
FINANCIAL COMPONENTS
Page 35
Part 2 - Development ofInternational Wellness Centre
WELLNESS TOURISM
Wellness tourism represents the intersection of a powerful lifestyle trend and a growing
global industry.
► Wellness industry projected to touch ₹150,000 crore by FY20*
► Wellness tourists are high-yield tourists who bring greater economic impacts.
► Wellness tourism can support preservation of traditional culture and natural assets, and canstimulate entrepreneurship.
► Wellness tourism brings in revenues, creates jobs, and may help improve the well-being of thegeneral population.
Wellness Travelers visit for ...
Source: The Global Tourism Economy report , FICCI wellness Industry report
Why Is Wellness Important To People, Business, & Government?
Worldwide obesity has nearlydoubled since 1980.
Almost10%oftheworld’sadultpopulation has diabetes.
Chronic disease is responsiblefor 60% of deaths.
over half the global businesspopulationhasexperienced anappreciable rise in workplacestress in recent years.
From 2000 to 2050, theproportion of the world’spopulation over 60 yearswill double.
Source: WHO
PhysicalIntegrativemedicine
DiagnosticsHealth check-upsChronic condition
mgmt.
MentalMassageBathing
Bodytreatments
YogaMeditation
SocialGym visits
Fitnessclasses
StretchingPilates
SpiritualPrayer
VolunteeringTime alone
Environmental
HikingBiking
Taking walksNature visits
EmotionalRetreats
Life coachingStress
reduction
Page 36
Project OutlineDevelopment of InternationalWellness Centre
► An integrated wellness centre is proposed to be developed on 150 Acre land in Rishikesh This
Centre will cater to larger society of nearby districts.
► The proposed opportunity is to Develop world class wellness centre with all amenities on PPP
Model.
► This hospital will cater the society in all types of AYUSH treatments and other treatments. This
property will be one of its kind facility with world class hospitality facility.
Picture courtesy - Anandaspa, Rishikesh
Page 37
Yoga, Ayurveda andNaturopathy Centre
Physiotherapy,Wellness/ TreatmentCentre andGymnasium
Operation Theatre Nursery of Medicinaland Aromatic Plants
Organic Food Facility
Agriculture,Horticulture,Floriculture andOrganic FarmingZone
Pathology Lab Swimming pool
Project OverviewDevelopment of International Wellness Centre
PROJECT COMPONENTS
Proposed Land 150 Acres
Concession Period 30 years (with scope of additional concessionperiod of 30 Years)Construction Period : 3 years
Total Project Cost 59.7 Crore
Room Category & No. of Rooms (Indicative)
Deluxe Double Bed 25 Rooms Cottage Suites 10 RoomsDeluxe Hut 20 Rooms Executive Single Room 20 RoomsDeluxe Nest 5 Rooms Executive Double Room 35 RoomsHut Suites 15 Rooms Economy Single Room 20 RoomsNest Suites 5 Rooms Economy Double Room 40 Rooms
Dormitory – 2 Nos. 15 beds
Page 38
Financial Assumptions (1/2)Development of International Wellness Centre
FINANCIAL COMPONENTS
Construction Cost
Construction phasing Year 130%
Year 230%
Year 340%
No. of years of construction 3 Years
Year to year increase 2%
Funding of construction expense
Equity 40%
Debt 60%
Total Debt INR 35.8 crores
Debt repayment period 10 years
Rate of interest 10%
Moratorium period 3 years
Revenue
Occupancy Assumptions (Rooms)Occupancy in1st Yr40%
Y-to-Y increase3%
Maximumoccupancy80%
Suites and Deluxe Rooms* 4,500 – 8,000 INR / Day / Room
Cottages, Executive and Economy Rooms* 22000 – 3,500 INR / Day / Room
Economy Single Room and Dormitory* 500 – 1,000 INR / Day / Room
Year to year increase in revenue 5%
*Room Tariff includes the food charges for the patient
Page 39
Financial Assumptions (2/2)Development of International Wellness Centre
FINANCIAL COMPONENTS
Other rental Revenue Cost (INR crore)
Revenue from Stores 15% of the Room revenue
Wellness Treatment Revenue 30% of the Room revenue
Revenue of the F&B 10% of the Room revenue
Cost of F&B 70 % of the F&B revenue
Operating Expenses
Operating expense 40.0% of Room revenue
Shop cost 85% of shop revenue
Treatment cost 50% of treatment revenue
Maintenance exp 10% of Total revenue
Payment to Government
Annual lease rent 1 Crore
Y-to-Y increase 5%
Royalty 5% of the Total Revenue
Equity IRR 18.90%
Project IRR 16.20%
Page 40
Uttarakhand | Ease of Doing Business
Hassle free setup and operations in the state
Use of modern supervisory control anddata acquisition system to ensurereliable supply of electricity
Online Single Window System for allrequired approvals for setting upbusiness
Single Point Sectoral Clearances
Commercial Court set up in Dehradunwith entire state jurisdiction
Self / Third party certification inlieu of departmental inspections
Auto renewal of Consent toEstablish, Consent to Operate
Investment facilitation centre tohandhold investors
Geographic information system ofall land banks
Single Integrated return for alllabour laws
Objective Criteria for landallotment
I
Assured & Timely disposal of applications along with Deemed approvals
Step01
Step02
Step03
In-Principle Approval:Decisions on Project Proposals within 15 days
Pre-Establishment:Approvals for pre-establishment services within 15 days
Pre-Operations:Approvals for pre-Operations services within 30days
200+ Investor Services covered under the Uttarakhand Single Window Facilitation and Clearance Act, 2012 &the Uttarakhand Right to Services Act, 2011
Page 41
POLICIES, SCHEMES& INCENTIVES (1/4)
Central Capital Investment Incentive for access to credit (CCIIAC) @30% of the investment in plant and machinery with an upper limit of INR5.00 crore
CentralCapital
Investment
Reimbursement of 100% insurance premium on insurance of buildingand Plant & Machinery for a maximum period of 5 years from the date ofcommencement of commercial production/ operation
CentralComprehensiv
e InsuranceIncentive
Note: Units which have commenced production on or after 01st of April, 2017 will be allowed toregister with DIPP on or before 30th of September, 2018
Industrial Development Scheme 2017
Page 42
MSME Policy 2015
Category Included Region
Category AWhole Districts of Pithoragrah, Uttarkashi, Chamoli, Champawat,Rudraprayag and Bageshwar
Category B
► Whole District of Almora► All hilly development blocks of District Pauri Garhwal, Tehri
Garhwal (Excluding regions under category B+)► All hilly development blocks of District Nainital and Dehradun
(Excluding regions under category B+)
Category B+
► Kotdwar, Sigaddi and adjoining plain regions of Dugaddadevelopment block of district Pauri Garhwal
► Dhalwala, Muni Ki Reti, Tapovan and adjoining plain regions ofFakot development block of District Tehri Garhwal
► Kotabagh development block of District Nainital► Plain regions of Kalsi development block of District Dehradun
Category C
► Regions located above 650 mtrs from sea level in Raipur,Sahaspur, Vikasnagar and Doiwala development blocks of DistrictDehradun
► Ramnagar and Haldwani development blocks of District Nainital
Category D► Whole Districts of Haridwar and UdhamSingh Nagar► Remaining area of District Dehradun and Nainital (which are not
included in category ‘B’, ‘B+’ and ‘C’)
Categorization of industries for the purpose of quantum of incentives
► Tourism Sector has been accorded Industry Status► Tourism Units are eligible for electricity tariff on industrial rate
POLICIES, SCHEMES& INCENTIVES (2/4)
Page 43
Inte
rest
Subs
idy
*Per year/ unit
Category A:10%(Max 8 lacs)
Category B, B+:8% (Max 6 lacs)
Category C:6% (Max 4 lacs)
Category D:5% (Max 3 lacs)
Category A:40%(Max 40 lacs)
Category B, B+:35% (Max 35 lacs)
Category C: 30% (Max30 lacs)
Category D: 15% (Max15 lacs)
Cap
italS
ubsi
dy
% of Annual Turnover (Peryear/ unit) or Inbound/
Outbound Logistics Costwhichever is less
Category A: 7%Category B: 5%Category B+: 5% (Max 5lacs)Tr
ansp
ortS
ubsi
dy
Stam
pD
uty
Category A, B, B+, C: 100%
Category D: 50%
Category A:100% for the first 5 yrs
and 90% thereafter
Category B, B+:100% for the first 5 yrs
and 75% thereafter
SGST
Con
cess
ion*
Pow
erB
illR
ebat
e Category A:Sanctioned Load upto 100KVA: 100% for 5 yrs and
75% thereafter; If Load>100KVA: 60%
Category B, B+:Sanctioned Load upto 100KVA: 100% for 5 yrs and
60% thereafter; If Load>100KVA: 50%
*The SGST after adjustment of ITC on sale of finished product (B2C) will be reimbursed from the date of commencement of production ofthe unit
Inte
rnet
Cha
rges
50% Reimbursement oninternet usage charges
for all categories
Category A, B:100% exemption on
Mandi charges
Man
diC
harg
es
Exci
seD
uty Category A, B:
75% reimbursement onState Excise Duty,
Additional Excise Duty,Bottling fees and othercharges as under State
Excise Policy
Reimbursement of cost incurred for carrying out standardization and quality certification of products by accreditedinstitutions at national and international level by means of ISI marking, registration of copyright, trade marking etc. - 75%(maximum Rs. 1 lacs)
MSME Policy 2015
POLICIES, SCHEMES& INCENTIVES (3/4)
Page 44
Mega Industrial and Investment Policy 2015
Major Tourism activities are included in the policy
SGST after adjustment of ITC on sale of finished product (B2C) will be reimbursed
Category Units Included
Large Projects Investments of INR 50 Cr.to 75 Cr.
Mega Projects Investments of INR 75 Cr.to 200 Cr.
Ultra Mega Projects Investments above INR 200 Cr.
Categorization of industries for the purpose of quantum of incentives
Inte
rest
Subs
idy
7% for 5 yearsInvestment – InterestLarge – 25L MaxMega – 35L MaxUltra Mega – 50L Max
Large: 30%Mega / Ultra Mega: 50%SG
STC
once
ssio
n*
Stam
pD
uty
50% Exemption
Coverage:New & Existing Projects undergoing expansion (falling within notified Industrial Estates /declared non-agriculture land under section 143: Large projects (50 Cr to 75 Cr), Mega Projects(75 Cr to 200 Cr), Ultra Mega Projects (Above 200 Cr)
*The SGST after adjustment of ITC on sale of finished product (B2C) will be reimbursed from the date of commencement of production ofthe unit
ETP Subsidy
30% (up to 50 lacs)
Extra EmploymentSubsidy
@ 500 P.M. perMale
@700 P.M. perFemale
Land RegistrationFees
Landregistration fee@1/- per 1000/-
Power Assistance
Rebate of 1/- perunit on the
power bill and100% rebate onelectric duty for
7 years
Land RatesRebate
Rebate of 15%,25% and 30% on
SIIDCULprevailing landrate for Large,Mega and UltraMega Projectsrespectively
Detailed policies are available at https://www.doiuk.org/policies.php
POLICIES, SCHEMES& INCENTIVES (4/4)
Key Contacts
Uttarakhand Tourism Development Board
Investment Facilitation Centre
Address Directorate of IndustriesIndustrial Area, Patel Nagar, Dehradun, Uttarakhand
Website www.investuttarakhand.com
Email ID [email protected]
Toll Free 18002701213
Phone +91-135- 2559898, 2559987
Address Pt. Deendayal Upadhaya Paryatan Bhawan, Near ONGC Helipad,Garhi Cantt, Dehradun
Website www.uttarakhandtourism.gov.in
Email ID [email protected]
Phone +91-135- 2559898, 2559987
Declaimer: This project profile is based on preliminary study to facilitate prospective entrepreneurs toassess a prima facie scope. It is, however, advisable to get a detailed feasibility study prepared beforetaking a final investment decision