invitation to bid...hatfield, pretoria 0083 telephone: 012-432 1300/1344/1315 email:...
TRANSCRIPT
INVITATION TO BID
Bid Number Description of Bid Compulsory Briefing Session
Closing Date & Time
Enquiry Details
NLC/2019-04 Appointment of a service provider to
convert a residential building to an
office building for the National
Lotteries Commission in the Eastern
Cape Province (East London)
26 February 2019 @ 10h00 7 Rochester Street,
Vincent, East London
15 March 2018 @ 11h00
All enquiries should be in
writing and may be directed
to [email protected] for
the attention of Mr. Tshepiso
Mahlake Tel: (012) 432
1315
Bid Documents Request: Bidders will be forwarded the bid documents upon request on [email protected]
Bid Submission: Bid documents must be deposited into the bid box at the Main Entrance (Reception) of the National Lotteries Commission,
INVITATION TO BID
Bid Documents Request: Bidders will be forwarded the bid documents upon request on [email protected] Submission: Bid documents must be deposited into the bid box at the Main Entrance (Reception) of the
National Lotteries Commission, 7 Rochester Street, Vincent Park, East London
Bid Number
NLC/2019-04
Description of Bid
Appointment of a service provider to convert a residential building to an office building for the National Lotteries Commission in the Eastern Cape Province (East London)
CompulsoryBriefing Session
26 February 2019@ 10h007 Rochester Street, Vincent,East London
Closing Date & Time
15 March2019@ 11h00
Enquiry Details
All enquiries should be in writing and may be directed to [email protected] for the attention of Mr. Tshepiso Mahlake Tel: (012) 432 1315
1 | P a g e
NLC/2019 – 04
TERMS OF REFERENCE FOR THE APPOINTMENT OF
A SERVICE PROVIDER TO CONVERT A
RESIDENTIAL BUILDING TO AN OFFICE BUILDING
FOR THE NATIONAL LOTTERIES COMMISSION IN
EASTERN CAPE PROVINCE (EAST LONDON OFFICE)
CLOSING DATE: 15 MARCH 2019
CLOSING TIME: 11H00 (South African Standard Time)
2 | P a g e
1. Assignment The National Lotteries Commission (NLC)
requires suitable service providers to submit
proposals to convert a residential building to
an office building for NLC in Eastern Cape
Province (East London Office)
2. Name of the responsible office SCM & Facilities Management
3. Address for submitting proposals & other
correspondence
Attention: The Supply Chain Senior Manager
National Lotteries Commission
Block D, Hatfield Gardens
333 Grosvenor Street
Hatfield, Pretoria
0083
Telephone: 012-432 1300/1344/1315
Email: [email protected] for the
attention of Tshepiso Mahlake
4. Closing date & time for submission of bid
proposals
15 March 2019 @11:00
5. Compulsory Site Inspection 26 February 2019 @10:00
Address: 7 Rochester Street Vincent East
London
6. Bid description: Appointment of a service provider to convert
a residential building to an office building for
NLC in Eastern Cape Province (East London
Office)
7. Bid number: NLC/2019 - 04
3 | P a g e
1. BACKGROUND AND CONTEXT
The National Lotteries Commission (NLC), is a public entity established by Lotteries Act
No. 57 of 1997 as amended to regulate the South African lotteries industry. The functions
of the Commission can be divided into two categories, namely “regulation of National
Lottery and other Lotteries” and “administration of the National Lottery Distribution Trust
Fund (NLDTF)”.
The NLC has experience growth in terms of its operations. This growth was as the results
of the change in the National Lotteries Act which required the organization to change and
expand some of their operations. This Change informed the decentralization of core
functions of the organization closer to the people with an establishment of the NLC across
the nine (9) provinces. Due to this growth, as well as the need to improve our corporate
image, a need has arisen to acquire suitable office accommodation that is:
• Safe, healthy and legislatively compliant;
• Functional and cost-effective;
• Consistent, equitable and sustainable; and
• Adaptable to new ways of working and new technology.
The NLC has embarked on a project to procure new premises to accommodate its
Provincial Offices. The acquisition of these new facilities will ensure that the facilities:
Conforms to the Mission, Vision and Values of the NLC;
Embodies the corporate identity of the NLC;
Is fit for purpose in terms of the mandate, functions and activities of the NLC;
Is in line with the space planning norms and standard for the office
accommodation for organs of state guidelines;
Supports National initiatives regarding sustainability and energy efficiency;
Complies with the principles of the Government Immovable Asset Management
Act (GIAMA); and
4 | P a g e
In its acquisition supports emerging organization in construction and/or facilities
management.
The NLC invites suitably qualified and experienced bidders to submit proposals. In line
with the requirements of the Public Finance Management Act (PFMA) No. 1 of 1999 and
Treasury Regulations, the NLC seeks to engage the services of a duly qualified bidder.
2. PURPOSE
The purpose of the terms of reference (TOR) is to appoint a suitable service provider to
assist NLC with the conversion of a residential building to an office building in Eastern
Cape (East London office).
3. OBJECTIVES
The objective is to appoint experienced service provider that will ensure that the NLC
residential building is converted into an office building.
4. SCOPE OF WORK
PROVISIONAL SCOPE OF WORKS
4.1 Yard woks:
4.1.1 External works: Paving, landscaping and Carports installations
Supply and install NLC’s new signage according to NLC’s spec
Supply and install new landscaping as per the NLC’s spec
Dismantle existing steel parking carport in preparation for the extension
of the building
Remove all external paving works and concrete blocks and send to the
salvage yard to be packed according to the project managers instruction
Installation of new paving work according to Architectural designs
5 | P a g e
Remove all kerbs and any other precast units and send to the salvage
yard
Install new concrete kerbs and channels as per the architectural design
Remove shrubs and trees and send to the salvage yard
Supply and Install new parking carports according to NLC’s spec
4.1 Building works:
4.2.1 Internal works
Remove existing floor tiles
Prepare floor surface to receive new floor tiles
Supply and install non-slippery floor tiles on open plan and with carpet on
enclosed offices according to NLC’s spec
Prepare walls to receive new paint
Paint walls according to NLC’s spec
Remove and replace existing doors as per NLC’s spec
Remove existing, reasonably damaged doors and handover to employer
Supply and install doors, to replace damaged, according to NLC’s spec
Paint existing painted doors according to NLC’s spec
Remove existing, reasonably damaged ceiling boards and cornices
Supply and install ceiling boards and cornices, to replace the damaged,
according to NLC’s spec
Prepare existing internal walls to receive new paint and/or finish
Paint existing internal walls according to the NLC’s spec
Remove reasonably damaged window frames
Supply and install window frames, to replace the damaged, according to
NLC’s spec
Prepare window frames to receive new paint
Paint window frames according to NLC’s spec
Remove existing, reasonably damaged window sills
Supply and Install window sills, to replace the damaged, according to
NLC’s spec
6 | P a g e
Remove existing kitchen cupboard, Bedroom cupboards and drawers
and handover to the employer
Supply and install new or re-use existing kitchen cupboards and drawers
to match with NLC’s spec
Remove existing counters and handover to the employer
Supply and Install new counters according to NLC’s spec
Remove reasonably damaged air conditioner and handover to employer
and/or Re-use air conditioners which are reasonably in a good condition
and serviceable
Supply and install new air conditioner according to NLC’s spec
Prepare existing painted doors to receive new paint
Paint existing painted doors according to NLC’s spec
Remove damaged windows and handover to the employer
Supply and install windows to replace the existing windows, according to
the NLC’ s spec
Supply and install ceiling boards and cornices according to NLC’s spec
Paint ceiling boards and cornices according to NLC’s spec
Remove existing burglar bars/grills
Install new burglar bars/grills according to NLC’s spec
Paint burglar bars/grills according to NLC’s spec
Remove steel/metal works and hand over to the employer
Install new steel/metal works according to NLC’s spec
Paint steel/metal works to receive new painting according to NLC’s spec
Remove existing sanitary fittings and handover to employer
Supply and install new sanitary fittings according to NLC’s spec
Remove existing wall tiles
Prepare wall surface for new tile installation
Supply and install wall tiles according to NLC’s spec
Remove existing plumbing and drainage and handover to employer
Supply and install new plumbing and drainage
Paint all internal and external face brick walls according to NLC’s spec.
7 | P a g e
4.3 External works
4.3.1 Roofs:
Completely remove existing roof structure and hand over to the employer;
Prepare walls up to beam filling level for installation of new roof structure;
and
Install a complete new roof structure according to NLC’s spec.
4.3.2 External Walls: Extension to existing structure
Break and/or demolish existing walls as per structural design
Excavations for new brick walls
Concrete works in foundations for external brick walls
Plaster to external walls
Paint and/or finish to walls as per NLC’s spec
Prepare existing walls to receive new paint
Paint walls according to NLC’s spec
Prepare external wall to receive new paint and/or finish
Paint and/or finish to external walls according to NLC’s spec
4.3.3 Miscellaneous Work- Installations
Supply and install security system
Installation of new parking Car-ports
Supply and install WIFI
Supply and install general lighting including DB box etc.
Rubble removal and site cleaning
Remove only damaged rainwater goods and handover to employer
Supply and install rain water goods according to NLC’s spec
Paint all existing and new rainwater goods according to NLC’s spec
Supply and Install upgraded IT system according to NLC’s spec
8 | P a g e
Supply an installation of water supply
Supply and installation of Standby Generator
Supply and installation of fire extinguishers
Risk assessment to be done
4.4 ICT Required Specifications
Below please find a standardised outline of the ICT requirements for the new
NLC provincial office. The outline is based on the premise that:
i. New cabling infrastructure is installed;
ii. Existing server racks are reutilised instead of purchasing new racks;
iii. Existing wireless access devices are reutilised instead of new
devices; and
iv. Existing UPS system is to be reutilised instead of a new system.
No Item Description Specification Qty Comply/ Not
Comply
1. Raised Access
Flooring
Floor elevation height:
20cm.
Width = 2m
Length = 3m.
1
2. Data Network
Point
CAT6 structured cabling. 40
3. Wifi Access
Points
Install wifi access points as
provided by NLC
2
4. Server Rack
Cabinet
Install rack to be provided
as provided by NLC
1
9 | P a g e
5. UPS Install UPS equipment as
provided by NLC
1
6. Ceiling Cable
Trays
TBC*** TBC
4.5 Green initiatives
Collection of rain water harvesting for watering gardens and etc.;
Introduction low maintenance, dry and heat resistant plants for landscaping;
Introduction of low water pressured taps to save water;
Installation of solar panels to supplement the electricity consumption;
Installation of motion detection low power consumption LED lights;
Installation of smart heating, ventilation, and air conditioning (HVAC) system
with automatic switches to save electricity
Proposing wooden floor; and
Standby generators.
Supply and installation of solar according to NLC’s spec
5. REQUIREMENTS AND BILL OF QUANTITIES
Visual Scope of works attached as ‘Annexure A’;
Comprehensive bill of quantities attached as ‘Annexure B’; and
Construction Drawings as ‘Annexure C’.
6. DELIVERABLES
The following deliverables will be expected from the principal contractor:
External Works Construction works:
o Demolitions;
o Site clearance;
o Masonry works;
10 | P a g e
o Roofing works;
o Building finishes; and
o Landscaping.
Internal Construction works:
o Electrical installation;
o Floor finishes;
o Ceilings;
o Mechanical installations (HVAC);
o Plumbing;
o Information technology and telecommunication installations; and
o Carpentry.
Additional works /installations
o Installations of carports;
o Installations of UPS;
o Generator installation;
o Solar installations; and
o Smoke detection systems.
7. DURATION OF APPOINTMENT
The total duration of the project is expected to be three (3) months from the date of
signing the service level agreement (SLA).
8. COMPULSORY – SITE INSPECTION
To conduct the site inspection on the actual address where the construction work
will be made. The compulsory site inspection will be held at the following address:
National Lotteries Commission Offices: 7 Rochester Street Vincent East
London Date: 26 February 2019
Time: 10h00
11 | P a g e
9. EVALUATION CRITERIA
The NLC will evaluate all proposals in terms of the Preferential Procurement Policy
Framework Act. No. 5 of 2000 (PPPFA). A three (3) phase evaluation criteria will be
considered in evaluating the bid, being:
9.1. Phase 1: Pre-Qualification Criteria (Mandatory Requirements)
Bidders must submit all the below mentioned requirements:
Original signed standard bidding documents (SBD Forms).
In the event of the bidder being in a joint venture, joint venture agreement must
be submitted (where applicable).
Company registration certificates (CK). In the event of the bidder being a
consortium organization, relevant shareholding certificates must be submitted
(where applicable).
Bidders must be an EME or QSE which is at least 51% owned by black people
(supported by certified copies of all share ownership certificates and CIPC or CK
documents).
Bidders must have a minimum B-BBEE status level of contributor of 1.
Certified copy of a valid Construction Industry Development Board (CIDB)
certificate with minimum of 5GB or higher.
Only service providers that are located in the Eastern Cape Province are
required to respond. To confirm localization, bidders are required to submit proof
of residence in the form of Municipal Bill or proof of residence letter from the
local councilor/leader or a certified copy of a signed SLA where the bidder is
renting office accommodation. The required proof of residence must be in the
name of the company or the name of the director/s.
The bidder that fails to meet the above-mentioned pre-qualifying criteria stipulated
is an unacceptable bid.
Non - mandatory requirements
Central Supplier Database (CSD) Summarized Report. Please submit the
current CSD Report.
12 | P a g e
Original signed standard bidding documents (SBD Forms). Bidders are
required to return all SBD Forms fully completed and duly signed. The
NLC TOR should not be returned.
9.2. Phase 2: Functional/technical Evaluation
Only bidders that have met the pre-qualification criteria will be evaluated for functional
evaluation. In this phase the evaluation will be based on the bidders’ responses in
respect of the bid proposal (evaluated on the minimum functional specifications).
Prospective bidders who score a minimum of 70 points or more will be considered for
the next phase 3 (Price and B-BBEE status level contributor).
EVALUATION CRITERIA WEIGHT
1. Company Experience
The bidder must provide details of work of a similar nature undertaken by the
bidder within the previous years. Specific details must be given to indicate the
extent to which these previous experiences relate to the work described in the
TOR.
The bidder must take note of the following:
Please attach a minimum of three (3) written reference letters for the
similar services (construction work) within the previous five (5) years
in the letter heads of the clients. References should be presented in a
form of a written letter on an official letterhead from clients where
similar services (construction work) have been provided and may not
be longer than two (2) years. No appointment letters from clients will
be accepted as reference letters.
20%
2. Members Experience
CV’s of all major core resources should be attached with the following:
- Previous project management involvement experience;
- Construction Qualifications; and
- Knowledge of green building initiatives.
25%
13 | P a g e
3. Project Plan / Methodology
Considers the responsiveness to the TOR, the level of detail in the proposal,
attention to project management and innovative approaches and ideas. Proposal
should address the following:
- Project timelines; and
- Project deliverables.
40%
4. Capacity
The bidder is required to provide a company profile on its size, staff complement,
infrastructure, etc. Maximum points allocation of 10% for demonstration of
capacity of the company.
The bidder is required to submit a certified copy of certification of compliance
with the Compensation for Occupational Injuries & Diseases (COID) Act.
Maximum points allocation of 5% for demonstration of capacity for compliance
with COID.
15%
TOTAL 100%
9.3. Phase 3: The 80/20 Principle based on Price and B-BBEE status level contributor.
Points will be awarded to a bidder for attaining the B-BBEE status level of contributor in
accordance with the table below:
Points will be awarded to a bidder for attaining the B-BBEE status level of contributor in
accordance with the table below:
B-BBEE Status Level of Contributor Number of Points (80/20 system)
1 20
2 18
3 14
4 12
5 8
6 6
7 4
8 2
14 | P a g e
Non-Compliant contributor 0
10. Other Conditions:
Only bidders who obtain at least 70% under Functional/Technical Evaluation will be
considered for further evaluation in phase three on their price proposal and BEE
Status Level of Contributor.
Bidders are further requested to provide separate financial and technical proposals.
Bidders are requested to provide a clear agreement regarding joint
venture/consortia. The percentage involvement of each company in the joint
venture agreement should be indicated on the agreement. A trust, consortium or
joint venture must submit a consolidated B-BBEE Status Level Verification
Certificate for every separate bid.
Bidders are required to submit original and valid B-BBEE Status Level Verification
Certificates or certified copies thereof together with their bids, to substantiate their
B-BBEE rating claims. Current and valid original or certified B-BBEE Certificate or
Sworn Affidavit for Exempted Micro Enterprise (EME)/Qualifying Small Business
Enterprise (QSE) must be submitted. (Failure to submit a certificate will result in
scoring 0 for B-BBEE.);
A person will not be awarded points for B-BBEE status level if it is indicated in the
bid documents that such a bidder intends sub-contracting more than 25% of the
value of the contract to any other enterprise that does not qualify for at least the
points that such a bidder qualifies for, unless the intended sub-contractor is an EME
that has the capability and ability to execute the sub-contract.
A person awarded a contract may not sub-contract more than 25% of the value of
the contract to any other enterprise that does not have an equal or higher B-BBEE
status level than the person concerned, unless the contract is sub-contracted to an
EME that has the capability and ability to execute the sub-contract.
Fraudulent practices shall result in immediate disqualification.
NLC is under no obligation to accept any bid and reserves its right not to proceed
with the appointment of any service provider that responded to the invitation to
submit proposals, for whatever reasons it may consider appropriate.
The service provider to be appointed must display an unquestionable track record
and experience with positive feedback from their existing and previous clients;
15 | P a g e
The service provider must comply with all the laws and regulations of the Republic
of South Africa.
10. GENERAL GUIDELINES
10.1. Submission Instruction
Bids should be hand delivered to the address specified below: -
Phase 4A, Waverly Office Park
Phillip Frame Road, Chiselhurst
East London
5200
043 813 3510
012 432 1315
Please note that the Technical and Financial proposals should be submitted in two
(2) separate sealed envelopes clearly marked: Technical and Financial Proposal as
follows: -
Technical Financial
One (1) original One (1) original
Four (4) copies Four (4) copies
One (1) electronic copy (CD or USB) One (1) electronic copy (CD/USB)
Total submission of copies including original & CD = Twelve (12)
Bidders are requested to indicate on the cover of each document whether it is the original
document or a copy.
10.2. Late submission
Proposal received late shall not be considered. A proposal will be considered late if it
arrived one second after 11:00 am or any time thereafter. The tender (bid) box shall be
locked at exactly 11:00 am and bids arriving late will not be considered under any
circumstances. Bidders are therefore strongly advised to ensure that bids are dispatched
allowing enough time for any unforeseen events that may delay the delivery of the bid.
16 | P a g e
The official Telkom time (Dial 1026) will be used to verify the exact closing time.
10.3. No legal relationship
No binding legal relationship will exist between any of the bidders and the NLC until the
execution of a signed contractual SLA. The TOR document will not form part of any such
contract or arrangement.
10.4. Evaluation of offers
Each bidder acknowledges and accepts that the NLC may, at its absolute discretion, apply
selection criteria specified in this document for the evaluation of proposals for short listing/
selecting the eligible bidder(s).
10.5. Format of your proposal
The proposal should be presented in two sections i.e. Technical Proposal and Financial
Proposal.
10.5.1 Technical proposal format
Bidders are at liberty to structure their Proposals according to any format, as long
as it covers all areas specified in this document. The Technical proposals will be
evaluated against the criteria detailed below.
10.5.2 Technical approach
The bidders should adhere to the TOR by elaborating on the services required, and
demonstrating whether the proposed process meets the requirements.
The bidder should demonstrate adherence to the TOR by elaborating on the
services required, and demonstrating whether the proposed process meets the
requirements.
Bidders must, at a minimum, cover the under-mentioned in their technical approach
and return as part of their submission:
17 | P a g e
How they propose to carry out the requirements to achieve the outcomes
identified in the terms of reference including any possible problems that
might hinder delivery and how they will avoid, or overcome, such
problems.
The position(s) involved in the direct delivery of the service to be provided
and in the overall management of the work and the names of the people
who will fill these positions. Provide information in a table format e.g.:
Name Position Duties/
activities
Turnaround time to
complete task
10.6 Disclosures
The bidder must disclose:
If they are or have been the subject of any proceedings or other arrangements
relating to bankruptcy/ insolvency.
If they have been convicted of, or are the subject of any proceedings, relating
to:
- A criminal offence or other offence, involving the activities of a criminal nature in its
organisation or found by any regulator or professional body to have committed
professional misconduct.
- Corruption, including the offer or receipt of any inducement of any kind in relation to
obtaining any contract with any contracting authority.
- Failure to fulfil any obligation in any jurisdiction relating to the payment of taxes and
other legal obligations.
If a bidder or related company or any individual discloses details of any previous
misconduct or complaint, the NLC will seek an explanation and background
details from them. At the sole discretion of the NLC, an assessment as to
whether the bidder will be allowed to continue to the next phase of the
evaluation phase will then be made.
Disclosure extends to any company in the same group of the bidder, including
but not limited to parent, subsidiary and sister companies, companies with
common shareholders (whether direct or indirect) and parties with whom the
bidder is associated in respect of this tender.
18 | P a g e
10.7 Disclaimer
The NLC reserves the right not to appoint a service provider.
The NLC also reserves the right to:
Award the contract or any part thereof to one or more service providers;
Reject all bids;
Decline to consider any bids that do not conform to any aspect of the bidding
requirements;
Request further information from any bidder after the closing date for clarity
purposes;
Cancel this tender or any part thereof at any time;
Should any of the above occur, it will be communicated in writing to the
bidders.
10.8 Confidentiality
Bids submitted will not be revealed to any other bidders and will be treated as
contractually binding;
All information pertaining to the NLC obtained by the bidder as a result of
participation in this RFP is confidential and must not be disclosed without written
authorisation from the NLC; and
The successful bidder will be expected to sign a SLA with the NLC.
10.9 Disqualification
Any form of canvassing/lobbying/influence regarding the short listing will result
in disqualification;
Any non-disclosure of any other information pertaining to this bid will result in
disqualification;
Non-compliance with the bid requirements will invalidate the bid; and
Non-compliance with all the applicable Acts, Regulations and by-laws will result
in the disqualification of the bid.
19 | P a g e
10.10. Prices
All services’ pricing should be inclusive of all taxes etc. and payment shall be
made in South African Rand;
The NLC may require a breakdown of rates on any of the items priced and the
bidders are to provide same without any additional cost and also provide a
“Pricing Grid” or “Transaction Fee Schedule”; and
The total amount should be carried out on the Standard Bidding Form (SBD1).
10.11. Prices adjustments
No price adjustment
10.12. Validity
A proposal shall remain valid for ninety (90) days after the closing date of the
submission for proposals. A proposal which is valid for a shorter period may be
rejected by the NLC for non-responsiveness; and
In exceptional circumstances, the NLC may solicit the bidder’s consent to an
extension of the period of the validity of the bid. The request and responses thereto
shall be made in writing. A bidder that has been granted the request will neither be
required nor permitted to modify the Proposal.
10.13. Signatories
All responses to this RFP should be signed off by the authorised signatories of the
bidder.
11. LOCAL PRODUCTION AND CONTENT
The NLC promotes Local Production and Content. In the case of designated sectors,
only locally produced goods, services or works or locally manufactured goods, with a
stipulated minimum threshold for local production and content will be considered. NLC
reserves the right at its sole discretion to set minimum thresholds for sectors which may
20 | P a g e
not have been declared as designated sectors by the Department of Trade & Industry
(DTI) in an effort to stimulate local production and content where relevant.
12. CLARIFICATIONS / ENQUIRIES
Telephonic request for clarification will not be considered. Any clarification required by
a bidder regarding the meaning or interpretation of the TOR or any other aspects
concerning the bid is to be requested in writing (letter, facsimile or e-mail) from the below
contact persons. The bid reference number should be mentioned in all correspondence.
12.1 Bid Enquiries
Name and Surname: Tshepiso Mahlake
E-mail: [email protected]
Telephone: 012 432 1315
Enquiries received will be responded to within two (2) working days of receiving the
enquiry.
THE NLC IS NOT OBLIGED TO ACCEPT THE LOWEST OR ANY BID AND RESERVES
THE RIGHT TO ACCEPT ANY BID IN WHOLE OR PART
Igniting Distinctive Quantity Surveying
RENOVATIONS AND REFURBISHMENTS TO “07 ROCHESTER
STREET, VINCENT”
EAST LONDON PROVINCIAL OFFICE (VINCENT)
SCOPE OF WORKS
Igniting Distinctive Quantity Surveying
INDEX
1-VISUAL SCOPE OF WORKS
2-NARATED SCOPE OF WORKS
1-VISUAL SCOPE OF WORKS
Igniting Distinctive Quantity Surveying
PROPOSED RENOVATIONS AND REFURBISHMENT –WORKS APPROACH
Existing roof structure to be
removed completely
Igniting Distinctive Quantity Surveying
Floor coverings to be removed and
replaced with new.
Igniting Distinctive Quantity Surveying
Demolish wall as shown on plans
and make good.
Igniting Distinctive Quantity Surveying
Remove existing floor coverings and prepare the floor to receive new
floor coverings.
Remove existing sanitaryware
Prepare walls to receive new paint
Igniting Distinctive Quantity Surveying
Demolish existing
timber staircase in
preparation for new
concrete staircase
Remove floor carpeting and
prepare the floor to receive new
floor coverings.
Igniting Distinctive Quantity Surveying
2-PROVISIONAL SCOPE OF WORKS
Remove existing
door and frame,
brick up exiting door
opening as shown on
plans and make
good.
Igniting Distinctive Quantity Surveying
1. YARD WOKS:
External works
Supply and install NLC’s new signage according to NLC’s spec
Supply and install new landscaping as per the NLC’s spec
Dismantle existing steel parking carport in preparation for the extension of the building
Remove all external paving works and concrete blocks and send to the salvage yard to be packed
according to the project managers instruction
Installation of new paving work according to Architectural designs
Remove all kerbs and any other precast units and send to the salvage yard
Install new concrete kerbs and channels as per the architectural design
Remove shrubs and trees and send to the salvage yard
Supply and Install new parking carports according to NLC’s spec
Igniting Distinctive Quantity Surveying
2. Building works:
Internal works
Remove existing floor tiles
Prepare floor surface to receive new floor tiles
Supply and install non slippery floor tiles on open plan and with carpet on enclosed offices
according to NLC’s spec
Prepare walls to receive new paint
Paint walls according to NLC’s spec
Remove and replace existing doors as per NLC’s spec
Remove existing, reasonably damaged doors and handover to employer
Supply and install doors, to replace damaged, according to NLC’s spec
Paint existing painted doors according to NLC’s spec
Remove existing, reasonably damaged ceiling boards and cornices
Supply and install ceiling boards and cornices, to replace the damaged, according to NLC’s spec
Prepare existing internal walls to receive new paint and/or finish
Paint existing internal walls according to the NLC’s spec
Remove reasonably damaged window frames
Supply and install window frames, to replace the damaged, according to NLC’s spec
Prepare window frames to receive new paint
Paint window frames according to NLC’s spec
Remove existing, reasonably damaged window sills
Supply and Install window sills, to replace the damaged, according to NLC’s spec
Remove existing kitchen cupboard, Bedroom cupboards and drawers and handover to the employer
Supply and install new or re-use existing kitchen cupboards and drawers to match with NLC’s spec
Remove existing counters and handover to the employer
Igniting Distinctive Quantity Surveying
Supply and Install new counters according to NLC’s spec
Remove reasonably damaged air conditioner and handover to employer and/or Re-use air conditioners
which are reasonably in a good condition and serviceable
Supply and install new air conditioner according to NLC’s spec
Prepare existing painted doors to receive new paint
Paint existing painted doors according to NLC’s spec
Remove damaged windows and handover to the employer
Supply and install windows to replace the existing windows, according to the NLC’ s spec
Supply and install ceiling boards and cornices according to NLC’s spec
Paint ceiling boards and cornices according to NLC’s spec
Remove existing burglar bars/grills
Install new burglar bars/grills according to NLC’s spec
Paint burglar bars/grills according to NLC’s spec
Remove steel/metal works and hand over to the employer
Install new steel/metal works according to NLC’s spec
Paint steel/metal works to receive new painting according to NLC’s spec
Remove existing sanitary fittings and handover to employer
Supply and install new sanitary fittings according to NLC’s spec
Remove existing wall tiles
Prepare wall surface for new tile installation
Supply and install wall tiles according to NLC’s spec
Remove existing plumbing and drainage and handover to employer
Supply and install new plumbing and drainage
Paint all internal and external face brick walls according to PRASA spec
Igniting Distinctive Quantity Surveying
External works
Roofs:
Completely remove existing roof structure and hand over to the employer
Prepare walls up to beam filling level for installation of new roof structure
Install a completely new roof structure according to NLC’s spec
External Walls: Extension to existing structure
Break and/or demolish existing walls as per structural design
Excavations for new brick walls
Concrete works in foundations for external brick walls
Plaster to external walls
Paint and/or finish to walls as per NLC’s spec
Prepare existing walls to receive new paint
Paint walls according to NLC’s spec
Prepare external wall to receive new paint and/or finish
Paint and/or finish to external walls according to NLC’s spec
Igniting Distinctive Quantity Surveying
3. Miscellaneous Work- Installations
Supply and install security system
Installation of new parking Car-ports
Supply and install WIFI
Supply and install general lighting including DB box etc.
Rubble removal and site cleaning
Remove only damaged rainwater goods and handover to employer
Supply and install rain water goods according to NLC’s spec
Paint all existing and new rainwater goods according to NLC’s spec
Supply and Install upgraded IT system according to NLC’s spec
Supply an installation of water supply
Supply and installation of Standby Generator
Supply and installation of fire extinguishers
Risk assessment to be done
37 m²Board room
35 m²Open plan office
13 m²Meeting room
8 m²Sick bay
8 m²Server room
33 m²Dining
RedundantRoom
Kitchen
19 m²Office 3
19 m²Office 2
25 m²Office 1
19 m²Reception area
14 m²Office 4
14 m²Kiosk
8 m²Female
WC?
25 m²Waiting area
10 m²Male
3 m²Para
5
A102
6
A102
500mm line of roof overhang
110Ø pvc soilpipe invert level min 450 with min fall 1:60 to sewer connection
IE
110Ø
pvc
soi
lpip
e in
vert
leve
l min
450
w
ith m
in fa
ll 1:
60 to
sew
er c
onne
ctio
n
500m
m li
ne o
f ro
of o
verh
ang
1000
mm
line
of
roof
ove
rhan
g
500m
m li
ne o
f ro
of o
verh
ang
D06
D06
D06
D06
D06
D06
D06
D06
D06D06
D05
59
W02
W01
W01
W01
W01
W01
W01
W01
W01
W01
W01
W01
W01
W01
W01
W01
W01
W01
W01
W01
W01
W01
W01
W01
W01
W01
W01
W03
W03
D06
D05
D0359
D04
W05W
05
W04
D06 D06
D06
D06D06
D06
D06
D05
D01
D06
D06
D02W05 W03 W03 W03 W03 W03 W03W05
D06
W03
1.2.3.3.4.5.6.
270 5506 270 4210 110 980 110 3706 220 5730 270
270 871 270 3733 220 10071 220 5457 270
270 20842 270
1141 4003 632 9609 5997
21382
2706
1022
035
2022
014
8011
010
0011
013
0011
022
1111
022
1122
010
7011
042
8822
0
270
4350
220
1480
270
2140
270
3817
110
2868
110
4200
110
4200
110
4300
270
270
6050
270
2140
270
3817
270
2548
270
1292
027
0
270
2855
527
0
1346
025
4843
5721
4065
90
2909
5
27061
088
0
270 2141 220 1600 110 1850 110 3955 110 4796 220 1200 110 3660 270490
270
270 2141 220 1540 110 900 110 900 110 1350 110 900 110 900 110 3381 110 890 110 890 220 5730 270
270 20842 270
2411 12701 6270
21382
220
3520
220
3160
110
925
110
4317
220
1090
110
2448
110
1730
220
220
5488
220
4132
270
3190
270
760
220
3520
220
220
1807
022
0
3960
760
3460
5075
5255
1851
0
440
110
1265
110Ø pvc soilpipe invert level min 450 with min fall 1:60 to sewer connection
IE IEIEIEIEIEIE
IE IE
IE IE
IE
IE
IE
10201020
00
0
-85
0
existing staircase to be demolished
1000
1000
new concrete staircase rise 170 mmtread 255 mm
Re
Re
wall to be demolished as shown on plans and make good all trades.
remove existing door and frame, bricked up existing door opening as shown on plans and make good all trades.
new
ope
ning
as
show
n on
pl
ans
and
mak
e go
od a
ll tra
des.
all counters and counter topsby specialist to client's specifications
Pass
age
tile
Interlocking concrete pavers
Interlocking concrete pavers
2000
2500
grass
grass
NOTE :All final levels to bedetermined in site.Please consult Architectfor confirmation.
IBR Kliplock 686 sheeting Colour:Sunset Red. fixed on evenly space battens. Industrial roof insulation on battens on pre-manufactured timber trusses to Roof truss contractors specifications. 100mm aerolite above ceiling insulation.
150mm Concrete Slab to Structural Engineer's Detail Slab Soffit to be Painted White
parapet wall
1 2 3 4
5
6
2500
2000
2000
4500
R o
c h
e s
t e
r S
t r e
e t
Erf:8470
55.10m
Interlocking concrete pavers
Erf:
Existing house
Erf:8471
Interlocking concrete pavers
55.10m
55.1
0m55.1
0m
NO
obs
truct
ion
Vehi
cle
Entra
nce
Bell
mou
th e
ntra
nces
(to
be
cons
truct
ed w
ith h
eavy
dut
y ke
rbin
g at
a ra
dius
of 6
, 5
MIN
25m
m
ASPH
ALT
2m building line
2m b
uild
ing
line
4.5m
bui
ldin
g lin
e
2m building line
grass
grass
Existing Garage
prop
osed
814
Erf:8472
stormwater run-off
stormwater run-off stormwater
run-off
stormwater run-off
stormwater run-off
stormwater run-off
Ex. e
ntra
nce
Ex. e
ntra
nce
ARCHITECTS:
[email protected]______www.80something.co.za
Owner:
Scale:
Sheet:
Revision:
Designed By
Drwawing No.
Checked
Drawn By
Drwawing title:
Sign.
Sign.
Sign.
SACAP: (PrArch) Reg. No. 5830
.........................................................Lusapo John Walaza
No. 9 Sterre road, Nancefield, Gauteng, 1811TEL : (011) 945 1210FAX : 086 602 6488
Consultans:
Client:
NOTES:BASED ON THE NATIONAL BUILDING REGULATIONS AND SABS Code of Practice 0400-1987.
B STRUCTURAL NOTESThe design of the STRUCTURAL ELEMENTS AND COMPONENTS will be carried out by a PROFESSIONAL ENGINEER who has certified that the design complies with the requirements of The National Building Regulations.
C ROOM DIMENSIONSHABITABLE ROOMS will have a floor area of not less than 6sqm, a minimum horizontal dimension of not less than 2m and a minimum height of 2,4m.
D PUBLIC SAFETYThe edge of any CHANGE OF LEVEL more than 1m above any adjacent level is provided with a BALUSTRADE or PARAPET WALL not less than 1m high and such balustrade will not have any openings larger than 100mm.
E DEMOLITION WORKAll demolitions, including protection of the public, will be executed in strict accordance with Part E of The National Building Regulations.
F SITE OPERATIONSAll site operations, including protection of the public, will be executed in strict accordance with Part F of The National Building Regulations under the supervision of the ARCHITECT and the ENGINEER.Approved sanitary facilities for all personnel will be available before the commencement of and throughout the duration of the building operations.SOIL POISONING: The ground area prescribed in code of practice SABS 0124 shall be treated in accordance with the recommendations of SABS 0124.
G EXCAVATIONS, H FOUNDATIONS, J FLOORS, K WALLSParts G, H, J and K will be designed by a PROFESSIONAL ENGINEER and will be executed in strict accordance with the National Building Regulations and SABS 0400.Approved DAMP-PROOF COURSING (as SABS 248,952 or 298) extending the full thickness of walls to be installed at all WALLS at the level at the TOP of the SURFACE BED at least 150mm above the adjoining ground and at all WINDOW SILLSAn approved VERTICAL WATERPROOF MEMBRANE to be fitted where a WALL of a room is in contact with the ground.Roofs to be ANCHORED to walls in compliance with clause KK13 of The National Building Regulations.
L ROOFSSee sections and roof plans for notes and details.
O LIGHTING AND VENTILATIONHABITABLE ROOMS to be provided with WINDOWS.The total area of any such window is to be not less than 10% of the floor area served by it for NATURAL LIGHT, and such window will be provided with opening sections for NATURAL VENTILATION the total area of which will not be less than 5% of the floor area of the room, or 0.2sqm, whichever is the greater.
P DRAINAGESINGLE STACK and 2 PIPE SYSTEMS as shown complying with Part P of the National Regulations and comprising the following:-100∅ DISCHARGE STACKS, SOIL DISCHARGE PIPES, DRAINS and STACK VENTS of approved material.50 dia SOIL DISCHARGE PIES to urinals.40 dia WASTE DISCHARGE PIPES to wash hand basins's, showers, baths, sinks discharging to single stacks.GULLY to comply with P29.
All waste fittings to have RESEALING TRAPS and water seals not less than 65mm.ACCESS to the drainage installation to be provided by adequately marked and protected and permanently accessible RODDING EYES at all changes of direction, within 1,5m of the drain connection to the sewer, at the highest point of the drain and at 25m intervals along the line of the drain.INSPECTION EYES at all bends and junctions.
Block D, Hartfied Gardens333 Grosvernor Street
Hartfield, Pretoria0083
Tell: 012 632 1300
Srsqs Quantity SurveyorsCnr. John Vorster & Karee StreetSouthdowns Office Park,block D
Centurion, Irene.0157
Tell: 012 665 0996
2018/10/25 7:55:42 AM
As indicated
Floor, Roof and Site layout plan
Author
Checker
Designer
Project Number A101
ADDITIONS ANDALTERATIONS TO EXISTINGHOUSE ON Erf. No. 8470, 7
ROCHESTER STREETVINCENT, EAST LONDON
1 : 10001 Ground Floor level
Area scheduleArea of site
Ground floor
Proposed
existing house
Total
Coverage
F.a.r
Coverage Percentage
945m²
200.90m²
233.00m²
474.90m²
50%
1 : 200Roof Layout Plan
1 : 20000 Site Floor Plan2
existing garage 41m²
474.90m²
STRAPPING
METAL APRONFLASHING
DERBIGUM STAR
DERBIGUM COLLAR
CUT
Ground Floor level0
Window level2125
Underside Of Slab2890
Level 83145
Level 93910
Level 101020
NOTE :All final levels to bedetermined in site.Please consult Architectfor confirmation.
all windows and doors as per schedule
IBR Kliplock 686 sheeting Colour:Sunset Red. fixed on evenly space battens. Industrial roof insulation on battens on pre-manufactured timber trusses to Roof truss contractors specifications. 100mm aerolite above ceiling insulation.
15 mm plaster & paint to owner's choice
15 mm plaster & paint to owner's choice
Ground Floor level0
Window level2125
Underside Of Slab2890
NOTE :All final levels to bedetermined in site.Please consult Architectfor confirmation.
all windows and doors as per schedule
IBR Kliplock 686 sheeting Colour:Sunset Red. fixed on evenly space battens. Industrial roof insulation on battens on pre-manufactured timber trusses to Roof truss contractors specifications. 100mm aerolite above ceiling insulation.
15 mm plaster & paint to owner's choice
Level 7-1615
Level 83145
Level 101020
NOTE :All final levels to bedetermined in site.Please consult Architectfor confirmation.
all windows and doors as per schedule
IBR Kliplock 686 sheeting Colour:Sunset Red. fixed on evenly space battens. Industrial roof insulation on battens on pre-manufactured timber trusses to Roof truss contractors specifications. 100mm aerolite above ceiling insulation.
15 mm plaster & paint to owner's choice
Ground Floor level0
Window level2125
Underside Of Slab2890
Level 7-161525
5
Level 83145
Level 93910
Level 101020
NOTE :All final levels to bedetermined in site.Please consult Architectfor confirmation.
all windows and doors as per schedule
IBR Kliplock 686 sheeting Colour:Sunset Red. fixed on evenly space battens. Industrial roof insulation on battens on pre-manufactured timber trusses to Roof truss contractors specifications. 100mm aerolite above ceiling insulation.
150mm Concrete Slab to Structural Engineer's Detail Slab Soffit to be Painted White
15 mm plaster & paint to owner's choice
Ground Floor level0
Window level2125
Underside Of Slab2890
Office 3?Office 4
?Female
?Male
?
GENERAL FOUNDATIONS NOTE:FOUNDATIONS TO BE ESCAVATED BELOW ANY FILLING TO A DEPTH OF THE
ENGINEERS SPECIFICATION.IF A CONCRETE APRON IS RECOMMENDED, IT SHOULD BE LAID AT MINIMUM OF 255
BELOW FGL AND COVERED WITH HARDPACKED SOIL.
40mm SCREED 100mm SURFACEBED ON 250 MICRON USB GREEN FILLING AS PER ENGINEER ON COMPACTED GROUND FILLING IN
LAYERS NOT EXCEEDING 150mm MAX - ALL TO ENGINEER
NOTE :All final levels to bedetermined in site.Please consult Architectfor confirmation.
700 x 300 min 25mpa concrete foundation to engineers
specification min. 255 below nglDRAINAGE AROUND THE STRUCTURE MUST BE CONTROLLED IN ORDER TO KEEP THE FOUNDATION DRY. THE GROUND SURFACE AROUND THE WALL MUST BE
SHAPED WITH A POSITIVE FALL AWAY FROM THE WALL. AN IMPERMIABLE APRON OF 1.5 - 2m WIDE MUST BE FORMED AROUND THE WALL AND RAINWATER MUST BE
LED AWAY FROM THE WALL TO PREVENT PONDING OF WATER ABOVE THE FOUNDATION.
IBR Kliplock 686 sheeting Colour:Sunset Red. fixed on evenly space battens. Industrial roof insulation on battens on pre-manufactured timber trusses to Roof truss contractors specifications. 100mm aerolite above ceiling insulation.4mm Torched on Derbigum Waterproofing on
40mm min Cement Screed to Fall on170mm Concrete Slab to Structural Engineer's DetailSlab Soffit to be Painted White
dpc to be incorporated beneath all window cills and
underneath all floors
all windows and doors as per schedule
10°
Ground Floor level0
Window level2125
Underside Of Slab2890
Level 7-1615
2720
2720
Level 83145
Level 93910
Level 101020
2465
2125
220
506
2890
GENERAL FOUNDATIONS NOTE:FOUNDATIONS TO BE ESCAVATED BELOW ANY FILLING TO A DEPTH OF THE
ENGINEERS SPECIFICATION.IF A CONCRETE APRON IS RECOMMENDED, IT SHOULD BE LAID AT MINIMUM OF 255
BELOW FGL AND COVERED WITH HARDPACKED SOIL.
40mm SCREED 100mm SURFACEBED ON 250 MICRON USB GREEN FILLING AS PER ENGINEER ON COMPACTED GROUND FILLING IN
LAYERS NOT EXCEEDING 150mm MAX - ALL TO ENGINEER
NOTE :All final levels to bedetermined in site.Please consult Architectfor confirmation.
700 x 300 min 25mpa concrete foundation to engineers
specification min. 255 below ngl
DRAINAGE AROUND THE STRUCTURE MUST BE CONTROLLED IN ORDER TO KEEP THE FOUNDATION DRY. THE GROUND SURFACE AROUND THE WALL MUST BE
SHAPED WITH A POSITIVE FALL AWAY FROM THE WALL. AN IMPERMIABLE APRON OF 1.5 - 2m WIDE MUST BE FORMED AROUND THE WALL AND RAINWATER MUST BE
LED AWAY FROM THE WALL TO PREVENT PONDING OF WATER ABOVE THE FOUNDATION.
IBR Kliplock 686 sheeting Colour:Sunset Red. fixed on evenly space battens. Industrial roof insulation on battens on pre-manufactured timber trusses to Roof truss contractors specifications. 100mm aerolite above ceiling insulation.
4mm Torched on Derbigum Waterproofing on40mm min Cement Screed to Fall on170mm Concrete Slab to Structural Engineer's DetailSlab Soffit to be Painted White
dpc to be incorporated beneath all window cills and
underneath all floors
Open plan office?
Office 4?
10°
10°
all windows and doors as per schedule
100
Architect's specification* Final corbelling detail to
match existingplastered to
MinimumDUAL REINFORCED DERBIGUM SP4
Coping to specification
Screed to fall
Fillet min. 50/50mm
Internal face
overlap
100
fully sealed using COLDBOND90 or Torch Fusion
rendered smooth
Roof slab to Engineersspecification
Stepped dpc
towards rwp
Glass fibre/polyester counter flashing overcoated with GEOFLEX
min 1:100Screed to fall
fully sealedDERBIGUM SP4
400x400 SP4 pad
Slab to specification
dressed into outlet
ARCHITECTS:
[email protected]______www.80something.co.za
Owner:
Scale:
Sheet:
Revision:
Designed By
Drwawing No.
Checked
Drawn By
Drwawing title:
Sign.
Sign.
Sign.
SACAP: (PrArch) Reg. No. 5830
.........................................................Lusapo John Walaza
No. 9 Sterre road, Nancefield, Gauteng, 1811TEL : (011) 945 1210FAX : 086 602 6488
Consultans:
Client:
NOTES:BASED ON THE NATIONAL BUILDING REGULATIONS AND SABS Code of Practice 0400-1987.
B STRUCTURAL NOTESThe design of the STRUCTURAL ELEMENTS AND COMPONENTS will be carried out by a PROFESSIONAL ENGINEER who has certified that the design complies with the requirements of The National Building Regulations.
C ROOM DIMENSIONSHABITABLE ROOMS will have a floor area of not less than 6sqm, a minimum horizontal dimension of not less than 2m and a minimum height of 2,4m.
D PUBLIC SAFETYThe edge of any CHANGE OF LEVEL more than 1m above any adjacent level is provided with a BALUSTRADE or PARAPET WALL not less than 1m high and such balustrade will not have any openings larger than 100mm.
E DEMOLITION WORKAll demolitions, including protection of the public, will be executed in strict accordance with Part E of The National Building Regulations.
F SITE OPERATIONSAll site operations, including protection of the public, will be executed in strict accordance with Part F of The National Building Regulations under the supervision of the ARCHITECT and the ENGINEER.Approved sanitary facilities for all personnel will be available before the commencement of and throughout the duration of the building operations.SOIL POISONING: The ground area prescribed in code of practice SABS 0124 shall be treated in accordance with the recommendations of SABS 0124.
G EXCAVATIONS, H FOUNDATIONS, J FLOORS, K WALLSParts G, H, J and K will be designed by a PROFESSIONAL ENGINEER and will be executed in strict accordance with the National Building Regulations and SABS 0400.Approved DAMP-PROOF COURSING (as SABS 248,952 or 298) extending the full thickness of walls to be installed at all WALLS at the level at the TOP of the SURFACE BED at least 150mm above the adjoining ground and at all WINDOW SILLSAn approved VERTICAL WATERPROOF MEMBRANE to be fitted where a WALL of a room is in contact with the ground.Roofs to be ANCHORED to walls in compliance with clause KK13 of The National Building Regulations.
L ROOFSSee sections and roof plans for notes and details.
O LIGHTING AND VENTILATIONHABITABLE ROOMS to be provided with WINDOWS.The total area of any such window is to be not less than 10% of the floor area served by it for NATURAL LIGHT, and such window will be provided with opening sections for NATURAL VENTILATION the total area of which will not be less than 5% of the floor area of the room, or 0.2sqm, whichever is the greater.
P DRAINAGESINGLE STACK and 2 PIPE SYSTEMS as shown complying with Part P of the National Regulations and comprising the following:-100∅ DISCHARGE STACKS, SOIL DISCHARGE PIPES, DRAINS and STACK VENTS of approved material.50 dia SOIL DISCHARGE PIES to urinals.40 dia WASTE DISCHARGE PIPES to wash hand basins's, showers, baths, sinks discharging to single stacks.GULLY to comply with P29.
All waste fittings to have RESEALING TRAPS and water seals not less than 65mm.ACCESS to the drainage installation to be provided by adequately marked and protected and permanently accessible RODDING EYES at all changes of direction, within 1,5m of the drain connection to the sewer, at the highest point of the drain and at 25m intervals along the line of the drain.INSPECTION EYES at all bends and junctions.
Block D, Hartfied Gardens333 Grosvernor Street
Hartfield, Pretoria0083
Tell: 012 632 1300
Srsqs Quantity SurveyorsCnr. John Vorster & Karee StreetSouthdowns Office Park,block D
Centurion, Irene.0157
Tell: 012 665 0996
2018/10/25 7:55:59 AM
1 : 100
Elevations and Sections
Author
Checker
Designer
Project Number A102
ADDITIONS ANDALTERATIONS TO EXISTINGHOUSE ON Erf. No. 8470, 7
ROCHESTER STREETVINCENT, EAST LONDON
1 : 100East
1 : 100North
1 : 100South
1 : 100West
1 : 100Section 1
1 : 100Section 2
drainage outlet for roof slabsParapet detail for roof slabs
600
600
600
1800
2125
W01
26
Window No.
Quantity
Type of frame
Finish
Mechanism/Fittings
Standard extruded aluminum window framePowder-coated finish, color to color scheduleAll standard mechanisms / fittings as normally required for such a window
Glazing Type of glass : clear / obscure float glass. Glass thickness : to NBR (see glass schedule : title block)
fitting of Glass Glass to be factory fitted to manufacturer's specification
2125
W02
02
Standard extruded aluminum window framePowder-coated finish, color to color scheduleAll standard mechanisms / fittings as normally required for such a windowType of glass : clear / obscure float glass. Glass thickness : to NBR (see glass schedule : title block)Glass to be factory fitted to manufacturer's specification
2125 30
060
0
900
600
W03
09
Standard extruded aluminum window framePowder-coated finish, color to color scheduleAll standard mechanisms / fittings as normally required for such a windowType of glass : clear / obscure float glass. Glass thickness : to NBR (see glass schedule : title block)Glass to be factory fitted to manufacturer's specification
DOOR DESCRIPTION
DOOR FRAME
DOOR FINISH
QUANTITY
18820MM X 2125MM ALUMINIUM HINGED DOUBLE DOOR WITH MIDRAIL HUNG ON PAIR OF ALUMINIUM BUTTS,GLAZED IN ACCORDANCE WITH SANS 10160:2010, SANS 10137:2002, SANS 10400:2010 (PART N OFSECTION 3) AND SANS 1263:2006, ALL IN ACCORDANCE WITH AAAMSA SELECTION GUIDE FOR GLAZEDALUMINIUM ARCHITECTURAL ALUMINIUM PRODUCTS.
D01
01
PURPOSE-MADE ALUMINIUM FRAME, MANUFACTURED FROM STANDARD ALUMINIUM SECTIONS.PURPOSE-MADE ALUMINIUM FRAME, MANUFACTURED FROM STANDARD ALUMINIUM SECTIONS.
STANDARD POWDER COATED WHITE TO MANUFACTURERS SPECIFICATIONS
ironmongery
GLAZING 6,38MM ENVIROSAFE CLEAR SAFETY LAMINATE N.S.
5000
1014 990 990 990 1014
D04
01
ALUMINIUM HINGED FOLDING DOOR WITH MIDRAIL HUNG ON PAIR OF ALUMINIUM BUTTS,GLAZED IN ACCORDANCE WITH SANS 10160:2010, SANS 10137:2002, SANS 10400:2010 (PART N OFSECTION 3) AND SANS 1263:2006, ALL IN ACCORDANCE WITH AAAMSA SELECTION GUIDE FOR GLAZEDALUMINIUM ARCHITECTURAL ALUMINIUM PRODUCTS.
PURPOSE-MADE ALUMINIUM FRAME, MANUFACTURED FROM STANDARD ALUMINIUM SECTIONS.PURPOSE-MADE ALUMINIUM FRAME, MANUFACTURED FROM STANDARD ALUMINIUM SECTIONS.
STANDARD POWDER COATED WHITE TO MANUFACTURERS SPECIFICATIONS
6 MM ENVIROSAFE CLEAR SAFETY LAMINATE N.S.
2465
D03
01
D06
25
D02
01
D05
03
925
GENERAL NOTES:1. THE CONTRACTOR IS REQUIREDTO CHECK THAT NONE OF THE PAGES ARE MISSING OR DUPLICATED. IF ANY PART OF THIS SCHEDULE ISINDISTINCT OR CONTAINS ANY OBVIOUS ERRORS, THE CONTRACTOR MUST MAKE WRITTEN APPLICATION TOTHE ARCHITECT TO HAVE SUCH ERRORS RECTIFIED.2. UNLESS OTHERWISE INDICATED, ALL ELEVATIONS ARE EXTERNAL ELEVATIONS.3. DOOR FRAMES AREA TO BE ADEQUATELY PROTECTED AGAINST DAMAGE AND SPOILING AFTERFIXING INTO POSITION.4. GLASS SHALL BE FREE FROM FLAWS, SPECKS, SCRATCHES, BUBBLES AND ANY OTHER DEFECTS,AND SHALL BE CLEANED DOWN UPON COMPLETION. BROKEN GLASS SHALL BE REPLACED AT THECONTRACTOR'S EXPENSE.5. EVERY WINDOW IS TO BE TESTED UPON COMPLETION OF THE CONTRACT, ADJUSTED WHERENECESSARY AND LEFT IN PERFECT WORKING ORDER.6. FRAMES AND LININGS ARE TO BE ADEQUATELY PROTECTED AGAINST DAMAGE AND SPOILINGAFTER FIXING IN POSITION.7. ALL WINDOWS ARE TO HAVE FACTORY FITTED BURGLAR BARS.8. GLASS TO BE MARKED IN ACCORDANCE TO SABS 0137-200 CODE OF PRACTICE.9. ALL EXTERNAL DOORS TO BE FITTED WITH WEATHER STRIP
Note:All dimensions to be checkedand verified on site prior tomanufacture.Allow for a clear silicone bead allaround both sides of windowframe.All juctions of aluminiumsections to be sealed with clearsilicone bead all around tomanufacturer's recomendationswhere cut & mitred.
Note:All glazing to be executed strictly in conformancewith the glassmanufacturers recommendations and all inaccordance with the National BuildingRegulations.Clear glass in accordance with DSS SANS10400-XA, Part X: Evironmental Sustainability &Part XA: Energy Usagein Buildings and SANS 204 for energy effieciencyin buildings, SABS 0400,SABS 1263 andAAAMSA selection guide for safety glazingmaterials.
Swartland Cape Culture door frame with full glass with 90 x 70mm rebated, moulded, grooved and weather grooved hardwood door frame with full glass toplight and 90 x 44mm splay rebated, grooved and weather grooved sealed with a linseed oil basedtransit stabilizing sealer.
PURPOSE-MADE ALUMINIUM FRAME, MANUFACTURED FROM STANDARD ALUMINIUM SECTIONS.PURPOSE-MADE ALUMINIUM FRAME, MANUFACTURED FROM STANDARD ALUMINIUM SECTIONS.
STANDARD POWDER COATED WHITE TO MANUFACTURERS SPECIFICATIONS
6 MM ENVIROSAFE CLEAR SAFETY LAMINATE N.S.
Sand down new timber surface to a fine smooth finish and apply three coats Swartland Maxicare Mahogany quality timber sealant (Code: MC/W/MAH/1), all in accordance with the manufacturer`s recommendations.
Sand down new timber surface to a fine smooth finish and apply three coats Swartland Maxicare Mahogany quality timber sealant (Code: MC/W/MAH/1), all in accordance with the manufacturer`s recommendations.
Swartland Cape Culture door frame with full glass toplight with 90 x 70mm rebated, moulded, grooved and weather grooved hardwood door frame with full glass toplight and 90 x 44mm splay rebated, grooved and weather grooved sealed with a linseed oil basedtransit stabilizing sealer.
44mm semi-solid core door size 813 x 2032mm with Masonite Plain standard S.A.B.S approved hardboard,on both sides for door size 813 x 1882mm high.
Stop, fill, sand down and prepare wood surfaces. Apply one coat Wood Primer, one coat Universal Undercoat, two coats Super Universal Enamel paint to new interior general wood surfaces.All applied in strict accordance to manufacturersColour: As per colour schedule.
105 x 50mm moulded and rebated hardwood door frame, overall size 889 x 2090mmsuitable for single door with fan light, size 813 x 2032mm high.
N/A 6 MM ENVIROSAFE CLEAR SAFETY LAMINATE N.S. N/A
Cylinder lockset with hollow brushed stainless steel or aluminium furniture as per Dorma, or similar approved by the Architect.
Cylinder lockset with hollow brushed stainless steel or aluminium furniture as per Dorma, or similar approved by the Architect.
Cylinder lockset with hollow brushed stainless steel or aluminium furniture as per Dorma, or similar approved by the Architect.
Cylinder lockset with hollow brushed stainless steel or aluminium furniture as per Dorma, or similar approved by the Architect.
AS PER MANUFACTURER'S SPECIFICATIONAS PER MANUFACTURER'S SPECIFICATION
813 X 2032 X 40MM THICK "TDM" SEMI SOLID DOOR WITHCOMMERCIAL VENEER BOTH SIDES AND 2 HARDWOODCONCEALED EDGES.
556
600 900 600
2100600
W04
01
Standard extruded aluminum window framePowder-coated finish, color to color scheduleAll standard mechanisms / fittings as normally required for such a windowType of glass : clear / obscure float glass. Glass thickness : to NBR (see glass schedule : title block)Glass to be factory fitted to manufacturer's specification
Standard extruded aluminum window framePowder-coated finish, color to color scheduleAll standard mechanisms / fittings as normally required for such a windowType of glass : clear / obscure float glass. Glass thickness : to NBR (see glass schedule : title block)Glass to be factory fitted to manufacturer's specification
W04
05
600
600
1200
600 600 600
1800 900
600
300 90
0
2125
8931480 815
Office 1
Meeting room
Board room
Filing room
Server room
Waiting area
Reception
Kitchen
Office 2
Office 3
Office 4
Dining
V. Male toilets
V. Female toilets
O. Male toilets
O. Male toilets
Sick Bay
Floor Skirting Wall Ceiling
Approved 12.7mm x 120mm x1200mm stained and sealed mahogany floor planks with brushed aluminium strips inlays
330x330mm ceramic floor tiles code: un 512. fixed with a min 5mm bed of rapid hardening adhesive and grouted with 3mm flush joints
330x330mm ceramic floor tiles code: un 512. fixed with a min 5mm bed of rapid hardening adhesive and grouted with 3mm flush joints
330x330mm ceramic floor tiles code: un 512. fixed with a min 5mm bed of rapid hardening adhesive and grouted with 3mm flush joints
330x330mm ceramic floor tiles code: un 512. fixed with a min 5mm bed of rapid hardening adhesive and grouted with 3mm flush joints
600 mm x 600 mm Porcelain tiles or similar
600 mm x 600 mm Porcelain tiles or similar
600 mm x 600 mm Porcelain tiles or similar
600 mm x 600 mm Porcelain tiles or similar
Open space & Passages
Floorworx Laminated Floor or similar approvedStrip design boards size 1225 x 200 x 7mm thick water proof membrane layer lapped 200mm including 40mm turn
Floorworx Laminated Floor or similar approvedStrip design boards size 1225 x 200 x 7mm thick water proof membrane layer lapped 200mm including 40mm turn
carpet 100% recycled matirial colour blue
carpet 100% recycled matirial colour blue
Approved 12.7mm x 120mm x1200mm stained and sealed mahogany floor planks with brushed aluminium strips inlays
Approved 12.7mm x 120mm x1200mm stained and sealed mahogany floor planks with brushed aluminium strips inlays
Approved 12.7mm x 120mm x1200mm stained and sealed mahogany floor planks with brushed aluminium strips inlays
330x330mm ceramic floor tiles code: un 512. fixed with a min 5mm bed of rapid hardening adhesive and grouted with 3mm flush joints
raised floor to manufacture's specification
75x19mm meranti skirting sand papered, 1 coat sanding sealer, 3 coats clear varnish screwed and plugged to wall with counter sunk screws at 450mm c/c.
75x19mm meranti skirting sand papered, 1 coat sanding sealer, 3 coats clear varnish screwed and plugged to wall with counter sunk screws at 450mm c/c.
75x19mm meranti skirting sand papered, 1 coat sanding sealer, 3 coats clear varnish screwed and plugged to wall with counter sunk screws at 450mm c/c.
75x19mm meranti skirting sand papered, 1 coat sanding sealer, 3 coats clear varnish screwed and plugged to wall with counter sunk screws at 450mm c/c.
75x19mm meranti skirting sand papered, 1 coat sanding sealer, 3 coats clear varnish screwed and plugged to wall with counter sunk screws at 450mm c/c.
75x19mm meranti skirting sand papered, 1 coat sanding sealer, 3 coats clear varnish screwed and plugged to wall with counter sunk screws at 450mm c/c.
75x19mm meranti skirting sand papered, 1 coat sanding sealer, 3 coats clear varnish screwed and plugged to wall with counter sunk screws at 450mm c/c.
75x19mm meranti skirting sand papered, 1 coat sanding sealer, 3 coats clear varnish screwed and plugged to wall with counter sunk screws at 450mm c/c.
75x19mm meranti skirting sand papered, 1 coat sanding sealer, 3 coats clear varnish screwed and plugged to wall with counter sunk screws at 450mm c/c.
75x19mm meranti skirting sand papered, 1 coat sanding sealer, 3 coats clear varnish screwed and plugged to wall with counter sunk screws at 450mm c/c.
75x19mm meranti skirting sand papered, 1 coat sanding sealer, 3 coats clear varnish screwed and plugged to wall with counter sunk screws at 450mm c/c.
75x19mm meranti skirting sand papered, 1 coat sanding sealer, 3 coats clear varnish screwed and plugged to wall with counter sunk screws at 450mm c/c.
75x19mm meranti skirting sand papered, 1 coat sanding sealer, 3 coats clear varnish screwed and plugged to wall with counter sunk screws at 450mm c/c.
75x19mm meranti skirting sand papered, 1 coat sanding sealer, 3 coats clear varnish screwed and plugged to wall with counter sunk screws at 450mm c/c.
2 x coats eggshell acrylic1 x coat undercoat1 x coat smooth gypsum plaster1 x coat cement plaster
200x200mm glazed ceramic wall tiles fixed with prof adhesive & pointed with 3mm flush joints to 2200mm high. above 2200mm; 2 x coat eggshell acrylic, on 1 x undercoat, on 2 x coats plaster.
200x200mm glazed ceramic wall tiles fixed with prof adhesive & pointed with 3mm flush joints to 2200mm high. above 2200mm; 2 x coat eggshell acrylic, on 1 x undercoat, on 2 x coats plaster.
200x200mm glazed ceramic wall tiles fixed with prof adhesive & pointed with 3mm flush joints to 2200mm high. above 2200mm; 2 x coat eggshell acrylic, on 1 x undercoat, on 2 x coats plaster.
200x200mm glazed ceramic wall tiles fixed with prof adhesive & pointed with 3mm flush joints to 2200mm high. above 2200mm; 2 x coat eggshell acrylic, on 1 x undercoat, on 2 x coats plaster.
2 x coats eggshell acrylic1 x coat undercoat1 x coat smooth gypsum plaster1 x coat cement plaster
2 x coats eggshell acrylic1 x coat undercoat1 x coat smooth gypsum plaster1 x coat cement plaster
2 x coats eggshell acrylic1 x coat undercoat1 x coat smooth gypsum plaster1 x coat cement plaster
2 x coats eggshell acrylic1 x coat undercoat1 x coat smooth gypsum plaster1 x coat cement plaster
2 x coats eggshell acrylic1 x coat undercoat1 x coat smooth gypsum plaster1 x coat cement plaster
2 x coats eggshell acrylic1 x coat undercoat1 x coat smooth gypsum plaster1 x coat cement plaster
2 x coats eggshell acrylic1 x coat undercoat1 x coat smooth gypsum plaster1 x coat cement plaster
2 x coats eggshell acrylic1 x coat undercoat1 x coat smooth gypsum plaster1 x coat cement plaster
2 x coats eggshell acrylic1 x coat undercoat1 x coat smooth gypsum plaster1 x coat cement plaster
2 x coats eggshell acrylic1 x coat undercoat1 x coat smooth gypsum plaster1 x coat cement plaster
2 x coats eggshell acrylic1 x coat undercoat1 x coat smooth gypsum plaster1 x coat cement plaster
2 x coats eggshell acrylic1 x coat undercoat1 x coat smooth gypsum plaster1 x coat cement plaster
2 x coats eggshell acrylic1 x coat undercoat1 x coat smooth gypsum plaster1 x coat cement plaster
2 x coats acrylic paint, 1 x undercoat to plastered 6.4mm thick gypsum ceiling, sand papered, sealed and primed with 2x50mm fibre glass insulation laid crosswise with a single sheet of kraft paper laid underneath.
2 x coats acrylic paint, 1 x undercoat to plastered 6.4mm thick gypsum ceiling, sand papered, sealed and primed with 2x50mm fibre glass insulation laid crosswise with a single sheet of kraft paper laid underneath.
2 x coats acrylic paint, 1 x undercoat to plastered 6.4mm thick gypsum ceiling, sand papered, sealed and primed with 2x50mm fibre glass insulation laid crosswise with a single sheet of kraft paper laid underneath.
2 x coats acrylic paint, 1 x undercoat to plastered 6.4mm thick gypsum ceiling, sand papered, sealed and primed with 2x50mm fibre glass insulation laid crosswise with a single sheet of kraft paper laid underneath.
2 x coats acrylic paint, 1 x undercoat to plastered 6.4mm thick gypsum ceiling, sand papered, sealed and primed with 2x50mm fibre glass insulation laid crosswise with a single sheet of kraft paper laid underneath.
2 x coats acrylic paint, 1 x undercoat to plastered 6.4mm thick gypsum ceiling, sand papered, sealed and primed with 2x50mm fibre glass insulation laid crosswise with a single sheet of kraft paper laid underneath.
2 x coats acrylic paint, 1 x undercoat to plastered 6.4mm thick gypsum ceiling, sand papered, sealed and primed with 2x50mm fibre glass insulation laid crosswise with a single sheet of kraft paper laid underneath.
2 x coats acrylic paint, 1 x undercoat to plastered 6.4mm thick gypsum ceiling, sand papered, sealed and primed with 2x50mm fibre glass insulation laid crosswise with a single sheet of kraft paper laid underneath.
2 x coats acrylic paint, 1 x undercoat to plastered 6.4mm thick gypsum ceiling, sand papered, sealed and primed with 2x50mm fibre glass insulation laid crosswise with a single sheet of kraft paper laid underneath.
2 x coats acrylic paint, 1 x undercoat to plastered 6.4mm thick gypsum ceiling, sand papered, sealed and primed with 2x50mm fibre glass insulation laid crosswise with a single sheet of kraft paper laid underneath.
2 x coats acrylic paint, 1 x undercoat to plastered 6.4mm thick gypsum ceiling, sand papered, sealed and primed with 2x50mm fibre glass insulation laid crosswise with a single sheet of kraft paper laid underneath.
2 x coats acrylic paint, 1 x undercoat to plastered 6.4mm thick gypsum ceiling, sand papered, sealed and primed with 2x50mm fibre glass insulation laid crosswise with a single sheet of kraft paper laid underneath.
2 x coats acrylic paint, 1 x undercoat to plastered 6.4mm thick gypsum ceiling, sand papered, sealed and primed with 2x50mm fibre glass insulation laid crosswise with a single sheet of kraft paper laid underneath.
2 x coats acrylic paint, 1 x undercoat to plastered 6.4mm thick gypsum ceiling, sand papered, sealed and primed with 2x50mm fibre glass insulation laid crosswise with a single sheet of kraft paper laid underneath.
SANITARYWARE
Basins –Manufactured of acrylic material (white colour) as per developer’s preferred choice and range.
Toilets –Wall - hung (white colour) with Geberit or similar system as per developer’s preferred choice and range.
Mixers (wash hand basin, bath and or shower) -Grohe or similar as per developer’s preferred choice and range.
Kitchen sink -Stainless steel double bowl sink as per developer’s preferred choice and range.
Accessories -toilet roll holder and towel rail per bathroom and as per developer’s preferred choice and range.
FOUNDATIONS
Concrete strip footings –As per approved plans and Engineer’s detail.STRUCTURE
Main dwelling to have 2220mm external cavity and 110mm partition internal walls (where indicated)
Reinforced pre-cast concrete lintels over all openings.
Concrete deck to be precast.
MISCELLANEOUSMechanical ventilation in compliance with the NBR where needed, natural ventilation will be provided where practical
The material specified in this specification will serve only as a guideline and the developer reserves the right to amend the specification at his sole discretion. Any deviation in specification will be of similar quality.
2141
2125
595
2720
ARCHITECTS:
[email protected]______www.80something.co.za
Owner:
Scale:
Sheet:
Revision:
Designed By
Drwawing No.
Checked
Drawn By
Drwawing title:
Sign.
Sign.
Sign.
SACAP: (PrArch) Reg. No. 5830
.........................................................Lusapo John Walaza
No. 9 Sterre road, Nancefield, Gauteng, 1811TEL : (011) 945 1210FAX : 086 602 6488
Consultans:
Client:
NOTES:BASED ON THE NATIONAL BUILDING REGULATIONS AND SABS Code of Practice 0400-1987.
B STRUCTURAL NOTESThe design of the STRUCTURAL ELEMENTS AND COMPONENTS will be carried out by a PROFESSIONAL ENGINEER who has certified that the design complies with the requirements of The National Building Regulations.
C ROOM DIMENSIONSHABITABLE ROOMS will have a floor area of not less than 6sqm, a minimum horizontal dimension of not less than 2m and a minimum height of 2,4m.
D PUBLIC SAFETYThe edge of any CHANGE OF LEVEL more than 1m above any adjacent level is provided with a BALUSTRADE or PARAPET WALL not less than 1m high and such balustrade will not have any openings larger than 100mm.
E DEMOLITION WORKAll demolitions, including protection of the public, will be executed in strict accordance with Part E of The National Building Regulations.
F SITE OPERATIONSAll site operations, including protection of the public, will be executed in strict accordance with Part F of The National Building Regulations under the supervision of the ARCHITECT and the ENGINEER.Approved sanitary facilities for all personnel will be available before the commencement of and throughout the duration of the building operations.SOIL POISONING: The ground area prescribed in code of practice SABS 0124 shall be treated in accordance with the recommendations of SABS 0124.
G EXCAVATIONS, H FOUNDATIONS, J FLOORS, K WALLSParts G, H, J and K will be designed by a PROFESSIONAL ENGINEER and will be executed in strict accordance with the National Building Regulations and SABS 0400.Approved DAMP-PROOF COURSING (as SABS 248,952 or 298) extending the full thickness of walls to be installed at all WALLS at the level at the TOP of the SURFACE BED at least 150mm above the adjoining ground and at all WINDOW SILLSAn approved VERTICAL WATERPROOF MEMBRANE to be fitted where a WALL of a room is in contact with the ground.Roofs to be ANCHORED to walls in compliance with clause KK13 of The National Building Regulations.
L ROOFSSee sections and roof plans for notes and details.
O LIGHTING AND VENTILATIONHABITABLE ROOMS to be provided with WINDOWS.The total area of any such window is to be not less than 10% of the floor area served by it for NATURAL LIGHT, and such window will be provided with opening sections for NATURAL VENTILATION the total area of which will not be less than 5% of the floor area of the room, or 0.2sqm, whichever is the greater.
P DRAINAGESINGLE STACK and 2 PIPE SYSTEMS as shown complying with Part P of the National Regulations and comprising the following:-100∅ DISCHARGE STACKS, SOIL DISCHARGE PIPES, DRAINS and STACK VENTS of approved material.50 dia SOIL DISCHARGE PIES to urinals.40 dia WASTE DISCHARGE PIPES to wash hand basins's, showers, baths, sinks discharging to single stacks.GULLY to comply with P29.
All waste fittings to have RESEALING TRAPS and water seals not less than 65mm.ACCESS to the drainage installation to be provided by adequately marked and protected and permanently accessible RODDING EYES at all changes of direction, within 1,5m of the drain connection to the sewer, at the highest point of the drain and at 25m intervals along the line of the drain.INSPECTION EYES at all bends and junctions.
Block D, Hartfied Gardens333 Grosvernor Street
Hartfield, Pretoria0083
Tell: 012 632 1300
Srsqs Quantity SurveyorsCnr. John Vorster & Karee StreetSouthdowns Office Park,block D
Centurion, Irene.0157
Tell: 012 665 0996
2019/01/10 3:45:18 PM
1 : 100
Doors, Window & Finishingschedule
Author
Checker
Designer
Project Number A103
ADDITIONS ANDALTERATIONS TO EXISTINGHOUSE ON Erf. No. 8470, 7
ROCHESTER STREETVINCENT, EAST LONDON
1 : 100Doors, Window & Finishing schedule
SBD1
1
PART A INVITATION TO BID
YOU ARE HEREBY INVITED TO BID FOR REQUIREMENTS OF THE (NAME OF DEPARTMENT/ PUBLIC ENTITY)
BID NUMBER: NLC/2019 -04 CLOSING DATE: 15 MARCH 2019 CLOSING TIME: 11:00
DESCRIPTION APPOINTMENT OF A SERVICE PROVIDER TO CONVERT A RESIDENTIAL BUILDING TO AN OFFICE BUILDING FOR THE NATIONAL LOTTERIES COMMISSION IN THE EASTERN CAPE PROVINCE (EAST LONDON OFFICE)
BID RESPONSE DOCUMENTS MAY BE DEPOSITED IN THE BID BOX SITUATED AT (STREET ADDRESS)
NATIONAL LOTTERIES COMMISSION (NLC), Phase 4A, Waverly Office Park, Phillip Frame Road, Chiselhurst, East
London
BIDDING PROCEDURE ENQUIRIES MAY BE DIRECTED TO TECHNICAL ENQUIRIES MAY BE DIRECTED TO:
CONTACT PERSON Tshepiso Mahlake / Bojane Mosima CONTACT PERSON Simon Fete
TELEPHONE NUMBER 012 432 1315 / 1344 TELEPHONE NUMBER 012 432 1515
FACSIMILE NUMBER FACSIMILE NUMBER
E-MAIL ADDRESS [email protected] E-MAIL ADDRESS [email protected]
SUPPLIER INFORMATION
NAME OF BIDDER
POSTAL ADDRESS
STREET ADDRESS
TELEPHONE NUMBER CODE NUMBER
CELLPHONE NUMBER
FACSIMILE NUMBER CODE NUMBER
E-MAIL ADDRESS
VAT REGISTRATION
NUMBER
SUPPLIER
COMPLIANCE STATUS
TAX
COMPLIANCE
SYSTEM PIN:
OR
CENTRAL
SUPPLIER
DATABASE
No: MAAA
B-BBEE STATUS
LEVEL VERIFICATION
CERTIFICATE
TICK APPLICABLE BOX]
Yes No
B-BBEE STATUS LEVEL SWORN
AFFIDAVIT
[TICK APPLICABLE BOX]
Yes No
[A B-BBEE STATUS LEVEL VERIFICATION CERTIFICATE/ SWORN AFFIDAVIT (FOR EMES & QSEs) MUST BE SUBMITTED IN ORDER TO QUALIFY FOR PREFERENCE POINTS FOR B-BBEE]
ARE YOU THE
ACCREDITED
REPRESENTATIVE IN
SOUTH AFRICA FOR
THE GOODS
/SERVICES /WORKS
OFFERED?
Yes No
[IF YES ENCLOSE PROOF]
ARE YOU A FOREIGN BASED
SUPPLIER FOR THE GOODS /SERVICES /WORKS OFFERED?
Yes No
[IF YES, ANSWER PART B:3 ]
QUESTIONNAIRE TO BIDDING FOREIGN SUPPLIERS
IS THE ENTITY A RESIDENT OF THE REPUBLIC OF SOUTH AFRICA (RSA)? YES NO
DOES THE ENTITY HAVE A BRANCH IN THE RSA? YES NO
DOES THE ENTITY HAVE A PERMANENT ESTABLISHMENT IN THE RSA? YES NO
DOES THE ENTITY HAVE ANY SOURCE OF INCOME IN THE RSA? YES NO
IS THE ENTITY LIABLE IN THE RSA FOR ANY FORM OF TAXATION? YES NO IF THE ANSWER IS “NO” TO ALL OF THE ABOVE, THEN IT IS NOT A REQUIREMENT TO REGISTER FOR A TAX COMPLIANCE STATUS SYSTEM PIN CODE FROM THE SOUTH AFRICAN REVENUE SERVICE (SARS) AND IF NOT REGISTER AS PER 2.3 BELOW.
SBD1
2
PART B TERMS AND CONDITIONS FOR BIDDING
1. BID SUBMISSION:
1.1. BIDS MUST BE DELIVERED BY THE STIPULATED TIME TO THE CORRECT ADDRESS. LATE BIDS WILL NOT BE ACCEPTED FOR
CONSIDERATION.
1.2. ALL BIDS MUST BE SUBMITTED ON THE OFFICIAL FORMS PROVIDED–(NOT TO BE RE-TYPED) OR IN THE MANNER PRESCRIBED IN THE BID DOCUMENT.
1.3. THIS BID IS SUBJECT TO THE PREFERENTIAL PROCUREMENT POLICY FRAMEWORK ACT, 2000 AND THE PREFERENTIAL
PROCUREMENT REGULATIONS, 2017, THE GENERAL CONDITIONS OF CONTRACT (GCC) AND, IF APPLICABLE, ANY OTHER SPECIAL
CONDITIONS OF CONTRACT.
1.4. THE SUCCESSFUL BIDDER WILL BE REQUIRED TO FILL IN AND SIGN A WRITTEN CONTRACT FORM (SBD7).
2. TAX COMPLIANCE REQUIREMENTS
2.1 BIDDERS MUST ENSURE COMPLIANCE WITH THEIR TAX OBLIGATIONS.
2.2 BIDDERS ARE REQUIRED TO SUBMIT THEIR UNIQUE PERSONAL IDENTIFICATION NUMBER (PIN) ISSUED BY SARS TO ENABLE THE
ORGAN OF STATE TO VERIFY THE TAXPAYER’S PROFILE AND TAX STATUS.
2.3 APPLICATION FOR TAX COMPLIANCE STATUS (TCS) PIN MAY BE MADE VIA E-FILING THROUGH THE SARS WEBSITE
WWW.SARS.GOV.ZA.
2.4 BIDDERS MAY ALSO SUBMIT A PRINTED TCS CERTIFICATE TOGETHER WITH THE BID.
2.5 IN BIDS WHERE CONSORTIA / JOINT VENTURES / SUB-CONTRACTORS ARE INVOLVED, EACH PARTY MUST SUBMIT A SEPARATE
TCS CERTIFICATE / PIN / CSD NUMBER.
2.6 WHERE NO TCS IS AVAILABLE BUT THE BIDDER IS REGISTERED ON THE CENTRAL SUPPLIER DATABASE (CSD), A CSD NUMBER
MUST BE PROVIDED.
2.7 NO BIDS WILL BE CONSIDERED FROM PERSONS IN THE SERVICE OF THE STATE, COMPANIES WITH DIRECTORS WHO ARE
PERSONS IN THE SERVICE OF THE STATE, OR CLOSE CORPORATIONS WITH MEMBERS PERSONS IN THE SERVICE OF THE
STATE.”
NB: FAILURE TO PROVIDE / OR COMPLY WITH ANY OF THE ABOVE PARTICULARS MAY RENDER THE BID INVALID.
SIGNATURE OF BIDDER: ……………………………………………
CAPACITY UNDER WHICH THIS BID IS SIGNED: ……………………………………………
(Proof of authority must be submitted e.g. company resolution)
DATE: …………………………………………...
SBD 4
DECLARATION OF INTEREST
1. Any legal person, including persons employed by the state¹, or persons having a kinship with persons
employed by the state, including a blood relationship, may make an offer or offers in terms of this
invitation to bid (includes a price quotation, advertised competitive bid, limited bid or proposal). In view
of possible allegations of favouritism, should the resulting bid, or part thereof, be awarded to persons
employed by the state, or to persons connected with or related to them, it is required that the bidder or
his/her authorised representative declare his/her position in relation to the evaluating/adjudicating
authority where-
- the bidder is employed by the state; and/or
- the legal person on whose behalf the bidding document is signed, has a relationship with
persons/a person who are/is involved in the evaluation and or adjudication of the bid(s), or where
it is known that such a relationship exists between the person or persons for or on whose behalf
the declarant acts and persons who are involved with the evaluation and or adjudication of the
bid.
2. In order to give effect to the above, the following questionnaire must be completed and submitted with the bid.
2.1 Full Name of bidder or his or her representative: ………………………………………………………….
2.2 Identity Number: …………………………………………………………………………………………………
2.3 Position occupied in the Company (director, trustee, shareholder²): ……………………………………..
2.4 Company Registration Number: ………………………………………………………………………..…….
2.5 Tax Reference Number: ………………………………………………………………………………….………
2.6 VAT Registration Number: ………………………………………………………………………………....
2.6.1 The names of all directors / trustees / shareholders / members, their individual identity numbers, tax
reference numbers and, if applicable, employee / persal numbers must be indicated in paragraph 3
below. ¹“State” means –
(a) any national or provincial department, national or provincial public entity or constitutional institution within the meaning of
the Public Finance Management Act, 1999 (Act No. 1 of 1999);
(b) any municipality or municipal entity;
(c) provincial legislature;
(d) national Assembly or the national Council of provinces; or
(e) Parliament.
²”Shareholder” means a person who owns shares in the company and is actively involved in the management of the enterprise or
business and exercises control over the enterprise.
2.7 Are you or any person connected with the bidder YES / NO
presently employed by the state?
2.7.1 If so, furnish the following particulars:
Name of person / director / trustee / shareholder/ member: ……....………………………………
Name of state institution at which you or the person
connected to the bidder is employed : ………………………………………
Position occupied in the state institution: ………………………………………
Any other particulars:
………………………………………………………………
………………………………………………………………
………………………………………………………………
2.7.2 If you are presently employed by the state, did you obtain YES / NO
the appropriate authority to undertake remunerative
work outside employment in the public sector?
2.7.2.1 If yes, did you attached proof of such authority to the bid YES / NO
document?
(Note: Failure to submit proof of such authority, where
applicable, may result in the disqualification of the bid.
2.7.2.2 If no, furnish reasons for non-submission of such proof:
…………………………………………………………………….
…………………………………………………………………….
…………………………………………………………………….
2.8 Did you or your spouse, or any of the company’s directors / YES / NO
trustees / shareholders / members or their spouses conduct
business with the state in the previous twelve months?
2.8.1 If so, furnish particulars:
…………………………………………………………………..
…………………………………………………………………..
…………………………………………………………………...
2.9 Do you, or any person connected with the bidder, have YES / NO
any relationship (family, friend, other) with a person
employed by the state and who may be involved with
the evaluation and or adjudication of this bid?
2.9.1If so, furnish particulars.
……………………………………………………………...
…………………………………………………………..….
………………………………………………………………
2.10 Are you, or any person connected with the bidder, YES/NO
aware of any relationship (family, friend, other) between
any other bidder and any person employed by the state
who may be involved with the evaluation and or adjudication
of this bid?
2.10.1 If so, furnish particulars.
………………………………………………………………
………………………………………………………………
………………………………………………………………
2.11 Do you or any of the directors / trustees / shareholders / members YES/NO
of the company have any interest in any other related companies
whether or not they are bidding for this contract?
2.11.1 If so, furnish particulars:
…………………………………………………………………………….
…………………………………………………………………………….
…………………………………………………………………………….
3 Full details of directors / trustees / members / shareholders.
Full Name Identity
Number
Personal Tax
Reference Number
State Employee
Number / Persal
Number
4 DECLARATION
I, THE UNDERSIGNED (NAME)………………………………………………………………………
CERTIFY THAT THE INFORMATION FURNISHED IN PARAGRAPHS 2 and 3 ABOVE IS CORRECT.
I ACCEPT THAT THE STATE MAY REJECT THE BID OR ACT AGAINST ME IN TERMS OF
PARAGRAPH 23 OF THE GENERAL CONDITIONS OF CONTRACT SHOULD THIS DECLARATION
PROVE TO BE FALSE.
………………………………….. ..……………………………………………
Signature Date
…………………………………. ………………………………………………
Position Name of bidder
May 2011
SBD 8
DECLARATION OF BIDDER’S PAST SUPPLY CHAIN MANAGEMENT
PRACTICES
1 This Standard Bidding Document must form part of all bids invited.
2 It serves as a declaration to be used by institutions in ensuring that when goods
and services are being procured, all reasonable steps are taken to combat the
abuse of the supply chain management system.
3 The bid of any bidder may be disregarded if that bidder, or any of its directors
have-
a. abused the institution’s supply chain management system;
b. committed fraud or any other improper conduct in relation to such system; or
c. failed to perform on any previous contract.
4 In order to give effect to the above, the following questionnaire must be
completed and submitted with the bid.
Item Question Yes No
4.1 Is the bidder or any of its directors listed on the National Treasury’s Database of
Restricted Suppliers as companies or persons prohibited from doing business with the
public sector?
(Companies or persons who are listed on this Database were informed in writing
of this restriction by the Accounting Officer/Authority of the institution that
imposed the restriction after the audi alteram partem rule was applied).
The Database of Restricted Suppliers now resides on the National Treasury’s
website(www.treasury.gov.za) and can be accessed by clicking on its link at the
bottom of the home page.
Yes
No
4.1.1 If so, furnish particulars:
4.2 Is the bidder or any of its directors listed on the Register for Tender Defaulters in
terms of section 29 of the Prevention and Combating of Corrupt Activities Act (No 12
of 2004)?
The Register for Tender Defaulters can be accessed on the National Treasury’s
website (www.treasury.gov.za) by clicking on its link at the bottom of the home
page.
Yes
No
4.2.1 If so, furnish particulars:
4.3 Was the bidder or any of its directors convicted by a court of law (including a court
outside of the Republic of South Africa) for fraud or corruption during the past five
years?
Yes
No
4.3.1 If so, furnish particulars:
4.4 Was any contract between the bidder and any organ of state terminated during the past
five years on account of failure to perform on or comply with the contract?
Yes
No
4.4.1 If so, furnish particulars:
SBD 8
CERTIFICATION
I, THE UNDERSIGNED (FULL NAME)…………………………………………………
CERTIFY THAT THE INFORMATION FURNISHED ON THIS DECLARATION
FORM IS TRUE AND CORRECT.
I ACCEPT THAT, IN ADDITION TO CANCELLATION OF A CONTRACT,
ACTION MAY BE TAKEN AGAINST ME SHOULD THIS DECLARATION
PROVE TO BE FALSE.
………………………………………... …………………………..
Signature Date
………………………………………. …………………………..
Position Name of Bidder Js365bW
1
SBD 9 CERTIFICATE OF INDEPENDENT BID DETERMINATION
1 This Standard Bidding Document (SBD) must form part of all bids¹ invited.
2 Section 4 (1) (b) (iii) of the Competition Act No. 89 of 1998, as amended, prohibits an
agreement between, or concerted practice by, firms, or a decision by an association of
firms, if it is between parties in a horizontal relationship and if it involves collusive
bidding (or bid rigging).² Collusive bidding is a pe se prohibition meaning that it cannot
be justified under any grounds.
3 Treasury Regulation 16A9 prescribes that accounting officers and accounting authorities must take all reasonable steps to prevent abuse of the supply chain management system and authorizes accounting officers and accounting authorities to:
a. disregard the bid of any bidder if that bidder, or any of its directors have abused
the institution’s supply chain management system and or committed fraud or any other improper conduct in relation to such system.
b. cancel a contract awarded to a supplier of goods and services if the supplier
committed any corrupt or fraudulent act during the bidding process or the execution of that contract.
4 This SBD serves as a certificate of declaration that would be used by institutions to
ensure that, when bids are considered, reasonable steps are taken to prevent any form
of bid-rigging.
5 In order to give effect to the above, the attached Certificate of Bid Determination (SBD 9)
must be completed and submitted with the bid:
¹ Includes price quotations, advertised competitive bids, limited bids and proposals.
² Bid rigging (or collusive bidding) occurs when businesses, that would otherwise be expected to compete, secretly conspire to raise prices or
lower the quality of goods and / or services for purchasers who wish to acquire goods and / or services through a bidding process. Bid
rigging is, therefore, an agreement between competitors not to compete.
2
SBD 9 CERTIFICATE OF INDEPENDENT BID DETERMINATION
I, the undersigned, in submitting the accompanying bid:
________________________________________________________________________
(Bid Number and Description)
in response to the invitation for the bid made by:
______________________________________________________________________________
(Name of Institution)
do hereby make the following statements that I certify to be true and complete in every respect:
I certify, on behalf of:_______________________________________________________that:
(Name of Bidder)
1. I have read and I understand the contents of this Certificate;
2. I understand that the accompanying bid will be disqualified if this Certificate is found not
to be true and complete in every respect;
3. I am authorized by the bidder to sign this Certificate, and to submit the accompanying
bid, on behalf of the bidder;
4. Each person whose signature appears on the accompanying bid has been authorized by
the bidder to determine the terms of, and to sign the bid, on behalf of the bidder;
5. For the purposes of this Certificate and the accompanying bid, I understand that the
word “competitor” shall include any individual or organization, other than the bidder,
whether or not affiliated with the bidder, who:
(a) has been requested to submit a bid in response to this bid invitation;
(b) could potentially submit a bid in response to this bid invitation, based on
their qualifications, abilities or experience; and
(c) provides the same goods and services as the bidder and/or is in the same
line of business as the bidder
3
SBD 9
6. The bidder has arrived at the accompanying bid independently from, and without
consultation, communication, agreement or arrangement with any competitor. However
communication between partners in a joint venture or consortium³ will not be construed
as collusive bidding.
7. In particular, without limiting the generality of paragraphs 6 above, there has been no
consultation, communication, agreement or arrangement with any competitor regarding:
(a) prices;
(b) geographical area where product or service will be rendered (market
allocation)
(c) methods, factors or formulas used to calculate prices;
(d) the intention or decision to submit or not to submit, a bid;
(e) the submission of a bid which does not meet the specifications and
conditions of the bid; or
(f) bidding with the intention not to win the bid.
8. In addition, there have been no consultations, communications, agreements or
arrangements with any competitor regarding the quality, quantity, specifications and
conditions or delivery particulars of the products or services to which this bid invitation
relates.
9. The terms of the accompanying bid have not been, and will not be, disclosed by the
bidder, directly or indirectly, to any competitor, prior to the date and time of the official
bid opening or of the awarding of the contract.
³ Joint venture or Consortium means an association of persons for the purpose of combining their expertise, property, capital, efforts, skill and knowledge in an activity for the execution of a contract
SBD 9
4
10. I am aware that, in addition and without prejudice to any other remedy provided to
combat any restrictive practices related to bids and contracts, bids that are suspicious
will be reported to the Competition Commission for investigation and possible imposition
of administrative penalties in terms of section 59 of the Competition Act No 89 of 1998
and or may be reported to the National Prosecuting Authority (NPA) for criminal
investigation and or may be restricted from conducting business with the public sector
for a period not exceeding ten (10) years in terms of the Prevention and Combating of
Corrupt Activities Act No 12 of 2004 or any other applicable legislation.
………………………………………………… …………………………………
Signature Date
…………………………………………………. …………………………………
Position Name of Bidder
Js914w 2
SBD 6.1
PREFERENCE POINTS CLAIM FORM IN TERMS OF THE PREFERENTIAL PROCUREMENT REGULATIONS 2017
This preference form must form part of all bids invited. It contains general information and serves as a claim form for preference points for Broad-Based Black Economic Empowerment (B-BBEE) Status Level of Contribution NB: BEFORE COMPLETING THIS FORM, BIDDERS MUST STUDY THE GENERAL
CONDITIONS, DEFINITIONS AND DIRECTIVES APPLICABLE IN RESPECT OF B-BBEE, AS PRESCRIBED IN THE PREFERENTIAL PROCUREMENT REGULATIONS, 2017.
1. GENERAL CONDITIONS
1.1 The following preference point systems are applicable to all bids:
- the 80/20 system for requirements with a Rand value of up to R50 000 000 (all applicable taxes included); and
- the 90/10 system for requirements with a Rand value above R50 000 000 (all applicable taxes included).
1.2
a) The value of this bid is estimated to not exceed R50 000 000 (all applicable taxes included) and therefore the 80/20 preference point system shall be applicable; or
1.3 Points for this bid shall be awarded for:
(a) Price; and
(b) B-BBEE Status Level of Contributor.
1.4 The maximum points for this bid are allocated as follows:
POINTS
PRICE
B-BBEE STATUS LEVEL OF CONTRIBUTOR
Total points for Price and B-BBEE must not exceed
100
1.5 Failure on the part of a bidder to submit proof of B-BBEE Status level of contributor together with the bid, will be interpreted to mean that preference points for B-BBEE status level of contribution are not claimed.
1.6 The purchaser reserves the right to require of a bidder, either before a bid is adjudicated or at any time subsequently, to substantiate any claim in regard to preferences, in any manner required by the purchaser.
Page 2 of 5
2
2. DEFINITIONS
(a) “B-BBEE” means broad-based black economic empowerment as defined in section 1 of the Broad-Based Black Economic Empowerment Act;
(b) “B-BBEE status level of contributor” means the B-BBEE status of an entity in terms of a code of good practice on black economic empowerment, issued in terms of section 9(1) of the Broad-Based Black Economic Empowerment Act;
(c) “bid” means a written offer in a prescribed or stipulated form in response to an invitation by an organ of state for the provision of goods or services, through price quotations, advertised competitive bidding processes or proposals;
(d) “Broad-Based Black Economic Empowerment Act” means the Broad-Based Black Economic Empowerment Act, 2003 (Act No. 53 of 2003);
(e) “EME” means an Exempted Micro Enterprise in terms of a code of good practice on black economic empowerment issued in terms of section 9 (1) of the Broad-Based Black Economic Empowerment Act;
(f) “functionality” means the ability of a tenderer to provide goods or services in accordance with specifications as set out in the tender documents.
(g) “prices” includes all applicable taxes less all unconditional discounts;
(h) “proof of B-BBEE status level of contributor” means:
1) B-BBEE Status level certificate issued by an authorized body or person;
2) A sworn affidavit as prescribed by the B-BBEE Codes of Good Practice;
3) Any other requirement prescribed in terms of the B-BBEE Act;
(i) “QSE” means a qualifying small business enterprise in terms of a code of good practice on black economic empowerment issued in terms of section 9 (1) of the Broad-Based Black Economic Empowerment Act;
(j) “rand value” means the total estimated value of a contract in Rand, calculated at the time of bid invitation, and includes all applicable taxes;
3. POINTS AWARDED FOR PRICE
3.1 THE 80/20 OR 90/10 PREFERENCE POINT SYSTEMS
A maximum of 80 or 90 points is allocated for price on the following basis: 80/20 or 90/10
min
min180
P
PPtPs or
min
min190
P
PPtPs
Where
Ps = Points scored for price of bid under consideration
Pt = Price of bid under consideration
Pmin = Price of lowest acceptable bid
4. POINTS AWARDED FOR B-BBEE STATUS LEVEL OF CONTRIBUTOR
4.1 In terms of Regulation 6 (2) and 7 (2) of the Preferential Procurement Regulations, preference points must be awarded to a bidder for attaining the B-BBEE status level of contribution in accordance with the table below:
Page 3 of 5
3
B-BBEE Status Level of Contributor
Number of points
(90/10 system)
Number of points
(80/20 system)
1 10 20
2 9 18
3 6 14
4 5 12
5 4 8
6 3 6
7 2 4
8 1 2
Non-compliant contributor
0 0
5. BID DECLARATION
5.1 Bidders who claim points in respect of B-BBEE Status Level of Contribution must complete the following:
6. B-BBEE STATUS LEVEL OF CONTRIBUTOR CLAIMED IN TERMS OF PARAGRAPHS 1.4 AND 4.1
6.1 B-BBEE Status Level of Contributor: . = ………(maximum of 10 or 20 points)
(Points claimed in respect of paragraph 7.1 must be in accordance with the table reflected in paragraph 4.1 and must be substantiated by relevant proof of B-BBEE status level of contributor.
7. SUB-CONTRACTING
7.1 Will any portion of the contract be sub-contracted?
(Tick applicable box)
YES NO
7.1.1 If yes, indicate:
i) What percentage of the contract will be subcontracted............…………….…………%
ii) The name of the sub-contractor………………………………………………………….. iii) The B-BBEE status level of the sub-contractor......................................…………….. iv) Whether the sub-contractor is an EME or QSE
(Tick applicable box)
YES NO
v) Specify, by ticking the appropriate box, if subcontracting with an enterprise in terms of Preferential Procurement Regulations,2017:
Designated Group: An EME or QSE which is at last 51% owned by:
EME √
QSE √
Black people
Black people who are youth
Black people who are women
Black people with disabilities
Black people living in rural or underdeveloped areas or townships
Cooperative owned by black people
Page 4 of 5
4
Black people who are military veterans
OR
Any EME
Any QSE
8. DECLARATION WITH REGARD TO COMPANY/FIRM
8.1 Name of
company/firm:…………………………………………………………………………….
8.2 VAT registration
number:……………………………………….…………………………………
8.3 Company registration
number:…………….……………………….…………………………….
8.4 TYPE OF COMPANY/ FIRM
Partnership/Joint Venture / Consortium
One person business/sole propriety
Close corporation
Company
(Pty) Limited [TICK APPLICABLE BOX]
8.5 DESCRIBE PRINCIPAL BUSINESS ACTIVITIES
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……..
8.6 COMPANY CLASSIFICATION
Manufacturer
Supplier
Professional service provider
Other service providers, e.g. transporter, etc. [TICK APPLICABLE BOX]
8.7 Total number of years the company/firm has been in business:……………………………
8.8 I/we, the undersigned, who is / are duly authorised to do so on behalf of the
company/firm, certify that the points claimed, based on the B-BBE status level of
contributor indicated in paragraphs 1.4 and 6.1 of the foregoing certificate, qualifies the
company/ firm for the preference(s) shown and I / we acknowledge that:
i) The information furnished is true and correct;
ii) The preference points claimed are in accordance with the General Conditions as indicated in paragraph 1 of this form;
iii) In the event of a contract being awarded as a result of points claimed as shown in paragraphs 1.4 and 6.1, the contractor may be required to furnish documentary proof to the satisfaction of the purchaser that the claims are correct;
iv) If the B-BBEE status level of contributor has been claimed or obtained on a
Page 5 of 5
5
fraudulent basis or any of the conditions of contract have not been fulfilled, the purchaser may, in addition to any other remedy it may have –
(a) disqualify the person from the bidding process;
(b) recover costs, losses or damages it has incurred or suffered as a result of that person’s conduct;
(c) cancel the contract and claim any damages which it has suffered as a result of having to make less favourable arrangements due to such cancellation;
(d) recommend that the bidder or contractor, its shareholders and directors, or only the shareholders and directors who acted on a fraudulent basis, be restricted by the National Treasury from obtaining business from any organ of state for a period not exceeding 10 years, after the audi alteram partem (hear the other side) rule has been applied; and
(e) forward the matter for criminal prosecution.
………………………………………. SIGNATURE(S) OF BIDDERS(S)
DATE: …………………………………..
ADDRESS …………………………………..
…………………………………..
…………………………………..
WITNESSES 1. ……………………………………..
2. …………………………………….
ANNEXURE D NLC/2019 - 04
Annexure D: NLC Bid Submission Checklist – Mpumalanga Office Building
BID SUBMISSION CHECKLIST: APPOINTMENT OF A SERVICE PROVIDER TO
CONVERT A RESIDENTIAL BUILDING TO AN OFFICE BUILDING FOR THE
NATIONAL LOTTERIES COMMISSION IN THE EASTERN CAPE PROVINCE (EAST
LONDON)
Name of the bidder :
Item Description Yes No
1 Compulsory (Mandatory) Requirements
Please indicate below if whether the SBD (Standard Bidding Document) Forms are duly completed and signed by the relevant person:
1.1 SBD 1
1.2 SBD 4
1.3 SBD 6.1
1.4 SBD 8
1.5 SBD 9
*Only the original signed SBD Forms of the above will be accepted
1.6 In the event of the bidder being in a joint venture, a signed joint venture agreement must be submitted (where applicable)
1.7 In the event of the bidder being a consortium organization, relevant shareholding certificates must be submitted (where applicable).
1.8 Bidder must be an Exempted Micro Enterprise (EME)/Qualifying Small Business Enterprise (QSE) exempted micro which is at least 100% owned by black people (supported by certified copy of B-BBEE Certificate or Sworn Affidavit).
1.9 The bidder must have a stipulated minimum B-BBEE status level one (1) of contribution and consolidated if bidders are in a Joint Venture (JV)
1.10 Certified copy of a valid Construction Industry Development Board (CIDB) certificate with minimum of
ANNEXURE D NLC/2019 - 04
Annexure D: NLC Bid Submission Checklist – Mpumalanga Office Building
5GB or higher and consolidated if bidders are in a Joint Venture(JV)
1.11 The bidder is required to submit a certified copy of certification of compliance with the Compensation for Occupational Injuries & Diseases (COID) Act
1.12 In the event of the bidder with litigation history, accurate information on any litigation or arbitration resulting from contracts completed or under execution by him over the last five (5) years should be provided.
1.13 To confirm localization, bidders are required to submit proof of residence in the form of Municipal Bill or proof of residence letter from the local councilor/leader or a certified copy of a signed SLA.
2. Administrative Requirements
2.1 Valid Tax Clearance Certificate (TCC).
2.2 Company/Agency Profile.
2.3 B-BBEE Certificate.
2.4 Central Supplier Database (CSD) Summary Report.
3. Submission of Proposals:
3.1 Technical Proposal:
3.1.1 One (1) original
3.1.2 Four (4) copies
3.2 Financial (Price) Proposal:
3.2.1 One (1) original
3.2.2 Four (4) copies
3.2.3 One (1) electronic copy (CD) for both technical & financial proposal
ANNEXURE D NLC/2019 - 04
Annexure D: NLC Bid Submission Checklist – Mpumalanga Office Building
4. Bid Document Responsiveness: Do you adhere to the bid documents and terms of reference?
DESCRIPTION UNIT
SECTION NO. 1 H1
BILL NO. 1 H1
PRELIMINARIES H1
NOTE H2
All prices/rates to be net, excluding Value Added Tax
General H3
i)The agreement is to be the JBCC Series 2000 Principal Building Agreement (Edition 5.0) prepared by the Joint Building Contracts Committee, July 2007
ii) The preliminaries are to be the JBCC Series 2000 Preliminaries prepared by the Joint Building Contracts Committee, March 2005 edition and shall be deemed to be incorporated herein
iii) Tenderers are referred to the abovementioned documents for the full intent and meaning of each clause thereof (hereinafter referred to by heading and clause number only) for which such allowance must be made as may be considered necessary
iv)Where standard clauses or alternatives are not entirely applicable to this contract such modifications, corrections or supplements as will apply are given under each relevant clause heading
v) Where any item is not relevant to this specific contract such item is marked N/A (signifying "not applicable")
vi)If Alternative A as set out in clause B10.3 hereinafter is to be used for the adjustment of the preliminaries each item priced is to be allocated to one or more of the three categories, where "F" denotes a fixed amount (amount not to be varied), "V" denotes an amount variable in proportion to value and "T" denotes an amount in proportion to time
-------------------------
SECTION A:
PRINCIPAL BUILDING AGREEMENT
Definitions (A1) H3
Definitions and interpretation (clause 1) Item
Fixed
Value Related Item
Time Related Item
Objective (A2) H3
Offer, acceptance and performance (clause 2) Item
Fixed
Value Related Item
Time Related Item
Preparation (A3-A14) H3
Documents (clause 3) Item
Clause 3.1 shall be deemed to be omitted and replaced with the following:
No payment guarantee will be provided by the employer
Fixed
Value Related Item
Time Related Item
Design responsibility (clause 4) Item
Fixed
Value Related Item
Time Related Item
Employer's agents (clause 5) Item
Fixed
Value Related Item
Time Related Item
Contractor's site representative (clause 6) Item
Fixed
Value Related Item
Time Related Item
Compliance with regulations (clause 7) Item
Fixed
Value Related Item
Time Related Item
Works risk (clause 8) Item
Fixed
Value Related Item
Time Related Item
Indemnities (clause 9) Item
Fixed
Value Related Item
Time Related Item
General insurances (clause 10) Item
All insurances are to be taken by the Contractor
Fixed
Value Related Item
Time Related Item
Special insurances (clause 11) Item
Fixed
Value Related Item
Time Related Item
Effecting insurance (clause 12) Item
Fixed
Value Related Item
Time Related Item
Assignment (clause 13) Item
Fixed
Value Related Item
Time Related Item
Security (clause 14) Item
Fixed
Value Related Item
Time Related Item
Execution (A15-A23) H3
Preparation for and execution of the works (clause 15) Item
Fixed
Value Related Item
Time Related Item
Site and Access (clause 16) Item
Fixed
Value Related Item
Time Related Item
Contract instructions (clause 17) Item
Fixed
Value Related Item
Time Related Item
Setting out of the works (clause 18) Item
The contractor shall notify the principal agent if any encroachments of adjoining foundations, buildings, structures, pavements, boundaries, etc. exist in order that the necessary arrangements may be made for the rectification of any such encroachments
Fixed
Value Related Item
Time Related Item
Temporary Works and Plant (clause 19) Item
Fixed
Value Related Item
Time Related Item
Nominated sub-contractors (clause 20) Item
Fixed
Value Related Item
Time Related Item
Selected sub-contractors (clause 21) Item
Notwithstanding the content of this clause, the contractor's attention is drawn to the fact that all the work provided for by means of the inclusion of provisional amounts elsewhere in these bills of quantities, is to be executed and installed in the works during the construction period by selected sub-contractors
The selected sub-contractors shall be chosen, as far as possible, by the principal agent together with the contractor
Fixed
Value Related Item
Time Related Item
Employer's direct contractors (clause 22) Item
Fixed
Value Related Item
Time Related Item
Contractor's domestic sub-contractors (Clause 23) Item
Fixed
Value Related Item
Time Related Item
Completion (A24-A30) H3
Practical completion (clause 24) Item
Fixed
Value Related Item
Time Related Item
Works completion (clause 25) Item
Fixed
Value Related Item
Time Related Item
Final completion (clause 26) Item
Fixed
Value Related Item
Time Related Item
Latent defects liability period (clause 27) Item
Fixed
Value Related Item
Time Related Item
Sectional completion (clause 28) Item
Fixed
Value Related Item
Time Related Item
Revision of date of practical completion (clause 29) Item
Clause 29.1.1 shall be deemed to be omitted and replaced by the following:
Inclement weather shall be defined as weather in excess of the average rainfall (volume and period) for each calender month over the past ten (10) years as recorded by the nearest commonly recognised weather bureau in the region of the project
It shall be deemed that the contractor has adequately allowed in his programme and tendered rates for expenses which might result from delays due to average or below rainfall as described above
Fixed
Value Related Item
Time Related Item
Penalty for non-completion (clause 30) Item
Fixed
Value Related Item
Time Related Item
Payment (A31 - A35) H3
Interim payment to the contractor (clause 31) Item
Notwithstanding this or any other clause, materials and goods stored off site shall not to be included in the amount authorized for payment
Clause 31.6.5 shall be deemed to be deleted
Clause 31.9:
The wording "seven (7)" be replaced with "thirty (30)"
Cause 31.11.1:
The wording "one hundred and sixty per cent (160%)" be replaced with "one hundred and ten per cent (110%)"
Fixed
Value Related Item
Time Related Item
Adjustment to the contract value (clause 32) Item
Fixed
Value Related Item
Time Related Item
Recovery of expense and loss (clause 33) Item
Fixed
Value Related Item
Time Related Item
Final account and final payment (clause 34) Item
Fixed
Value Related Item
Time Related Item
Payment to other parties (clause 35) Item
Fixed
Value Related Item
Time Related Item
Termination (A36-A39) H3
Termination by employer - contractor's default (clause 36) Item
Fixed
Value Related Item
Time Related Item
Termination by employer - loss and damage (clause 37) Item
Fixed
Value Related Item
Time Related Item
Termination by contractor - employer's default (clause 38) Item
Fixed
Value Related Item
Time Related Item
Termination - cessation of the works (clause 39) Item
Fixed
Value Related Item
Time Related Item
Dispute (A40) H3
Settlement of Disputes (clause 40) Item
Fixed
Value Related Item
Time Related Item
Contract Agreement (A41) H3
The schedule: Pre-tender information (clause 42) Item
Fixed
Value Related Item
Time Related Item
42.1 CONTRACTING AND OTHER PARTIES H3
See "Notes to Tenderers" for all the relevantphysical and postal addresses, telephone andfacsimile numbers
42.1.1 Employer:
National Lotteries Commission
42.1.2 Client:
National Lotteries Commission
42.1.3 Agent (1):
SRSQS Quantity Surveyors (Pty) Ltd
Agents service: Principal Agents
42.1.5 Agent (2):
SRSQS Quantity Surveyors (Pty) Ltd
Agents service: Quantity Surveyors
42.1.6 Agent (3):
SRSQS Structurl and Civil Eng Division
Agents service: Structural and Civil Engineers
42.1.7 Agent (4):
SRSQS Mechanical and Electrical Eng Division
Agents service: Electrical and Mechanical Engineers
42.1.8 Agent (5):
Not Applicable
42.1.9 Agent (6):
Not Applicable
42.1.10 Agent (7):
Not applicable
42.2 CONTRACT DETAILS H3
42.2.1 Works Description:
The works shall be as described in the "Notes toTenderers"
42.2.2 Site Description:
The site shall be as described in the "Notes toTenderers"
42.2.3 Work or installations by direct contractors:
Refer to notes to tenders: Item 2 Scope of contract
42.2.4 Specific options that are applicable to a State organonly:
Interest rate legislation:
N/A
Lateral support insurance to be effected by thecontractor:
N/A
Payment will be made for materials and goods:
N/A
Dispute resolution by litigation:
N/A
Extended defects liability period applicable to thefollowing elements:
N/A
42.2.5 Possession of the site is be given on:
Date to be determined
42.2.6 Period for the commencement of the works after thecontractor takes possession of the site:
Within seven (7) working days
42.2.7 The date for practical completion and the penalty per calendar day for the works as a whole:
Date:
Within four (4) calendar months, exclusive of builders' holidays, after the date of site handover
Penalty:
0,05% of the tendered amount, inclusive of value added tax
42.2.8 The date for practical completion and the penalty
N/A
Section 1: Date: N/A Penalty: R ..............Section 2: Date: N/A Penalty: R ..............Section 3: Date: N/A Penalty: R ..............Section 4: Date: N/A Penalty: R ..............Section 5: Date: N/A Penalty: R ..............Section 6: Date: N/A Penalty: R ..............
42.2.9 The law applicable to this agreement shall be that of:
Republic of south Africa
42.3 INSURANCES H3
42.3.1 Contract works insurance:
To be effected by: Contractor
For the sum of: Tendered amount plus 20%
With a deductible of: to be determined by the contractor
42.3.2 Supplementary insurance is required:
No
42.3.3 Public liability insurance:
Yes
To be effected by: Contractor
For the sum of: R 10 000 000-00
With a deductible of: to be determined by the contractor
42.3.4 Support insurance to be effected by the employer:
No
42.4 DOCUMENTS H3
41.4.1 Waivers of contractor's lien or right of continuingpossesion is required:
Yes
42.4.2 Construction document copies to be supplied to thecontractor free of charge:
Three (3) copies of each
42.4.3 Bills of quantities drawn up in accordance with:
Standard System of Measuring Building Work
42.4.4 On acceptance of the tender the bills of quantities is tobe submitted:
Within seven (7) working days
42.4.5 JBCC Engineering General Conditions are to be included in the documents:
No
42.4.6 The contract value is to be adjusted using CPAP:
No
Base month of indexes:
42.4.7 Details of changes made to the provision of JBCC standard documentation:
Clause 3 : See item 3, page 2
Clause 10 : See item 10, page 3
Clause 18 : See item 18, page 5
Clause 21 : See item 21, page 6
Clause 29 : See item 29, page 8
Clause 31 : See item 31, page 9
42.5 CONTRACT DETAILS H3
All post-tender information for this section will bedetermined once tender is awarded
42.6 DOCUMENTS H3
All post-tender information for this section will bedetermined once tender is awarded
42.7 DISPUTE RESOLUTION H3
All post-tender information for this section will bedetermined once tender is awarded
42.8 SIGNATURES OF THE CONTRACTING PARTIES H3
All post-tender information for this section will bedetermined once tender is awarded
-------------------------
SECTION B: PRELIMINARIES H2
Definition and interpretation (B1) H3
Definition and interpretation (B1.1 - B1.6.5) Item
Fixed
Value Related Item
Time Related Item
Documents (B2) H3
Checking of documents (B2.1) Item
These bills of quantities:
contain pages and annexes as indexed, and;are in multiple procurement format, i.e. all trades are fully measured with minor budgetary allowances
Items in these bills of quantities are to be read and priced in conjunction with and the descriptions regarded as amplified by the Model Preambles for Trades, 1999 edition,
as recommended and published by the Association of South African Quantity Surveyors and no claim arising from brevity of description of items fully described in the said Model Preambles for Trades will be entertained
Fixed
Value Related Item
Time Related Item
Provisional bills of quantities (B2.2) Item
Fixed
Value Related Item
Time Related Item
Availability of construction documentation (B2.3) Item
The minor budgetary allowances included in this document will be separately procured, based on multiple procurement of selected sub-contractors during the construction period
Fixed
Value Related Item
Time Related Item
Interests of agents (B2.4) Item
Fixed
Value Related Item
Time Related Item
Priced documents (B2.5) Item
Fixed
Value Related Item
Time Related Item
Tender submission (B2.6) Item
Notwithstanding anything contained in this clause tenders shall be valid for a period of ninety (90) days from the closing date of tenders
Fixed
Value Related Item
Time Related Item
The site (B3) H3
Defined works area (B3.1) Item
Fixed
Value Related Item
Time Related Item
Geotechnical investigation (B3.2) Item
Fixed
Value Related Item
Time Related Item
Inspection of the site (B3.3) Item
No claims for extras arising from the contractor having failed to comply with this clause will be entertained
Fixed
Value Related Item
Time Related Item
Existing premises occupied (B3.4) Item
Fixed
Value Related Item
Time Related Item
Previous work - dimensional accuracy (B3.5) Item
Work executed under a previous contract and the extent
thereof will be pointed out to the contractor by the principal agent on handing over of the site
Fixed
Value Related Item
Time Related Item
Previous work - defects (B3.6) Item
Fixed
Value Related Item
Time Related Item
Services - known (B3.7) Item
Fixed
Value Related Item
Time Related Item
Services - unknown (B3.8) Item
Fixed
Value Related Item
Time Related Item
Protection of trees, etc (B3.9) Item
Fixed
Value Related Item
Time Related Item
Articles of value (B3.10) Item
Fixed
Value Related Item
Time Related Item
Inspection of adjoining properties, etc (B3.11) Item
Fixed
Value Related Item
Time Related Item
Management of contract (B4) H3
Management of the works (B4.1) Item
Fixed
Value Related Item
Time Related Item
Programming for the works (B4.2) Item
Fixed
Value Related Item
Time Related Item
Progress meetings (B4.3) Item
Fixed
Value Related Item
Time Related Item
Technical meetings (B4.4) Item
Fixed
Value Related Item
Time Related Item
Labour and plant records (B4.5) Item
Fixed
Value Related Item
Time Related Item
Samples and shop drawings (B5) H3
Samples of materials (B5.1) Item
Fixed
Value Related Item
Time Related Item
Workmanship samples (B5.2) Item
Fixed
Value Related Item
Time Related Item
Shop drawings (B5.3) Item
Fixed
Value Related Item
Time Related Item
Compliance with manufacturer's instructions (B5.4) Item
Fixed
Value Related Item
Time Related Item
Temporary works and plant (B6) H3
Deposits and fees (B6.1) Item
Fixed
Value Related Item
Time Related Item
Enclosure of the works (B6.2) Item
Fixed
Value Related Item
Time Related Item
Advertising (B6.3) Item
Fixed
Value Related Item
Time Related Item
Plant, equipment, sheds and offices (B6.4) Item
Fixed
Value Related Item
Time Related Item
Main notice board (B6.5) Item
Fixed
Value Related Item
Time Related Item
Subcontractors notice board (B6.6) Item
Fixed
Value Related Item
Time Related Item
Temporary services (B7) H3
Location (B7.1) Item
Fixed
Value Related Item
Time Related Item
Water (B7.2) Item
Fixed
Value Related Item
Time Related Item
Electricity (B7.3) Item
Fixed
Value Related Item
Time Related Item
Telecommunication equipment (B7.4) Item
Fixed
Value Related Item
Time Related Item
Ablution facilities (B7.5) Item
Fixed
Value Related Item
Time Related Item
Prime cost amounts (B8) H3
Responsibility for prime cost amounts (B8.1) Item
Fixed
Value Related Item
Time Related Item
Attendance on nominated and selected subcontractors H3 (B9)
General attendance (B9.1) Item
Fixed
Value Related Item
Time Related Item
Special attendance (B9.2) Item
Fixed
Value Related Item
Time Related Item
Commissioning - Fuel, water and power (B9.3) Item
Fixed
Value Related Item
Time Related Item
Financial aspects (B10) H3
Statutory taxes, duties and levies (B10.1) Item
Provision is made in the summary of these bills of quantities for the inclusion of Value Added Tax (VAT)
Fixed
Value Related Item
Time Related Item
Payment of preliminaries (B10.2) Item
Fixed
Value Related Item
Time Related Item
Adjustment of preliminaries (B10.3) Item
Fixed
Value Related Item
Time Related Item
Payment certificate cash flow (B10.4) Item
Fixed
Value Related Item
Time Related Item
General (B11) H3
Protection of works (B11.1) Item
Fixed
Value Related Item
Time Related Item
Protection/isolation of existing/sectionally occupied work Item (B11.2)
Fixed
Value Related Item
Time Related Item
Site security (B11.3) Item
Fixed
Value Related Item
Time Related Item
Notice before covering work (B11.4) Item
Fixed
Value Related Item
Time Related Item
Disturbance (B11.5) Item
Fixed
Value Related Item
Time Related Item
Enviromental disturbance (B11.6) Item
Fixed
Time Related Item
Value Related Item
Works cleaning and clearing (B11.7) Item
Fixed
Value Related Item
Time Related Item
Vermin (B11.8) Item
Fixed
Value Related Item
Time Related Item
Overhand work (B11.9) Item
Fixed
Value Related Item
Time Related Item
Instruction manuals and guarantees (B11.10) Item
Fixed
Value Related Item
Time Related Item
As built information (B11.11) Item
Fixed
Value Related Item
Time Related Item
Tenant installations (B11.12) Item
Fixed
Value Related Item
Time Related Item
Schedule of variables (B12) H3
Pre-tender information (B12.1) Item
Fixed
Value Related Item
Time Related Item
12.1.1 Provisional bills of quantities (B2.2)
The quantities are provisional:
Yes
12.1.2 Availability of construction documentation (B2.3)
Construction documentation is not complete:
No
12.1.3 Interest of agents (B2.4)
No
12.1.4 Defined works area (B3.1)
The area of the works to be occupied by the contractor, any restriction on the area and the limit of access or exit will be pointed out to the contractor by the principal agent on handing over of the site
12.1.5 Geotechnical investigation (B3.2)
N/A
12.1.6 Existing premises occupied (B3.4)
No
12.1.7 Previous work - Dimensional accuracy (B3.5)
No
12.1.8 Previous work - Defects (B3.6)
No
12.1.9 Services - known (B3.7)
Existing services and points of connection are shown on the site plan and/or will be pointed out on site by the principal agent
12.1.10 Protection of trees (B3.9)
N/A
12.1.11 Inspection of adjoining properties (B3.11)
N/A
12.1.12 Enclosure of the works (B6.2) (See notes to tenders)
12.1.13 Offices (B6.4.3)
The contractor shall provide, maintain and remove on completion of the works an office for the exclusive use for meetings to be held on site. The minimum size of the office shall be 8 x 4 x 2,40m high internally with concrete floor, insulated ceiling and roof. The office shall be suitably ventilated, equiped with electric lighting and fitted with table, twelve (12) chairs, one (1) pining board 2,40 x 1,20m high, one (1) writing board 2,40 x 1,20m high and a set of ten (10) aluminium "Ozafile" drawing hangers complete with stand. The office shall be kept clean and fit for use at all times
12.1.14 Main notice board (B6.5)
The contractor shall provide, erect where directed, maintain and remove on completion of the works a notice board size 3 x 3m high. The exact extent of the details, clour scheme and wording will be provided by the principal agent on the day of the site handover. The board shall be securely fixed to and including a suitable supporting structure of timber or tubular posts and braces
12.1.15 Sub-contractors notice board (B6.6)
A notice board is required:
No
12.1.16 Water (B7.2)
Alternative selected: A
12.1.17 Electricity (B7.3)
Alternative selected: A
12.1.18 Telecommunications (B7.4)
Alternative selected: A
12.1.19 Ablution facilities (B7.5)
Alternative selected: A
12.1.20 Protection of existing/sectionally occupied works(B11.2)
No
12.1.22 Protection of the works
No
12.1.23 Disturbance (B11.5)
No
12.1.24 Enviromental disturbance (B11.6)
No
Post-tender information (B12.2) Item
All post-tender information for this section will be determined once tender is awarded
Fixed
Value Related Item
Time Related Item
-------------------------
SECTION C: SPECIFIC PRELIMINARIES H2
Clause C1 - Proprietary branded products Item
The contractor shall take delivery of, handle, store, use, apply
and/or fix all proprietary branded products in strict accordance with the manufacturers' instructions after consultation with the manufacturer's authorized representative
Fixed
Value Related Item
Time Related Item
Clause C2 - Overtime Item
Should overtime be required to be worked for any reason whatsoever, the costs of such overtime are to be borne by the contractor unless the principal agent has specifically authorized and indicated in writing, prior to the execution thereof, that costs for such overtime will to be borne by the employer
Fixed
Value Related Item
Time Related Item
Clause C3 - As-built drawings Item
The position of construction breaks and the extent of individual concrete pours are to be recorded by the contractor on the structural engineer's drawings and are to be submitted to the principal agent and the structural engineer for their records
Fixed
Value Related Item
Time Related Item
Clause C4 - Site instructions Item
All site instructions issued on site shall be recorded in writing within seven (7) calendar days in site instruction book (A4 size and triplicate carbon format), which is to be provided and maintained by the contractor. The said site instruction book shall be kept on site at all times for the exclusive use of recording site instructions only
Site instructions may be issued by the architect or any of the consultants only. Copies of the site instructions are to be
submitted to the architect and quantity surveyor within seven (7)
calendar days of such recording in the site instruction book
Fixed
Value Related Item
Time Related Item
Clause C5 - Labour record Item
At the end of each week the contractor shall provide the
principal agent with a written record, in schedule form, reflecting the number and description of tradesmen and labourers employed by him and all subcontractors on the works each day
Fixed
Value Related Item
Time Related Item
Clause C6 - Plant record Item
At the end of each calendar week the contractor shall provide the principal agent with a written record, in schedule form, reflecting the number, type and capacity of all plant, excluding hand tools, currently used on the works
Fixed
Value Related Item
Time Related Item
Clause C7 - Non-cession of monies Item
The contractor shall not cede nor assign his rights or claims to any monies due or to become due to him under this contract
Fixed
Value Related Item
Time Related Item
Clause C8 - Occupational Health and Safety Act Item
In terms of the Occupational Health and Safety Regulations promulgated on 18 July 2003, it will be expected from the
contractor to comply fully with and adhere to all such regulations pertaining to this project as no claims in this regard will be entertained
Fixed
Value Related Item
Time Related Item
TOTAL SETION 1 - BILL NO. 1 - PRELIMINARIES AND GENERAL
SECTION 2 H1
RENOVATIONS & REFURBISHMENTS H1
BILL NO 1 H1
ALTERATIONS H1
For preambles see "Model Preambles for Trades (2008 Edition)" and Supplementary preambles as specified in the Trades
Unless otherwise stated, all materials from the alterations and demolition will belong to the builder.
The builder should allow for the removal of all debris from site and keeping the site clean at all times.
The Contractor should allow for removing of rubble from site on daily basis, failing which the client might stop the construction until the site has been cleaned.
---------------------------------------
SUPPLEMENTARY PREAMBLES H2
NATURE OF WORK: Tenderers are advised to visit the site and to satisfy themselves as to the nature and extent of the work to be done and provide in their tenders any items not specifically mentioned which they may deem necessary for the proper completion of the work. Tenderers are advised that the
existing building will be in occupation during the progress of the work and due allowance must be made for work being carried out at such times and in such manner as will least interfere with the routine of the occupants and as may be directed by the
Quantity Surveyor.
NATURE OF WORK: Tenderers are advised to visit the site and thoroughly acquaint themselves with the nature of demolitions, the nature and the extent the work to be done and adequate provisions are to be made in tendered rates for items not specifically mentioned which they may deem necessary for the proper completion of the work
BUILDING TO REMAIN NON OPERATIONAL: Tenderers are to note that all existing buildings of the facility will remain occupied and fully operational during the construction period and due allowance must be made for the work being carried out at such times and in such manner as directed by the Principal Agent to ensure the least interference with the routine of the Station.
DEMOLITIONS OF BUILDINGS: Tenderers are to note that tendered rates for the demolitions of buildings are to cater for the following: i.e. water supply, sewer lines, etc deed underground services as referred to above.
- Trenches, holes, etc. created as a result of the removal of foundations, services, etc shall be backfilled with approved filling material and compacted to 95% Mod AASHTO density. 150mm, including breaking down oversize material and compacted to 93% Mod AASHTO density.
- It will at all times throughout the contract period, be expected from the Contractor to, immediately after each portion of demolishing has been completed, remove and cart away all
building rubble generated to a dumping site to be located by the Contractor off the station premises. The temporarily dumping and/or stockpiling of rubble on site will not be permitted
CARTING AWAY OF EXCESSIVE AND/OR UNSUITABLE EXCAVATED MATERIAL, BUILDING RUBBLE, ETC
Descriptions for "carting away excessive or unsuitable excavated material, building rubble from demolitions, etc from site" shall be deemed to include the loading and hauling of excessive or unsuitable excavated material, building rubble from demolitions, etc. to a suitable dumping site to be located by the Contractor off the building site.
The location of the intended dumping site will be subjected to prior written approval of the Principal Agent.
The Contractor will also be liable to, upon completion, rehabilitate all those areas of the dumping site used dumping/spoiling by grading the area to follow the adjacent ground contours and afterwards compacted to 80% Mod AASHTO density, all to the satisfaction of the Principal Agent.
Tendered rates must make provision for the above-mentioned as no additional claims in this regard will afterwards be entertained.
The re-use of old materials obtained from the demolitions in the construction of the new buildings, for filling, etc will not be perimtted.
EXISTING SERVICES: Special care is to be taken by the Contractor not to interefere unnecessarily with existing services. Should be contractor encounter any existing services such as underground cables, pipes or sewers during the execution of the works he shall notify the Principal Agent immediately and suspend all affected work in the immediate vicinity until such have been dealt with (i.e. removed,
disconnected, re-routed, etc) and instruction to proceed with the work has been given by the Principal Agent
The Contractor shall afford every facility to Specialist which might be employed by the Principal Agent to effect the necessary removal, disconnection, re-routing, etc of services as might be required.
PROTECTION: In taking down and demolishing existing work the utmost care is to be observed to avoid any structural or other damages to the remaining portions and/or adjacent buildings, structures and services, etc. It will be expected from the Contractor to, at all times, employ adequate precaution measures in this regard and to provide all necessary materials for so doing
The Contractor will be held solely responsible for any damages to persons or property and for the safety of the structures throughout the whole of this Contract and shall make good at his own expense any such damages arising out of his failure to adhere to the aforesaid requirement.
FILLING: Where described as "including back filling", "back filling" shall mean the filling of all trenches, holes, etc. with approved gravel filling ( Minimum G5 standard) to be obtained from a commercial source and compacted to 93% Mod AASHTO density.
OLD MATERIAL:
Unless specifically otherwise described, all other old materials from demolitions are to become the property of the NLC, therefore, tendered rates for demolitions must cater for adequate credit in this regard.
It will be expected from the Contractor that all old materials not required, rubble, rubbish, etc. to be immediately carted away and site left clean and unencumbered at all times.
MEASUREMENT: Measurement given are approximate and the Contractor is advised to view the site and existing structures to be demolished and to thoroughly acquaint himself with the extent of the work to be done.
Any errors to the tendered rates in this regard shall be Contractor's expense as no claims in this regard will be entertained afterwards
TENDER: The submission of a tender will imply that the Contractor has physically visited the site and fully understands the content and extent of the work described in this Bill and, therefore, accepts that no claims in this respect will thus be entertained afterwards.
DIMENSIONS The Contractor is advised to take all dimensions affecting the existing buildings on the site, as he will be held solely responsible for all new work being of the correct size.
PIPES, ETC Special care is to be taken not to interfere unnecessary with any supply pipes or other piping that may be met with and found necessary to disconnect or cut, are to be effectively stopped off and any new connections that may be necessary are to be made with proper fittings and to the satisfaction of the QS to whom due notice must be given of any alterations to the existing services.
PROTECTION In taking down and removing existing work the utmost care is to be observed to avoid any structural or other damage to the remaining portions of the buildings. The Contractor must also protect all work not removed such as walls, floors, doors, windows or other joinery,loose and fixed fittings and electrical appliances, etc. from damage during the progress of the work and provide all necessary materials for doing so. The Contractor will be held solely responsible for any damage to persons or property and for the safety of the structure throughout the whole of this Contract and must make good at his own expense any damage that may occur.
CREDITS, ETC Old materials from the pulling down (except such as described to be re-used ) are to become the property of the NLC. Old materials for re-use are to be carefully removed, stored and protected from injury including making good any damaged or defective parts as required before fixing. Old materials described to be handed over are to be carefully removed and neatly stacked on site where directed. The
remainder of the old materials and all rubbish to be immediately carted away and the site left clean and unencumbered. None of the old stock bricks from the pulling down are to be re-used for any new work.
MATERIALS, ETC The materials to be used and work to be done to be similar in all respects to that described for new work insofar as they concur. All work in making good is to be properly jointed to the existing.
NOTE: All Demolished materials to be sent to the salvaged yard which is to be loacted by the contractor, thus all the rates to allow for sending to the salvage yard that will be located by the contractor
DEMOLITION OF EXISTING ONE BRICK WALLS H3
Demolition of brick walls H4
Break down and remove existing 110mm brickwall complete as m2 per the scope of works and/or Project Manager's instruction and all works to be made good
Break down and remove existing 220mm brickwall complete as m2 per the scope of works and/or Project Manager's instruction and all works to be made good
Break down and remove existing 270mm brickwall complete as m2 per the scope of works and/or Project Manager's instruction and all works to be made good
TAKE OUT AND REMOVAL OF EXISTING DOORS AND H3 WINDOWS
Take out and remove existings doors and send to the salvage H4 yard to be located by the contractor
Carefully take out and remove existing single door including No frame fixed to one brickwall including making good the wall surfaces in preparation of the new door installation complete as per the principal agent's instruction
CAREFULLY REMOVE EXISTING STEEL DOOR H2 FRAME AND WINDOW FRAME
Carefully take out and remove existing door frames on wall and No hand it over to the client
Aluminium windows and Steel windows H4
Aluminium windows m2
Take out and remove existinng Burglars and Screens H4
Structural steel,gates, grilles, burglar screens, balustrading, etc m2
TAKE OUT AND REMOVAL OF EXISTING WALL TILING H3
Wall Tiling H4
Carefully take out and remove existing wall tiling including m2 grouting and send to the salvage yard, including making good the floor surfaces in preparation of new wall tiling installation complete as per the principal agent's instruction
TAKE OUT AND REMOVAL OF EXISTING FLOORING H3
Floor Tiling H4
Carefully take out and remove existing ceramic floor tiling m2 including grouting and send to the salvage yard, including
making good the floor surfaces in preparation of new floor tiling installation complete as per the principal agent's instruction
TAKE OUT AND REMOVAL KITCHEN FITTINGS H3
Kitchen Sink H4
Carefully take out and remove existing kitchen sink size at the Item kitchen complete as per the project manager's instrution
Kitchen Cupboards H4
Carefully take out and remove existing kitchen cupboards Item complete as per the project manager's instruction.
Kitchen Built In Unit H4
Take down and remove existing Kitchen built in unit complete Item as per the project manager's instruction.
TAKE OUT AND REMOVAL OF EXISTING BATHROOM H3 FITTINGS
SANITARY FITTINGS H4
Carefully take out and remove existing 'Vaal' water closet and No hand over to the employer, including making good the floor and wall surfaces in preparation of the new water closet installation complete as per the principal agent's instruction
Carefully take out and remove existing 'Vaal' wash hand basins No and hand over to the employer, including making good the floor and wall surfaces in preparation of the new wash hand basins installation complete as per the principal agent's instruction
Carefully take out toilet roll holder and hand over to the No employer
TAKE OUT AND REMOVAL OF EXISTING PAVING IN H3 PREPARATIONS FOR NEW
Paving H4
Carefully take out and remove existing paving complete as per Item the principal agent's instruction and send to the salvage yard
Kerbs H4
Removal of existing kerb H4
Carefully take out and remove existing kerb to the existing Item paving and send to the salvage yard
DEMOLISH EXISTING CONCRETE STAIRCASE H3
Existing staircase to be demolished H4
Concrete Staircase Item
DEMOLISH EXISTING TIMBER STAIRCASE H3
Existing staircase to be demolished H4
Timber Staircase Item
DISMANTLE, TAKE OUT AND REMOVE THE EXISTING H3 ROOF STRUCTURE
Dismantle and emove existing roof structures complete with Item
trusses, purlins, wall plates including roof tiles complete for the entire existing structurein preparation of a new roof.
Dismantle and remove existing rainwater goods complete in Item preparation of new rainwater goods.
REMOVAL OF SMALL POWER AND LIGHTING H3 INSTALLATIONS
Take out and remove complete the existing Itemsmall power and lighting worksconnectionss, plugs, sockets; isolators,switches, lights; all complete and send tothe salvage yard and make good inpreparation of the new supply andinstallation of the smallpower and lightingworks complete as per the scope of worksand/or project manager's instruction
TAKE DOWN AND REMOVE THE EXISTING CEILING H3 BOARDS COMPLETE
Take down and remove the existing ceiling boards, brandering, m2 cornices etc.
TAKE OUT AND REMOVAL OF EXISTING PARTITIONING H3
Partitioning H4
Take out and remove the existing partitioning, including making m2 good the floor surfaces in preparation of new floor fitting complete and send to salvage yard
TAKE OUT AND REMOVAL OF EXISTING CARPORTS IN H3 PREPARATIONS FOR EXTENSION OF BUILDING
Parking Carpots H4
Carefully take out and remove existing paving complete as per No the principal agent's instruction and send to the salvage yard
TAKE DOWN AND REMOVE THE CORRUGATED H3 SHEETING STRUCTURE
Take down and remove existing corrugated structure and to the Item salvage yard
TOTAL SECTION 2 - BILL NO. 1 - ALTERATIONS
SECTION NO.2 H1
RENOVATIONS AND REFURBISHMENT H1
BILL NO.2 H1
FOUNDATIONS H1
EARTHWORKS H2
For preambles see "Model Preambles for Trades (2008 Edition)" and Supplementary preambles as specified in the Trades.
---------------------------------------
SUPPLEMENTARY PREAMBLES H2
Nature of ground H4
The nature of the ground is assumed to be sandy weathered granite, therefore "earth", but possibly interspersed with "hard rock"
Excavation for working space in rock H4
Notwithstanding clause 11 page 8 of the Standard System of Measuring Building Work, excavation for working space in rock will be measured in cubic metres to the extent executed and given as "extra over" bulk excavation or trench and hole excavation as the case may be
Carting away of excavated material H4
Descriptions of carting away of excavated material shall be deemed to include loading excavated material onto trucks directly from the excavations or, alternatively, from stock piles situated on the building site
Filling H4
Notwithstanding the reference to prescribed multiple handling in clause 1 page 6 of the Standard System of Measuring Building Work, prices for filling and backfilling shall include for all selection and any multiple handling of material
Soil poisoning H4
Ant and weed poisoning will be applied in accordance to SABS specifications by Registered and Approved Specialists who will issue a five (5) year guarantee. The contractor will only be paid for this items once they have produced the said cerfificate to the Principal Agent
SITE CLEARANCE, ETC. H2
Site clearance H3
Digging up and removing rubbish, debris, vegetation, hedges, m2 shrubs and trees not exceeding 200mm girth, bush, etc.
EXCAVATION, FILLING, ETC H2
Excavation in earth not exceeding 2m deep H4
Trenches m3
Extra over trench and hole excavations in earth for excavation H4 in
Soft rock m3
Hard rock m3
Extra over all excavations for carting away H4
Surplus material from excavations on site to a dumping site to m3 be located by the contractor
Risk of collapse of excavations H4
Sides of trench and hole excavations not exceeding 1,5m deep m2
Keeping excavations free of water H4
Keeping excavations free of all water other than subterranean Item water
Earth filling obtained from the excavations and /or prescribed H4 stock piles on site including compacted to 93% Mod AASHTO density
Under floors, steps, paving, etc m2
Approved G5 filling supplied and carted by the contractor H3 and compacted in layers not exceeding 150mm to 95% Mod AASHTO density
Backfilling to trenches, holes, etc m3
Under floors, steps, paving etc. m2
Compaction of surfaces H4
Compaction of ground surface under floors etc including m2 scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density
Prescribed density tests on filling H4
Modified AASHTO Density test No
SOIL POISONING H2
Soil insecticide H4
Under floors etc including forming and poisoning shallow m2 furrows against foundation walls etc, filling in furrows and ramming
To bottoms and sides of trenches etc m2
CONCRETE, FORMWORK AND REINFORCEMENT H2
REINFORCED CONCRETE CAST AGAINST H2 EXCAVATED SURFACES
30MPa/19mm concrete H4
Strip footings m3
Fabric reinforcement H4
Type 395 fabric reinforcement in concrete surface beds, slabs, m2 etc
BRICKWORK H2
Brickwork of NFP bricks in class II mortar H4
Half brick walls m2
One brick walls m2
Brickwork reinforcement H4
150mm Wide reinforcement built in horizontally m
TOTAL SECTION 2 -BILL NO. 2 - FOUNDATIONS
SECTION NO.2 H1
RENOVATIONS AND REFURBISHMENTS H1
BILL NO.3 H1
CONCRETE, FORMWORK AND H1 REINFORCEMENT
For preambles see "Model Preambles for Trades (2008 Edition)" and Supplementary preambles as specified in the Trades.
---------------------------------------
SUPPLEMENTARY PREAMBLES H2
Cost of tests H4
The costs of making, storing and testing of concrete test cubes as required under clause 7 "Tests" of SABS 1200 G shall include the cost of providing cube moulds necessary for the purpose, for testing costs and for submitting reports on the tests to the architect. The testing shall be undertaken by an
independent firm or institution nominated by the contractor and to the approval of the architect. (Test cubes are measured separately)
Breeze concrete shall consist of twelve parts clean dry furnace ash, free from coal or other foreign matter, to one part cement (12:1), the ash graded up to particles which will pass a 16,5mm ring from a minimum which fails to pass a 4,75mm mesh. The finer materials from the screening are to be first mixed with the cement into a mortar and the ash added afterwards and thoroughly incorporated
Formwork H4
Description of formwork shall be deemed to include use and
waste only (except where described as "left in" or "permanent"),
for fitting together in the required forms, wedging, plumbing and fixing to true angles and surfaces as necessary to ensure easy
release during stripping and for reconditioning as necessary before re-use
The vertical strutting shall be carried down to such construction as is sufficiently strong to afford the required support without damage and shall remain in position until the newly constructed work is able to support itself
Formworks to soffits of solid slabs etc shall be deemed to be slabs not exceeding 250mm thick unless otherwise described
Formwork to soffits of slabs, beams, etc shall be deemed to be propped up exceeding 1,5m and not exceeding 3,5m high unless otherwise described
Formwork to sides of bases, pile caps, ground beams, etc will only be measured where it is prescribed by the engineer for design reasons. Formwork necessitated by irregularity or collapse of excavated faces will not be measured and the cost thereof shall be deemed to be included in the allowance for taking the risk of collapse of the sides of the excavations, provision for which is made in "Earthworks"
REINFORCED CONCRETE H2
25MPa/19mm concrete H4
Surface beds m3
Slabs cast in panels m3
Aprons cast in panels to falls m3
Raised floor (Server room) m3
Stairs including landings, beams and inverted beams m3
CONCRETE SUNDRIES H2
Finishing top surfaces of concrete smooth with a steel trowel H4
Surface beds, slabs, etc m2
Concrete stairs m2
FORMWORK H2
CAST AGAINST EXCAVATED MATERIALS H2
Casting against excavated materials H3
Sides of footings m2
Sides of Surface bed m2
SMOOTH FORMWORK (DEGREE OF ACCURACY II) H2
Smooth formwork to soffits H4
Landings m2
Stairs with sloping soffits m2
REINFORCEMENT H2
Mild steel reinforcement to structural concrete work H4
8mm Diameter bars t
10mm Diameter bars t
12mm Diameter bars t
TOTAL SECTION NO. 2 BILL O. 3 - CONCRETE, FORMWORK AND REINFORCEMENT
SECTION NO.2 H1
RENOVATIONS AND REFURBISHMENTS H1
BILL NO. 4 H1
MASONRY H2
For preambles see "Model Preambles for Trades (2008 Edition)" and Supplementary preambles as specified in the Trades.
---------------------------------------
SUPPLEMENTARY PREAMBLES H2
BRICKWORK H2
Sizes in descriptions H4
Where sizes in descriptions are given in brick units, "one brick" shall represent the length and "half brick" the width of a brick
Linings to concrete H4
Descriptions of linings to concrete, unless otherwise described, shall be deemed to include wire ties
Hollow walls etc H4
Descriptions of hollow walls shall be deemed to include wire ties and leaving every fifth perpend of the bottom course of the external skin open as a weep hole
Reinforced brick lintels H4
Lintels shall bear at least 160mm onto adjacent walling. Where such bearing cannot be obtained due to the proximity of adjacent openings the lintel shall be continuous
Face bricks H4
Bricks shall be ordered timeously to obtain uniformity in size and colour
Pointing H4
Descriptions of recessed pointing to fair face brickwork and face brickwork shall be deemed to include square recessed, hollow recessed, weathered pointing, etc
SUPERSTRUCTURE H2
Brickwork of NFP bricks in class II mortar H4
Half brick walls m2
One brick walls m2
Brickwork reinforcement H4
75mm Wide reinforcement built in horizontally m
150mm Wide reinforcement built in horizontally m
Turning pieces H4
230mm Wide turning piece to lintels etc m
Allied Concrete prestressed fabricated lintels H4
110 x 75mm Lintels in lengths not exceeding 3m (Provisional) m
NUTEC-CEMENT/FIBRE-CEMENT WINDOW SILLS H2
Nutec window internal sill, size 150mm x 15mm thick, H4 manufactured in accordance with SANS 803:2005 and installed below window with window sill lug screwed to underside of sill at 400mm centres, minimum of 75mm from end of window sill and bedded in Class II mortar with plastic slip joints at end of sills at plaster reveals and projecting from the finished face of wall, all in accordance with the manufacturer's recommendations.
15mm x 150mm Wide sills set flat and slightly projecting m
TOTAL SECTION NO. 2 BILL NO. 4 - MASONRY
SECTION NO.2 H1
RENOVATIONS AND REFURBISHMENTS H1
BILL NO.5 H1
WATERPROOFING H1
For preambles see "Model Preambles for Trades (2008 Edition)" and Supplementary preambles as specified in the Trades.
---------------------------------------
SUPPLEMENTARY PREAMBLES H2
Waterproofing H4
DAMP-PROOFING OF WALLS AND FLOORS H2
One layer of 375 micron Consol Plastic Brikgrip DPC" H4 embossed damp proof course
In walls m2
One layer of 250 micron "Consol Plastic USB Green" H4 waterproof sheeting sealed at laps with "Gunplas Pressure Sensitive Tape"
Under surface beds m2
4mm Torched on Derbigum waterproofing on 40mm min H4
cement screed
Roof slab m2
TOTAL SECTION NO. 2 BILL NO. 5 - WATERPROOFING
SECTION NO.2 H1
RENOVATIONS AND REFURBISHMENTS H1
BILL NO.6 H1
ROOF COVERINGS ETC H1
For preambles see "Model Preambles for Trades (2008 Edition)" and Supplementary preambles as specified in the Trades.
---------------------------------------
SUPPLEMENTARY PREAMBLES H2
General H4
All roof coverings, etc., to be with a covering of Z275 galvanising. All holes to be drilled and not punched
Where described as with "Chromadek" finish, all sheets, flashings, etc., shall be with "Chromadek" silicone polyester paint for exterior use
Sizes H4
All items are measured net unless otherwise described
Flashings, trimming plates, etc. H4
Prices to include for all cutting and waste and relevant fixing material, unless otherwise described
All rates for flashings, trimmings, etc., to include for forming drips and closed ends to troughs of sheet steel roof covering where applicable
All items are unless otherwise described measured net
PROFILED METAL SHEETING AND ACCESSORIES H2
IBR Kliplock 686 Steel Roof sheeting zinc coated with H4
Chromadek finish and protective primer on 38x38mm SA Pinebattens @ 340mm centres max. 0.25mm white polyolefin membrane on prefabricated approved engineered SA Pine timber trusses with gang nail or similar joints 700mm centres max. on 115x38mm SA Pine wall plate.
Roof covering with pitch not exceeding 15 degrees m2
Narrow flute closer m
TOTAL SECTION NO. 2 - BILL NO. 7 - ROOF COVERINGS
SECTION NO.2 H1
RENOVATIONS AND REFURBISHMENTS H1
BILL NO.7 H1
FLOOR COVERINGS H1
For preambles see "Model Preambles for Trades (2008 Edition)" and Supplementary preambles as specified in the Trades.
---------------------------------------
SUPPLEMENTARY PREAMBLES H2
General H4
FLOOR COVERINGS H2
Carpet 100% recycled material colour blue H4
On Floors m2
Approved 12.7mm x 1200mm strained and sealed mahogany H4 floor planks with brushed aluminium strips inlays.
On floors m2
Floorworx Laminated Floor or similar approved Strip design H4 boards size 1225x200x7mm thick water proof membrane layer lapped 200mm including 40mm turn.
On Floors and landings m2
On treads 255mm wide m
On risers 170mm high m
Skirting 150mm high stepped overtreads and risers of stairs m
TOTAL SECTION NO. 2 BILL NO. 7 - FLOOR COVERINGS
SECTION NO.2 H1
RENOVATIONS AND REFURBISHMENTS H1
BILL NO.8 H1
CARPENTRY AND JOINERY H1
For preambles see "Model Preambles for Trades (2008 Edition)" and Supplementary preambles as specified in the Trades.
---------------------------------------
SUPPLEMENTARY PREAMBLES H2
Particle board: H3
Particle board shall comply with the following specifications:
a) SABS 1300 Particle board: exterior and flooring type
b) SABS 1301 Particle board: interior type
Joinery: H3
Descriptions of frames shall be deemed to include frames, transomes, mullions, rails, etc
Descriptions of hardwood joinery shall be deemed to include pelleting of bolt holes
Fixing H3
Items described as "nailed" shall be deemed to be fixed with hardened steel nails or shot pins to brickwork or concrete
Decorative laminate finish: H3
Laminate finish shall be glued under pressure. Edge strips shall be butt jointed at junctions with adjacent similar finish
PREFABRICATED ROOF TRUSSES H2
Pre-fabricated metal connected timber roof trusses H3
All trusses shall be fabricated by an approved truss manufacturer who holds a current Certificate of Competence awarded by the Institute for Timber Construction
Timber H3
Timber for trusses to be South African softwood and shall be in accordance with the grades as defined in SABS Specification No 563 or as defined in SABS Specification No 1460
Bolts H3
Bolts shall be in accordance with BS 4190 or SABS 135
Shear plates, tooth connectors and split rings H3
Shear plates, tooth connectors and split rings shall be in accordance with BSS 1759 : 1960 and installed in accordance with the CSIR Publication HOUT 468, "The Design, Manufacturing and Erection of Timber Trusses"
Washers H3
Square or round washers of the following dimensions shall be used with all bolts:
1 Bolts up to 8mm diameter:Washers shall be minimum 25mm wide of minimum 2,50mmthickness
2 Bolts up to 12mm diameter:
Washers shall be minimum 36mm wide of minimum 4,00mmthickness
3 Bolts up to 20mm diameter:
Washers shall be minimum 60mm wide of minimum 5,00mmthickness
Metal connector plates H3
Metal connector plates shall be fabricated out of not less than 1mm thick drawn quality galvanised steel
The steel shall have a minimum yield strength of 228MPa and a minimum ultimate tensile strength of 330MPa. The corrosion resisting coating shall be not less than 275g/m2 commercial class hot dipped galvanising as per SABS 934 before stamping
All connector plates shall have been tested by the engineers and be of a size capable of transmitting the forces between members of a truss without exceeding the design values published in the engineers report
Truss construction H3
Trusses shall be constructed in jigs specially designed to unsure the correct profile, overhangs and cambers
Where metal connector plates are used all joints are to be close fitted butt joints made by precision pressing of the metal connector plates into each side of the joint
Truss design H3
All trusses shall be designed by a registered Professional Engineer in accordance with SABS 0163 ("Design of Timber Structures") and Code 0160 ("Loadings")
Truss spacing H3
The truss centres shall be less than or equal to that as described in this bill for each respective truss
Truss pitch H3
The truss pitch shall be as described in this bill for each respective truss type
Truss loading H3
Trusses shall be designed for a live load of 0,50kN/m2 and dead load as specified under the sub-heading "Specific load specifications for roof trusses"
Shop drawings, design and erection guarantee certificates H3
It will be expected from the Contractor to timeously prepare, submit and obtain the necessary approvals from the Representative/Agent in respect of the required shop drawings, design and erection guarantee certificates as specified
Dimensions H3
All dimensions given in the descriptions of the trusses are nominal and actual measurements are to be obtained by actual measurements taken on the site before design or fabrication commences
Erection H3
All trusses are to be hoisted and erected strictly in accordance with the procedures and recommendations of the manual "The Erection and Bracing of Timber roof Trusses" as published by the Institute for Timber Construction, or the SABS Code of Practice "The Design, Manufacture and Erection of Timber Roof Trusses", or as designed and detailed by the designer
Design system H3
The design system as documented in this bill is based on the "MiTek" system and all references given in the descriptions are related to specific type of trusses based on this design system
However, Contractors are to note that any design system of similar quality may be used subject to the prior written approval of the Representative/Agent
Specific specifications for roof trusses H3
Unless otherwise described, the following specifications will apply:
1 All trusses to be with a 10░ pitch
2 The dead load consists of corrugated roof sheeting and purlins at approximately 1200mm centres
SKIRTINGS H2
Wrought meranti H4
19 x 76mm Skirting including 19mm quadrant bead nailed m
DOORS, ETC H2
44mm semi-solid core door with Masonite Plain standard H3 SABS approved hardboard on both sides of the door
44mm Door 813x2032mm high (D2) No
Swartland Cape Culture door frame with full glass with 90 x H470mm rebated, moulded, grooved and weather grooved hardwood door frame with full glass top light and 90 x 44mm splay rebated, grooved and weather grooved sealed sealed with a linseed oil based transit stabilizing sealer
44mm thick door 813x2032mm high (D3) No
Swartland Cape Culture door frame with full glass with 90 x H470mm rebated, moulded, grooved and weather grooved hardwood door frame with full glass top light and 90 x 44mm splay rebated, grooved and weather grooved sealed sealed with a linseed oil based transit stabilizing sealer
44mm thick door 1480x2032mm high (D5) No
813x2032x40mm THICK TDM SEMI SOLID DOOR WITH H4COMMERCIAL VENEER BOTH SIDES AND 2 HARDWOOD CONCEALED EDGES
40mm door 813x2032mm high (D6) No
TOTAL SECTION NO. 2 BILL NO. 8 - CARPENTRY AND JOINERY
SECTION NO.2 H1
RENOVATIONS AND REFURBISHMENTS H1
BILL NO.9 H1
CEILING , ETC. H1
For preambles see "Model Preambles for Trades (2008 Edition)" and Supplementary preambles as specified in the Trades.
---------------------------------------
SUPPLEMENTARY PREAMBLES H2
Descriptions: H4
Items described as "nailed" shall be deemed to be fixed with hardened steel nails or pins or shot pinned to brickwork or concrete
Items described as "plugged" shall be deemed to include screwing to fibre, plastic or metal plugs at not exceeding
600mm centres, and where described as "bolted" the bolts have been given elsewhere
PARTITIONING H2
60mm thick wall partitioning 3340mm high m2
CEILING CONSTRUCTION, CORNICES, ETC. H2
Herculite ceiling boards H4
75mm Coved cornices m
NAILED UP AND SCREWED UP CEILINGS H1
2 x coats acrylic paint, 1 x undercoat to plstered 6.4mm thick H4gypsum celing sand papered, sealed and primed with 2x50mm fibre glass insulation laid crosswise with a single sheet of kraft paper laid underneath 6.4mm thik gypsum ceiling
6.4mm gypsum ceiling m2
Extra over ceiling for opening for 610x610mm trap door of No50x76mm wrought softwood rebated framing with one38x38mm sawn softwood cross brander covered with ceilingboard and fitted flush in opening
TOTAL SECTION NO. 2 BILL NO. 9 - CEILINGS, PARTITIONS AND ACCESS FLOORING
SECTION NO.2 H1
RENOVATIONS AND REFURBISHMENTS H1
BILL NO.10 H1
IRONMONGERY H1
For preambles see "Model Preambles for Trades (2008 Edition)" and Supplementary preambles as specified in the Trades.
---------------------------------------
SUPPLEMENTARY PREAMBLES H2
Descriptions H4
Items described as "plugged" shall be deemed to include screwing to fibre, plastic or metal plugs
Finishes to ironmongery H4
Where applicable finishes to ironmongery are indicated by suffixes in accordance with the following list:
BS Satin bronze lacquered CH Chromium plated
SC Satin chromium plated
SE Silver enamelled
GE Grey enamelled
AS Anodised silver
AB Anodised bronze
AG Anodised gold
ABL Anodised black
PB Polished brass
PL Polished and lacquered
PT Epoxy coated
SD Sanded
Solid H4
Cylinder lockset with hollow brushed stainless steel or Noaluminium furniture as per dorma, or similar approved by theArchitect
SUNDRIES H2
Solid H4
Dorma "Code 255" door stop plugged No
TOTAL SECTION NO. 2 BILL NO. 10 - IRONMONGERY
RENOVATIONS AND REFURBISHMENTS H1
BILL NO. 11 H1
METALWORK H1
For preambles see "Model Preambles for Trades (2008 Edition)" and Supplementary preambles as specified in the Trades.
---------------------------------------
Descriptions H4
Descriptions of bolts shall be deemed to include nuts and washers
Descriptions of expansion anchors and bolts and chemical anchors and bolts shall be deemed to include nuts, washers and mortices in brickwork or concrete
Metalwork described as"holed for bolt(s)" shall be deemed to exclude the bolts unless otherwise described
Drawings H4
Tenderers are referred to architect's drawings annexed to this document for full details of the windows, doors, etc
Standard extruded aluminium window frame H4
600x2125mm high standard extruded aluminium windows No (W01)
2100x556mm high standard extruded aluminium windows No (W02)
600x900mm high standard extruded aluminium windows(W03) No
1800x1200mm gigh standard extruded aluminium windows No (W04)
900x900mm high standard extruded aluminium windows (W05) No
ALUMINIUM HINGED DOUBLE DOOR WITH MIDRAIL HUNG H4ON PAIR OF ALUMINIUM BUTTS, GLAZED IN ACCORDANCE WITH SANS 10160:2010 SANS10137:2002, SANS 10400:2010 (PART N OF SECTION 3) AND SANS 1263; ALL IN ACCORDANCE WITH AAAMSA SELECTION GUIDE FOR GLAZED ALUMINIUM ARCHITECTURAL ALUMINIUM PRODUCTS
2141x2125mm Aluminium double door (D01) No
ALUMINIUM HINGED FOLDING DOOR WITH MIDRAIL H4HUNG ON PAIR OF ALUMINIUM BUTTS, GLAZED IN ACCORDANCE WITH SANS 10160:2006, ALL IN ACCORDANCE AAAMSA SELECTION GUIDE FOR GLAZED ALUMINIUM ARCHITECTURAL ALUMINIUM PRODUCTS
5000x2465mm high (D04) No
Welded handrails to stairs H3
60mm diameter continuous horizontal stainless steel handrails, m 100mm high overall, fixed with and including 15mm stainless steel rods at 600mm centres fixed to wall with 40mm diameter stainless steel spon cus to conceal fix plate, including all flat section plates, cleats, etc.
60mm diameter continuous raking stainless steel handrails, m 100mm high overall, fixed with and including 15mm stainless steel rods at 600mm centres fixed to wall with 40mm diameter stainless steel spon cus to conceal fix plate, including all flat section plates, cleats, etc.
Extra over for flat colsed end No
Extra over ramp or knee No
Extra over for rounded closed end No
TOTAL SECTION NO. 2 BILL NO. 11 - METALWORK
SECTION NO.2 H1
RENOVATIONS AND REFURBISHMENTS H1
BILL NO. 12 H1
PLASTERING H1
For preambles see "Model Preambles for Trades (2008 Edition)" and Supplementary preambles as specified in the Trades.
---------------------------------------
EXTERNAL PLASTER H2
Cement plaster on brickwork H3
On Walls m2
SCREEDS H2
Screeds on concrete H4
30mm Thick on floors m2
INTERNAL PLASTER H2
Cement plaster on brickwork H4
On walls m2
Screeds on concrete H4
25mm thick on floors on staircase infill m2
TOTAL SECTION NO. 2 BILL NO. 12 - PLASTERING
SECTION NO.2 H1
RENOVATIONS AND REFURBISHMENTS H1
BILL NO.13 H1
TILING H1
For preambles see "Model Preambles for Trades (2008 Edition)" and Supplementary preambles as specified in the Trades.
---------------------------------------
SUPPLEMENTARY PREAMBLES H2
Descriptions H4
Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding
WALL TILING H2
Glazed ceramic wall tiles (PC R85,00/m2 VAT excl.) fixed with H4 adhesive to plaster (plaster elsewhere)
On walls m2
FLOOR TILING H2
600x600mm Porcelain tiles or similar approved H4
On floors and landings m2
330x330mm Ceramic tiles or similar approved H4
On floors and landings m2
TOTAL SECTION NO. 2 BILL NO. 13 - TILING
SECTION NO.2 H1
BUILDING WORKS (RENOVATIONS AND H1 REFURBISHMENTS)
BILL NO.14 H1
PLUMBING AND DRAINAGE H3
For preambles see "Model Preambles for Trades (2008 Edition)" and Supplementary preambles as specified in the Trades.
---------------------------------------
SUPPLEMENTARY PREAMBLES H2
Polycop polypropylene pipes: H3
Polypropylene pipes 54mm diameter and under shall be seamless copper coloured class 16 pipes jointed with "Fast-fuse" heat welded thermoplastic or brass compression fittings as designed for use with copper pipes as stated
Pipes shall be firmly fixed to walls etc with coloured nylon snap-in pipe clips with provision for accommodating thermal movement and jointed and fixed strictly in accordance with the manufacturer's instructions
All pipe diameters are nominal external
Polylink polypropylene pipes: H3
Polypropylene pipes 63mm diameter and over shall be class 12 pipes jointed with cast iron "Supraclamp" running joints
Fusion welded bends, once or twice mitred as necessary, and tees shall be factory manufactured
Fusion welded bends and tees shall include jointing to pipes with PVC rubber ring double Z joint couplers
Branch tees shall include flanged and bolted joints to "Polycop" branch pipes in addition and for brass compression male iron to copper straight couplers
Reducers shall include jointing to pipes with PVC rubber ring double Z joint couplers and reducers shall be of sufficient overall length to accommodate same
All pipes shall be jointed and fixed strictly in accordance with the manufacturer's instructions
All pipe diameters are nominal external
Concrete pipes: H3
Pipes shall be jointed with ogee joints with rubber collars or socket and spigot joints with rubber rings
Vitrified clay pipes: H3
Pipes shall rest on solid ground and, where necessary, pockets
of sufficient size shall be cut around joints to enable the jointing
to be properly performed or, alternatively, pipes shall be bedded full length on and including unreinforced concrete laid in a semi-dry state immediately before pipes are laid
Sewer and drainage pipes and fittings shall be jointed and sealed with butyl rubber rings
uPVC pipes and fittings: H3
Soil, waste and vent pipes and fittings shall be solvent weld jointed
uPVC pressure pipes and fittings: H3
Pipes for water supply shall be of the class stated
Pipes of 40mm diameter and smaller shall be plain ended with solvent welded uPVC loose sockets and fittings
Pipes of 50mm diameter and greater shall have sockets and spigots with push in type integral rubber ring joints. Bends shall be uPVC and all other fittings shall be cast iron, all with similar push-in type joints
Copper pipes: H3
Pipes shall be hard drawn and half-hard pipes of the class stated. Class 0 (thin walled hard drawn) pipes shall not be bent. Class 1 (thin walled half-hard), class 2 (half-hard) and class 3 (heavy walled half-hard) pipes shall only be bent with benders with inner and outer formers. Fittings to copper waste, vent and anti-syphon pipes, capillary solder fittings and compression fittings shall be "Cobra Watertech" type. Capillary solder fittings shall comply with ISO 2016. Only compression fittings shall be used in walls or in ground
Fixing of pipes H3
Unless specifically otherwise stated, descriptions of pipes shall be deemed to include fixing to walls etc, casting in, building in or suspending not exceeding 1m below suspension level
Lead pipes and fittings H3
All soldered joints shall be wiped and brass unions shall be used for jointing lead to steel
Reducing fittings H3
Where fittings have reducing ends or branches they are described as "reducing". In the case of pipes with diameters not exceeding 60mm only the largest end or branch size is given. Should the contractor wish to use other fittings and bushes or reducers he may do so on the understanding that no claim in this regard will be entertained. In the case of pipes with diameters exceeding 60mm all sizes are given and no claim for extra bushes, reducers, etc will be entertained
Wire gratings H3
Descriptions of gutter outlets etc shall be deemed to include
wire balloon gratings
Septic tanks H3
Descriptions of septic tanks shall be deemed to include excavation, bedding and jointing, concrete base slabs, jointing to drains and backfilling, compaction, etc all in accordance with the manufacturer's instructions
Exposed concrete surfaces H3
Exposed surfaces of concrete stormwater channels, cover slabs, inspection eye marker slabs, gulley tops, cleaning eye tops, catchpits, inspection chambers, etc shall be finished smooth with plaster
Excavations H3
No claim for rock excavation will be entertained unless the contractor has timeously notified the quantity surveyor thereof prior to backfilling
Soft rock and "hard rock" shall be as defined in "Earthworks"
Laying, backfilling, bedding, etc. of pipes H3
Pipes shall be laid and bedded and trenches shall be carefully backfilled in accordance with manufacturers' instructions
Where no manufacturers' instructions exist pipes shall be laid in accordance with clauses 5.1 and 5.2 of each of the following:
SABS 1200 L : Medium-pressure pipelines
LD : Sewers
LE : Stormwater drainage
Pipe trenches etc shall be backfilled in accordance with clauses 3, 5.5, 5.6, 5.7 and 7 of SABS 1200
DB : Earthworks (Pipe trenches)
Pipes shall be bedded in accordance with clauses 3.1 to 3.4.1, 5.1 to 5.3 and 7 of SABS 1200
LB : Bedding (Pipes).
Unless otherwise described bedding of rigid pipes shall be class B bedding
Flush pans H3
Flush pans shall have straight or side outlets and "P" or "S" traps as necessary
Stainless steelbasins, sinks, wash troughs, urinals, etc. H3
Units shall have standard aprons on all exposed edges and tiling keys against walls where applicable
Waste unions H3
Descriptions of waste unions shall be deemed to include rubber or vulcanite plugs and chains fixed to fittings
Steel sectional water tanks H3
Tanks shall comply with SABS CKS 114
Densyl petrolatum anti-corrosion tape as manufactured H3 by Denso SA (Pty) Ltd.
Pipes to be taped shall be coated with the appropriate primer and the tape shall be applied with minimum 15mm lap per spiral unless otherwise described
Couplings and fittings to pipes shall be taped in strict accordance with the manufacturer's instructions including all mastic, tape, "Layflat" sheeting, securing of same, etc
WATER SUPPLIES H2
Class 0 copper pipes H3
15mm Pipes m
22mm Pipes m
28mm Pipes m
Extra over class 0 copper pipes for capillary fittings H3
15mm Fittings No
22mm Fittings No
28mm Fittings No
PVC gulley H3
110mm Gulley trap with ),P,Q or S outlet, plain gulley head and No grating, jointed to 110mm PVC pipe, including excavated for, bedding on and encasing in concrete 15 MPa/19mm, not exceeding 0.75mm deep to invert
Sundries H3
300 x 300 x 50mm Precast concrete inspectio eye marker slab No set in ground
100mm Cast iron "ABC" cleaning eye No
RAINWATER DISPOSAL H2
0,6mm Galvanised sheet iron with "Chromadek" finish on one H4 side
100 x 125mm Eaves gutters with beaded front edge m
Extra over eaves gutter for angle No
Extra over eaves gutter for stopped end No
Extra over eaves gutter for outlet for 100mm diameter pipe No
100mm Diameter rainwater pipes m
Extra over rainwater pipe for eaves or plinth offset 450mm No projection
Extra over rainwater pipe for shoe No
SANITARY PLUMBING H2
Extra heavy duty structured wall uPVC sewer pipes to H3 SANS 1601
50mm Pipes m
110mm Pipes m
Extra over extra heavy duty structured wall uPVC sewer H3 pipes to SANS 1601 for fittings
50mm Access bend No
110mm Access bend No
50mm Junction No
SANITARY FITTINGS H2
BASINS H4
Manufactured of acrylic material (white colour) as per No developers prefered choice and range
Toilets H4
Wall - hung ( white colour) with Geberit or similar system as per No developers prefered choice
MIXERS H2
Cobra Watertech H4
Grohe or similar as per developers prefered choice and range. No
Accessories H4
Toilet roll holder No
Kitchen sink H4
Stainles steel double bowl sink as per developers prefered Item choice and range
Urinals H4
VAAL Sanitaryware 570x455mm Weaver surface mounted No vitreous china vanity urinals (product code 704201/702500)
TOTAL SECTION NO. 2 BILL NO. 14 - PLUMBING AND DRAINAGE
SECTION NO.2 H1
BUILDING WORK (RENOVATIONS & H1 REFURBISHMENTS)
BILL NO.15 H1
ELECTRICAL WORK H1
For preambles see "Model Preambles for Trades (2008 Edition)" and Supplementary preambles as specified in the Trades.
Note: Contractor to provide temporary generator H1 power on site during installation for testing and temporary power supply for the duration of the construction period
Complete installation: Reticulation; electrical, telephone and H4 data)
NOTE: Tenderers are advised to study the specifications before H4 pricing the bill.
DISTRIBUTION BOARDS H2
Supply, Install, test and commision distribution board in the H4 bulding - Flush mounted distribution board cupboards, c/w all switchgear and breakers
DB-A No
Label all circuits and install signage to the panels and COC SUM
Supply cable SUM
EXTERNAL LIGHTING H2
Supply, deliver, install, connect, test and commissioning the H4 following external light fittings
TYPE W1 - Wall mounted bulkhead LED light fitting with LM6 No die cast and extruded aluminium body and opal acrylic diffuser fitted with 15W LED lamp
TYPE F03 - Vapour proof flourescent light fitting, fitted with No 2x36W T5 lamps
WIRING & TERMINALS H3
Supply, delivery and installation of Cu Conductors: H4
2,5mm2 PVC insulated conductor H4
Supply and delivery m
Installation m
2,5mm2 bare copper earth wire H4
Supply and delivery m
Installation m
Day Light switch H4
Supply and installation No
LIGHTING INSTALLATIONS H2
WIREWAYS H3
Supply and Install Trunking H4
Supply and install P8000 trunking suspended from slab and H4 trusses in ceiling void.
Supply and delivery m
Installation m
Supply, delivery and installation of PVC conduits, surface H4
mounted in ceiling voids and fixed to walls or cast-in or built into walls, including all fixing materials, bends, terminations, draw boxes, etc.
20mm diameter H4
Supply and delivery m
Installation m
Supply, delivery and installation of Conduit outlets boxes c/w H4 locknuts and bushes built into brick or cast into concrete or surface mounted
100 x 50 x 50 mm, c/w applicable cover H4
Supply and delivery No
Installation No
65mm round box, c/w cover H4
Supply and delivery No
Installation No
ACCESSORIES H3
Supply, deliver and install accessories to boxes H4
5A, 3-pin socket outlets to trunking No
WIRING & TERMINALS H3
Supply, delivery and installation of Cu Conductors: H4
1,5mm2 PVC insulated conductor H4
Supply and delivery m
Installation m
2,5mm2 bare copper earth wire H4
Supply and delivery m
Installation m
LIGHT FITTINGS H3
Supply, deliver, install, connect, test and commissioning the H4 following light fittings
TYPE F01 - 1200x300mm surface mounted flourescent light No fitting
TYPE C1 - 230V 103mm diameter LED downlight ceiling No recessed Die-cast aluminium body with acrylic lens(8w cool white)
TYPE F02 - Open channel flourecscent light fitting No
Supply, deliver, install, connect, test and commissioning of H4 Sensors
Supply, deliver, install, connect, test and commissioning H4 occupancy sensors
WSD PDT No
Adaptors 5 Amp 2 Way No
Adaptors 5 Amp 4 Way No
SMALL POWER INSTALLATION H2
WIREWAYS H3
Supply, delivery and installation of PVC conduits, surface H4
mounted in ceiling voids and fixed to walls or cast-in or built into walls, including all fixing materials, bends, terminations, draw boxes, etc.
20mm diameter H4
Supply and delivery m
Installation m
Supply and install conduit droppers chased or built into wall, No consisting of 3 x 25mm dia & 2 x 20mm dia from wire basket & trunking in ceiling void to power skirting c/w 1.6mm draw wires
Supply, delivery and installation of Conduit outlets boxes c/w H4 locknuts and bushes built into brick or cast into concrete or surface mounted, c/w applicable cover
100 x 100 x 50 mm H4
Supply and delivery No
Installation No
Supply, deliver and installation of the 1 compartment, 1 cover H4 Midland power skirting complete with all accessories including internal/external bends, end caps etc.
as per ground floor drawing m
Supply and Install Trunking H4
Supply and install 5A 3 pin power trunking suspended from slab H4 and trusses in ceiling void.
Supply and delivery No
Installation No
Supply, delivery and installation of socket outlets H4
16 A, 3-pin standard white SSO H4
Flush Mounted No
Power skirting mounted No
16 A, 3-pin double white SSO H4
Flush Mounted No
16 A, 3-pin dedicated red SSO H4
Power skirting mounted, 45 degree (including plug top) No
Supply and installation of power skirting accessories H4
Blank cover plate suitable for RJ 11 telephone outlet No
WIRING & TERMINALS H3
Supply, Deliver and installation of Cu Conductors: H4
2.5mm2 PVC insulated conductor H4
Supply and delivery m
Installation m
2.5mm2 bare copper earth wire H4
Supply and delivery m
Installation m
PROVISIONAL SUMS H2
Provisional Sums exclude the cost of Overheads, Preliminaries and Profit
Provisional Sums: H4
Eskom Connection Fee SUM
TOTAL SECTION NO. 2 BILL NO 15 - ELECTRICAL WORKS
SECTION NO.2 H1
RENOVATIONS AND REFURBISHMENTS H1
BILL NO. 16 H1
GLAZING H1
For preambles see "Model Preambles for Trades (2008 Edition)" and Supplementary preambles as specified in the Trades.
---------------------------------------
GLAZING TO STEEL WITH PUTTY H2
4mm Clear float glass H4
Panes exceeding 0,1m2 and not exceeding 0,5m2 m2
TOPS, SHELVES, DOORS, MIRRORS, ETC H2
4 mm Silvered float glass copper backed mirrors with 10 H3 mm bevelled and polished edges holed for and fixed with chromium plated dome capped mirror screws with rubber buffers to plugs in brickwork or concrete
Mirror 400 x 600mm high with four (4) screws No
TOTAL SECTION NO. 2 BILL NO. 16 - GLAZING
SECTION NO.2 H1
RENOVATIONS AND REFURBISHMENTS H1
BILL NO. 17 H1
PAINTWORK H1
For preambles see "Model Preambles for Trades (2008 Edition)" and Supplementary preambles as specified in the Trades.
---------------------------------------
PAINTWORK ETC TO NEW WORK H2
ON FLOATED PLASTER H2
2 x coats eggshell acrylic, 1 xx coat undercoat H4
On internal walls m2
On external walls m2
ON FIBRE-CEMENT H2
2 x coats eggshell acrylic, 1 xx coat undercoat H4
On ceilings and cornices m2
2 x coats eggshell acrylic, 1 xx coat undercoat H4
On window sills not exceeding 300 mm girth m
2 x coats eggshell acrylic, 1 xx coat undercoat H4
Edges and soffit of slabs m2
ON WOOD H2
Three coats matt varnish H4
On doors m2
On skirtings, rails, cornices etc not exceeding 300 mm girth m
ON METAL H2
As per the NLC Spec H4
On support steel work m2
TOTAL SECTION NO. 2 BILL NO. 17 - PAINTWORK
SECTION NO.3 H1
RENOVATIONS AND REFURBISHMENTS H1
BILL NO.1 H1
EXTERNAL WORKS H1
PAVING H1
Materials and workmanship must be in accordance to the H4 following SABS 1200 specifications:
C
D
DM
M
ME
MF
MK
MM
EARTHWORKS H2
Site clearance H4
Digging up and removing rubbish, debris, vegetation, hedges, m2 shrubs and trees not exceeding 200mm girth, bush, etc
Earthworks H4
Rip and scarify ground level to a depth of 150mm and m2 consolidate to 90% mod. AASHTO density (minimum CBR 3)
Paving layers H4
The following to be natural selected gravel layers evenly spread and consolidated in layers and dimensions as specified and on the drawings. All thicknesses to be consolidated thicknesses.
Where described as "imported" the gravel to be supplied and carted on by the contractor from an approved borrow pit
150mm Selected filling previously set aside compacted to 93% m2 mod. AASHTO density
150mm Imported G6 material compacted to 95% mod. m2 AASHTO density
PAVING H2
Interlocking paving H4
200x100x80mm 'Grey' Interlocking concrete paving blocks m2 layed on compacted ground and riversand blinding.
Weed-killing treatment of surface under paving m2
Kerbs, etc H4
Precast concrete figure 7 kerb (SABS 927), levelled and jointed m in 1:5 cement mortar complete with 15Mpa/19mm in situ concrete support blocks size 225 x 150 x 225mm high, at joints at 1,0m centres, including leaving 6mm expansion joints at 10m intervals between kerbs
TOTAL SECTION NO. 3 BILL NO. 1 - PAVING
SECTION NO. 3 H1
RENOVATIONS AND REFURBISHMENTS H3
BILL NO.2 H1
SUPPLEMENTARY PREAMBLES H2
NOTE: Tenderers are referred to the definition of general attendance on nominated sub-contractors given in Clause 9 of the Preliminaries
NOTE: Under no circumstances may any Prime Cost - Provisional Amount, etc be extended at an amount lower than the amount given in the Bill
THE FOLLOWING PROVISIONAL SUMS ARE FOR WORK TO BE EXECUTED BY SELECTED SUBCONTRACTORS
The following Provisional Sums are for specialists work to be executed by a selected Sub-contractor who upon appointment in terms of the Conditions of Contract shall be deemed to be a Domestic Sub-Contractor to the Contractor
A Selected Sub-Contractor shall be a Sub-contractor executing work for which a sum of money is provided for in the Bills of Quantities or a Sub-contractor executing additional specialist work which arises as a result of an instruction by the Principal Agent/Engineer
Tender documents for such work shall be prepared by the Principal Agent/Engineer in consultation with and to the approval of the Contractor and such tender document shall be issued by the Principal Agent/Engineer to a list of tenderers agreed upon between the Principal Agent/Engineer and Contractor.
Tenders shall be submitted to the Principal Agent/Engineer
The Selected Sub-contractor shall be chosen by the Principal Agent/Engineer and the Contractor, and the Contractor shall satisfy himself that such selected sub-contractor can meet the requirements of the Sub-Contract agreement and the Contractor shall inform the Principal Agent/Engineer accordingly
The procedure relating to the method of selection, obtaining of tenders, adjudication thereof and the appointment of the Selected Sub-contractor shall not create any contractual relationship between the Client and the Selected Sub-contractor
Carports H4
Provide the sum of R 120 000,00 (One Hundred and Twenty Item Thousand rand) for the erection of carports by Specialists
Allow for giving every facility to Specialists as described Item
Allow for profit on above if required Item
TOTAL SECTION NO. 3 BILL NO. 2 - PARKING CARPORTS
SECTION NO. 3 H1
RENOVATIONS AND REFURBISHMENTS H3
BILL NO.3 H1
SUPPLEMENTARY PREAMBLES H2
NOTE: Tenderers are referred to the definition of general attendance on nominated sub-contractors given in Clause 9 of the Preliminaries
NOTE: Under no circumstances may any Prime Cost - Provisional Amount, etc be extended at an amount lower than the amount given in the Bill
NOTE: The existing boundary wall is still in a very good condition, and for the certainty that the proposed renovations are not likely to tamper with the boundary lines, the likelihood
that the boundary wall will require any work to be done on it are very minimal.The allowances is for any unforseen tampering.
THE FOLLOWING PROVISIONAL SUMS ARE FOR WORK TO BE EXECUTED BY SELECTED SUBCONTRACTORS
The following Provisional Sums are for specialists work to be executed by a selected Sub-contractor who upon appointment in terms of the Conditions of Contract shall be deemed to be a Domestic Sub-Contractor to the Contractor
A Selected Sub-Contractor shall be a Sub-contractor executing work for which a sum of money is provided for in the Bills of Quantities or a Sub-contractor executing additional specialist work which arises as a result of an instruction by the Principal Agent/Engineer
Tender documents for such work shall be prepared by the Principal Agent/Engineer in consultation with and to the approval of the Contractor and such tender document shall be issued by the Principal Agent/Engineer to a list of tenderers agreed upon between the Principal Agent/Engineer and Contractor.
Tenders shall be submitted to the Principal Agent/Engineer
The Selected Sub-contractor shall be chosen by the Principal Agent/Engineer and the Contractor, and the Contractor shall satisfy himself that such selected sub-contractor can meet the requirements of the Sub-Contract agreement and the Contractor shall inform the Principal Agent/Engineer accordingly
The procedure relating to the method of selection, obtaining of tenders, adjudication thereof and the appointment of the Selected Sub-contractor shall not create any contractual relationship between the Client and the Selected Sub-contractor
Boundary Wall H4
Provide the sum of R 150 000,00 (One Hundred and Fifty Item Thousand rand) for the required accessories to the boundary wall
Allow for giving every facility to Specialists as described Item
Allow for profit on above if required Item
TOTAL SECTION NO. 3 BILL NO. 3 - BOUNDARY WALL ALLOWANCE
SECTION NO.4 H1
RENOVATIONS AND REFURBISHMENTS H3
BILL NO.1 H1
SUPPLEMENTARY PREAMBLES H2
NOTE: Tenderers are referred to the definition of general attendance on nominated sub-contractors given in Clause 9 of the Preliminaries
NOTE: Under no circumstances may any Prime Cost - Provisional Amount, etc be extended at an amount lower than the amount given in the Bill
THE FOLLOWING PROVISIONAL SUMS ARE FOR WORK TO BE EXECUTED BY SELECTED SUBCONTRACTORS
The following Provisional Sums are for specialists work to be executed by a selected Sub-contractor who upon appointment in terms of the Conditions of Contract shall be deemed to be a Domestic Sub-Contractor to the Contractor
A Selected Sub-Contractor shall be a Sub-contractor executing work for which a sum of money is provided for in the Bills of Quantities or a Sub-contractor executing additional specialist work which arises as a result of an instruction by the Principal Agent/Engineer
Tender documents for such work shall be prepared by the Principal Agent/Engineer in consultation with and to the approval of the Contractor and such tender document shall be issued by the Principal Agent/Engineer to a list of tenderers agreed upon between the Principal Agent/Engineer and Contractor.
Tenders shall be submitted to the Principal Agent/Engineer
The Selected Sub-contractor shall be chosen by the Principal Agent/Engineer and the Contractor, and the Contractor shall satisfy himself that such selected sub-contractor can meet the requirements of the Sub-Contract agreement and the Contractor shall inform the Principal Agent/Engineer accordingly
The procedure relating to the method of selection, obtaining of tenders, adjudication thereof and the appointment of the Selected Sub-contractor shall not create any contractual relationship between the Client and the Selected Sub-contractor
HVAC SYSTEM SUPPLY AND INSTALLATION H2
HVAC System H4
Allow for the supply and installation of the HVAC system by the SUM
duly appointed specialist for the sum of R 150 000 ( One Hundred and Fifty Thousand Rands) complete as per the scope of works
Allow profit for the supply and installation of HVAC system Item
Allow attendance for the supply and installation of the HVAC Item system
TOTAL SECTION NO. 4 BILL NO. 1 - HVAC SYSTEM
SECTION NO.4 H1
RENOVATIONS & REFURBISHMENTS H3
BILL NO.2 H1
SUPPLEMENTARY PREAMBLES H2
NOTE: Tenderers are referred to the definition of general attendance on nominated sub-contractors given in Clause 9 of the Preliminaries
THE FOLLOWING PROVISIONAL SUMS ARE FOR WORK TO BE EXECUTED BY SELECTED SUBCONTRACTORS
The following Provisional Sums are for specialists work to be executed by a selected Sub-contractor who upon appointment in terms of the Conditions of Contract shall be deemed to be a Domestic Sub-Contractor to the Contractor
A Selected Sub-Contractor shall be a Sub-contractor executing work for which a sum of money is provided for in the Bills of Quantities or a Sub-contractor executing additional specialist work which arises as a result of an instruction by the Principal Agent/Engineer
Tender documents for such work shall be prepared by the Principal Agent/Engineer in consultation with and to the approval of the Contractor and such tender document shall be issued by the Principal Agent/Engineer to a list of tenderers agreed upon between the Principal Agent/Engineer and Contractor.
Tenders shall be submitted to the Principal Agent/Engineer
The Selected Sub-contractor shall be chosen by the Principal Agent/Engineer and the Contractor, and the Contractor shall
satisfy himself that such selected sub-contractor can meet the requirements of the Sub-Contract agreement and the Contractor shall inform the Principal Agent/Engineer accordingly
The procedure relating to the method of selection, obtaining of tenders, adjudication thereof and the appointment of the Selected Sub-contractor shall not create any contractual relationship between the Client and the Selected Sub-contractor
NOTE: Under no circumstances may any Prime Cost - Provisional Amount, etc be extended at an amount lower than the amount given in the Bill
FIRE AND SMOKE DETECTOR WORKS SUPPLY AND H2 INSTALLATION
Fire and Smoke Detector/ Fire System H4
Provide a sum of R200 000,00 ( Two Hundred Thousand Rand) Item for the supply and installation of Smoke Detector/Fire System complete by Specialists
Allow for giving every facility to Specialists as described Item Allow for profit on above if required Item
TOTAL SECTION NO. 4 BILL NO. 2 - FIRE AND SMOKE DETECTOR WORKS SUPPLY AND INSTALLATION
SECTION NO.4 H1
RENOVATIONS & REFURBISHMENTS H3
BILL NO.3 H1
SUPPLEMENTARY PREAMBLES H2
NOTE: Tenderers are referred to the definition of general attendance on nominated sub-contractors given in Clause 9 of the Preliminaries
THE FOLLOWING PROVISIONAL SUMS ARE FOR WORK TO BE EXECUTED BY SELECTED SUBCONTRACTORS
The following Provisional Sums are for specialists work to be executed by a selected Sub-contractor who upon appointment
in terms of the Conditions of Contract shall be deemed to be a Domestic Sub-Contractor to the Contractor
A Selected Sub-Contractor shall be a Sub-contractor executing work for which a sum of money is provided for in the Bills of Quantities or a Sub-contractor executing additional specialist work which arises as a result of an instruction by the Principal Agent/Engineer
Tender documents for such work shall be prepared by the Principal Agent/Engineer in consultation with and to the approval of the Contractor and such tender document shall be issued by the Principal Agent/Engineer to a list of tenderers agreed upon between the Principal Agent/Engineer and Contractor.
Tenders shall be submitted to the Principal Agent/Engineer
The Selected Sub-contractor shall be chosen by the Principal Agent/Engineer and the Contractor, and the Contractor shall satisfy himself that such selected sub-contractor can meet the requirements of the Sub-Contract agreement and the Contractor shall inform the Principal Agent/Engineer accordingly
The procedure relating to the method of selection, obtaining of tenders, adjudication thereof and the appointment of the Selected Sub-contractor shall not create any contractual relationship between the Client and the Selected Sub-contractor
NOTE: Under no circumstances may any Prime Cost - Provisional Amount, etc be extended at an amount lower than the amount given in the Bill
IT FIXED REQUIREMENTS WORKS SUPPLY AND H2 INSTALLATION
IT Fixed Requiremenst H4
Allow for the supply and installation of the IT Fixed SUM Requirements works by the duly appointed specialist for the sum of R100,000,00 ( One Hundred Thousand Rands) complete as per the scope of works
Allow profit for the supply and installation of IT Fixed Item requirement works
Allow attendance for the supply and installation of IT Fixed Item requirement works
TOTAL SECTION NO. 4 BILL NO. 3 - IT FIXED REQUIREMENTS WORKS SUPPLY AND INSTALLATION
SECTION NO.4 H1
RENOVATIONS & REFURBISHMENTS H3
BILL NO.4 H1
SUPPLEMENTARY PREAMBLES H2
NOTE: Tenderers are referred to the definition of general attendance on nominated sub-contractors given in Clause 9 of the Preliminaries
THE FOLLOWING PROVISIONAL SUMS ARE FOR WORK TO BE EXECUTED BY SELECTED SUBCONTRACTORS
The following Provisional Sums are for specialists work to be executed by a selected Sub-contractor who upon appointment in terms of the Conditions of Contract shall be deemed to be a Domestic Sub-Contractor to the Contractor
A Selected Sub-Contractor shall be a Sub-contractor executing work for which a sum of money is provided for in the Bills of Quantities or a Sub-contractor executing additional specialist work which arises as a result of an instruction by the Principal Agent/Engineer
Tender documents for such work shall be prepared by the Principal Agent/Engineer in consultation with and to the approval of the Contractor and such tender document shall be issued by the Principal Agent/Engineer to a list of tenderers agreed upon between the Principal Agent/Engineer and Contractor.
Tenders shall be submitted to the Principal Agent/Engineer
The Selected Sub-contractor shall be chosen by the Principal Agent/Engineer and the Contractor, and the Contractor shall satisfy himself that such selected sub-contractor can meet the requirements of the Sub-Contract agreement and the Contractor shall inform the Principal Agent/Engineer accordingly
The procedure relating to the method of selection, obtaining of tenders, adjudication thereof and the appointment of the
Selected Sub-contractor shall not create any contractual relationship between the Client and the Selected Sub-contractor
NOTE: Under no circumstances may any Prime Cost - Provisional Amount, etc be extended at an amount lower than the amount given in the Bill
LANDSCAPING SUPPLY AND INSTALLATION H2
Landscaping H4
Allow for the supply and installation of the landscaping by the SUMduly appointed specialist for the sum of R 45,000,00 (Forty FiveThousand Rands) complete as per the scope of works
Allow profit for the supply and installation of landscaping Item
Allow attendance for the supply and installation of landscaping Item
TOTAL SECTION NO. 4 BILL NO. 4 - LANDSCAPING
SECTION NO.4 H1
RENOVATIONS & REFURBISHMENTS H3
BILL NO.5 H1
SUPPLEMENTARY PREAMBLES H2
NOTE: Tenderers are referred to the definition of general attendance on nominated sub-contractors given in Clause 9 of the Preliminaries
THE FOLLOWING PROVISIONAL SUMS ARE FOR WORK TO BE EXECUTED BY SELECTED SUBCONTRACTORS
The following Provisional Sums are for specialists work to be executed by a selected Sub-contractor who upon appointment in terms of the Conditions of Contract shall be deemed to be a Domestic Sub-Contractor to the Contractor
A Selected Sub-Contractor shall be a Sub-contractor executing work for which a sum of money is provided for in the Bills of Quantities or a Sub-contractor executing additional specialist work which arises as a result of an instruction by the Principal Agent/Engineer
Tender documents for such work shall be prepared by the Principal Agent/Engineer in consultation with and to the approval of the Contractor and such tender document shall be issued by the Principal Agent/Engineer to a list of tenderers agreed upon between the Principal Agent/Engineer and Contractor.
Tenders shall be submitted to the Principal Agent/Engineer
The Selected Sub-contractor shall be chosen by the Principal Agent/Engineer and the Contractor, and the Contractor shall satisfy himself that such selected sub-contractor can meet the requirements of the Sub-Contract agreement and the Contractor shall inform the Principal Agent/Engineer accordingly
The procedure relating to the method of selection, obtaining of tenders, adjudication thereof and the appointment of the Selected Sub-contractor shall not create any contractual relationship between the Client and the Selected Sub-contractor
NOTE: Under no circumstances may any Prime Cost - Provisional Amount, etc be extended at an amount lower than the amount given in the Bill
SIGNS COST ALLOWANCE H2
Signage Cost Allowance H4
Allow for the sum of R45, 000,00 ( Forty Five Thousand Rands) SUM for the supply and installation of the signage
Allow profit for the supply and installation of signage Item
Allow attendance for the supply and installation of the signage Item
TOTAL SECTION NO. 4 BILL NO. 5 - SIGNAGE COST ALLOWANCE
SECTION NO.5 H1
RENOVATIONS & REFURBISHMENTS H3
OFFICE FURNITURE H2
BILL NO.1 H1
Note. Contractor to obtain SOW and/or liaise with NLC's H3
Project Team Prior purchase of the office furniture
The plugs, data points and the cabling must be entailed on the supply and installation of the tables
Managers Table And Chairs (Including Joinery Fittings, H4Shelving and Units)
Allow provisional sum for the amount of R 50,000.00 (Fifty SUMThousand Rands) for the supply and installation of managerstables including chairs, including timber credenza, glass andsilstone finish complete as per the scope of works and/orProject Manager's specification
Allow a profit for the supply and installation of the managers Itemtable including chairs
Allow attendance for the supply and installation managers table Itemincluding chairs
TOTAL SECTION NO. 5 BILL NO. 1 MANAGERS TABLE AND CHAIRS
SECTION NO.5 H1
RENOVATIONS & REFURBISHMENTS H3
BILL NO.2 H1
Note. Contractor to obtain SOW and/or liaise with NLC's H3 Project Team Prior purchase of the office furniture
The plugs, data points and the cabling must be entailed on the supply and installation of the tables
FILING CABINETS H4
Filing Cabinets (Including Joinery Fittings, Shelving and Units) H4
Allow provisional sum for the amount of R 30,000.00 (Thirty SUMThousand Rands) for the supply and installation of filingcabinets complete as per the scope of works and/or ProjectManager's specification
Allow a profit for the supply and installation of filing cabinets Item
Allow attendance for the supply and installation of filing cabinets Item
TOTAL SECTION NO. 5 BILL NO. 2 - FILING CABINETS
SECTION NO.5 H1
RENOVATIONS & REFURBISHMENTS H3
BILL NO.3 H1
Note. Contractor to obtain SOW and/or liaise with NLC's H3 Project Team Prior purchase of the office furniture
The plugs, data points and the cabling must be entailed on the supply and installation of the tables
PROVISIONAL SUMS - OFFICE FURNITURE H3
OPEN PLAN WORKSTATION H4
Open plan Table And Chairs (Including Joinery Fittings, H4Shelving and Units)
Allow provisional sum for the amount of R 50,000.00 (Fifty SUMThousand Rands) for the supply and installation of open plantables including chairs, including timber credenza, glass andsilstone finish complete as per the scope of works and/orProject Manager's specification
Allow a profit for the supply and installation of the open plan Itemtable including chairs
Allow attendance for the supply and installation open plan table Itemincluding chairs
TOTAL SECTION NO. 5 BILL NO. 3 - OPEN PLAN TABLE AND CHAIRS
SECTION NO.5 H1
RENOVATIONS & REFURBISHMENTS H3
BILL NO.4 H1
Note. Contractor to obtain SOW and/or liaise with NLC's H3 Project Team Prior purchase of the office furniture
The plugs, data points and the cabling must be entailed on the supply and installation of the tables
PROVISIONAL SUMS - OFFICE FURNITURE H3RECEPTION COUNTER H3
Reception Counter ( Including Joinery Fittings, Shelving and H4Units)
Allow provisional sum for the amount of R 50,000.00 (Fifty SUMThousand Rands) for the supply and installation of thereceptionist counter, including timber, silstone and back paintedglass complete as per the project manager's specification
Allow a profit for the supply and installation of the reception Itemcounter including chairs
Allow attendance for the supply and installation of the reception Itemcounter including chairs
TOTAL SECTION NO. 5 BILL NO. 4 - RECEPTION COUNTER
SECTION NO.5 H1
RENOVATIONS & REFURBISHMENTS H3
BILL NO.5 H1
Note. Contractor to obtain SOW and/or liaise with NLC's H3 Project Team Prior purchase of the office furniture
The plugs, data points and the cabling must be entailed on the supply and installation of the tables
OFFICE FURNITURE H2
PROVISIONAL SUMS - OFFICE FURNITURE H3
KITCHEN CUPBOARDS m
Kitchen Cupboards (Including Joinery Fittings, Shelving and H4Units)
Allow provisional sum for the amount of R 40,000.00 (Forty SUMThousand Rands) for the supply and installation of the kitchencupboard, including granite tops, formica door and drawerfronts, melawood internal shelves complete as per the Projectmanager's specification
Allow a profit for the supply and installation of the kitchen Itemcounter including chairs
Allow attendance for the supply and installation of the kitchen Itemcounter including chairs
TOTAL SECTION NO. 5 BILL NO. 5 - KITCHEN CUPBOARDS AND COUNTERS
SECTION NO.6 H1
RENOVATIONS & REFURBISHMENTS H3
BILL NO.1 H1
CONTIGENCIES H2
Contigencies H4
Allow Contigencies for the sum of R 300, 000,00 (Three SUM Hundred Thousand Rands)
TOTAL SECTION NO. 6 BILL NO. 1 - CONTINGENCIES
TOTAL BEFORE VATVAT @ 15%GRAND TOTAL INCLUSIVE OFV AT
QUANTITY RATE AMOUNT
37,2
20
46,5
5
12
12
6
50
274
1
1
1
2
2
2
1
1
1
2
1
1
1
233
170
2
890
104
10
6
60
297
1
101
45
101
475
3
475
312
45
475
60
56
681
48
24
5
2
3
650
13
129
166
5
8
6,2
5
5
230
176
741
733
14
45
56
26
475
111
528
668
50
77
90
11
11
17
320
1
1
3
25
114
327
475
1
32
32
26
2
9
1
5
1
1
10
9
2
4
4
182
475
501
25
181
101
37
42
20
14
10
10
10
2
2
4
5
4
4
4
8
5
5
40
35
6
6
4
8
8
9
8
1
3
1
1 SUM
1 SUM
12
8
300
300
150
150
2
38
38
100
100
10
10
8
8
10
350
350
300
300
27
4
9
10
8
2
100
100
5
0
0
7
7
15
20
20
7
2
6
2
2
300
300
100
100
1
76
6
501
182
475
49
475
120
427
180
300
300
300
300
300
300
71
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1