invitation for bids cck-2484-20 addendum # 2 07/07/2020 · chemistry/physics building renovation...

14
University of Kentucky Purchasing Division 322 Peterson Service Building Lexington, KY 40506-0005 An Equal Opportunity University INVITATION FOR BIDS CCK-2484-20 ADDENDUM # 2 07/07/2020 ATTENTION: This is not an order. Read all instructions, terms and conditions carefully. IMPORTANT: BID AND ADDENDUM MUST BE RECEIVED BY 07/14/2020 @ 3:00 P.M. LEXINGTON, KY TIME Bidder must acknowledge receipt of this and any addendum as stated in the Invitation for Bids. 1. Please refer to and incorporate within the offer, the attached documents for Addendum #2. 2. Important: In accordance with COVID-19 response, this solicitation will be opened publicly via Zoom only. Visit the Purchasing Division Bid and Opportunities website (http://www.uky.edu/Purchasing/bidlist.htm) to access the Zoom link. The Zoom link will be provided with the respective bid prior to the bid opening date and time. OFFICIAL APPROVAL SIGNATURE UNIVERSITY OF KENTUCKY ________________________________________ ______________________________________ ________________________________________ Procurement Manager / (859) 323-5405 Typed or Printed Name

Upload: others

Post on 08-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: INVITATION FOR BIDS CCK-2484-20 ADDENDUM # 2 07/07/2020 · Chemistry/Physics Building Renovation – Bid Package No. 2B UK Project No. 2446.1 University of Kentucky – Lexington,

University of Kentucky Purchasing Division 322 Peterson Service Building Lexington, KY 40506-0005

A n E q u a l O p p o r t u n i t y U n i v e r s i t y

INVITATION FOR BIDS

CCK-2484-20 ADDENDUM # 2

07/07/2020

ATTENTION: This is not an order. Read all instructions, terms and conditions carefully.

IMPORTANT: BID AND ADDENDUM MUST BE RECEIVED BY 07/14/2020 @ 3:00 P.M. LEXINGTON, KY TIME Bidder must acknowledge receipt of this and any addendum as stated in the Invitation for Bids. 1. Please refer to and incorporate within the offer, the attached documents for Addendum #2. 2. Important: In accordance with COVID-19 response, this solicitation will be opened publicly via Zoom only. Visit the Purchasing Division Bid and Opportunities website (http://www.uky.edu/Purchasing/bidlist.htm) to access the Zoom link. The Zoom link will be provided with the respective bid prior to the bid opening date and time.

OFFICIAL APPROVAL SIGNATURE UNIVERSITY OF KENTUCKY

________________________________________

______________________________________ ________________________________________

Procurement Manager / (859) 323-5405 Typed or Printed Name

Page 2: INVITATION FOR BIDS CCK-2484-20 ADDENDUM # 2 07/07/2020 · Chemistry/Physics Building Renovation – Bid Package No. 2B UK Project No. 2446.1 University of Kentucky – Lexington,

Chemistry/Physics Building Renovation – Bid Package No. 2B UK Project No. 2446.1

University of Kentucky – Lexington, KY July 7, 2020

Addendum Number Two

Clarifications:

1. Scope Clarification – The scope of this bid package is only for the audiovisual components of this project as

defined in Form of Proposal: Trade Package #34 – Audiovisual. All other scopes of work for this project have

been bid in previous bid packages.

END OF ADDENDUM NO. 2

Page 3: INVITATION FOR BIDS CCK-2484-20 ADDENDUM # 2 07/07/2020 · Chemistry/Physics Building Renovation – Bid Package No. 2B UK Project No. 2446.1 University of Kentucky – Lexington,

1 of 1

UK Chemistry-Physics Third Floor Renovation Bid Package 2B – Audiovisual

ADDENDUM #2 - AV July 7th, 2020

Item #1 Refer to the Audiovisual Specifications A. Revise Section 2.14.I to the following:

Basis of design: SHURE ULX-D (ULXD1 body pack, ULXD2 handheld, ULXD4 receiver), Sennheiser G4, AudioTechnica or equivalent

B. Revise Section 2.3 LCD Flat Panel Displays to the followingi. Panel Technology: S-IPSii. Viewable Image Size: 65” or as indicated.iii. Aspect Ratio: 16:9iv. Native Resolution: 3840x2160v. Supported Resolutions: UHD, 1080p at minimumvi. Brightness: 400 cd/m^2vii. Viewing Angle: 178 degree vertical, 178 degree horizontalviii. Refresh Rate 60Hzix. Operation: 24/7x. Warranty: 3 year parts & laborxi. Provide with tilting wall mount as specified.xii. Basis of Design: LG 65UT640S0UA (or size most close to those specified in this series of displays), NEC, Sharp or

equivalent.

END OF ADDENDA ITEMS

Page 4: INVITATION FOR BIDS CCK-2484-20 ADDENDUM # 2 07/07/2020 · Chemistry/Physics Building Renovation – Bid Package No. 2B UK Project No. 2446.1 University of Kentucky – Lexington,

Written Questions and Answers – Page 1 of 5

Written Questions and Answers CCK-2484-20

#2446.1 Facilities Renewal, Modernization and Deferred Maintenance – Chemistry/Physics 3rd Floor Bid Package #2B – TP -34 Audiovisual

No. Question Answer

1.

WILL UK BE PROVIDING/INSTALLING A TWO GANG IN WALL JUNCTION BOX FOR ALL LOCATIONS (EXCEPT THE VIDEO WALL SYSTEM) OF THE EXTRON TLP PRO 725M TOUCH PANEL?

All rough ins are as shown on the plans. Refer to the Electrical Systems sheets along with the AV elevations for that information.

2. PAGE 2388 - 2,4,5 / T-2.0 INDICATES A SINGLE GANG ROUGH IN BOX (FOR THE EXTRON TLP PRO 725M TOUCH PANEL) TO BE INSTALLED. IS THIS AN ERROR?

The roughin is correct. The touchpanel will be mounted with the associated wall plate over the 1G roughin.

3.

PAGE 2388 – 2,3,4,5 / T-2.0 INDICATE THE ROUGH IN BOX (FOR THE EXTRON TLP PRO 725M TOUCH PANEL) TO BE PROVIDED BY AV INTEGRATOR. IS THIS AN ERROR?

The tag indicates that the single gang box is existing, the touchpanel is to be provided by the Integrator.

4.

PAGE 2389 – 4 / T-2.1 DRAWINGS IMPLY THE AUDIO FROM THE EXTRON SHARELINK PRO 500 TO BE PLAYED THROUGH THE MONITOR SPEAKERS. PLEASE CONFIRM.

Confirmed.

5.

PAGE 2389 – 4 / T-2.1 INDICATES A (UK PROVIDED) SMALL FORM FACTOR PC MOUNTED BEHIND DISPLAY. WHAT ARE THE ROUGH DIMENSIONS OF THIS DEVICE?

7.2” x 1.4” for the computer, plus the optiplex micro vesa mount.

6.

PAGE 2389 – 4 / T-2.1 INDICATES A (UK PROVIDED) SMALL FORM FACTOR PC MOUNTED BEHIND DISPLAY. WHAT TYPE OF FASTENING (PULL OUT SHELF, VELCRO DIRECT TO MONITOR CHASSIS, ETC.) IS REQUIRED?

This is means and methods and up to the installer.

7. PAGE 2385 1 / T-1.1c WHAT IS THE FINISHED CEILING HEIGHT OF THE VIDEO WALL SPACE THAT HOUSE THE CEILING SPEAKERS?

The finish ceiling elevation is 9’-0” aff.

8.

PAGE 230 (SECTION M) INDICATES MODEL ELO 5553L AND PAGE 2384 (A/V EQUIPMENT SCHEDULE) INDICATES MODEL ELO 5502L. WHICH MODEL DOES UK REQUIRE FOR THE SPACES UTILIZING THE ELO DISPLAYS?

Model 5553L is the basis of design, equipment schedule will be updated via addendum.

9. PAGE 236 (SECTION 2.14 – I ) INDICATES A SHURE GLX-D WIRELESS MIC SYSTEM AS A BASIS OF DESIGN.

Refer to addendum for clarification.

Page 5: INVITATION FOR BIDS CCK-2484-20 ADDENDUM # 2 07/07/2020 · Chemistry/Physics Building Renovation – Bid Package No. 2B UK Project No. 2446.1 University of Kentucky – Lexington,

Written Questions and Answers – Page 2 of 5

THIS UNIT DOES NOT PROVIDE ANTENNA EXTENSION CAPABILITY. IS THIS AN ERROR?

10.

WHAT TYPE OF WIRELESS MIC CONFIGURATION IS REQUIRED FOR THE VIDEO WALL SYSTEM? (IE. COMBO, DUAL SYSTEM, ETC.) TO BE CLEAR, DO YOU WANT TO BE ABLE TO USE (2) MICROPHONES SIMULTANEOUSLY?

Yes, ability to use 2 microphones at once is required.

11.

PAGE 227 (SECTION C5) INDICATES A WIRELESS CONTROL INTERFACE (IPAD OR EQUIVALENT) REQUIRED BUT NO MENTION OF A WIRED TOUCH PANEL. IS THIS AN OMISSION?

Hardwired control panel is also required in addition to the wireless control. Hardwired touchpanel to be mounted at the rack location, this will be clarified in addendum.

12.

PAGE 227 (SECTION C5) INDICATES A WIRELESS CONTROL INTERFACE (IPAD OR EQUIVALENT) REQUIRED. IS UK PROVIDING THE IPAD OR EQUIVALENT? IF NOT, WHAT SIZE OF WIRELESS TABLET IS REQUIRED?

Integrator to provide this device and all licensing associated. Size is 9.7” minimum, 12” max.

13.

PAGE 227 (SECTION C5) INDICATES A WIRELESS CONTROL INTERFACE (IPAD OR EQUIVALENT) REQUIRED. IS THERE A SPECIFIC CHARGER OR DOCKING STATION REQUIRED?

No additional hardware is required for this wireless control interface. It will be kept in a location TBD by UK and utilize the charger that comes with it.

14.

PAGE 229 (SECTION 2.3 – N) INDICATES NEC C861Q (86”) AS THE BASIS OF DESIGN. PAGE 2384 INDICATES LG 65UT640S0UA (65”) IN THE A/V EQUIPMENT SCHEDULE. WHICH MONITOR SIZE IS REQUIRED?

65” displays are correct. Specification will be updated via addendum.

15. WILL YOU HAVE A NEED FOR HAZARDOUS MATERIALS SURVEY (ASBESTOS, LEAD, ETC.) AND/OR MONITORING ON THIS PROJECT?

No, this scope of work bid in a previous bid package.

16.

ON DRAWING T-2.1, THE MANUFACTURE IS NOT SPELLED OUT FOR THE VIDEO WALL OR ASSOCIATED SOUND EQUIPMENT OTHER THAN THE JBL COLUMN SPEAKERS. ARE THE REMAINING COMPONENTS DESIGN BUILD? IS THE TP-34 SPELLED OUT, OR ONLY ON THE SHOWN ON THE DRAWINGS?

Refer to specifications for basis of design manufacturers along with all of the remaining information requested here. The Trade Package #34 language is included in bid documents and can be found on pages 60-64 of the download.

17.

SINCE THIS IS A STATE BUILDING, WILL A LOW VOLTAGE PERMIT BE REQUIRED FOR TP-34 AUDIO-VISUAL PACKAGE?

Bidders are responsible for determining if a permit is required.

18. SPECIFICATION 272416 2.3 LCD FLAT PANEL CALL FOR NEC 86” DISPLAYS. DRAWING T1.0 CALL OUT LG 65” DISPLAYS. WILL YOU CLARIFY THIS CONFLICT?

65” displays are correct. Specification will be updated via addendum.

Page 6: INVITATION FOR BIDS CCK-2484-20 ADDENDUM # 2 07/07/2020 · Chemistry/Physics Building Renovation – Bid Package No. 2B UK Project No. 2446.1 University of Kentucky – Lexington,

Written Questions and Answers – Page 3 of 5

19.

DRAWING T2.1 DETAIL # 2 INDICATES THAT THE KORBYT ARIES MEDIA PLAYER WILL BE OFCI. IT ALSO STATES UNDER THE DISPLAY’S PICTURE THAT THE MEDIA PLAYER W/ LICENSE WILL BE PROVIDED BY THE INTEGRATOR. WILL YOU CLARIFY THIS CONFLICT?

The player and license will be owner provided. Drawings will be updated to reflect this.

20.

SPECIFICATION 272416 3.2 EQUIPMENT RACKS: IS THE INTEGRATOR TO CHOOSE MFG., DATA RACK HEIGHT, OPEN DATA 2 OR 4 POST STYLE, ETC. TO HOUSE AUDIO VISUAL EQUIPMENT?

Refer to drawing T2.1, equipment is to be located in UK ITS rack, no rack is to be provided by AV Integrator.

21.

WILL U-K PROVIDE A NETWORK SWITCH FOR THE VIDEO WALL SYSTEM AV OVER IP VIDEO DISTRIBUTION ENCODERS & DECODERS?

No, switch is to be provided by integrator for a closed system to support video transport.

22.

SUBSTITUTION REQUEST: WE’D LIKE TO REQUEST THE FOLLOWING PRODUCTS BE CONSIDERED AS APPROVED EQUALS FOR THE LCD VIDEO WALL CONFIGURATION: CHRISTIE FHD EXTREME SERIES https://www.christiedigital.com/products/lcd-video-walls/extreme-series/

Approved.

23.

SUBSTITUTION REQUEST: FOR THE DIRECT VIEW LED ALTERNATE WE’D ALSO LIKE TO REQUEST AS APPROVED EQUALS: CHRISTIE CORE SERIES LED 135” DIAGONAL 1.5 MM https://www.christiedigital.com/products/led-video-walls/core-series/ MAX HUB 110” LM110M07 https://www.maxhub.com/en/led/

Approved. 110” MaxHub is not close enough to the dimensions, the Max Hub 138” is approved.

24.

SUBSTITUTION REQUEST: FOR THE DIGITAL SIGNAGE TOUCH DISPLAYS WE REQUEST: CHRISTIE ACCESS SERIES UHD551-L, 55" UHD, OPS SLOT, LANDSCAPE ONLY, 16/7, 400 NITS 9 TOUCH OVERLAY FOR 55" UHD551-L, 10-POINT TOUCH, USB CONNECTION https://www.christiedigital.com/products/lcd-panels/access-series/christie-uhd551-l/

Approved.

Page 7: INVITATION FOR BIDS CCK-2484-20 ADDENDUM # 2 07/07/2020 · Chemistry/Physics Building Renovation – Bid Package No. 2B UK Project No. 2446.1 University of Kentucky – Lexington,

Written Questions and Answers – Page 4 of 5

25.

SUBSTITUTION REQUEST: FOR THE VIDEO WALL PROCESSOR: CHRISTIE TERRA https://www.christiedigital.com/products/switchers-av-distribution/terra-transmitter/overview

Approved.

26.

SUBSTITUTION REQUEST: FOR FLAT PANEL DISPLAYS CHRISTIE ACCESS SERIES UHD861-P WITH A TOUCH OVERLAY https://www.christiedigital.com/products/lcd-panels/access-series/christie-uhd861-p/overview

Approved.

27.

What is the basis of design for the All in One Video Teleconferencing System? Drawing T.2.1 Calls out Logitech Meet-Up System

Logitech Meet-Up is the basis of design.

28.

IN LIGHT OF COVID 19, WILL ONSITE ATTENDANCE BE REQUIRED AT COMMUNICATION PROGRESS MEETINGS OR WILL PROVISION BE MADE FOR VIDEO CONFERENCING?

On-site attendance will not be required for progress meetings and video conferencing will be made available.

29.

I WOULD LIKE TO ADD SHAFFNER HEANEY ASSOCIATES, SHAPE ACM PRODUCT AS AN APPROVED COMPOSITE METAL WALL PANEL FOR THIS PROJECT

There are no metal panel systems to bid in this trade package.

30.

TECHNICAL: PLEASE CONFIRM THE PATHWAYS AND CABLING ARE PROVIDED BY OTHERS. PLEASE CLARIFY WHICH MODEL SHOULD BE PROVIDED. THE SCHEDULE LISTS AN ELO 5502L AND THE SPECIFICATION LISTS AND ELO 5553L. WHICH IS CORRECT?

All cabling for the AV scope of work is to be provided by the AV contractor. There are pathways provided by others, but any additional pathways needed to complete the AV scope of work is to be provided by the AV contractor.

31.

ADMINISTRATIVE: RE: MBE/WBE PARTICIPATION: WE CONTACTED THE UK FACILITIES MANAGEMENT CONTRACTOR/SUPPLY CHAIN COORDINATOR FOR A LISTING OF THESE FIRMS; THEY ARE NOT AWARE OF A LISTING. DUE TO THE TRAINING REQUIREMENTS ON THESE TYPES OF SYSTEMS AND TECHNICAL NATURE OF THIS PROJECT, PLEASE CONFIRM THIS IS A REQUIREMENT.

MBE/WBE Participation Goals PART 4 - OBLIGATION OF BIDDER 4.1 The bidder shall make a Good Faith Effort to achieve the Participation Goal for MBE/WBE subcontractors/suppliers. The failure to meet the goal shall not necessarily be cause for disqualification of the bidder; however, bidders not meeting the goal are required to furnish with their bids written documentation of their Good Faith Efforts to do so.

Page 8: INVITATION FOR BIDS CCK-2484-20 ADDENDUM # 2 07/07/2020 · Chemistry/Physics Building Renovation – Bid Package No. 2B UK Project No. 2446.1 University of Kentucky – Lexington,

Written Questions and Answers – Page 5 of 5

32.

DURING THE PRE-BID MEETING HELD ON JUNE 25, WEHR CONSTRUCTION STATED THAT WE WOULD RECEIVE A COPY OF THE CONSTRUCTION SCHEDULE. COULD THAT PLEASE BE PROVIDED?

The construction schedule is included in the bid documents. Please reference pages 213 – 222 in the download.

33.

PLEASE VERIFY IF THE S98 NOTE OUTSIDE ROOM 345 IS CORRECT. BASED ON THE DRAWING, IT APPEARS A COLLABORATION SYSTEM IS NEEDED OUTSIDE THE ROOM.

This note is accurate, the system is for the collaboration area outside Rm 345.

34.

PLEASE VERIFY IF INTEGRATORS SHOULD UTILIZE THE SPECIFICATIONS OR THE DRAWINGS FOR DISPLAY SIZES. THE SPECIFICATIONS LIST AN 86” NEC DISPLAY, BUT THE DRAWING NOTES A 65” LG DISPLAY.

65” displays are correct. Specification will be updated via addendum.

35.

IS THE INTEGRATOR RESPONSIBLE FOR PROVIDING BACKBOXES? IF SO, WHO IS RESPONSIBLE FOR INSTALLATION?

AV wall boxes are by the electrical contractor. They will be existing when av integrator installation occurs.

36. ON THE ELO INTERACTIVE DISPLAY, WHICH TOUCH TECHNOLOGY DO YOU WANT, IR OR PCAP?

Per specification section 2.4.B. – PCAP.

37. THE VIDEO WALL QSC CXD4.2-XX AMPLIFIER DOES NOT HAVE A 70V OUTPUT CHANNEL. WHAT IS YOUR SOLUTION FOR THE [4] QSC 70V CEILING SPEAKERS?

The speakers specified have 16 ohm bypass.

38. HOW MANY RACK HEIGHT UNIT SHOULD I ALLOW FOR THE TBD OWNER FURNISH VIDEO WALL SOURCE EQUIPMENT?

4RU

39.

EQUIPMENT RACK EXISTING OR BY AV CONTRACTOR? SECTION 3.2, ITEM C DISCUSSES INSTALLING EQUIPMENT FOR THE VIDEOWALL IN DATA RACKS. NEITHER THE AV SERIES DRAWINGS, NOR THE SPECIFICATIONS DETAIL OR QUANTIFY AN EQUIPMENT RACK. PLEASE CONFIRM THAT THE EQUIPMENT RACK IS NOT REQUIRED. IF THE EQUIPMENT RACK IS REQUIRED FOR THE AV SYSTEM, PLEASE PROVIDE ADDITIONAL INFORMATION SPECIFYING THE MANUFACTURER AND MODEL NUMBER.

Refer to drawing T2.1, equipment is to be located in UK ITS rack, no rack is to be provided by AV Integrator.

40.

WALL PLATES EXISTING OR BY AV CONTRACTOR? DRAWING T-2.1, DETAIL 2 SHOWS A WALL PLATE, BUT DOES NOT SPECIFY IF THIS PLATE IS EXISTING OR PROVIDED BY THE AV CONTRACTOR. IF THE WALL PLATE IS REQUIRED FOR THE AV SYSTEM, PLEASE PROVIDE ADDITIONAL INFORMATION REGARDING THE INTEGRATION OF THIS EQUIPMENT INTO THE AV SYSTEMS.

The UK data wall plate shown in 2/T-2.1 is an existing data drop in a wallbox for network connectivity to UK’s Digital Signage VLAN by UK ITS.

Page 9: INVITATION FOR BIDS CCK-2484-20 ADDENDUM # 2 07/07/2020 · Chemistry/Physics Building Renovation – Bid Package No. 2B UK Project No. 2446.1 University of Kentucky – Lexington,

GENERAL AV NOTES:

1. SCOPE

A. AUDIOVISUAL SCOPE OF WORK SHALL INCLUDE:

A. INSTALLATION AND TESTING OF ALL AUDIOVISUAL CABLING AND EQUIPMENT, INCLUDING BUTNOT LIMITED TO MONITORS, AUDIO COMPONENTS, MATRIX SWITCHES, DISTRIBUTIONAMPLIFIERS, EQUALIZERS, CENTRAL CONTROLLERS, INTERFACES, EQUIPMENT RACKS, ANDHARDWARE. ANY ITEMS NOT CALLED OUT THAT ARE NECESSARY FOR A COMPLETE ANDFUNCTIONING AV SYSTEM PER DESIGN INTENT SHALL BE INCLUDED.

B. AUDIOVISUAL CONTRACTOR SHALL COORDINATE WITH THE ELECTRICAL CONTRACTOR FORPOWER AND CONDUIT REQUIREMENTS.

C. AUDIOVISUAL CONTRACTOR SHALL COORDINATE WITH THE GENERAL CONTRACTOR FORINSTALLATION OF WALL MOUNTED PLYWOOD FOR DEVICES AND MOUNTING OF DISPLAYS.

D. AUDIOVISUAL CONTRACTOR SHALL COORDINATE WITH ARCHITECTURAL DRAWINGS FORMOUNTING OF MONITORS AND DISPLAYS.

E. AUDIOVISUAL CONTRACTOR SHALL PROVIDE AND INSTALL J-HOOKS OR SIMILAR CABLEMANAGEMENT IN AREAS THAT HAVE TILE CEILINGS.

B. GENERAL CONTRACTOR SCOPE OF WORK SHALL INCLUDE:

A. INSTALLATION OF ALL CONDUITS, BACK BOXES, CONDUIT STUB-UPS, GROUND BARS,GROUNDING EQUIPMENT, AND POWER FOR AUDIOVISUAL EQUIPMENT. COORDINATE WITHELECTRICAL DRAWINGS.

B. INSTALLATION OF FLOOR BOXES OR RACEWAY AS SHOWN ON DRAWINGS.

C. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL AUDIOVISUAL INSTALLATION ANDOVERSIGHT.

2. GENERAL CONDITIONS

A. ALL AUDIOVISUAL WORK SHALL BE PERFORMED IN ACCORDANCE WITH ANSI/TIA – 568C“COMMERCIAL BUILDING TELECOMMUNICATIONS CABLING STANDARD”, TIA - 569B “COMMERCIALBUILDING STANDARD FOR TELECOMMUNICATIONS PATHWAYS AND SPACES”, EIA/TIA - 606“ADMINISTRATION STANDARD FOR THE TELECOMMUNICATIONS INFRASTRUCTURE OF COMMERCIALBUILDINGS”, EIA/TIA - 607 “COMMERCIAL BUILDING GROUNDING AND BONDING REQUIREMENTS FORTELECOMMUNICATIONS”, TIA/EIA - 75 HORIZONTAL PATHWAYS, AND BICSI “TELECOMMUNICATIONSDISTRIBUTION MANUAL".

B. THE DRAWINGS, WHICH CONSTITUTE A PART OF THIS CONTRACT, INDICATE THE GENERALARRANGEMENT OF CABLING AND OUTLETS, LOCATIONS OF EQUIPMENT, AND OTHER WORK. ALLITEMS NOT SPECIFICALLY MENTIONED HEREIN, WHICH ARE NECESSARY FOR A COMPLETEAUDIOVISUAL SYSTEM SHALL BE INCLUDED AT NO ADDITIONAL COST.

C. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO EXAMINE THE ARCHITECTURAL,STRUCTURAL, MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS TO BECOME FAMILIAR WITHALL ASPECTS OF THESE DESIGNS AFFECTING THIS WORK. THE AUDIOVISUAL CONTRACTOR ISRESPONSIBLE FOR COORDINATION WITH ALL OTHER TRADES AND IS REQUIRED TO ATTENDSCHEDULED WEEKLY MEETINGS.

D. ALL AUDIOVISUAL MATERIAL SHALL BE NEW, DEFECTIVE EQUIPMENT OR EQUIPMENT THAT ISDAMAGED IN THE COURSE OF INSULATION OR TESTING SHALL BE REPLACED OR REPAIRED IN AMANNER MEETING THE APPROVAL OF THE OWNER. WHERE APPLICABLE, ALL EQUIPMENT SHE’LL BEIN ACCORDANCE WITH NEMA AND UL STANDARDS.

E. ALL WORK SHALL BE SUBJECT TO APPROVAL OF THE OWNER OR THE OWNER’S AUTHORIZEDREPRESENTATIVE.

F. ALL WORK SHALL BE INSTALLED IN A NEED AND WORKMAN LIKE MANNER. ALL SPACES SHALL BELEFT CLEAN, SWEPT AND FREE OF ANY DEBRIS, SCRATCHES, OR MARKINGS.

G. WHERE CABLING AND OR CONDUIT PASSES THROUGH FIRE RATED PARTITIONS OR SLABS, INSTALLFIRE STOP MATERIALS RATED TO MEET OR EXCEED THE RATING OF THE STRUCTURE PENETRATED.FIRE STOP MATERIALS SHALL HAVE BEEN TESTED FOR UL 1479 AND ASTM E-814. FOR SLEEVES,INSTALL EITHER A MECHANICAL FIRE STOP, INTUMESCENT FIRE STOP PILLOWS OR A COMBINATIONOF INTUMESCENT PUTTY AND MINERAL WOOD/CERAMIC FIBER. FOR SLOTS OR LARGER OPENINGS,INSTALL EITHER A MECHANICAL FIRE STOP OR A RATED ASSEMBLY SUITABLE FOR THE TYPE OFOPENING TO BE PROTECTED.

3. PATHWAY REQUIREMENTS

A. INSTALL AUDIOVISUAL CABLES IN WALLS USING CONDUIT STUB UPS AS SHOWN ON DRAWINGS.

B. INSTALL AUDIOVISUAL CABLES IN CEILING USING CONDUIT AND/OR J-HOOKS AS SHOWN ONDRAWINGS.

C. ROUTE ALL CABLES INSIDE FURNITURE USING ACCESS AREAS PROVIDED BY THE MANUFACTURER.COORDINATE WITH FURNITURE INSTALLER.

D. OBTAIN WRITTEN PERMISSION FROM STRUCTURAL ENGINEER PRIOR TO PENETRATING SLABS ORLOAD BEARING WALLS.

4. INSTALLATION PRACTICES

A. MANUFACTURER AND TIAA 568B RECOMMENDATIONS FOR CABLING BEND RADIUS SHALL BEFOLLOWED AT ALL TIMES.

B. DO NOT EXCEED THE MAXIMUM PULLING TENSION SPECIFIED FOR COPPER CABLE BY ITSMANUFACTURER.

C. ALL TIE WRAPS SHALL BE PLENUM RATED VELCRO WRAPS. PLASTIC TIE WRAPS ARE NOTPERMITTED.

D. TIE WRAPS SHALL NOT INCREASE THE TENSION OF THE CABLE OR OF ANY INDIVIDUAL PAIRS WITHIN A CABLE. ANY TIE WRAPS CINCHED SO TIGHTLY AS TO CAUSE AN INDENTATION OR DECREASE INCABLE DIAMETER SHALL BE REMOVED. ALL TIE WRAPS SHALL BE LOOSE ENOUGH TO MOVE ORSLIDE WITHOUT MOVING THE CABLE. EACH TIE WRAP SHALL HAVE 1/4 - 1/2 INCH SLACK, SO AS TOALLOW A FINGER TO PASS UNDER IT. AMOUNT OF THE TIE WRAPS USED SHALL BE MINIMIZED ANDPLACED WITH VARYING SPACING. EVENLY SPACED TIE WRAPS CAN REDUCE CABLE PLANTPERFORMANCE.

E. MAINTAIN THE SHEATH OF EACH INDIVIDUAL CABLE UP TO THE POINT OF TERMINATION BYREMOVING ONLY AS MUCH CABLE SHEATH AS NECESSARY AND PRACTICAL TO TERMINATE THECABLES.

F. ALL AUDIOVISUAL CABLING INSTALLED IN CEILING SHALL BE PLENUM RATED.

G. SUPPORT CABLE OFF THE FLOOR UNTIL TERMINATION. CABLING THAT HAS BEEN WALKED ONSHALL BE REPLACED.

H. AUDIOVISUAL WORK SHALL BE SEQUENCED TO AVOID ANY WORK ABOVE INSTALLED CEILING TILESOR OVER INSTALLED FURNITURE/CASEWORK.

5. CABLING

A. SUPPORT ALL AV CABLES ON J HOOKS OR ROUTE IN CONDUIT AS SHOWN ON THE DRAWINGS.

B. AUDIOVISUAL CONTRACTOR SHALL PROVIDE ADEQUATE LENGTH OF CABLING AT EQUIPMENTLOCATIONS TO FACILITATE MOVEMENT OF EQUIPMENT FOR MAINTENANCE WITHOUT REMOVING

CABLES.

C. IN CONFERENCE AREAS, AUDIOVISUAL CONTRACTOR SHALL PROVIDE AND INSTALL CONNECTORSAND CABLES TO FLOOR BOXES, OUTLETS, AND POKE THRUS AS SHOWN ON DRAWINGS. PROVIDE

INSERTS AND COORDINATE WITH TELECOM INSTALLER.

D. COORDINATE ALL CABLE JACKET COLORS WITH THE OWNER AND OTHER TRADES.

E. STRUCTURED CABLING CONTRACTOR MUST COORDINATE BACK BOXES, CONDUIT, SLEEVES, ETC.

F. ALL DATA, VOICE AND CATV/SATV CABLING, FACE PLATES, CONNECTORS, JACKS AND PATCHCABLES REQUIRED FOR THE AUDIOVISUAL SYSTEM SHALL BE PROVIDED AND INSTALLED BY THE

STRUCTURED CABLING CONTRACTOR.

G. ALL CABLING SUPPORTS FOR THE DATA, VOICE AND CATV/SATV CABLING FOR AUDIOVISUAL SYSTEMS SHALL BE PROVIDED AND INSTALLED BY THE STRUCTURED CABLING CONTRACTOR.

6. CONDUIT

A. ELECTRICAL CONTRACTOR SHALL PROVIDE AND INSTALL ALL METALLIC CONDUIT WITH MY FLOORS AS SHOWN ON DRAWINGS.

B. ELECTRICAL CONTRACTOR SHALL PROVIDE AND INSTALL PULL BOXES AS SHOWN ON DRAWINGS.

C. COORDINATE WITH THE INSTALLATION OF ELECTRICAL AND MECHANICAL CONDUITS AND HVAC DUCTWORK SHARING THE SAME CEILING AREA.

D. REMOVE ALL SHARP EDGES AND BURRS FROM END OF CONDUITS AND FIT WITH BUSHINGS.

7. GROUNDING

A. THE AUDIOVISUAL CONTRACTOR SHALL GROUND ALL EQUIPMENT RACKS TO ELECTRICALCONTRACTOR SUPPLIED GROUND BUS BAR.

B. ALL GROUND WIRES AND CABLES SHALL BE TERMINATED IN CONNECTORS PER EXCEPTED PRACTICES. UNDER NO CIRCUMSTANCES SHALL DRAIN WIRES BE CUT. ANY DIFFICULTIES DUE TO GROUND POTENTIAL DIFFERENCES ARE TO BE BROUGHT TO THE ATTENTION OF THE OWNER.

8. SYSTEM AND PROGRAMMING

A. THE AUDIOVISUAL CONTRACTOR SHALL PROVIDE COMPLETE SYSTEM PROGRAMMING FOR THE CONTROLLERS AND ALL DEVICES INSTALLED. PROGRAMMING SHALL BE ACCOMPLISHED IN COORDINATION WITH TENANTS. PROJECT SHOULD NOT BE DEEMED COMPLETE AND EXCEPTED WITHOUT TENANT APPROVAL OF THE PROGRAMMING AND INTERFACES.

B. THE AV CONTRACTOR SHALL PROVIDE ALL PROGRAMMING SOURCE CODE TO THE OWNER UPONCOMPLETION OF THE PROJECTION.

C. THE AV CONTRACTOR SHALL CREATE AND PROVIDE FIVE ELECTRONIC USB THUMB DRIVE COPIESOF USER MANUALS DESCRIBING THE OPERATION OF EACH TYPE OF SYSTEM.

D. THE AV CONTRACTOR SHALL PROVIDE TRAINING FOR AT LEAST FIVE REPRESENTATIVES OF THEOWNER FOR EACH TYPE OF SYSTEM. TRAINING SHALL BE A MINIMUM OF FOUR (4) HOURS PER PERSON.

E. OWNER WILL REQUIRE A FULL-FUNCTIONAL COMMISSIONING TEST DEMONSTRATING OPERATIONOF ALL DEVICES PRIOR TO SYSTEM ACCEPTANCE.

F. ALL PROJECTORS SHALL HAVE A SCHEDULED SHUT OFF PROGRAM TO PRESERVE LIFE.COORDINATE WITH TENANT FOR SHUT OFF SCHEDULE.

G. ALL NETWORK SWITCHES, ROUTERS, PATCHING AND CONFIGURATION OF THE OWNERS NETWORK(FOR THE AUDIOVISUAL SYSTEMS) SHALL BE PROVIDED, INSTALLED AND CONFIGURED BY THE OWNER.

H. ALL VOIP INTEGRATION AND CONFIGURATION WITH THE OWNERS VOIP SERVER/PBX AND THE AUDIOVISUAL CONFERENCING SIP ENDPOINTS SHALL BE PROVIDED BY THE OWNER.

I. THE OWNER SHALL PROVIDE A RANGE (QTY TBD) OF STATIC IP ADDRESSES WITH A DEDICATED AUDIOVISUAL VLANS (QTY TBD) FOR THE AUDIOVISUAL SYSTEMS.

9. SITE VISIT

A. PRIOR TO SUBMITTING BIDS, THE AUDIOVISUAL CONTRACTOR SHALL VISIT THE SITE ANDFAMILIARIZE HIMSELF WITH ALL EXISTING CONDITIONS. THE AUDIOVISUAL CONTRACTOR SHALLNOTIFY THE ARCHITECT AND/OR THE ENGINEER IN ADVANCE OF ANY CONDITION THAT EXISTS THATWOULD PREVENT THE WORK HEREIN SPECIFIED OR SHOWN ON THE DRAWINGS FROM BEINGPERFORMED. FAILURE TO SURVEY THE SITE PRIOR TO BID AND START OF CONSTRUCTION WILL NOTRELIEVE THE CONTRACTOR OF THE RESPONSIBILITY TO INSTALL DESIGN WITHIN THE CONFINES OFEXISTING CONDITIONS.

10. GUARANTEE

A. THE AUDIOVISUAL CONTRACTOR SHALL LEAVE THE ENTIRE AUDIOVISUAL SYSTEM INSTALLEDUNDER THIS CONTRACT IN PROPER WORKING ORDER AND SHALL, WITHOUT CHARGE, REPLACE ANYWORK OR MATERIALS WHICH DEVELOP DEFECTS, EXCEPT FROM ORDINARY WEAR AND TEAR,WITHIN ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE. BENEFICIAL USE SHALL NOT BE

CONSTRUED AS FINAL ACCEPTANCE.

B. THE AUDIOVISUAL CONTRACTOR SHALL, DURING THE ONE-YEAR GUARANTEE, BE RESPONSIBLEFOR THE PROPER REPAIR AND ADJUSTMENTS OF ALL AUDIOVISUAL SYSTEMS AND EQUIPMENT,APPARATUS, DEVICES, ETC., INSTALLED BY HIM, AND DO ALL WORK NECESSARY TO ENSUREEFFICIENT AND PROPER FUNCTIONING.

C. PRIOR TO THE EXPIRATION OF THE GUARANTEE, APPROXIMATELY 11 MONTHS AFTER FINALACCEPTANCE OF THIS PROJECT, A POST-CONSTRUCTION REVIEW OF THE PROJECT WILL BE MADE.THE CONTRACTOR SHALL FURNISH PERSONNEL TO ASSIST THE OWNER IN THIS REVIEW. ANYADJUSTMENTS, REPAIRS, OR REPLACEMENTS FOUND NECESSARY DURING REVIEW SHALL BE DONEBY THE CONTRACTOR, AT NO ADDITIONAL COST TO THE OWNER.

D. THE AUDIOVISUAL CONTRACTOR SHALL BE RESPONSIBLE FOR, AND SHALL INCUR FINANCIALRESPONSIBILITY FOR ANY DAMAGES CAUSED BY, OR RELATING FROM, DEFECTS IN HIS WORK.

11. RECORD DRAWINGS

A. THE A/V CONTRACTOR SHALL MAINTAIN AT THE SITE, FOR THE OWNER, ONE COPY OF ALLDRAWINGS, ADDENDA, APPROVED SHOP DRAWINGS, REVISIONS AND OTHER MODIFICATIONS, INGOOD ORDER AND MARKED TO RECORD ALL CHANGES MADE DURING CONSTRUCTION. ONE SET OFDRAWINGS AND ANY OTHER INFORMATION SHALL BE DELIVERED TO THE OWNER VIA USB THUMBDRIVE UPON COMPLETION OF WORK.

PL

AN

NO

RT

H

TRUE N

ORTH

AU

DIO

/VIS

UA

L:

CH

EM

IST

RY

-P

HY

SIC

S R

EN

OV

AT

ION

Th

is D

raw

ing a

nd th

e D

esig

n s

how

n

there

on

are

th

e p

rope

rty o

f O

mni

Arc

hitects

. T

he r

ep

rodu

ction

, cop

yin

g

or

oth

er

use

of

this

Dra

win

g o

r D

esig

n

with

out th

e w

ritten

con

sen

t o

f O

mn

i A

rch

itects

is p

rohib

ite

d.

Job N

um

ber:

Le

xin

gto

n,

Ke

ntu

cky

212

No

rth U

pp

er

Str

ee

tL

exin

gto

n,

Ke

ntu

cky

405

07-1

00

1p

85

9.2

52

.666

4w

ww

.om

nia

rchitects

.co

m

Revis

ion:

BID DOCUMENTS

BID

DO

CU

ME

NT

S

T-1.0

AU

DIO

/VIS

UA

L L

EG

EN

DX

KC

P17-0

1M

AY

18, 2020

AUDIO/VISUAL EQUIPMENT SCHEDULE

ROOM NAME

ROOM

NUMBER TAG DISPLAY TYPE MANUFACTURER MODEL MOUNT MODEL QUANTITY

ATRIUM 300A FPD-7 WALL MOUNTED COLLEGE DISPLAY LG 65UT640S0UA CHIEF LTM1U 1

CORRIDOR SOUTH 300B FPD-5 WALL MOUNTED INFORMATION DISPLAY ELO 5553L CHIEF MTM1U 1

CORRIDOR SOUTH 300B FPD-7 WALL MOUNTED COLLEGE DISPLAY LG 65UT640S0UA CHIEF LTM1U 1

CORRIDOR SOUTH 300B FPD-5 WALL MOUNTED INFORMATION DISPLAY ELO 5553L CHIEF MTM1U 1

CORRIDOR SOUTH 300B FPD-5 WALL MOUNTED INFORMATION DISPLAY ELO 5553L CHIEF MTM1U 1

COLLABORATION AREA 300B1 FPD-7 WALL MOUNTED COLLEGE DISPLAY LG 65UT640S0UA CHIEF LTM1U 1

COLLABORATION AREA 300B2 FPD-7 WALL MOUNTED COLLEGE DISPLAY LG 65UT640S0UA CHIEF LTM1U 1

COLLABORATION AREA 300C3 FPD-7 WALL MOUNTED COLLEGE DISPLAY LG 65UT640S0UA CHIEF LTM1U 1

COLLABORATION AREA 300E1 FPD-7 WALL MOUNTED COLLEGE DISPLAY LG 65UT640S0UA CHIEF LTM1U 1

CORRIDOR EAST 300F FPD-5 WALL MOUNTED INFORMATION DISPLAY ELO 5553L CHIEF MTM1U 1

CORRIDOR EAST 300F FPD-5 WALL MOUNTED INFORMATION DISPLAY ELO 5553L CHIEF MTM1U 1

COLLABORATION AREA 300F1 FPD-7 WALL MOUNTED COLLEGE DISPLAY LG 65UT640S0UA CHIEF LTM1U 1

COLLABORATION AREA 300F2 FPD-7 WALL MOUNTED COLLEGE DISPLAY LG 65UT640S0UA CHIEF LTM1U 1

SOUTH CAFE 301 FPD-6 WALL MOUNTED CONFERENCE DISPLAY LG 65UT640S0UA CHIEF TS318TU W/ CHIEF PSBUB 1

CONFERENCE 302 FPD-6 WALL MOUNTED CONFERENCE DISPLAY LG 65UT640S0UA CHIEF TS318TU W/ CHIEF PSBUB 1

CONFERENCE ROOM 303 FPD-6 WALL MOUNTED CONFERENCE DISPLAY LG 65UT640S0UA CHIEF TS318TU W/ CHIEF PSBUB 1

NORTH CAFE 337 FPD-7 WALL MOUNTED COLLEGE DISPLAY LG 65UT640S0UA CHIEF LTM1U 1

CONFERENCE 338 FPD-6 WALL MOUNTED CONFERENCE DISPLAY LG 65UT640S0UA CHIEF TS318TU W/ CHIEF PSBUB 1

COMPUTATIONAL LAB - KEKENES - HUSKY 341 FPD-7 WALL MOUNTED COLLEGE DISPLAY LG 65UT640S0UA CHIEF LTM1U 1

CONFERENCE 378A FPD-6 WALL MOUNTED CONFERENCE DISPLAY LG 65UT640S0UA CHIEF TS318TU W/ CHIEF PSBUB 1

CONFERENCE 378B FPD-6 WALL MOUNTED CONFERENCE DISPLAY LG 65UT640S0UA CHIEF TS318TU W/ CHIEF PSBUB 1

FACULTY LOUNGE 397 FPD-6 WALL MOUNTED CONFERENCE DISPLAY LG 65UT640S0UA CHIEF TS318TU W/ CHIEF PSBUB 1

2

2

2

Revision Schedule

No. Revision Date

2 Chemistry/Physics Bid Package #2B Addendum 2

2020-07-02

Page 10: INVITATION FOR BIDS CCK-2484-20 ADDENDUM # 2 07/07/2020 · Chemistry/Physics Building Renovation – Bid Package No. 2B UK Project No. 2446.1 University of Kentucky – Lexington,

M

S

S

S

S

98

C

10 11

E

D

H

J

C

D

E

G

H

J

7 8 9 10 11

9a'

D.01

D1

D2

7a 8a 9a9'6' 7' 8' 10' 11'9b9b'9a''

C.6

K

12

E.2

10.2 11.4 12.1

D.5

D.9

S11

S68

S58

S58

S58

S89

CORR

100F

CLASSROOM

139

VAULT

125A

OFFICE SERVICE

125B

STORAGE

127B

OFFICE

127A

TOILET

129

OFFICE

127

SERVICE CLOSET

138

OFFICE

144

ENTRY

142A

MEN

142

STAIR-D

ST-D

VESTIBULE

100A1

EINSTEIN'S SERVICE

101A

EINSTEIN'S SUPPORT

102A

VESTIBULE

100A2

ELEC

100F

DW1

263JJ

CLASSROOM

153

WOMEN

130

OFFICE

150OFFICE

148D

OFFICE

148C

OFFICE

148B

OFFICE

148A

RESEARCH

148D1

RESEARCH

148A1

INSTRUMENT ROOM

146

X-RAY LAB

146A

COMMUNICATIONS

128

DEVELOPING ROOM

146A1

STORAGE

151

STORAGE

149OFFICE

135

PHYSICS LEARNING CENTER

133

ELEVATOR B

EL-B

ATRIUM

100A

CORR

100J

PATIO SEATING

P100

COLLABORATION

100F1

ATRIUM SEATING

100A4

C

D

E

F

H

J

7 8 9 10 11

9a'

D.01

D1

D2

7a 8a 9a9'6' 7' 8' 10' 11'9b9b'9a''

C.6

K

12

E.2

10.2 11.4 12.1

D.5

D.9

7

T-2.0

S102

MIC-1

SPK-1

SPK-1

SPK-1

SPK-1

S105

S104

S104

S104

S104

S103

SPK-2

SPK-2

S106

S106

PL

AN

NO

RT

H

TRUE N

ORTH

AU

DIO

/VIS

UA

L:

CH

EM

IST

RY

-P

HY

SIC

S R

EN

OV

AT

ION

Th

is D

raw

ing a

nd th

e D

esig

n s

how

n

there

on

are

th

e p

rope

rty o

f O

mni

Arc

hitects

. T

he r

ep

rodu

ction

, cop

yin

g

or

oth

er

use

of

this

Dra

win

g o

r D

esig

n

with

out th

e w

ritten

con

sen

t o

f O

mn

i A

rch

itects

is p

rohib

ite

d.

Job N

um

ber:

Le

xin

gto

n,

Ke

ntu

cky

212

No

rth U

pp

er

Str

ee

tL

exin

gto

n,

Ke

ntu

cky

405

07-1

00

1p

85

9.2

52

.666

4w

ww

.om

nia

rchitects

.co

m

Revis

ion:

BID DOCUMENTS

BID

DO

CU

ME

NT

S

T-1.1c

AU

DIO

/VIS

UA

L P

LA

N -

FIR

ST

FL

OO

RX

KC

P17-0

1M

AY

18, 2020TAGGED NOTES

S11 ROUTE FIBER UP THROUGH CHASE TO 1ST FLOOR.

S58 PROVIDE 2" CONDUIT ABOVE ACCESSIBLE CEILING SPACE,PROVIDE PULL BOXES AS REQUIRED. EXTEND 7-CAT6ACABLES FROM COMMUNICATIONS CLOSET 128 TO EXISTINGWIRELESS ACCESS POINTS IN CLASSROOMS AS REQUIRED.

S68 EXTEND A TEMPORARY FIBER SERVICE TO EXISTINGCOMMUNICATIONS CLOSET 128, ROUTE ON J-HOOKS ABOVEACCESSIBLE CEILINGS. PROVIDE PATCH PANEL ON WALL INEXISTING COMMUNICATIONS CLOSET 053. CABLING SHALLBE 6 STRANDS OF SINGLE MODE (FREEDOM CABLE) AND 6STRANDS OF OM1 MULTI MODE FIBER (FREEDOM CABLE ).

S89 EXTEND 1" CONDUIT SLEEVE THROUGH EXTERIOR WALL FOR5"X5"ANTENNA WITH ARTICULATING MOUNT (BY UK).

S102 VIDEO WALL EQUIPMENT FOR VIDEO WALL IN FIRST FLOORATRIUM TO BE LOCATED IN THIS ROOM. EQUIPMENT SHALLBE RACKED IN IT RACK IN CLOSE COORDINATION WITH UKITS.

S103 PROVIDE VIDEO WALL HERE, REFER TO DETAIL ON SHEETT-2.1.

S104 PROVIDE LOW PROFILE CEILING MOUNTED SPEAKER IN THISLOCATION. ROUTE SPEAKER CABLE TO VIDEO WALL RACK.

S105 PROVIDE XLR MICROPHONE INPUT WITH HDMI AND 3.5mmAUDIO WITH CABLING TO EQUIPMENT RACK.

S106 PROVIDE LINE ARRAY COLUMN LOUDSPEAKER (JBL CBT100LA-1) IN THIS LOCATION. ROUTE SPEAKER CABLE TOVIDEO WALL RACK. SEE SPECIFICATIONS FOR ADDITIONALINFORMATION.

T-1.1c 1/8" = 1'-0"

1 AUDIO/VISUAL - FIRST FLOOR - AREA C

Revision Schedule

No. Revision Date

Page 11: INVITATION FOR BIDS CCK-2484-20 ADDENDUM # 2 07/07/2020 · Chemistry/Physics Building Renovation – Bid Package No. 2B UK Project No. 2446.1 University of Kentucky – Lexington,

4

C

A

21

E

B

D

A

1 2

B

C

D

E

3 4

A.90

D.01

A1

A2

D1

D2

4a1a 4b

C.6

3.9

D.5

D.9

4.8

FPD-5

FPD-6

FPD-7

COMPUTATIONAL LAB - KEKENES -HUSKY

341

SUPPLIES

376

CONFERENCE

378A

INSTRU LAB

350

LAB EQUIP

354

RESEARCH LAB - NEW HIRE #1

374

RESEARCH LAB - ODOM

370

RESEARCH LAB - GRAHAM

348

OFFICE

373

OFFICE

377

STUDENT WORKSTATIONS (12)

379

OFFICE

365

OFFICE

363

OFFICE

361

STUDENT WORKSTATIONS (4)

360

STUDENT WORKSTATIONS (10)

339

STAIR-B

ST-B

COLLABORATION AREA

300E1

COLLABORATION AREA

300C2

OFFICE

353

CUSTODIAL

340

TOILET

346

MEN

342

MDF

336B

WOMEN

344

TRASH/ RECYCLING

336

CONFERENCE

338

COLLABORATION AREA

300C3

OFFICE

375

OFFICE

359

OFFICE

357

MECHANICAL

369

ELEVATOR-A

EL-A

CHASE

PC4

CHASE

PC5

CONFERENCE

378B

RESEARCH LAB - KIM

372

STUDENT WORKSTATIONS (4)

371

ELECTRICAL

336A

STUDENT WORKSTATIONS (5)

345

STUDENT WORKSTATIONS (6)

347

OFFICE

349

CROSS CORRIDOR

300D

CORRIDOR NORTH

300E

STAIR-A

ST-A

CORRIDOR EAST

300F

CORRIDOR WEST

300C

STUDENT WORKSTATIONS (4)

355

OFFICE

351

COLLABORATION AREA

300F1

NORTH CAFE

337

FPD-7

FPD-7

FPD-5

FPD-6

FPD-6

FPD-7

FPD-7

FPD-7

A

1 2

B

C

D

E

3 4

A.90

D.01

A1

A2

D1

D2

4a1a 4b

C.6

3.9

D.5

D.9

4.8

S97

S97

S100

S100

S100

S99

S99

S98

S98

S98

S98

S98

S98

PL

AN

NO

RT

H

TRUE N

ORTH

AU

DIO

/VIS

UA

L:

CH

EM

IST

RY

-P

HY

SIC

S R

EN

OV

AT

ION

Th

is D

raw

ing a

nd th

e D

esig

n s

how

n

there

on

are

th

e p

rope

rty o

f O

mni

Arc

hitects

. T

he r

ep

rodu

ction

, cop

yin

g

or

oth

er

use

of

this

Dra

win

g o

r D

esig

n

with

out th

e w

ritten

con

sen

t o

f O

mn

i A

rch

itects

is p

rohib

ite

d.

Job N

um

ber:

Le

xin

gto

n,

Ke

ntu

cky

212

No

rth U

pp

er

Str

ee

tL

exin

gto

n,

Ke

ntu

cky

405

07-1

00

1p

85

9.2

52

.666

4w

ww

.om

nia

rchitects

.co

m

Revis

ion:

BID DOCUMENTS

BID

DO

CU

ME

NT

S

T-1.3a

AU

DIO

/VIS

UA

L P

LA

N -

TH

IRD

FL

OO

RX

KC

P17-0

1M

AY

18, 2020TAGGED NOTES

S97 IN THIS ROOM, PROVIDE INPUT LOCATION AT WALLOPPOSITE THE DISPLAY. REFER TO ELEVATIONS FORADDITIONAL INFORMATION.

S98 AUDIOVISUAL INTEGRATOR TO PROVIDE COLLABORATIONSYSTEM. REFER TO ELEVATION 2 ON SHEET T-2.0 ANDSCHEMATIC 1 ON SHEET T-2.1 FOR ADDITIONALINFORMATION.

S99 AUDIOVISUAL INTEGRATOR TO PROVIDE INTERACTIVEDIGITAL SIGNAGE DISPLAY. REFER TO ELEVATION 1 ONSHEET T-2.0 AND SCHEMATIC 2 ON SHEET T-2.1 FORADDITIONAL INFORMATION.

S100 AUDIOVISUAL INTEGRATOR TO PROVIDE CONFERENCEROOM PRESENTATION SYSTEM. REFER TO ELEVATION 5 ONSHEET T-2.0 AND SCHEMATIC 4 ON SHEET T-2.1 FORADDITIONAL INFORMATION.

T-1.3a 1/8" = 1'-0"

1 AUDIO/VISUAL - THIRD FLOOR - AREA A

Revision Schedule

No. Revision Date

Page 12: INVITATION FOR BIDS CCK-2484-20 ADDENDUM # 2 07/07/2020 · Chemistry/Physics Building Renovation – Bid Package No. 2B UK Project No. 2446.1 University of Kentucky – Lexington,

9865

C

A

10 11

E

B

D

7

A

B

C

D

E

5 6 7 8 9 10 11

9a'

A.90

D.01

A1

A2

D1

D2

4b 5a 7a 8a 9a9'5' 6' 7' 8' 10' 11'9b9b' 10a

C.6

12

E.2

10.2 11.4 12.1

D.5

D.9

4.8 10.4

MECHANICAL

325

RESEARCH LAB - GUITON

380

RESEARCH LAB - NEW HIRE #2

334

RESEARCH LAB - NEW HIRE #3

332

SHARED BIOCHEM INSTR

388A

INSTRU

386

AUTOCLAVE

388B

RESEARCH LAB - HEIDARY

322RESEARCH LAB - GLAZER

318

RESEARCH LAB - WEI

390

RESEARCH LAB - AWUAH

310

TISSUE CULTURE

324B3

TISSUE CULTURE

324B1

TISSUE CULTURE PREPARATION

324B

RADIO-ISOTOPE LAB

324ACHEM PREP LAB

328

CYL ROOM

326

TISSUE CULTURE

324B2

STUDENT WORKSTATIONS (10)

381

OFFICE

383

OFFICE

385

OFFICE

387

STUDENT WORKSTATIONS (13)

389

OFFICE

391

OFFICE

393

STUDENT WORKSTATIONS (13)

395

FACULTY LOUNGE

397

STUDENT WORKSTATIONS (6)

305

OFFICE

307

OFFICE

309

OFFICE

313

OFFICE

315

STUDENT WORKSTATIONS (13)

319

STUDENT WORKSTATIONS (10)

333

SOUTH CAFE

301

COLLABORATION AREA

300F1

COLLABORATION AREA

300B1

COLLABORATION AREA

300B2

CONFERENCE

302

CUSTODIAL

398

LACTATION ROOM

392

WOMEN

394

MEN

396

OFFICE

331

OFFICE

327

CONFERENCE ROOM

303

EQUIPMENT CORRIDOR

388

COLLABORATION AREA

300C1

CHASE

PC3

CHASE

PC1

CHASE

PC2

CORRIDOR SOUTH

300B

OFFICE

321

OFFICE

323

COLLABORATION AREA

300F2

ELECTRICAL

306A

MDF

306B

OFFICE

311

NORTH CAFE

337

TRASH/ RECYCLE

306

RESEARCH LAB - RICHARDS

382C

RESEARCH LAB - RICHARDS

382B

RESEARCH LAB - RICHARDS

382A

RESEARCH LAB - RICHARDS

382

RESEARCH LAB - DEROUCHEY

384A

RESEARCH LAB - DEROUCHEY

384

OFFICE

329

RESEARCH LAB - WEI

390A

RESEARCH LAB - NEW HIRE #4

330

DW

DW1

SERVICE

399

EQUIPMENT CORRIDOR

324

STAIR-C

ST-C

SERVICE ELEVATOR

EL-C

STUDENT WORKSTATIONS (6)

317

ELEVATOR B

EL-B

TRASH/ RECYCLE

300C2

FPD-7

FPD-7

FPD-7

FPD-5

FPD-7

FPD-6

FPD-7

FPD-6

FPD-7

FPD-6

FPD-5

FPD-5

A

B

C

D

E

5 6 7 8 9 10 11

9a'

A.90

D.01

A1

A2

D1

D2

4b 5a 7a 8a 9a9'5' 6' 7' 8' 10' 11'9b9b' 10a

C.6

12

E.2

10.2 11.4 12.1

D.5

D.9

4.8 10.4

FPD-6

S98

S98

S98

S98

S98

S98

S99

S99

S99

S100

S100

S100

S101

PL

AN

NO

RT

H

TRUE N

ORTH

AU

DIO

/VIS

UA

L:

CH

EM

IST

RY

-P

HY

SIC

S R

EN

OV

AT

ION

Th

is D

raw

ing a

nd th

e D

esig

n s

how

n

there

on

are

th

e p

rope

rty o

f O

mni

Arc

hitects

. T

he r

ep

rodu

ction

, cop

yin

g

or

oth

er

use

of

this

Dra

win

g o

r D

esig

n

with

out th

e w

ritten

con

sen

t o

f O

mn

i A

rch

itects

is p

rohib

ite

d.

Job N

um

ber:

Le

xin

gto

n,

Ke

ntu

cky

212

No

rth U

pp

er

Str

ee

tL

exin

gto

n,

Ke

ntu

cky

405

07-1

00

1p

85

9.2

52

.666

4w

ww

.om

nia

rchitects

.co

m

Revis

ion:

BID DOCUMENTS

BID

DO

CU

ME

NT

S

T-1.3b

AU

DIO

/VIS

UA

L P

LA

N -

TH

IRD

FL

OO

RX

KC

P17-0

1M

AY

18, 2020

TAGGED NOTES

S98 AUDIOVISUAL INTEGRATOR TO PROVIDECOLLABORATION SYSTEM. REFER TOELEVATION 2 ON SHEET T-2.0 ANDSCHEMATIC 1 ON SHEET T-2.1 FORADDITIONAL INFORMATION.

S99 AUDIOVISUAL INTEGRATOR TO PROVIDEINTERACTIVE DIGITAL SIGNAGE DISPLAY.REFER TO ELEVATION 1 ON SHEET T-2.0 ANDSCHEMATIC 2 ON SHEET T-2.1 FORADDITIONAL INFORMATION.

S100 AUDIOVISUAL INTEGRATOR TO PROVIDECONFERENCE ROOM PRESENTATIONSYSTEM. REFER TO ELEVATION 5 ON SHEETT-2.0 AND SCHEMATIC 4 ON SHEET T-2.1 FORADDITIONAL INFORMATION.

S101 AUDIOVISUAL INTEGRATOR TO PROVIDECONFERENCE ROOM PRESENTATIONSYSTEM. REFER TO ELEVATION 3 ON SHEETT-2.0 FOR ADDITIONAL INFORMATION.

T-1.3b 1/8" = 1'-0"

1 AUDIO/VISUAL - THIRD FLOOR - AREA B

Revision Schedule

No. Revision Date

Page 13: INVITATION FOR BIDS CCK-2484-20 ADDENDUM # 2 07/07/2020 · Chemistry/Physics Building Renovation – Bid Package No. 2B UK Project No. 2446.1 University of Kentucky – Lexington,

3' -

8"

FLOOR

FPD-55

3' -

11

"

9' -

0"

9'-0" CEILING

MONITOR MOUNT BY AV INTEGRATOR

CABLE ORGANIZATION

AND EQUIPMENT STORAGE BY AV

INTEGRATOR

AV WALL BOX BY OTHERS

5' -

2"

KORBYT DIGITAL SIGNAGE MEDIA

PLAYER TO BE INSTALLED ON

SLIDE-OUT SHELF

POWER AND DATA TO BE INSTALLED INSIDE THIS BOX

TOUCH SCREEN FLATPANEL DISPLAY - ELO

2

4' -

1 1

/4"

FLOOR

FPD-65

6' -

0"

4' -

3 1

/2"

9' -

0"

9'-0" CEILING

MONITOR MOUNT BY AV INTEGRATOR

CABLE ORGANIZATION AND EQUIPMENT STORAGE BY AV INTEGRATOR

AV WALL BOX BY OTHERS

HDMI INPUT ROUGHIN, EXISTING 6 X 6 X 3-1/2" BOX WITH SINGLE GANG EXTENSION RING

2" CONDUIT

1" CONDUIT

4' -

0"

1' -

6"

EXTRON SHARELINK PRO 500 TO BE INSTALLED ON SLIDE-OUT SHELF

POWER AND DATA TO BE INSTALLED INSIDE THIS BOX

7" CONTROL TOUCHPANEL BY AV INTEGRATOR, SINGLE GANG BOX ROUGH-IN IS EXISTING

2

2

4' -

1 1

/4"

FLOOR

FPD-65

6' -

0"

4' -

3 1

/2"

9' -

0"

9'-0" CEILING

AV WALL BOX BY OTHERS

2" CONDUIT

1" CONDUIT

4' -

0"

MONITOR MOUNT BY AV INTEGRATOR

CABLE ORGANIZATION AND EQUIPMENT STORAGE BY AV INTEGRATOR

HDMI INPUT ROUGHIN, EXISTING 6 X 6 X 3-1/2" BOX WITH SINGLE GANG EXTENSION RING

EXTRON SHARELINK PRO 500 TO BE INSTALLED ON SLIDE-OUT SHELF

POWER AND DATA TO BE INSTALLED INSIDE THIS BOX

LOCATION IS ACROSS THE ROOM. SEE FLOOR PLAN FOR ADDITIONAL INFORMATION.

7" CONTROL TOUCHPANEL BY AV INTEGRATOR, SINGLE GANG BOX ROUGH-IN IS EXISTING

2

2

5' -

0"

FLOOR

FPD-65

9'-0" CEILING

OFFSETTING AV WALL BOXES FOR BACK-TO-BACK DISPLAYS BY OTHERS

5' -

6"

9' -

0"

4' -

0"

1' -

6"

2" CONDUIT

1" CONDUIT7' -

0"

5' -

2"

MONITOR MOUNT BY AV INTEGRATOR

7" CONTROL TOUCHPANEL BY AV INTEGRATOR, SINGLE GANG BOX ROUGH-IN IS EXISTING

HDMI INPUT ROUGHIN, EXISTING 6 X 6 X 3-1/2" BOX WITH SINGLE GANG EXTENSION RING

EXTRON SHARELINK PRO 500 TO BE MOUNTED TO WALL BEHIND DISPLAY

POWER AND DATA TO BE INSTALLED INSIDE THIS BOX

2

2

2

5' -

0"

FLOOR

FPD-65

9' -

0"

9'-0" CEILING

AV WALL BOXBY OTHERS

5' -

6"

7' -

0"

5' -

2"

4' -

0"

1' -

6"

2" CONDUIT

1" CONDUIT

MONITOR MOUNT BY AV INTEGRATOR

HDMI INPUT ROUGHIN, EXISTING 6 X 6 X 3-1/2" BOX WITH SINGLE GANG EXTENSION RING

POWER AND DATA TO BE INSTALLED INSIDE THIS BOX

EXTRON SHARELINK PRO 500 TO BE MOUNTED TO WALL BEHIND DISPLAY

7" CONTROL TOUCHPANEL BY AV INTEGRATOR, SINGLE GANG BOX ROUGH-IN IS EXISTING

2

2

2

NOTES:1. J-BOX CENTERED AT LOCATION. SEE ELEVATIONS FOR EXACT DIMENSIONS.2. ALWAYS SPAN BETWEEN THREE STUDS.3. SEE PARTITION TYPES FOR STUD SIZE AND GAUGE.4. VERIFY LOCATIONS OF BACKING WITH PLANS & ROOM ELEVATIONS.5. FASTEN BACKING FLUSH WITH FACE OF STUDS.6. FLAT PANEL DISPLAYS AND MOUNTING BRACKETS BY AV CONTRACTOR.

METAL STUDS

BACKING SECTIONSSPAN AT LEAST 3 STUDS

TO SUPPORT 200 LBS+5X SAFETY FACTOR

(18"H X 48"W OVERALL MIN.)

CHIEF PAC525F WALL ENCLOSURE

POWER OUTLET

CUTOUT ANDWALL BOX

ASSEMBLY

CONCENTRIC (1/2", 1" AND 1-1/4") KNOCKOUTS

8' - 3 1/2"

4' -

5 7

/8"

9' - 11"

5' -

7"

PL

AN

NO

RT

H

TRUE N

ORTH

AU

DIO

/VIS

UA

L:

CH

EM

IST

RY

-P

HY

SIC

S R

EN

OV

AT

ION

Th

is D

raw

ing a

nd th

e D

esig

n s

how

n

there

on

are

th

e p

rope

rty o

f O

mni

Arc

hitects

. T

he r

ep

rodu

ction

, cop

yin

g

or

oth

er

use

of

this

Dra

win

g o

r D

esig

n

with

out th

e w

ritten

con

sen

t o

f O

mn

i A

rch

itects

is p

rohib

ite

d.

Job N

um

ber:

Le

xin

gto

n,

Ke

ntu

cky

212

No

rth U

pp

er

Str

ee

tL

exin

gto

n,

Ke

ntu

cky

405

07-1

00

1p

85

9.2

52

.666

4w

ww

.om

nia

rchitects

.co

m

Revis

ion:

BID DOCUMENTS

BID

DO

CU

ME

NT

S

T-2.0

AU

DIO

/VIS

UA

L D

ET

AIL

SX

KC

P17-0

1M

AY

18, 2020

T-2.0 NOT TO SCALE

1 AV DISPLAY ELEVATION FOR DIGITAL SIGNAGE/CORRIDORS

T-2.0 NOT TO SCALE

2 AV DISPLAY ELEVATION FOR COLLABORATION AREAS

T-2.0 NOT TO SCALE

3 AV DISPLAY ELEVATION FOR SOUTH CAFE ROOM 301

T-2.0 NOT TO SCALE

4 AV DISPLAY ELEVATION FOR BACK-TO-BACK CONFERENCE ROOMS

T-2.0 NOT TO SCALE

5 AV DISPLAY ELEVATION FOR NON BACK-TO-BACK CONFERENCE ROOMS

T-2.0 NOT TO SCALE

6 WALLBOX ROUGH-IN (CHIEF PAC525F)

FOR REFERENCE ONLY - PART OF EARLIER PACKAGE BY OTHERS

T-2.0 1/4" = 1'-0"

7 VIDEO WALL ELEVATION - BASE BID

T-2.0 1/4" = 1'-0"

8 VIDEO WALL ELEVATION - ALTERNATE

Revision Schedule

No. Revision Date

2 Chemistry/Physics Bid Package #2B Addendum 2

2020-07-02

Page 14: INVITATION FOR BIDS CCK-2484-20 ADDENDUM # 2 07/07/2020 · Chemistry/Physics Building Renovation – Bid Package No. 2B UK Project No. 2446.1 University of Kentucky – Lexington,

HDMI

PASSIVE HDMI

TABLET

SMARTPHONE

LAPTOP

EXTRON SHARELINK PRO 500WIRED AND WIRELESSPRESENTATION GATEWAY

ETHERNET

PASSIVE HDMI/CEC

TCP/IPNETWORK

ROOM WIRELESS ACCESS POINT BY UK ITS

EXTRON WPD 110 APASS-THROUGH WALLPLATE

LAPTOP

LG UT640S0UA DISPLAY

EXTRON TLC PRO 726MTOUCHLINK PRO TOUCHPANELWITH BUILT IN CONTROLLER

INSTALL ON SLIDE-OUT SHELF BEHIND DISPLAY

RS232 TO DISPLAY

SHOWN FOR REFERENCE ONLY

COLLABORATION AREAS AND CAFE STATEMENT OF FUNCTIONALITY:

COLLABORATION AREAS SHALL BE CAPABLE OF WIRELESSLY SHARING CONTENT FROM ANY MOBILE DEVICE, WIRED AND WIRELESS SOURCES SHALL BE ABLE TO COLLABORATE SIMULTANEOUSLY, VIEW UP TO FOUR PIECES OF CONTENT SIMULTANEOUSLY.

WHEN SYSTEM IS NOT USED IT SHALL AUTOMATICALLY SWITCH TO DIGITAL SIGNAGE VIA RMG KORBYT ARIES PLAYER.

KORBYT ARIES MEDIA PLAYEROWNER FURNISHED, CONTRACTOR INSTALLED

HDMI

MOUNTED BEHIND DISPLAY

ETHERNET

3D IN WALLBOX(EXISTING)

PATCH CORD DATA DROP #2 IN WALLBOX

PATCH CORD TO DATA DROP #1 IN WALLBOX

PATCH CORD DATA DROP #3 IN WALLBOX

ELO 5553L 4K TOUCH SCREEN DISPLAY

KORBYT ARIES MEDIA PLAYEROWNER FURNISHED, CONTRACTOR INSTALLED

USB

HDMI

DATA DROP IN WALLBOX (EXISTING)

MOUNTED BEHIND DISPLAY

DIGITAL SIGNAGE STATEMENT OF FUNCTIONALITY:

DIGITAL SIGNAGE SYSTEM SHALL BE CABPABLE OF CONNECTION TO THE UNIVERSITY'S MANAGED SYSTEM (RMG KORBYT) VIA A STANDARD MEDIA PLAYER.

2

VIDEO WALL - 2X2 55"; 3840X2160; 0.88mm BEZEL TO BEZEL

CEILING MOUNTED LOUDSPEAKERS

AMPLIFIER

DSP

VIDEO WALL CONTROLLER AND PROCESSOR

ENCODER (QUANTITY 4)

EXTRON CONTROLLER

INPUT PLATE HDMI, XLR, 3.5mm AUDIO

VIDEO WALL AND ASSOCIATED AUDIO SYSTEM STATEMENT OF FUNCTIONALITY:

VIDEO WALL SYSTEM SHALL BE CAPABLE OF ONE IMAGE OR (4) IMAGES FROM (4) DIFFERENT SOURCES. VIDEO WALL CONTROLLER SHALL ACCOMODATE (4) SOURCES AND BE ABLE TO SCALE TO RESOLUTIONS NECESSARY.

AUDIO SUPPORT WILL CONSIST OF SPEAKERS IN THE SPACE WITH THE VIDEO WALL (REFER TO PLANS) INCLUDING WIRELESS MICROPHONE AND WIRED MICROPHONE CAPABILITY.

CONTROL SHALL CONSIST OF WIRELESS TOUCHPANEL ALONG WITH WIRED TOUCH PANEL LOCATED AT THE RACK. CONTROL SHALL BE BEHIND A PASSWORD PROTECTED INTERFACE.

95.52"

53.8

8"

EQUIPMENT TO BE LOCATED IN ITS RACK ROOM 128

LINE ARRAY SPEAKERS

DECODER (QUANTITY 4) ONE PER QUADRANT

WIRELESS MICROPHONE RECEIVER

TLP PRO 1025M MOUNTED ON RACK

2

HDMI

PASSIVE HDMI

TABLET

SMARTPHONE

LAPTOP

ETHERNET

EXTRON SHARELINK PRO 500WIRED AND WIRELESSPRESENTATION GATEWAY

ETHERNET

PASSIVE HDMI/CEC

TCP/IPNETWORK

ROOM WIRELESS ACCESS POINT BY UK ITS

EXTRON WPD 110 APASS-THROUGH WALLPLATE

LAPTOP

LG UT640S0UA DISPLAY

ETHERNET

3D IN WALLBOX(EXISTING)

PATCH CORD DATA DROP #2 IN WALLBOX

PATCH CORD TO DATA DROP #1 IN WALLBOX

INSTALL ON SLIDE-OUT SHELF BEHIND DISPLAY

HDMI

USB

LOGITECH MEETUP MOUNTED BELOW DISPLAY

OFE SMALL FORM FACTOR COMPUTER (BY UK ITS) MOUNTED BEHIND DISPLAY

EXTRON TLC PRO 726MTOUCHLINK PRO TOUCHPANELWITH BUILT IN CONTROLLER

RS232 TO DISPLAY

SHOWN FOR REFERENCE ONLY

CONFERENCE ROOM STATEMENT OF FUNCTIONALITY:

LOCAL CONTENT PRESENTATION MODE: THIS MODE WILL ALLOW THE ROOM TO BE CAPABLE OF WIRELESSLY SHARING CONTENT FROM ANY MOBILE DEVICE, WIRED AND WIRELESS SOURCES SHALL BE ABLE TO COLLABORATE SIMULTANEOUSLY, VIEW UP TO FOUR PIECES OF CONTENT SIMULTANEOUSLY.

OWNER FURNISHED COMPUTER MODE: THIS MODE WILL ALLOW THE USE OF THE UK ITS-ISSUED COMPUTER TO BE THE SOURCE FOR THE DISPLAY. THE COMPUTER WILL HAVE ACCESS TO THE ALL-IN-ONE CAMERA, MICROPHONE AND SPEAKER UNIT THAT IS TO BE MOUNTED BELOW THE DISPLAY.

PATCH CORD TO DATA DROP #3 IN WALLBOX

DIRECT VIEW LED VIDEO WALL - 1.58mm PIXEL PITCH, 1920X1080

AMPLIFIER

DSP

ENCODER (QUANTITY 4)

EXTRON CONTROLLER

DECODER (QUANTITY 4) ONE PER QUADRANT

VIDEO WALL AND ASSOCIATED AUDIO SYSTEM STATEMENT OF FUNCTIONALITY:

VIDEO WALL SYSTEM SHALL BE CAPABLE OF ONE IMAGE OR (4) IMAGES FROM (4) DIFFERENT SOURCES. VIDEO WALL CONTROLLER SHALL ACCOMODATE (4) SOURCES AND BE ABLE TO SCALE TO RESOLUTIONS NECESSARY.

AUDIO SUPPORT WILL CONSIST OF SPEAKERS IN THE SPACE WITH THE VIDEO WALL (REFER TO PLANS) INCLUDING WIRELESS MICROPHONE AND WIRED MICROPHONE CAPABILITY.

CONTROL SHALL CONSIST OF WIRELESS TOUCHPANEL ALONG WITH WIRED TOUCH PANEL LOCATED AT THE RACK. CONTROL SHALL BE BEHIND A PASSWORD PROTECTED INTERFACE.

119.04"

66.9

6"

EQUIPMENT TO BE LOCATED IN ITS RACK ROOM 128

CEILING MOUNTED LOUDSPEAKERS

LINE ARRAY SPEAKERS

VIDEO WALL CONTROLLER AND PROCESSOR

INPUT PLATE HDMI, XLR, 3.5mm AUDIO

WIRELESS MICROPHONE RECEIVER

TLP PRO 1025M MOUNTED ON RACK

2

PL

AN

NO

RT

H

TRUE N

ORTH

AU

DIO

/VIS

UA

L:

CH

EM

IST

RY

-P

HY

SIC

S R

EN

OV

AT

ION

Th

is D

raw

ing a

nd th

e D

esig

n s

how

n

there

on

are

th

e p

rope

rty o

f O

mni

Arc

hitects

. T

he r

ep

rodu

ction

, cop

yin

g

or

oth

er

use

of

this

Dra

win

g o

r D

esig

n

with

out th

e w

ritten

con

sen

t o

f O

mn

i A

rch

itects

is p

rohib

ite

d.

Job N

um

ber:

Le

xin

gto

n,

Ke

ntu

cky

212

No

rth U

pp

er

Str

ee

tL

exin

gto

n,

Ke

ntu

cky

405

07-1

00

1p

85

9.2

52

.666

4w

ww

.om

nia

rchitects

.co

m

Revis

ion:

BID DOCUMENTS

BID

DO

CU

ME

NT

S

T-2.1

AU

DIO

/VIS

UA

L S

CH

EM

AT

ICS

XK

CP

17-0

1M

AY

18, 2020

T-2.1 NOT TO SCALE

1 A/V SCHEMATIC FOR COLLABORATION AREAS AND CAFE

T-2.1 NOT TO SCALE

2 A/V SCHEMATIC FOR DIGITAL SIGNAGE

T-2.1 NOT TO SCALE

3 A/V SCHEMATIC FOR VIDEO WALL - BASE BID

T-2.1 NOT TO SCALE

4 A/V SCHEMATIC FOR CONFERENCE ROOMS

T-2.1 NOT TO SCALE

5 A/V SCHEMATIC FOR VIDEO WALL - ALTERNATE

Revision Schedule

No. Revision Date

2 Chemistry/Physics Bid Package #2B Addendum 2

2020-07-02