investment corp. · bunt & associates engineering (bc) ltd. phone: 778.379.3173 email:...
TRANSCRIPT
Architect
# Date Issued / Revision
1
Project:
4459 Rupert St
Town of Hastings Suburbuan Lands, Plan 1705
Block 4, South East 1/4 of section 49
Lot 3, except the west 8 feet, now lane
Legal Lot Description
Title :
Scale :
Date :
Drawn :
Reviewed : OL Revision :
DWG # :
File :MONADonRupert_DD
Client
REJOYCEInvestment Corp.
T: 604.722.8882
Contact : James Ko
Vancouver, BC, V5R 4C6
5296 McKinnon Street
Phone : 604.730.1422
Email : [email protected]
Vancouver, BC V5Y 3X2
202 - 388 West 8th Avenue
Robert Malczyk, Structural Engineer
EQUILIBRIUM CONSULTING Inc.
& Passive House
Mechanical Electrical
Phone: 604.689.4449
Email: [email protected]
Vancouver, BC V6C 1T2
950-409 Granville Street,
Andrew Harmsworth
GHL CONSULTANTS Ltd.
Phone: 604.454.0402
Email: [email protected]
Burnaby, BC V5C 6S7
Suite 310, 4321 Still Creek Drive,
Sophie Mercier
Morrison Hershfield
Acoustical
Landscape
Phone: 604.988.2508 x 153
Email: [email protected]
North Vancouver, BC V7J 2A2
#308-1200 Lynn Valley Road,
Jordan Reniak
BKL CONSULTANTS Ltd.
Phone: 604.685.6427
Vancouver, BC V6E 3S7
Suite 1550-1050 West Pender Street,
Simon Mueller, Daniel Fung
Bunt & Associates Engineering (BC) Ltd.
Phone: 778.379.3173
Email: [email protected]
Vancouver, BC V5T 1W2
202 - 175 East Broadway,
Bryce Gauthier
EnnsGauthier Landscape Architecture
NOT FOR CONSTRUCTION
Vancouver, BC V6C 1S4
Suite 180-200 Granville Street,
Phone: 604.484.8571
Email: [email protected]
Ali Nazari, Passive House Consultant
Phone: 604.687.1800
Email: [email protected]
Gary Rhode, Electrical Consultant
C: 778.389.1598
D: 604.484.8569
Phone: 604.687.1800 x 213
Email: [email protected]
Kai Chen, Mechanical Consultant
Intergral Group
Building Code
Building Envelope
Traffic
Feb 20, 2017
Structural
Feb 08, 2017
DE / REZONING CONCURRENT
L W P A C
TB
Phone 604.737.7600
Email [email protected]
Vancouver BC V6R 1N6 Canada
3353 West 4th Avenue
Oliver Lang, Architect AIBC
Lang Wilson Practice in Architecture Culture
the attention of the Architect for clarification.
Documents; and immediately, bring these items to
between this drawing and the full Contract
errors and omissions; ascertain any discrepancies
dimensions, datums and levels to identify any
work the contractor shall verify all assemblies,
by the architect. Prior to commencement of the
used for construction until issued for that purpose
consent of the architect. This drawing is not to be
used for any other purpose without the written
Practice in Architecture Culture Inc. and cannot be
drawings are the exclusive property of Lang Wilson
Copyright reserved 2017. This design and the
MONAD_R
A0.01
ILLUSTRATIONS
PROJECT
4View From South-West Corner
1View From South-East Corner
2
3
Front View
View From Rupert St Crossing At East 28th Avenue