investing in our water future

4
Phoenix Water is building additional infrastructure to continue its mission of providing a reliable water supply to our 1.7 million customers. As part of the City’s preparation for resiliency in a hotter and drier future, the improvements will provide more flexibility to move Salt and Verde River water supplies to areas of the city that are currently entirely dependent on Colorado River water. Learn more about this project, including all the investments Phoenix Water is undertaking to improve water and wastewater infrastructure by visiting: www.phoenix.gov/water Phoenix Water is one of the largest water and sewer utilities in the country. Phoenix water is distributed using a system that includes: The Improvements Include: 12 miles of new pipelines. Allowing us to deliver reliable water supply. 4 water booster pump stations. Transport and boost clean water throughout the water distribution system Pressure-reducing valve stations. Regulate and maintain safe water pressure to provide better water distribution. 7,000 miles of water pipelines Hundreds of facilities including pump stations, wells and reservoirs 2019 2020 2021 2022 DESIGN CONSTRUCTION 5 drinking water treatment plants INVESTING IN OUR WATER FUTURE 2023 2024

Upload: others

Post on 29-Nov-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: INVESTING IN OUR WATER FUTURE

Phoenix Water is building additional infrastructure to

continue its mission of providing a reliable water

supply to our 1.7 million customers.

As part of the City’s preparation for resiliency in

a hotter and drier future, the improvements

will provide more flexibility to move Salt

and Verde River water supplies to areas

of the city that are currently entirely

dependent on Colorado River water.

Learn more about this project,

including all the investments

Phoenix Water is undertaking to

improve water and wastewater

infrastructure by visiting:

www.phoenix.gov/water

Phoenix Water is one of

the largest water and sewer

utilities in the country.

Phoenix water is distributed

using a system that includes:

The Improvements

Include:12 miles of new pipelines.Allowing us to deliver reliable water supply.

4 water booster pump stations.Transport and boost clean water throughout the water distribution system

Pressure-reducing valve stations.Regulate and maintain safe water pressure to provide better water distribution.

7,000 miles of water pipelines

Hundreds of facilities including pump stations,

wells and reservoirs

2019 2020 2021 2022

DESIGN CONSTRUCTION

5 drinking water treatment

plants

INVESTING IN OUR WATER FUTURE

2023 2024

Page 2: INVESTING IN OUR WATER FUTURE

Project 1Phoenix Mountains Preserve and nearby neighborhoods 66” pipeline & 48” pipeline

Project 232nd Street from Shea Boulevard to Bell Road 66” pipeline

Project 335th Avenue from Thunderbird Road to Greenway Road 42” pipeline

Project 4Deer Valley Road, between 7th Avenue and 7th Street 60” and 66” pipelines

Booster Pump Stations: 24th Street Water Treatment Plant booster pump station

32nd Street & Bell Road booster pump station

Deer Valley Water Treatment Plant booster pump station

Central Avenue and Deer Valley Road booster pump station

2019 2020 2021 2022

DESIGN

17

101101

51

17

51

E Bethany Home Rd

W Glendale Ave

E Glendale Ave

W Northern Ave

Cave

Cre

ek R

d

W Cactus Rd E Cactus Rd

E Greenway Rd

W Greenway Rd

W Pinnacle Peak Rd E Pinnacle Peak Rd

N 27th Ave

N 19th Ave

N 15th Ave

N Central Ave

N 7th St

N 12th St

N 36th St

Cave Creek Rd

W Northern Ave

W Thunderbird Rd

E Greenway Pkwy

E Lincoln Dr

W Dunlap Ave

N 35th Ave

N 7th Ave

N 7th St N 24th St

N 32nd St

N 24th St

W Bell Rd E Bell Rd

W Deer Valley Rd

N 7th St

N 7th Ave

N 32nd St

N 35th Ave

W Bethany Home Rd

W Peoria AveE Shea Blvd

W Grovers Ave

W Union Hills Rd E Union Hills Rd

W Happy Valley Rd

N 19th AveN 19th Ave

N 40th St

E Deer Valley Rd

Lookout Mountain Preserve

Buffalo Ridge Park

North Mountain

Park

Phoenix MountainsPreserve

Project 342” Pipeline

Project 266” Pipeline

Project 148” Pipeline

Project 148” Pipeline

Rehabilitation

Project 166” Pipeline

Project 460” and 66” Pipelines

Construction Area = Pump Stations =

2019 2020 2021 2022

DESIGN CONSTRUCTION

2019

DESIGNCONSTRUCTION

PHOENIX WATERQUALITY. RELIABILITY. VALUE.

Clayton Freed, Project ManagerPhoenix Water

24-HOUR CONSTRUCTION HOTLINE: 602-235-2666

CONSTRUCTION EMAIL: [email protected]/PHXWATER www.phoenix.gov/water

Receive regular updates on the Drought Pipeline Project by joining the information email list. Email your name, address, phone and email address to [email protected] to be included in the updates. Information provided will only be used for internal information purposes only. Personal information will never be provided to outside vendors.

2019 2020 2021 2022

DESIGN CONSTRUCTION

2020 2021 2022 2023 2024

101

51

51

E Bethany Home Rd

E Glendale Ave

Cave

Cree

k Rd

E Cactus Rd

E Greenway Rd

N Central Ave

N 7th StN 12th St

N 36th St

Cave Creek Rd

W No rthern Ave

E Greenway Pkwy

E Lincoln Dr

N 7th St

N 32th St

N 24th St

E Bell Rd

N 7th St N 32th St

E Shea Blvd

E Union Hills Rd

N 40th St

Lookout Mountain Preserve

Buffalo Ridge Park

North Mountain

Park

Phoenix MountainsPreserve

DROUGHTPIPELINEPROJECT

DOWNLOADOUR FREE APP

STAY INFORMED...

DROUGHT PIPELINE PROJECTINVESTING IN OUR WATER FUTURE August 2021

2023

CONSTRUCTION

Page 3: INVESTING IN OUR WATER FUTURE

El Departamento de Servicios de Agua de la Ciudad de Phoenix está construyendo infraestructura adicional con el fin de adelantar su misión de proporcionar un suministro de agua fiable a nuestros 1.7 millones de clientes.

Como parte de las preparaciones de la Ciudad para la resiliencia en un futuro más caliente y árido, las mejoras brindarán mejor flexibilidad para poder trasladar los suministros de agua desde los ríos Salt y Verde hasta las zonas de la ciudad que hoy en día dependen completamente del agua del Río Colorado.

Aprenda más sobre este proyecto, incluyendo todas las inversiones que Agua de Phoenix realiza con el fin de mejorar la infraestructura de agua y aguas residuales por visitar: www.phoenix.gov/water

Agua de Phoenix es

uno de los servicios

de agua y alcantarillado

más grandes del país.

Las Mejoras

Incluyen:12 millas de nueva tubería.Nos facilita encargar un suministro de agua fiable.

4 estaciones de bomba elevadora de agua.Trasladar y aumentar la presión del agua limpia por todo el sistema de distribución de agua

Estaciones de válvulas de reducción de presión.Regular y mantener un nivel de presión segura del agua para facilitar una distribución de agua mejorada.

7.000 millas de tubería de agua

Cientos de instalaciones incluyendo estaciones de

bombeo, pozos, y depósitos

2019 2020 2021 2022

DISEÑO CONSTRUCCIÓN

5 plantas de tratamiento de agua potable

INVIRTIENDO EN EL FUTURO DE NUESTRA AGUA

Page 4: INVESTING IN OUR WATER FUTURE

2019 2020 2021 2022

DISEÑO

2023

CONSTRUCCIÓN

Proyecto 1Reserva Natural Phoenix Mountain y los vecindarios circundantes.Tuberías de 66 pulgadas y de 48 pulgadas

Proyecto 232nd Street desde la Shea Boulevard hasta la Bell Road Tubería de 66 pulgadas

Proyecto 335th Avenue desde la Thunderbird Road hasta la Greenway Road Tubería de 42 pulgadas

Proyecto 4La Deer Valley Road, entre la 7th Avenue y la 7th Street Tuberías de 60 pulgadas y de 66 pulgadas

Estaciones de Bomba Elevadora:

Estación de bomba elevadora de la Planta de Tratamiento de Agua de la 24th Street

Estación de bomba elevadora de 32nd Street y la Bell Road

Estación de bomba elevadora de la Planta de Tratamiento de Deer Valley

Estación de bomba elevadora de la Central Avenue y la Deer Valley Road

2019

DISEÑOCONSTRUCCIÓN

2020 2021 2022 2023 2024

17

101101

51

17

51

E Bethany Home Rd

W Glendale Ave

E Glendale Ave

W Northern Ave

Cave

Cre

ek R

d

W Cactus Rd E Cactus Rd

E Greenway Rd

W Greenway Rd

W Pinnacle Peak Rd E Pinnacle Peak Rd

N 27th Ave

N 19th Ave

N 15th Ave

N Central Ave

N 7th St

N 12th St

N 36th St

Cave Creek Rd

W Northern Ave

W Thunderbird Rd

E Greenway Pkwy

E Lincoln Dr

W Dunlap Ave

N 35th Ave

N 7th Ave

N 7th St N 24th St

N 32th St

N 24th St

W Bell Rd E Bell Rd

W Deer Valley RdN 7th St

N 7th Ave

N 32th St

N 35th Ave

W Bethany Home Rd

W Peoria AveE Shea Blvd

W Grovers Ave

W Union Hills Rd E Union Hills Rd

W Happy Valley Rd

N 19th AveN 19th Ave

N 40th St

E Deer Valley Rd

Phoenix Mountains Preserve

North Mountain Park

Lookout Mountain Preserve

Buffalo Ridge Park

Proyecto 3Tubería de

42 pulgadas

Proyecto 2Tubería de

66 pulgadas

Proyecto 1Tubería de

48 pulgadas

Proyecto 1Rehabilitación de Tubería de 48 Pulgadas

Proyecto 1Tubería de

66 pulgadas

Proyecto 4Tuberías de 60 y

66 pulgadas

Zona de Construcción = Estaciones de Bombeo =

INVIRTIENDO EN EL FUTURO DE NUESTRA AGUA

2019 2020 2021 2022

DISEÑO CONSTRUCCIÓN

AGUA DE PHOENIX CALIDAD. FIABILIDAD. VALOR.Clayton Freed, Administrador de Proyectos Agua de Phoenix

/PHXWATER www.phoenix.gov/water

STAY INFORMED: Reciba actualizaciones regulares sobre el Proyecto de Tubería de Agua uniéndose a la lista de correo electrónico de información. Envíe su nombre, dirección, teléfono y correo electrónico a [email protected] para subscribirse a la lista. Cualquier información proporcionada se usará sólo para fines de información interna. Nunca se proporcionará ninguna información personal a proveedores externos.

2019 2020 2021 2022

DISEÑO CONSTRUCCIÓN

LÍNEA DE INFORMACIÓN DE CONSTRUCCIÓN DE 24 HORAS: 602-235-2666

CORREO ELECTRÓNICO DE CONSTRUCCIÓN: [email protected]