Page 1: INVESTING IN · 2016. 2. 15. · Outfall BR064 Outfall BR063 B l u e R i v e r Consolidation Pipe.. eet. . eet SEWER PIPE CONSOLIDATION INVESTING IN Middle Blue River Basin: Outfall

!

!Outfall BR064

Outfall BR063

Blu

e R

iver

Consolidation Pipe

Cle

vela

nd A

ve.

Cle

vela

nd A

ve.

Che

stnu

t Ave

.

69th Street

Gregory Blvd. Elm

wo

od

Ave

.

73rd Street

SEWER PIPE CONSOLIDATION

ININVESTING

Middle Blue River Basin: Outfall 063

PROJECT AREA

Design occurring Fall 2014 - Summer 2015

N

Page 2: INVESTING IN · 2016. 2. 15. · Outfall BR064 Outfall BR063 B l u e R i v e r Consolidation Pipe.. eet. . eet SEWER PIPE CONSOLIDATION INVESTING IN Middle Blue River Basin: Outfall

WHAT?

•Consolidation of existing piping.

•Disconnection of stormwater inlets from the combined sewer system.

• Elimination of 15 of the 18 existing diversion structures.

WHY?

• Eliminate overflows at outfall 063.

•Reduce the volume of untreated wastewater to the receiving waters downstream.

• Provide capacity to alleviate basement backup concerns in upstream areas.

•Meet regulatory requirements as part of KC’s Overflow Control Program.

WHEN?

•Detailed design started October 2014 and is expected to run to August 2015.

•Construction is expected to be completed late 2017.

SEWER PIPE CONSOLIDATION

YOUR INVESTMENTS AT WORK

Middle Blue River Basin: Outfall 063

QUESTIONS?

WHO?

•Kansas City Water Services assisted by SKW, OBI Consulting Engineers, TREKK Design Group, TSi Engineering, Vireo, and VSM Engineering.

WHERE?

The project area boundaries:

•Northern boundary - Meyer Boulevard

• Southern boundary - 72nd Street

• Eastern boundary - Crest Drive/Railroad tracks

•Western boundary - Prospect Avenue

IMPROVEMENTS?

• 12,000 linear feet of new sanitary sewer consolidation pipe.

•Reroute storm inlets and connect to existing storm sewer box.

•Repair structural defects in sanitary sewer.

• Eliminate 15 diversion structures with new manholes.

WHAT TO EXPECT?

• SKW survey crews conducting topographical survey along proposed improvements.

•Utilities marking the locations of their services

• Public meeting before construction begins to inform the property owners about the new construction.

CONTRACT AMOUNT

Design professional services contract includes all services rendered through the construction phase of the project.

• $874,000

Specific questions about this project can be directed to:

•Karine Papikian, Project Manager,

KC Water Services at 816-513-0300 or [email protected]

• Philip Burns, Project Manager, SKW at 913-307-2556 or [email protected]