introduktion til dcs - insatech€¦ · “ as a result of yokogawa’s high r&d investment and...

63
Seminar TI-14 – Erik Fjordside/ Carsten Hounsgaard Introduktion til DCS systemer

Upload: others

Post on 31-May-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Seminar TI-14 – Erik Fjordside/ Carsten Hounsgaard

Introduktion til DCS systemer

Page 2: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

- 2 -

“ As a result of Yokogawa’s high R&D investment and the

consistent long term migration policy of the CENTUM DCS

family our investment are secure ”

Nearly 40 years History and the continuity

AVR

FFCS

HIS

CENTUM CS 3000 R3 HIS

CENTUM VP

Vnet/IP

2008

2001 2005

FFCS-L

1Gbps Dual

Redundant

2011 [Release 5]

FFCS-V

CFFS

HF-Bus

COPS

F-Bus

250 KBPS Dual

Redundant Token Pass

CENTUM

1MBPS Dual

Redundant Token Pass

CENTUM-XL

EOPS

EFCS EFCD

ENGS PFCS

KFCS LFCS COPS2 COPSV

CENTUM V

CFCS2 CFCD2

ABC

CENTUM CS ICS

EWS PICS

V net

10 MBPS Dual

Redundant Token Pass

HIS

1975

1983 1988

1998

1993

ENG

CENTUM CS 3000

CFCD CFCS

ENG

• Full Lifecycle Support for Customers’ Legacy Systems

The migration path for each legacy system is always taken into consideration before a new system is released

Page 3: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

NORTH AMERICA

Africa

Asia

Oceania

Middle East

South America

North America

Europe

862

599

419

19407

366

580

2,144

EUROPE

As of Dec 2012

TOTAL

24,377 UNITS

AFRICA

MIDDLE EAST

OCEANIA AUSTRALIA (407)

NEW ZEALAND (2)

NEW CALEDONIA (1)

PAPUA NEW GUINEA (3)

FIJI (6)

ASIA SOUTH AMERICA

DCS Installation Map

AUSTRIA (30)

AZERBAIJAN (1)

BELGIUM (199)

BELARUS (8)

BULGARIA (5)

CROATIA (5)

DENMARK (6)

FINLAND (1)

FRANCE (232)

GERMANY (256)

GREECE (18)

HUNGARY (63)

IRELAND (3)

ITALY (149)

KAZAKHSTAN (7)

LITHUANIA (1)

NETHERLANDS (173)

NORWAY (5)

POLAND (17)

PORTUGAL (8)

ROMANIA (12)

RUSSIA (545)

SERBIA (10)

SLOVAKIA/CZECH (112)

SLOVENIA (2)

SPAIN (162)

SWEDEN (1)

SWITZERLAND (17)

TURKMENISTAN (5)

UK (83)

UKRAINE (8)

ALGERIA (35)

ANGOLA (15)

BOTSWANA (4)

CONGO (4)

EGYPT (60)

GABON (6)

GHANA (5)

KENYA (3)

LIBYA (4)

MOROCCO (22)

MOZAMBIQUE (1)

NAMBIA (1)

NIGERIA (38)

SENEGAL (2)

SOUTH AFRICA (153)

SUDAN (6)

SWAZILAND (2)

TUNISIA (1)

UGANDA (4)

BAHRAIN (34)

DUBAI (1)

IRAN (105)

IRAQ (9)

JORDAN (5)

KUWAIT (14)

OMAN (48)

QATAR (9)

SAUDI ARABIA (256)

SYRIA (6)

TURKEY (33)

U.A.E (52)

YEMEN (8)

BANGLADESH (1) INDIA (1,425) MYANMAR (5) PAKISTAN (6) CHINA (2,565) KOREA (1,101) TAIWAN (479) JAPAN (12,399) MALAYSIA (284) INDONESIA (284) PHILIPPINES (172) SINGAPORE (225) THAILAND (423) VIETNAM (35) BRUNEI (1) SRILANKA (2)

ARGENTINE (11)

BRAZIL (498)

CHILE (4)

COSTA RICA (1)

COLOMBIA (16)

CUBA (12)

EL SALVADOR (1)

MEXICO (41)

NICARAGUA (1)

PANAMA (2)

PERU (1)

TRINIDAD TOBAGO (2)

URUGUAY (1)

VENEZUELA (8)

CANADA (19)

USA (843)

Page 4: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Release Information

Page 5: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

CENTUM VP Features

• Scalability and flexibility

– CENTUM VP meets the requirements for both simple small scale systems and huge scale 1,000,000 tag level systems

– CENTUM VP is suitable for different application types and system architectures

• Super-high plant operation availability

– Seven 9’s (99.9999959) hardware availability

– Pair & Spare technology to keep higher control loop availability

• Operators’ perspective design

– Real-time plant operation environment

– Intuitive look & feel HMI design

• Open Architecture

– The latest technologies can be applied in the control systems

– Easy integration with other subsystems

Page 6: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

CENTUM VP System Configuration Overview

HIS (Operator Station)

Digital Field Network

Vnet/IP Real time Control Network

Open Style

Console Solid Style

Console

Client PC

Plant Asset

management

OPC

server

Engineering

Station

Desktop type

HIS

PR

M

SCS Safety Control Station

UGS Unified Gateway Station

Exaquantum Plant Information Management System

Subsystems

FCS

Field Control Station

TSE

serve

r

Page 7: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Operation and Monitoring

Page 8: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Operator Station (HIS)

HIS (Operator Station)

Vnet/IP Real time Control Network

Open Style

Console Solid Style

Console

Client PC

Plant Asset

management

OPC

server

Engineering

Station TSE

serve

r

Desktop type

HIS

PR

M

SCS Safety Control Station

UGS Unified Gateway Station

Exaquantum Plant Information Management System

Subsystems

FCS

Field Control Station

Digital Field Network

Page 9: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

HIS (Operation Station) Features

• Various types of the operation views are prepared

– Graphic, Trend graph, Overview, Tuning etc.

• One-touch operation for related information

– Alarm dialog, trend graph, Graphics, and faceplates can be called up from each other based on the related tag without engineering

Ex.) Click alarm message, then the related faceplate is shown

• Performance and function for achieving real-time plant operation – 1 second graphic call up – 1 second screen refresh – Data gather mechanism for real-time trend

without the affection by the network delay – Frame display – Window History function

• Real-time Alarm Management View

Page 10: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

• Large Capacity – Max. No. of Tags: 1,000,000 per system – Max. Graphic Displays: 4,000 per HIS – Real-time trend Points: 3,328 per HIS

• Various types of operation environment are available – Single, dual, quad monitor are available – Wide monitor is also available

– Mouse operation

– Operation keyboard and touch screen are also available

• Higher Compatibility with the former CENTUM systems

– Similar operation is also available

– Accessible to the FCSs of the former CENTUM systems with different control networks

HIS (Operation Station) Features

Page 11: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

HIS Hardware

Solid Style

Console

• HIS works on the latest Microsoft Windows OS platform

– Windows 7, VISTA and 2008 server

• Three types of hardware can be chosen

– Desktop, Solid Style Console, and Open Style Console

• Various Operation Styles

– Mouse/Operation Keyboard/Touch panel

– Single, Dual and Quad-monitor are available

Open Style

Console

Desktop

Type

Page 12: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Operation Keyboard Features

• Calling up necessary information quickly – 64 function keys

– Alphanumeric buttons

– Tab switching

• Avoiding human mistakes – Highlighting the instrument plates

– Security key • Authorized Operator

• System Engineer

– IEC9241-11 Complied Key pitch

• Easing the installation – Power supply via USB (AC adapter is not needed)

– 2 built-in speakers for buzzer and for other sound

Page 13: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Operation Keyboard (OPKB) Description

USB Power Supply Control Keys

AIP831: Eight-Loop

AIP830:Single-Loop

64 Function

Keys

Buzzer Reset Key / Alarm

Acknowledgement Key

Numeric

keypad

Container Window

Key (for Frame Tab Switch)

Window Call

Keys

Operation

Confirmation Keys

Mode Selection

Switch

Built-in

Speakers

IEC 9241-11

Key Pitch

Page 14: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

HIS Screen Overview System Message Banner

– Buttons to call-up the alarm & event dialogs quickly

– Latest 3 alarm messages are always displayed in real-time

Navigation

– Graphics & trend

views are arranged in

a hierarchy display

– Alarm status are

shown as the icon color

Favorite

– Frequently used views

can be registered by

operators’ drag & drop

Operation History

– Last 20 call-up

operations are listed

– Double-click the listed

operation to call up the

same view again Graphics, trend graphs and other views are displayed

Page 15: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

The Latest Browser-like Operation Provided

Similar operation to the Internet Explorer

Tab operation Quick call up of up to five frequently used tabs

Less memory consumption to show multiple tabs

Each tab can be divided into 4 frames

4 frames can be shown at the same time to monitor overall

Tab Display

4 views on a sreen

Page 16: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Trend Data Acquisition

• Trend data is acquainted by each trend block on the HIS

– 34 trend blocks per HIS

– Up to 128 data points can be assigned in each trend block

– Other 16 trend blocks can be used for accessing the trend data acquainted in other HISs

• Data Acquisition period is specified for each trend block

– 1-sec, 10-sec, 1-min, 2-min, 5-min or 10-min

– The mechanism to achieve more accrued trend data acquisition

• For 1-second and 10-second trends, the trend data buffer is prepared in the FCS to eliminate the affection of network delay between FCS and HIS

• The capacity of the trend data buffer in an FCS is 8 trend data blocks

Page 17: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Trend Graph Display

• Up to 8 trend lines can be display in each trend graph

– Displaying/hiding of each trend line is by a single click

– Drag & Drop dynamic trend line assignment is available

– The trend lines with different acquisition periods can be displayed on a trend graph together

• Data export function for csv/bitmap format

– To ease to generate the report for analysis

• Drag & Drop zooming function

– For more quick and intuitive operation

• Index marks to show the data values on the trend graphs

– To refer and to compare the data easily

Page 18: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Trend Graph Display Example

Legend Area

– Assigned data points and the current data are shown

– Check/Uncheck to show/hide trend line

Trend line Assignment

– Drag & Drop to assign the data points

from any trend blocks on a trend view

Faceplate Display

– Click the Legend Area, then the Faceplate

is shown next to the trend graph view

Index

– Up to three indexes can be displayed

– Data values on the trend graphs can be checked

Page 19: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Trend Export Reporting Function

•Trend data export

– Right-click on the view, then the trend data can be exported

• Copied to the Clip Board

– It can be easily used for reporting or analysis

Page 20: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Real-time Alarm View (CAMS) Click blinking icons to open the CAMS View

The latest three alarms

are always shown

The Alarm list is shown here

Filter Pane – Based on the priority, consequence, tag, etc.

– Only the related alarm message for the operator can be

shown to reduce the workload

Shelving Pane

– Non-urgent alarms

can be shelved in temporary

– Operators can concentrate

to the alarms which requires

urgent actions

Page 21: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Real-time Alarm Management – Filtering

• To avoid overlooking important alarms in an alarm flooding situation, the displayed alarms can be filtered based on various conditions

– E.g. Alarm priority, Alarm purpose, Consequence, tag, etc.

Filter Pane

– Filters can be pre-configured

and can be configured by operators

during the operation

– Alarms from ProSafe-RS, System alarms,

and Process Alarm filters

are prepared in default

Only the filtered alarms are displayed

– Operators can concentrate to the related important

alarms which require urgent actions

– Less opportunities to overlook the important alarms

Page 22: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Real-time Alarm Management – Eclipsing

• To avoid overlooking important alarms in the alarm flooding situation, the displayed alarms can be grouped based on tag

– Only the highest priority alarm for each tag is displayed

– It can reduce the number of lines on the displayed list, so less opportunity to overlook important alarms

Click to open/close

the grouped alarm messages

Only a single line per tag

Page 23: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Support Quick Actions against the Alarms

• A single operation calls up related dialogs

Context menu on the alarm message

– Right-click on a alarm message to show the

context menu

– It calls up that alarm related faceplate,

tuning view, trend graph or graphic

by a single mouse click

Page 24: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Remote Operation

HIS (Operator Station)

Vnet/IP Real time Control Network

Open Style

Console Solid Style

Console

Client PC

Plant Asset

management

OPC

server

Engineering

Station TSE

server

Desktop type

HIS

PRM

SCS Safety Control Station

UGS Unified Gateway Station

Exaquantum Plant Information Management System

Subsystems

FCS

Field Control Station

Digital Field Network

Page 25: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Remote Operation and Monitoring

Terminal

Server

Office LAN

HIS

- Graphic

- Faceplate operation

- Trend view

- Alarm monitoring

Vnet/IP

Ethernet

Firewall

Controller

Page 26: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Field Control Station (FCS)

Page 27: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Field Control Station (FCS)

HIS (Operator Station)

Vnet/IP Real time Control Network

Open Style

Console Solid Style

Console

Client PC

Plant Asset

management

OPC

server

Engineering

Station

TSE

server

Desktop type

HIS

PR

M

SCS Safety Control Station

UGS Unified Gateway Station

Exaquantum Plant Information Management System

Subsystems

FCS

Field Control Station

Digital Field Network

Page 28: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

FCS (Field Control Station)

• High availability process controller

– Seven 9’s (99.9999959) hardware availability

– Pair & Spare technology for higher control loop availability

• Large capacity Controller

– One controller handles 1,760 analog signals and 4,096 digital signals

– Various field digital protocols can be handled

• Foundation Fieldbus, ISA100, PROFIBUS, EtherNet/IP, HART, etc

– Up to 13 extra I/O racks

– Up to 50km distance remote I/O rack

• Various types of control functions are prepared

– Regulatory Control blocks, Sequence Control Blocks, Arithmetic blocks, etc

– 7,000 functions work on a controller

• Self-Independent controller

– All the control application runs in the highly reliable controller hardware

Page 29: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

• CENTUM-VP Controller hardware Availability

– 0.999999959; Jun ’93 to May ’10

(Seven 9’s!)

• Benefit : Case of the users in a petrochemical Facility

– CENTUM Annual Failure Rate 0.29 loops for facility

• 26 CENTUM Systems, uptime for 33,000 loops

• From 1981 for first installation

– Other-vendor DCS Annual Failure Rate 2.86 loops for facility

• 2 Systems (one is 6-yrs old, one is 9-yrs old)

• Uptime of approximately 3,200 loops

“We’ve never had a processor fail and,

only once, replaced a couple of I/O cards

because we washed down the cabinets.” Jeff Bolhius, Flieshman’s Yeast

Highly Reliable Process Controller

Page 30: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Key Technologies for Highly Available FCS

• Extremely low failure rate design of each hardware

• Self-diagnosis function – Each portion is checked just before working

– If some abnormalities are detected, the module set its status flag to FALSE

• Dual hardware configuration – Each of dual hardware components is checking the status flags of the partner hardware

through backplane bus

• Real-time abnormality detecting

• Seamless switching – Immediately switching from the active module to the stand-by module without affecting

the input/output for process

• Hot swapping – Abnormal modules can be removed and spare modules can be inserted instead without

stopping any other input/output or any other hardware

Page 31: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Redundant Configuration of CENTUM VP

Dual Vnet/IP

Dual remote I/O network

Dual CPU module

Dual Vnet/IP

Dual Power

Dual ESB bus

All data are equalized in real time without

affecting the control communication

among all HISs

Dual Power

Dual ESB/ER bus

Dual I/O modules

Analog, Digital, Fieldbus, Serial

Page 32: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Pair & Spare CPU Architecture

• Both CPU modules are processing independently allowing CENTUM to achieve a real faultless switchover (For Redundancy purposes)

A pair of CPU chips is on

each CPU module

– Each CPU is processing

independently

•This is not

for redundancy purposes

Result checking

– Processed results of

CPUs are every time

compared each other

– If the results are not

congruous, control

switches to the stand-by

module

Vnet/IP I/F

Power card Power card

Coupler Coupler

Vnet/IP

I/O bus

Com

pa

rato

r IO bus

I/F

CPU module CPU module

IO bus

I/F

CPU 1

CPU 2

CPU 1

CPU 2

Com

pa

rato

r

PIO I/F

PIO I/F

PIO I/F

PIO I/F

Vnet/IP I/F

Main memory with ECC

Main memory with ECC

Page 33: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Control Function

• Basic Control functions are contained in a ‘Function Block’

– Almost 200 types of function blocks are available

– Regulatory Control blocks, Sequence Control Blocks, Arithmetic blocks, etc.

– Any function block type can work in a controller at the same time

– Control logics are generated by the combination of function blocks

• The processing of all the function blocks are executed periodically

– The processing period can be specified for each function block

• 1-sec, 500-msec, 250-msec, 100-msec and 50-msec can be selected

Page 34: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Control Function Capacity

PVI BLEND SI-1 BAND OPSBL SI-1E

PVI-DV FF-AI SI-2 BOR OPSFC SI-2E

PID FF-DI SO-1 BNOT OPSFCP1 SO-1E

PI-HLD FF-CS SO-2 CALCU OPSFCP2 SO-2E

PID-BSW FF-PID SIO-11 CALCU-C OPSFCP3 SIO-11E

ONOFF FF-RA SIO-12 SW-33 OPSFCP4 SIO-12E

ONOFF-G FF-AO SIO-21 SW-91 OPSFCP5 SIO-21E

ONOFF-E FF-DO SIO-22 DSW-16 ONOFF-E SIO-22E

ONOFF-GE FF-OS SIO-12P DSW-16C ONOFF-GE SIO-12PE

PID-TP FF-SC SIO-22P DSET MC-2E SIO-22PE

PD-MR FF-IT TM DSET-PVI MC-3E

PI-BLEND FF-IS CTS BDSET-1L SI-1E

PID-STC FF-MDI CTP BDSET-1C SI-2E

MLD FF-MDO CI BDSET-2L SO-1E

MLD-PVI FF-MAI CO BDSET-2C SO-2E

MLD-SW FF-MAO RL BDA-L SIO-11E

MC-2 FF-SUNV RS BDA-C SIO-12E

MC-3 SLCD VLVM INDST2 SIO-21E

RATIO SLPC LC64 INDST2S SIO-22E

PG-L13 SLMC ALM-R INDST3 SIO-12PE

BSETU-2 SMST-111 L_ST16E BSI SIO-22PE

BSETU-3 SMST-121 M_ST16E PBS5C VPM64

Signal SMRT ST16E PBS10C VPM128

SS-H/M/L SBSD L-ST16 Hybrid VPM256

AS-H/M/L SLCC M_ST16 _UTSW VPM512

SS-DUAL SLBC ST16 _UTPB VPM64A

FOUT STLD ADD _UTAS VPM128A

FFSUM _SFCSW MUL _UTSW-N VPM256A

XCPL _SFCPB DIV _UTPB-N VPM512A

SPLIT _SFCAS AVE _UTAS-N FSBSET

Function Block Types

Category Item Max.

Analog 1,760

Digital (On/Off) 4,096

Elements 18,000

Function blocks 7,000

Control drawings 500

Annunciator messages 2,000

Operator guide messages 2,000

Common switches 9,000

Global Switches 256Internal switches

Process IO

Tag Names

Message Outputs

Capacity of one Controller (FFCS-V)

Page 35: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

35

I/O Nodes

Up to 13 I/O nodes can be connected per FCS

One I/O node has 8 I/O module slots

I/O nodes are connected by the remote I/O bus (ESB Bus)

– Up to 10 m from the FCS CPU node to the end of the I/O node if

electric cables are used as the ESB bus

– Up to 50 km in case of optical cables as the ESB bus

CPU node

I/O node

Max 9 I/O nodes/Line

Total Max 13 I/O nodes

Page 36: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

36

ESB Bus for Remote I/O

Up to 50km per line by using optical fiber cables

13 nodes per FCS, 9 I/O nodes per line

Star configuration is available

8 Lines per FCS

Up to two-hop is available

SOE Recording from remote sites is available

FCS I/O node

I/O node

I/O node I/O node

Optical fiber cables

Optical fiber cables Optical fiber cables

Page 37: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Separated sites

Corrosive sites

(ISA G3)

Explosive sites

Remote I/O installation

FCS

ooo

CCR (Central Control Room)

Remote I/O network

•FM Class1, Div 2

•CSA Class 1, Div 2

•ATEX Zone 2

Page 38: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

PROFIBUS-DP

ALP121 PROFIBUS-DP Module • Redundant Configuration is available

DeviceNet

Control Logix

PLC-5

SLC500

CIP

ALE111 Ethernet Communications

Module •EtherNet/IP (CIP)

•Modbus TCP

•PLC-5/SLC500

ALF111 Foundation Fieldbus Module • World’s First Dual-Redundant Fieldbus Ports • 4 Ports per ALF111 • 31 Devices per Port • 1,500 Fieldbus faceplate blocks per FCS

Foundation Fieldbus HART I/O

4-20mA

Linking Device

Various Field Digital Communication Protocols

Modbus/TCP

MW100

Page 39: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Analog Module with HART

• FIO HART Module Lineups

– AAI135-H: 8 input, channel isolated

– AAI835-H: 4 input / 4 output, channel isolated

– AAI141-H: 16 input, non-isolated

– AAI841-H: 8 input / 8 output, non-isolated

– AAI143-H: 16 input, Isolated

– AAI543-H: 16 output, Isolated

– ASI133-H: 8 input, IS module

– ASI533-H: 8 output, IS module

HART Module

HART Modem

Input Signal from HART Device

Analog Signal + HART Signal Analog Signal

(Current)

HART Variable

Page 40: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Real time Control network (Vnet/IP)

Page 41: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Control Network (Vnet/IP)

HIS (Operator Station)

Vnet/IP Real time Control Network

Open Style

Console Solid Style

Console

Client PC

Plant Asset

management

OPC

server

Engineering

Station

TSE

server

Desktop type

HIS

PR

M

SCS Safety Control Station

UGS Unified Gateway Station

Exaquantum Plant Information Management System

Subsystems

FCS

Field Control Station

Digital Field Network

Page 42: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Vnet/IP Specifications

• General specifications

– Topology: Star topology

– Transmission speed: 1 Gbps for Yokogawa hardware, 100 Mbps for general Ethernet equipment

– Access control: Full duplex

– Scale: 64 stations/domain

– Configuration: Redundant

– Control communication: Functionally compatible with Vnet

– Open communication: UDP/IP

– Network equipment: Commercially available switching hubs and routers (Layer 2 switches and Layer 3 switches)

– Cables: CAT5e or higher UTP cables or single-mode fiber optic cables

Page 43: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Vnet/IP Network Configuration

Field network

OPC Server Plant Asset

Management HMI

Controller

ENG

Vnet

Router ProSafe-RS

Vnet

System

Third party

system

Interface

Field network

OPC Server

Controller ProSafe-RS

ENG HMI Plant Asset

Management

Domain1

Domain2

Page 44: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

OPC

Open Vnet

HIS/ENG

Open Vnet

HIS

Open Vnet

PIMS

Open

3rd Pty Appl.

Open

FCS

Vnet

PLC

Open

Field Eye

Server

Open

UGS

Vnet Open

Vnet/IP Unique Architecture -- Open Communication

Open Communication (UDP/IP)

Control Communication (Vnet Protocol)

Control Communication (Vnet Protocol)

LAN2 cable

LAN1 cable

Page 45: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

- 45 -

WAC(Wide Area Communication) Router – Realize control and monitoring among remote Vnet/IP domains through WAN

lines • Available for long distance connection

• Available for using WAN lines (public network, satellite connections, etc.)

– High reliable and dedicated to Vnet/IP network • High reliable devices with redundant CPU, power, etc.

• Available for redundant wide area communication

• Availability of back up connection with different route

Local

domain

HIS FCS Wide area network line

Remote

domain

Satellite

WAC WAC

Fiber optic

Wide Area Communication with Vnet/IP

Page 46: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Engineering Function

Page 47: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Quick & High-quality Engineering

• The shutdown time for a new plant construction or reconstruction should be minimal

– A longer time results in larger financial disadvantage

• CENTUM VP provides the following configuration environment

– Total Project management

– Reuse of configuration data between several stations or plants

– Several engineers can work at the same time

– Online maintenance

– DCS Tag equalization for Historian

Page 48: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Total Project Management

• The application of all stations in a system is contained in one database

ooo

All graphics,

all control logic

are in a database

ooo HIS No.1 HIS No.2 FCS No.1 FCS No.2

Page 49: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Benefits of Project Management

• The application of all stations in a system is contained in one database

– At least 1 PC is required to generate whole over a system so there is no need to create the same or similar graphics for all the HMIs

– One PC (with configuration software) can handle several projects

– The application database of a plant can be reused on another plant by a project, by a station, by a graphic or by a control logic

• This shortens the configuration time

• This makes the configuration quality excellent because the copy source has been operational in an actual plant

– Optimum management of application data is available

Page 50: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

ooo

Plant A

(project A)

Reuse of Configuration Asset (Application)

ooo

Plant B

(project B)

ooo

Graphics can be re-used for as a basis of other graphics,

on another HIS or on the HIS in different projects

Control application can be re-used for others in the controller,

in different controllers in the project or in another project

Page 51: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

ooo

Plant A

(project A)

Reuse of Configuration Asset (Application)

ooo

Plant B

(project B)

ooo

Export CSV file to use within MS-EXCEL

Import CSV file to reuse data

•Configuration tool is not needed

for simple entry work

Tag 1 Tag 2 Tag 3

Page 52: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Concurrent Engineering

• Multiple engineers can work at the same time

Only one database

Page 53: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Advanced Debugging

• The delivery time of controller and construction time of field wiring is much longer than the delivery time of PC

– If you can advance your configuration work only with PC, you can shorten your total configuration time

– If you can advance your debugging work without actually connecting the controllers and field devices, you can shorten your total configuration time

• Yokogawa provides excellent debug capability

Virtual Test

You can debug only with a PC

Target Test

You can debug without field wiring

Back

Page 54: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Virtual test (only with PC)

– Check simple entry mistakes

– Try new control logic

– Check graphic work

– Operator training

Advanced Debugging Theory

Page 55: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Advanced Debugging Theory

Virtual test (only with PC)

– Check simple entry mistakes

– Try new control logic

– Check graphic work

– Operator training

Target test (without wiring)

– Check actual FCS CPU performance

– Check the actual relationship among each station

Page 56: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Advanced Debugging Theory

Virtual test (only with PC)

– Check simple entry mistakes

– Try new control logic

– Check graphic work

– Operator training

Target test (without wiring)

– Check actual FCS CPU performance

– Check the actual relationship among each station

Only minimum check is needed at start up!

Page 57: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

On-line maintenance

• For a more productive plant operation, online maintenance of the control application or HMI application is sometimes required

– Application modification without stopping the controller

– Application modification without affecting the rest of other application

• CENTUM VP provides the ‘On-line maintenance’ capability to meet the above needs

Page 58: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

On-line Maintenance Example

Control logic

ooo

Controlling

No effect

No effect No effect

No effect

No effect

No effect

Controller CPU

is Non-stop !

• Modifying the configuration of one of control loops, and downloading to the controller under operation

– No impact for any other loops, graphics or processes

– Controller CPU is not stopped

Page 59: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Integration with other systems

Page 60: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Unified Gateway Station - UGS

Shadow Block with alarm information

Access by tag name + item name

FIC001 FIC002 FIC003

Vnet/IP

Redundant UGS Server

MODBUS/TCP,

MODBUS/RTU,

Ethernet/IP

STARDOM 3rd party

OPC

Server

• DCS and intelligent control Subsystem

are ’truly integrated’

– UGS enable to perform supervising data and alarms of various subsystems in the same manner as CENTUM series system tag based faceplate operation

– UGS can have the Shadow blocks inside to represent the data of the subsystem and the Shadow blocks can generate alarms

• High capacity monitoring

– UGS provide high capacity monitoring large amount of subsystems

– 1 UGS can treat 256 controllers and 750,000 data items

IED via

IEC61850

Subsystem data and alarms via faceplate for the Shadow Block

Page 61: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Unified Gateway Station – UGS Redundancy

• High availability of UGS Redundant system – The switch-over is achieved by the L2SWs connected on Vnet/IP

– Specific Hirschmann L2SWes are required separately from Vnet/IP L2SWes

– 10 to 20 seconds are required for switch-over.

– Subsystem data value would be shown on HIS within 10 sec – 3 min after switching over completed.

Note: Generally speaking, the server PC failure rate is less than 1% per year. Fail-over would hardly occur.

• Cause of switch-over of UGS Redundancy – No power on UGS PC

– OS stopped on UGS PC

– UGS service stopped on UGS PC

– Vnet/IP driver stopped on UGS PC

Trouble of each subsystem does not affect to switch-over of UGS redundancy to protect communication of other subsystems.

(Active) (Stand-by)

UGS redundancy system

L2SW

FCS is recommended for critical control and monitoring subsystem to avoid black out at HIS.

Page 62: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Safety Integration

• DCS and SIS are ’truly integrated’ – SIS and DCS data are within the same window

– SIS data can be used in the FCS

– Sequence of Event (SOE) data from the SIS and DCS are integrated

Integrated Monitoring - Faceplate - Trend - Graphic - System status - Alarm - SOE

CENTUM VP FCS ProSafe-RS SCS

CENTUM VP

Time shared

on the same

network

SIS data can be

used in FCS

FCS and SCS information integrated

SOE Viewer

SCS FCS

System status

Vnet/IP SCS FCS

SCS and FCS Faceplates

Page 63: Introduktion til DCS - Insatech€¦ · “ As a result of Yokogawa’s high R&D investment and the consistent long term migration policy of the CENTUM DCS family our investment are

Plant Asset Data Integration

• Device information can be called-up

Device diagnostic

information

Device status

Help

Result of device Diagnosis