introduction to zte zxur9000 v4rnc and dimensioning

20
RNC Introduction and Configuration

Upload: bobmirk

Post on 08-Nov-2015

165 views

Category:

Documents


18 download

DESCRIPTION

RNC Introduction and Configuration fir the ZXUR9000 V4 RNC•ZXWR RNC Introduction•ZXWR RNC Dimensioning Principle•ZXWR RNC Dimensioning Example

TRANSCRIPT

  • RNC Introduction and Configuration

  • Contents

    ZXWR RNC Introduction

    ZXWR RNC Dimensioning Principle

    ZXWR RNC Dimensioning Example

  • RNC Overview

    RNC

    To CN ATM/IP

    Iub

    Iu

    Iur To RNC

    RNC in UTRAN

  • Power & Fan

    Process Unit

    RPU

    O&M Unit

    ROMU

    Peripheral Monitor Unit

    RPMU

    RA

    U

    Acce

    ss U

    nit

    RS

    U

    Sw

    itch

    Un

    it

    ZXWR RNC

    Node B

    RNC

    CN

    STM-1

    E1

    FE/GE

    485

    GPS

    Iub

    Iur

    Iu

    RNC Hardware Logical Units

    ZXWR RNC Hardware Architecture

    ROMU (RNC O&M unit)

    ROMB, CLKG, SBCX

    RAU (RNC Access Unit)

    APBE, EIPI, GIPI,SDTB, DTB,IMAB

    RSU (RNC Switch Unit)

    PSN, GLI, UIMC, GUIM and CHUB

    RPU (RNC Processing Unit)

    RCB, RUB

    RPMU( Peripheral Monitor Unit)

    PWRD: Power Distributor

    ALB: Alarm Board

  • ZXWR RNC Features ZTE Large Capacity All-IP RNC

    Modularity design, four types of shelves

    Control shelf

    Resource shelf

    Switch shelf

    Interface shelf Rich interface: E1T1/FE/GE/STM-1/CSTM-1

    ZXWR RNC 2 Racks Capacity

    Subscribers 1 Million

    Traffic Vol. 52,500Erl

    BHCA 7,000K

    Switch Capacity 80Gbps

    Data Throughput 6,600 Mbps

    Max. Node B 1,900

    Max. Cell 5,700

    Interface shelf can

    expand

    independently to

    provide access

    interface, easy for

    future evolution to

    IP UTRAN.

  • Contents

    ZXWR RNC Introduction

    ZXWR RNC Dimensioning Principle

    ZXWR RNC Dimensioning Example

  • ZXWR RNC System Structure

    Control Signal

    Data Signal

    DTB G

    U

    I

    M

    RUB

    APBE

    CHUB

    EIPI SDTB

    IMAB

    GIPI

    RCB

    P

    S

    N U

    I

    M

    C

    G

    U

    I

    M

    APBE

    CLKG

    ROMB

    GLI

    GLI

    UIMC

    Switch Shelf

    Interface Shelf

    Main

    Control Shelf

    Main

    Resource Shelf

    CHUB, ROMB,

    CLKG only for

    main control

    shelf

    SBCX only in

    main resource

    shelf

    Control shelf

    Resource shelf

    Switch shelf

    Interface shelf

    BCTC as Backboard

    Process RNC control plane (RCB)

    ROMB,CLKG,CHUB,SBCX

    BGSN as Backboard

    Process RNC user plane (RUB)

    GIPI, APBE

    BPSN as Backboard

    Supply switch unit for user plane

    PSN, GLI

    BGSN as Backboard

    DTB, SDTB, IMAB, EIPI, APBE

    SBCX

  • Control Shelf Configuration 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

    S

    B

    C

    X

    R

    C

    B

    R

    C

    B

    R

    C

    B

    R

    C

    B

    R

    C

    B

    R

    C

    B

    U

    I

    M

    C

    U

    I

    M

    C

    R

    O

    M

    B

    R

    O

    M

    B

    C

    L

    K

    G

    C

    L

    K

    G

    C

    H

    U

    B

    C

    H

    U

    B

    R

    S

    V

    B

    R

    U

    I

    M

    2

    R

    U

    I

    M

    3

    R

    M

    P

    B

    R

    M

    P

    B

    R

    C

    K

    G

    1

    R

    C

    K

    G

    2

    R

    C

    H

    B

    1

    R

    C

    H

    B

    2

    Name Full Name Configuration Principle Backup

    Principle

    ROMB RNC Operating & Maintenance Board Each RNC 1 pair 1+1

    RCB RNC Control plane processing Board BHCA & Cell & Sig Bandwidth 1+1

    CHUB Control plane HUB Each RNC 1 pair 1+1

    CLKG Clock Generator Each RNC 1 pair 1+1

    SBCX X86 Single Board Computer Each RNC 3 pcs

    OMM: 2; Log Server: 1

    1+1 for

    OMM

    UIMC Universal Interface Module of Control plane Each control shelf 1 pair 1+1

    CHUB, ROMB and CLKG

    1 pair (1+1backup) for

    one RNC in the main

    control shelf.

    Other control shelves

    only have UIMC, RCB or

    SBCX boards.

  • Board Dimensioning: RCB in Control Shelf

    RCB Items Processing

    capacity Formula

    Number of Cells 410 RCB_1=Number of Cells / 410

    No. of BHCA 500K RCB_2 =No of BHCA / 500k

    Throughput of Signaling 14Mbps RCB_IpSig=Throughput of Signaling

    / 14Mbps

  • RCB and SBCX dimensioning principle

    Detailed dimensioning principle with detailed traffic model:

    RCB=2*MAX(RCB_1, RCB_2) + 2* RCB_IpSig

    Simple dimensioning principle without detailed traffic model:

    RCB = RUB + RCB_IpSig

    RCB_IpSig =

    2, if (RUB)

  • Resource Shelf Configuration

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

    G

    I

    P

    I

    G

    I

    P

    I

    A

    P

    B

    E

    A

    P

    B

    E

    R

    U

    B

    R

    U

    B

    R

    U

    B

    R

    U

    B

    G

    U

    I

    M

    G

    U

    I

    M

    G

    I

    P

    I

    G

    I

    P

    I

    R

    U

    B

    R

    U

    B

    R

    U

    B

    R

    U

    B

    G

    I

    P

    I

    R

    G

    E

    R

    R

    G

    E

    R

    R

    G

    I

    M

    1

    R

    G

    I

    M

    1

    R

    G

    U

    M

    1

    R

    G

    U

    M

    2

    R

    M

    N

    I

    C

    R

    M

    N

    I

    C

    R

    G

    E

    R

    Each RNC has 2 GIPI

    (1+1) for OMCB in slot

    11/12 of main resource

    shelf.

    2 GUIM (1+1 backup)

    for internal switching.

    Providing interface

    boards for IU interface.

    Name Full Name Configuration Principle Backup

    Principle

    RUB RNC User plane

    processing Board Depends on user plan traffic model (CE) N+1

    GIPI Gigabit IP

    Interface 1GE or 4FE, Throughput of each Interface

    Load sharing

    or 1+1

    APBE ATM Process

    Board Enhanced

    4 ATM STM-1, Throughput of each Interface & ATM

    STM-1

    Load sharing

    or 1+1

    GUIM Universal Interface

    Module of User plane Each Resource shelf 1 Pair 1+1

  • Board Dimensioning: RUB in Resource Shelf

    Voice Data RUB number = ----------- + ----------

    2100 165 Mbps (R99 64k)

    265 Mbps (R99 384K)

    Voice processing capacity is 2100.

    For different data server, the data throughput capacity is different.

  • GIPI & APBE Dimensioning

    Interfaces Throughput Calculation

    Iub BIub = BIubData + BlubSig

    Iu

    Iu-CS BIuCS = BIuCSData + BIuCSSig

    Iu-PS BIuPS = BIuPSData + BIuPSSig

    Iur BIur= BIurData + BIurSig

    BIurData = (BIuCSData + BIuPSData) * RIur

    GIPI=IP interface throughput / 1Gbps

    APBE=MAX (ATM interface throughput / 140Mbps, STM-1 Interface / 4)

  • Interface Shelf Configuration

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

    (S)

    D

    T

    B

    (S)

    D

    T

    B

    I

    M

    A

    B

    E

    I

    P

    I

    (S)

    D

    T

    B

    (S)

    D

    T

    B

    I

    M

    A

    B

    E

    I

    P

    I

    G

    U

    I

    M

    G

    U

    I

    M

    (S)

    D

    T

    B

    (S)

    D

    T

    B

    I

    M

    A

    B

    I

    M

    A

    B

    (S)

    D

    T

    B

    R

    D

    T

    B

    R

    D

    T

    B

    R

    D

    T

    B

    R

    D

    T

    B

    R

    G

    U

    M

    1

    R

    G

    U

    M

    2

    R

    D

    T

    B

    R

    D

    T

    B

    R

    D

    T

    B

    2 GUIM (1+1 backup)

    for internal switching.

    Providing interface

    boards for IUB

    Interface boards

    depend on networking

    requirements.

    Name Full Name Configuration Principle Backup Principle

    DTB Digital Trunk Board 32E1, DTB = N_E1/32 Load sharing

    SDTB SONET Digital Trunk Board 63E1, SDTB=N_E1/63 Load sharing/1+1

    APBE ATM Process Board Enhanced 4 ATM STM-1, Throughput of each

    Interface & ATM STM-1 Load sharing/1+1

    IMAB/

    EIPI IMA & EIPI Board

    1IMAB/EIPI + 2DTB,

    1IMAB/EIPI + 1SDTB Load sharing/1+1

  • Interface boards dimensioning principle

    ATM over E1 : DTB + IMAB

    ATM over CSMT-1 : SDTB + IMAB

    IP over E1 : DTB + EIPI

    IP over CSTM-1: SDTB + EIPI

    ATM over STM-1: APBE

    FE/GE: GIPI

    IMAB dimensioning principle: 2 DTB need 1 IMAB;

    1 SDTB need 1 IMAB;

    EIPI dimensioning principle: 2 DTB need 1 EIPI;

    1 SDTB need 1 EIPI;

  • Switch Shelf Configuration

    Name Full Name Configuration Principle Backup Principle

    PSN Packet Switching Network 1 pair for switch shelf 1+1

    GLI GE Line Interface 2 pairs GUIM need 1 pair GLI 1+1

    UIMC Universal Interface Module of

    Control plane 1 pair for switch shelf 1+1

    Each GUIM has 2 GE,

    each GLI has 4 GE.

    1 GLI can connect two

    resource shelf or

    interface shelf.

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

    G

    L

    I

    G

    L

    I

    G

    L

    I

    G

    L

    I

    G

    L

    I

    G

    L

    I

    P

    S

    N

    P

    S

    N

    U

    I

    M

    C

    U

    I

    M

    C

    R

    U

    I

    M

    2

    R

    U

    I

    M

    3

  • Contents

    ZXWR RNC Introduction

    ZXWR RNC Dimensioning Principle

    ZXWR RNC Dimensioning Example

  • RNC Dimensioning Example

    RUB= CEILING (5805/2100+388/200+92/200,1) = 6; After N+1 backup, RUB=8;

    Voice Data RUB number = ----------- + ----------

    2100 165 Mbps (R99 64k)

    265 Mbps (R99 384K)

    RCB = RUB + RCB_IpSig

    RCB_IpSig =

    2, if (RUB)

  • RNC Dimensioning Result

    After 1+1 backup,

    SDTB dimensioning result is 9+9;

    APBE dimensioning result is 2+2;

    GIPI dimensioning result is 2+2;

    IUB planning :

    GLI Dimensioning result:

    Resource shelf + Interface shelf=5

    GLI=6;