introduction to the common rules for · pdf file · 2011-01-14msc.1/circ.1331...
TRANSCRIPT
![Page 1: Introduction to the Common Rules for · PDF file · 2011-01-14MSC.1/Circ.1331 contains recommended standards which include ISO Standards ... MSC/Circ.1231 Recommendation](https://reader031.vdocuments.site/reader031/viewer/2022030415/5aa09b977f8b9a71178e5d92/html5/thumbnails/1.jpg)
Regulatory Update
INTERTANKO Latin American Panel
Regulatory Update
INTERTANKO Latin American Panel
15/16 October 2009Adam W. Moilanen, SVP Operations
ABS Americas
![Page 2: Introduction to the Common Rules for · PDF file · 2011-01-14MSC.1/Circ.1331 contains recommended standards which include ISO Standards ... MSC/Circ.1231 Recommendation](https://reader031.vdocuments.site/reader031/viewer/2022030415/5aa09b977f8b9a71178e5d92/html5/thumbnails/2.jpg)
2
Reg
ulat
ory
Upd
ate –
Augu
st 2
009
Regulatory UpdateRegulatory Update
SOLAS -
AmendmentsMARPOL IV -
Revision
MARPOL VI –
RevisionBWM Convention –
not in force
Ship Recycling –
New ConventionISM Code –
Revision
Future Regulatory Developments
![Page 3: Introduction to the Common Rules for · PDF file · 2011-01-14MSC.1/Circ.1331 contains recommended standards which include ISO Standards ... MSC/Circ.1231 Recommendation](https://reader031.vdocuments.site/reader031/viewer/2022030415/5aa09b977f8b9a71178e5d92/html5/thumbnails/3.jpg)
3
Reg
ulat
ory
Upd
ate –
Augu
st 2
009
ECDIS RequirementsECDIS Requirements
Ship Type Date of Build
GT Compliance Date
Passenger ≥
1 July 12 GT ≥
500
At deliveryTanker ≥
1 July 12 GT ≥
3k
Cargo ShipexcludingTankers
≥
1 July 13 GT ≥
10k
≥
1 July 14 3k ≥
GT < 10k
Passenger < 1 July 12 GT ≥
500 1st
Svy ≥
1 July 14
Tanker < 1 July 12 GT ≥
3k 1st
Svy ≥
1 July 15
Cargo ShipexcludingTankers
< 1 July 13 GT ≥
50k 1st
Svy ≥
1 July 16
< 1 July 13 20k ≥
GT < 50k 1st
Svy ≥
1 July 17
< 1 July 13 10k ≥
GT < 20k 1st
Svy ≥
1 July 18
Electronic Chart Display and Information SystemSOLAS Amendment - MSC.282(86)Performance Standards – A.817(19)
Implementation (New and Existing Ships)
May exempt ECDIS if ship scrapped within 2 yrs of compliance
![Page 4: Introduction to the Common Rules for · PDF file · 2011-01-14MSC.1/Circ.1331 contains recommended standards which include ISO Standards ... MSC/Circ.1231 Recommendation](https://reader031.vdocuments.site/reader031/viewer/2022030415/5aa09b977f8b9a71178e5d92/html5/thumbnails/4.jpg)
4
Reg
ulat
ory
Upd
ate –
Augu
st 2
009
BNWAS RequirementsBNWAS Requirements
Ship Type Date of Build GT Compliance Date
Cargo ≥
1 July 11 GT ≥
150 At deliveryPassenger ≥
1 July 11 - At deliveryPassenger < 1 July 11 - 1st
Svy ≥
1 July 12
Cargo < 1 July 11GT ≥
3k 1st
Svy ≥
1 July 12500 ≥
GT < 3k 1st
Svy ≥
1 July 13150 ≥
GT < 500 1st
Svy ≥
1 July 14
Bridge Navigational Watch Alarm System (BNWAS)SOLAS Amendment - MSC.282(86)Performance Standards - MSC.128(75)
Implementation (New and Existing Ships)
BNWAS installed < 1 July 11 may be exempted from compliance with MSC.125(78)
![Page 5: Introduction to the Common Rules for · PDF file · 2011-01-14MSC.1/Circ.1331 contains recommended standards which include ISO Standards ... MSC/Circ.1231 Recommendation](https://reader031.vdocuments.site/reader031/viewer/2022030415/5aa09b977f8b9a71178e5d92/html5/thumbnails/5.jpg)
5
Reg
ulat
ory
Upd
ate –
Augu
st 2
009
SOLAS –
Means of Embarkation/DisembarkationSOLAS –
Means of Embarkation/DisembarkationApplication of SOLAS II-1/3-9 - MSC.256(84)
All ships > 500 gtNew: Keel laid > 1 Jan 2010Existing: Keel laid < 1 Jan 10
Design Standard (new equipment)Installations on new ships MSC.1/Circ.1331 containsrecommended standards whichinclude ISO StandardsGangways/accommodation laddersMax load/inclination to be marked
Onboard Certification (new & existing equipment)Initial operational test for new installationsStatic load test of gangway and winches every five years:- MWL applied for new ladders- if MWL unknown for existing gangways, owner nominates loadAnnual SLE Survey- visual inspection of gangway and winches- review log-book of inspection, maintenance and repairs- wires maintained as per SOLAS III/20.4 (lifeboat falls)
![Page 6: Introduction to the Common Rules for · PDF file · 2011-01-14MSC.1/Circ.1331 contains recommended standards which include ISO Standards ... MSC/Circ.1231 Recommendation](https://reader031.vdocuments.site/reader031/viewer/2022030415/5aa09b977f8b9a71178e5d92/html5/thumbnails/6.jpg)
6
Reg
ulat
ory
Upd
ate –
Augu
st 2
009
SOLAS –
Emergency Towing ProcedureSOLAS –
Emergency Towing Procedure
Application - MSC.256(84)All ships > 500 gt, includingtankers ≥ 20,000 dwtNew and existing ships
CompliancePassenger ships by 1 Jan 10Cargo ships:- keel laid ≥ 1 Jan 10 - at delivery- keel laid < 1 Jan 10 - by 1 Jan 12
Emergency Towing Booklet (approval not required):May be part of ISM emergency preparednessArrangement drawingsInventory of equipmentMeans of communicationMethod of conducting tow
Emergency Towing Guidance (MSC.1/Circ.1255)Recommendations for assessing and developing the procedure
![Page 7: Introduction to the Common Rules for · PDF file · 2011-01-14MSC.1/Circ.1331 contains recommended standards which include ISO Standards ... MSC/Circ.1231 Recommendation](https://reader031.vdocuments.site/reader031/viewer/2022030415/5aa09b977f8b9a71178e5d92/html5/thumbnails/7.jpg)
7
Reg
ulat
ory
Upd
ate –
Augu
st 2
009
SOLAS –
Long Range ID & Tracking System (LRIT)SOLAS –
Long Range ID & Tracking System (LRIT)Application
Cargo ships (incl HSC) > 300 gtPassenger ships (incl pass HSC)Self-propelled MODUs (except on station)
ComplianceNew ships (keel laid > 31 Dec 08) at deliveryExisting ships: at First Safety Radio Survey :≥ 31 Dec 2008 for A1/A2/A3≥ 01 July 2009 for A1/A2/A3/A4
N/A to ships with AIS operated exclusively in Sea Area A1LRIT Survey and Certification
Type Approval:- Radio/Navigation equipment TA per SOLAS IV/14 or V/19-1; or- IEC 60945; or- SOLAS-approved SSAS
Initial survey (within SLR window)- controlled by SLE Certificate/Record:- ASP must be recognized by flag State; and- Conformance test by ASP must correspond to equipment
Renewal/Annual Surveys:- Check that conformance test report corresponds to equipment
![Page 8: Introduction to the Common Rules for · PDF file · 2011-01-14MSC.1/Circ.1331 contains recommended standards which include ISO Standards ... MSC/Circ.1231 Recommendation](https://reader031.vdocuments.site/reader031/viewer/2022030415/5aa09b977f8b9a71178e5d92/html5/thumbnails/8.jpg)
8
Reg
ulat
ory
Upd
ate –
Augu
st 2
009
MARPOL Annex IV –
Recent InterpretationsMARPOL Annex IV –
Recent Interpretations
Sewage Treatment Plants- enhanced performance- “installed on or after 1 Jan 2010” means:
(a)
Installed on new ships -
built ≥
1 Jan 2010
(b)
Installed on existing ships if: -
contractual delivery date
≥
1 Jan 2010; or -
equipment delivery date
≥
1 Jan 2010, if no CDD
![Page 9: Introduction to the Common Rules for · PDF file · 2011-01-14MSC.1/Circ.1331 contains recommended standards which include ISO Standards ... MSC/Circ.1231 Recommendation](https://reader031.vdocuments.site/reader031/viewer/2022030415/5aa09b977f8b9a71178e5d92/html5/thumbnails/9.jpg)
9
Reg
ulat
ory
Upd
ate –
Augu
st 2
009
Adopted SOx (Sulphur Content) LimitsAdopted SOx (Sulphur Content) Limits
* Note: Effective year (2020 or 2025)
will be decided by 2018.
+
Note: Alternative Technology
is also acceptable and
includes Exhaust Gas
Cleaning Systems
and onboard blending
MEPC approved the 200nmi (0.10%) USA/Canada ECA
(Current ECAs –
Baltic and North Sea)
Global (1 January)
Emission Control Areas (SOx, NOx and PM controls)
Entry Into Force Date
≥
2012 to
< 2020/25* ≥
2020/25*
≥
1 July 2010
to < 1 Jan 2015
≥
1 Jan 2015
Limit (mm) 3.5% + 0.5% + 1.0% + 0.10% +
Current Limit (m/m) 4.5 % 1.5 %
![Page 10: Introduction to the Common Rules for · PDF file · 2011-01-14MSC.1/Circ.1331 contains recommended standards which include ISO Standards ... MSC/Circ.1231 Recommendation](https://reader031.vdocuments.site/reader031/viewer/2022030415/5aa09b977f8b9a71178e5d92/html5/thumbnails/10.jpg)
10
Reg
ulat
ory
Upd
ate –
Augu
st 2
009
Adopted NOx Emission LimitsAdopted NOx Emission Limits
Ship Constructed(≥1 January)
Application of Requirements
EmissionLimits
Compliance at engine’s delivery except as below
1990to
2000Retroactiveto existingengines
Engine size > 5000 kW and
≥
90 liters / cylinder Tier I
1st
IAPP Renewal Survey≥
12 mo after IMO advisedby Party of availability
(physical and cost) of “upgrade kit”
2000 ≤
x <2011
> 130 kW
----2011 ≤
x <2016Tier II
≥
2016 Operation outside of ECA≥
2016two exceptions + Tier III Operation within ECA
RPM
Total Weight of NO2
Emission (g/kWh) Relative NO2
Reduction from Tier I
< 130 130 ≤
n < 2000 ≥
2000
Tier I 17.0 45*n(-0.2) 9.8 CurrentTier II 14.4 44*n(-0.23) 7.7 15.5% -
21.8%Tier III 3.4 9*n(-0.2) 2.0 80%
+ L<24m if used for recreational purposes or total power <750kW if unable to achieve due to design limitations
![Page 11: Introduction to the Common Rules for · PDF file · 2011-01-14MSC.1/Circ.1331 contains recommended standards which include ISO Standards ... MSC/Circ.1231 Recommendation](https://reader031.vdocuments.site/reader031/viewer/2022030415/5aa09b977f8b9a71178e5d92/html5/thumbnails/11.jpg)
11
Reg
ulat
ory
Upd
ate –
Augu
st 2
009
BWM Convention –
Methods of TreatmentBWM Convention –
Methods of Treatment
Exchange Treatment Systems Retention/Reception
SequentialFlow
Through Dilution
Mechanical
Filtration
Cyclonic Separation
Physical
Ultraviolet Lights
Cavitation
Deoxygenation
Chemical
Biocides
Electrolytic Chlorination
![Page 12: Introduction to the Common Rules for · PDF file · 2011-01-14MSC.1/Circ.1331 contains recommended standards which include ISO Standards ... MSC/Circ.1231 Recommendation](https://reader031.vdocuments.site/reader031/viewer/2022030415/5aa09b977f8b9a71178e5d92/html5/thumbnails/12.jpg)
12
Reg
ulat
ory
Upd
ate –
Augu
st 2
009
BW Management Convention -
Implementation BW Management Convention -
Implementation
Ballast Cpty (m3)
Build Date
First Intermediate or Renewal Survey, whichever occurs first, after the anniversary date of delivery in the respective year ®
2009 2010 2011 2012 2013 2014 2015 2016 2017
<1500
<
2009 D1
or D2 D2 ®
in 2009 D1;
D2 by “2nd
Annual but not beyond 31 Dec 11”
or EIF, whichever is later (Note)
>2009 D2 (at delivery or EIF, whichever is later)
≥1500
or
≤5000
<
2009 D1
or D2 D2 ®
in 2009 D1;
D2 by “2nd
Annual but not beyond 31 Dec 11”
or EIF, whichever is later (Note)
>2009 D2 (at delivery or EIF, whichever is later)
>5000< 2012 D1
or D2 D2 ®
>
2012 N/A D2 (at delivery or EIF, whichever is later)
Enters Into Force (EIF)12 months after ratification by 30 States with 35% world’s GTAs of Feb 2009, 17 States (15.35% GT) have ratified the ConventionA.1005(25) delays D2 implementation for ships built in 2009 w/ Bst Cpty < 5000m3
Implementation (D1 = Exchange Standard, D2 = Biological Standard)Ships of signatory flag States / All ships in jurisdictional waters of signatory States
Note: Signatory States may not invoke delayed D2 enforcement permitted by A.1005(25).
![Page 13: Introduction to the Common Rules for · PDF file · 2011-01-14MSC.1/Circ.1331 contains recommended standards which include ISO Standards ... MSC/Circ.1231 Recommendation](https://reader031.vdocuments.site/reader031/viewer/2022030415/5aa09b977f8b9a71178e5d92/html5/thumbnails/13.jpg)
13
Reg
ulat
ory
Upd
ate –
Augu
st 2
009
BWM Convention -
System ConsiderationsBWM Convention -
System Considerations
•
Estimated Operating Cost -
$0.02 to $0.40 / m3
•
Location -
hazardous areas
•
Footprint size- 3m2
to 70m2
-
depending on capacity•
Flow Rates
-
250 to 2500 m3/hr•
Ease of Operation
•
Maintenance•
Training
![Page 14: Introduction to the Common Rules for · PDF file · 2011-01-14MSC.1/Circ.1331 contains recommended standards which include ISO Standards ... MSC/Circ.1231 Recommendation](https://reader031.vdocuments.site/reader031/viewer/2022030415/5aa09b977f8b9a71178e5d92/html5/thumbnails/14.jpg)
14
Reg
ulat
ory
Upd
ate –
Augu
st 2
009
US BWM Regulations …..in a nutshellUS BWM Regulations …..in a nutshell
•
Applicability: All vessels operating or bound to US ports •
Exemptions:
-
Crude oil tanker in coastwise trade
-
Vessel operating within one COTP zone -
Vessel on innocent passage
•
Documentation:–
Maintain BWM Plan
–
Report 24 hours before arrival–
Maintain records on board for two years
•
Exchange Ballast Water: –
At water depth > 2000m and ≥
200nmi offshore
•
Good Operational Practices: –
Remove tank sediments
–
Rinse anchors/lockers–
Minimize uptake near dredging operations
–
Train personnel•
Penalties: –
Knowing-violation is class C felony
–
Civil penalty not > $27,500/day of continuous violation
![Page 15: Introduction to the Common Rules for · PDF file · 2011-01-14MSC.1/Circ.1331 contains recommended standards which include ISO Standards ... MSC/Circ.1231 Recommendation](https://reader031.vdocuments.site/reader031/viewer/2022030415/5aa09b977f8b9a71178e5d92/html5/thumbnails/15.jpg)
15
Reg
ulat
ory
Upd
ate –
Augu
st 2
009
Scope of ApplicationAll new ships – keel laid on/after entry into forceExisting ships – to the extent practicable for hardware
Certification of Recycling FacilitiesGovernment authorizesCompetent Authorities toapprove Facilities in its jurisdictionSafe and environmentally soundremoval/disposal of materials
Preparation for recyclingShip Recycling Plan prepared by Recycling Facility with ship ownerSRP is to address Inventory of Hazardous Materials:Part I - Yard responsible for hardware (new build/modifications)
- Authorized “Experts” for hardware (existing ships)Parts II/III - Owner records wastes/stores
Entry Into Force Provisions – 24 months after:15 States ratifying States with at least 40% world’s GTCombined maximum annual ship recycling volume of ratifying States during preceding 10 years is at least 3% GT of ratifying States.
Ship Recycling ConventionShip Recycling Convention
![Page 16: Introduction to the Common Rules for · PDF file · 2011-01-14MSC.1/Circ.1331 contains recommended standards which include ISO Standards ... MSC/Circ.1231 Recommendation](https://reader031.vdocuments.site/reader031/viewer/2022030415/5aa09b977f8b9a71178e5d92/html5/thumbnails/16.jpg)
16
Reg
ulat
ory
Upd
ate –
Augu
st 2
009
Ship Recycling –
Final Certification ProcessShip Recycling –
Final Certification Process
Ship Recycling
Facility
Ship Owner
Final survey and IRRC
cannot be concluded
Final survey complete
and IRRC issued
IHM represents shipSRP addresses IHMSRP contains
safe-for-entry/hot workSRF has valid DASR
SRP
Flag State /RO
noyes
noyes
CA issues DASR
Competent Authority
SRP approvedExplicit approval
CA confirms SRP received without
objection in 14 days
Tacit approval
Final Survey
![Page 17: Introduction to the Common Rules for · PDF file · 2011-01-14MSC.1/Circ.1331 contains recommended standards which include ISO Standards ... MSC/Circ.1231 Recommendation](https://reader031.vdocuments.site/reader031/viewer/2022030415/5aa09b977f8b9a71178e5d92/html5/thumbnails/17.jpg)
17
Reg
ulat
ory
Upd
ate –
Augu
st 2
009
ISM Code revised by MSC.273(85)Implementation ≥ 1 July 2010SMS to be periodically reviewed
by MasterCorrective action to include measures
to prevent recurrenceSMC renewal window same
as SOLAS certificatesCompany to carry out mandatory
annual internal audits
ISM Guidelines - A.913(22)Under revision based on experience gainedIACS EG/ISM-ISPS developing input
MSC/Circ.1231RecommendationCargo and special purpose ships- if GRT < 500 GRT, no longer exempted if ITC 69 > 500 gt)
Recommend compliance not later than 1 Jan 2010
ISM Code RevisionsISM Code Revisions
![Page 18: Introduction to the Common Rules for · PDF file · 2011-01-14MSC.1/Circ.1331 contains recommended standards which include ISO Standards ... MSC/Circ.1231 Recommendation](https://reader031.vdocuments.site/reader031/viewer/2022030415/5aa09b977f8b9a71178e5d92/html5/thumbnails/18.jpg)
18
Reg
ulat
ory
Upd
ate –
Augu
st 2
009
18
Regulation Under Development –
What’s on the horizonRegulation Under Development –
What’s on the horizon
Cargo Tank Coating Standard
Similar in scope to ballast tank coating standardApplies to new crude oil tankersCombination carriers excluded
![Page 19: Introduction to the Common Rules for · PDF file · 2011-01-14MSC.1/Circ.1331 contains recommended standards which include ISO Standards ... MSC/Circ.1231 Recommendation](https://reader031.vdocuments.site/reader031/viewer/2022030415/5aa09b977f8b9a71178e5d92/html5/thumbnails/19.jpg)
19
Reg
ulat
ory
Upd
ate –
Augu
st 2
009
19
Keep Pace with Regulatory DevelopmentsKeep Pace with Regulatory Developments
http://www.eagle.org/eagleExternalPortalWEB/