introduction to ramlog
TRANSCRIPT
![Page 1: Introduction to RamLog](https://reader035.vdocuments.site/reader035/viewer/2022062419/5583f1b9d8b42a66288b4d35/html5/thumbnails/1.jpg)
1
Introduction R&M Technologies
and RamLog
![Page 2: Introduction to RamLog](https://reader035.vdocuments.site/reader035/viewer/2022062419/5583f1b9d8b42a66288b4d35/html5/thumbnails/2.jpg)
2
Agenda
• Introduction to R&M Technologies
• R&M Technologies - Capabilities
• RamLog Overview
• Demonstration
• Summary
![Page 3: Introduction to RamLog](https://reader035.vdocuments.site/reader035/viewer/2022062419/5583f1b9d8b42a66288b4d35/html5/thumbnails/3.jpg)
3
Introduction to R&M Technologies
• Established in 1990 (19 years old) Specializing in Reliability, Maintainability and Logistic Support Analysis
• Start to develop RamLog in 1992
(16 years old)
![Page 4: Introduction to RamLog](https://reader035.vdocuments.site/reader035/viewer/2022062419/5583f1b9d8b42a66288b4d35/html5/thumbnails/4.jpg)
4
R&M Technologies Capabilities
• LSA Data Development and Management
• RamLog Software
• R&M Engineering
• Logistic Support Analysis
• Modeling (LCC, RAM, Spare Part, Logistic Support)
• FRACAS
![Page 5: Introduction to RamLog](https://reader035.vdocuments.site/reader035/viewer/2022062419/5583f1b9d8b42a66288b4d35/html5/thumbnails/5.jpg)
5
Early Design
Production/Construction
Phase Out
Development
Operational Phase
System Baseline InformationRamLog Information Management
Edition
Maintenance Management System (Transactional Database)
RAMLOG.NET
Decision Making ModelRamLog Simulation Edition
Whole Life Management
![Page 6: Introduction to RamLog](https://reader035.vdocuments.site/reader035/viewer/2022062419/5583f1b9d8b42a66288b4d35/html5/thumbnails/6.jpg)
6
Information Management Edition
![Page 7: Introduction to RamLog](https://reader035.vdocuments.site/reader035/viewer/2022062419/5583f1b9d8b42a66288b4d35/html5/thumbnails/7.jpg)
7
Support Analysis Process
Phase BFailure Analysis
Phase ASystem Definition
Phase CTask
Identification
Phase DDetail Task
Analysis
Develop a System
Breakdown FBS / PBS
Perform FMECA / RCM
analysis
Identify the tasks and
the task level
Identify the tasks requirements and develop detail task description
What does the system consist of ?
How can it fail ?What is the
failure criticality ?How can it
be detected ?Can the failure be prevented ?
Should it be redesigned ?
What tasks are required to correct/ prevent a failure ?
Who is going to do these tasks ?(at what level ?)
What is the most cost effective
support concept ?(last opportunity
before detail analysis)
What is required to perform
these tasks? (all support elements)
How, in detail will the task been performed ?
(for TMs)
![Page 8: Introduction to RamLog](https://reader035.vdocuments.site/reader035/viewer/2022062419/5583f1b9d8b42a66288b4d35/html5/thumbnails/8.jpg)
8
Early Design
Production/Construction
Phase Out
Development
Operational Phase
PBS/FBS
Functional and/or Physical Breakdown Structure
Internal and External LCN Structure which provide flexibility (i.e. floating nodes and reference nodes)
csv file Import/Export
Data Checking and Data Checker
![Page 9: Introduction to RamLog](https://reader035.vdocuments.site/reader035/viewer/2022062419/5583f1b9d8b42a66288b4d35/html5/thumbnails/9.jpg)
9
Early Design
Production/Construction
Phase Out
Development
Operational Phase
FMECA
Functional and/or Physical FMECA can be performed
![Page 10: Introduction to RamLog](https://reader035.vdocuments.site/reader035/viewer/2022062419/5583f1b9d8b42a66288b4d35/html5/thumbnails/10.jpg)
10
Early Design
Production/Construction
Phase Out
Development
Operational Phase
RCM Analysis
MSG-3 logic but user have the ability to built its own logic
![Page 11: Introduction to RamLog](https://reader035.vdocuments.site/reader035/viewer/2022062419/5583f1b9d8b42a66288b4d35/html5/thumbnails/11.jpg)
11
Early Design
Production/Construction
Phase Out
Development
Operational Phase
Detail Task Analysis
Task Documentation Editor for procedural tasks linked with imbedded figures and photos
![Page 12: Introduction to RamLog](https://reader035.vdocuments.site/reader035/viewer/2022062419/5583f1b9d8b42a66288b4d35/html5/thumbnails/12.jpg)
12
Early Design
Production/Construction
Phase Out
Development
Operational Phase
Task Network Model
Task Network Diagrams to define the task sequence for simulation purposes
![Page 13: Introduction to RamLog](https://reader035.vdocuments.site/reader035/viewer/2022062419/5583f1b9d8b42a66288b4d35/html5/thumbnails/13.jpg)
13
Early Design
Production/Construction
Phase Out
Development
Operational Phase
Illustrated Parts Breakdown (IPB) Editor
IPB Editor with “hot spots” and imbedded figures linked to the PBS
![Page 14: Introduction to RamLog](https://reader035.vdocuments.site/reader035/viewer/2022062419/5583f1b9d8b42a66288b4d35/html5/thumbnails/14.jpg)
14
Early Design
Production/Construction
Phase Out
Development
Operational Phase
Interactive Electronic Technical Manual/Publication IETM/P
chm (windows help)
html (web based, publish to RAMLOG.NET or intranet)
MS Word (2007) - RSA-MIL-STD-122 printable copy format)
Information sets and data modules (based on AECMA S1000D)
![Page 15: Introduction to RamLog](https://reader035.vdocuments.site/reader035/viewer/2022062419/5583f1b9d8b42a66288b4d35/html5/thumbnails/15.jpg)
15
Simulation Edition
![Page 16: Introduction to RamLog](https://reader035.vdocuments.site/reader035/viewer/2022062419/5583f1b9d8b42a66288b4d35/html5/thumbnails/16.jpg)
16
Early Design
Production/Construction
Phase Out
Development
Operational Phase
Simulation Planner
Event planner to schedule events for simulation purposes (acquisitions, operations, etc)
![Page 17: Introduction to RamLog](https://reader035.vdocuments.site/reader035/viewer/2022062419/5583f1b9d8b42a66288b4d35/html5/thumbnails/17.jpg)
17
Early Design
Production/Construction
Phase Out
Development
Operational Phase
Operational Model
Operational Model to simulation the operation, life cycle of the system/plant
System Groups into clusters
Operational phases, parameters distribution based
![Page 18: Introduction to RamLog](https://reader035.vdocuments.site/reader035/viewer/2022062419/5583f1b9d8b42a66288b4d35/html5/thumbnails/18.jpg)
18
Early Design
Production/Construction
Phase Out
Development
Operational Phase
Deploy & Support Model
Deploy & Support Model to simulate the flow of Work Orders, Job Cards, Item Orders and Delivery Notes
![Page 19: Introduction to RamLog](https://reader035.vdocuments.site/reader035/viewer/2022062419/5583f1b9d8b42a66288b4d35/html5/thumbnails/19.jpg)
19
Early Design
Production/Construction
Phase Out
Development
Operational Phase
RBD and FTA
RBDs and FTAs linked to the failure modes to simulation Reliability and Availability
Reliability and Availability Culprit Identification
![Page 20: Introduction to RamLog](https://reader035.vdocuments.site/reader035/viewer/2022062419/5583f1b9d8b42a66288b4d35/html5/thumbnails/20.jpg)
20
Early Design
Production/Construction
Phase Out
Development
Operational Phase
Animation Model
Animation Model to assist during the model verification process
![Page 21: Introduction to RamLog](https://reader035.vdocuments.site/reader035/viewer/2022062419/5583f1b9d8b42a66288b4d35/html5/thumbnails/21.jpg)
21
Early Design
Production/Construction
Phase Out
Development
Operational Phase
Simulation Results
Life Cycle Cost Results
![Page 22: Introduction to RamLog](https://reader035.vdocuments.site/reader035/viewer/2022062419/5583f1b9d8b42a66288b4d35/html5/thumbnails/22.jpg)
22
Early Design
Production/Construction
Phase Out
Development
Operational Phase
Simulation Results Continue
Statistical results including Availability, Reliability, Spare Parts Requirements, Delay Times - Histograms and Distributions
![Page 23: Introduction to RamLog](https://reader035.vdocuments.site/reader035/viewer/2022062419/5583f1b9d8b42a66288b4d35/html5/thumbnails/23.jpg)
23
RAMLOG.NET
![Page 24: Introduction to RamLog](https://reader035.vdocuments.site/reader035/viewer/2022062419/5583f1b9d8b42a66288b4d35/html5/thumbnails/24.jpg)
24
Early Design
Production/Construction
Phase Out
Development
Operational Phase
RAMLOG.NET
Job Card
Item Orders
Delivery Notes
web based IETM/P
Work Orders
Configuration AdministratorAdministrator
System ManagerSupervisorMaintainer
Stores PersonnelData Capture
![Page 25: Introduction to RamLog](https://reader035.vdocuments.site/reader035/viewer/2022062419/5583f1b9d8b42a66288b4d35/html5/thumbnails/25.jpg)
25
RAMLOG.NET
It provides System Managers, Supervisors, Maintainers and Store Personnel thee ability to manage equipment assets, with respect to:
• stock and inventory control
• system utilisation and operational tracking
• as-maintained configuration control (i.e. configuration control during maintenance and serial number tracking)
• collect system and equipment failure data
• collect maintenance and repair data
• collect supply and turn-around times/data
• implementation of a Failure Recording Analysis and Corrective Action System (FRACAS)
![Page 26: Introduction to RamLog](https://reader035.vdocuments.site/reader035/viewer/2022062419/5583f1b9d8b42a66288b4d35/html5/thumbnails/26.jpg)
26
Early Design
Production/Construction
Phase Out
Development
Operational Phase
Whole Life Management
Estimations Reality