introduction to efficiency te items 35 to 40 · introduction to efficiency te items 35 to 40 nancy...
TRANSCRIPT
![Page 1: Introduction to Efficiency TE Items 35 to 40 · Introduction to Efficiency TE Items 35 to 40 Nancy Graham Director, Air Navigation Bureau 01 October 2010. 2 ... –Regional training](https://reader033.vdocuments.site/reader033/viewer/2022052923/5f0407257e708231d40bf5d3/html5/thumbnails/1.jpg)
International Civil Aviation Organization
Introduction to Efficiency TE Items 35 to 40
Nancy GrahamDirector, Air Navigation Bureau
01 October 2010
![Page 2: Introduction to Efficiency TE Items 35 to 40 · Introduction to Efficiency TE Items 35 to 40 Nancy Graham Director, Air Navigation Bureau 01 October 2010. 2 ... –Regional training](https://reader033.vdocuments.site/reader033/viewer/2022052923/5f0407257e708231d40bf5d3/html5/thumbnails/2.jpg)
2
Importance to ICAO
Efficiency is ICAO’s Core Business; name changed to Sustainability this triennium
Budget Document outlines Plans this Triennium
Efficiency/Sustainability is integrally linked to Safety and Environment
Over $50 Billion investment will be made by contracting States in the coming years
ICAO General Assembly 2010
![Page 3: Introduction to Efficiency TE Items 35 to 40 · Introduction to Efficiency TE Items 35 to 40 Nancy Graham Director, Air Navigation Bureau 01 October 2010. 2 ... –Regional training](https://reader033.vdocuments.site/reader033/viewer/2022052923/5f0407257e708231d40bf5d3/html5/thumbnails/3.jpg)
3
Optimizing Airspace Today
Need: Expedite benefits-driven PBN implementation via PBN TF
Plans this upcoming triennium:
– Joint ICAO/Industry Go-Teams (4 per year)
– Airspace Design Workshops (4 per year)
– Ops Approval Workshops (3 per year)
– Continuous Descent/Climb Operations Workshops (3 per year)
– Implementation of the NEW ICAO Flight Plan Form
– New PBN Guidance with focus on:• Increased route predictability
• Increased aerodrome accessibility
ICAO General Assembly 2010
![Page 4: Introduction to Efficiency TE Items 35 to 40 · Introduction to Efficiency TE Items 35 to 40 Nancy Graham Director, Air Navigation Bureau 01 October 2010. 2 ... –Regional training](https://reader033.vdocuments.site/reader033/viewer/2022052923/5f0407257e708231d40bf5d3/html5/thumbnails/4.jpg)
4
Optimizing Airspace Today
Need: Reductions in Separation Minima
Plans this upcoming triennium:
– Use of 3 NM separation between aircraft utilizing ADS-B & Multilateration technologies (2012)
– Use of 2.5NM separation between in-trail aircraft up to 20 miles from runway threshold (2013)
– Allow PBN aircraft to auto-navigate in closely spaced parallel runway operations (2013)
ICAO General Assembly 2010
![Page 5: Introduction to Efficiency TE Items 35 to 40 · Introduction to Efficiency TE Items 35 to 40 Nancy Graham Director, Air Navigation Bureau 01 October 2010. 2 ... –Regional training](https://reader033.vdocuments.site/reader033/viewer/2022052923/5f0407257e708231d40bf5d3/html5/thumbnails/5.jpg)
5
Optimizing Airspace Today
Need: Civil Military Cooperation/Shared Airspace
Plans this upcoming triennium:– “Civil Military Cooperation in ATM” (Cir 330) Oct 2010
– 5 Collaborative Workshops • AFI, ASPAC, Eastern Europe & Middle East
– 2nd Global ATM Management Forum on Civil/Military Cooperation (2014)
ICAO General Assembly 2010
![Page 6: Introduction to Efficiency TE Items 35 to 40 · Introduction to Efficiency TE Items 35 to 40 Nancy Graham Director, Air Navigation Bureau 01 October 2010. 2 ... –Regional training](https://reader033.vdocuments.site/reader033/viewer/2022052923/5f0407257e708231d40bf5d3/html5/thumbnails/6.jpg)
6
Optimizing Airspace Today
Need: UAS operations in non-segregated airspace
Plans this triennium:
– “Unmanned Aircraft Systems” Circular on ICAONET (Oct 2010)
– UAS Symposium (3-5 April 2013)
– Funding (or secondment) required for Manual & SARPs/PANS development
ICAO General Assembly 2010
![Page 7: Introduction to Efficiency TE Items 35 to 40 · Introduction to Efficiency TE Items 35 to 40 Nancy Graham Director, Air Navigation Bureau 01 October 2010. 2 ... –Regional training](https://reader033.vdocuments.site/reader033/viewer/2022052923/5f0407257e708231d40bf5d3/html5/thumbnails/7.jpg)
7
Optimizing Airspace Today
Need: Demonstrate ATM’s contribution to environment by measuring enhancements
Plans this upcoming triennium:
– Standardized tool for measuring & reporting fuel and CO2 savings from operational improvements
– Regional training 2011
– Report on first benefits in 2012
ICAO General Assembly 2010
![Page 8: Introduction to Efficiency TE Items 35 to 40 · Introduction to Efficiency TE Items 35 to 40 Nancy Graham Director, Air Navigation Bureau 01 October 2010. 2 ... –Regional training](https://reader033.vdocuments.site/reader033/viewer/2022052923/5f0407257e708231d40bf5d3/html5/thumbnails/8.jpg)
8
Tomorrow’s Aviation System
Global Air Navigation Plan outlines the Future Aviation System
But -
– When do States upgrade CNS/AIM infrastructure?
– When do Operators equip with avionics?
Need -
– Revised Global Air Navigation Plan with
• Global Block Upgrades defined by Operational Results
• Appendices for Avionics and Communications
Plan -
– Global Air Navigation Forum (21 – 23 Sep 2011)
– 12th Air Navigation Conference (19 – 30 Nov 2012)
ICAO General Assembly 2010
![Page 9: Introduction to Efficiency TE Items 35 to 40 · Introduction to Efficiency TE Items 35 to 40 Nancy Graham Director, Air Navigation Bureau 01 October 2010. 2 ... –Regional training](https://reader033.vdocuments.site/reader033/viewer/2022052923/5f0407257e708231d40bf5d3/html5/thumbnails/9.jpg)
9
How?
Step 1 – Brought people together– Initial Symposium (2008)
– Convened Standards Organization Roundtable
– Established working agreements with Standards Organisations on work programmes
ICAO General Assembly 2010
![Page 10: Introduction to Efficiency TE Items 35 to 40 · Introduction to Efficiency TE Items 35 to 40 Nancy Graham Director, Air Navigation Bureau 01 October 2010. 2 ... –Regional training](https://reader033.vdocuments.site/reader033/viewer/2022052923/5f0407257e708231d40bf5d3/html5/thumbnails/10.jpg)
10
How? (cont’d)
Step 2 – Getting the right information– Reviewed Individual Regional Plans
• Developed gap analysis
– Looking at common areas for possible Block Upgrades
– Dialoguing with expert Panels• ASP, ACP, NSP, AISAIMSG
– Next - Global Air Navigation Forum• Listen to our industry partners (21 – 23 Sept 2011)
– Will propose regional and global operational trials• Generate agreement on what needs to be tested
ICAO General Assembly 2010
![Page 11: Introduction to Efficiency TE Items 35 to 40 · Introduction to Efficiency TE Items 35 to 40 Nancy Graham Director, Air Navigation Bureau 01 October 2010. 2 ... –Regional training](https://reader033.vdocuments.site/reader033/viewer/2022052923/5f0407257e708231d40bf5d3/html5/thumbnails/11.jpg)
11
How (cont’d)
Step 3 – Delivering the goods
– 12th Air Navigation Conference (Nov 2012)• International agreement on strategic direction
• Identification of what performance standards are necessary - when and by whom
– New Global Air Navigation Plan• Global agreement on common Block Upgrades
• Appendices for Avionics, Communications, Navigation, Surveillance & AIM
– Transparent and real-time regional planning• Documented with electronic Air Navigation Plan
ICAO General Assembly 2010
![Page 12: Introduction to Efficiency TE Items 35 to 40 · Introduction to Efficiency TE Items 35 to 40 Nancy Graham Director, Air Navigation Bureau 01 October 2010. 2 ... –Regional training](https://reader033.vdocuments.site/reader033/viewer/2022052923/5f0407257e708231d40bf5d3/html5/thumbnails/12.jpg)
Electronic Safety Tools
What this effort will mean to you?
– Presents ICAO information & data in a way that makes sense to you
– Keeps you informed in 10 minutes or less
– Access & update information in real-time
– See demonstrations in the ICAO Booth
SARPs Management & Reporting Tool (2011)
– Lets you easily do all things related to SARPs (filing, research, etc.)
Online Aircraft Safety Information System (2011)
– Share aircraft & operator information with others
Online interactive maps (2012)
– Up-to-date information when planning Air Navigation improvements
– Keep track of implementation