Page 1: Introduction to Connected Cost - taradigm.com

Copyright © 2019, Oracle and/or its affiliates. All rights reserved. | Oracle Confidential

Primavera Review

October 2020

Comparison of P6 and Primavera Cloud Functionality

Page 2: Introduction to Connected Cost - taradigm.com

Safe Harbor Statement

The following is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making purchasing decisions. The development, release, and timing of any features or functionality described for Oracle’s products remains at the sole discretion of Oracle.

Confidential – Oracle Internal

Page 3: Introduction to Connected Cost - taradigm.com

Primavera Cloud Introduction & Application Positioning

CPM Scheduling & Resource Management

Lean Scheduling

Cost Management

Mobile Applications

Risk Management

Enterprise Reporting, Dashboards & Portfolios

Summary

Agenda

Page 4: Introduction to Connected Cost - taradigm.com

C&E GBU Application Positioning

4

Primavera Cloud Portfolios & Enterprise Reporting

UnifierFacilities

Management

P6 EPPMProgram Mgmt

CPM Scheduling

Resource Mgmt

Risk Register

Primavera Cloud ProjectsProgram Mgmt

Risk Analysis

CPM Scheduling

Lean / Tasks

Resource Mgmt

Aconex Collaboration Platform (Documents & Correspondences)

Connected Cost

& ContractsBIM / Models FieldTenders

Plan Build Operate

WorkflowsBusiness

IntelligenceMobile Integration History Task MgmtCloud ioT

TPM

Progress

Claims

Page 5: Introduction to Connected Cost - taradigm.com

Oracle Primavera P6 EPPM

Activity ID Activity Name OD RD Start Finish TF FF Contract

Sample ProjSample Project 175 175 04-Jan-16 0 08-Sep-16 0 0

Pre-ConstruPre-Construction 170 170 04-Jan-16 0 31-Aug-16 1 0

DesignDesign 95 95 04-Jan-16 0 16-May-16 0 0

Design: SDesign: Site & Structure 60 60 04-Jan-16 0 28-Mar-16 3 0

A1000 Prepare & Issue SD Pkg - Site & Structure 10 10 04-Jan-16 0 15-Jan-16 0 0 0 CON-001

A1010 Prepare & Issue DD Pkg - Site & Structure 10 10 18-Jan-16 0 29-Jan-16 0 0 0 CON-001

A1020 Prepare & Issue 50% CD Pkg - Site & Structure 20 20 01-Feb-16 29-Feb-16 3 0 CON-001

A1030 Prepare & Issue 100% CD Pkg - Site & Structure 20 20 01-Mar-16 28-Mar-16 3 0 CON-001

Design: EDesign: Exterior 75 75 01-Feb-16 16-May-16 0 0

A1040 Prepare & Issue SD Pkg - Exterior 15 15 01-Feb-16 22-Feb-16 0 0 CON-001

A1050 Prepare & Issue DD Pkg - Exterior 20 20 23-Feb-16 21-Mar-16 0 0 CON-001

A1060 Prepare & Issue 50% CD Pkg - Exterior 20 20 22-Mar-16 18-Apr-16 0 0 0 CON-001

A1070 Prepare & Issue 100% CD Pkg - Exterior 20 20 19-Apr-16 0 16-May-16 0 0 CON-001

SubmittalsSubmittals 110 110 29-Mar-16 31-Aug-16 1 0

SubmittalSubmittals: Concrete 15 15 29-Mar-16 18-Apr-16 0 18 0

A1080 Prepare & Submit - Concrete Mix 5 5 29-Mar-16 04-Apr-16 0 18 0 CON-001

A1090 Contractor Review - Concrete Mix 5 5 05-Apr-16 0 11-Apr-16 0 18 0 CON-001

A1100 A/E Approve - Concrete Mix 5 5 12-Apr-16 0 18-Apr-16 0 18 15 CON-001

SubmittalSubmittals: Rebar 30 30 29-Mar-16 09-May-16 18 0

A1110 Prepare & Submit - Rebar 5 5 29-Mar-16 04-Apr-16 0 8 0 CON-001

A1120 Contractor Review - Rebar 5 5 05-Apr-16 0 11-Apr-16 0 8 0 CON-001

A1130 A/E Approve - Rebar 10 10 12-Apr-16 0 25-Apr-16 0 8 0 CON-001

A1140 Fabricate & Deliver - Rebar Foundations 5 5 26-Apr-16 0 02-May-16 8 0 CON-001

A1150 Fabricate & Deliver - Rebar Decks 5 5 03-May-16 09-May-16 18 15 CON-001

SubmittalSubmittals: Curtainwall & Storefront 95 95 19-Apr-16 0 31-Aug-16 1 0

A1400 Prepare & Submit - Curtainwall & Storefront 15 15 19-Apr-16 0 09-May-16 0 0 CON-003

A1410 Contractor Review - Curtainwall & Storefront 5 5 10-May-16 16-May-16 0 0 CON-003

A1420 A/E Approve - Curtainwall & Storefront 10 10 17-May-16 31-May-16 0 0 CON-003

A1430 Fabricate & Deliver - Curtainwall L02/03 30 30 01-Jun-16 0 13-Jul-16 0 0 0 CON-003

A1440 Fabricate & Deliver - Curtainwall L04/05 10 10 14-Jul-16 0 27-Jul-16 0 0 0 CON-003

A1450 Fabricate & Deliver - Curtainwall L06/07 10 10 28-Jul-16 0 10-Aug-16 0 0 CON-003

A1460 Fabricate & Deliver - Curtainwall L08/09 5 5 11-Aug-16 0 17-Aug-16 1 0 CON-003

A1470 Fabricate & Deliver - Storefront L01 10 10 18-Aug-16 31-Aug-16 1 1 CON-003

Jan Feb Mar Apr May Jun Jul Aug Sep ct

2016

Prepare & Issue SD Pkg - Site & Structure

Prepare & Issue DD Pkg - Site & Structure

Prepare & Issue 50% CD Pkg - Site & Struc

Prepare & Issue 100% CD Pkg - Site

Prepare & Issue SD Pkg - Exterior

Prepare & Issue DD Pkg - Exterior

Prepare & Issue 50% CD Pkg - E

Prepare & Issue 100% CD P

Prepare & Submit - Concrete Mix

Contractor Review - Concrete Mix

A/E Approve - Concrete Mix

Prepare & Submit - Rebar

Contractor Review - Rebar

A/E Approve - Rebar

Fabricate & Deliver - Rebar Fo

Fabricate & Deliver - Rebar D

Prepare & Submit - Curtainw

Contractor Review - Curtain

A/E Approve - Curtainwa

Fabricate & Del

Fabricate & D

Fabricate

Fabricate

Fabric

Project ID: 00000-00

Print Date: 14-Oct-15, 04:40 PM Sample Project

Layout: 00 - Activites by WBS

TASK filter: All Activities

Page: 1 of 2 User: admin

Data Date: 04-Jan-16

Activity ID Activity Name OD RD Start Finish TF FF Contract

Sample ProjSample Project 175 175 04-Jan-16 0 08-Sep-16 0 0

Pre-ConstruPre-Construction 170 170 04-Jan-16 0 31-Aug-16 1 0

DesignDesign 95 95 04-Jan-16 0 16-May-16 0 0

Design: SDesign: Site & Structure 60 60 04-Jan-16 0 28-Mar-16 3 0

A1000 Prepare & Issue SD Pkg - Site & Structure 10 10 04-Jan-16 0 15-Jan-16 0 0 0 CON-001

A1010 Prepare & Issue DD Pkg - Site & Structure 10 10 18-Jan-16 0 29-Jan-16 0 0 0 CON-001

A1020 Prepare & Issue 50% CD Pkg - Site & Structure 20 20 01-Feb-16 29-Feb-16 3 0 CON-001

A1030 Prepare & Issue 100% CD Pkg - Site & Structure 20 20 01-Mar-16 28-Mar-16 3 0 CON-001

Design: EDesign: Exterior 75 75 01-Feb-16 16-May-16 0 0

A1040 Prepare & Issue SD Pkg - Exterior 15 15 01-Feb-16 22-Feb-16 0 0 CON-001

A1050 Prepare & Issue DD Pkg - Exterior 20 20 23-Feb-16 21-Mar-16 0 0 CON-001

A1060 Prepare & Issue 50% CD Pkg - Exterior 20 20 22-Mar-16 18-Apr-16 0 0 0 CON-001

A1070 Prepare & Issue 100% CD Pkg - Exterior 20 20 19-Apr-16 0 16-May-16 0 0 CON-001

SubmittalsSubmittals 110 110 29-Mar-16 31-Aug-16 1 0

SubmittalSubmittals: Concrete 15 15 29-Mar-16 18-Apr-16 0 18 0

A1080 Prepare & Submit - Concrete Mix 5 5 29-Mar-16 04-Apr-16 0 18 0 CON-001

A1090 Contractor Review - Concrete Mix 5 5 05-Apr-16 0 11-Apr-16 0 18 0 CON-001

A1100 A/E Approve - Concrete Mix 5 5 12-Apr-16 0 18-Apr-16 0 18 15 CON-001

SubmittalSubmittals: Rebar 30 30 29-Mar-16 09-May-16 18 0

A1110 Prepare & Submit - Rebar 5 5 29-Mar-16 04-Apr-16 0 8 0 CON-001

A1120 Contractor Review - Rebar 5 5 05-Apr-16 0 11-Apr-16 0 8 0 CON-001

A1130 A/E Approve - Rebar 10 10 12-Apr-16 0 25-Apr-16 0 8 0 CON-001

A1140 Fabricate & Deliver - Rebar Foundations 5 5 26-Apr-16 0 02-May-16 8 0 CON-001

A1150 Fabricate & Deliver - Rebar Decks 5 5 03-May-16 09-May-16 18 15 CON-001

SubmittalSubmittals: Curtainwall & Storefront 95 95 19-Apr-16 0 31-Aug-16 1 0

A1400 Prepare & Submit - Curtainwall & Storefront 15 15 19-Apr-16 0 09-May-16 0 0 CON-003

A1410 Contractor Review - Curtainwall & Storefront 5 5 10-May-16 16-May-16 0 0 CON-003

A1420 A/E Approve - Curtainwall & Storefront 10 10 17-May-16 31-May-16 0 0 CON-003

A1430 Fabricate & Deliver - Curtainwall L02/03 30 30 01-Jun-16 0 13-Jul-16 0 0 0 CON-003

A1440 Fabricate & Deliver - Curtainwall L04/05 10 10 14-Jul-16 0 27-Jul-16 0 0 0 CON-003

A1450 Fabricate & Deliver - Curtainwall L06/07 10 10 28-Jul-16 0 10-Aug-16 0 0 CON-003

A1460 Fabricate & Deliver - Curtainwall L08/09 5 5 11-Aug-16 0 17-Aug-16 1 0 CON-003

A1470 Fabricate & Deliver - Storefront L01 10 10 18-Aug-16 31-Aug-16 1 1 CON-003

Jan Feb Mar Apr May Jun Jul Aug Sep ct

2016

Prepare & Issue SD Pkg - Site & Structure

Prepare & Issue DD Pkg - Site & Structure

Prepare & Issue 50% CD Pkg - Site & Struc

Prepare & Issue 100% CD Pkg - Site

Prepare & Issue SD Pkg - Exterior

Prepare & Issue DD Pkg - Exterior

Prepare & Issue 50% CD Pkg - E

Prepare & Issue 100% CD P

Prepare & Submit - Concrete Mix

Contractor Review - Concrete Mix

A/E Approve - Concrete Mix

Prepare & Submit - Rebar

Contractor Review - Rebar

A/E Approve - Rebar

Fabricate & Deliver - Rebar Fo

Fabricate & Deliver - Rebar D

Prepare & Submit - Curtainw

Contractor Review - Curtain

A/E Approve - Curtainwa

Fabricate & Del

Fabricate & D

Fabricate

Fabricate

Fabric

Project ID: 00000-00

Print Date: 14-Oct-15, 04:40 PM Sample Project

Layout: 00 - Activites by WBS

TASK filter: All Activities

Page: 1 of 2 User: admin

Data Date: 04-Jan-16

Activity ID Activity Name OD RD Start Finish TF FF Contract

Sample ProjSample Project 175 175 04-Jan-16 0 08-Sep-16 0 0

Pre-ConstruPre-Construction 170 170 04-Jan-16 0 31-Aug-16 1 0

DesignDesign 95 95 04-Jan-16 0 16-May-16 0 0

Design: SDesign: Site & Structure 60 60 04-Jan-16 0 28-Mar-16 3 0

A1000 Prepare & Issue SD Pkg - Site & Structure 10 10 04-Jan-16 0 15-Jan-16 0 0 0 CON-001

A1010 Prepare & Issue DD Pkg - Site & Structure 10 10 18-Jan-16 0 29-Jan-16 0 0 0 CON-001

A1020 Prepare & Issue 50% CD Pkg - Site & Structure 20 20 01-Feb-16 29-Feb-16 3 0 CON-001

A1030 Prepare & Issue 100% CD Pkg - Site & Structure 20 20 01-Mar-16 28-Mar-16 3 0 CON-001

Design: EDesign: Exterior 75 75 01-Feb-16 16-May-16 0 0

A1040 Prepare & Issue SD Pkg - Exterior 15 15 01-Feb-16 22-Feb-16 0 0 CON-001

A1050 Prepare & Issue DD Pkg - Exterior 20 20 23-Feb-16 21-Mar-16 0 0 CON-001

A1060 Prepare & Issue 50% CD Pkg - Exterior 20 20 22-Mar-16 18-Apr-16 0 0 0 CON-001

A1070 Prepare & Issue 100% CD Pkg - Exterior 20 20 19-Apr-16 0 16-May-16 0 0 CON-001

SubmittalsSubmittals 110 110 29-Mar-16 31-Aug-16 1 0

SubmittalSubmittals: Concrete 15 15 29-Mar-16 18-Apr-16 0 18 0

A1080 Prepare & Submit - Concrete Mix 5 5 29-Mar-16 04-Apr-16 0 18 0 CON-001

A1090 Contractor Review - Concrete Mix 5 5 05-Apr-16 0 11-Apr-16 0 18 0 CON-001

A1100 A/E Approve - Concrete Mix 5 5 12-Apr-16 0 18-Apr-16 0 18 15 CON-001

SubmittalSubmittals: Rebar 30 30 29-Mar-16 09-May-16 18 0

A1110 Prepare & Submit - Rebar 5 5 29-Mar-16 04-Apr-16 0 8 0 CON-001

A1120 Contractor Review - Rebar 5 5 05-Apr-16 0 11-Apr-16 0 8 0 CON-001

A1130 A/E Approve - Rebar 10 10 12-Apr-16 0 25-Apr-16 0 8 0 CON-001

A1140 Fabricate & Deliver - Rebar Foundations 5 5 26-Apr-16 0 02-May-16 8 0 CON-001

A1150 Fabricate & Deliver - Rebar Decks 5 5 03-May-16 09-May-16 18 15 CON-001

SubmittalSubmittals: Curtainwall & Storefront 95 95 19-Apr-16 0 31-Aug-16 1 0

A1400 Prepare & Submit - Curtainwall & Storefront 15 15 19-Apr-16 0 09-May-16 0 0 CON-003

A1410 Contractor Review - Curtainwall & Storefront 5 5 10-May-16 16-May-16 0 0 CON-003

A1420 A/E Approve - Curtainwall & Storefront 10 10 17-May-16 31-May-16 0 0 CON-003

A1430 Fabricate & Deliver - Curtainwall L02/03 30 30 01-Jun-16 0 13-Jul-16 0 0 0 CON-003

A1440 Fabricate & Deliver - Curtainwall L04/05 10 10 14-Jul-16 0 27-Jul-16 0 0 0 CON-003

A1450 Fabricate & Deliver - Curtainwall L06/07 10 10 28-Jul-16 0 10-Aug-16 0 0 CON-003

A1460 Fabricate & Deliver - Curtainwall L08/09 5 5 11-Aug-16 0 17-Aug-16 1 0 CON-003

A1470 Fabricate & Deliver - Storefront L01 10 10 18-Aug-16 31-Aug-16 1 1 CON-003

Jan Feb Mar Apr May Jun Jul Aug Sep ct

2016

Prepare & Issue SD Pkg - Site & Structure

Prepare & Issue DD Pkg - Site & Structure

Prepare & Issue 50% CD Pkg - Site & Struc

Prepare & Issue 100% CD Pkg - Site

Prepare & Issue SD Pkg - Exterior

Prepare & Issue DD Pkg - Exterior

Prepare & Issue 50% CD Pkg - E

Prepare & Issue 100% CD P

Prepare & Submit - Concrete Mix

Contractor Review - Concrete Mix

A/E Approve - Concrete Mix

Prepare & Submit - Rebar

Contractor Review - Rebar

A/E Approve - Rebar

Fabricate & Deliver - Rebar Fo

Fabricate & Deliver - Rebar D

Prepare & Submit - Curtainw

Contractor Review - Curtain

A/E Approve - Curtainwa

Fabricate & Del

Fabricate & D

Fabricate

Fabricate

Fabric

Project ID: 00000-00

Print Date: 14-Oct-15, 04:40 PM Sample Project

Layout: 00 - Activites by WBS

TASK filter: All Activities

Page: 1 of 2 User: admin

Data Date: 04-Jan-16

Combined Primavera EcosystemIntegrated P6, CPM & Lean Scheduling

Oracle Primavera

Cloud

• Bi-directional Web Services Integration OOTB

• Export - Import

Page 6: Introduction to Connected Cost - taradigm.com

Why Primavera Cloud is different?

1 versionAll customers are on the same version all the time. The latest updates are applied, reducing

time to market

Cloud OnlyPrimavera Cloud is only available in the cloud. No hassle setup for

customers. Get started right away. Easy for collaboration

SimplicityEasy to use, intuitive interface

helps users get things done quickly.

Integrated PlatformManage portfolios, schedules,

resources, risks & project documents on a single

platform

Page 7: Introduction to Connected Cost - taradigm.com

Primavera Positioning – High Level

P6 EPPM Professional Client Primavera Cloud

On-Premise Client Machine Cloud – Access anywhere

Skilled Power Schedulers Wider Community (Ease of Use & In-App Enablement)

Large Complex Projects – Mid/Long Range Planning Small-Medium Projects – Mid/Long Range Planning

Short Range Planning/ Lean/Task Scheduling

Qualitative Risk Mgmt Qualitative & Quantitative Risk Mgmt

Portfolio Management & Capital/Scenario Planning

Earned Value / S-CurvesFunding & Top Down Cost PlanningEarned Value (Roadmap)

General Reporting Capabilities

Major New Functionality

Workflows/Task Management

Page 8: Introduction to Connected Cost - taradigm.com

Why Primavera Cloud?Capital Planning & Portfolio Management

• Visibility of all proposed and active work• Review key metrics delivered or forecasted • Review Spending Plans, Resource Demand

and carry out business planning (later)

Page 9: Introduction to Connected Cost - taradigm.com

Schedule Risk for Non-Specialists

• Simple End to End Process –designed for non-specialists

• Fully integrated with schedule for faster results

• One Integrated Pre and Post Response Plan (not multiple files)

• Configurable Workflows & Forms• Propose New Risks

• Risk Review Process

• Program Risks & Register

• Enhanced Mean Impacts

• Continuous development

Page 10: Introduction to Connected Cost - taradigm.com

Digitise Short Range Planning with Lean Tasks

Task Analytics e.g. PPC Reporting

Task Gantt, Printing & CPM Integration

Flexible Reporting

Collaborative Whiteboard Task Planning

Oracle Confidential – Highly Restricted10

Page 11: Introduction to Connected Cost - taradigm.com

11

PlatformWorkspaces

Ide

as

Po

rtfo

lio

sP

roje

cts

(P

rop

osa

ls,

Pro

gra

ms)

Teams

Primavera Cloud Architecture – its very different!

Page 12: Introduction to Connected Cost - taradigm.com

Introduction & About Today

CPM Scheduling & Resource Management

Lean Scheduling

Cost Management

Mobile Applications

Risk Management

Enterprise Reporting, Dashboards & Portfolios

Summary

Agenda

Page 13: Introduction to Connected Cost - taradigm.com

P6 Specific Capability Primavera Cloud specific capability

Guide

P6 Professional Primavera Cloud & ProfessionalP6 Web

Cross Functional Capability – shared across applications

High Level Comparison

Page 14: Introduction to Connected Cost - taradigm.com

Skilled UsersOn-Premise & Cloud (SaaS)P6 Professional (offline mode)Scheduling & Gantt Chart Specific e.g. multiple float paths

Reflections, Claim Digger Report

Ease of Use & In-App EnablementCloud (SaaS)Flexible BaseliningScenarios & Historic SchedulesDynamic Schedule Comparison

Planning & SchedulingP6 Professional Primavera Cloud &

ProfessionalP6 Web

Shared P6 DNAMature Scope Definition – WBSExtensive Planning, Scheduling & Gantt Charting CapabilitiesStatusing Methods (Activity and/or Resource Driven, Spotlight, Mobile)Multi user access & Activity OwnershipTemplating (Project, WBS)

Page 15: Introduction to Connected Cost - taradigm.com

Tracking GanttRequest & Allocation Process

Workspace Mgmt of ResourcesDemand / FTE Planning (w/out schedule)

Role based Levelling

Resource PlanningP6 Professional Primavera Cloud &

ProfessionalP6 Web

Role & Resource Planning – Rolling Wave SupportMature Assignment Planning & Profiles – simple multi activity assignmentsEnterprise Visibility of Capacity & UtilisationAggregation by Customer CodesResource Levelling

Page 16: Introduction to Connected Cost - taradigm.com

.. Specific Program ObjectProgram Risks, Top Down CostsProgram Lean Tasks (Planning)

Program PlanningP6 Professional Primavera Cloud &

ProfessionalP6 Web

Flexible Programs – EPS, Codes, Easy GroupingInter-dependency mgmt. & Program SchedulingResource Planning & LevellingProgram Lean Tasks (Activity Integration)

Page 17: Introduction to Connected Cost - taradigm.com

Integrated & Easy 14 pt Check & Investigate

Schedule Quality & Forensic Checking

Enterprise View for holistic reporting across projects

User configured tolerances drive traffic lighting and reportingDrill down into highlighted

activities

Page 18: Introduction to Connected Cost - taradigm.com

Introduction & About Today

CPM Scheduling & Resource Management

Lean Scheduling

Cost Management

Mobile Applications

Risk Management

Enterprise Reporting, Dashboards & Portfolios

Summary

Agenda

Page 19: Introduction to Connected Cost - taradigm.com

..

Digital Whiteboard PlanningCollaborative Task ManagementMobile Task ProgressAnalysis of PPC and Re-commitments

Short Range Planning or Lean SchedulingP6 Professional Primavera Cloud &

ProfessionalP6 Web

Integrated Task & Activity Data for CPM Updates

Page 20: Introduction to Connected Cost - taradigm.com

Democratised & Integrated Project Execution

Lean Schedulers (PrimCloud)

CPM Schedulers(P6 or PrimCloud)

Activity ID Activity Name OD RD Start Finish TF FF Contract

Sample ProjSample Project 175 175 04-Jan-16 0 08-Sep-16 0 0

Pre-ConstruPre-Construction 170 170 04-Jan-16 0 31-Aug-16 1 0

DesignDesign 95 95 04-Jan-16 0 16-May-16 0 0

Design: SDesign: Site & Structure 60 60 04-Jan-16 0 28-Mar-16 3 0

A1000 Prepare & Issue SD Pkg - Site & Structure 10 10 04-Jan-16 0 15-Jan-16 0 0 0 CON-001

A1010 Prepare & Issue DD Pkg - Site & Structure 10 10 18-Jan-16 0 29-Jan-16 0 0 0 CON-001

A1020 Prepare & Issue 50% CD Pkg - Site & Structure 20 20 01-Feb-16 29-Feb-16 3 0 CON-001

A1030 Prepare & Issue 100% CD Pkg - Site & Structure 20 20 01-Mar-16 28-Mar-16 3 0 CON-001

Design: EDesign: Exterior 75 75 01-Feb-16 16-May-16 0 0

A1040 Prepare & Issue SD Pkg - Exterior 15 15 01-Feb-16 22-Feb-16 0 0 CON-001

A1050 Prepare & Issue DD Pkg - Exterior 20 20 23-Feb-16 21-Mar-16 0 0 CON-001

A1060 Prepare & Issue 50% CD Pkg - Exterior 20 20 22-Mar-16 18-Apr-16 0 0 0 CON-001

A1070 Prepare & Issue 100% CD Pkg - Exterior 20 20 19-Apr-16 0 16-May-16 0 0 CON-001

SubmittalsSubmittals 110 110 29-Mar-16 31-Aug-16 1 0

SubmittalSubmittals: Concrete 15 15 29-Mar-16 18-Apr-16 0 18 0

A1080 Prepare & Submit - Concrete Mix 5 5 29-Mar-16 04-Apr-16 0 18 0 CON-001

A1090 Contractor Review - Concrete Mix 5 5 05-Apr-16 0 11-Apr-16 0 18 0 CON-001

A1100 A/E Approve - Concrete Mix 5 5 12-Apr-16 0 18-Apr-16 0 18 15 CON-001

SubmittalSubmittals: Rebar 30 30 29-Mar-16 09-May-16 18 0

A1110 Prepare & Submit - Rebar 5 5 29-Mar-16 04-Apr-16 0 8 0 CON-001

A1120 Contractor Review - Rebar 5 5 05-Apr-16 0 11-Apr-16 0 8 0 CON-001

A1130 A/E Approve - Rebar 10 10 12-Apr-16 0 25-Apr-16 0 8 0 CON-001

A1140 Fabricate & Deliver - Rebar Foundations 5 5 26-Apr-16 0 02-May-16 8 0 CON-001

A1150 Fabricate & Deliver - Rebar Decks 5 5 03-May-16 09-May-16 18 15 CON-001

SubmittalSubmittals: Curtainwall & Storefront 95 95 19-Apr-16 0 31-Aug-16 1 0

A1400 Prepare & Submit - Curtainwall & Storefront 15 15 19-Apr-16 0 09-May-16 0 0 CON-003

A1410 Contractor Review - Curtainwall & Storefront 5 5 10-May-16 16-May-16 0 0 CON-003

A1420 A/E Approve - Curtainwall & Storefront 10 10 17-May-16 31-May-16 0 0 CON-003

A1430 Fabricate & Deliver - Curtainwall L02/03 30 30 01-Jun-16 0 13-Jul-16 0 0 0 CON-003

A1440 Fabricate & Deliver - Curtainwall L04/05 10 10 14-Jul-16 0 27-Jul-16 0 0 0 CON-003

A1450 Fabricate & Deliver - Curtainwall L06/07 10 10 28-Jul-16 0 10-Aug-16 0 0 CON-003

A1460 Fabricate & Deliver - Curtainwall L08/09 5 5 11-Aug-16 0 17-Aug-16 1 0 CON-003

A1470 Fabricate & Deliver - Storefront L01 10 10 18-Aug-16 31-Aug-16 1 1 CON-003

Jan Feb Mar Apr May Jun Jul Aug Sep ct

2016

Prepare & Issue SD Pkg - Site & Structure

Prepare & Issue DD Pkg - Site & Structure

Prepare & Issue 50% CD Pkg - Site & Struc

Prepare & Issue 100% CD Pkg - Site

Prepare & Issue SD Pkg - Exterior

Prepare & Issue DD Pkg - Exterior

Prepare & Issue 50% CD Pkg - E

Prepare & Issue 100% CD P

Prepare & Submit - Concrete Mix

Contractor Review - Concrete Mix

A/E Approve - Concrete Mix

Prepare & Submit - Rebar

Contractor Review - Rebar

A/E Approve - Rebar

Fabricate & Deliver - Rebar Fo

Fabricate & Deliver - Rebar D

Prepare & Submit - Curtainw

Contractor Review - Curtain

A/E Approve - Curtainwa

Fabricate & Del

Fabricate & D

Fabricate

Fabricate

Fabric

Project ID: 00000-00

Print Date: 14-Oct-15, 04:40 PM Sample Project

Layout: 00 - Activites by WBS

TASK filter: All Activities

Page: 1 of 2 User: admin

Data Date: 04-Jan-16

Activity ID Activity Name OD RD Start Finish TF FF Contract

Sample ProjSample Project 175 175 04-Jan-16 0 08-Sep-16 0 0

Pre-ConstruPre-Construction 170 170 04-Jan-16 0 31-Aug-16 1 0

DesignDesign 95 95 04-Jan-16 0 16-May-16 0 0

Design: SDesign: Site & Structure 60 60 04-Jan-16 0 28-Mar-16 3 0

A1000 Prepare & Issue SD Pkg - Site & Structure 10 10 04-Jan-16 0 15-Jan-16 0 0 0 CON-001

A1010 Prepare & Issue DD Pkg - Site & Structure 10 10 18-Jan-16 0 29-Jan-16 0 0 0 CON-001

A1020 Prepare & Issue 50% CD Pkg - Site & Structure 20 20 01-Feb-16 29-Feb-16 3 0 CON-001

A1030 Prepare & Issue 100% CD Pkg - Site & Structure 20 20 01-Mar-16 28-Mar-16 3 0 CON-001

Design: EDesign: Exterior 75 75 01-Feb-16 16-May-16 0 0

A1040 Prepare & Issue SD Pkg - Exterior 15 15 01-Feb-16 22-Feb-16 0 0 CON-001

A1050 Prepare & Issue DD Pkg - Exterior 20 20 23-Feb-16 21-Mar-16 0 0 CON-001

A1060 Prepare & Issue 50% CD Pkg - Exterior 20 20 22-Mar-16 18-Apr-16 0 0 0 CON-001

A1070 Prepare & Issue 100% CD Pkg - Exterior 20 20 19-Apr-16 0 16-May-16 0 0 CON-001

SubmittalsSubmittals 110 110 29-Mar-16 31-Aug-16 1 0

SubmittalSubmittals: Concrete 15 15 29-Mar-16 18-Apr-16 0 18 0

A1080 Prepare & Submit - Concrete Mix 5 5 29-Mar-16 04-Apr-16 0 18 0 CON-001

A1090 Contractor Review - Concrete Mix 5 5 05-Apr-16 0 11-Apr-16 0 18 0 CON-001

A1100 A/E Approve - Concrete Mix 5 5 12-Apr-16 0 18-Apr-16 0 18 15 CON-001

SubmittalSubmittals: Rebar 30 30 29-Mar-16 09-May-16 18 0

A1110 Prepare & Submit - Rebar 5 5 29-Mar-16 04-Apr-16 0 8 0 CON-001

A1120 Contractor Review - Rebar 5 5 05-Apr-16 0 11-Apr-16 0 8 0 CON-001

A1130 A/E Approve - Rebar 10 10 12-Apr-16 0 25-Apr-16 0 8 0 CON-001

A1140 Fabricate & Deliver - Rebar Foundations 5 5 26-Apr-16 0 02-May-16 8 0 CON-001

A1150 Fabricate & Deliver - Rebar Decks 5 5 03-May-16 09-May-16 18 15 CON-001

SubmittalSubmittals: Curtainwall & Storefront 95 95 19-Apr-16 0 31-Aug-16 1 0

A1400 Prepare & Submit - Curtainwall & Storefront 15 15 19-Apr-16 0 09-May-16 0 0 CON-003

A1410 Contractor Review - Curtainwall & Storefront 5 5 10-May-16 16-May-16 0 0 CON-003

A1420 A/E Approve - Curtainwall & Storefront 10 10 17-May-16 31-May-16 0 0 CON-003

A1430 Fabricate & Deliver - Curtainwall L02/03 30 30 01-Jun-16 0 13-Jul-16 0 0 0 CON-003

A1440 Fabricate & Deliver - Curtainwall L04/05 10 10 14-Jul-16 0 27-Jul-16 0 0 0 CON-003

A1450 Fabricate & Deliver - Curtainwall L06/07 10 10 28-Jul-16 0 10-Aug-16 0 0 CON-003

A1460 Fabricate & Deliver - Curtainwall L08/09 5 5 11-Aug-16 0 17-Aug-16 1 0 CON-003

A1470 Fabricate & Deliver - Storefront L01 10 10 18-Aug-16 31-Aug-16 1 1 CON-003

Jan Feb Mar Apr May Jun Jul Aug Sep ct

2016

Prepare & Issue SD Pkg - Site & Structure

Prepare & Issue DD Pkg - Site & Structure

Prepare & Issue 50% CD Pkg - Site & Struc

Prepare & Issue 100% CD Pkg - Site

Prepare & Issue SD Pkg - Exterior

Prepare & Issue DD Pkg - Exterior

Prepare & Issue 50% CD Pkg - E

Prepare & Issue 100% CD P

Prepare & Submit - Concrete Mix

Contractor Review - Concrete Mix

A/E Approve - Concrete Mix

Prepare & Submit - Rebar

Contractor Review - Rebar

A/E Approve - Rebar

Fabricate & Deliver - Rebar Fo

Fabricate & Deliver - Rebar D

Prepare & Submit - Curtainw

Contractor Review - Curtain

A/E Approve - Curtainwa

Fabricate & Del

Fabricate & D

Fabricate

Fabricate

Fabric

Project ID: 00000-00

Print Date: 14-Oct-15, 04:40 PM Sample Project

Layout: 00 - Activites by WBS

TASK filter: All Activities

Page: 1 of 2 User: admin

Data Date: 04-Jan-16

Activity ID Activity Name OD RD Start Finish TF FF Contract

Sample ProjSample Project 175 175 04-Jan-16 0 08-Sep-16 0 0

Pre-ConstruPre-Construction 170 170 04-Jan-16 0 31-Aug-16 1 0

DesignDesign 95 95 04-Jan-16 0 16-May-16 0 0

Design: SDesign: Site & Structure 60 60 04-Jan-16 0 28-Mar-16 3 0

A1000 Prepare & Issue SD Pkg - Site & Structure 10 10 04-Jan-16 0 15-Jan-16 0 0 0 CON-001

A1010 Prepare & Issue DD Pkg - Site & Structure 10 10 18-Jan-16 0 29-Jan-16 0 0 0 CON-001

A1020 Prepare & Issue 50% CD Pkg - Site & Structure 20 20 01-Feb-16 29-Feb-16 3 0 CON-001

A1030 Prepare & Issue 100% CD Pkg - Site & Structure 20 20 01-Mar-16 28-Mar-16 3 0 CON-001

Design: EDesign: Exterior 75 75 01-Feb-16 16-May-16 0 0

A1040 Prepare & Issue SD Pkg - Exterior 15 15 01-Feb-16 22-Feb-16 0 0 CON-001

A1050 Prepare & Issue DD Pkg - Exterior 20 20 23-Feb-16 21-Mar-16 0 0 CON-001

A1060 Prepare & Issue 50% CD Pkg - Exterior 20 20 22-Mar-16 18-Apr-16 0 0 0 CON-001

A1070 Prepare & Issue 100% CD Pkg - Exterior 20 20 19-Apr-16 0 16-May-16 0 0 CON-001

SubmittalsSubmittals 110 110 29-Mar-16 31-Aug-16 1 0

SubmittalSubmittals: Concrete 15 15 29-Mar-16 18-Apr-16 0 18 0

A1080 Prepare & Submit - Concrete Mix 5 5 29-Mar-16 04-Apr-16 0 18 0 CON-001

A1090 Contractor Review - Concrete Mix 5 5 05-Apr-16 0 11-Apr-16 0 18 0 CON-001

A1100 A/E Approve - Concrete Mix 5 5 12-Apr-16 0 18-Apr-16 0 18 15 CON-001

SubmittalSubmittals: Rebar 30 30 29-Mar-16 09-May-16 18 0

A1110 Prepare & Submit - Rebar 5 5 29-Mar-16 04-Apr-16 0 8 0 CON-001

A1120 Contractor Review - Rebar 5 5 05-Apr-16 0 11-Apr-16 0 8 0 CON-001

A1130 A/E Approve - Rebar 10 10 12-Apr-16 0 25-Apr-16 0 8 0 CON-001

A1140 Fabricate & Deliver - Rebar Foundations 5 5 26-Apr-16 0 02-May-16 8 0 CON-001

A1150 Fabricate & Deliver - Rebar Decks 5 5 03-May-16 09-May-16 18 15 CON-001

SubmittalSubmittals: Curtainwall & Storefront 95 95 19-Apr-16 0 31-Aug-16 1 0

A1400 Prepare & Submit - Curtainwall & Storefront 15 15 19-Apr-16 0 09-May-16 0 0 CON-003

A1410 Contractor Review - Curtainwall & Storefront 5 5 10-May-16 16-May-16 0 0 CON-003

A1420 A/E Approve - Curtainwall & Storefront 10 10 17-May-16 31-May-16 0 0 CON-003

A1430 Fabricate & Deliver - Curtainwall L02/03 30 30 01-Jun-16 0 13-Jul-16 0 0 0 CON-003

A1440 Fabricate & Deliver - Curtainwall L04/05 10 10 14-Jul-16 0 27-Jul-16 0 0 0 CON-003

A1450 Fabricate & Deliver - Curtainwall L06/07 10 10 28-Jul-16 0 10-Aug-16 0 0 CON-003

A1460 Fabricate & Deliver - Curtainwall L08/09 5 5 11-Aug-16 0 17-Aug-16 1 0 CON-003

A1470 Fabricate & Deliver - Storefront L01 10 10 18-Aug-16 31-Aug-16 1 1 CON-003

Jan Feb Mar Apr May Jun Jul Aug Sep ct

2016

Prepare & Issue SD Pkg - Site & Structure

Prepare & Issue DD Pkg - Site & Structure

Prepare & Issue 50% CD Pkg - Site & Struc

Prepare & Issue 100% CD Pkg - Site

Prepare & Issue SD Pkg - Exterior

Prepare & Issue DD Pkg - Exterior

Prepare & Issue 50% CD Pkg - E

Prepare & Issue 100% CD P

Prepare & Submit - Concrete Mix

Contractor Review - Concrete Mix

A/E Approve - Concrete Mix

Prepare & Submit - Rebar

Contractor Review - Rebar

A/E Approve - Rebar

Fabricate & Deliver - Rebar Fo

Fabricate & Deliver - Rebar D

Prepare & Submit - Curtainw

Contractor Review - Curtain

A/E Approve - Curtainwa

Fabricate & Del

Fabricate & D

Fabricate

Fabricate

Fabric

Project ID: 00000-00

Print Date: 14-Oct-15, 04:40 PM Sample Project

Layout: 00 - Activites by WBS

TASK filter: All Activities

Page: 1 of 2 User: admin

Data Date: 04-Jan-16

Commit toDue Dates &

Complete Tasks

Monitor Performance

DefinePhases

withWBS

SubdivideActivities

intoTasks

Define Activities,

Durations & Relationships

Page 21: Introduction to Connected Cost - taradigm.com

Hopper

Planning Board

Future BucketsCPM

Activity

Lean Tasks

Page 22: Introduction to Connected Cost - taradigm.com

Primavera Cloud Progress Mobile App – Task Update

• iOS / Android

• Activity & Task Updates

• Filters• Red Flag• Complete• Re-commit• Reason

Page 23: Introduction to Connected Cost - taradigm.com

Task Management

Page 24: Introduction to Connected Cost - taradigm.com

Integrated Lean & CPM Scheduling

Page 25: Introduction to Connected Cost - taradigm.com

Monitor Planned Percent Complete and more

Page 26: Introduction to Connected Cost - taradigm.com

Introduction & About Today

CPM Scheduling & Resource Management

Lean Scheduling

Cost Management

Mobile Applications

Risk Management

Enterprise Reporting, Dashboards & Portfolios

Summary

Agenda

Page 27: Introduction to Connected Cost - taradigm.com

WBS Cost AssignmentExpensesEarned Value ReportingFinancial PeriodsTracking Gantt

Top Down Budgeting, CashflowRole Demand CostingActivity Lump Sum CostingEarned Value (roadmap)Scope based EV

Cost Loaded SchedulesP6 Professional Primavera Cloud &

ProfessionalP6 Web

Resource Loaded Cost SchedulesTime phased Unit Rates – Resources & RolesTime phased resource cost curves

Page 28: Introduction to Connected Cost - taradigm.com

Integrated Cost Controls & Contract Administration

Oracle Confidential – Highly Restricted28

Aconex Cost – Fully collaborative supply chain cost and contract management solution

Deeply integrated with P6 and more recently Primavera Cloud

Strong EVM, Forecasting & Performance Reporting

Page 29: Introduction to Connected Cost - taradigm.com

Introduction & About Today

CPM Scheduling & Resource Management

Lean Scheduling

Cost Management

Mobile Applications

Risk Management

Enterprise Reporting, Dashboards & Portfolios

Summary

Agenda

Page 30: Introduction to Connected Cost - taradigm.com

Flexible ApprovalsTimesheets

Portfolio AppLean Planning AppTask Progress AppBrowser Timesheets

Mobile ApplicationsP6 Team Member Primavera Cloud Mobile Apps

Activity based Progress App

Page 31: Introduction to Connected Cost - taradigm.com

Remote / on site statusing capabilityOn Site Visibility & Faster Updates

• P6 Team Member & Primavera Cloud Progress Apps

• Field based visibility of tasks & details

• Capture and present Real time progress into your schedules

• Data governance through appropriate access and visibility

• Process governance through approvals

Page 32: Introduction to Connected Cost - taradigm.com

Mature Mobile Apps

Recent Updates

• UI Refresh

• Photo Markups

• Easy QR Code Configuration

• Location Services

• Grouping & Filtering Enhancements

• Status Other Resources

• Offline Mode

• Audio & Video Attachments

Page 33: Introduction to Connected Cost - taradigm.com

Introduction & About Today

CPM Scheduling & Resource Management

Lean Scheduling

Cost Management

Mobile Applications

Risk Management

Enterprise Reporting, Dashboards & Portfolios

Summary

Agenda

Page 34: Introduction to Connected Cost - taradigm.com

Primavera Cloud Schedule Risk

• Simple End to End Process –designed for non-specialists

• Fully integrated with schedule for faster results

• One Integrated Pre and Post Response Plan (not multiple files)

• Configurable Workflows & Forms• Propose New Risks

• Risk Review Process

• Program Risks & Register

• Enhanced Mean Impacts

• Continuous development

Page 35: Introduction to Connected Cost - taradigm.com

Program & Project Risk Registers & Reporting

Additional Program Risks

Page 36: Introduction to Connected Cost - taradigm.com

Mean Impacts & Risk Removal Impact

Page 37: Introduction to Connected Cost - taradigm.com

Easier, Quicker Integrated Schedule Results

• Immediate Reporting of Results

•Optimistic, P50 and Pessimistic Dates

Page 38: Introduction to Connected Cost - taradigm.com

Integrated Risk Reporting

• Easier to combine risk information in automated Project Status Report• Schedule, Risk, Cashflow, Benefits etc.

• Ad-hoc Report Writer (in App)

• Utilise BI Publisher for Pixel perfect standard reports

• Report on Risks across multiple projects

Page 39: Introduction to Connected Cost - taradigm.com

Primavera Cloud Task Management & Workflows

Page 40: Introduction to Connected Cost - taradigm.com

Introduction & About Today

CPM Scheduling & Resource Management

Lean Scheduling

Cost Management

Mobile Applications

Risk Management

Enterprise Reporting, Dashboards & Portfolios

Summary

Agenda

Page 41: Introduction to Connected Cost - taradigm.com

Enterprise & Portfolio Visibility

Strength of EPPM & Primavera Cloud – Architecture, Flexible Coding & Grouping of Data, Calculated Fields/Measures, Scorecarding, Resource Capacity etc.

Page 42: Introduction to Connected Cost - taradigm.com

Primavera Cloud Portfolio Mgmt & Capital Planning

42

Business Case Collection & Prioritise/Rank• Flexible

prioritisation matrix for proposals & in-flight projects

• Score & Rank projects

• Collaborate & capture team Comments

Demand Intake – Ideation & Proposals• Capture ideas in

configurable forms

• Capture strategic alignment data

• Use workflow to turn ideas into projects

‘What-if’ Budget & Resource Driven Plans

• Compare different Budget Scenarios

• Time phased over defined planning period (e.g. 5 yrs)

• In-built approvals

Portfolio Scorecards, Strategy Performance

• Monitor the health and status of a portfolio of projects

Page 43: Introduction to Connected Cost - taradigm.com

Enterprise Dashboards with filters Create ChartsProject, Program, Portfolio & Workspace Dashboards

Intuitive Dashboards - In-ApplicationPrimavera CloudP6 Web

Easily Configurable Dashboards – End UserScorecards, Charts, RAG IndicatorsRole Based Permissions

Page 44: Introduction to Connected Cost - taradigm.com

Intuitive Dashboards – Cross PlatformPrimavera Analytics Today

44

Page 45: Introduction to Connected Cost - taradigm.com

Introduction & About Today

CPM Scheduling & Resource Management

Lean Scheduling

Cost Management

Mobile Applications

Risk Management

Enterprise Reporting, Dashboards & Portfolios

Summary

Agenda

Page 46: Introduction to Connected Cost - taradigm.com

Benefits of Oracle CEGBU PlatformApplication UI Flexibility• to suit size/complexity of project and skills of users

• Location/access (Cloud and on-premise),

• Deployment flexibility - Browser, desktop, mobile

• Role Based (Schedulers vs Last Planners vs Risk Mgrs vs Field Staff)

Maturity of Solution

• Enterprise platform, portfolio visibility

• Program Capabilities, Flexible organization of data

• Multi user access

• Sharing of project data with third parties

• Reporting Options

Roadmap• Common Data Environment for Driving planning and controls through digital model

• Single data lake for Cross Platform Insights, AI & Benchmarking

Oracle Confidential – Highly Restricted46

Page 47: Introduction to Connected Cost - taradigm.com

Thank you

Nick Fenn

Principal Sales ConsultantOracle Construction & Engineering Business Unit

47 Confidential – © 2019 Oracle Internal/Restricted/Highly Restricted

Page 48: Introduction to Connected Cost - taradigm.com

Backup slides

Integration

Confidential – © 2019 Oracle Internal/Restricted/Highly Restricted48

Page 49: Introduction to Connected Cost - taradigm.com

Oracle Primavera P6 EPPM

Activity ID Activity Name OD RD Start Finish TF FF Contract

Sample ProjSample Project 175 175 04-Jan-16 0 08-Sep-16 0 0

Pre-ConstruPre-Construction 170 170 04-Jan-16 0 31-Aug-16 1 0

DesignDesign 95 95 04-Jan-16 0 16-May-16 0 0

Design: SDesign: Site & Structure 60 60 04-Jan-16 0 28-Mar-16 3 0

A1000 Prepare & Issue SD Pkg - Site & Structure 10 10 04-Jan-16 0 15-Jan-16 0 0 0 CON-001

A1010 Prepare & Issue DD Pkg - Site & Structure 10 10 18-Jan-16 0 29-Jan-16 0 0 0 CON-001

A1020 Prepare & Issue 50% CD Pkg - Site & Structure 20 20 01-Feb-16 29-Feb-16 3 0 CON-001

A1030 Prepare & Issue 100% CD Pkg - Site & Structure 20 20 01-Mar-16 28-Mar-16 3 0 CON-001

Design: EDesign: Exterior 75 75 01-Feb-16 16-May-16 0 0

A1040 Prepare & Issue SD Pkg - Exterior 15 15 01-Feb-16 22-Feb-16 0 0 CON-001

A1050 Prepare & Issue DD Pkg - Exterior 20 20 23-Feb-16 21-Mar-16 0 0 CON-001

A1060 Prepare & Issue 50% CD Pkg - Exterior 20 20 22-Mar-16 18-Apr-16 0 0 0 CON-001

A1070 Prepare & Issue 100% CD Pkg - Exterior 20 20 19-Apr-16 0 16-May-16 0 0 CON-001

SubmittalsSubmittals 110 110 29-Mar-16 31-Aug-16 1 0

SubmittalSubmittals: Concrete 15 15 29-Mar-16 18-Apr-16 0 18 0

A1080 Prepare & Submit - Concrete Mix 5 5 29-Mar-16 04-Apr-16 0 18 0 CON-001

A1090 Contractor Review - Concrete Mix 5 5 05-Apr-16 0 11-Apr-16 0 18 0 CON-001

A1100 A/E Approve - Concrete Mix 5 5 12-Apr-16 0 18-Apr-16 0 18 15 CON-001

SubmittalSubmittals: Rebar 30 30 29-Mar-16 09-May-16 18 0

A1110 Prepare & Submit - Rebar 5 5 29-Mar-16 04-Apr-16 0 8 0 CON-001

A1120 Contractor Review - Rebar 5 5 05-Apr-16 0 11-Apr-16 0 8 0 CON-001

A1130 A/E Approve - Rebar 10 10 12-Apr-16 0 25-Apr-16 0 8 0 CON-001

A1140 Fabricate & Deliver - Rebar Foundations 5 5 26-Apr-16 0 02-May-16 8 0 CON-001

A1150 Fabricate & Deliver - Rebar Decks 5 5 03-May-16 09-May-16 18 15 CON-001

SubmittalSubmittals: Curtainwall & Storefront 95 95 19-Apr-16 0 31-Aug-16 1 0

A1400 Prepare & Submit - Curtainwall & Storefront 15 15 19-Apr-16 0 09-May-16 0 0 CON-003

A1410 Contractor Review - Curtainwall & Storefront 5 5 10-May-16 16-May-16 0 0 CON-003

A1420 A/E Approve - Curtainwall & Storefront 10 10 17-May-16 31-May-16 0 0 CON-003

A1430 Fabricate & Deliver - Curtainwall L02/03 30 30 01-Jun-16 0 13-Jul-16 0 0 0 CON-003

A1440 Fabricate & Deliver - Curtainwall L04/05 10 10 14-Jul-16 0 27-Jul-16 0 0 0 CON-003

A1450 Fabricate & Deliver - Curtainwall L06/07 10 10 28-Jul-16 0 10-Aug-16 0 0 CON-003

A1460 Fabricate & Deliver - Curtainwall L08/09 5 5 11-Aug-16 0 17-Aug-16 1 0 CON-003

A1470 Fabricate & Deliver - Storefront L01 10 10 18-Aug-16 31-Aug-16 1 1 CON-003

Jan Feb Mar Apr May Jun Jul Aug Sep ct

2016

Prepare & Issue SD Pkg - Site & Structure

Prepare & Issue DD Pkg - Site & Structure

Prepare & Issue 50% CD Pkg - Site & Struc

Prepare & Issue 100% CD Pkg - Site

Prepare & Issue SD Pkg - Exterior

Prepare & Issue DD Pkg - Exterior

Prepare & Issue 50% CD Pkg - E

Prepare & Issue 100% CD P

Prepare & Submit - Concrete Mix

Contractor Review - Concrete Mix

A/E Approve - Concrete Mix

Prepare & Submit - Rebar

Contractor Review - Rebar

A/E Approve - Rebar

Fabricate & Deliver - Rebar Fo

Fabricate & Deliver - Rebar D

Prepare & Submit - Curtainw

Contractor Review - Curtain

A/E Approve - Curtainwa

Fabricate & Del

Fabricate & D

Fabricate

Fabricate

Fabric

Project ID: 00000-00

Print Date: 14-Oct-15, 04:40 PM Sample Project

Layout: 00 - Activites by WBS

TASK filter: All Activities

Page: 1 of 2 User: admin

Data Date: 04-Jan-16

Activity ID Activity Name OD RD Start Finish TF FF Contract

Sample ProjSample Project 175 175 04-Jan-16 0 08-Sep-16 0 0

Pre-ConstruPre-Construction 170 170 04-Jan-16 0 31-Aug-16 1 0

DesignDesign 95 95 04-Jan-16 0 16-May-16 0 0

Design: SDesign: Site & Structure 60 60 04-Jan-16 0 28-Mar-16 3 0

A1000 Prepare & Issue SD Pkg - Site & Structure 10 10 04-Jan-16 0 15-Jan-16 0 0 0 CON-001

A1010 Prepare & Issue DD Pkg - Site & Structure 10 10 18-Jan-16 0 29-Jan-16 0 0 0 CON-001

A1020 Prepare & Issue 50% CD Pkg - Site & Structure 20 20 01-Feb-16 29-Feb-16 3 0 CON-001

A1030 Prepare & Issue 100% CD Pkg - Site & Structure 20 20 01-Mar-16 28-Mar-16 3 0 CON-001

Design: EDesign: Exterior 75 75 01-Feb-16 16-May-16 0 0

A1040 Prepare & Issue SD Pkg - Exterior 15 15 01-Feb-16 22-Feb-16 0 0 CON-001

A1050 Prepare & Issue DD Pkg - Exterior 20 20 23-Feb-16 21-Mar-16 0 0 CON-001

A1060 Prepare & Issue 50% CD Pkg - Exterior 20 20 22-Mar-16 18-Apr-16 0 0 0 CON-001

A1070 Prepare & Issue 100% CD Pkg - Exterior 20 20 19-Apr-16 0 16-May-16 0 0 CON-001

SubmittalsSubmittals 110 110 29-Mar-16 31-Aug-16 1 0

SubmittalSubmittals: Concrete 15 15 29-Mar-16 18-Apr-16 0 18 0

A1080 Prepare & Submit - Concrete Mix 5 5 29-Mar-16 04-Apr-16 0 18 0 CON-001

A1090 Contractor Review - Concrete Mix 5 5 05-Apr-16 0 11-Apr-16 0 18 0 CON-001

A1100 A/E Approve - Concrete Mix 5 5 12-Apr-16 0 18-Apr-16 0 18 15 CON-001

SubmittalSubmittals: Rebar 30 30 29-Mar-16 09-May-16 18 0

A1110 Prepare & Submit - Rebar 5 5 29-Mar-16 04-Apr-16 0 8 0 CON-001

A1120 Contractor Review - Rebar 5 5 05-Apr-16 0 11-Apr-16 0 8 0 CON-001

A1130 A/E Approve - Rebar 10 10 12-Apr-16 0 25-Apr-16 0 8 0 CON-001

A1140 Fabricate & Deliver - Rebar Foundations 5 5 26-Apr-16 0 02-May-16 8 0 CON-001

A1150 Fabricate & Deliver - Rebar Decks 5 5 03-May-16 09-May-16 18 15 CON-001

SubmittalSubmittals: Curtainwall & Storefront 95 95 19-Apr-16 0 31-Aug-16 1 0

A1400 Prepare & Submit - Curtainwall & Storefront 15 15 19-Apr-16 0 09-May-16 0 0 CON-003

A1410 Contractor Review - Curtainwall & Storefront 5 5 10-May-16 16-May-16 0 0 CON-003

A1420 A/E Approve - Curtainwall & Storefront 10 10 17-May-16 31-May-16 0 0 CON-003

A1430 Fabricate & Deliver - Curtainwall L02/03 30 30 01-Jun-16 0 13-Jul-16 0 0 0 CON-003

A1440 Fabricate & Deliver - Curtainwall L04/05 10 10 14-Jul-16 0 27-Jul-16 0 0 0 CON-003

A1450 Fabricate & Deliver - Curtainwall L06/07 10 10 28-Jul-16 0 10-Aug-16 0 0 CON-003

A1460 Fabricate & Deliver - Curtainwall L08/09 5 5 11-Aug-16 0 17-Aug-16 1 0 CON-003

A1470 Fabricate & Deliver - Storefront L01 10 10 18-Aug-16 31-Aug-16 1 1 CON-003

Jan Feb Mar Apr May Jun Jul Aug Sep ct

2016

Prepare & Issue SD Pkg - Site & Structure

Prepare & Issue DD Pkg - Site & Structure

Prepare & Issue 50% CD Pkg - Site & Struc

Prepare & Issue 100% CD Pkg - Site

Prepare & Issue SD Pkg - Exterior

Prepare & Issue DD Pkg - Exterior

Prepare & Issue 50% CD Pkg - E

Prepare & Issue 100% CD P

Prepare & Submit - Concrete Mix

Contractor Review - Concrete Mix

A/E Approve - Concrete Mix

Prepare & Submit - Rebar

Contractor Review - Rebar

A/E Approve - Rebar

Fabricate & Deliver - Rebar Fo

Fabricate & Deliver - Rebar D

Prepare & Submit - Curtainw

Contractor Review - Curtain

A/E Approve - Curtainwa

Fabricate & Del

Fabricate & D

Fabricate

Fabricate

Fabric

Project ID: 00000-00

Print Date: 14-Oct-15, 04:40 PM Sample Project

Layout: 00 - Activites by WBS

TASK filter: All Activities

Page: 1 of 2 User: admin

Data Date: 04-Jan-16

Activity ID Activity Name OD RD Start Finish TF FF Contract

Sample ProjSample Project 175 175 04-Jan-16 0 08-Sep-16 0 0

Pre-ConstruPre-Construction 170 170 04-Jan-16 0 31-Aug-16 1 0

DesignDesign 95 95 04-Jan-16 0 16-May-16 0 0

Design: SDesign: Site & Structure 60 60 04-Jan-16 0 28-Mar-16 3 0

A1000 Prepare & Issue SD Pkg - Site & Structure 10 10 04-Jan-16 0 15-Jan-16 0 0 0 CON-001

A1010 Prepare & Issue DD Pkg - Site & Structure 10 10 18-Jan-16 0 29-Jan-16 0 0 0 CON-001

A1020 Prepare & Issue 50% CD Pkg - Site & Structure 20 20 01-Feb-16 29-Feb-16 3 0 CON-001

A1030 Prepare & Issue 100% CD Pkg - Site & Structure 20 20 01-Mar-16 28-Mar-16 3 0 CON-001

Design: EDesign: Exterior 75 75 01-Feb-16 16-May-16 0 0

A1040 Prepare & Issue SD Pkg - Exterior 15 15 01-Feb-16 22-Feb-16 0 0 CON-001

A1050 Prepare & Issue DD Pkg - Exterior 20 20 23-Feb-16 21-Mar-16 0 0 CON-001

A1060 Prepare & Issue 50% CD Pkg - Exterior 20 20 22-Mar-16 18-Apr-16 0 0 0 CON-001

A1070 Prepare & Issue 100% CD Pkg - Exterior 20 20 19-Apr-16 0 16-May-16 0 0 CON-001

SubmittalsSubmittals 110 110 29-Mar-16 31-Aug-16 1 0

SubmittalSubmittals: Concrete 15 15 29-Mar-16 18-Apr-16 0 18 0

A1080 Prepare & Submit - Concrete Mix 5 5 29-Mar-16 04-Apr-16 0 18 0 CON-001

A1090 Contractor Review - Concrete Mix 5 5 05-Apr-16 0 11-Apr-16 0 18 0 CON-001

A1100 A/E Approve - Concrete Mix 5 5 12-Apr-16 0 18-Apr-16 0 18 15 CON-001

SubmittalSubmittals: Rebar 30 30 29-Mar-16 09-May-16 18 0

A1110 Prepare & Submit - Rebar 5 5 29-Mar-16 04-Apr-16 0 8 0 CON-001

A1120 Contractor Review - Rebar 5 5 05-Apr-16 0 11-Apr-16 0 8 0 CON-001

A1130 A/E Approve - Rebar 10 10 12-Apr-16 0 25-Apr-16 0 8 0 CON-001

A1140 Fabricate & Deliver - Rebar Foundations 5 5 26-Apr-16 0 02-May-16 8 0 CON-001

A1150 Fabricate & Deliver - Rebar Decks 5 5 03-May-16 09-May-16 18 15 CON-001

SubmittalSubmittals: Curtainwall & Storefront 95 95 19-Apr-16 0 31-Aug-16 1 0

A1400 Prepare & Submit - Curtainwall & Storefront 15 15 19-Apr-16 0 09-May-16 0 0 CON-003

A1410 Contractor Review - Curtainwall & Storefront 5 5 10-May-16 16-May-16 0 0 CON-003

A1420 A/E Approve - Curtainwall & Storefront 10 10 17-May-16 31-May-16 0 0 CON-003

A1430 Fabricate & Deliver - Curtainwall L02/03 30 30 01-Jun-16 0 13-Jul-16 0 0 0 CON-003

A1440 Fabricate & Deliver - Curtainwall L04/05 10 10 14-Jul-16 0 27-Jul-16 0 0 0 CON-003

A1450 Fabricate & Deliver - Curtainwall L06/07 10 10 28-Jul-16 0 10-Aug-16 0 0 CON-003

A1460 Fabricate & Deliver - Curtainwall L08/09 5 5 11-Aug-16 0 17-Aug-16 1 0 CON-003

A1470 Fabricate & Deliver - Storefront L01 10 10 18-Aug-16 31-Aug-16 1 1 CON-003

Jan Feb Mar Apr May Jun Jul Aug Sep ct

2016

Prepare & Issue SD Pkg - Site & Structure

Prepare & Issue DD Pkg - Site & Structure

Prepare & Issue 50% CD Pkg - Site & Struc

Prepare & Issue 100% CD Pkg - Site

Prepare & Issue SD Pkg - Exterior

Prepare & Issue DD Pkg - Exterior

Prepare & Issue 50% CD Pkg - E

Prepare & Issue 100% CD P

Prepare & Submit - Concrete Mix

Contractor Review - Concrete Mix

A/E Approve - Concrete Mix

Prepare & Submit - Rebar

Contractor Review - Rebar

A/E Approve - Rebar

Fabricate & Deliver - Rebar Fo

Fabricate & Deliver - Rebar D

Prepare & Submit - Curtainw

Contractor Review - Curtain

A/E Approve - Curtainwa

Fabricate & Del

Fabricate & D

Fabricate

Fabricate

Fabric

Project ID: 00000-00

Print Date: 14-Oct-15, 04:40 PM Sample Project

Layout: 00 - Activites by WBS

TASK filter: All Activities

Page: 1 of 2 User: admin

Data Date: 04-Jan-16

Primavera Cloud <> P6 Synchronisations TodayIntegrated P6, CPM & Lean Scheduling

Oracle Primavera

Cloud

•Bi-directional Web Services Integration•Configurable Data Mapping

•Export - Import

Page 50: Introduction to Connected Cost - taradigm.com

P6 – Primavera Cloud Integration