Page 1: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

April 29, 2013

Page 2: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

Introduction

Project Overview

Conceptual Design – Area 1

Conceptual Design – Area 2

Conceptual Design – Area 3

2

Page 3: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

Introduction

Project Overview

Conceptual Design – Area 1

Conceptual Design – Area 2

Conceptual Design – Area 3

3

Page 4: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

4

24,000 AFY

14,000 AFY

Existing Supply Mix

(Groundwater & canyon water)

22,800 AFY

14,000 AFY

1,200 AFY

Future Supply Mix with Arroyo Seco Canyon Project

(Groundwater & canyon water)

Page 5: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

5

Page 6: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

6

Page 7: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

Reduce dependence on imported water

Drought-tolerant water supply through groundwater recharge

Cost Savings◦ Imported Water: $1,000/AF◦ Groundwater: $130/AF

7

Groundwater

Page 8: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

8

Sediment and debris deposits:◦ Damaged Headworks area◦ Reduced flow diversion◦ Compromised recharge capacity

Page 9: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

99

Feb 2010

Average

Page 10: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

10

Page 11: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

Introduction

Project Overview

Conceptual Design – Area 1

Conceptual Design – Area 2

Conceptual Design – Area 3

11

Page 12: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

12

Headworks

JPL Parking Lot

Arroyo Intake Structure

Existing Spreading Basins

Page 13: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

13

Area 1 – Headworks

Area 2 – Diversion Dam & Intake

Area 3 – Spreading Grounds & JPL parking lot

Page 14: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

Remove Headworks dam

Naturalize area and restore riparian habitat

Install new restroom

Install recreational & educational facilities

Remove portion of fence

14

Page 15: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

Construct a new diversion dam

Replace intake trash rack

Install a fine screen to improve aquatic protection

Install educational signage

Remove K-rail & improve road

15

Page 16: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

Remove JPL Parking Lot (~1000 spaces)

Construct smaller parking lot (~100-150 spaces)

Construct a new access road for JPL employees

Expand spreading basins (from ~13 to 21 acres)

16

Page 17: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

Introduction

Project Overview

Conceptual Design – Area 1

Conceptual Design – Area 2

Conceptual Design – Area 3

17

Page 18: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

Headworks Dam5-yr Flood Plain

Water Fountain

18

10-yr Flood Plain

50-yr Flood Plain

Ranger Station

Trail

Page 19: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

Demolish Headworks Dam Naturalize stream Restroom and drinking

fountain Horse trough Picnic tables Garbage cans Signage Trail

19

Picnic Tables

Headworks

Garbage Cans

Islands

Willow Posts

Horse trough

Restroom

Signage

Page 20: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

20

Page 21: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

21

Nature Trail

Picnic Area

Main Channel (low flow)

High Flow Channel

Planting Islands

Restroom

Naturalization Area

Page 22: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

22

Page 23: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

23

After 3 yearsAfter 3 months

Las Virgenes Creek, Calabasas

Dec 2007

Page 24: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

24

Page 25: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

25

Page 26: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

26

Page 27: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

27

Page 28: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

28

Building type◦ Prefabricated◦ Custom build on-site

Size◦ 1 Male/Female stall◦ 2 Male/Female stalls

Disposal method◦ Septic Tank System◦ Composting Toilet

Restroom

Ranger Station

Page 29: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

29

Page 30: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

30

Page 31: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

31

Page 32: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

32

Page 33: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

33

At restroom:Style: 1 large signTopic: Water quality benefits

In naturalized area:Style: multiple small plates and/or rocksTopics: stream restoration, native vegetation,

dynamic riparian ecosystem

Page 34: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

Headworks demolition Stream Restoration Restroom and fountain Horse trough Picnic tables Garbage cans Signage Trail

Page 35: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

Introduction

Project Overview

Conceptual Design – Area 1

Conceptual Design – Area 2

Conceptual Design – Area 3

35

Page 36: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

Bridge No. 3

IntakeDiversion Dam

Former Chlorination

Station

36

Page 37: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

Diversion Dam Intake Temporary

bridge Road repair Signage

37

Signage

New Intake

Temporary Bridge

Road repair

New Diversion Dam

Page 38: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

38

Page 39: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

39

Bascule gate

Flash Board diversion weir

Obermeyer spillway gate

Page 40: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

40

Pros Cons

Obermeyerspillway gate

High reliability High capital cost

Ease of operation Sole source availabilityLow Headwater during flood eventsCaptures most water

Bascule gate High reliability High capital cost

Ease of operation

Extreme durability

Low Headwater during flood events

Captures most water

Flash Boards weir

Low capital cost Dangerous to operate during stormLow reliabilityPoor aestheticsPoor control of HeadwaterNo automation

Page 41: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

41

Abutment Plate

Intake

Sediment deposits

Page 42: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

42

New Trash Rack

New Fine Screen

Page 43: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

43

Page 44: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

44

At new dam & intake:Style: small plateTopics: diversion dam operations

aquatic habitat protection

Signage

Page 45: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

45

New diversion dam New intake Road improvement/

K-rail removal Temporary bridge Signage

45

Page 46: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

Introduction

Project Overview

Conceptual Design – Area 1

Conceptual Design – Area 2

Conceptual Design – Area 3

46

Page 47: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

Pipeline from Intake

County Storm Drain

Utilities

Behner WTP

Spreading Basins

JPL Parking Lot

yEquestrian

Pathway

JPL

47

Page 48: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

New basins with pre-sedimentation

Small recreational parking lot

Access Road Utility relocation New pipes JPL Well Signage

48

Page 49: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

49

Signage + Pet Waste StationRoundabout

Equestrian Pathway(existing)

Stairway

Walkway

New Linear Parking

New Access Road

Roundabout

New Spreading Basins

JPL Well

49

Linear Parking Lot 10 New Basins:◦ 2 Pre-sedimentation◦ 8 Spreading/Recharge

Pre-sedimentationBasins

Page 50: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

50

Roundabout

Equestrian Pathway(existing)

Stairway

WalkwayNew

Parking

New Access Road

New Parking

New Spreading Basins

JPL Well

Signage + Pet Waste Station

Parking Lot North End 9 New Basins:◦ 2 Pre-sedimentation◦ 7 Spreading/Recharge

Pre-sedimentationBasins

Page 51: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

51

66 ft

Page 52: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

52

ADA Parking

Interpretative Signage

Stairway (Trail Access)

Walkway

New Parking

North Side

Parking for Hahamongna

Watershed Park Visitors

Access via Explorer

Road

New Basins New Access

Rd

South Side

Page 53: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

53

At the trail head:Style: small plateTopics: spreading basins and groundwater recharge operations, local supply benefits

Signage

Page 54: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

Annual saving ~ 1,200 afy x $870/af ~ $1 M/yr Payback Period ~ 5 years

54

AreaAnnual

Recharge (af/yr)Existing 2,000

New 1,200Total 3,200

Area Estimate CostArea 1 $900,000Area 2 $1,100,000Area 3 $2,700,000Total $4,700,000

ESTIMATED PROJECT COST ESTIMATED PROJECT YIELD

Page 55: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

55

New basins with pre-sedimentation

New recreational parking lot Access road Walkway/Stairway Equestrian Trail Pet waste station Signage

55

Roundabout

Equestrian Pathway(existing)

Stairway

WalkwayNew

Parking

New Access Road

New Parking

New Spreading Basins

JPL Well

Signage + Pet Waste Station

Pre-sedimentationBasins

Page 56: Introduction Project Overview - Arroyo Seco Workshop... · 4 24,000 AFY 14,000 AFY Existing Supply Mix (Groundwater & canyon water) 22,800 AFY 14,000 AFY 1,200 AFY Future Supply Mix

E-mail Natalie Ouwersloot by Monday May [email protected]

56