introduction engineering manual/process views of teamcenter strategy process current status summary...
TRANSCRIPT
• Introduction• Engineering Manual/Process• Views of Teamcenter• Strategy
• Process• Current Status• Summary
1
Teamcenter: Engineering Data Management System
Agenda
Rich StanekOn behalf of the Teamcenter Implementation Team
2
• What is Teamcenter?• Software tool to help us do our jobs better• Commercial, Product Lifecycle Management (PLM) software (Siemens)
• Document and Process centric relational database (Oracle)• Used by many large, internationally based manufacturing companies• Also used by DESY for the XFEL project (TC Enterprise)• CERN study on EDMS identified TC as upgrade to their present system
• Who will it affect?• Lab’s technical, procurement and fabrication staff
• Scientists, engineers, designers, technicians, machinists, QC, ES&H & Procurement personnel• Mechanical, electrical, and civil disciplines
• Used for projects and for internal engineering data• Allow access for Collaborators (project-related eng. documents)
Introduction
3
Product Lifecycle Management
“Product Lifecycle Management (PLM) is the process of managing the entire lifecycle of a component and its associated data from conception, through design and manufacture, to service and maintenance, and finally disposal.”
“…provides an engineering information backbone for companies and their extended enterprise.”
4
• What type of documents will be stored in Teamcenter?• Focus on engineering documents and data
• CAD files, specifications, requirements documents, engineering calculations & analysis, safety documents, QC reports, vendor data...
• Will this be our only Document Management System?• No. Lab is also pursuing SharePoint as a more general DMS• Teamcenter will be integrated with SharePoint• There may be a few other systems that will be integrated as well
Goal is one common access point for documents“one stop shopping”
Introduction (cont’d)
5
• What problems are we trying to solve?
• Lack of a common EDMS Many DocDB instances and ad hoc systems• Makes collaboration (even between Divisions) difficult
• CAD files are disjointed mechanical, electrical, civil all handled differently
• Hard to find information, engineering reports, analysis on previous designs…• “Reinvent the wheel” far too often
• Loss of data/information when people retire or move to another project
• Reviews and Signoffs require a manual process • Often without full information available to the approver
Introduction (cont’d)
6
• Why did we choose Teamcenter? • Started off within the CAD Tools Committee as a means to replace our mechanical CAD (I-deas) TDM has grown into something much bigger
• Needed software that could handle all of our common file formats• NX, AutoCAD, MS Office, pdf, JT, as well as a variety of ECAD formats
• Wanted a system with a proven track record that had all the capabilities • Minimize customization to limit problems with updates
• Were able to “partner” with Siemens to create an affordable solution
Introduction (cont’d)
7
Engineering Manual
Archiving and Control (page 30)
“In the future, Fermilab will implement a lab-wide Electronic Document Management System (EDMS). This will provide a central location and common method for document storage, document identification, workflow, configuration control, change management and document retrieval.”
The future is now and the EDMS is Teamcenter
10
CAD DATA MANAGEMENTNX, AutoCADDrawing & 3D
ACCESS CONTROLInformation Security
INTEGRATED VISUALIZATIONAccess 2D & 3D Drawing
Sectioning / Measure / Clearance CheckNo CAD Tool Required
COLLABORATIONShare Documents,
Conference
BOM MANAGEMENTDesign Re-use
Variants / Options
RELEASE MANAGEMENTEngineering Release Process
Teamcenter
Single Source of Product Data
MS OfficeIntegration
Functional View
Core Team and Steering Committee Members
11
Division/Section Core Team Members Steering Committee Members
CD
Bob AndreeTony MetzScott Nolan/Julie TrumboNelly StanfieldSimon KwanBill Boroski
Rich KaruhnTony MetzBob Tschirhart
TD James BlowersTom Nicol Dave Harding
AD - Mechanical Tony ParkerSalman Tariq Paul Czarapata
AD - Electrical Rich Divelbiss
AD – Cryogenics Alex MartinezPhil Pfund (safety)
PPD – Mechanical Dave Pushka Peter Wilson
PPD - Electrical Marcus Larwill
ES&H Jody FederwitzCindy Rogers
Directorate Rich Stanek, Kathryn Grim (PR) Rich Stanek
FESS Jim Niehoff Randy Ortgiesen
Manufacturing Ed Hagler
Project Management Elaine McCluskey
Integration Partner Siemens
13
• Core Team has met a few times
• Still in “discovery phase” • Will start to break into smaller Working Groups
• Need to understand • How engineering data is currently handled in each group• Systems/software that are in place and should be continued
• Meeting with India Labs’ representatives • Work on details of how pilot project system can be configured• Understand infrastructure limitations
• Initiating contract for consulting services for final system • Will use “industry best practices” to help establish data schema
• Building up hardware architecture• Utilize existing infrastructure as well as new hardware purchase• High availability, scalable, redundancy
• Working with the SharePoint Team to assure smooth integration
Current Status
14
• Teamcenter will be the Lab’s EDMS
• Have a plan for how to proceed • Purchased the required software licenses• Established program phases
• Charter/Roadmap will guide implementation process
• This program has• Director’s support • Funding for hardware, software, licenses and consulting• Team is forming to align and implement the software
• Strong representation from around the Lab
• Needed for success• Commitment from D/S/C and Department Heads• Acceptance from the engineering and technical staff• Resources for training, data migration and testing
Summary