Introduction
• Project overview
• Data centre design management
• CFD modelling
• CRACS and Racks
• Commissioning validation
• Summary
![Page 3: Introduction - airah.org.au · Data centre design management • Integrated Design / Construction / Commissioning and Handover programme • Single BIM Model Workflow - LOD 100 –LOD](https://reader030.vdocuments.site/reader030/viewer/2022040420/5e0814d25c62c659280e0d5d/html5/thumbnails/3.jpg)
• 2 x $10m Data centres in Melbourne & Brisbane
• 90 Racks / 376kW
• TIA 942 Tier 3
• 0.99997 Availability
• MTBO 200,000hrs
• MTTR 40 Minutes
• Seismic IL 4
Project overview
![Page 4: Introduction - airah.org.au · Data centre design management • Integrated Design / Construction / Commissioning and Handover programme • Single BIM Model Workflow - LOD 100 –LOD](https://reader030.vdocuments.site/reader030/viewer/2022040420/5e0814d25c62c659280e0d5d/html5/thumbnails/4.jpg)
![Page 5: Introduction - airah.org.au · Data centre design management • Integrated Design / Construction / Commissioning and Handover programme • Single BIM Model Workflow - LOD 100 –LOD](https://reader030.vdocuments.site/reader030/viewer/2022040420/5e0814d25c62c659280e0d5d/html5/thumbnails/5.jpg)
Data centre design management
• Integrated Design / Construction / Commissioning and Handover programme
• Single BIM Model Workflow - LOD 100 – LOD 400
• Rigorous Return Brief
• Early engagement of specialist CFD Modellers / Availability Consultants to provide advice, design and design verification
![Page 6: Introduction - airah.org.au · Data centre design management • Integrated Design / Construction / Commissioning and Handover programme • Single BIM Model Workflow - LOD 100 –LOD](https://reader030.vdocuments.site/reader030/viewer/2022040420/5e0814d25c62c659280e0d5d/html5/thumbnails/6.jpg)
Design management
Client
Head Contractor
A.G. COOMBS Design
Management
MechanicalElectrical/Communication
sCFD Availability EMI Security
(SCEC) Containment
Architect Structural / Civil
![Page 7: Introduction - airah.org.au · Data centre design management • Integrated Design / Construction / Commissioning and Handover programme • Single BIM Model Workflow - LOD 100 –LOD](https://reader030.vdocuments.site/reader030/viewer/2022040420/5e0814d25c62c659280e0d5d/html5/thumbnails/7.jpg)
CFD
• 6SimgaDCX from Future Facilities
![Page 8: Introduction - airah.org.au · Data centre design management • Integrated Design / Construction / Commissioning and Handover programme • Single BIM Model Workflow - LOD 100 –LOD](https://reader030.vdocuments.site/reader030/viewer/2022040420/5e0814d25c62c659280e0d5d/html5/thumbnails/8.jpg)
• Software Capability
• Modelling Assumptions
Modelling details
* Images courtesy of http://pixabay.com
![Page 9: Introduction - airah.org.au · Data centre design management • Integrated Design / Construction / Commissioning and Handover programme • Single BIM Model Workflow - LOD 100 –LOD](https://reader030.vdocuments.site/reader030/viewer/2022040420/5e0814d25c62c659280e0d5d/html5/thumbnails/9.jpg)
CRACs
Traditional BlowersLowered EC Plug Fans
Different types of fan arrangement distribute air in different ways
![Page 10: Introduction - airah.org.au · Data centre design management • Integrated Design / Construction / Commissioning and Handover programme • Single BIM Model Workflow - LOD 100 –LOD](https://reader030.vdocuments.site/reader030/viewer/2022040420/5e0814d25c62c659280e0d5d/html5/thumbnails/10.jpg)
CRAC Controls
![Page 11: Introduction - airah.org.au · Data centre design management • Integrated Design / Construction / Commissioning and Handover programme • Single BIM Model Workflow - LOD 100 –LOD](https://reader030.vdocuments.site/reader030/viewer/2022040420/5e0814d25c62c659280e0d5d/html5/thumbnails/11.jpg)
Rack Representation
No Internal gaps
1-5 mm gaps
1-10 mm gaps
![Page 12: Introduction - airah.org.au · Data centre design management • Integrated Design / Construction / Commissioning and Handover programme • Single BIM Model Workflow - LOD 100 –LOD](https://reader030.vdocuments.site/reader030/viewer/2022040420/5e0814d25c62c659280e0d5d/html5/thumbnails/12.jpg)
Validation – Existing DC
Simulation Results Matching Thermal Images
Grille airflows Temperature Point Measurements
![Page 13: Introduction - airah.org.au · Data centre design management • Integrated Design / Construction / Commissioning and Handover programme • Single BIM Model Workflow - LOD 100 –LOD](https://reader030.vdocuments.site/reader030/viewer/2022040420/5e0814d25c62c659280e0d5d/html5/thumbnails/13.jpg)
Validation – Design
• Images courtesy of http://pixabay.com and www.hillstone.co.uk
• During the Integrated Services Test
![Page 14: Introduction - airah.org.au · Data centre design management • Integrated Design / Construction / Commissioning and Handover programme • Single BIM Model Workflow - LOD 100 –LOD](https://reader030.vdocuments.site/reader030/viewer/2022040420/5e0814d25c62c659280e0d5d/html5/thumbnails/14.jpg)
• Data centre design management
• CFD modelling
• CRACS and Racks
• Commissioning validation
Summary