intertek learning & development company confidential – for internal use only 1 global...
TRANSCRIPT
Intertek Learning & Development
Company Confidential – For internal use only1
Global Engineering On-boarding Program
Intertek Learning & Development
Company Confidential – For internal use only2
Objectives
- PG 231
•Learn who we are
•Why you are here
•Understand Valued Quality. Delivered.
•Identify our culture and behaviors
•Understand the Commercial and Electrical Business
•Understand what is in it for you
At the end of the day, you should be able to interpret and discuss the
important points of each lesson.
Intertek Learning & Development
Company Confidential – For internal use only3
Agenda
- PG 234
Thursday- Electrical Evaluation Skills
Intertek Learning & Development
Company Confidential – For internal use only4
Quiz Review
- PG 232
Wednesday Evening LMS Quiz Results
Intertek Learning & Development
Company Confidential – For internal use only6
Testing Skills
- PG 192
1. Measure Voltage
2. Measure Current
3. Measure Leakage Current
4. Dielectric Withstand Test (DWT)
5. Temperature Test• Thermocouple
• Change of Resistance
Intertek Learning & Development
Company Confidential – For internal use only7
Voltage Measurement
- PG 193
We measure voltage for the following reasons:
• To determine correct types of connections to power supply
• To determine shock hazards
• To determine spacing in products that is based on voltage
• To find locations where circuit becomes compliant with requirements to allow no further evaluation
Intertek Learning & Development
Company Confidential – For internal use only8
Current Measurement
- PG 194
We measure current for the following reasons:
• Because the amount of current used will determine the size of supply conductors and wiring used
• Determine if a unit is operating properly (does the current match the ratings)
• To determine the existence of a fire hazard
• To find areas (along with voltage) which are considered safe so no further evaluation is needed
Intertek Learning & Development
Company Confidential – For internal use only9
Leakage Current Measurement
- PG 195
We measure leakage current for the following reasons:
• Leakage current is the current available from parts which a user can touch. We measure this to make sure values are not high enough to hurt (or even feel in some cases) someone who can touch the product.
• Your lab should have a variety of leakage networks, and perhaps a variety of test circuit boxes. Be sure you ask somebody how to set them up, such as measurement to ground or measurement between parts of the equipment.
• Note that testing sometimes must be performed after environmental conditioning
• Be sure to follow sequence
Intertek Learning & Development
Company Confidential – For internal use only10
Dielectric Voltage Withstand Test
- PG 196
What is DWT?
A high voltage, low current test to find breakdowns
in the insulation of a product
Intertek Learning & Development
Company Confidential – For internal use only11
Dielectric Voltage Withstand Test
- PG 196
When is a DWT indicated?
• Indicated where spacings are not sufficient
• Indicated when there are nicks or cuts in insulation of wire
• Indicated where there issues with insulation becoming conductive
when heated
• Simple test to find these issues that need to be looked at further
Intertek Learning & Development
Company Confidential – For internal use only12
Temperature Testing
- PG 197
Temperature Testing is a basic test performed on all products to make sure the product will operate properly for the expected length of time
Intertek Learning & Development
Company Confidential – For internal use only13
Creepage & Clearances
Creepage Distance- Shortest path that follows surface between two points
Clearance- Shortest path between two points through air
- PG 198
Intertek Learning & Development
Company Confidential – For internal use only14
Creepage & Clearances
- PG 198
Intertek Learning & Development
Company Confidential – For internal use only15
Creepage & Clearances
- PG 198
Intertek Learning & Development
Company Confidential – For internal use only16
Measurement Uncertainty
• Utilize calibrated test equipment in lab
• If you use non Intertek calibrated equipment, then verification of measurement equipment is required
• In the US, we follow CTL Decision Sheet 251B to comply
• There is a more formal course on the detailed rules which is available upon request. This course will be needed if you ever work in the UK or Europe.
- PG 200
Intertek Learning & Development
Company Confidential – For internal use only17
Class Exercise
- PG 200
1
10
100
1000
10000
0 50 100 150 200 250
Push Force
Lif
e (C
ycle
s)
Life
Test one
Test two
Test three
Single Stress Model
Intertek Learning & Development
Company Confidential – For internal use only18
Customer Focus
- PG 204
Intertek Learning & Development
Company Confidential – For internal use only19
Customer Focus
• Customer Complaints
• Complete Project Management
• RFQ Process (Sales Interface)
• Contact Client
• PCD Deadlines and Queue Times
- PG 205
Intertek Learning & Development
Company Confidential – For internal use only20
Customer Service
Good Customer Service = Lasting relationships
Average Customer Service = Steady relationships that could be lost
Poor Customer Service = Lost business
- PG 206
Intertek Learning & Development
Company Confidential – For internal use only21
Customer Service – Why bother?
Statistics
• For every one customer that complains, seven do not!
• Many customers move away without telling you why.
• An unhappy customer is likely to tell 30 other people about their experience.
- PG 207
Intertek Learning & Development
Company Confidential – For internal use only22
Complaints
What is a complaint?
How can complaints be made?
- PG 208
Intertek Learning & Development
Company Confidential – For internal use only23
Complaints and SOP 7.14.1
Use SOP 7.14.1 for significant complaints
• Validity of test data is questioned
• Threat of lawyer or lawsuit
Examples of lower-level complaints:
• Customer disputes a bill
• Customer did not receive deliverable
• Customer has not heard back from engineer or sales person…
• Customer PO does not match our invoice
• Customer has not received a quote
- PG 209
Intertek Learning & Development
Company Confidential – For internal use only24
Internal Request for Quote Template
Internal Request for Quote (IRFQ)
Benefits to Engineering and Operations
• Sales is training to do quotes
• PC uses RFQ to schedule time
• All information in one form
Benefits to Sales
• Twenty four (24) hour turn-around time from Operations
• PC uses RFQ to schedule based on time need and not $$ quoted
• Able to quote faster and more independent
- PG 210
Intertek Learning & Development
Company Confidential – For internal use only25
Signed Order Template
Contact your reviewer and client
Signed Order Template
- PG 211
Intertek Learning & Development
Company Confidential – For internal use only26
Promised Completion Dates
Promised Completion Dates (PCDs)
• Set five (5) days after the last day of the project
• Important to meet all PCDs
• Notify PC if a project need to be pushed out for some reason, such as extra testing
Waiting for Client Information – More than 48 hours
• Ensure the communication process was followed
• Write a Letter Report so the project can be invoiced
• A PCOR will be at the discretion of Sales and Operations
Queue Time – 2 day times
• Use of the Network
- PG 212
Intertek Learning & Development
Company Confidential – For internal use only27
Class Exercise
Typical Testing
Locate the standards noted in your Participant Guide and
identify the difference in how testing is presented
When you get to UL 1598, please leave the standard open and
accessible on your computer
- PG 237
Intertek Learning & Development
Company Confidential – For internal use only28
Typical Test Program
• How to create a Test Program
• Discuss data sheet creation
• Examine the overall program
• Consider the order in which tests are performed
- PG 238
Intertek Learning & Development
Company Confidential – For internal use only29
Why do we perform tests?
• Compliance with the standard
• Allows the manufacturer more latitude in how he/she designs products rather than simply defining the construction of the product to meet safety requirements
- PG 239
Intertek Learning & Development
Company Confidential – For internal use only30
When there is more than one standard
Sometimes, there is more than one standard in a report
- PG 241
Intertek Learning & Development
Company Confidential – For internal use only31
Reasons
• Clients want to have more than one standard on a product due to selling the same product in more than one country
• We can use multiple standards when the product complies with all the requirements in all standards used
- PG 241
Intertek Learning & Development
Company Confidential – For internal use only32
When can we use more than one standard?
We need a separate report when the requirements in the standard conflict
- PG 241
Intertek Learning & Development
Company Confidential – For internal use only33
Separate Reports
• US and Canadian Standards
• Two Construction Reviews (unless standards are harmonized)
• When we can include two standards in a report
• When we are required to create separate reports
• French Markings for Canada
- PG 241
Intertek Learning & Development
Company Confidential – For internal use only34
Class Discussion
• What standards are commonly used in your lab?
• Special circumstances in Safety Testing
• What if I don’t have all of the materials that I require when I start a job?
- PG 242
Intertek Learning & Development
Company Confidential – For internal use only35
Summary
• Review of Job Process Flow
• Testing Paperwork
• Voltage Measurement
• Current Measurement
• Leakage Current Measurement
• Dielectric Voltage Withstand Test
• Creepage and Clearances
• Measurement Uncertainty
• When to use more than one standard
• Typical Testing
• Typical Standard Use
Intertek Learning & Development
Company Confidential – For internal use only36
That’s a Wrap
Thank you for your participation today!