internet services for crs country programs request … · 2020. 10. 27. · pp protocol processor...
TRANSCRIPT
![Page 1: INTERNET SERVICES FOR CRS COUNTRY PROGRAMS Request … · 2020. 10. 27. · PP Protocol Processor RFP Request for Proposal SARO South Africa Regional Office SLA Service Level Agreement](https://reader034.vdocuments.site/reader034/viewer/2022052617/60af052493fe1d72ac257ba6/html5/thumbnails/1.jpg)
INTERNET SERVICES FOR CRS COUNTRY PROGRAMS
Request for Proposal No. USVSAT2021
CATHOLIC RELIEF SERVICES
Contact: Regina Hill
![Page 2: INTERNET SERVICES FOR CRS COUNTRY PROGRAMS Request … · 2020. 10. 27. · PP Protocol Processor RFP Request for Proposal SARO South Africa Regional Office SLA Service Level Agreement](https://reader034.vdocuments.site/reader034/viewer/2022052617/60af052493fe1d72ac257ba6/html5/thumbnails/2.jpg)
INTERNET SERVICES RFP #USVSAT2021
2
INVITATION TO PARTICIPATE
October 22, 2020
Dear Prospective Vendors:
Your company is invited to participate in this Request for Proposal (RFP) for an
international organization that has the experience and capabilities to supply, install, and
provide Internet Services through Very Small Aperture Terminal (VSAT) systems to its field
offices located in West, East, and Central Africa. Catholic Relief Services – USCCB (CRS) is
requesting proposals from Vendors to evaluate experiences with similar clients, creative
ideas, and strategic and tactical approaches to delivering and maintaining Internet Services.
As the Procurement professional responsible for facilitating this process, the rules of
engagement are for you to contact me via e-mail at [email protected], with CC to
CRS will accept questions through 12 p.m. ET. on October 28, 2020. Interested Bidders
should submit their questions to the email addresses above. CRS will provide answers to all
relevant questions by email to all participating companies or organizations.
Complete proposals packets are due by 4 p.m. ET, November 13, 2020.
Please refrain from communicating with other staff of CRS in regard to this RFP. Any
communication outside of this process may result in disqualification. Please follow the
instructions provided in this document for your responses to the RFP. CRS looks forward to
working with you throughout the RFP process.
Sincerely,
Regina Hill
RFP Manager
![Page 3: INTERNET SERVICES FOR CRS COUNTRY PROGRAMS Request … · 2020. 10. 27. · PP Protocol Processor RFP Request for Proposal SARO South Africa Regional Office SLA Service Level Agreement](https://reader034.vdocuments.site/reader034/viewer/2022052617/60af052493fe1d72ac257ba6/html5/thumbnails/3.jpg)
INTERNET SERVICES RFP #USVSAT2021
3
Organization Overview and Background
Catholic Relief Services – United States Conference of Catholic Bishops (CRS) was founded in
1943 to serve World War II survivors in Europe. Since then, CRS has expanded in size to
reach more than 130 million people in more than 100 countries on five continents.
For over 75 years, our mission has been to assist impoverished and disadvantaged people
overseas, working in the spirit of Catholic social teaching to promote the sacredness of
human life and the dignity of the human person. Although our mission is rooted in the
Catholic faith, our operations serve people based solely on need, regardless of their race,
religion or ethnicity. Within the United States, CRS engages Catholics to live their faith in
solidarity with the poor and suffering people of the world.
Trusted and globally respected, CRS partners with people, organizations, and governments
around the world to end poverty, disease, hunger and injustice—always based on need, not
creed. We put our faith into action to help the world’s poorest people create lasting change.
Guided by the belief that we are all one human family, CRS invites you to witness what
together we can do.
![Page 4: INTERNET SERVICES FOR CRS COUNTRY PROGRAMS Request … · 2020. 10. 27. · PP Protocol Processor RFP Request for Proposal SARO South Africa Regional Office SLA Service Level Agreement](https://reader034.vdocuments.site/reader034/viewer/2022052617/60af052493fe1d72ac257ba6/html5/thumbnails/4.jpg)
INTERNET SERVICES RFP #USVSAT2021
4
TABLE OF CONTENTS
INVITATION TO PARTICIPATE ................................................................................................... 2
TABLE OF CONTENTS.................................................................................................................... 4
REQUEST FOR PROPOSAL DEFINITIONS, ACRONYMS, INITIALISMS ................................... 7
SECTION 1. SCOPE OF WORK (SOW) .......................................................................................... 8
Scope of Work/Service ......................................................................................................................................... 8
Stage I: VSAT Network Design ............................................................................................................................ 8
1.1 Design ........................................................................................................................................................ 8
1.2 Approval .................................................................................................................................................... 8
1.3 Time Schedule .......................................................................................................................................... 8
Stage II: Recommissioning, Repointing of VSAT terminals ............................................................................. 9
2.1 Installation ................................................................................................................................................ 9
2.2 Configuration ............................................................................................................................................ 9
2.3 Time Schedule .......................................................................................................................................... 9
Stage III: Provide Internet Service and Support ............................................................................................... 9
3.1 Internet Service ........................................................................................................................................ 9
3.2 Support .................................................................................................................................................... 10
4.1 General .................................................................................................................................................... 10
SECTION 2. PURPOSE .................................................................................................................. 11
1. Background ................................................................................................................................................. 11
2. Project Profile, Current Context, and Requirements ............................................................................. 11
2.1 Project Profile......................................................................................................................................... 11
2.2 Existing Equipment & Current Ground Conditions ............................................................................ 11
3. Bandwidth Requirements ......................................................................................................................... 12
![Page 5: INTERNET SERVICES FOR CRS COUNTRY PROGRAMS Request … · 2020. 10. 27. · PP Protocol Processor RFP Request for Proposal SARO South Africa Regional Office SLA Service Level Agreement](https://reader034.vdocuments.site/reader034/viewer/2022052617/60af052493fe1d72ac257ba6/html5/thumbnails/5.jpg)
INTERNET SERVICES RFP #USVSAT2021
5
4. VSAT Network Technical Requirements ................................................................................................. 12
5. NATIONAL DEFENSE AUTHORIZATION ACT ............................................................................................ 13
6. termS of the contract ................................................................................................................................. 13
8. Price Adjustments ...................................................................................................................................... 14
9. Conditions and Place of Performance ...................................................................................................... 14
10. LAWS AND REGULATIONS ..................................................................................................................... 14
SECTION 2. BID PROCESS AND EVALUATION CRITERIA ...................................................... 15
1. Questions and Answers ............................................................................................................................. 15
2. Award Process ............................................................................................................................................ 15 A. Method of Evaluation ..................................................................................................................................... 15 B. Evaluation Criteria ......................................................................................................................................... 15 C. Award Recommendation ............................................................................................................................... 15
SECTION 3. PROPOSAL DETAILS............................................................................................... 16
1. Complete Proposal ..................................................................................................................................... 16
2. ADDITIONAL DOCUMENTATION ............................................................................................................... 16
3. Submitting Bids and Proposals ................................................................................................................. 16 A. Sealed Bid Receipt .......................................................................................................................................... 16 B. Validity Period ................................................................................................................................................ 17
Proposal Timeline .............................................................................................................................................. 17
ANNEX A ........................................................................................................................................ 18
PROPOSAL RESPONSE FORM ............................................................................................................................. 18
ANNEX B ........................................................................................................................................ 19
FINANCIAL PROPOSAL ....................................................................................................................................... 19
ANNEX C......................................................................................................................................... 20
BIDDER QUESTIONNAIRE FORM ....................................................................................................................... 20
ANNEX D ........................................................................................................................................ 21
![Page 6: INTERNET SERVICES FOR CRS COUNTRY PROGRAMS Request … · 2020. 10. 27. · PP Protocol Processor RFP Request for Proposal SARO South Africa Regional Office SLA Service Level Agreement](https://reader034.vdocuments.site/reader034/viewer/2022052617/60af052493fe1d72ac257ba6/html5/thumbnails/6.jpg)
INTERNET SERVICES RFP #USVSAT2021
6
DETAILED COMPANY INFORMATION ............................................................................................................... 21
ANNEX E......................................................................................................................................... 22
TERMS AND CONDITIONS .................................................................................................................................. 22
ANNEX F ......................................................................................................................................... 23
Vetting Requirements ........................................................................................................................................ 23
ATTACHMENT I – TERMS AND CONDITIONS .......................................................................... 24
Appendix C - Offices Upstream/ Downstream Bandwidth ............................................................................. 25
Appendix D - Downstream Application Groups .............................................................................................. 26
Appendix E - Upstream Application Groups .................................................................................................... 27
Appendix F - Office Subnets ............................................................................................................................... 28
Appendix G – Firewall settings .......................................................................................................................... 29
Comments ............................................................................................................................................................. 29
Appendix H - Content filtering, application blocking and malware protection solution ........................... 30
![Page 7: INTERNET SERVICES FOR CRS COUNTRY PROGRAMS Request … · 2020. 10. 27. · PP Protocol Processor RFP Request for Proposal SARO South Africa Regional Office SLA Service Level Agreement](https://reader034.vdocuments.site/reader034/viewer/2022052617/60af052493fe1d72ac257ba6/html5/thumbnails/7.jpg)
INTERNET SERVICES RFP #USVSAT2021
7
REQUEST FOR PROPOSAL DEFINITIONS, ACRONYMS, INITIALISMS Bidder The eligible vendor who will participate in proposal process
B/w Band width
CARO Central Africa Regional Office
CNO Customer Network Observation
CRS Catholic Relief Services
EARO East Africa Regional Office
Eb/No Energy per bit noise power spectral density
HNO Host Network Operator
ISA Internet Security and Acceleration
ISP Internet Service Provider
IXP Internet Exchange Point
GKIM Global Knowledge and Information Management
NMS Network Management System
NOC Network Operations Center
OEM Original Equipment/Software Manufacturer
PP Protocol Processor
RFP Request for Proposal
SARO South Africa Regional Office
SLA Service Level Agreement
Service Provider
The vendor awarded the contract as a result of the proposal process
VoIP Voice Over Internet Protocol
VNO Virtual Network Operator
VSAT Very small aperture terminal
WARO West Africa Regional Office
![Page 8: INTERNET SERVICES FOR CRS COUNTRY PROGRAMS Request … · 2020. 10. 27. · PP Protocol Processor RFP Request for Proposal SARO South Africa Regional Office SLA Service Level Agreement](https://reader034.vdocuments.site/reader034/viewer/2022052617/60af052493fe1d72ac257ba6/html5/thumbnails/8.jpg)
INTERNET SERVICES RFP #USVSAT2021
8
SECTION 1. SCOPE OF WORK (SOW)
This RFP and the submission of a proposal do not create any obligation upon CRS to buy
goods or services from Vendor, or to enter any negotiations or binding legal relationships
with any vendor.
SCOPE OF WORK/SERVICE
The scope of work for this proposal is divided into three stages.
Stage I: VSAT network design
Stage II: Re commissioning and/ or Re pointing of VSATs
State III: Provide Internet service and support
Vendors must submit proposals for all three stages, which clearly distinguish level of effort
and cost between Stages. In the event the vendor fails to quote for either of the stages, the
proposal will be rejected. For safety reasons, requests for site visits at this time must be
deemed absolutely necessary by the vendor and CRS.
STAGE I: VSAT NETWORK DESIGN
The vendor is to propose design for the entire VSAT network that spans teleport and remote
VSAT terminal setups.
1.1 DESIGN
VSAT network design must include equipment list; topology diagrams; and VNO, field office
and other equipment specifications and configurations, and must meet requirements stated
in “VSAT Network Technical Requirements,” “Bandwidth Requirements,” and other sections
of this RFP.
1.2 APPROVAL
VSAT network design must be approved by CRS engineers before implementation
1.3 TIME SCHEDULE
Supply and installation: Installation and work shall begin on March 1, 2021.
1.4 Configuration: Within 30 days from effective date of contract.
![Page 9: INTERNET SERVICES FOR CRS COUNTRY PROGRAMS Request … · 2020. 10. 27. · PP Protocol Processor RFP Request for Proposal SARO South Africa Regional Office SLA Service Level Agreement](https://reader034.vdocuments.site/reader034/viewer/2022052617/60af052493fe1d72ac257ba6/html5/thumbnails/9.jpg)
INTERNET SERVICES RFP #USVSAT2021
9
STAGE II: RECOMMISSIONING, REPOINTING OF VSAT TERMINALS
The vendor is to recommission on the same satellite where necessary or draw up a plan for
repointing to other satellites they deem fit to supply the service as stipulated above. CRS
will assist when possible to secure discounts from vendors especially iDirect.
All sites have an already existing Prodelin 2.4M terminal. Service provider must incorporate
the Prodelin 2.4M terminal equipment into their design with minimum alterations as
changes have cost implications. Offices Upstream/ Downstream Bandwidth for details on
Modem and BUC installed in each office, including the office coordinates.
2.1 INSTALLATION
Installations on the sites should be done strictly according to OEM equipment manufacturer
recommendations/standards
2.2 CONFIGURATION
Terminals must meet the requirements outlined in the document. However, configurations
of the various terminals on the sites will be left to the vendor since this is influenced by the
proposed design. Configuration at all locations should be complete within 30 days from the
effective date of contract.
2.3 TIME SCHEDULE
Supply and installation: All required locations within 30 days from effective date of
contract.
STAGE III: PROVIDE INTERNET SERVICE AND SUPPORT
3.1 INTERNET SERVICE
CRS expects the availability for the VSAT links specified in this proposal to be 99.5% when
these conditions are satisfied on site:
i. Stable Power supply to the VSAT terminals at all times
ii. A properly earthed facility where the VSAT is installed to ensure protection
from power surges or lightening
iii. Specific Lightening protection for the VSAT
3.1.1 Supplier will provide the technical design and specifications to ensure the
above three conditions are satisfied on each site.
3.1.2 CRS prefers dedicated channels for its sites instead of shared channels.
![Page 10: INTERNET SERVICES FOR CRS COUNTRY PROGRAMS Request … · 2020. 10. 27. · PP Protocol Processor RFP Request for Proposal SARO South Africa Regional Office SLA Service Level Agreement](https://reader034.vdocuments.site/reader034/viewer/2022052617/60af052493fe1d72ac257ba6/html5/thumbnails/10.jpg)
INTERNET SERVICES RFP #USVSAT2021
10
3.2 SUPPORT
Customer contact center must be reachable by phone, IM and email. The call center should
have direct escalation to senior engineers in the Network Operations Centre (NOC) who will
work to restore faults and problems within the agreed time defined by service levels. The
Vendor contact center will field and begin the resolution process for customer service
requests, and will also provide CRS with a proactive outage notification service, alerting it to
service outages.
3.2.1 All problems must be logged into a web based Help Desk system that should
keep track of all past and current problems and problems resolution state.
3.2.2 CRS must have direct view only access to all equipment and VNO capabilities
on the vendor’s network to be able to do its own monitoring as well as
configuration changes on the channels CRS terminals will be running on.
3.2.3 It is preferred that the vendor controls the NOC Hosts the services directly.
4.1 GENERAL
CRS expects vendor to be recognized partners of equipment supplied for this project and
therefore be in the position to pass on manufacturers’ warranties to CRS on equipment
supplied.
4.1.1 Vendor will be responsible for optimized performance tuning of the network
to meet the levels outlined in this document.
4.1.2 Vendor is responsible for monitoring the network status at all times even if
CRS has access to VNO capabilities.
4.1.3 CRS will expect a minimum of 24-hour notice on outages for maintenance on
the hub or client site.
4.1.4 Vendor must hold a Virtual Network Operator license.
4.1.5 Vendor is expected to quote hardware needed per site FOB plus estimated
shipping charges via air freight.
4.1.6 Vendor will have to submit sales tax registration number(s), upon request,
without which vendor will not be contracted.
4.1.7 This RFP is not a legal document. This RFP and any associated
correspondence or discussions do not bind CRS to award contract(s) for all or
part of the project.
4.1.8 CRS reserves the right to accept or reject in part or full any or all proposals
without assigning any reason whatsoever.
4.1.9 CRS is not bound to accept the lowest priced proposal and may reject any
proposal or any part of the proposal without assigning any reason thereof.
![Page 11: INTERNET SERVICES FOR CRS COUNTRY PROGRAMS Request … · 2020. 10. 27. · PP Protocol Processor RFP Request for Proposal SARO South Africa Regional Office SLA Service Level Agreement](https://reader034.vdocuments.site/reader034/viewer/2022052617/60af052493fe1d72ac257ba6/html5/thumbnails/11.jpg)
INTERNET SERVICES RFP #USVSAT2021
11
SECTION 2. PURPOSE
Catholic Relief Services (CRS), is launching this RFP to solicit proposals from qualified
vendors that will manage and provide Internet service and corporate WAN to CRS locations
worldwide by a very small aperture terminal satellite system, or VSAT.
Presently CRS has a VNO made up of iDirect VSAT terminals in all the under listed sites
pointing to NSS10 in some areas and T10 in others. CRS seeks to contract a single VSAT
provider for services to the existing infrastructure as well as additional sites as and when
CRS deems fit. The vendor selected through this RFP will be expected to manage services as
outlined within this document.
1. BACKGROUND
Presently CRS has a VNO made up of iDirect VSAT terminals in all the under listed sites
pointing to NSS10 in some areas and T10 in others. CRS seeks to contract a single VSAT
provider for services to the existing infrastructure as well as additional sites as and when
CRS deems fit. The vendor selected through this RFP will be expected to manage services as
outlined within this document.
2. PROJECT PROFILE, CURRENT CONTEXT, AND REQUIREMENTS
2.1 PROJECT PROFILE
This Request for Proposals is for the management and support services of Internet Service
by VSAT to CRS offices located in Africa. CRS offices are under the oversight of three (3)
regional offices.
For this project, each regional office will manage project implementation for the countries
under its purview. Regional offices and their oversight countries included in this project are
listed in Section 3.3 below.
2.2 EXISTING EQUIPMENT & CURRENT GROUND CONDITIONS
2.2.1 All of the field offices referenced below are presently equipped with idirect vsats
utilizing c-band (or ku band where c band is not available) technology.
2.2.2 All of the offices are equipped with VSAT terminals. It is assumed the Eb/No is
technically of an acceptable level, and that the pick and pol has been done properly.
Vendors should feel free to include a quotation for those field office visits they
deem necessary for general diagnosis or change of satellite.
2.2.3 All offices are using a cross polarization and have no additional parts for migration
to a different polarization.
![Page 12: INTERNET SERVICES FOR CRS COUNTRY PROGRAMS Request … · 2020. 10. 27. · PP Protocol Processor RFP Request for Proposal SARO South Africa Regional Office SLA Service Level Agreement](https://reader034.vdocuments.site/reader034/viewer/2022052617/60af052493fe1d72ac257ba6/html5/thumbnails/12.jpg)
INTERNET SERVICES RFP #USVSAT2021
12
3. BANDWIDTH REQUIREMENTS
Region MB
Central Africa 17.51
East Africa 43.57
West Africa 5.36
Total 66.44
3.1 Vendor must provide bandwidth that is 100% physically separated from other
clients and is for the exclusive use of the field offices.
3.2 CRS will provide vendor with a 60 days’ notice for adding or removing offices from
the network or changing service levels or bandwidth requirements.
4. VSAT NETWORK TECHNICAL REQUIREMENTS
4.1 CRS prefers the winning supplier own its own earth station/hub facilities.
4.2 Supplier must implement private subnets as specified in Appendix F (Office
Subnets) with ability to route packets across offices within the private address
space.
4.3 Access to Internet should be provided using Internet gateway(s) at teleport(s) with
One-to-Many NAT for each office separately (separate single public IP address for
each offices).
4.4 State what firewall setup at teleport(s) and upstream packet filter at VSAT modems
must be implemented as per configuration specified in Appendix G (Firewall
settings).
4.5 The vendor must implement concurrent TCP connections limit per office and
enable separation so potential Internet traffic anomalies generated by one office do
not affect other offices.
4.6 Group Quality of Service (GQoS) must be configured as specified in Appendix D
(Downstream Application Groups) and Appendix E (Upstream Application Groups).
4.7 The vendor must implement content filtering, application blocking and malware
protection solution as specified in Appendix H. All internet traffic must be routed
through this setup.
4.8 The vendor must provide access to CRS-appointed network administrators to
monitor bandwidth utilization per location and combine usage of all offices. CRS
will use this access to confirm that bandwidth provided corresponds with
contracted requirements. This provision does not discharge vendor from its
responsibility to provide support to field office terminals and VSAT networks.
![Page 13: INTERNET SERVICES FOR CRS COUNTRY PROGRAMS Request … · 2020. 10. 27. · PP Protocol Processor RFP Request for Proposal SARO South Africa Regional Office SLA Service Level Agreement](https://reader034.vdocuments.site/reader034/viewer/2022052617/60af052493fe1d72ac257ba6/html5/thumbnails/13.jpg)
INTERNET SERVICES RFP #USVSAT2021
13
4.9 The vendor must be a VNO with the ability to enable configuration in this Technical
Requirements section with management from a single NOC.
4.10 The vendor must possess its own NMS Servers and Protocol Processors.
4.11 The vendor must provide flexibility to increase or decrease bandwidth amounts
quarterly.
4.12 The vendor must try to minimize the number of satellites for the entire service
area.
4.13 All pricing should be for duplex (not simplex).
4.14 CRS IT staff on site will be the first point of support should a problem arise.
4.14.1 The vendor is expected to design a training program and to train these staff so that
they are able to provide that first level of support as well as to be able to liaise with
the NOC should the problem require escalated support.
4.14.2 Cost associated with this training should be enclosed.
5. NATIONAL DEFENSE AUTHORIZATION ACT
Provider must comply with the recently enacted John S. McCain National Defense
Authorization Act (NDAA), specifically section 889. Early interpretation of this regulation in
our sector states that contractors and/or implementing partners with the US Government
shall not procure equipment/services from Huawei or ZTE (or any of their known
subsidiaries), or procure services from providers that utilize equipment/services from
Huawei or ZTE (or any of their known subsidiaries) in the delivery of their services.
6. TERMS OF THE CONTRACT
6.1 This engagement will be documented in a business contract for an initial period of
one (1) year with the potential for two additional renewal periods.
6.2 The anticipated contract shall commence on March 1, 2021, with the option for
renewal under the same terms and conditions. Annually CRS and Service Provider
will review the contract to ensure that CRS is receiving optimal pricing against
industry standards.
6.3 For the avoidance of doubt, under no circumstances will the contract renew
automatically.
6.4 The Effective Date of the contract shall be mutually agreed upon by the parties and
stipulated in the contract recitals.
6.5 Annex E and Attachment 1 are hereby incorporated into this RFP and any resulting
contract. The Service Provider is required to adhere to the clauses in Attachment 1.
7. CANCELLATION
7.1 Cancellation for Convenience: Catholic Relief Services reserves the right to cancel
the contract without reason provided that the Service Provider is given at least
![Page 14: INTERNET SERVICES FOR CRS COUNTRY PROGRAMS Request … · 2020. 10. 27. · PP Protocol Processor RFP Request for Proposal SARO South Africa Regional Office SLA Service Level Agreement](https://reader034.vdocuments.site/reader034/viewer/2022052617/60af052493fe1d72ac257ba6/html5/thumbnails/14.jpg)
INTERNET SERVICES RFP #USVSAT2021
14
thirty (30) days written notice of its intent to cancel. This provision should not be
understood as waiving the right of CRS to terminate the contract for cause, but is
supplementary to that provision.
7.2 Cancellation for Insolvency: Catholic Relief Services reserves the right to cancel the
contract at any time by giving written notice to the Service Provider, without
compensation to the Service Provider, if the Service Provider becomes bankrupt or
otherwise insolvent provided and unable to fulfill the terms of the contract
awarded to Service Provider.
8. PRICE ADJUSTMENTS
Prices shall be firm for the initial term of the contract. Upon renewal, the Service Provider
may request an adjustment in the contract price. Any increase will not take effect until
formal approval is received from CRS and Service Provider notified accordingly. In the
event of extreme increases in price, CRS reserves the right to terminate this contract in its
entirety upon thirty (30) days written notice to Service Provider.
Where CRS is able to obtain less expensive pricing from Equipment Manufacturer or
Bandwidth supplier directly vendor should be willing to accept and incorporate this offer
into their Design.
9. CONDITIONS AND PLACE OF PERFORMANCE
9.1 In the event that site surveys are deemed necessary they should be identified and
costs associated with them should be included in the proposal.
9.2 Local government relationship and prior experience CRS will as much as possible
facilitate the relationship between local government relationships. Vendor
relationships with local government will be a plus.
9.3 Site Surveys - In the event that site surveys are deemed necessary they should be
identified and costs associated with them should be included in the Financial
Proposal.
9.4 Training requirements should take into account various bandwidth options.
10. LAWS AND REGULATIONS
10.1 Vendors will be obligated to comply with all applicable federal, state, and local laws
and regulations, including certification of compliance with the United States
PATRIOT Act and Anti-Terrorism laws.
10.2 Vendors must be allowed to conduct business in the Country and State of Business
Registration.
10.3 The registration and tax clearance documentation should be provided in the
proposal.
![Page 15: INTERNET SERVICES FOR CRS COUNTRY PROGRAMS Request … · 2020. 10. 27. · PP Protocol Processor RFP Request for Proposal SARO South Africa Regional Office SLA Service Level Agreement](https://reader034.vdocuments.site/reader034/viewer/2022052617/60af052493fe1d72ac257ba6/html5/thumbnails/15.jpg)
INTERNET SERVICES RFP #USVSAT2021
15
SECTION 2. BID PROCESS AND EVALUATION CRITERIA
1. QUESTIONS AND ANSWERS
CRS will accept questions submitted through email for further clarification of the RFP
Document and to ensure that there is a clear and concise understanding of the
requirements. All questions should be submitted to the sole point of contact for this RFP:
Regina Hill, [email protected], with CC to [email protected].
Questions must be received by October 27, 2020.
2. AWARD PROCESS
A. METHOD OF EVALUATION
Each bid will be evaluated by a CRS Bid Committee. The award will go to the company that
provides the services at a cost that are in the best interest of CRS.
The CRS Bid Committee endeavors to select the Supplier who offers the most beneficial
combination of qualifications, services, and cost and meets the requirements of the RFP
document. Only proposals judged to be responsive to the submission requirements set
forth in this RFP will be evaluated.
For the purposes of evaluation, each proposal must be submitted in two (2) parts. Part I
consists of the Technical Proposal. Part II consists of the Financial Proposal. The Technical
Proposal will be evaluated strictly on its merits.
After completion of the Technical and Financial Evaluations, a composite score will be
assigned to each proposal with the Technical score weighted at 50 points and Cost score
weighted at 50 points.
The basis for award will be the highest composite score.
B. EVALUATION CRITERIA
The following represents the evaluation criteria:
1. Financial Proposal (Commercial/Cost/Competitiveness)
2. Technical Proposal Capability and Resources
3. Completion of RFP Requirements
4. Bidder References
C. AWARD RECOMMENDATION
Bidders are cautioned to propose the best possible offer at the outset of the process, as
there is no guarantee that any bidder will be allowed an opportunity to submit a Best and
Final Offer.
![Page 16: INTERNET SERVICES FOR CRS COUNTRY PROGRAMS Request … · 2020. 10. 27. · PP Protocol Processor RFP Request for Proposal SARO South Africa Regional Office SLA Service Level Agreement](https://reader034.vdocuments.site/reader034/viewer/2022052617/60af052493fe1d72ac257ba6/html5/thumbnails/16.jpg)
INTERNET SERVICES RFP #USVSAT2021
16
SECTION 3. PROPOSAL DETAILS
1. COMPLETE PROPOSAL
To be considered responsive, a complete proposal addressing the specifications of this RFP
is required. Each proposal should be prepared simply and economically, providing a straight
forward, concise description of the Bidder’s ability to meet the requirements of the RFP. A
complete proposal will contain separate Technical and Financial offerings.
The following information must be included in all proposals. Bidders must respond to all
Annex sections of the RFP.
i. Statement/Scope of Work – Bidder must provide a proposal that
demonstrates their ability to complete the work requested in this RFP
document. Proposals should address requirements outlined in the Statement
of Work.
ii. Proposal Response Form (Annex A).
iii. Financial Proposal (Annex B).
iv. Reply to Bidder Questionnaire (Annex C).
v. Detailed Company Information (Annex D).
vi. Terms and Conditions (Annex E and Attachment I).
vii. Vetting Requirements (Annex F).
2. ADDITIONAL DOCUMENTATION
i. Copies of corporate registration and tax clearance documents should be attached to the proposal.
3. SUBMITTING BIDS AND PROPOSALS
A. SEALED BID RECEIPT
Once a bid is submitted, it cannot be modified. Proposals that are received after the specified
due date and time cannot be considered unless (a) all other bids received on time do not
meet specifications, or (b) no other bids are received.
All proposals and accompanying documentation will become the property of the CRS and
will not be returned. The content of each proposal will be held in strict confidence during
the bid evaluation process, and no details of any proposal will be discussed outside the
evaluation process. The successful bidder's proposal and a copy of the specification will be
made part of the contract. Therefore, an official authorized to commit the company to a
contract must sign Annex A.
![Page 17: INTERNET SERVICES FOR CRS COUNTRY PROGRAMS Request … · 2020. 10. 27. · PP Protocol Processor RFP Request for Proposal SARO South Africa Regional Office SLA Service Level Agreement](https://reader034.vdocuments.site/reader034/viewer/2022052617/60af052493fe1d72ac257ba6/html5/thumbnails/17.jpg)
INTERNET SERVICES RFP #USVSAT2021
17
B. VALIDITY PERIOD
Proposals must remain valid for a period of three (3) calendar months following
submission. If the proposal is withdrawn during the Validity Period the vendor should
notify CRS by emailing [email protected].
PROPOSAL TIMELINE RFP Launch October 22, 2020 Vendor Questions To CRS October 28, 2020 Questions and Answers to Vendor October 30, 2020 Proposal Due Date November 13, 2020 CRS Clarifications to/from Vendors, if required November 16 – 18, 2020 Negotiations with Supplier November 18 – 24, 2020 Award Announcement To Be Determined
![Page 18: INTERNET SERVICES FOR CRS COUNTRY PROGRAMS Request … · 2020. 10. 27. · PP Protocol Processor RFP Request for Proposal SARO South Africa Regional Office SLA Service Level Agreement](https://reader034.vdocuments.site/reader034/viewer/2022052617/60af052493fe1d72ac257ba6/html5/thumbnails/18.jpg)
INTERNET SERVICES RFP #USVSAT2021
18
ANNEX A
PROPOSAL RESPONSE FORM
Submitted by:
The undersigned hereby submits the attached proposal for RFP #USVSAT2021.
Authorized Name and Title:
Authorized Signature:
Witness Name and Signature:
![Page 19: INTERNET SERVICES FOR CRS COUNTRY PROGRAMS Request … · 2020. 10. 27. · PP Protocol Processor RFP Request for Proposal SARO South Africa Regional Office SLA Service Level Agreement](https://reader034.vdocuments.site/reader034/viewer/2022052617/60af052493fe1d72ac257ba6/html5/thumbnails/19.jpg)
INTERNET SERVICES RFP #USVSAT2021
19
ANNEX B
FINANCIAL PROPOSAL
Provide complete cost details for Product, Training, Support Services, and Implementation.
Financials must be stated in USD.
Please ensure pricing quoted is comprehensive and includes all reasonable business
expenses that may be incurred.
For any variable costs based on activity volumes (etc.), please provide per unit pricing,
specifying any volume levels at which discounts may apply.
Indicate whether the cost is a one-time or recurring charge.
I. Items may include, but are not limited to those listed below.
a. Cost element (e.g., license fee, hosting fee, configuration support)
b. Cost category (Fixed, Time and Materials)
c. Unit measure (e.g., named user, concurrent user, site, consulting hours, travel)
d. Customization and Reporting
e. Total Cost
f. Amount of total cost that constitutes a one-time cost
g. Ongoing support and maintenance (if not a subscription-based solution) (e.g.,
upgrades, systems enhancements, changes/additions/deletions to, incident
case management, training portal).
II. Explanation of Financial Proposal.
Identify the basis of offering, any critical assumptions, implied service levels, restrictions on
raising or reducing quantities, and any application of non-profit discounts.
![Page 20: INTERNET SERVICES FOR CRS COUNTRY PROGRAMS Request … · 2020. 10. 27. · PP Protocol Processor RFP Request for Proposal SARO South Africa Regional Office SLA Service Level Agreement](https://reader034.vdocuments.site/reader034/viewer/2022052617/60af052493fe1d72ac257ba6/html5/thumbnails/20.jpg)
INTERNET SERVICES RFP #USVSAT2021
20
ANNEX C
BIDDER QUESTIONNAIRE FORM
Completed table is required with Bidders official proposal.
BIDDER QUESTIONNAIRE
REQUESTED INFORMATION BIDDER RESPONSE Legal Company Name Address Telephone No. and Email Address Website Name of Contact Person Title of Contact Person Billing Address Tax Registration or equivalent document DUNS Number Parent Company (if applicable) Parent Company Address Subsidiaries, Associates, Associations, Overseas Representatives Type of Business (corporation, partnership, sole proprietorship, etc.) Within the last three years, has administrative, civil or criminal litigation been filed or pursued in any country against your Company? If yes, provide specific details.
Three references: Two clients with a similar scope of services as requested in the RFP. Client Name, Email, Phone Number, Business Address
![Page 21: INTERNET SERVICES FOR CRS COUNTRY PROGRAMS Request … · 2020. 10. 27. · PP Protocol Processor RFP Request for Proposal SARO South Africa Regional Office SLA Service Level Agreement](https://reader034.vdocuments.site/reader034/viewer/2022052617/60af052493fe1d72ac257ba6/html5/thumbnails/21.jpg)
INTERNET SERVICES RFP #USVSAT2021
21
ANNEX D
DETAILED COMPANY INFORMATION
Submitted by (Name):
Please insert your responses within this document. The pages will expand as needed to fit your responses.
A. Brief Background: Provide company overview/background and indicate the prior experience of the company. (No more than five pages.)
B. Prior Experience: Provide prior work/projects of the magnitude described in this RFP document, and include references for CRS’ information.
C. Unsuccessful Performance: Please describe an unsuccessful performance event. (No more than 2 pages.)
D. Contact Details: Client with whom you were recently terminated or dismissed from contract. Please explain cause for dismissal.
E. Location Work Plan: Provide a detailed plan on how you intend to service the contract regarding the following:
1) Implementation Phase: What will be the initial setup to start or kick-off the project?
2) Contingency Phase: What are your contingency plans and how do you plan to carry them out if any unforeseen circumstance arise that can cause disruption in the service (e.g., pandemic, employee absence, platform/software/equipment failure)?
![Page 22: INTERNET SERVICES FOR CRS COUNTRY PROGRAMS Request … · 2020. 10. 27. · PP Protocol Processor RFP Request for Proposal SARO South Africa Regional Office SLA Service Level Agreement](https://reader034.vdocuments.site/reader034/viewer/2022052617/60af052493fe1d72ac257ba6/html5/thumbnails/22.jpg)
INTERNET SERVICES RFP #USVSAT2021
22
ANNEX E
TERMS AND CONDITIONS
Attachment I presents the Terms & Conditions (“T&Cs”) which CRS considers to be essential
and relevant to the contractual relationship between the parties. Bidders are expected to
familiarize themselves with these T&Cs and be prepared to be governed by them in
substantially the form presented here. In submitting a proposal, a vendor who desires to
request an exception to these T&Cs and/or desires to propose an alternative approach to a
particular provision should identify such provision(s) and explain the rationale for the
exception or alternative. Additionally, should the Bidder propose to use a form contract
adapted to its particular goods or services which substantially conforms to the T&Cs
presented here, that form contract should be submitted as part of the Bidder’s Bid Package
as Annex C.
Terms and Conditions Acceptance
I hereby accept and agree to the Terms and Conditions of this Request for Proposal for the
managing and support of internet services by VSAT to CRS offices located in Africa.
Name and Title of authorized respondent:
Signature:
Date:
![Page 23: INTERNET SERVICES FOR CRS COUNTRY PROGRAMS Request … · 2020. 10. 27. · PP Protocol Processor RFP Request for Proposal SARO South Africa Regional Office SLA Service Level Agreement](https://reader034.vdocuments.site/reader034/viewer/2022052617/60af052493fe1d72ac257ba6/html5/thumbnails/23.jpg)
INTERNET SERVICES RFP #USVSAT2021
23
ANNEX F
VETTING REQUIREMENTS
A. The bidder must verify that it does not appear on the following sites in a dishonorable
disposition. Please include below (or attach) a screenshot of the results of each of the three
searches.
1. The website of the System for Award Management (SAM) formally known as the
Excluded Party List System (EPLS): https://www.sam.gov
2. The website of the United Nations Security (UNSC) sanctions committee
established under UNSC Resolution 1267 (1999) (the “1267 Committee”):
https://www.un.org/securitycouncil/content/un-sc-consolidated-list
3. The Office of Foreign Assets Control Specially Designated Nationals and Blocked
Persons List https://www.treasury.gov/ofac/downloads/sdnlist.pdf
![Page 24: INTERNET SERVICES FOR CRS COUNTRY PROGRAMS Request … · 2020. 10. 27. · PP Protocol Processor RFP Request for Proposal SARO South Africa Regional Office SLA Service Level Agreement](https://reader034.vdocuments.site/reader034/viewer/2022052617/60af052493fe1d72ac257ba6/html5/thumbnails/24.jpg)
INTERNET SERVICES RFP #USVSAT2021
24
ATTACHMENT I – TERMS AND CONDITIONS
![Page 25: INTERNET SERVICES FOR CRS COUNTRY PROGRAMS Request … · 2020. 10. 27. · PP Protocol Processor RFP Request for Proposal SARO South Africa Regional Office SLA Service Level Agreement](https://reader034.vdocuments.site/reader034/viewer/2022052617/60af052493fe1d72ac257ba6/html5/thumbnails/25.jpg)
INTERNET SERVICES RFP #USVSAT2021
25
APPENDIX A - OFFICES UPSTREAM/ DOWNSTREAM BANDWIDTH
X
CARO 18.569 3072 6
CARO 15.7894 1536 3
CARO 24.4193 128 0.25
CARO 22.4488 1024 2
CARO 23.5949 2304 4.5
CARO 23.5963 640 1.25
CARO 15.2815 128 0.25
CARO 13.15302 64 0.13
CARO 11.8656 64 0.13
17.51
EARO 31.19825 1440 2.11
EARO 31.60049 9620 13.36
EARO 31.39794 1440 2.11
EARO 31.41347 2400 3.52
EARO 31.13567 480 0.7
EARO 31.6011 4096 4.89
EARO 31.57 1440 2.11
EARO 31.68917 2400 3.52
EARO 33.13056 2400 3.52
EARO 31.41167 3360 4.92
EARO 30.4999 1440 2.81
Total EARO 30996 43.56
WARO 1228 1.8
WARO 1024 1.5
WARO 1024 1.5
4.8
65.8725Grand Total
Total WARO
1536
Niger Sassoumbroum 512 1536
Niger Wacha 512
Burkina Faso Ouagadougou 614 1842
4556814572
5040
S.Sudan Yirol X3 5 6.55454 1440 2880
S.Sudan Twic East X3 5 7.168333 1680
3600
S.Sudan Pibor X3 5 6.793333 1200 3600
S.Sudan Pajut X3 5 7.746 1200
5008
S.Sudan Langbar X3 5 6.22 720 2160
S.Sudan Juba IQ IDirect 20 4.87201 912
3600
S.Sudan Jiech X3 5 8.3625 240 720
S.Sudan Duk Poktap X3 5 7.45702 1200
13680
S.Sudan Duk Padiet X3 5 7.748605 720 2160
S.Sudan Bor IQ IDirect 25 6.195865 4060
S.Sudan Awerial (Minkaman) X3 5 6.104563 720 2160
128
Total CARO
Nigeria Damaturu X5 4w kuband 11.7368 64
256
Nigeria Maiduguri X5 4w kuband 11.811 64 128
DRC Kinshasa X5 5 -4.3218 128
DRC Lodja X3 5 -3.5445 640 1280
2048
DRC Mbuji Mayi X5 10 -6.1276 2304 4608
DRC Kananga X3 8 -5.8970 1024
3072
DRC Kalemie X3 8 -8.8851 128 256
CAR Berberati X5 4w kuband 4.2613 1536
3072 6144
UP (Tx)
kbps
Down
(Rx) kbps
Total
kbps
MB = kbps/
1024Y
CAR Bangui X5 10 4.3775
Region Country OfficeModem
installedBUC (W)
Coordinates
![Page 26: INTERNET SERVICES FOR CRS COUNTRY PROGRAMS Request … · 2020. 10. 27. · PP Protocol Processor RFP Request for Proposal SARO South Africa Regional Office SLA Service Level Agreement](https://reader034.vdocuments.site/reader034/viewer/2022052617/60af052493fe1d72ac257ba6/html5/thumbnails/26.jpg)
INTERNET SERVICES RFP #USVSAT2021
26
APPENDIX B - DOWNSTREAM APPLICATION GROUPS
Application Group 1
Priority 4
Protocol Source Destination
DiffServ TOS VLAN IP or Network Ports IP or Network Ports
Any 207.10.X.Y/32 Any Any Any
Any 207.10.X.Y/32 Any Any Any
Application Group 2
Cost 0.1
Protocol Source Destination
DiffServ TOS VLAN IP or Network Ports IP or Network Ports
Any 207.10.X.Y/26 Any Any Any
Application Group 3
Cost 0.3
Protocol Source Destination
DiffServ TOS VLAN IP or Network Ports IP or Network Ports
Any EXCEPT SMTP
Any Any Any Any
Application Group 4
Cost 1
Protocol Source Destination
DiffServ TOS VLAN IP or Network Ports IP or Network Ports
SMTP Any Any Any Any
![Page 27: INTERNET SERVICES FOR CRS COUNTRY PROGRAMS Request … · 2020. 10. 27. · PP Protocol Processor RFP Request for Proposal SARO South Africa Regional Office SLA Service Level Agreement](https://reader034.vdocuments.site/reader034/viewer/2022052617/60af052493fe1d72ac257ba6/html5/thumbnails/27.jpg)
INTERNET SERVICES RFP #USVSAT2021
27
APPENDIX C - UPSTREAM APPLICATION GROUPS
Application Group 1
Priority 4
Protocol Source Destination
DiffServ TOS VLAN IP or Network
Ports IP or Network Ports
Any Any Any 207.10.X.Y/32 Any
Any Any Any 207.10.X.Y/32 Any
Application Group 2
Cost 0.1
Protocol
Source Destination
DiffServ TOS VLAN IP or Network
Ports IP or Network Ports
Any Any Any 207.10.X.Y/26 Any
Application Group 3
Cost 0.3
Protocol Source Destination
DiffServ TOS VLAN IP or Network
Ports IP or Network Ports
Any EXCEPT SMTP
Any Any Any Any
Application Group 4
Cost 1
Protocol Source Destination
DiffServ TOS VLAN IP or Network
Ports IP or Network Ports
SMTP Any Any Any Any
![Page 28: INTERNET SERVICES FOR CRS COUNTRY PROGRAMS Request … · 2020. 10. 27. · PP Protocol Processor RFP Request for Proposal SARO South Africa Regional Office SLA Service Level Agreement](https://reader034.vdocuments.site/reader034/viewer/2022052617/60af052493fe1d72ac257ba6/html5/thumbnails/28.jpg)
INTERNET SERVICES RFP #USVSAT2021
28
APPENDIX D - OFFICE SUBNETS
Country Office Network Network Mask Bits VSAT Modem IP/ Default Gateway
Burundi Bujumbura 10.50.10.0 24 10.50.10.1
Cameroon Yaounde 10.50.20.0 24 10.50.20.1
DR Congo Bukavu 10.50.41.0 24 10.50.41.1
DR Congo Kinshasa 10.50.40.0 24 10.50.40.1
DR Congo Lubumbashi 10.50.42.0 24 10.50.42.1
Nigeria Abuja 10.50.50.0 24 10.50.50.1
Rwanda Kigali 10.50.60.0 24 10.50.60.1
Madagascar Antananarivo 10.80.30.0 24 10.80.30.1
Malawi Lilongwe 10.80.40.0 24 10.80.40.1
Zambia Lusaka 10.80.60.0 24 10.80.60.1
Benin Cotonou 10.90.10.0 24 10.90.10.1
Ghana Tamale 10.90.41.0 24 10.90.41.1
Liberia Monrovia 10.90.60.0 24 10.90.60.1
Niger Niamey 10.90.80.0 24 10.90.80.1
Sierra Leone Freetown 10.90.100.0 24 10.90.100.1
Afghanistan Bamyan 10.30.103.0 24 10.30.103.1
Afghanistan Chakhcharan 10.30.102.0 24 10.30.102.1
Malawi Blantyre 10.80.41.0 24 10.80.41.1
Zimbabwe Harare 10.80.68.0 22 10.80.68.1
Guinea Conakry 10.90.50.0 24 10.90.50.1
DR Congo Goma 10.50.44.0 24 10.50.44.1
South Sudan Awerial (Minkaman)
10.60.51.0 24 10.60.51.1
South Sudan Bor 10.60.58.0 24 10.60.58.1
South Sudan Duk Padiet 10.60.53.0 24 10.60.53.1
South Sudan Duk Poktap 10.60.52.0 24 10.60.52.1
South Sudan Jiech 10.60.55.0 24 10.60.55.1
South Sudan Juba 10.60.50.0 24 10.60.50.1
South Sudan Langbar 10.60.57.0 24 10.60.57.1
South Sudan Pajut 10.60.54.0 24 10.60.54.1
South Sudan Pibor 10.60.56.0 24 10.60.56.1
South Sudan Twic East 10.60.54.0 24 10.60.54.1
South Sudan Yirol 10.60.30.0 24 10.60.30.1
![Page 29: INTERNET SERVICES FOR CRS COUNTRY PROGRAMS Request … · 2020. 10. 27. · PP Protocol Processor RFP Request for Proposal SARO South Africa Regional Office SLA Service Level Agreement](https://reader034.vdocuments.site/reader034/viewer/2022052617/60af052493fe1d72ac257ba6/html5/thumbnails/29.jpg)
INTERNET SERVICES RFP #USVSAT2021
29
APPENDIX E – FIREWALL SETTINGS
RULE # PROTOCOL ACTION SOURCE
DESTINATION
COMMENTS
IP or Network Ports IP or
Network Ports
1 UDP Allow 10.30.102.1 Any Any 53 2 UDP Allow 10.30.103.1 Any Any 53 3 UDP Allow 10.50.10.1 Any Any 53 4 UDP Allow 10.50.20.1 Any Any 53 5 UDP Allow 10.50.40.1 Any Any 53 6 UDP Allow 10.50.41.1 Any Any 53 7 UDP Allow 10.50.42.1 Any Any 53 8 UDP Allow 10.50.50.1 Any Any 53 9 UDP Allow 10.50.60.1 Any Any 53
10 UDP Allow 10.80.30.1 Any Any 53 11 UDP Allow 10.80.40.1 Any Any 53 12 UDP Allow 10.80.41.1 Any Any 53 13 UDP Allow 10.80.60.1 Any Any 53 14 UDP Allow 10.80.68.1 Any Any 53 15 UDP Allow 10.90.10.1 Any Any 53 16 UDP Allow 10.90.100.1 Any Any 53 17 UDP Allow 10.90.41.1 Any Any 53 18 UDP Allow 10.90.50.1 Any Any 53 19 UDP Allow 10.90.60.1 Any Any 53 20 UDP Allow 10.90.80.1 Any Any 53 21 TCP Allow 10.30.102.1 Any Any 53 22 TCP Allow 10.30.103.1 Any Any 53 23 TCP Allow 10.50.10.1 Any Any 53 24 TCP Allow 10.50.20.1 Any Any 53 25 TCP Allow 10.50.40.1 Any Any 53 26 TCP Allow 10.50.41.1 Any Any 53 27 TCP Allow 10.50.42.1 Any Any 53 28 TCP Allow 10.50.50.1 Any Any 53 29 TCP Allow 10.50.60.1 Any Any 53 30 TCP Allow 10.80.30.1 Any Any 53 31 TCP Allow 10.80.40.1 Any Any 53 32 TCP Allow 10.80.41.1 Any Any 53 33 TCP Allow 10.80.60.1 Any Any 53 34 TCP Allow 10.80.68.1 Any Any 53 35 TCP Allow 10.90.10.1 Any Any 53 36 TCP Allow 10.90.100.1 Any Any 53 37 TCP Allow 10.90.41.1 Any Any 53 38 TCP Allow 10.90.50.1 Any Any 53 39 TCP Allow 10.90.60.1 Any Any 53 40 TCP Allow 10.90.80.1 Any Any 53
41 Any Deny 10.0.0.0/8 Any 172.16.0.0/12
Any Block requests to private subnets
42 Any Deny 10.0.0.0/8 Any 192.168.0.0/16
Any Block requests to private subnets
43 ICMP Allow 10.0.0.0/8 Any Any Any Allow ICMP after blocked
subnets
44 Any Allow 10.0.0.0/8 Any 207.10.X.Y/26
Any
45 Any Allow 10.0.0.0/8 Any 69.65.X.Y/32
Any
46 TCP Allow 10.0.0.0/8 Any Any
20,21,25,80,110,143,443, 465,587,993,995,1863,1935, 3101,7800,7810, 8801, 21736
Common TCP ports. Note that DNS is blocked
![Page 30: INTERNET SERVICES FOR CRS COUNTRY PROGRAMS Request … · 2020. 10. 27. · PP Protocol Processor RFP Request for Proposal SARO South Africa Regional Office SLA Service Level Agreement](https://reader034.vdocuments.site/reader034/viewer/2022052617/60af052493fe1d72ac257ba6/html5/thumbnails/30.jpg)
INTERNET SERVICES RFP #USVSAT2021
30
47 UDP Allow 10.0.0.0/8 Any Any 123,7800,7810 Common UDP ports.
Note that DNS is blocked
48 TCP Allow 10.0.0.0/8 25,110,443 Any Any For Mail and HTTPS
servers at CRS site
APPENDIX F - CONTENT FILTERING, APPLICATION BLOCKING AND MALWARE PROTECTION SOLUTION
Content Filtering
Destructive
Category Block Warn Monitor Allow
Criminal Activity X
Hacking X
Illegal Drugs X
Intolerance & Hate X
Phishing & Fraud X
Tasteless & Offensive X
Terrorism X
Violence X
Weapons X
Spam X
Sexual
Category Block Warn Monitor Allow
Adult X
Intimate Apparel & Swimsuit X
Porn X
Gaming
Category Block Warn Monitor Allow
Gambling X
Game Media X
Game Playing X
Commerce
Category Block Warn Monitor Allow
Advertisements & Pop-Ups X
Auctions X
Business X
Finance & Investment X
Job Search & Career Development X
Real Estate X
Shopping X
Communication & Technology
Category Block Warn Monitor Allow
Chat X
![Page 31: INTERNET SERVICES FOR CRS COUNTRY PROGRAMS Request … · 2020. 10. 27. · PP Protocol Processor RFP Request for Proposal SARO South Africa Regional Office SLA Service Level Agreement](https://reader034.vdocuments.site/reader034/viewer/2022052617/60af052493fe1d72ac257ba6/html5/thumbnails/31.jpg)
INTERNET SERVICES RFP #USVSAT2021
31
Downloads X
Forums & Newsgroups X
Hosting Sites X
Proxies X
Peer-to-Peer X
Search Engines & Portals X
Social Networking X
Spyware X
Streaming Media X
Web-based Email X
Leisure
Category Block Warn Monitor Allow
Alcohol & Tobacco X
Comics, Humor, & Jokes X
Entertainment X
Food & Dining X
Hobbies & Recreation X
Home & Garden X
Kid's Sites X
Motor Vehicles X
Personals and Dating X
Photo Searches X
Sports X
Travel X
Knowledge
Category Block Warn Monitor Allow
Arts X
Computing & Technology X
Education X
Government & Legal X
Health & Medicine X
News X
Political Issues & Activist Groups X
Reference X
Religion X
Science X
Sex Education X
Society & Culture X
Image/Multimedia Safe Search
Category Disable Enable Google X Yahoo X MSN X Dogpile X Bing X
Applications
IM
Application Block Allow
![Page 32: INTERNET SERVICES FOR CRS COUNTRY PROGRAMS Request … · 2020. 10. 27. · PP Protocol Processor RFP Request for Proposal SARO South Africa Regional Office SLA Service Level Agreement](https://reader034.vdocuments.site/reader034/viewer/2022052617/60af052493fe1d72ac257ba6/html5/thumbnails/32.jpg)
INTERNET SERVICES RFP #USVSAT2021
32
AIM (AOL Browser) X Yahoo X MSN X
ICQ X
QQ X
IRC X
MySpaceIM X
GoogleTalk X
Media
Application Block Allow
Real Player (Guide, Music Store) X iTunes (Music Store, update) X Yahoo!MusicJukeBox (Guide, Music Store) X Winamp (Internet Radio/TV) X Quicktime (Update) X
Tools
Application Block Allow Weatherbug (Connection) X Alexa Toolbar (Connection) X Remote Approach PDF Tracker X GoToMyPC X LogMeIn X Proxies X
Updates
Application Block Allow Microsoft Office X Yahoo Toolbar X
P2P
Application Block Allow Skype X BitTorrent X Kazaa X WinNY X