International ISO standardization seminar for the reliability technology and cost areaInternational ISO standardization seminar for the reliability technology and cost area
Statoil Business Centre, Stavanger – Norway
Offshore & Onshore reliability data (OREDA) collection –Snapshots from an OREDA JIP member company in Brazil
1
26 April 2016
Everton Nogueira Lima, M.Sc. – PETROBRASGuilherme da Silva Telles Naegeli, M.Sc. – PETROBRAS
26 April 2016
Introduction
Objective:
Development and Implementation ofa Reliability Databank for Petrobras
2
• Present some highlights in the developmentand implementation of a reliability data bankfor the process equipment and productionsystems;
• Present the first results from data collectedfrom Downstream and Upstream areas;
26 April 2016
Development and Implementation ofa Reliability Databank for Petrobras
3Source: https://www.oreda.com
26 April 2016
ISO-14224 - Indústrias de petróleo e gás natural - Coleta e intercâmbio de dados de confiabilidade e manutenção para equipamentos
1. Overview
Source: ABNT NBR ISO 14224:2011 4
26 April 2016
Exercise for Pre-Qualification for OREDA -2010
3. Pilot
Source: ABNT NBR ISO 14224:2011 6
26 April 2016
P-A P-B P-C Total Equip. Class
17 18 16 51 HE15 15 13 43 VE8 6 3 17 PU8 6 3 17 EM
21 20 41 VA
48 66 55 169
Upstream: August/2011 – April/2012
4. Data Collection – Phase X
8
26 April 2016
Upstream: Analysis of Water Injection Pumps and its Electrical Motors.
Failure modes: ISO14224 vs OREDA vs SAP for Centrifugal Pumps
4. Data Collection – Phase X
9
26 April 2016
Upstream: Analysis of Water Injection Pumps and its Electrical Motors.
Operational time: Counting from PI – Plant Information System
4. Data Collection – Phase X
10
26 April 2016
Upstream: Analysis of Water Injection Pumps and its Electrical Motors.
Demand: Counting from PI – Plant Information System
4. Data Collection – Phase X
11
26 April 2016
Upstream: Analysis of Water Injection Pumps and its Electrical Motors.
Overview: Work orders, notes, maintenance records and addressing
4. Data Collection – Phase X
12
26 April 2016
Upstream: Distribution of corrective and preventive maintenance
Upstream: Analysis of Water Injection Pumps and its Electrical Motors.
4. Data Collection – Phase X
13
26 April 2016
Upstream: Analysis of Water Injection Pumps and its Electrical Motors.
Upstream: Distribution of corrective maintenance by failure modes
4. Data Collection – Phase X
14
26 April 2016
Upstream: Work orders and maintenance plans – Maintenance criticality
Upstream: Analysis of Water Injection Pumps and its Electrical Motors.
4. Data Collection – Phase X
15
26 April 2016
� Data collection showed the need to adequate the equipment borders according to the ISO-14224 in the hierarchical trees in the SAP;
� SAP Failure Catalogue is 85% in compliance with ISO Failure Modes for the equipment class;
� Identified difficulties for the opening and closure of “Failure“ work orders.
� Around 50% of the work orders were opened as “Service” instead of “Failure”
� Identified the pointing of the w.o. to many different locals, instead of the equipment unit.
� Identified the need of recording or updating the inventory information in theSAP. (missing data)
� The Downstream and Midstream business areas have organized the SAPhierarchical trees.
� Upstream areas are using the data in RAM analysis.
Upstream : Analysis of Water Injection Pumps and its Electrical Mot ors.
5. Data Collection – Phase X - RESULTS
16
26 April 2016
Everton Nogueira Lima Guilherme da Silva Telles Nae [email protected] [email protected]: +55 (21) 2162-1777 Phone: +55 (21) 2162-7084PETROBRAS/CENPES PETROBRAS/CENPESRio de Janeiro – RJ Rio de Janeiro – RJ
Thanks!