international conference on applications of radiation science …€¦ · 27-04-2017 ·...
TRANSCRIPT
![Page 1: International Conference on Applications of Radiation Science …€¦ · 27-04-2017 · 15/04/2017 IAEA meeting, Warsaw 2016 1. UPGRADING AND CONTINUOUS IMPROVEMENT OF ININ GAMMA](https://reader034.vdocuments.site/reader034/viewer/2022050611/5fb266660cd1392c6c2fecb6/html5/thumbnails/1.jpg)
International Conference on Applications of Radiation Science and
Technology (ICARST-2017)IAEA Headquarters, Vienna, Austria
24–28 April 2017
15/04/2017 IAEA meeting, Warsaw 2016 1
![Page 2: International Conference on Applications of Radiation Science …€¦ · 27-04-2017 · 15/04/2017 IAEA meeting, Warsaw 2016 1. UPGRADING AND CONTINUOUS IMPROVEMENT OF ININ GAMMA](https://reader034.vdocuments.site/reader034/viewer/2022050611/5fb266660cd1392c6c2fecb6/html5/thumbnails/2.jpg)
UPGRADING AND CONTINUOUS IMPROVEMENT OF ININ GAMMA IRRADIATION FACILITY
Period 2000-2016
15/04/2017 IAEA meeting, Warsaw 2016 2
GAMMA IRRADIATOR FACILITYAT THE NATIONAL INSTITUTE OF NUCLEAR RESEARCH (ININ)
Presented by MIGUEL IRAN ALCÉRRECA SÁNCHEZDepartamento del Irradiador Gamma, ININ México
![Page 3: International Conference on Applications of Radiation Science …€¦ · 27-04-2017 · 15/04/2017 IAEA meeting, Warsaw 2016 1. UPGRADING AND CONTINUOUS IMPROVEMENT OF ININ GAMMA](https://reader034.vdocuments.site/reader034/viewer/2022050611/5fb266660cd1392c6c2fecb6/html5/thumbnails/3.jpg)
1. ININ´s Gamma Irradiation Facility“Centro Nuclear de México, Nabor Carrillo Flores”
15/04/2017 IAEA meeting, Warsaw 2016 3
![Page 4: International Conference on Applications of Radiation Science …€¦ · 27-04-2017 · 15/04/2017 IAEA meeting, Warsaw 2016 1. UPGRADING AND CONTINUOUS IMPROVEMENT OF ININ GAMMA](https://reader034.vdocuments.site/reader034/viewer/2022050611/5fb266660cd1392c6c2fecb6/html5/thumbnails/4.jpg)
• Facility designed and built in the end of 1970s•AECL irradiator Model JS-6500 , container type (boxes). •Shielding for a maximum of a million Curies of activity •Operation plant began on March 1980 •Main commercial approach to the market of the disposable medical products •Currently activity greater than 800 kCi. • Process capacity 1004 containers (boxes)/ day , at 1MCi considering dose delivery between 7 to 16 kGy).
15/04/2017 IAEA meeting, Warsaw 2016 4
![Page 5: International Conference on Applications of Radiation Science …€¦ · 27-04-2017 · 15/04/2017 IAEA meeting, Warsaw 2016 1. UPGRADING AND CONTINUOUS IMPROVEMENT OF ININ GAMMA](https://reader034.vdocuments.site/reader034/viewer/2022050611/5fb266660cd1392c6c2fecb6/html5/thumbnails/5.jpg)
2. Upgrading and improvement aspects. Period 2000-2016
Quality SystemWarehouse and OfficesDosimetryMachinery and EquipmentControl ConsoleSafety
15/04/2017 IAEA meeting, Warsaw 2016 5
![Page 6: International Conference on Applications of Radiation Science …€¦ · 27-04-2017 · 15/04/2017 IAEA meeting, Warsaw 2016 1. UPGRADING AND CONTINUOUS IMPROVEMENT OF ININ GAMMA](https://reader034.vdocuments.site/reader034/viewer/2022050611/5fb266660cd1392c6c2fecb6/html5/thumbnails/6.jpg)
ÁREA MEJORAS DE LA PIG/AÑO OBJETIVO 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
ISO 9001:2000 certification Process control & reliability
ISO 9001:2008 certification Process control & reliability
Health license authorization (SSA) Process reliability
Custumer Care audits Customer satisfaction
Dose interval analysisOperating costs , capacity and process
control
Improved load patterns Process control
Incorporation of dose interval of 5 to 10
kGyIncreased processing capacity
Dose definition for the catalog of services Operating costs and improved capacity
Improved dose for high density products Customer satisfaction
Dosimetry system calibration (IDAS,
NORDION, NIST)Process control and reliable records IDAS IDAS IDAS IDAS IDAS IDAS NORDIONNORDIONNORDION NIST NIST NIST NIST NIST NIST NIST NIST
QUALITY
DOSIMETRY
TIMELINE OF UPGRADES AND IMPROVEMENTS PIG
15/04/2017 IAEA meeting, Warsaw 2016 6
![Page 7: International Conference on Applications of Radiation Science …€¦ · 27-04-2017 · 15/04/2017 IAEA meeting, Warsaw 2016 1. UPGRADING AND CONTINUOUS IMPROVEMENT OF ININ GAMMA](https://reader034.vdocuments.site/reader034/viewer/2022050611/5fb266660cd1392c6c2fecb6/html5/thumbnails/7.jpg)
ÁREA MEJORAS DE LA PIG/AÑO OBJETIVO 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
Storage building Process capacity
Installation of epoxy floor Health and Safety
Construction of the parking warehouse Safety and customer service
Relocation of administrative area (new
offices)
Improved safety and better customer
service
Installation leveling ramps store (2 per
year)Safety and customer care
Enlargement of Visitors lobby Customer satisfaction
WAREHOUSE
AND OFFICES
TIMELINE OF UPGRADES AND IMPROVEMENTS PIG
15/04/2017 IAEA meeting, Warsaw 2016 7
![Page 8: International Conference on Applications of Radiation Science …€¦ · 27-04-2017 · 15/04/2017 IAEA meeting, Warsaw 2016 1. UPGRADING AND CONTINUOUS IMPROVEMENT OF ININ GAMMA](https://reader034.vdocuments.site/reader034/viewer/2022050611/5fb266660cd1392c6c2fecb6/html5/thumbnails/8.jpg)
ÁREA MEJORAS DE LA PIG/AÑO OBJETIVO 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
Automation, capacity increase and
modernization of external conveyors Operating costs and improved capacity
Installation of hydraulic tables in loading
and unloading areasImproving occupational safety (Ergonomy)
Improved pneumatic source pass conveyor
cylinders, to reduce cycle times
Increased processing capacity (Dose A
incorporation)
Reducing cycle time of chain conveyor
(Frequency variator)
Increased processing capacity (Dose A
incorporation)
Relocation of compresors and pneumatic
lines redesing
Obsolesence, operation cost and electric
efficiency
Incorporation of electric materials
handling equipment (electric and manual
fork lift truck )
Improving occupational safety (Ergonomy)
Purchasing Power Plant EmergencyProcess reliablility, electrical efficiency
and customer satisfaction
Purchase and installation of rotary screw
compressors
Operation costs, process reliability and
electrical efficiency
Internal Conveyor's Control Electrovalves
replacement
Obsolesence, operation cost and electric
efficiency
Purchasing and replacement of Water
Chiller
Obsolesence, operation cost and electric
efficiency
TIMELINE OF UPGRADES AND IMPROVEMENTS PIG
MACHINERY
AND
EQUIPMENT
15/04/2017 IAEA meeting, Warsaw 2016 8
![Page 9: International Conference on Applications of Radiation Science …€¦ · 27-04-2017 · 15/04/2017 IAEA meeting, Warsaw 2016 1. UPGRADING AND CONTINUOUS IMPROVEMENT OF ININ GAMMA](https://reader034.vdocuments.site/reader034/viewer/2022050611/5fb266660cd1392c6c2fecb6/html5/thumbnails/9.jpg)
ÁREA MEJORAS DE LA PIG/AÑO OBJETIVO 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
CONTROL
CONSOLE
Modernization of the irradiator control
console JS -6500
Operation costs, process reliability and
availability of spare parts
Fire System Installation Safety
Replacement of water filtration plant
system Obsolescence and safety improvement
Installing video surveillance cameras Safety improvement
Confinement of the control room of the
irradiator JS -6500Safety improvement
Acquisition of radiation detectors (5
Ludlum 44-38, 1 Ludlum 14C, 1 RMS)Obsolescence and safety improvement
Improving ozone extraction Obsolescence and safety improvement
Replacement of source hoist system Obsolescence and safety improvement
Replacement of float level switch Safety improvement
TIMELINE OF UPGRADES AND IMPROVEMENTS PIG
SAFETY
15/04/2017 IAEA meeting, Warsaw 2016 9
![Page 10: International Conference on Applications of Radiation Science …€¦ · 27-04-2017 · 15/04/2017 IAEA meeting, Warsaw 2016 1. UPGRADING AND CONTINUOUS IMPROVEMENT OF ININ GAMMA](https://reader034.vdocuments.site/reader034/viewer/2022050611/5fb266660cd1392c6c2fecb6/html5/thumbnails/10.jpg)
Quality System
• At opening in 1980 a quality assurance was implemented for the plant operations
• First quality assurance (QA) program, under two rules: 10CFR Part 36 and IAEA Code 50-C-Q.
• "Modernization Program of the Public Administration 1995-2000" of the Gov. of Mexico, demanded to adopt Total Quality schemes
• October 18, 2000, starts the process to obtain the ISO 9001:2000 QMS certification that ends in February 2002
Maintenance of the quality management system is a must:• The QMS, stays with very good performance indicators endorsed
through countless quality system audits and likewise inspections of the National Commission of Nuclear Safety and Safeguards (C.N.S.N.S.).
• We allow also audits of our customers, and have annual maintenance and recertification audits by the certifying agency (CALMECAC),
• In 2009 the plant`s QMS was certified with ISO 9001:2008
15/04/2017 IAEA meeting, Warsaw 2016 10
![Page 11: International Conference on Applications of Radiation Science …€¦ · 27-04-2017 · 15/04/2017 IAEA meeting, Warsaw 2016 1. UPGRADING AND CONTINUOUS IMPROVEMENT OF ININ GAMMA](https://reader034.vdocuments.site/reader034/viewer/2022050611/5fb266660cd1392c6c2fecb6/html5/thumbnails/11.jpg)
15/04/2017 IAEA meeting, Warsaw 2016 11
Warehouse & offices
![Page 12: International Conference on Applications of Radiation Science …€¦ · 27-04-2017 · 15/04/2017 IAEA meeting, Warsaw 2016 1. UPGRADING AND CONTINUOUS IMPROVEMENT OF ININ GAMMA](https://reader034.vdocuments.site/reader034/viewer/2022050611/5fb266660cd1392c6c2fecb6/html5/thumbnails/12.jpg)
Dosimetry
Dose intervals and service dose catalog.- To establish process specifications and work with dose intervals and not with average dose.
• From October 2004 a database was developed with information of absorbed dose for selected products
• Statistical analysis conducted in 2006 in order to know the behavior of dose for groups product of densities (from 0.01 to 0.7 g / cc)
• Specification limits were defined at + 3σ and -3σ from the average, with a confidence level of 95% of the dose values are within this range
15/04/2017 IAEA meeting, Warsaw 2016 12
![Page 13: International Conference on Applications of Radiation Science …€¦ · 27-04-2017 · 15/04/2017 IAEA meeting, Warsaw 2016 1. UPGRADING AND CONTINUOUS IMPROVEMENT OF ININ GAMMA](https://reader034.vdocuments.site/reader034/viewer/2022050611/5fb266660cd1392c6c2fecb6/html5/thumbnails/13.jpg)
Currently it is working with a group of "slightly different “catalog dose" and includes now "dose C for high density products
Year Dose IntervalProcesscycle (s)
Lower spec(kGy)
Upper spec. (kGy)
2010
Type A A= 101 5 10Type B B= 146 7 16Type C (low density <0.3 g/cc)
C= 1859 18
Type C (high density > 0.3 g/cc)
C= 2039 18
Type D 2B 14 28Type E 1B + 1C 17 31Type F 2C 21 38Special Dose -- Higher than
38 kGy--
15/04/2017 IAEA meeting, Warsaw 2016 13
![Page 14: International Conference on Applications of Radiation Science …€¦ · 27-04-2017 · 15/04/2017 IAEA meeting, Warsaw 2016 1. UPGRADING AND CONTINUOUS IMPROVEMENT OF ININ GAMMA](https://reader034.vdocuments.site/reader034/viewer/2022050611/5fb266660cd1392c6c2fecb6/html5/thumbnails/14.jpg)
15/04/2017 IAEA meeting, Warsaw 2016 14
Loading patternoverlapping
![Page 15: International Conference on Applications of Radiation Science …€¦ · 27-04-2017 · 15/04/2017 IAEA meeting, Warsaw 2016 1. UPGRADING AND CONTINUOUS IMPROVEMENT OF ININ GAMMA](https://reader034.vdocuments.site/reader034/viewer/2022050611/5fb266660cd1392c6c2fecb6/html5/thumbnails/15.jpg)
15/04/2017 IAEA meeting, Warsaw 2016 15
Current return and load conveyor
Original conveyor
Auxiliary facilities and process equipment
![Page 16: International Conference on Applications of Radiation Science …€¦ · 27-04-2017 · 15/04/2017 IAEA meeting, Warsaw 2016 1. UPGRADING AND CONTINUOUS IMPROVEMENT OF ININ GAMMA](https://reader034.vdocuments.site/reader034/viewer/2022050611/5fb266660cd1392c6c2fecb6/html5/thumbnails/16.jpg)
15/04/2017 IAEA meeting, Warsaw 2016 16
Source pass conveyor
![Page 17: International Conference on Applications of Radiation Science …€¦ · 27-04-2017 · 15/04/2017 IAEA meeting, Warsaw 2016 1. UPGRADING AND CONTINUOUS IMPROVEMENT OF ININ GAMMA](https://reader034.vdocuments.site/reader034/viewer/2022050611/5fb266660cd1392c6c2fecb6/html5/thumbnails/17.jpg)
15/04/2017 IAEA meeting, Warsaw 2016 17
Pneumatic system. New air lines and compressors
![Page 18: International Conference on Applications of Radiation Science …€¦ · 27-04-2017 · 15/04/2017 IAEA meeting, Warsaw 2016 1. UPGRADING AND CONTINUOUS IMPROVEMENT OF ININ GAMMA](https://reader034.vdocuments.site/reader034/viewer/2022050611/5fb266660cd1392c6c2fecb6/html5/thumbnails/18.jpg)
15/04/2017 IAEA meeting, Warsaw 2016 18
Control Console. The update was done 100% by ININ engineers, the process lasted 2 years since it avoided to have prolonged process stops during the installations.
![Page 19: International Conference on Applications of Radiation Science …€¦ · 27-04-2017 · 15/04/2017 IAEA meeting, Warsaw 2016 1. UPGRADING AND CONTINUOUS IMPROVEMENT OF ININ GAMMA](https://reader034.vdocuments.site/reader034/viewer/2022050611/5fb266660cd1392c6c2fecb6/html5/thumbnails/19.jpg)
Physical security of the installation.- The video camera surveillance system installation in 2010. Control area and access to the irradiation chamber modified .This project was supported by USA´s DOE.
15/04/2017 IAEA meeting, Warsaw 2016 19
Irradiation plant control area before 2010 Irradiation plant control area after 2010
![Page 20: International Conference on Applications of Radiation Science …€¦ · 27-04-2017 · 15/04/2017 IAEA meeting, Warsaw 2016 1. UPGRADING AND CONTINUOUS IMPROVEMENT OF ININ GAMMA](https://reader034.vdocuments.site/reader034/viewer/2022050611/5fb266660cd1392c6c2fecb6/html5/thumbnails/20.jpg)
CURRENT SITUATION
•The ININ gamma irradiation plant, during the last 15 years maintained a great dynamic of continuous operation work.
• For example in the year of 2013, were attended 7,130 service requests to 382 companies in a wide range of products. •The annual preventive maintenance programs have been attended timely and solved the problems of failures with efficient improvement actions and programs
15/04/2017 IAEA meeting, Warsaw 2016 20
![Page 21: International Conference on Applications of Radiation Science …€¦ · 27-04-2017 · 15/04/2017 IAEA meeting, Warsaw 2016 1. UPGRADING AND CONTINUOUS IMPROVEMENT OF ININ GAMMA](https://reader034.vdocuments.site/reader034/viewer/2022050611/5fb266660cd1392c6c2fecb6/html5/thumbnails/21.jpg)
PERSPECTIVES
• Persist in the increase of the installed capacity of the plant, this is still possible
• programming based on studies of dose ranges in more closed intervals of densities and mixture of sequences in the program.
• the movement of products through various stages: total external conveyor (transportation) system automation is not yet concluded.
• The information system of product(which is an own development) will have to continue its updating and evolution in order to include the technological changes implemented for the benefit of our QMS and the satisfaction of the requirements of the users.
15/04/2017 IAEA meeting, Warsaw 2016 21
![Page 22: International Conference on Applications of Radiation Science …€¦ · 27-04-2017 · 15/04/2017 IAEA meeting, Warsaw 2016 1. UPGRADING AND CONTINUOUS IMPROVEMENT OF ININ GAMMA](https://reader034.vdocuments.site/reader034/viewer/2022050611/5fb266660cd1392c6c2fecb6/html5/thumbnails/22.jpg)
To Finish
The support of our institutional authorities to the Quality Management System (QMS)
The commitment to the productivity of the staff working in the Department of the Gamma Irradiator
The continuous communication with our clients and with national and international organizations who are users and developers of irradiation technology
All the above conditions have been the architects and key factors for the mentioned achievements.
15/04/2017 IAEA meeting, Warsaw 2016 22
![Page 23: International Conference on Applications of Radiation Science …€¦ · 27-04-2017 · 15/04/2017 IAEA meeting, Warsaw 2016 1. UPGRADING AND CONTINUOUS IMPROVEMENT OF ININ GAMMA](https://reader034.vdocuments.site/reader034/viewer/2022050611/5fb266660cd1392c6c2fecb6/html5/thumbnails/23.jpg)
¡Thank you for your attention !
15/04/2017 IAEA meeting, Warsaw 2016 23
www.inin.gob.mx