International Case Study
A pilot project in Lebanon
![Page 3: International Case Study A pilot project in Lebanon](https://reader030.vdocuments.site/reader030/viewer/2022032516/56649c7c5503460f94930f8c/html5/thumbnails/3.jpg)
SELE
CTION
INTEROPER
ABILITY
DEPLOYMENTPLANNING
START-UP
MAINTENANCE
![Page 4: International Case Study A pilot project in Lebanon](https://reader030.vdocuments.site/reader030/viewer/2022032516/56649c7c5503460f94930f8c/html5/thumbnails/4.jpg)
Three different places:• Urban areas• Semi-Urban areas• Rural areas
![Page 5: International Case Study A pilot project in Lebanon](https://reader030.vdocuments.site/reader030/viewer/2022032516/56649c7c5503460f94930f8c/html5/thumbnails/5.jpg)
We need to know the network topology
![Page 6: International Case Study A pilot project in Lebanon](https://reader030.vdocuments.site/reader030/viewer/2022032516/56649c7c5503460f94930f8c/html5/thumbnails/6.jpg)
ASPECTS TO CONSIDER
• Distances• Number of clients• Power topology (number of
transformers)• Type of lines (air, underground)• …………
![Page 7: International Case Study A pilot project in Lebanon](https://reader030.vdocuments.site/reader030/viewer/2022032516/56649c7c5503460f94930f8c/html5/thumbnails/7.jpg)
SELE
CTION
INTEROPER
ABILITY
DEPLOYMENTPLANNING
START-UP
MAINTENANCE
![Page 8: International Case Study A pilot project in Lebanon](https://reader030.vdocuments.site/reader030/viewer/2022032516/56649c7c5503460f94930f8c/html5/thumbnails/8.jpg)
THE IMPORTANCE OF TESTING
CERTIFICATION
DEPLOYMENT
APPROVAL IN LABORATORY
APPROVAL IN FIELD
![Page 9: International Case Study A pilot project in Lebanon](https://reader030.vdocuments.site/reader030/viewer/2022032516/56649c7c5503460f94930f8c/html5/thumbnails/9.jpg)
CERTIFICATION• BASIC (Metrological,.......etc.)• DLMS APPROVAL: METER PROTOCOL• PRIME APPROVAL: MODEM plc (SERVICE NODE)
NECESSARY…. BUT NOT ENOUGH
PENDING: Integration, functional test...…
![Page 10: International Case Study A pilot project in Lebanon](https://reader030.vdocuments.site/reader030/viewer/2022032516/56649c7c5503460f94930f8c/html5/thumbnails/10.jpg)
APPROVAL IN LABORATORY
• Interoperability Test• Functionality• Performance• Stability• …
NEW DEVELOPMENTS NEW TEST
MAINTENANCE
![Page 11: International Case Study A pilot project in Lebanon](https://reader030.vdocuments.site/reader030/viewer/2022032516/56649c7c5503460f94930f8c/html5/thumbnails/11.jpg)
APPROVAL IN FIELD
• SELECT 1-2 secondary substations for test• Represent the different scenarios• With the same version of PRIME SW• Detailed analysis• Monitoring the test
![Page 12: International Case Study A pilot project in Lebanon](https://reader030.vdocuments.site/reader030/viewer/2022032516/56649c7c5503460f94930f8c/html5/thumbnails/12.jpg)
DEPLOYMENT
• As a last step• After the test
WITH GUARANTEES
![Page 13: International Case Study A pilot project in Lebanon](https://reader030.vdocuments.site/reader030/viewer/2022032516/56649c7c5503460f94930f8c/html5/thumbnails/13.jpg)
SpecsProof of concept
Prototyping
Lab testingField deployment
![Page 14: International Case Study A pilot project in Lebanon](https://reader030.vdocuments.site/reader030/viewer/2022032516/56649c7c5503460f94930f8c/html5/thumbnails/14.jpg)
SELE
CTION
INTEROPER
ABILITY
DEPLOYMENTPLANNING
START-UP
MAINTENANCE
![Page 15: International Case Study A pilot project in Lebanon](https://reader030.vdocuments.site/reader030/viewer/2022032516/56649c7c5503460f94930f8c/html5/thumbnails/15.jpg)
GPRSGPRS
SELECT THE TECHNOLOGY SOLUTIONS
![Page 16: International Case Study A pilot project in Lebanon](https://reader030.vdocuments.site/reader030/viewer/2022032516/56649c7c5503460f94930f8c/html5/thumbnails/16.jpg)
Remote reading(scheduled)
PLC MT, GPRS, ADSL,
etc.
LAN
DLMS overPLC PRIME
MDM
FRONT-END
Concentrators DC
Smart meters
Interface DC-METERS
Interface FE-DC
Interface MDM-FRONT-END
4
3
2
1
time
end
time
Operations
6
3
1
5
4
2
end
SMART METERING ARCHITECTURE
![Page 17: International Case Study A pilot project in Lebanon](https://reader030.vdocuments.site/reader030/viewer/2022032516/56649c7c5503460f94930f8c/html5/thumbnails/17.jpg)
Start
DC Communi.
Test
Meter Comm.
Test
DC Config.
Test
Meter Config.
Test
DC Functio. & Operation
Test
Meter Functio. & Operation
Test
END
TESTING PROCESS
![Page 18: International Case Study A pilot project in Lebanon](https://reader030.vdocuments.site/reader030/viewer/2022032516/56649c7c5503460f94930f8c/html5/thumbnails/18.jpg)
SELE
CTION
INTEROPER
ABILITY
DEPLOYMENTPLANNING
START-UP
MAINTENANCE
![Page 19: International Case Study A pilot project in Lebanon](https://reader030.vdocuments.site/reader030/viewer/2022032516/56649c7c5503460f94930f8c/html5/thumbnails/19.jpg)
INSTALL + VALIDATEThe importance of validation
![Page 20: International Case Study A pilot project in Lebanon](https://reader030.vdocuments.site/reader030/viewer/2022032516/56649c7c5503460f94930f8c/html5/thumbnails/20.jpg)
CONSIDER
• We need to be clear the deployment plan, and steps to certify an installation I coordinate the installation of data
concentrators and meters? or are they two completely independent activities?
How can I validate an installation? What tools do I need?
• Thinking on how to adapt our IT systems to the new way of working
![Page 21: International Case Study A pilot project in Lebanon](https://reader030.vdocuments.site/reader030/viewer/2022032516/56649c7c5503460f94930f8c/html5/thumbnails/21.jpg)
INSTALL IN THE SECONDARY SUBSTATION
• Cabinet installation• Installation of current transformers• Power Supply• Checking operation equipment
DC Communications
![Page 22: International Case Study A pilot project in Lebanon](https://reader030.vdocuments.site/reader030/viewer/2022032516/56649c7c5503460f94930f8c/html5/thumbnails/22.jpg)
INSTALL IN THE CENTRALIZATION
• Installing Meters• Power supply• Check functioning and registration
LED PRIME!!!!
![Page 23: International Case Study A pilot project in Lebanon](https://reader030.vdocuments.site/reader030/viewer/2022032516/56649c7c5503460f94930f8c/html5/thumbnails/23.jpg)
• LED PRIME– PLM: Activity PRIME– PLM: Try to register– PLM: Registered
• 1000 Imp /KWh – Imp/KVArh flashing: load
• PHONE: 432 connection
INSTALL IN THE CENTRALIZATION (II)
![Page 24: International Case Study A pilot project in Lebanon](https://reader030.vdocuments.site/reader030/viewer/2022032516/56649c7c5503460f94930f8c/html5/thumbnails/24.jpg)
INSTALL IN THE CENTRALIZATION (III)
Sequence LED PRIME
1. FLASHING FAST
2. TURNS OFF
3. FLASHING 30 seconds
4. GOES TO Try to register
5. GOES TO Registered
![Page 25: International Case Study A pilot project in Lebanon](https://reader030.vdocuments.site/reader030/viewer/2022032516/56649c7c5503460f94930f8c/html5/thumbnails/25.jpg)
VALIDATION OF THE INSTALLATION
* Use the DC to validate
Monitoring the network PRIME1. Availability2. Availability launching measurement cycles
<cycles><cycle name="TEST_ciclos" period="1" immediate="true"
stop="2010/10/28 01:00">
<get obis="1-0:1.8.10.255" class="3" element="2"/><get obis="0-0:21.0.6.255" class="7" element="2"/>
</cycle></cycles>
![Page 26: International Case Study A pilot project in Lebanon](https://reader030.vdocuments.site/reader030/viewer/2022032516/56649c7c5503460f94930f8c/html5/thumbnails/26.jpg)
VALIDATION OF THE INSTALLATION (II)
![Page 27: International Case Study A pilot project in Lebanon](https://reader030.vdocuments.site/reader030/viewer/2022032516/56649c7c5503460f94930f8c/html5/thumbnails/27.jpg)
SELE
CTION
INTEROPER
ABILITY
DEPLOYMENTPLANNING
START-UP
ROLL-OUT
![Page 28: International Case Study A pilot project in Lebanon](https://reader030.vdocuments.site/reader030/viewer/2022032516/56649c7c5503460f94930f8c/html5/thumbnails/28.jpg)
Poor conditions of some metering rooms
![Page 29: International Case Study A pilot project in Lebanon](https://reader030.vdocuments.site/reader030/viewer/2022032516/56649c7c5503460f94930f8c/html5/thumbnails/29.jpg)
DIAGNOSIS OF THE NETWORK
meter as a switch40:40:22:10:1e:88
meter as a switchc0:ac:54:f4:73:89
meter as terminal00:80:e1:13:08:94
![Page 30: International Case Study A pilot project in Lebanon](https://reader030.vdocuments.site/reader030/viewer/2022032516/56649c7c5503460f94930f8c/html5/thumbnails/30.jpg)
DIAGNOSIS
A network diagnostic for:
Topology MAC traffic Noise spectrum …………
![Page 31: International Case Study A pilot project in Lebanon](https://reader030.vdocuments.site/reader030/viewer/2022032516/56649c7c5503460f94930f8c/html5/thumbnails/31.jpg)
TopologyMAC Traffic
Noise Spectrum
![Page 32: International Case Study A pilot project in Lebanon](https://reader030.vdocuments.site/reader030/viewer/2022032516/56649c7c5503460f94930f8c/html5/thumbnails/32.jpg)
SOME EXAMPLES
SELECTIVE NOISE IN FREQUENCY IMPULSE NOISE