Internal Monitoring Report Project Number: 48402-002 (Oct - Dec 2017) PAK: National Motorway M-4 Shorkot– Khanewal Project Prepared by Social Safeguard Management Consultant (SSMC), National Highway Authority, Ministry of Communications, Government of Pakistan for the Asian Development Bank. This Internal Monitoring Report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Upload: ngominh

Post on 21-Apr-2018

214 views

Category:

Documents


1 download

TRANSCRIPT

Internal Monitoring Report

Project Number: 48402-002

(Oct - Dec 2017)

PAK: National Motorway M-4 Shorkot– Khanewal Project

Prepared by Social Safeguard Management Consultant (SSMC), National Highway Authority, Ministry of Communications, Government of Pakistan for the Asian Development Bank. This Internal Monitoring Report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation

of or reference to a particular territory or geographic area in this document, the Asian

Development Bank does not intend to make any judgments as to the legal or other status of any

territory or area.

NATIONAL HIGHWAY AUTHORITY

Ministry of Communications

Government of Pakistan

PAK: NATIONAL MOTORWAY M-4 GOJRA-SHORKOT-KHANEWAL PROJECT

Consultancy Services for

Social Safeguard Management Consultant (SSMC) of Faisalabad – Khanewal (M-4) Project

Internal Monitoring Report (No.7)

for the Implementation of Land Acquisition & Resettlement Plan (LARP) and

Corrective Action Plan (CAP) of M-4 Shorkot-Khanewal Section

(M-4 Section-III)

Chainage 120+268 – 194+487 (64 km) (October 2017 – December 2017)

International Development Consultants

Suite# 3, 11-Civic Centre, C-Block, Faisal Town, Lahore, Pakistan Ph: +92-42-3517 4997; Fax: +92-42-3516-8449

E-mail: [email protected]

January 15, 2018

NATIONAL HIGHWAY AUTHORITY

Ministry of Communications

Government of Pakistan

PAK: NATIONAL MOTORWAY M-4 GOJRA-SHORKOT-KHANEWAL PROJECT

Consultancy Services for

Social Safeguard Management Consultant (SSMC) of Faisalabad – Khanewal (M-4) Project

Internal Monitoring Report (No.7)

for the Implementation of Land Acquisition & Resettlement Plan (LARP) and

Corrective Action Plan (CAP) of M-4 Shorkot-Khanewal Section

(M-4 Section-III)

Chainage 120+268 – 194+487 (64 km) (October 2017 – December 2017)

International Development Consultants

Suite# 3, 11-Civic Centre, C-Block, Faisal Town, Lahore, Pakistan Ph: +92-42-3517 4997; Fax: +92-42-3516-8449

E-mail: [email protected]

January 15, 2018

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

i

TABLE OF CONTENTS

TABLE OF CONTENTS .............................................................................................................. i

LIST OF TABLES ...................................................................................................................... iii

LIST OF ANNEXES .................................................................................................................. iii

ABBREVIATIONS ..................................................................................................................... iv

1. INTRODUCTION ............................................................................................................ 1

1.1 Project Background ........................................................................................................ 1

1.2 Land Acquisition and Resettlement Impacts ................................................................. 1

2 NEED FOR INTERNAL MONITORING OF LARP AND CAP ....................................... 3

2.1 Internal Monitoring Requirements of LARP and CAP ................................................... 3

2.2 Objectives of the Internal Monitoring Report ................................................................. 3

2.3 Monitoring Indicators ...................................................................................................... 3

2.4 Monitoring Methodology ................................................................................................. 3

2.5 Structure of the Internal Monitoring Report.................................................................... 4

3. LARP IMPLEMENTATION STATUS ............................................................................. 5

3.1 Status of Land Acquisition for Carriageway/ Interchange ROW ................................... 5

3.1.1 Status of Land Acquisition for Interchange ROW .......................................................... 5

3.2 Compensation Payment Disbursement ......................................................................... 6

3.2.1 Land and Non-Land Payment ........................................................................................ 6

3.2.2 Allowances and rehabilitation/ livelihood restoration ..................................................... 6

3.2.3 Payment of Land Compensation for Awarded land ....................................................... 6

3.2.4 Payment of Crop Compensation .................................................................................... 6

3.2.5 Payment of Structures .................................................................................................... 7

3.2.6 Payment of Trees ........................................................................................................... 7

3.2.7 Payment of Allowances .................................................................................................. 7

3.3. Pending Payment ........................................................................................................... 9

3.3.1. Payments Stuck due to Legal Administrative Reasons ................................................. 9

3.4 Facilitation provided to DPs in Processing of Claims .................................................. 10

3.5 Efforts exhausted to approach unpaid DPs for additional documentation .................. 11

3.6 Assessment on Compensation Uses by DPs .............................................................. 12

3.7 Request for a NTP for Cicil Work (Highway) in Interchange ROW Land .................... 12

3.7.1 Various Categories of Stuck Payments of Interchanges RoW Land ........................... 13

4. RELOCATION AND CONSTRUCTION RELATED EMERGING LAR ISSUES ......... 14

4.1 Relocation of Schools................................................................................................... 14

4.2 Construction Related Emerging LAR issues ............................................................... 14

5. CONSULTATIONS, PARTICIPATION AND INFORMATION DISCLOSURE ............ 16

5.1 Community Consultations ............................................................................................ 16

5.1.1 Community Consultations with Men and Women Unpaid DPs ................................... 16

5.2 Issues/ Concerns Discussed During Consultation Meetings ....................................... 16

5.3 Consultation plan for the succeeding quarter .............................................................. 17

5.4 Internal and External Coordination meetings to Facilitate Compensation Payment... 18

6. GENDER ISSUES/ ANALYSIS IN LARP IMPLEMENTATION ................................... 19

6.1 Gender Segregated Consultations with the Unpaid DPs ............................................ 19

6.2 Project impact on Women Mobility and Privacy .......................................................... 19

6.3 Gender Issues/ analysis in LARP Implementation ...................................................... 19

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

ii

6.4 Issues relating the Payment of Compensation to unpaid DPs .................................... 20

7. GRIEVANCE REDRESS MECHANISM AND COMPLAINTS HANDLING ................. 20

8 CONCLUSIONS AND RECOMMENDATIONS ........................................................... 21

8.1 Conclusions .................................................................................................................. 21

8.2 Recommendations ....................................................................................................... 21

PHOTOLOG ............................................................................................................................ 23

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

iii

LIST OF TABLES

Table 1.1: Impacted Assets ....................................................................................................... 2

Table 1.2: DPs Entitled to Resettlement and Rehabilitation Allowances ................................. 2

Table 3.1: Awarded Land Acquisition for Carriageway/ Interchange ROW.............................. 5

Table 3.2: A Summary of Payments by type of Impacts ........................................................... 8

Table 3.3: Reasons for Delay in Payment of Land Compensation ......................................... 10

Table 3.4: Compensation payment against each category of unpaid cases .......................... 10

Table 3.5: Efforts and facilitation to DPs for Processing Claims ............................................ 11

Table 3.6: Efforts made on Additional Documentation to expedite the process of Stuck Payments ............................................................................................................... 11

Table 3.7: Utilization of Land and Non Land Payment by DPs ............................................... 12

Table 3.8: Compensation Payment status of Interchanges RoW Land .................................. 13

Table 3.9: Various Categories of Stuck Payments of Interchanges RoW Land ..................... 13

Table 4.1: Time-bound Action Plan for Safeguards Issues on M-4 (Section III) Project ........ 15

Table 5.1: Summary of Community Consultation with Men and Women Unpaid DPs .......... 16

Table 5.2: Issues and Response from the project team ......................................................... 16

Table 5.3: Tentative Community consultation/ mobilization plan for next Quarter ................. 17

Table 5.4: Consultative Meetings with PIU and Revenue Officials ......................................... 18

Table 6.1: Gender Segregated Summary of Community Consultation .................................. 19

Table 7.1: Status of Complaints Resolution by Type Overall Complaints Resolution ............ 20

LIST OF ANNEXES

Annex 3.1: Award Interchange ROW land of Jalla Pahore Tehsil Kabirwala & District Khanewal ............................................................................................................... 30

Annex 3.2: Award Interchange ROW land of 15-Venoi Teh & District Khanewal .................. 32

Annex 3.3: Village-wise Payment of Land Compensation for Awarded land ......................... 34

Annex 3.4: Village-wise Payment of Crops Compensation .................................................... 35

Annex 3.5: Village -wise Status of Payment for Affected Structure ........................................ 36

Annex 3.6: Village -wise Status of Payment for Affected Fruit & Non-Fruit Trees ................. 37

Annex 3.7: List of Villages for Certification Statement ............................................................ 38

Annex 3.8: Certification Statement of Legal Heirs of Deceased DPs ..................................... 39

Annex 3.9: Sample copy of Statement regarding Migrated (Moved out project area) DPs ... 40

Annex 3.10: Sample copy of Statement regarding Migrated (Abroad) DPs ........................... 41

Annex 3.11: Sample copy of Statement by DPs informed about Compensation Payment ... 42

Annex 3.12: List of DPs by Payment of Awarded Interchange ROW Land ............................ 43

Annex 5.1: List of Consultations with (Men) Unpaid DPs ....................................................... 47

Annex 5.2: List of Consultations with (Women) Unpaid DPs .................................................. 55

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

iv

ABBREVIATIONS

ADB Asian Development Bank

AIIB

Asian Infrastructure Investment Bank

CAP Corrective Action Plan

CNIC

Computerized National Identity Card

DFID

The Department for International Development

DPAC

District Price Assessment Committee

DPC Displaced Persons Committee

DPs Displaced Persons

EA Executing Agency

EALS Environment, Afforestation, Land and Social Wing

EMA

External Monitor Agency

GM General Manager

GOP Government of Pakistan

GRC Grievance Redress Committee

GRM Grievance Redress Mechanism

IDC International Development Consultants

IR Involuntary Resettlement

LAA Land Acquisition Act

LAC Land Acquisition Collector

LAR Land Acquisition and Resettlement

LARF Land Acquisition and Resettlement Framework

LARP Land Acquisition and Resettlement Plan

MFF Multi -Tranche Financing Facility

NHA National Highway Authority

NTP

Notice to Proceed

PD

Project Director

PIU Project Implementation Unit

PRM Pakistan Resident Mission

QAC Quality Assurance Committee

ROW

Right of Way

RS Resettlement Specialist

SPS Safeguard Policy Statement

SSMC Social Safeguard and Management Consultant

TOR Terms of Reference

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

1

FAISALABAD – KHANEWAL MOTORWAY PROJECT (M4) 7th Internal Monitoring Report for the Implementation of LARP & CAP of

National Motorway M-4 Shorkot-Khanewal Section Project (120+268 – 184+487 = 64 km)

1. INTRODUCTION

1.1 Project Background

1. This report is the 7th internal monitoring report (October - December 2017) on the implementation of LARP for the National Motorway M-4 Shorkot-Khanewal Section Project (Additional Financing) (hereinafter referred to as the Project) co-financed by ADB, AIIB and DFID.

2. The project starts at chainage120+268 at Mouza Kakki Kohna, crossing through various rural settlements, and ends at chainage184+487 km in Mouza Shamkot (near Khanewal city). Project works include the construction of a four-lane dual carriage way with four (4) interchanges located at chainage 148+400 km (Abdul Hakeem Interchange), 166+000 km (Makhdoompur Interchange), 178+070 km (Kabirwala Interchange) and 184+000 km (Khanewal Interchange). The project is located in the districts of Jhang and Khanewal. The location map of the project is given in Figure 1.1.

Figure 1.1: Location Map of Faisalabad – Khanewal (M-4) Project

1.2 Land Acquisition and Resettlement Impacts

3. The project requires 64 km of 100 meter ROW for the carriageway and 40 meter ROW for the interchange loops. A Land Acquisition and Resettlement Plan (LARP) was finalized, approved and disclosed by ADB in January 2016. Table 1.1 provides a summary of LARP impacts and number of DPs, while Table 1.2 shows the number of DPs entitled to various allowances.

M-4 Section III (Shorkot-Khanewal)

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

2

Table 1.1: Impacted Assets

As per LARP Updated as of 7th IMR *Difference

(Increased/ Decreased)

Sr. No.

Impacted Assets Category

Assets Acquired Amount DPs

Assets Acquired Amount DPs

Assets Acquired Amount DPs

(Acre/ No) (Rs.

Million) (Nos.) (Acre/ No)

(Rs. Million)

(Nos.)

(Acre/ No) (Rs.

Million) (Nos.)

a b c d e f g h i=c-f J=d-g K=e-h

1 Land

i) Carriageway/ Interchange ROW (Awarded)

1,537.6 1,530.76 6036 1,514.61 1473.738 6,484

22.99 57.024 (448)

ii) Government Land 79.1 - - 103 - - 103 - -

Total Land 1,616.7 1,530.76 6036 1,617.61 1473.748 6,484 (0.91) 57.02 (448)

2 Assets other than land 1

i) Residential structure 162 83.39 162 157 67.86 157 5 15.53 5

ii) Commercial structure 23 20.43 23 22 17.17 22 1 3.26 1

iii) Cattle yards 13 3.09 13 14 3.15 14 (1) (0.06) (1)

iv) Miscellaneous 33 2.70 33 41 2.27 41 (8) 0.43 (8)

v) Public (mosque & schools)2

5 5.86 5 5 31.08 5

- (25.22) -

vi) Crops 1,156.62 131.75 1,005 1,345.18 102.704 1,066 (188.56) 29.046 (61)

vii) Trees 91,661 62.85 1405 91,661 71.678 734 - (8.828) 671

viii) Other assets/ hand pumps

143 2.82 143 141 2.32 135

2 0.5 8

ix) Tube wells 39 7.83 39 40 6.77 40 (1) 1.06 (1)

*Based on LARP (Section III)

Table 1.2: DPs Entitled to Resettlement and Rehabilitation Allowances

Sr. No.

Compensation Resettlement & Rehabilitation Entitlements

As per LARP Updated as of 7th IMR *Difference

(Increased/ Decreased)

Amount

(Rs. Million) Entitled DPs

(Nos.) Verified Cost (Rs. Million)

Verified DPs (Nos.)

Amount

(Rs. Million) DPs

(Nos.)

a B c d e f g=c-e h=d-f

A Additional crop compensation 39.903 1,005 45.581 1,062 (5.678) (57)

B Livelihood assistance 6.420 162 5.905 149 0.515 13

C Transportation Allowance 3.20 224 2.920 206 0.28 18

D Business Loss Allowance 3.369 62 3.052 58 0.317 4

E Vulnerable Allowance 4.082 103 3.844 97 0.238 6

F Employment loss allowance 0.832 21 0.515 13 0.317 8

G Electricity Allowance 7.400 185 4.360 109 3.04 76

H House Rent Allowance 0.81 162 0.745 149 0.065 13

*Based on LARP (Section III)

4. This internal monitoring report is prepared by NHA with assistance of Social Safeguards Management Consultants (SSMC) of the project. Internal monitoring reports are prepared and shared with the NHA EALS and ADB for review and disclosure. The report presents the results of internal monitoring of LARP implementation in Section III M-4 Shorkot-Khanewal Section Project covering a period of three months from October to December 2017. The report presents the progress of implementation of LARP and a Corrective Action Plan (CAP) of section III and highlights NHA’s efforts made to facilitate payment of meager amount of compensation to DPs and other types of compensation facing legal and administrative impediments.

1 Due to acquisition of land, the land owners/ DPs also face loss for assets like structures, trees and crops that are appended to acquired land. So, the DPs mentioned against losses other than land are also counted above in the Land Owner DPs. In structure, amount increased as 0.417 million and 29 DPs decreased in Structure as per actual revenue record and duplication has been removed. 2 For two public schools total Rs: 30,103,687 (for Land Rs: 5,239,687 and for structure construction of both schools Rs: 24,864,000) and Rs: 972557 for three mosques has been paid to relevant authorities.

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

3

2 NEED FOR INTERNAL MONITORING OF LARP AND CAP

2.1 Internal Monitoring Requirements of LARP and CAP

5. LARP activities under the Project are subject to both internal and external monitoring. The Executing Agency NHA with the assistance of SSMC is responsible for internal monitoring of resettlement activities. Internal monitoring is done on quarterly basis and this report is for 7th Internal monitoring of M-4 Shorkot-Khanewal Section Project (Section III). The results of internal monitoring are included in the quarterly monitoring report for submission to ADB.

6. NHA has engaged the services of an External Monitor Agency (EMA) for external monitoring of section III. External monitoring reports are prepared on a semi-annual basis during the implementation of the project.

2.2 Objectives of the Internal Monitoring Report

7. The objective of 7th Internal monitoring report (IMR) are given below:

i) Delivery of compensation against acquired assets and allowances;

ii) Community consultations and information dissemination measures for effective safeguards management and disbursement of compensation.

iii) Updated status of interchanges ROW land.

iv) Updated status of additional land acquisition emerged along interchanges carriageway ROW.

v) Updates on the grievance redress mechanism; and

vi) Recommendations to improve safeguards management and facilitate disbursement of compensation payments and allowances

2.3 Monitoring Indicators

8. Specific monitoring benchmarks is based on the approved LARP and cover the following:

a) Information campaign and consultation with DPs; b) Status of land acquisition and payments on land compensation; c) Status of crop, trees, structures compensation; d) Relocation of DPs; e) Payments for loss of income; f) Status of payment for Resettlement and Rehabilitation Allowances g) Selection and distribution of replacement land areas; h) Income restoration activities; and i) Ensure gender mitigation measures in the LARP are adhered to during the quarterly

monitoring and reporting process.

2.4 Monitoring Methodology

9. This internal monitoring report is based on a review of: i) LAR institutional arrangements, ii) monthly progress reports; iii) social mobilization activities and community consultation initiatives; iv) status of additional land acquisition arisen along with interchanges carriageway ROW; v) measures implemented to improve coordination between LAR implementation units in PMU/ PIU and line government agencies; vi) DP outreach activities for LARP disclosure and compensation delivery; vii) grievance redress mechanism and complaints recording/ tracking systems; and viii) compensation records.

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

4

10. It also includes progress on identification, assessment and redress of construction related emerging LAR issues. It provides brief on identification and assessment of construction related emerging LAR issues with timebound corrective action plan and updated progress on timebound action plan for acquisition of additional land, prepration and implementation of addendum LARP to ensure project implementation is compliant with ADB’s IR sagfegaurds requirments.

2.5 Structure of the Internal Monitoring Report

11. This Internal monitoring report presents the updated status of implementation of LARP (October - December 2017) that includes disbursement of payments, grievance redress mechanism, disclosure of information, institutional arrangements, details components of which are presented below:

i) No. of displaced persons (DPs) paid, unpaid and being paid; ii) Status of land acquisition; iii) Loss of structures and status of payments and income restoration; iv) Affected fruit and timber/ wood trees and status of their payments; v) Affected crops and payments; vi) Payment of allowances including rehabilitation, livelihood restoration and

vulnerability allowances; vii) Categorized payment of land compensation including payments to the DPs (a)

not living in the project area, (b) have meager amounts of compensation, (c) national ID cards, (d) and have issues with land titles/ ownership or inheritance matters;

viii) Efforts underway to complete all categorized payments; ix) Complaints/ redress management; x) Institutional arrangements put in place for LARP implementation and

monitoring; and xi) Conclusions and recommendations.

12. The following section contains the progress of LARP (Section III) and findings of the report.

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

5

3. LARP IMPLEMENTATION STATUS

3.1 Status of Land Acquisition for Carriageway/ Interchange ROW

13. NHA is implementing the LARP of section III with assistance of SSMC based at Project Implementation Unit (PIU based in the field at Toba Tek Singh). Total number of land and non-land DPs in Section III and status of payments of DPs are given below:

14. Out of 1514.61 acres of privately owned land that need to be acquired,1492.71 acres (1461.97 acres for the main carriageway ROW and 30.74 acres for Interchange loops ROW) has been awarded covering 6,484 DPs (carriageway and interchanges ROW). The land acquisition process have been comeleted for remaining 21.9 acres of interchanges ROW land owned by 136 DPs in two villages including 16.363 acres in Jalapahore for Dinpur Interchange and 5.538 acres in village 15-V for Kabir wala interchange. Summary of land acqisition is given in Table 3.1.

Table 3.1: Awarded Land Acquisition for Carriageway/ Interchange ROW

As per LARP Updated as of 7th IMR

Sr. No.

Impacted Assets Category Assets Acquired Amount DPs

Assets Acquired Amount DPs

(Acre/ No) (Rs. Million) (Nos.) (Acre/ No) (Rs. Million) (Nos.)

Land

i) Carriageway/ Interchange ROW (Awarded)

1537.6 1530.76 6,036 1514.61 1473.736 6,484

ii) Government Land 79.1 - - 103 - -

Total Land 1616.7 1530.76 6,036 1617.61 1473.74 6,484

3.1.1 Status of Land Acquisition for Interchange ROW

15. For the remaining 21.90 acres acquired land for interchanges ROW in village Jalla Pahore (Abdul Hakeem interchange) and village 15-V (Kabirwala Interchange) efforts to complete by close of the monitoring period the achieved progress in completing for awarded interchanges land of two village is as follow:

• Jalla Pahore: Notices as required under section 9 & 10 dated September 27, 2017 of LAA were properly served upon the affected persons requiring them to appear before LAC on October 16, 2017 to deliver their statements regarding nature of their respective interests in the land and particulars of their claims to compensation and their objections, if any regarding measurement. In response to the Notices under section 9 &10, the affected persons appeared before LAC on October 16, 2017 at Union Council, Mouza Umeed Garh Tehsil Kabirwala & District Khanewal and got recorded their statements and agreed with the rates approved by the District Collector Khanewal. Therefore, land award of 16.363 acres amounting to Rs.38.836 million including compensation of land, crops and trees of interchange ROW was announced and by the end of December 2017, 18 DPs (19.8%) have been paid an amount of Rs. 13.796 million. Copy of award are presented in Annex 3.1.

• 15-Venoi: The estimated cost was framed by District Collector, Khanewal which was properly checked and finally approved by District Collector Khanewal vide No.225/LAC/ADC(R) on Dated October 10, 2017. Notices as required under section 9 & 10 dated Oct. 16, 2017 of the LAA were propely served upon the affected persons requireing them to appear before LAC on November 2, 2017 to deliver their statements regarding nature of their respective interests in the land and particulars of their claims to compensation and their objections, if any regarding measurement. In response to the Notices under section 9 &10, the affected persons appeared before LAC on November 2, 2017 at Govt. Boys Primary School 15-Venoi Adiwal, Tehsil & District Khanewal and got

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

6

recorded their statements and agreed with the rates approved by the District Collector Khanewal, Therefore, land award of 5.538 acres amounting to Rs. 13.431,535 including compensation of land, crops and trees of interchange ROW was announced and by the end of December 2017, 22 DPs (48.9%) have been paid an amount of Rs. 8.402 million. Copy of award are presented in Annex 3.2.

16. For the carriageway ROW land, delivery of compensation to all payable DPs is almost completed and leftover unpaid compensation is because of legal and administrative impediments faced by the DPs. During monitoring period, efforts to outreach and facilitate unpaid DPs having legal and administrative impediments continued along with delivery of compensation for acquired 30.74 acres of interchanges ROW land. From October to December 2017, compensation amount Rs 24.417 million has been paid to 65 landowners (including DPs for interchanges/ main carriageway ROW land) for acquired assets i.e. land and an amount Rs. 7.691 million was paid for non-land based assets.

17. Abstract of the progress made during the reporting period are provided in the bullets below and a comparative summary of implementation progress since last monitoring report is provided in Table 3.1:

3.2 Compensation Payment Disbursement

3.2.1 Land and Non-Land Payment

• Land Compensation: 65 landowner (DPs) are paid a compensation amount of Rs. 24.417 million that makes 4,693 DPs (72.4%) paid out of total 6,484;

• Payment of Crop Compensation: During the reporting period compensation amount Rs. 1.026 million was paid to 19 DPs entitled for crop compensation, Out of total 1,066 DPs of crop compensation (102.704 million), overall 832 DPs (78.0%) have received crop compensation of amount (85.545 million);

• Payment of Structure: During this quarter 14 DPs are paid a compensation for structures amount of Rs. 5.865 million that makes a total 235 DPs (94.4%) paid out of total 249;

• Payment of Trees: Compensation amount Rs. 0.800 million was paid to 14 DPs ;

3.2.2 Allowances and rehabilitation/ livelihood restoration

• During the reporting period compensation amount of allowances and rehabilitation/ livelihood restoration are is process of payment.

3.2.3 Payment of Land Compensation for Awarded land

18. A total amount of Rs. 1473.738 million was to be paid to 6,484 DPs. Of which, 4,693 DPs (72.4%) have been paid an amount of Rs. 1,363.21 million (92.5%). During this quarter 21.90 acres of land has been awarded for the interchanges, compensation for DPs to be start in end of January 2018. The Table 3.2 below provides a summary of land compensation for awarded land while village wise payment detail is added as Annex 3.3.

3.2.4 Payment of Crop Compensation

19. As of updated database by December 2017, Out of total 1,066 DPs of crop awarded compensation (Rs. 102.704 million), 832 DPs (78.0%) have received Rs.85.545 million (83.3%) as crop compensation, while efforts are continued to outreach 234 unpaid DPs with impediments to disburse compensation as and when they show-up after resolving their issues. The Table 3.2 below provides a summary of crop compensation while village-wise crop compensation payment status is in Annex 3.4.

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

7

3.2.5 Payment of Structures

20. The total amount of compensation for affected structures, including tube wells & hand pumps for 249 DPs is Rs. 108.570 million. Out of which, the payment of Rs. 102.29 million (94.2%) has been paid to 235 DPs (94.4%) as of December 2017. 14 Unpaid DPs with impediments are being coordinated for additioanl documentation and mobilized to show-up for compensation after resovling their issues/ impediments. The Table 3.2 below provides a summary of structure compensation while village wise payment details are presented in Annex 3.5.

3.2.6 Payment of Trees

21. For tree losses, compensation of Rs. 71.678 million is due to 734 DPs. Of which awarded amount, compensation for tree losses amounting to Rs. 65.999 million (92.1%) has been made to 572 DPs (77.9%). DPs with impediments are being coordinated for additional documentation and are being mobilized to resolve their issues/ impediments and show-up for compensation. The Table 3.2 below provides a summary of trees compensation while the village wise payment status is shown on Annex 3.6.

3.2.7 Payment of Allowances

22. Total amount of rehabilitation allowances is Rs 66.922 million. Of which, Rs 54.162 million (80.9%) has been disbursed as of December 2017. The resettlement and rehablitation costs are linked to the acquired land and assets of DPs and entitled allowance can only be paid to respective DPs after delivery of compesnation for acquired assets to ensure transprancy. Mostly the leftover unpaid allowances are for unpaid DPs assets categrories who are facing legal and adminstrative impediments. PIU/ SSMC team is continously making its efforts to reach, motivate and guide DPs to resove their issues and get compensation for acquired assets and entitled rehabilitation and resettlement allowances. Focus will be made to DPs who are vulnerable and severely affected DPs. The Table 3.2 below provides a summary of payment of allowances.

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

8

Table 3.2: A Summary of Payments by type of Impacts

Sr.

No. Type of Payment

Actual DPs and Cost Progress as per

(till Sep. 2017)

Progress during Quarter

(Oct. to Dec. 2017)

Total

(As of 31 December 2017)

Payable Total Paid Unpaid Paid Unpaid Paid Unpaid Paid Unpaid Paid Unpaid Paid Unpaid

Payment DPs Amount Amount DPs DPs Amount Amount DPs DPs Amount Amount DPs DPs

(Rs. M) (No) (Rs. M.) (Rs. M.) (No.) (No.) (Rs. M.) (Rs. M.) (No.) (No.) (Rs. M.) (Rs. M.) (No.) (No.)

1 Land Compensation 1473.738 6,484 1338.793 134.945 4,628 1856 24.417 110.53 65 1,791 1363.21 110.53 4,693 1,791

(Awarded)

(90.8%) (9.2%) (71.4%) (28.6%)

(92.5%) (7.5%) (72.4%) (27.6%)

2 Non-Land Payment 102.704 1,066 84.519 18.091 813 249 1.026 17.159 19 234 85.545 17.159 832 234

Crops Compensation*

(82.4%) (17.6%) (76.6%) (23.4%)

(83.3%) (16.7%) (78.0%) (22.0%)

3 Affected Structures** 108.570 249 96.423 12.600 221 28 5.865 6.282 14 14 102.29 6.282 235 14

(Awarded)

(88.4%) (11.6%) (88.8%) (11.2%)

(94.2%) (5.8%) (94.4%) (5.6%)

4 Affected Trees 71.678 734 65.199 13.235 558 190 0.800 5.679 14 162 65.999 5.679 572 162

(Awarded)

(83.1%) (16.9%) (74.6%) (25.4%)

(92.1%) (7.9%) (77.9%) (22.1%)

5 Allowances – rehabilitation/ livelihood restoration

i) Additional Crop 45.581 1,062 37.540 8.022 794 266 - 8.041 - 268 37.540 8.041 794 268

Compensation

(82.4%) (17.6%) (74.9%) (25.1%)

(82.4%) (17.6%) (74.8%) (25.2%)

ii) Resettlement Allowance - - - - - - - - - - - - - -

iii) Livelihood Allowance 5.905 149 4.855 1.050 125 24 - 1.050 - 24 4.855 1.050 125 24

(82.2%) (17.8%) (83.9%) (16.1%)

(82.2%) (17.8%) (83.9%) (16.1%)

iv) Transport Allowance 2.920 206 2.417 0.503 154 52 - 0.503 - 52 2.417 0.503 154 52

(82.8%) (17.2%) (74.8%) (25.2%)

(82.8%) (17.2%) (74.8%) (25.2%)

v) Business Allowance 3.052 58 2.378 0.674 46 12 - 0.674 - 12 2.378 0.674 46 12

(77.9%) (22.1%) (79.3%) (20.7%)

(77.9%) (22.1%) (79.3%) (20.7%)

vi) Vulnerable Allowance 3.844 97 2.299 1.546 58 39 - 1.545 - 39 2.299 1.545 58 39

(59.8%) (40.2%) (59.8%) (40.2%)

(59.8%) (40.2%) (59.8%) (40.2%)

vii) Employment losses 0.515 13 0.396 0.119 11 2 - 0.119 - 2 0.396 0.119 11 2

allowance

(76.9%) (23.1%) (84.6%) (15.4%)

(76.9%) (23.1%) (84.6%) (15.4%)

viii) Replacement Cost - - - - - - - - - - - - - -

ix) Electricity 4.360 109 3.660 0.700 92 17 - 0.700 - 17 3.660 0.700 92 17

83.9% 16.1% 84.4% 15.6%

(83.9%) (16.1%) (84.4%) (15.6%)

x) House rent 0.745 149 0.617 0.128 125 24 - 0.128 - 24 0.617 0.128 125 24

82.8% 17.2% 83.9% 16.1%

(82.8%) (17.2%) (83.9%) (16.1%)

Note: :i) *Difference during quarter (Oct – Dec 2017) of 4 DPs is increased and amount Rs.0.094 million increased due to award announced (Jhala Pohre and 15-V Int.), i.e. the total number of DPs & amount payable is 1,066 (Rs.102.704 million), while the 6 IMR reported 1,062 landowners and amount Rs.102.610 million.

ii) ** Structures amount Rs.0.454 million decreased due to award announced (Jhala Pohre and 15-V Int.), i.e. the total amount payable is Rs.108.570 million, while the 6 IMR reported amount 109.023 million. iii) *** Tree Compensation: 14 DPs is decreased and amount Rs.6.756 million decreased due to award announced (Jhala Pohre and 15-V Int.), i.e. the total number of DPs & amount payable is 734 (Rs.71.678 million),

while the 6 IMR reported 748 DPs and amount Rs.78.434 million.

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

9

3.3. Pending Payment

3.3.1. Payments Stuck due to Legal Administrative Reasons

23. The findings of the IMR revealed that some land payments are impeded due to some legal and administrative factors. For example payments of land compensation of an amount of Rs. 110.53 million (7.5% of total amount) to about 1,791 DPs (27.6% of total DPs) have been impeded due to the following reasons.

24. The main reasons of delayed payment are legal and administrative impediments faced by the DPs due to which they are not showing up to claim compensation. During reporting period the data for unpaid DPs was reviewed and efforts were continued to outreach and faciliate the unpaid DPs in different categories of impediments for compensation disbursment and additional documentations. Based on field verifcation list of upaid DPs falling in different categories of impediments was revised and updated during this monitoring period. As per updated list of unpaid DPs, the impediments/ reasons contributing towards the delay in payments are described below while number of unpaid DPs against each impediment/ reason are summarized in Table 3.3:

• Delay in land awards for interchanges ROW land: As per LAA, land is considered legally acquired once the land award has been notified and compensation payment has been made. In case of interchanges ROW land, the compensation payment for awarded 30.74 acres and also awarded 21.90 acres acquired interchanges ROW land owned by 136 DPs in village Jalla Pahore (Abdul Hakeem interchange) and village

15-V (Kabirwala Interchange), 40 DPs (29.4%) have been paid an amount of Rs. 22.198 million (50.3%) by the end of December 2017 while the left over unpaid DPs will be coordinated for early submission of claims duirng next monitoring period.

• Inheritance mutation issues: 122 land owners have passed away which requires transfer of land to the inheritors. Payments of compensation to inheritors will be made after transfer of land to the inheritors by the district revenue authority. After inheritence mutation in land record, all heirs of deseased DPs will receive entitled compensation as per their inherited share.

• Living out of project area/ outside countery: As per LAA 1894, DPs have to submit their claims supported with valid title documenmts and receive compensation voucher/cheque in person after due verification of their documents and record. Currently, total 509 DPs who have been reportedly moved out of the project area without leaving a clue or address to with fellow villagers and 5 DPs are residing outside country.

• Meager3 Compensation Amounts and other reasons: The largest (842) number of DPs living in the affected or nearby villages have not showed up to claim compensation are having pending payments because of meager amounts of compensation of less than Rs. 5000. As procedural requirement, DPs have to open bank account to receive even such small amount of compensation for which DPs are reluctant to open bank account as sometimes the amount of opening bank account surplus the compensation amount, lack of interest to submit claim or some other reasons well known to them.

• Title Disputes/ court cases: 105 Landowners/ DPs have title disputes that have not been resolved. The compensation could not be paid to them until land title issues are resolved/decided by the competent revenue authorities/courts.

3 Compensation amount up to Rs. 5000 is defined as meager amount and it is likely most of the DPs in this category may lack interest in

claiming compensation following prevalent payment mode under LAA 1894.

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

10

• Underage DPs (Juvenile) or DPs lacking CNIC4: There are 82 DPs who are either of underage (juvenile) or lack identification documents like computerized national identity card (CNIC).

Table 3.3: Reasons for Delay in Payment of Land Compensation

Unresolved Legal and Administrative Impediments Unpaid DPs** (Nos.)

*Difference (DPs Nos.) During (Oct-Dec 2017)

(Unpaid DPs for Carriageway/ Interchanges ROW) Increased Decreased

(i) Meager compensation/Informed/ Not Interested 842 - 109

(ii) Name Incorrect / Underage/CNIC 82 11 -

(iii) Living out of Project Area (within country) 509 108 -

(iv) Tittle Disputed/ Court Case 105 1 -

(v) Deceased 122 15 -

(vi) Living Abroad 5 1 -

(vii) New Awarded Interchanges ROW land 126 92 119

Total 1,791 228 228

Notes: * Based on 6th IMR **Unpaid DPs in all categories is revised and updated as per field verification and payment disbursement.

3.4 Facilitation provided to DPs in Processing of Claims

25. During reporting quarter, SSMC team in collaboration with M-4 Land and Resettlement Unit visited the project effected villages of districts Jhang and Khanewal to: i) locate, motivate and guide DPs and heirs of deceased DPs; ii) facilitate delivery of compensation to the remaining unpaid DPs; and iii) record current residential addresses of those living out of project area; and iv) obtain certification statements of the guardians of juvenile and legal heirs of deceased DPs regarding payment of compensation as and when they approach with requisite legal/ title documents. Besides, the lists of DPs in differnet categories of impediments were reviewed and updated based on field verfications and accordingly the database was revised and the numbers of unpaid DPs in different categories of impediments were re-adjusted. The Table 3.4 below highlights the payement progress achieved against different categories of unpaid DPs and updated number of remaining unpaid DPs (as of 31 December 2017) in differnet categrories of legal and administrative impediments.

Table 3.4: Compensation payment against each category of unpaid cases

Unpaid DPs with Impediments

Total unpaid (as of 30th Sep., 2017)

DPs paid (During Oct., to Dec.,17)

Updated unpaid DPs (as of 30th Sep., 2017)

# Difference DPs after Field Verification

Up to 5000

Above 5000

Total Up to 5000

Above 5000

Total Up to 5000

Above 5000

Total *

Increased Decreased

Informed/ Not Interested 445 521 966 7 8 15 373 469 842 - 109

Name Incorrect/ Underage/ CNIC

22 51 73 - 2 2

24 58 82

11 -

Migrated (Project Area)

188 221 409 - 8 8

261 248 509

108 -

Tittle Disputed/ Court Case

34 71 105 - 1 1

30 75 105

1 -

Deceased 20 91 111 - 4 4 23 99 122 15 -

Abroad 1 3 4 - - 0 - 5 5 1 -

New Awarded* 21 167 188 4 31 35 9 117 126 92 119

Total 731 1,125 1,856 11 54 54 720 1,071 1,791 228 228 #Based on 6th IMR (Section III) *Jalla Pahore and 15-V: awards have been announced by November 2017 and unpaid DPs in all categories is revised and updated as per field verification and payment

disbursement

4 CNIC, Computerized National Identity Card.

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

11

26. Meanwhile, efforts were continued to facilitate DPs in resolving their impediments and disburse compensation during next monitoring period. Particularly, the DPs living in project corridor and the legal heirs of deceased DPs were visited and facilitated to get requisite title documents after mutations in the land records and legal heirs of inheritors DPs who got mutations of land were assisted in preparing their compensation claims. Accordingly, during monitoring period, land compensation claim files for 54 DPs were finalized and being processed for delivery of entitled resettlement allowances in next monitoring period. Village-wise summary of files processed and submitted for payment of payable allowances is given in Table 3.5.

Table 3.5: Efforts and facilitation to DPs for Processing Claims

Sr. No Village

No. of DPs/ Deceased Claim

for Land Compensation

Case Under Process (Status of case)

1. 14-V 4 � Claim files for reported DPs in each village have been prepared and processed for payment of land compensation.

� The compensation vouchers/ cheques will be delivered in ensuing months and updated payment status will be reflected in next monitoring report.

2. 29 Ghagh 3

3. 17 Ghagh 10

4. Ali Pur 3

5. Hassan Pur 4

6. 14-V Interchange 2

7. 15-V interchange 9

8. Jalla Pahor Interchange 7

9. 18 Ghagh 7

10. 15 D 1

11. Kakki Kohna 1

12. Sai Sahoo 1

13. Allah Hoo 2

Total 54

3.5 Efforts exhausted to approach unpaid DPs for additional documentation

27. During the reporting period, project villages were visited by the PIU/ PMU and unpaid DPs were approached through their relatives/ local residents. The contact details of DP’s living outside the project were asked and recorded and the legal heirs of the inheritors DPs were motivated for early mutations in land record. Certification statements from 205 DPs acknowledging their awareness that compensation will be provided upon resolution of the legal and administrative issues related to their compensation have been collected. Table 3.6 below summarizes the progress achieved for additional documentation about DPs with legal and administrative impediments and village wise list is Annex 3.7. Sample of copies of filled forms are attached as Annex 3.8, 3.9, 3.10 and 3.11.

Table 3.6: Efforts made on Additional Documentation to expedite the process of Stuck Payments

DPs with Legal and Administrative Impediments

Total unpaid DPs

(as of 31 Dec 2017)*

Addl. Documents

Signed (till Sep, 2017)

Addl. Documents

Signed (Oct. - Dec,

2017)

Additional Documents

Signed. Total

Remaining DPs

Remarks

Informed/ Not Interested

842 374 94 468 374

DPs approached through village elders and their relatives and motivated to get their compensation. The notables of village/ DPC heads were requested to approach otherremaining DPs for purpose.

Name Incorrect/ Underage/ CNIC

82 66 11 77 5 DPs approached and motivated for getting their CNIC issued and payment of compensation. Meeting with NADRA officials.

Migrated (Project Area)

509 407 89 496 13

DP’s approached through village elders and their relatives living in villages to collect contact addresses and motivate them to get their compensation. The notables of village/ DPC heads were requested to assist in approaching other remaining DPs. In next meetings the other DPs will be approached

Tittle Disputed/ Court Case

105 33 6 39 66

DPs approached through village elders and their relatives and motivated to get their compensation. The notables of village/ DPC heads were requested to approach other remaining DPs for purpose. In next meetings the other DPs will be approached

Deceased 122 88 5 93 29

Legal heirs available in village of the deceased DP’s were motivated for early mutations and submission of claims with valid title documents. The notables of village/ DPC heads were requested to assist in approaching other remaining DPs. In next meetings the other DPs will be approached

Abroad 5 - - - 5 DP’s approached through village elders and their relatives living in villages to collect contact addresses and motivate them to get

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

12

DPs with Legal and Administrative Impediments

Total unpaid DPs

(as of 31 Dec 2017)*

Addl. Documents

Signed (till Sep, 2017)

Addl. Documents

Signed (Oct. - Dec,

2017)

Additional Documents

Signed. Total

Remaining DPs

Remarks

their compensation. The notables of village/ DPC heads were requested to assist in approaching other remaining DPs. In next meetings the other DPs will be approached

New Awarded interchanges land (30.74 acres)

126 - - - 126

• DPs available in villages, which have been approached to submit claims and those not living in village, their relatives and village headmen, were requested to coordinate with them for early submission of claims.

• Jalla Pahore and 15-V (23.74 acres): Legal process to announce award completed for both villages and awards could be announced by November 2017

Total 1,791 968 205 1,173 618

* Number of DPs in all categories is reviewed and updated based on field verification and payment disbursement as of December 2017.

3.6 Assessment on Compensation Uses by DPs

28. During the reporting period, along with locating and approaching unpaid DPs for additional documentation and mobilization of DPs to collect their compensation, SSMC team started to collect information from paid DPs about use of compensation paid and restoration of their assets like land and structures by using a pre-structured questionnaire. The DPs were consulted and interviewed to collect information on predominant use of compensation amount and assess restroartion of their residential and productive assets. The analysis of collected data during (October – December 2017) on utilization of compensation amount for acquired assets (structures, land and other asstes) is presented in Table 3.7.

29. In land categroy 11 DPs and in structure category 15 DPs were interviewed to analyze predominant compensation uses by interviewed DPs. The results represent that 63% DPs in land categroy and 66% DPs in structure category utilized their compensation to re-establish their lost assets. The results of interviewed DPs highlighted that the DPs entitled for sizable compensation amount utilized it on productive purposes (i.e use of compensation for reconstruction/ establishment of replacement structure or assets) while the DPs entitled for meager amounts used the compensation on non-productive uses (use of compensation on other household needs).

Table 3.7: Utilization of Land and Non Land Payment by DPs (October –December 2017)

Impacts Activity Total Interviews

Less Than Rs. 100,000

Rs. 100,001 -500,000

Rs. 500,001 to 1,000,000

Rs. 1,000,001 & above

Percentage

Land Total Interviewed 11 5 4 - 2

Productive Use 7 2 3 - 2 63%

Unproductive Use 4 3 1 - - 37%

Structure Total Interviewed 15 1 9 2 3

Productive Use 10 - 7 2 2 66%

Unproductive Use 5 1 2 - 1 33%

3.7 Request of NTP for Civil Work in Remaining Loop of Interchanges ROW Land

30. As per LAA 1894, land is considered legally acquired once the land award has been notified and compensation payment has been made. In case of remaining loop of interchanges ROW land, the compensation payment for awarded 22.464 acres owned by 138 DPs in village Jalla Pahore and Umeedgarh (Dinpur interchange) and village 15-V (Kabirwala Interchange- North bound) the left over unpaid DPs will be coordinated for early submission of claims duirng next monitoring period.

31. The findings of field visit are; i) NHA has continued to restrict civil work (Highway Work) to the interchanges ROW for

which the land is 22.464 acres (Dinpur, Kabirwala Interchange (North bound); ii) Whereas available DPs have been fully compensated and validated by the Internal

Monitor for the total 22.464 acres of the cleared land (Dinpur, Kabirwala Interchange – North bound);

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

13

32. Furthermore, NHA has been able to make more payment to the DPs in interchange ROW/ portion restricted. Now the situation of the section where payment has been made to DPs and sections are cleared in section III.

33. NHA will request ADB to issue NTP for civil work (Highway Work) to the interchanges ROW of section III for which the land is 22.464 acres (Dinpur, Kabirwala (North bound) Interchanges). The tables identifying interchanges ROW land in which all types of payments have been fully completed to available DPs is given below in Table 3.8 and DPs wise status of payment is provided as Annex 3.12.

Table 3.8: Compensation Payment status of Remaining loop Interchanges RoW Land

Total Paid Status Unpaid Status

Interchange Village Land Award (Acre)

Land Award (Rs. M)

Payable DPs

Land (Acre)

Amount (Rs. M)

DPs (Nos)

Land (Acre)

Amount (Rs. M)

DPs (Nos)

Dinpur Jalla Pahore 16.363 31.048 91 7.270 13.796 18 9.092 17.252 73

(44.4%) (44.4%) (19.8%) (55.6%) (55.6%) (80.2%)

Umeedgarh 0.563 1.229 2 - - - 0.563 1.229 2 (100%) (100%) (100%)

Kabirwala 15-V 5.539 13.057 45 3.565 8.402 22 1.974 4.655 23 (64.4%) (64%) (48.9%) (35.6%) (35.7%) (51.1%)

Total 22.464 45.334 138 10.835 22.198 40 11.628 23.136 98

(48.2%) (49.0%) (29.0%) (51.8%) (51.0%) (71.0%)

3.7.1 Various Categories of Stuck Payments of Interchanges RoW Land

34. The updated status reflects that in case of awarded Interchanges ROW land (22.464 acre), overall the reason for delay in payment to unpaid 98 DPs is 10 are deceased and 45 are informed. In addition to this 17 are migrated while disputed cases are 21. The abroad case and underage is 1 each however, 3 DPs identification is in process. The overall villagewise delay in payment status of interchages RoW land (22.464 acres) is shown in Table 3.9:

Table 3.9: Various Categories of Stuck Payments of Interchanges RoW Land

Interchanges Villages DPs Reasons of Delay in payment

Total Paid Unpaid Deceased Informed Migrated Disputed Underage Abroad Other*

Din Pur Jalla Pahor 91 18 73 9 26 15 19 1 0 3

Umeed Garh 2 0 2 - - - 2 - - -

Kabeer Wala 15 V 45 22 23 1 19 2 - - 1 -

Total 138 40 98 10 45 17 21 1 1 3

*DPs identification in process

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

14

4. RELOCATION AND CONSTRUCTION RELATED EMERGING LAR ISSUES

4.1 Relocation of Schools

35. Two affected schools including one partialy affected primary school at village Traili and one significantly affected elementary (middle) school at village Shahdat Kandla required relocation. Compensation for land and construction of new building for the schools was deposited in district treasury at the disposal of the district administration for relocating the school of village shahadat kandla. For early completion of land acqusition, tendering and award of civil works for schools a close liasion was maintained with the local administration duirng reporting period. Achieved progress for construction of new school building to relocate school is presnted below.

• Land acquisition of schools: Land acquisition for construction new school buildings has been completed and after land awards for 20 kanal and 4 marla land in May 2017, compensation has already been paid to DPs and the land is mutated in the name of school by local district administration.

• Tender of construction: Tendering/ bidding process for award of civil works for school construction was already completed and civil contracts for construction of new school buildings were awarded in April 2017. Subsequent to contract award, the contractors were mobilized and site possession for construction of new school buildings was handed over in May 2017 by local district administration.

• Commencement of Construction of Schools: The construction works for both schools i.e primary school at Tirholi and elementary school at Shahadat Kandla is continued.

o Elementary School at Shahadat Kandla: Two blocks of school building Shahadat Kandla were to be constructed. Construction of one block has been completed, plaster is completed and after completion this block will be handedover to the school administration by the mid week of January 2017. Construction of second block is continued, walls of building have been completed and shuttering for roof lenter has been done. Construction work is in progress speedily. The contarctor aimed to complete the construction in minimum possible time to ensure schools are ready by November 2017 but still not completed due to some constraints in funds disbursment from district administration to contractor which causes delay.

36. However, the partly retained affected school building are used to continue school service at site and the local governmnet and the contractor have been requested and being followed to ensure that schools are ready and classes are started in new school buildings after December 2017. In this regards, a close liaison and follow-up will be continued with the school administration, disctrict government authorities and contractors in coming quarter.

4.2 Construction Related Emerging LAR issues

37. A 12.2 meter (40 feet) wide land strip is acquired for interchnegs loops carriageway following the detailed design. However, during execution of works in M-4 Shorkot-Khanewal

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

15

Section (M-4 Section III) it was identified that the interchanges loops ROW is inadequate to adjust the side slopes for elevated carriageway including approximately 6.5 meter outer side and 3 meter inner side acquired form toe point of interchanges loops carriageway for track for the community to access their farm land on either side of the interchanges loops carriageway. Nonetheless the loops carriageway roads can be completed within acquired ROW by making some design adjustments like retaining walls, managing horizontal and vertical side slopes into 1.5:1 (maximum) and excluding service track on either side of loop carriageway but this will restrict landowners to access their farm lands.

38. Keeping in view the emerging requirement for additional land along interchanges loops in M-4 Shorkot-Khenewal Section (M-4 Section-III), the engineering sections has been requested to finalize design with additional land indicated and marked at site for further assessment and initiating land acquisition process under LAA 1894. The adjoining land owners have been consulted and calrified about need and objectives of additional land strip to be acquired.

39. Section-4/ Gazette notice have been notified for the requisite additional land for interchanges in sections III. Gazette notification/ Section-4 is issued in September 12, 2017 vide letter No. 202/LAC/ADCR on dated August 25, 2017. PIU has been forward letters to respective District Collectors to form DPAC (District Price Assessment Committee) and for price assessment of the required land on priority basis and LAC issued a letter to District Collectors to form DPAC for price assessment vide letter No. 669/2017/Sec-II & III/M-4/NHA/LAC on dated September 27, 2017. After price assessment detailed land measurement survey and census of all affected land owners will be completed and addendum to LARP to address emerged LAR issues will be prepared and submitted to ADB for review and concurrence. A time bound action plan to acquire additional land and finalize the addendum LARP has been finalized in consultation with the engineering staff. Meanwhile the engineering staff has been advised to limit the construction within already acquired ROW ensureing no civil works are commenced in additional land to be acquired unless the acquisition is completed and compensation is paid to the DPs as per ADB’s SPS 2009 requirments. A timebound action plan for acquisition of additional land and prapration of addendum LARP is presented in the Table 4.1.

Table 4.1: Time-bound Action Plan for Safeguards Issues on M-4 (Section III) Project

Action Status/Revised/ Timeline Responsibility

Time Line Status

Section III

• Additional Land to be acquired (for catering embankment slope and providing access road along interchanges loop carriageway) marked on as per design.

20 Sep 2017

Done

SC/PD M-4

• Additional land measured and notified under section-4 of LAA 1894

20 Sep 2017 Done

LAC/ Dir Land/ GM M-4

• Potentially affected land owners coordinated and clarified on objectives, land acquisition process, payment mechanism and timelines.

Continued

Being done

SSMC/ Dir Land

• DPAC assessed land cost deposited in treasury and additional land notified under Section-5 of LAA 1894.

10 Feb 2018 Being done

LAC/ Dir Land/ GM M-4

• Detailed Measurement Survey and Census of potentially affected land owners completed.

28 Feb. 2018 Being done

LAC/ Dir Land/ GM M-4

• Notification under Section-6 published 25 Mar. 2018 Will be followed. Progress with adjustments (if any) will be reported in monitoring reports for respective period.

LAC/ Dir Land/ GM M-4

• Approval of cost by the Competent Authority 25 Apr. 2018 LAC/Director Land/GM-M-4

• Addendum of LARP finalized and submitted to ADB. 20 Mar. 2018 SSMC/ Dir Land/ GM M-4

• Issuance of notices under section 9 and 10 of LAA 1894 10 May. 2018 LAC/ Dir Land// GM M-4

• Land awards announced under LAA provisions 31 May, 2018 LAC/ Dir Land/ GM M-4

• Addendum to LARP reviewed and cleared by ADB 15 Apr. 2018 ADB

• Compensation paid to landowners and addendum LARP implementation confirmed to ADB

15 Jul, 2018 LAC/ SSMC/ Dir Land/ GM M-4

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

16

5. CONSULTATIONS, PARTICIPATION AND INFORMATION DISCLOSURE

5.1 Community Consultations

40. During the reporting quarter, the tasks performed by the LAR management team are discussed below:

5.1.1 Community Consultations with Men and Women Unpaid DPs

41. SSMC has established the displaced persons committees (DPCs) in project affected villages (M-4 section III). The SSMC’s social mobilizers held consultation meetings with men and women in project villages (Section III) during this quarter (as of 31st December 2017). The purpose of these meetings was to inform and facilitate DPs in the process of payments to unpaid DPs, addressing their concerns/ complaints, information disclosure and facilitation in preparation & submission of claims for payment and collect updated status of DPs and to find out contact numbers & addresses of DPs who are out of the project area.

42. SSMC social mobilizer conducted total 89 (59 Men, 30 Women) consultation meetings were held in which total 464 (365 Men, 99 Women unpaid DPs participated) DPs, members of DPCs, and local community residents were contacted in affected villages to assist/ motivate DPs in preparation and submission of compensation claim for payments of their acquired assets and also consultated with the DPs of meager amounts, the DPs were also informed about grievance redress mechanism and role and functions of DPCs were elaborated during consultations. Table 5.1 below summrizes the consultations carried out during reporting period and List of consultation meetings with both men & women and participants is given in Annex 5.1 & 5.2.

Table 5.1: Summary of Community Consultation with Men and Women Unpaid DPs During Quarter (Oct – Dec 2017)

Sction No. of Meetings Contacted with DPC/ Contacted with DPC/ DPs/ GRC

DPs/ GRC Men Participant Women Participant

III 89 464 365 99

5.2 Issues/ Concerns Discussed During Consultation Meetings

43. During consultation meetings, discussed issues concerns and their responses are given below in the table 5.2:

Table 5.2: Issues and Response from the project team Sr. No.

Discussion Points/Issues/ Summary of Concerns

Response from the PIU/SSMC

1.

Compensation entitlement concerns among DPs about land occupied due to Quarterly distribution of family owned assets without getting land record updated accordingly.

The PIU/ SSMC will continue coordinating with DPs to motivate and mobilize them to approach land revenue authorities for resolution of land record updating issues as soon as possible so that the payment could be disbursed as per their entitlement in acquired land parcel.

2.

DPs entitled to meager amount are not showing interest to get their compensation. Some DPs with meager amount coupled with mutation issues as well are least bothered to show-up for claiming and getting entitled compensation due to incidental expenses for procuring support document and processing of claim files.

The SSMC will keep coordinating and motivating such DPs to prepare file and to get compensation payment.

3.

Issue on inheritance mutations: In some cases, legal heirs are disinterested to record inheritance mutation due to meager compensation amounts or lack of coordination/ cooperation among themselves which is causing delay in payment of compensation.

The PIU will coordinate and request the land revenue authorities to facilitate DPs for recording inheritance mutation in record, however, the legal heirs of the DPs will have to submit request for mutation and follow the procedures under law. The compensation payment could only be paid when legal heirs of deceased DPs can submit

their claims with valid title after inheritance mutations of land.

4.

Migrated DPs Population in affected villages of section-III is scattered in small hamlets and many DPs have been shifted to other places. Locating DPs who are not living in project affected villages is time consuming. The addresses and contact numbers of DPs are gathered through village headmen/ notable persons and their relatives in the village but in some cases local community lacks addresses and contact numbers of migrated families. Through SSMC efforts will be

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

17

Sr. No.

Discussion Points/Issues/ Summary of Concerns

Response from the PIU/SSMC

continued to locate such DPs and mobilize them to submit their claims with valid documents.

5.3 Consultation plan for the succeeding quarter

44. Tentative Community consultation/ mobilization plan for next quarter: The PIU and SSMC will continue consultation in all identified villages to facilitate processing of claims, delivery of compensation for land award and R&R allowances in all project villages. Under the supervision of a resettlement specialist, two teams of social mobilizers will follow the work plan given in Table 5.3 to undertake the consultations with unpaid DPs in various villages in the next quarter as of March 2018. The DPs will be guided on the submission of claims and supporting documents. DPs with legal and administrative impediments will be identified, and certification statements and whereabouts of DPs will be recorded. Details of the consultation will be presented in next internal monitoring report as of March 2018.

Table 5.3: Tentative Community consultation/ mobilization plan for next Quarter

(Plan for the period Jan to Mar 2018)

Month Weeks Villages to be visited

Name of Villages to be visited

January 2018 1st week (01-01-2018 to 05-01-2018)

7

5 Ghagh, Kakki Kohna,15-V,14-V, 13-V, Khanewal Kohna, Jamasabad

2nd week (08-01-2018 to 12-01-2018)

5 15-D,14-D, Jalla Pahor, Shahadat Kandla, Umeed Garh,

3rd week (15-01-2018 to 19-01-2018)

6 17 Ghagh,18 Ghagh, Allah Hoo, Nehalywala, Kalkanwala, Jahan Pur

4th week (22-01-2018 to 26-01-2018)

6 Traili, Sae Saho, 17-D, 8-D, 8-V,9-V

Feburary 2018 1st week (01-02-2018 to 09-02-2018)

7 15-D,14-D, Jalla Pahor, Shahadat Kandla, Umeed Garh, Khanewal Kohna, Jamasabad

2nd week (12-02-2018 to16-02-2018)

6 5 Ghagh, Kakki Kohna,17-D, 8-D, 8-V,9-V

3rd week (19-02-2018 to 23-02-2018)

6 17 Ghagh,18 Ghagh, Allah Hoo, Nehalywala, Kalkanwala, Jahan Pur

4th week (26-02-2018 to 29-02-2018)

5 Traili, Sae Saho, Ali Pur, Noor Pur, Hassan Pur

March 2018 1st Week (01-03-2018 to 02-03-2018)

4 Nehalywala, Kalkanwala, Jahan Pur, Allah Hoo

2nd Week (05-03-2018 to 09-03-2018)

7 29 Ghagh, 23 Ghagh,10-D,9-D, 15-V,14-V, 13-V

3rd Week (12-03-2018 to 16-03-2018))

6 5 Ghagh, Kakki Kohna, 17-D, 8-D, 8-V,9-V

4th Week (19-03-2018 to 23-03-2018))

7 15-D,14-D, Jalla Pahor, Shahadat Kandla, Umeed Garh, Khanewal Kohna, Jamasabad,

5th Week (26-03-2018 to 30-03-2018))

2 17 Ghagh,18 Ghagh

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

18

5.4 Internal and External Coordination meetings to Facilitate Compensation Payment

45. SSMC team coordinates with revenue department, contractor through PIU regularly and ensures payments consistent with entitlements, construction related emerging LAR issues and changes in DPs data. During this quarter (as of 31st December 2017) 17 meeting between NHA and Revenue Department and other official were facilitated by SSMC. Highlights of these meetings are given in below Table 5.4.

Table 5.4: Consultative Meetings with PIU and Revenue Officials

Department No. of Meetings

Purpose/ Issues Discussed Remarks

Assistant Director Land NHA

5 Discussion on field activities, updated progress, field related issues, updated status of MIS data, LAR data for MPR of December 2017..

As AD Land is focal person for this project. SSMC is in contact with AD land.

Meeting with PD Section-III (A & B) M-4

4 Meeting regarding Additional Land acquired for Interchange

A meeting with PD Section-III (A & B) M-4 was conducted. Purpose of the meeting was to demarcation of Additional Land Acquired for interchange.

Contractor of Shahadat Kandla School

5 To boost up the construction of school Shahadat Kandla.

To boost up the construction of school to meet the agreed deadline.

NHA and ADB / Contractor of Shahadat Kandla School

1 To boost up the construction of school Shahadat Kandla.

To boost up the construction of school to meet the agreed deadline.

NHA and ADB 1 Site Visit by ADB Mission at NHA Complex Toba Tek Singh

Dicussed 7th IMR of section-III Additional Land Acquired for Interchange in Section-III.

Addendum of LARP finalized for additional land

Progress was reviewed in the meeting held at office SSMC NHA Complex Toba Tek Singh.on 13 December 2017

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

19

6. GENDER ISSUES/ ANALYSIS IN LARP IMPLEMENTATION

6.1 Gender Segregated Consultations with the Unpaid DPs

46. During this Quarter (Oct. – Dec. 2017) total 89 consultations in Section III were made with unpaid DPs consisting of men and women by the men and women social mobilizers, wherein 464 DPs/ members of DPCs/ DPs as well as local community participated. The main focus of the discussion was to consult those unpaid DPs for the collection of their amount and in case of any issues related to inheritance or ID card the DPs were advised to address it immediately, so that the payment could get cleared. Gender segregated summary of community consultation DPs are given in Table 6.1.

Table 6.1: Gender Segregated Summary of Community Consultation During Quarter (Oct – Dec 2017)

Section No. of Meetings Contacted with DPC/ DPs/ GRC

Contacted with DPC/ DPs/ GRC

GRC Men Participant

Women Participant

III 89 464 - 365 99

47. The main activities of these consultations were the following

- Information disclosure to the unpaid payable DPs regarding the process of payment. - Identification of issues and grievances regarding the payments of compensation, mode of

payment. - Assessment of the impacts of the project. - Determine the solutions to resolve the issues and concern of the DPs on village level

related to the payment.

48. The DPs actively participated in these consultation meetings and ensured that they would try their level best to contact untraced unpaid DPs and motivate them to collect their compensation amount.

49. Review of gender issues/ and analysis associated with the LARPs Implementation including:

• Payment of compensation by gender

• Gender segregated grievances

• Gender segregated issues associated with the project, such as restricted mobility, eligibility & entitlements, income/ livelihood restoration

50. A strategy to address the gender segregated LARPs (Section III) implementation issues in compliance with ADB's Gender Policy, has been prepared. Women social mobilizers are locating Unpaid DPs (women) in this regard, Initial and consultation meetings with women DPs for DPC formation are being conducted. During this quarter (as of December 31, 2017) 30 meetings have been conducted in project villages and 99 women participated in the meetings. Many women’s DPs are settled out of village after their marriages. Detail of participants in sections (III) has been presented in Annex 5.2.

6.2 Project impact on Women Mobility and Privacy

51. At this stage, there is no as such major impact recorded regarding women mobility and privacy in the project area due to project activities..

6.3 Gender Issues/ analysis in LARP Implementation

52. At this stage, there is no major impact recorded regarding gender issues particularly regarding women’s.

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

20

6.4 Issues relating the Payment of Compensation to unpaid DPs

53. These are the main issues relating the payment of compensation:

• Women unpaid DPs are migrated from villages and settled in other villages after their marriages.

• Some women’s DP’s families have been shifted to other villages.

• Some women’s DPs have no CNIC.

• Some women’s DPs are under age.

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

20

7. GRIEVANCE REDRESS MECHANISM AND COMPLAINTS HANDLING

54. During this quarter, no new complaint was received.

55. Below GRC recommended actions for remaining 4 complaints including 3 complaints on land measurement, 1 complaint about payment of residential structure are being followed.

� Measurement of Land: 3 Complaint of land measurement is in process.

� Payment residential structure: During last quarter, fact finding report was prepared and verification of structure was also done. Case was discussed in GRC meeting and was found genuine. So file/ case had been forwarded for issuance of cheque in the office of Director Account M-4 Lahore is in process. Although, the complaint is resolved technically, however, in table below it is counted in pending complaints and will be reflected in resolved column after delivery of compensation cheque.

56. Status of complaints received, resolved and pending upto 31st December 2017 has been presented in the Table 7.1.

Table 7.1: Status of Complaints Resolution by Type Overall Complaints Resolution

Section Previous Complaints Progress during Month

(Oct. - Dec 2017)

Total

(As of 31 December 2017)

Received Resolved Pending

Total Resolved

+ Pending)

Received Resolved Pending

Total Resolved

+ Pending)

ReceivedResolved Pending

Total Resolved

+ Pending)

III 31 27 4 31 - - - - 31 27 4 31 (87.1%) (12.9%) (87.1%) (12.9%)

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

21

8 CONCLUSIONS AND RECOMMENDATIONS

8.1 Conclusions

57. The awarded land for the project has already been acquired under the LAA in the project affected villages of section-III. On the whole, total amount of compensation of land (Rs. 1473.738 million) was to be paid to 6,484 DPs, out of which, an amount of Rs. 1363.21 million has been paid to 4,693 DPs on account of payment for the loss of land, acquisition of 21.9 acres of land owned by 136 DPs in two villages for Abdul Hakeem interchnage and Kabirwala interchange award announced by October and November 2017. Out of which, an non-land payment Rs. 253.832 million (89.7% of total amount) has been paid to 1,639 DPs (80% of total DPs) on account of payment for the loss structures, community structures, crops and trees. The achiveed progress in delivery of entitlled R&R allowances represent that 80.9% of entitled allowances cost has been disbursed to entitled DPs. Meanwhile the DPs with impediments are being approached to record additional documents and assist them in delivery of compensation as and when they show-up after resolving their issues.

58. Two blocks of school building Shahadat Kandla were to be constructed. Construction one block has been completed, plaster is completed and after completion this block will be handedover to the school administeration by the mid of January 2018. Construction of second block is continued, walls of building have been completed and shuttering for roof lenter has been done. A close follow-up is continued for early compeletion of constrcution and shifting of classes of new school buildings.

59. Progress on timed action plan for emerging land need at interchanges represent that the timelines for marking additional land along interchanges loops and finalize addendum LARP are being followed. Achieved progress on differnet activities and revised/ updated timles are discussed and provided under section 4.2 of the report.

8.2 Recommendations

60. The following actions will be initiated or continued to facilitate the completion of all pending compensation payments:

• Demarcation of Additional Land Acquired for interchanges: PIU will coordinate and assist the LAC to complete the process of demarcation of additional land acquired for interchanges..

• Pending Payment of Allowances and DPs with Legal and Administrative Impediments: PIU and SSMC will maintain in close liaison and shall continue their outreach activities to mobilize and assist DPs in processing of their claim files and payment of entitled allowances. During field visits, additional documentation for DPs with different categories of impediments will be recorded.The PIU staff will also increase coordination with LAC/ Revenue staff Sec-III to boost up payment process.

• DPs living out of project area with country or overseas. With assistance of the locals and village notables, efforts will be continued to record wherabouts of DPs living out of project area, approach and coordinate with DPs (where ever possible) for recording additional documents and mobilizing them to show-up for submission of claims. In case of DPs whose whereabouts are unknown, the certification statement form village notables will be recorded.

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

22

• DPs with Inheritance Mutation issues: The efforts will be continued to ccordinate with legal heirs of the DPs to record certification statements and mobilizing them to get their inheritance mutation recorded in the land records. Meanwhile, the legal heirs will be assisted for early inheritance mutations in land record and delivery of compensation as and when they come-up with valid title documents as per recorded mutations.

• Underage (Juvenile) DPs: The efforts will continue to approach and guide elders/ natural guardians of underage DPs for getting legal guardians certificates to receive compensation. Meanwhile statements will be recorded confirming DP’s understanding that compensation will be made when they come-up with the required legal guardian certificate.

• DPs with meager compensation amounts or lack of interest to take compensation: Efforts will be ensured to motivate DPs to submit compensation claims with the required supporting documents. For DPs who are unwilling to claim meager compensation amounts, statements to that affect will be recorded from willing DPs.

61. For timely compeletion of the new school buildings and handling of emerging land acquisition for interchnages loops carriageway follwing actions are recommended.

• The PIU PD and Engineering staff will closely laise with the District Administration, Education and Buildings Departments of Khenewal and the contarctor enagaged by District Buildings Department Khenewal for timely completion of school buildings to ensure the classes can resume in new school buildings by January 2018.

• A time bound action plan to acquire additional land and finalize the addendum LARP has been finalized in consultation with the engineering staff. Meanwhile the enginnering staff has been advised to limit the construction within already acquired ROW ensureing no civil works are commenced in additional land to be acquired unless the acquisition is complete and compensation is paid to the DPs.

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

23

PHOTOLOG

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

24

Pictorial Presentation

(Site Visit by ADB Mission at NHA Complex Toba Tek Singh) Progress was reviewed in the meeting held at office SSMC NHA Complex Toba Tek Singh.

on 13 December 2017

A view of progress review meeting at Office SSMC NHA Complex TTS

A view of group photograph NHA, ADB and SSMC at NHA Complex Toba Tek Singh

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

25

Pictorial Presentation

(Site Visit by ADB Mission at New Construction of School Shahadat Kandla)

The Project Director (M-4) Section –III, Director Land and Assistant Director (Land and Social) accompanied by ADB Review Mission, SSMC, visited the project section III on 16 November 2017.

A view of construction activeties

A view of construction activeties

A view of site visit at New Construction of School Shahadat Kandla

A view of site visit at School

A view of construction activeties during the month of November 2017 at School

Shahadat Kandla

A view of construction activeties during the month of November 2017 at School

Shahadat Kandla

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

26

Pictorial Presentation of Selected Events

Pictorial View of Consultation Meeting and Disclosure of LARP and Consultation Meetings with Men and Women

A view of meeting with female DPs at Village Allah Hoo, Sec-III

A view of meeting with DPs at Village Umeed Garh, Sec-III A view of meeting with DPs at Village Nehalay Wala, Sec-III

A view of meeting with female DPs at Village Kakki Kohna, Sec-III

A view of meeting with DPs at Village Kakki Kohna, Sec-III A view of meeting with DPs at Village 8-D, Sec-III

A view of meeting with DPs at Village Nehalay Wala, Sec-III A view of meeting with DPs at Village Hassan Pur, Sec-III

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

27

Pictorial Presentation of Selected Events Consultation Meetings with Men and Women

A view of meeting with DPs at village Sai Sahoo, Sec-III

A view of meeting with DPs at village Traili, Sec-III A view of consultation meeting with DPs of Village Sai Sahoo, Sec-III

Site visit for re-measurement of land at village 5 Ghagh, Sec-III

A meeting for award announcement at Village 15 Venoiee, Sec-III

A view of meeting with staff of Shahadat Kandla Middle School Sec-III

A view of new house of Mr. Muhammad Husain at Village Umeed Garh Sec-III

A view of consultation meeting at Hassan Pur, Sec-III

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

28

Pictorial Presentation of Selected Events Consultation Meetings with Men and Women

A view of meeting with female DP at village Umeed Garh, Sec-III

A view of consultation meeting at 14 V, Sec-III

A view of consultation meeting with DPs regarding Structure assessment of Village 14 V, Sec-IIIf

A view of meeting with DPs at 9-V, Sec-III

A view of consultation meeting with DPs at village 8-V, Sec-III

A view of consultation meeting at Shahadat Kandla, Sec-III

A view of consultation meeting with DPs of Village 15-V, Sec-III

Sec-III

A view of meeting with DPs at village Jalla Pahor, Sec-III

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

29

ANNEXES

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

30

Annex 3.1: Award Interchange ROW land of Jalla Pahore Tehsil Kabirwala & District Khanewal

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

31

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

32

Annex 3.2: Award Interchange ROW land of 15-Venoi Teh & District Khanewal

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

33

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

34

Annex 3.3: Village-wise Payment of Land Compensation for Awarded land

Acquired

Land Amount DPs

Location/ Village Total

(Acre)

Paid

(Acre)

To be

Paid

(Acre)

Total

(Rs.)

Paid

(Rs.)

Balance

(Rs.)

Total

(Nos.)

Paid

(Nos.)

Not

paid

(Nos.)

Kaki Kohna 33.5 28.422 5.07 56,236,006 54,825,487 1,410,519 301 201 100

17 Ghag 48.4 47.382 1.01 55,995,513 52,446,979 3,548,534 131 98 33

5-Gagh 19.3 16.428 2.85 16,181,363 14,557,866 1,623,497 73 60 13

18 Ghag 69.8 60.320 9.49 65,663,807 51,200,857 14,462,950 212 129 83

29 Ghag 21.4 20.483 0.93 25,909,500 23,115,012 2,794,488 105 64 41

23-GH 6.3 6.290 0.05 5,830,500 5,354,400 476,100 8 7 1

14-DH 38.7 33.825 4.86 40,767,500 39,526,850 1,240,650 64 63 1

15-DH 18.3 18.041 0.29 22,030,047 21,751,447 278,600 48 46 2

17-DH 64.1 62.614 1.45 66,182,500 64,802,947 1,379,553 175 153 22

8-DH 35.3 28.322 6.95 28,396,375 24,192,768 4,203,607 206 149 57

9-D 12.0 11.878 0.13 8,288,625 8,217,551 71,074 88 63 25

10-D 29.6 29.543 0.06 20,428,312 20,382,595 45,717 43 41 2

1-KM 13.2 13.200 - 7,582,813 7,582,813 - 21 21 -

Tarholi 78.5 74.335 4.14 74,267,000 71,534,134 2,732,866 328 253 75

Sai Sahu 33.9 33.576 0.33 31,883,750 31,112,720 771,030 133 97 36

Shahdat Kandla 66.9 60.039 6.85 76,920,625 70,882,736 6,037,889 593 477 116

Jalan Pahor 31.6 30.740 0.89 47,296,625 41,331,640 5,964,985 144 81 63

Umeedgarh 43.5 43.112 0.36 60,254,250 60,103,333 150,917 118 104 14

Din Pur 0.1 0.080 - 103,500 103,500 - 1 1 -

Allah Hoo 49.2 47.857 1.35 45,269,750 44,440,994 828,756 252 190 62

Nihalwala 36.5 36.150 0.32 33,551,250 33,269,563 281,687 296 81 215

Kalkan Wala 64.7 47.900 16.80 59,529,750 58,703,792 825,958 370 356 14

Jahan Pur 101.9 97.848 4.04 58,585,312 56,582,394 2,002,918 332 245 87

Nurpur 34.2 33.610 0.62 19,679,375 19,351,889 327,486 106 71 35

Ali Pur 69.9 63.254 6.60 38,537,937 33,950,580 4,587,357 196 130 66

Hussan Pur 53.5 50.483 2.99 30,744,531 26,323,641 4,420,890 266 165 101

13-V 54.6 51.547 3.00 50,315,950 47,898,839 2,417,111 285 229 56

14-V 57.4 55.409 1.97 66,648,250 65,692,904 955,346 239 200 39

Jamsaabad 78.7 76.081 2.60 72,386,750 71,646,218 740,532 308 221 87

Sham Kot 1.8 1.790 - 4,151,075 4,151,075 - 3 3 -

7-V 35.8 34.373 1.42 28,783,781 26,747,435 2,036,346 141 123 18

8-V 65.0 63.991 1.05 52,408,375 51,561,296 847,079 245 174 71

9-V 24.7 24.707 0.01 22,735,500 22,730,564 4,936 81 73 8

Khanewal Kuhna 52.3 52.157 0.12 61,297,156 59,666,342 1,630,814 226 159 67

Jamsaabad

Interchange 17.1 16.837 0.26 15,783,750 15,557,265 226,485 80 62 18

Hassanpur

Interchange 8.62 7.593 1.03 15,858,500 13,970,520 1,887,980 44

26 18

Ali Pur Interchange 7.93 6.605 1.33 10,936,500 9,113,863 1,822,637 62 33 29

14-V Inetchange 13.63 9.462 4.17 34,487,062 23,940,289 10,546,773 39 23 16

Umeed Garh

interchange 0.56 - 0.56 1,228,882 - 1,228,882 2

- 2

15-Venoee

Interchange 5.54 3.044 2.50 9,552,188 5,250,435 4,301,753 24

15 9

Jalla Pahore

Interchange 16.36 3.570 12.79 31,047,844 9,634,399 21,413,445 95

6 89

Total 1,514.10 1,402.90 111.20 1,473,738,079 1,363,209,932 110,528,147 6,484 4,693 1,791

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

35

Annex 3.4: Village-wise Payment of Crops Compensation

Location/ Village Amount DPs

Total

(Rs.)

Paid

(Rs.)

Balance

(Rs.)

Total

(Nos.)

Paid

(Nos.)

Not paid

(Nos.)

Kaki Kohna 2,360,075 1,729,263 630,812 32 19 13

17-Ghag 3,291,075 3,120,610 170,465 35 32 3

5- Ghag 1,263,500 1,144,150 119,350 20 11 9

18-Ghag 4,105,500 3,432,080 673,420 35 34 1

29/Ghag 1,242,125 1,168,470 73,655 19 17 2

23/ Ghag 166,250 166,250 - 1 1 -

14/D 1,633,419 1,184,973 448,446 25 17 8

15/D 1,215,950 1,051,433 164,517 20 17 3

17/D 3,003,650 2,481,627 522,023 37 30 7

8/D 1,777,550 1,348,425 429,125 24 14 10

9/D 619,100 502,352 116,748 7 7 -

10/D 751,350 712,350 39,000 18 16 2

1/KM 110,537 77,761 32,776 8 2 6

Tarholi 4,959,169 4,938,927 20,242 71 70 1

Sai Sahu 1,645,575 1,639,050 6,525 37 33 4

Shahdat Kandla 2,600,644 2,025,389 575,255 65 37 28

Jallah Pahore 1,379,338 852,501 526,837 23 19 4

Umeed Gharh 2,795,322 2,795,322 - 38 30 8

Din Pur 4,500 4,500 - 1 1 -

Allah Hoo 2,978,250 2,611,136 367,114 35 30 5

Nehaly Wala 2,174,275 2,094,300 79,975 20 9 11

Kalkan Wala 3,875,587 3,027,382 848,205 38 35 3

Jahan Pur 6,398,960 4,476,723 1,922,237 82 53 29

Noor Pur 2,095,050 1,876,050 219,000 12 10 2

Ali Pur 4,171,725 3,977,475 194,250 29 29 -

Hassan Pur 3,217,650 2,029,275 1,188,375 33 24 9

13/V 5,395,331 4,563,878 831,453 33 30 3

14/V 5,936,006 5,530,161 405,845 44 27 17

Jemsabad (ROW) 9,040,106 8,258,861 781,245 40 35 5

7/V 3,077,882 2,496,927 580,955 50 49 1

8/V 7,327,920 6,984,014 343,906 35 32 3

9/V 2,908,512 394,525 2,513,987 14 9 5

Khanewal Kohna 6,565,125 5,016,154 1,548,971 24 21 3

Hassanpur Interchange 78,331 43,525 34,806 5 2 3

14-V Interchange 635,569 634,623 946 16 11 5

Jemsabad (Interchange) 994,712 754,595 240,117 18 10 8

Umeedgarh Interchange 13,500 13,500 2 - 2

15-V Interchange 214,769 74,031 140,738 5 2 3

Jalla Pahore Interchange 680,097 325414 354,683 15 7 8

Total 102,703,986 85,544,482 17,159,504 1,066 832 234

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

36

Annex 3.5: Village -wise Status of Payment for Affected Structure

Location/ Village

Amount

DPs

Total

(Rs.)

Paid

(Rs.)

Balance

(Rs.)

Total

(Nos.)

Paid

(Nos.)

Not paid

(Nos.)

Kaki Kohna 2,976,935 2,976,935 - 12 12 -

17-Ghag 8,773,190 8,084,077 689,113 23 21 2

5- Ghag 1,902,273 1,764,726 137,547 8 6 2

18-Ghag 14,127,178 14,127,178 - 21 21 -

29/Ghag 1,555,889 1,518,534 37,355 8 7 1

23/Ghag 9,475 9,475 - 1 1 -

14/D 841,702 841,702 - 5 5 -

15/D 2,600,353 2,600,353 - 10 10 -

17/D 1,447,096 1,128,579 318,517 7 6 1

8/D 2,710,174 2,710,174 - 5 5 -

9/D 905,887 905,887 - 2 2 -

10/D 113,713 113,713 - 1 1 -

1/KM 1,089,750 523,252 566,498 2 1 1

Tarholi 5,665,362 4,631,386 1,033,976 18 16 2

Sai Sahu 1,095,070 1,095,070 - 2 2 -

Shahadat Kandla 12,080,936 8,699,268 3,381,668 20 19 1

Jallah Pahore 951,316 951,316 - 3 3 -

Umeed Gharh 3,745,541 3,745,541 - 10 10 -

Allah Hoo 4,892,511 4,892,511 - 8 8 -

Nehaly Wala 2,514,017 2,514,017 - 6 6 -

Kalkan Wala 13,330,374 13,330,374 - 10 10 -

Jahan Pur 5,166,973 5,166,973 - 9 9 -

Noor Pur 173,266 173,266 - 1 1 -

Ali Pur 1,713,741 1,713,741 - 7 7 -

Hassan Pur 1,536,253 1,475,461 60,792 5 4 1

13/V 205,343 205,343 - 1 1 -

14/V 1,293,398 1,265,159 28,239 5 4 1

Jamsaabad 2,890,798 2,876,943 13,855 10 9 1

7/V 183,517 183,517 - 2 2 -

8/V 3,771,160 3,771,160 - 6 6 -

Khanewal Kohna 2,110,514 2,110,514 - 5 5 -

14-V Interchange 2,155,240 2,140,801 14,439 9 8 1

Jalla Pahore 4,040,757 4,040,757 0 7 7 -

Total 108,569,702 102,287,703 6,281,999 249 235 14

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

37

Annex 3.6: Village -wise Status of Payment for Affected Fruit & Non-Fruit Trees

Location/ Village

Amount

DPs

Total

(Rs.)

Paid

(Rs.)

Balance

(Rs.)

Total

(Nos.)

Paid

(Nos.)

Not paid

(Nos.)

Kaki Kohna 1,280,838 1,060,151 220,687 28 16 12

17-Ghag 802,339 718,778 83,561 20 19 1

5- Ghag 888,449 825,952 62,497 15 10 5

18-Ghag 1,538,452 1,409,270 129,182 28 27 1

29/Ghag 730,119 470,278 259,841 15 13 2

23/ Ghag - - - - - -

14/D 840,859 538,869 301,990 17 10 7

15/D 591,996 525,332 66,664 16 15 1

17/D 1,672,367 1,638,084 34,283 28 27 1

8/D 1,243,823 1,122,934 120,889 24 15 9

9/D 268,350 168,081 100,269 6 6 -

10/D 269,491 269,491 - 12 12 -

1/KM - - - - - -

Tarholi 17,402,217 15,894,909 1,507,308 53 49 4

Sai Sahu 244,369 240,206 4,163 18 17 1

Shahadat Kandla 3,870,139 3,226,480 643,659 56 33 23

Jallah Pahore 16,097,433 15,898,392 199,041 29 18 11

Umeed Gharh 739,654 657,156 82,498 22 15 7

Din Pur - - - - - -

Allah Hoo 575,862 539,961 35,901 16 12 4

Nehaly Wala 1,188,426 1,137,979 50,447 11 10 1

Kalkan Wala 1,877,570 1,757,522 120,048 23 21 2

Jahan Pur 4,551,027 4,164,430 386,597 58 38 20

Noor Pur 2,226,609 2,226,609 - 6 6 -

Ali Pur 842,063 803,078 38,985 21 14 7

Hassan Pur 413,318 354,278 59,040 20 15 5

13/V 370,327 284,068 86,259 20 17 3

14/V 946,604 794,862 151,742 24 22 2

Jemsabad (ROW) 3,681,653 3,669,870 11,783 23 23 -

Jemsabad (Interchange) 281,872 153,926 127,946 15 6 9

7/V 300,534 295,035 5,499 26 26 -

8/V 732,500 695,788 36,712 25 21 4

9/V 2,876,724 2,845,683 31,041 6 5 1

Khanewal Kohna 749,711 725,125 24,586 17 17 -

Hassanpur Interchange 64,226 20,349 43,877 4 1 3

Ali Pur Interchange 63,801 - 63,801 3 - 3

Umeed Garh 55,310 - 55,310 1 - 1

14-V Inetchange 325,380 82,809 242,571 10 7 3

umeedgarh Interchange 26,403 - 26,403 1 - 1

Jalla Pahore 961,427 743,610 217,817 13 7 6

15-V Interchange 85,266 39,117 46,149 4 2 2

Total 71,677,508 65,998,462 5,679,046 734 572 162

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

38

Annex 3.7: List of Villages for Certification Statement

Sr. No. Village No. of Formats

1 8-DH 10

2 18-Ghag 4

3 Allah Hoo 20

4 Hussan Pur 30

5 Jahan Pur 10

6 Kaki Kohna 52

7 Nihalwala 49

8 Shahdat Kandla 1

9 Umeedgarh 3

10 Hussan Pur Interchange 12

11 Ali Pur Interchange 9

12 14-V Interchange 5

Total 205

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

39

Annex 3.8: Certification Statement of Legal Heirs of Deceased DPs

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

40

Annex 3.9: Sample copy of Statement regarding Migrated (Moved out project area) DPs

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

41

Annex 3.10: Sample copy of Statement regarding Migrated (Abroad) DPs

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

42

Annex 3.11: Sample copy of Statement by DPs informed about Compensation Payment

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

43

Annex 3.12: List of DPs by Payment of Awarded Interchange ROW Land

Sr. No.

ID. No. Interchange Village Name Father's Name

Land

Awarded (Acre)

Land Award (Rs.)

Paid Amount (Rs.)

Compensation Status

1 9012 Kabirwala 15-V Khalil Ahmed Mehndi Khan 0.112 263,602 248,162 Paid

2 9014 Kabirwala 15-V Muhammad Sarwar Muhammad Rafique 0.081 176,443 166,109 Paid

3 9015 Kabirwala 15-V Allah Ditta Mubarak Ali 0.618 1,445,560 1,360,892 Paid

4 9016 Kabirwala 15-V Nishan Ali Wazir Ali 1.243 2,925,134 - Unpaid

5 9017 Kabirwala 15-V Razia Bibi Wd/o Dollat Ali 0.049 110,543 104,068 Paid

6 9018 Kabirwala 15-V Shaukat Ali Dollat Ali 0.218 514,449 484,318 Paid

7 9019 Kabirwala 15-V Kalsoom Bibi Dollat Ali 0.112 259,351 244,160 Paid

8 9020 Kabirwala 15-V Muhammad Aslam S/o Imdad Ali S/o Wazir Ali

Imdad Ali S/o Wazir Ali 0.581

1,364,779 1,317,905 Paid

9 9021 Kabirwala 15-V Riaz Bibi Wd/o Abdul Rasheed 0.087 191,324 180,118 Paid

10 9022 Kabirwala 15-V Noshad Ali Abdul Rasheed 0.118 272,105 256,168 Paid

11 9023 Kabirwala 15-V Muhammad Arshad Abdul Rasheed 0.112 263,602 289,395 Paid

12 9024 Kabirwala 15-V Khushnood Abdul Rasheed 0.118 267,854 252,165 Paid

13 9025 Kabirwala 15-V Muhammad Ishfaque Abdul Rasheed 0.118 267,854 252,165 Paid

14 9026 Kabirwala 15-V Naseem Bibi Abdul Rasheed 0.056 131,801 124,081 Paid

15 9027 Kabirwala 15-V Tasleem Bibi Ali Akbar D/o Abdul Rasheed 0.062 136,053 128,084 Paid

16 9029 Kabirwala 15-V Abdul Hameed Chiraghdin 0.656 1,539,097 1,490,183 Paid

17 9030 Kabirwala 15-V Farzand Ali Rehmat Khan 0.024 46,768 44,029 Paid

18 9031 Kabirwala 15-V Mehmood Akhtar abdul Ghafoor 0.031 63,775 - Unpaid

19 9032 Kabirwala 15-V Shamshad Akhtar Muhammad Ali 0.031 63,775 - Unpaid

20 9033 Kabirwala 15-V Muhammad Ashraf Faiz Ahmed 0.193 446,423 - Unpaid

21 9034 Kabirwala 15-V Zulifqar Ali Muhammad Ali 0.137 318,874 - Unpaid

22 9035 Kabirwala 15-V Allah Rakha Muhammad Wakeel 0.006 9,567 9,006 Paid

23 9162 Kabirwala 15-V Mushtaq Ahmed Muhammad Shareef 0.012 21,258 - Unpaid

24 9164 Kabirwala 15-V Sumera Bibi Muhammad Wakeel 0.006 4,783 - Unpaid

25 9165 Kabirwala 15-V Nazar Abbas Muhammad Ilyas 0.018 42,516 - Unpaid

26 9166 Kabirwala 15-V Muhammad Shamshad Muhammad Wakeel 0.006 9,566 - Unpaid

27 9167 Kabirwala 15-V Ghulam Murtaza Nasrullah 0.018 34,013 - Unpaid

28 9168 Kabirwala 15-V Muhammad Wakeel Faqeer Muhammad 0.012 22,321 - Unpaid

29 9169 Kabirwala 15-V Allah Ditta Muhammad Wakeel 0.006 9,566 - Unpaid

30 9170 Kabirwala 15-V Mafia Bibi Muhammad Wakeel 0.006 4,783 - Unpaid

31 9171 Kabirwala 15-V Allah Rakhi Muhammad Wakeel 0.006 4,783 - Unpaid

32 9172 Kabirwala 15-V Nasira Akbar Muhammad Wakeel 0.006 4,783 - Unpaid

33 9173 Kabirwala 15-V Muhammad Shahbaz Muhammad Wakeel 0.006 9,567 - Unpaid

34 9174 Kabirwala 15-V Muhammad Parvez Muhammad Wakeel 0.006 9,566 - Unpaid

35 9175 Kabirwala 15-V Muhammad Akram Faqeer Muhammad 0.012 25,510 - Unpaid

36 9176 Kabirwala 15-V Muhammad Akram Abdul Sattar 0.018 29,762 - Unpaid

37 9177 Kabirwala 15-V Muhammad Asghar Abdul Rasheed 0.012 25,509 - Unpaid

38 9178 Kabirwala 15-V Abdul Ghafoor Muhammad Rafique 0.081 176,443 166,109 Paid

39 9179 Kabirwala 15-V Muhammad Asif Majeed Abdul Majeed 0.168 385,837 363,238 Paid

40 9180 Kabirwala 15-V Nazia Majeed Abdul Majeed 0.087 192,919 181,619 Paid

41 9181 Kabirwala 15-V Fouzia Majeed

Abdul Majeed W/o

Sabir Hussain 0.087 192,919 181,619 Paid

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

44

Sr. No.

ID. No. Interchange Village Name Father's Name Land

Awarded

(Acre)

Land Award (Rs.)

Paid Amount (Rs.)

Compensation Status

42 9182 Kabirwala 15-V Kalsoom Bibi Wd/o Abdul Majeed 0.087 192,919 181,619 Paid

43 9183 Kabirwala 15-V Shagufta Majeed Abdul Majeed 0.087 192,919 - Unpaid

44 9184 Kabirwala 15-V Sana Majeed Abdul Majeed 0.087 192,919 - Unpaid

45 9185 Kabirwala 15-V Samra Majeed Abdul Majeed 0.087 192,919 - Unpaid

46 9061 Dinpur Jalla Pahore Abu Bakar Sadique Haibat Khan 0.024 44,974 - Unpaid

47 9062 Dinpur Jalla Pahore Allah Ditta Basar Bukhsh 0.006 498 - Unpaid

48 9063 Dinpur Jalla Pahore Allah Ditta Ghulam Shabbir 0.293 568,187 - Unpaid

49 9064 Dinpur Jalla Pahore Allah Ditta Shameer 0.018 40,763 - Unpaid

50 9065 Dinpur Jalla Pahore Asghar Ali Abdullah 0.018 23,719 - Unpaid

51 9066 Dinpur Jalla Pahore Barkat Ali Allah Bukhsh 0.006 9,181 - Unpaid

52 9067 Dinpur Jalla Pahore Bhagan Wd/o Sardar Bukhsh 0.006 497 - Unpaid

53 9068 Dinpur Jalla Pahore Bushra Bibi Zahoor Ahmed 0.012 22,487 - Unpaid

54 9069 Dinpur Jalla Pahore Faisal Hayyat Allah Bukhsh 0.006 9,180 - Unpaid

55 9070 Dinpur

Jalla

Pahore Faiz Hussain Manzoor Hussain 0.331 626,624 - Unpaid

56 9071 Dinpur Jalla Pahore Fazallan Nawaz

D/o Haq Nawaz W/o M. Akhtar 0.274 518,429 485,916 Paid

57 9073 Dinpur

Jalla

Pahore Ghulam Muhammad Basar Bukhsh 0.006 497 - Unpaid

58 9074 Dinpur Jalla Pahore Haq Nawaz Khan Muhammad 0.224 424,147 - Unpaid

59 9075 Dinpur Jalla Pahore Husni Mubarak Zahoor Ismail 0.031 49,577 - Unpaid

60 9076 Dinpur Jalla Pahore Iftekhar Ahmed Zulifqar Ali 0.024 36,723 - Unpaid

61 9077 Dinpur Jalla Pahore Ijaz Mai Sultan Shah 0.099 185,006 - Unpaid

62 9078 Dinpur Jalla Pahore Jamal Khan Ghani Khan 0.012 11,243 - Unpaid

63 9079 Dinpur Jalla Pahore Jannat Bibi Nazar Hussain 0.024 44,975 - Unpaid

64 9080 Dinpur

Jalla

Pahore Kalsoom Bibi Muhammad Ramzan 0.156 284,625 284,625 Paid

65 9081 Dinpur

Jalla

Pahore Kanizan Bibi

Wd/o Muhammad

Ramzan 0.156 284,625 284,625 Paid

66 9082 Dinpur Jalla Pahore Khalid Mehood Laal Shah 0.043 72,576 - Unpaid

67 9083 Dinpur Jalla Pahore Khan Muhammad Muhammad 0.687 1,333,014 - Unpaid

68 9085 Dinpur

Jalla

Pahore Khawar Ali Shah Nazar Hussain Syed 0.356 671,543 - Unpaid

69 9086 Dinpur Jalla Pahore Khursheed Mai Muhammad Ramzan 0.093 175,429 901,313 Paid

70 9087 Dinpur Jalla Pahore Laal Shah Bahadur Shah 0.006 597 - Unpaid

71 9088 Dinpur Jalla Pahore Liaqat Hussain Muhammad Saeed 1.824 3,486,676 - Unpaid

72 9089 Dinpur Jalla Pahore Liaqat Hussain Sardar Bukhsh 0.006 398 - Unpaid

73 9090 Dinpur

Jalla

Pahore Mairaj Bibi Allah Bukhsh 0.149 272,766 272,766 Paid

74 9091 Dinpur Jalla Pahore Manzar Abbas Sultan Shah 0.131 237,865 - Unpaid

75 9092 Dinpur

Jalla

Pahore Mehar Din Wali Muhammad 0.012 22,486 - Unpaid

76 9093 Dinpur Jalla Pahore Mehboob Akhtar Noor Muhammad 0.018 32,011 - Unpaid

77 9094 Dinpur Jalla Pahore Missing Hissa Missing 0.068 119,751 - Unpaid

78 9095 Dinpur Jalla Pahore Missing Hissa Missing 0.031 47,944 - Unpaid

79 9096 Dinpur Jalla Pahore Missing Hissa Missing 0.006 653 - Unpaid

80 9097 Dinpur Jalla Mubashar Abbas Noor Muhammad 0.024 36,723 - Unpaid

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

45

Sr. No.

ID. No. Interchange Village Name Father's Name Land

Awarded

(Acre)

Land Award (Rs.)

Paid Amount (Rs.)

Compensation Status

Pahore

81 9098 Dinpur Jalla Pahore Muhammad Wariyam 0.006 1,790 - Unpaid

82 9099 Dinpur Jalla Pahore Muhammad Ajmal Ahmed Bukhsh 0.306 582,257 457,788 Paid

83 9102 Dinpur

Jalla

Pahore Muhammad Akmal Ahmed Bukhsh 0.306 584,580 460,112 Paid

84 9104 Dinpur Jalla Pahore Muhammad Amjad Muhammad Ramzan 0.006 1,193 - Unpaid

85 9105 Dinpur Jalla Pahore Muhammad Arif Noor Muhammad 0.024 36,724 - Unpaid

86 9106 Dinpur Jalla Pahore Muhammad Asif Muhammad Ramzan 0.162 296,485 296,484 Paid

87 9107 Dinpur Jalla Pahore Muhammad Aslam Allah Bukhsh 0.924 1,748,360 581,907 Paid

88 9108 Dinpur Jalla Pahore Muhammad Aslam Jaan Muhammad 0.024 44,974 - Unpaid

89 9109 Dinpur Jalla Pahore Muhammad Ayub Pehalwan 1.037 1,964,017 3,294,929 Paid

90 9110 Dinpur

Jalla

Pahore Muhammad Faheem Jaan Muhammad 0.543 1,048,076 - Unpaid

91 9111 Dinpur Jalla Pahore Muhammad Ikram Allah Bukhsh 0.756 1,435,273 1,028,538 Paid

92 9112 Dinpur Jalla Pahore Muhammad Iqbal Allah Bukhsh 0.324 610,914 569,250 Paid

93 9113 Dinpur Jalla Pahore Muhammad Iqbal Noor Muhammad 0.024 36,723 - Unpaid

94 9114 Dinpur Jalla Pahore Muhammad Ishfaq Noor Muhammad 0.024 36,723 - Unpaid

95 9115 Dinpur Jalla Pahore Muhammad Khalid Ahmed Bukhsh 0.081 146,164 - Unpaid

96 9116 Dinpur Jalla Pahore Muhammad Lateef Ilam Din 0.012 22,487 - Unpaid

97 9117 Dinpur

Jalla

Pahore Muhammad Nawaz Basar Bukhsh 0.106 200,296 - Unpaid

98 9118 Dinpur Jalla Pahore Muhammad Ramzan Ahmed 0.056 99,153 - Unpaid

99 9119 Dinpur Jalla Pahore Muhammad Ramzan Allah Bukhsh 0.381 721,301 587,591 Paid

100 9120 Dinpur Jalla Pahore Muhammad Ramzan Ghulam Shabbir 0.293 579,347 - Unpaid

101 9122 Dinpur Jalla Pahore Muhammad Ramzan Shameer 0.018 41,417 - Unpaid

102 9123 Dinpur Jalla Pahore Muhammad Saleem Jaan Muhammad 0.549 1,046,950 - Unpaid

103 9124 Dinpur Jalla Pahore Muhammad Wariyam Ameer 0.318 603,445 - Unpaid

104 9125 Dinpur Jalla Pahore Muhammad Yaqoob Noor Muhammad 0.018 32,011 - Unpaid

105 9126 Dinpur Jalla Pahore Muhammad Yaqoob Pehalwan 0.524 1,000,848 - Unpaid

106 9127 Dinpur

Jalla

Pahore Muhammad Yousuf Muhammad Ramzan 0.162 296,484 296,484 Paid

107 9128 Dinpur Jalla Pahore Mukhtar Ahmed Sultan 0.099 183,617 - Unpaid

108 9129 Dinpur Jalla Pahore Mukhtar Ahmed Zulifqar Ali 0.243 465,166 - Unpaid

109 9130 Dinpur Jalla Pahore Mushtaq Hussain Ghulam Shabbir 1.668 3,154,594 3,223,534 Paid

110 9131 Dinpur

Jalla

Pahore Naseem Bibi

D/o Dilmeer W/o Allah

Bukhsh 0.006 7,345 - Unpaid

111 9132 Dinpur Jalla Pahore Nasreen Khan 0.006 3,672 - Unpaid

112 9133 Dinpur Jalla Pahore Nasreen Shoukat Shoukat Bilal 0.312 587,574 - Unpaid

113 9134 Dinpur Jalla Pahore Nazir Ahmed Khadam Hussain 0.012 12,004 - Unpaid

114 9135 Dinpur Jalla Pahore Noor Bibi Sardar Bukhsh 0.018 29,429 - Unpaid

115 9136 Dinpur Jalla Pahore Panan Ameer 0.006 398 - Unpaid

116 9137 Dinpur Jalla Pahore Parveen Akhtar Allah Bukhsh 0.156 284,625 284,625 Paid

117 9138 Dinpur Jalla Pahore Parveen Akhtar Muhammad 0.049 99,758 - Unpaid

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

46

Sr. No.

ID. No. Interchange Village Name Father's Name Land

Awarded

(Acre)

Land Award (Rs.)

Paid Amount (Rs.)

Compensation Status

118 9139 Dinpur Jalla Pahore Razzaq Shah Sultan Shah 0.162 303,939 - Unpaid

119 9140 Dinpur

Jalla

Pahore Ruqiya Bibi Sardar Bukhsh 0.006 99 - Unpaid

120 9141 Dinpur Jalla Pahore Safdar Hussain Zulifqar Ali 0.437 818,297 - Unpaid

121 9142 Dinpur Jalla Pahore Safia Bibi Mazhar Abbas 0.099 179,894 - Unpaid

122 9143 Dinpur Jalla Pahore Sajid Ur Rahman Zahoor Ismail 0.031 49,577 - Unpaid

123 9144 Dinpur Jalla Pahore Shaada

D/o Haq Nawaz W/o M. Akhtar 0.037 66,074 - Unpaid

124 9145 Dinpur Jalla Pahore Shahid Iqbal Muhammad Ramzan 0.162 296,484 319,309 Paid

125 9146 Dinpur Jalla Pahore Shahnaz Sardar Bukhsh 0.006 99 - Unpaid

126 9147 Dinpur Jalla Pahore Shameer Ahmed 0.006 17,437 - Unpaid

127 9148 Dinpur Jalla Pahore Shameer Muhammad 0.006 895 - Unpaid

128 9149 Dinpur

Jalla

Pahore Shamim Mai Allah Bukhsh 0.156 284,625 284,625 Paid

129 9150 Dinpur Jalla Pahore Shehzadi Sardar Bukhsh 0.006 99 - Unpaid

130 9151 Dinpur Jalla Pahore Shoukat Ali Allah Bukhsh 0.006 9,181 - Unpaid

131 9152 Dinpur Jalla Pahore Sultan Muhammad 0.199 372,680 - Unpaid

132 9153 Dinpur Jalla Pahore Sultan Ahmed Muhammad 0.162 302,723 - Unpaid

133 9154 Dinpur Jalla Pahore Tahir Abbas Noor Muhammad 0.024 36,724 - Unpaid

134 9155 Dinpur Jalla Pahore Zahoor Ahmed Pehalwan 0.081 154,219 - Unpaid

135 9156 Dinpur

Jalla

Pahore Zubaida Sardar Bukhsh 0.018 29,429 - Unpaid

136 9157 Dinpur Jalla Pahore Zulifqar Muhammad 0.193 382,806 - Unpaid

137 8996 Dinpur Umeedgarh Muhammad Akram Barkat Ali 0.287 614,531 - Unpaid

138 8997 Dinpur Umeedgarh Muhammad Aslam Barkat Ali 0.287 614,351 - Unpaid

Total 45,333,539 21,939,633

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

47

Annex 5.1: List of Consultations with (Men) Unpaid DPs

Sr. No.

Date Location/ Village

Category of Participant

No. of Participa

nts

Name of Main Participant

1

October 02, 2017 Shahadat Kandla (School)

DPCs/ DPs/ Local Communities

8 - Muhammad Rafiq S/O Rehmatullah

- Muhammad Yaqoob S/O Muhammad Rafiq

- Muhammad Mazhar S/O Wazir Khan

- Liaqat Ali S/O Muhammadf Bakhsh

- Muhammad Bilal S/O Mahar Din

- Muhammad Asif S/O Ali Muhammad

- Babar Rafiq S/O Hussain Bakhsh

- Rab Nawaz

2

October 02, 2017 Umeed Garh DPCs/DPs/ Local Communities

7 - Muhammad Akabr Ali S/O Rehmat Ali

- Muhammad Asghar Al S/O Rehmat Ali

- Muhammad Bilal S/O Qadeer Ahmad

- Muhammad Javed S/O Akbar Ali

- Parvez Hussain S/O Akbar Ali

- Muhammad bakhsh S/O Rab Nawaz

- Muhammad Rafiq S/O Gulzar Ahmad

3

October 04 , 2017 8-D DPCs/DPs/ Local Communities

6 - Muhammad Hassan S/O Nazir Ahmad

- Abdul Ghafar S/O Zafar Ali

- Munawwar Hussain S/O Maqbool Hussain

- Maqsood Ali S/O Muhammad Yaqoob

- Muhammad Yaqoob S/O Fazal Muhammad

- Muhammad Ashraf S/O Taj Muhammad

4

October 05 , 2017 Allah Hoo DPCs/DPs/ Local Communities

10 - Zahoor Ahmad S/O Mian Manzoor Ahmad

- Ghulam Yasin S/O Muhammad Hayat

- Shabeer Ahmad S/O Muhammad Ramzan

- Ghulam Yasin S/O Muhammad Ramzan

- Qadeer Ahmad S/O Muhammad Ramzan

- Muhammad Ramzan S/O Shahab Din

- Ghulam Abbas S/O Luqman

- Muhammad Qaiser S/O Muhammad Bakhsh

- Ahmad Hussain S/O Muhammad Ramzan

- Muhammad Ajmal S/O Gul Muhammad

5

October 06, 2017 Shahadat Kandla (School)

DPCs/DPs/ Local Communities

8 - Rab Nawaz (Head Master)

- Liaqat Ali S/O Muhammad Bakhsh

- Arshad Ahmad S/O Ghulam Muhammad

- Muhammad Nasir S/O Muhammad Ashraf

- Muhammad Shawan S/O Haq Nawaz

- Muhammad Asif S/O Ali Muhammad

- Kashif Ali S/O Muhammad Zulfiqar

- Muhammad Waris S/O Allah Ditta

6

October 10 , 2017 17 Ghagh DPCs/DPs/ Local Communities

5 - Habib Ahmad S/O Abdur Rehman

- Abdur Razzaq S/O Muhammad Nawaz

- Khadim Hussain S/O Kabeer

- Muhammad Shafiq S/O Taj

- Muhammad Iqbal S/O Sarfaraz

7

October 10, 2017 18 Ghagh DPCs/DPs/ Local Communities

7 - Muhqammad Aslam S/O Shah Muhammad

- Muhammad Amin S/O Muhammad Ashraf

- Rab Nawaz S/O Jan Muhammad

- Mapal Khan S/O Ghulam Fareed

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

48

Sr. No.

Date Location/ Village

Category of Participant

No. of Participa

nts

Name of Main Participant

- Muhammad Zafar S/O Ghulam Fareed

- Maqbool Hussain S/O Ibrahim

- Abdusattar S/O Mahmood Hussain

8

October 11, 2017 14 V DPCs/DPs/ Local Communities

6 - Muhammad S/O Hazara

- Muhammad Arshad S/O Hazara

- Khalil Ahmad S/O Mehdi Hassan

- Muhammad Iqbal S/O Nizam Deen

- Muhammad Ashraf S/O Niaz Muhammad

- Haq Nawaz S/O Rajab Ali

9

October 12 , 2017 Hassan Pur DPCs/DPs/ Local Communities

16 - Fiaz Ahmad S/O Zulfiqar Ahmad

- Masood Ahmad S/O Muneer Ahmad

- Rauf Ahmad S/O Ahmad Hussain

- Ahmad Hussain S/O Muhammad Nawaz

- Khan Muhammad S/O Fazal Kareem

- Naveed Hussain S/O Muhammad Shabeer

- Ali Muhammad S/O Abdul Majeed

- Muhammad Ameen S/O Qasim Ali

- Rafi Ahmad S/O Muhammad Shafi

- Ghulam Yasin S/O Qasim Ali

- Muhammad Manzoor s/O Ahmad Bakhsh

- Ghulam Shabeer S/O Shahamand

- Muhammad Ilyas S/O Shahamand

- Ayoub S/O Shahamand

- Sajjad Hussain S/O Sardar Ali

- Nadeem Ahmad S/O Abdul Hameed

10

October 16 , 2017 Shahadat Kandla (School)

DPCs/DPs/ Local Communities

5 - Muhammad Azam S/O Muhammad Nawab Khan

- Nazakat S/O Muhammad Sadiq

- Muhammad Asif S/O Ali Muhammad

- Muhammad Rafiq S/O Rehmatullah

- Muhammad Nasir S/O Muhamad Ashraf

11

October 16 , 2017 Traili (School)

DPCs/DPs/ Local Communities

5 - Ghulam Muhammad S/O Allah Ditta

- Saqib Hussain S/O rab Nawaz

- Muhammad Shoaib S/O Nazar

- Rab Nawaz S/O Mahar Sada

- Muhammad Habib S/O khan Muhammad

12

October 17, 2017 Nehalay Wala

DPCs/DPs/ Local Communities

10 - Mazhar Iqbal S/O Waryam

- Allah Bakhsh S/O Sultan

- Manzoor Hussain S/O Sultan

- Muhammad Asif S/O Allah Bakhsh

- Riaz S/O Sultan

- Khuda Bakhsh S/O Sultan

- Mazhar Hussain S/O Ghulam

- Muhammad Ajmal S/O Manzoor

- Muzaffar S/O waryam

- Muhammad Noor Mustafa S/O shah Muhammad

13

October 19, 2017 James Abad DPCs/DPs/ Local Communities

5 - Mumtaz Ahmad S/O

- Rab Nawaz S/O Noor

- Muhammad Aslam S/O Ibrahim

- Mubashar S/O Muhammad Aslam

- Ansar Abbas S/O Allah Ditta

14

October 19 , 2017 Khanewal Kohna

DPCs/DPs/ Local Communities

5 - Shoukat Ali S/O Rustam

- Muhammad Ramzan s/O Murad

- Hetam Ali S/O Allah Bakhsh

- Shakir Abbas S/O Ghulam Zaid

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

49

Sr. No.

Date Location/ Village

Category of Participant

No. of Participa

nts

Name of Main Participant

- Muhammad Akram S/O Salabat

15

October 23, 2017 Jalla Pahor DPCs/DPs/ Local Communities

8 - Muhammad Ali S/O Muhammad Arif

- Zafar Ali S/O Amanat Ali

- Muhammad Aslam S/O Muhammad Ibrahim

- Iqbal Hussain shah S/O Noor Shah

- Ali Akbar S/O Nadir Shah

- Muhammad Altaf S/O Muhammad Bakhsh

- Farooq Ahmad s/O Shameer

- Sultan Alam S/O Muhammad Shabbir

16

October 24, 2017 Kakki Kohna DPCs/DPs/ Local Communities

7 - Faiz Muhammad S/O Khan

- Amanat Ali S/O Noor Ahmad

- Noor Ahmad S/O Khan

- Bahawal S/O Khan Muhammad

- Sharafat Hussain S/O Noor Ahmad

- Muhammad Javed S/O Abdul ghafoor

- Ghulam fareed S/O Khan

17

November 01, 2017

469 JB DPCs/DPs/ Local Communities

3 - Tariq Hussain S/O Adalat Khan

- Muhammad Salim S/O Muhammad Hussain

- Muhammad Sadiq S/O Muhammad Ali

18

November 01, 2017

400 JB DPCs/DPs/ Local Communities

4 - Muhammad Yousaf Khan S/O Abdullah Jan

- Ameer Shah S/O Faqeer Shah

- Usama Shah S/O Aslam Shah

- Muhammad Sadiq S/O Charagh Deen

19

November 02, 2017

501 JB DPCs/DPs/ Local Communities

4 - Shafqat Abbas S/O Haq Nawaz

- Muhammad Ameen S/O Haq Nawaz

- Shoukat Maqsood S/O Muhammad Akram Shah

- Faraz Ahmad S/O Ghulam Mustafa Manak

20 November 02, 2017

505 JB DPCs/DPs/ Local Communities

2 - Muhammad Asghar S/O Muhammad Iqbal

- Muhammad Zameer S/O Liaqat Ali

21

November 06, 2017

496 JB Disbursement Meeting

8 - Haq Nawaz S/O Haji Muhammad

- Hamayoun S/O Muhammad Bakhsh

- Asmat Ullah S/O Ghulam Nabi

- Umar Ali S/O Haq Nawaz

- Zulfiqar S/O Mian Ahmad

- Muhammad Arif S/O Murad

- Atta Ullah S/O Abdullah

- Basheer Ahmad S/O Nathoo Khan

22

November 06, 2017

494 JB DPCs/DPs/ Local Communities

5 - Lal Deen S/O Manik Khan

- Khursheed Ahmad S/O Mahmood

- Muhammad Ramzan S/O Mehmood

- Naseer Ahmad S/O Ahmad Basksh

- Shar Muhammad S/O Khan Muhammad

23 November 07, 2017

Kalowala DPCs/DPs/ Local Communities

1 - Asghar Ali S/O Ghulam Nabi

24

November 07, 2017

504 JB DPCs/DPs/ Local Communities

9 - Muhammad Zaffar Iqbal S/O Muhammad Azam

- Sajid Abbas S/O Manzoor Hussain

- Muhammad Ghos S/O Muhammad Nawaz

- Mazhar Hussain S/O Manzoor Hussain

- Azhar Abbas S/O Manzoor Hussain

- Haq Nawaz S/O Ghulam Fareed

- Muhammad Nawaz S/O Ghulam Fareed

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

50

Sr. No.

Date Location/ Village

Category of Participant

No. of Participa

nts

Name of Main Participant

- Abid Hussain S/O Manzoor Hussain

- Aman Ullah S/O Fatah Muhammad

25 November 08, 2017

390 JB DPCs/DPs/ Local Communities

2 - Shahzad Alim S/O Munawar Hussain

- Muhammad Rafiq S/O Ali Muhammad

26

November 08, 2017

384 JB DPCs/DPs/ Local Communities

3 - Muhammad Aslam S/O Muhammad Mushtaq

- Rifaqat Hussain S/O Hadayat Ullah

- Sultan Bakhsh S/O Muhammad Mushtaq

27 November 09, 2017

378 JB DPCs/DPs/ Local Communities

1 - Farooq Azam S/O Muhammad Irshad

28

November 09, 2017

383 JB DPCs/DPs/ Local Communities

4 - Saeed Ahmad S/O Allah Ditta

- Muhammad Murtaza Saeed S/O Saeed Ahmad

- Adnan Ali S/O Abdul Khaliq

- Muhammad Latif S/O Muhammad Yousaf

29

November 10, 2017

385 JB DPCs/DPs/ Local Communities

8 - Abdul Ghafar S/O Muhammad Ibraheem

- Muhammad Ashraf S/O Ghulam Muhammad

- Muhammad HussainS/O Barkat Ali

- Muhammad Abdullah S/O Muhammad Tufail

- Muhammad Umair S/O Khalid Mahmood

- Muhammad Riaz S/O Allah Ditta

- Abdul Sattar S/O Wali Muhammad

- Muhammad Yaqoub S/O Ghulam Ali

30 November 10, 2017

438 JB DPCs/DPs/ Local Communities

2 - Muhammad Ashraf S/O Nazeer Ahmad

- Muhammad Asif S/O Nawab Deen

31

November 13, 2017

504 JB EMA Meeting 7 - Ramzan S/O Nazeer

- Muhammad Ashiq S/O Bagh Ali

- Aftab Azam S/O Akhtar Ali

- Mahtab Azam S/O Akhtar Ali

- Tanveer Abbas S/O Khan Muhammad

- Ashiq Hussain S/O Murad

- Akhtar Ali

32

November 13, 2017

501 JB EMA Meeting 5 - Shoukat Maqsood S/O Muhammad Akram Shah

- Muhammad Yousaf S/O Muhammad Alim

- Niaz Ahmad S/O Feroz Deen

- Mehran Niaz S/O Niaz Ahmad

- Muhammad Aameen S/O Haq Nawaz

33

November 13, 2017

406 JB EMA Meeting 8 - Aftab Hussain S/O Manzoor Hussain

- Sajjad Akbar S/O Akbar Khan

- Muhammad Asif S/O M. Shafi Khan

- Rafaqat Hussain S/O Muhammad Yousaf

- Musadiq Abbas S/O Khalid Shair

- Zawar Hussain S/O Ameer Khan

- Qaiser Abbas S/O Muhammad Ramzan

- Aman Ullah Khan S/O Haq Nawaz

34

November 15, 2017

500 JB DPCs/DPs/ Local Communities

4 - Muhammad Usman S/O Muhammad Aslam

- Muhammad Ramzan S/O Asghar Ali

- Muhammad Shareef S/O Raheem Bakhsh

- Muneer Ahmad S/O Noor Muhammad

35

November 15, 2017

501 JB Disbursement Meeting

4 - Shafqat Abbas S/O Haq Nawaz

- Muhammad Ameen S/O Haq Nawaz

- Haq Nawaz S/O Allah Bakhsh

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

51

Sr. No.

Date Location/ Village

Category of Participant

No. of Participa

nts

Name of Main Participant

- Shoukat Maqsood S/O Akram Shah

36

November 22, 2017

383 JB EMA Meeting 9 - Musawar Saeed S/O Saeed Ahmad

- Kashif Nadeem S/O Younas Maseeh

- Mubarak Ali S/O Shah Muhammad

- Saeed Ahmad S/O Allah Ditta

- Wahid Akhtar S/O Manzoor Hussain

- Abid Hussain S/O Shar Muhammad

- Ghulam Fareed S/O Ali Muhammad

- Kamran S/O Munawar Hussain

- Ajmal Hussain S/O Muhamad Hussain

37

November 22, 2017

378 JB EMA Meeting 3 - Farooq Azam S/O Muhammad Irshad

- Muhammad Haneef S/O M. Sadiq

- Razzaq Ali S/O Ghulam Rasool

38

November 22, 2017

304 JB EMA Meeting 4 - Muhammad Akram S/O M. Hussain

- Muhammad Ishaq S/O Nazar Muhammad

- Amjad Parvaiz S/O Ghulam Ali

- Asghar Ali S/O Faiz Ahmad

39

November 22, 2017

307 JB EMA Meeting 10 - Muhammad Akram S/O Allah Ditta

- Muhammad Asghar S/O Ghulam Nabi

- Aman Ullah S/O Nazeer Ahmad

- Shahzad Ahmad S/O Muhammad Aslam

- Qaiser Ali S/O Ghulam Haider

- Ghulam Mustafa S/O Mirzy Khan

- Farzand Ali S/O Muhammad Sadiq

- Waheed Ahmad S/O Muhammad Anwar

- Muhammad Aslam S/O Basheer

- Muhammad Ashraf S/O Ghulam Nabi

40 November 22, 2017

307 JB Disbursement Meeting

1 - Muhammad Anwar S/O Muhammad Ali

41

December 04,2017

14 V DPCs/DPs/ Local Communities 4

- Mr. Shamshaad s/o Abdur Razzaq

- Mr. Muhammad Iqbal s/o Maseetay Khan

- Mr. Abdul Jabbar s/o Abdur Razzaq

- Mr. Abdul Ghaffar s/o Wali Muhammad

42

December 04,2017

15 V DPCs/DPs/ Local Communities

6

- Mr. Muhammad Arshad Javed s/o Abdur Rasheed

- Mr. Allah Ditta s/o Mubarak Ali

- Mr. Rana Asim s/o Rana Liaqat Ali

- Mr. Naseer Ahmad s/o Nishan Ali

- Mr. Kashif Ameer s/o Abdul Hameed

- Mr. Muhammad Asif s/o Abdul Majeed

43

December 05,2017

14 V DPCs/DPs/ Local Communities

11

- Mr. Abdul Jabbar s/o Abdur Razzaq

- Mr. Abdul Ghaffar s/o Muhammad Rafiq

- Mr. Muhammad Ilyas s/o Chajjo Khan

- Mr. Muhammad Shafiq s/o Karam Ali

- Mr. Muhammad Ishtiaq s/o Abdur Razzaq

- Mr. Muhammad Iqbal s/o Abdus Salam

- Mr. Khalil Ahmad s/o Mehdi Hussain

- Mr. Muhammad Aslam s/o Ghulam Hussain

- Mr. Bashir Ahmad s/o Allah Ditta

- Mr. Muhammad yousuf s/o Muhammad Akram

- Mr. Muhammad Shafqat s/o Muhammad Mansha

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

52

44

December 06,2017

Jalla Pahor DPCs/DPs/ Local Communities

8

- Mr. Mukhtar Ahmad s/o Bashir Ahmad

- Mr. Muhammad Altaf s/o Allah Ditta

- Mr. Muhammad Rafiq s/o Haq Nawaz

- Mr. Irfan Yousuf s/o Muhammad Yousuf

- Mr. Liaqat Ali s/o Allah Ditta

- Mr. Ghazanfar Ali s/o Shouq Muhammad

- Mr. Muhammad Ikram s/o Allah Bakhsh

- Mr. Muhammad Bakhsh s/o Allah Ditta

45

December 07,2017

Shahadat Kandla

DPCs/DPs/ Local Communities

9

- Mr. Mazhar Abbas s/o Wali Dad

- Mr. Khizar Hayat s/o Mahar Sultan

- Mr. Muhammad Nawaz s/o Mahar Sultan

- Mr. Ijaz Hussain s/o Sarfaraz Hussain

- Mr. Muhammad Muslim s/o Muhammad Nawaz

- Mr. Mumtaz Ahmad s/o Bahadur Khan

- Mr. Muhammad Nawaz s/o Allah Bakhsh

- Mr. Muhammad Mansha ur Rehman s/o Mahar Khan

- Mr. Irfan Yousuf s/o Muhammad Yousuf

46

December 11,2017

10 D DPCs/DPs/ Local Communities

5

- Mr. Zahoor Ahmad s/o Muhammad Ameer

- Mr. Muhammad Ramzan s/o Allah Yar

- Mr. Abdul Ghafoor s/o Allah Yar

- Mr. Allah Ditta s/o Mahamand

- Mr. Zulfiqar s/o Muhammad Nawaz

47

December 11,2017

9 D DPCs/DPs/ Local Communities

5

- Mr. Haji Muhammad Shameer s/o Gul Muhammad

- Mr. Muhammad Bashir s/o Gul Muhammad

- Mr. Wali Muhammad s/o Jalal Khan

- Mr. Muhammad Ramzan s/o Wali Muhammad

- Mr. Barkat Ali s/o Gul Muhammad

48

December 12,2017

17 D DPCs/DPs/ Local Communities

6

- Mr. Ali Sher s/o Muhammad ramzan

- Mr. Muhammad Ramzan s/o Muhamma Nawaz

- Mr. Muhammad Nawaz s/o Sajawal

- Mr. Rab Nawaz s/o Sultan

- Mr. Mulazim Hussain s/o Khan Muhammad

- Mr.Alam Sher s/o Muhammad Ramzan

49

December 12,2017

Kakki Kohna

DPCs/DPs/ Local Communities 3

- Mr. Muhammad Javed s/o Abdul Ghaffar

- Mr. Imdad Hussain s/o Bashir Ahmad

- Mr. Muhammad Zulfiqar s/o Muhammad Ramzan

50

December 14,2017

15 V DPCs/DPs/ Local Communities

12

- Mr. Muhammad Arshad Javed s/o Abdur Rasheed

- Mr. Naseer Ahmad s/o Nishan Ali

- Mr. Muhammad Akram s/o Faqeer Muhammad

- Mr. Muhammad Sharif s/o Waris Ali

- Mr. Muhammad Aslam s/o Imdad Ali

- Mr. Shoukat Ali s/o Dolat Ali

- Mr. Muhammad Asif s/o Abdul Majeed

- Mr. Farzand Ali s/o Rehmat Khan

- Mr. Khalil Ahmad s/o Mehndi Hassan

- Mr. Sarfaraz Ahmad s/o Abdul Ghafoor

- Mr. Maqsood Anjum s/o Abdul Ghafoor

- Mr. Mehmood Akhtar s/o Abdul Ghafoor

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

53

51

December 18,2017

Hassan Pur DPCs/DPs/ Local Communities

4

- Mr. Muhammad Idrees s/o Imdad Ali

- Mr. Muhammad Irtaza s/o Fazal Qadar

- Mr. Muhammad Tanvir s/o Khan Muhammad

- Mr. Ali Raza s/o Masood Ahmad

52

December 19,2017

Jalla Pahor DPCs/DPs/ Local Communities

5

- Mr. Khan Muhammad s/o Muhammad Bakhsh

- Mr. Muhammad Rafiq s/o Haq Nawaz

- Mr. Ghazanfar Ali s/o Shouq Muhammad

- Mr. Allah Ditta s/o Murad Bakhsh

- Mr. Muhammad Akram s/o Allah Bakhsh

53

December 19,2017

14 V DPCs/DPs/ Local Communities

12

- Mr. Muhammad Ilyas s/o Chajjoo Khan

- Mr. Rana Shokat Ali s/o Chajjo Khan

- Mr. Qaiser Abbas s/o Muhammad Ilyas

- Mr. Malik Shafique s/o Malik Karam Ali

- Mr. Gulzar Ahmad s/o Shokat Ali

- Mr. Muhammad Mohsin s/o Shamshad

- Mr. Muhammad Arshad JAved s/o Abdur Rasheed

- Mr. Muhammad Wasim s/o Basheer Ahmad

- Mr. Kaleemullah s/o Bashir Ahmad

- Mr. Bashir Ahmad s/o Allah Ditta

- Mr. Shokat Hayat s/o Haq Nawaz

- Mr. Muhammad Mansha s/o Rajab Ali

54

December 20,2017

Jalla Pahor DPCs/DPs/ Local Communities

11

- Mr. Haji Mushtaq Hussain Shah s/o Ghulam Shabbir Shah

- Mr. Mubashar Ali s/o Iqbal Shah

- Mr. Muhammad Raza Shah s/o Gull Hussain Shah

- Mr. Faheem Raza s/o Iqbal Hussain Shah

- Mr. Muhammad Akram s/o Allah Bakhsh

- Mr. Liaqat Ali s/o Allah Ditta

- Mr. Abdul Qayum s/o Shauq Muhammad

- Mr. Muhammad Bakhsh s/o Allah Ditta

- Mr. Ahmad Bakhsh s/o Lal Muhammad

- Mr. Abdullah Khan s/o Allah Ditta

- Mr. Altaf Khan s/o Allah Ditta

55

December 21,2017

Umeed Garh DPCs/DPs/ Local Communities

8

- Mr. Muhammad Javed s/o Akbar Ali

- Mr. Abid Hussai s/o Manzoor Hussain

- Mr. Nasir Ahmad s/o Allah Yar

- Mr. Asghar Ali s/o Rehmat Ali

- Mr. Akbar Ali s/o Rehmat Ali

- Mr. Mukhtar Ahmad s/o Bashir Ahmad

- Mr. Muhammad Altaf s/o Allah Ditta

- Mr. Muhammad Rafiq s/o Haq Nawaz

56

December 21,2017

Jalla Pahor DPCs/DPs/ Local Communities

12

- Mr. Muhammad Ramzan s/o Bashir Ahmad

- Mr. Ahmad Bakhsh s/o Shahadat

- Mr. Muhammad Altaf s/o Allah Ditta

- Mr. Ahmad Bakhsh s/o Lal Khan

- Mr. Allah Ditta s/o Mahar Sultan

- Mr. Muhammad Nawaz s/o Basar Bakhsh

- Mr. Muhammad Waryam s/o Ameer

- Mr. Allah Bakhsh s/o Muhammad Waryam

- Mr. Muhammad Ramzan s/o Shameer

- Mr. Allah Ditta s/o Shameer

- Mr. Mukhtar Ahmad s/o Zulfiqar

- Mr. Nazir Ahmad s/o Allah Ditta

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

54

57

December 26,2017

Ali Pur DPCs/DPs/ Local Communities

6

- Mr. Muhammad Asif s/o Khan Muhammad

- Mr. Muhammad Tahir s/o Maqbol Ahmad

- Mr. Muhammad Javed s/o Akbar Ali

- Mr. Ghulam Abbas s/o Abdur Rehman

- Mr. Asghar Ali s/o Ghulam Rasool

- Mr. Muhammad Aslam s/o Abdul Haq

58

December 26,2017

Nur Pur DPCs/DPs/ Local Communities

6

- Mr. Muhammad Rehman s/o Zafar Ahmad

- Mr. Nazir Hussain s/o Mian Shameer

- Mr. Zafar Ahmad s/o Muhammad Aslam

- Mr. Ashiq Hussain s/o Ahmad Bakhsh

- Mr. Ajmal Mukhayyar s/o Safdar Hussain

- Mr. Liaqat Naseem s/o Noor Muhammad

59

December 27,2017

9-V DPCs/DPs/ Local Communities

3

- Mr. Muhammad Imran s/o Abdul Khaliq

- Mr. Abdus Sattar s/o Hakam Ali

- Mr. Abdul Khaliq s/o Hakam Ali

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

55

Annex 5.2: List of Consultations with (Women) Unpaid DPs

Sr. No.

Date Location/ Village

Category of Participant

No. of Participants

Name of Main Participant

1

October 02, 2017 Umeed Garh DPCs/ DPs/ Local Communities

5 - Hameeda Bibi W/O Alam

- Ruqayya Bibi W/O Akbar

- Iqra Yasmeen D/O Akbar Ali

- Noreen Alam W/O M.Iqbal

- Rehana Safdar W/O Safdar Ali

2

October 04, 2017 8-D DPCs/ DPs/ Local Communities

4 - Razia Bibi W/O Nazir Ahmad

- Salma Begum W/O Maqbool Ahmad

- Fozia W/O Lal

- Musarrat W/O Mazhar

3

October 05, 2017 Allah Hoo DPCs/ DPs/ Local Communities

5 - Saira WO Samar Mehmood

- Haleema Bibi W/O Haq Nawaz

- Nasim W/O Mustafa

- Ruqayya W/O Qaiser Abbas

- Tasleem Bibi W/O Ramzan

4

October 10, 2017 17 Ghagh DPCs/ DPs/ Local Communities

5 - Tasleem W/O Muhammad Nawaz

- Rizwana D/O Nawaz

- Abida W/O Toseef

- Sattan W/O Ahmad Yar

5

October 10, 2017 18 Ghagh DPCs/ DPs/ Local Communities

7 - Parveen Bivbi W/O Muhammad Ashraf

- Ammara Tariq W/O Muhammad irfan

- Yasmin W/O Saifullah

- Sattan Mai W/O Rab Nawaz

- Khurshid Bibi W/O Mapal

- Nasim Bibi W/O Iqbal

- Jindan Mai W/O Iqbal

6

October 11, 2017 14 V DPCs/ DPs/ Local Communities

3 - Akhtari Bibi

- Tasleem Bibi W/O abdul Ghaffar

- Haseena W/O abdusattar

7

October 12, 2017 Hassan Pur DPCs/ DPs/ Local Communities

4 - Khurshid Mai W/O Zulfiqar

- Hameeda Bibi W/O Jahanzeb

- Noor Safia W/O Masood Ahmad

- Shahida W/O Zaheer Sultan

8

October 17, 2017 Nehalay Wala

DPCs/ DPs/ Local Communities

5 - Aqleem Mai W/O Muihammad Iqbal

- Maryam D/O Sultan

- Sughra D/O Hidayat

- Arifa D/O Shah Muhammad

- Peeno D/O Hidayat

9

October 19, 2017 James Abad DPCs/ DPs/ Local Communities

3 - Kulsoom Bibi W/O Ibrahim

- Sughran Bibi W/O Ismail

- Sakina W/O Waryam

10

October 24, 2017 Kakki Kohna DPCs/ DPs/ Local Communities

7 - Farzana W/O Muhammad Afzal

- Rukhsana D/O Noor

- Rubima W/O Jahangir

- Nasim W/O faiz Muhammad

- Sajida W/O Khizar Hayat

- Ramzana Bibi W/O Noor Ahmad

- Sallan W/O Allah Bakhsh

11 November 01, 2017 469 JB Female DPCs/

DPs/ Local Communities

2 - Aysha Bibi W/O Muhammad Ahmad

- Muassarat Bibi W/O Ghulam Murtaza

12 November 02, 2017 501 JB Female DPCs/

DPs/ Local Communities

1 - Bhag Bhari W/O Ghulam Mustafa

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

56

13 November 02, 2017 505 JB Female DPCs/

DPs/ Local Communities

1 - Safia Bibi W/O Safdar Ali

14

November 06, 2017 496 JB Female Disbursement Meeting

3 - Kaneez Bibi W/O Ahmad Bakhsh

- Ghulam Zuhran W/O Allah Ditta

- Shahnaz Bibi D/O Allah Ditta

15

November 06, 2017 494 JB Female DPCs/ DPs/ Local Communities

4 - Tasleem Bibi W/O Muhammad Altaf

- Lubna Kiran D/O Muhammad Altaf

- Kaneez Bibi W/O Bahadur

- Nasreen W/O Umar Deen

16 November 07, 2017 504 JB Female DPCs/

DPs/ Local Communities

2 - Fakhra W/O Atta Ullah

- Saddan W/O Umar Daraz

17

November 10, 2017 385 JB Female DPCs/ DPs/ Local Communities

3 - Zubaida Bibi W/O Shahzad Farooq

- Shakila Akhtar W/O Muhammad Latif

- Nighat Yasmin W/O Muhammad Sajjid Naseer

18 November 10, 2017 438 JB Female DPCs/

DPs/ Local Communities

1 - Sughran Bibi W/O Allah Ditta

19 November 13, 2017 406 JB EMA Meeting 1 - Sania Illyas W/O Tariq Maqsood

20 November 15, 2017 500 JB Female

Disbursement Meeting

1 - Saba Arif W/O Tanveer Ali

21 November 22, 2017 307 JB Female

Disbursement Meeting

1 - Abida Parveen W/O Ijaz Ahmad

22

December 04,2017 15 V Female DPCs/DPs/ Local Communities

3 - Ms. Sumaira Bibi w/o Naseer Ahmad

- Ms. Razia Bibi w/o Dolat Ali

- Ms. Fazlan Mai w/o Nazir Khan

23

December 06,2017 Jalla Pahor Female DPCs/DPs/ Local Communities

5 - Ms. Kishwar Sultana w/o Muhammad Iqbal

- Ms. Ijaz Mai w/o Azmat Khan

- Ms..Ammeran w/o Muhammad Nawaz

- Ms..Shami m bibi w/o Muhammad Iqbal

- Ms. Jannat Bibi w/o Rab Nawaz

24

December 12,2017 17 D Female DPCs/DPs/ Local Communities

3 - Ms. Sakina Mai w/o Muhammad Ramzan

- Ms. Fozia Khanum w/o Falak Sher

- Ms. Shahida Parveen w/o Khuda Bakhsh

25

December 12,2017 Kakki Kohna

Female DPCs/DPs/ Local Communities

2 - Ms. Munazza d/o Ghulam Hussain

- Ms. Bashiran Bibi w/o Iqbal Ahmad

26

December 14,2017 15 V Female DPCs/DPs/ Local Communities

3 - Ms. Razia Bibi w/o Dolat Ali

- Ms. Kulsoom Bibi w/o Muhammad Ashraf

- Ms. Zahooran Bibi w/o Khalil Ahmad

27

December 20,2017 Jalla Pahor Female DPCs/DPs/ Local Communities

4 - Ms. Shamim Mai w/o Manzoor Hussain

- Ms. Meraj bibi w/o Muhammad Saleem

- Ms. Parveen Akhtar w/o Azmat Khan

- Ms. Shamim Bibi w/o Muhammad Aslam

28

December 21,2017 Umeed Garh Female DPCs/DPs/ Local Communities

6 - Ms. Maqboolan Bibi w/o Mukhtar Ahmad

- Ms. Asia Parveen d/o Akbar Ali

- Ms. Iqra Yasmin w/o Muhammad Javed

- Ms. Noreen Alam wd/o Muhammad Iqbal

- Rehana Safdar w/o Safdar Ali

- Ms. Robina Bibi w/o Muhammad Akram

Faisalabad –Khanewal (M-4) Project (Section-III) Internal Monitoring Report No.7 (October –December 2017)

__________________________________________________________________________________________

57

29

December 26,2017

Ali Pur

DPCs/DPs/ Local Communities 3

- Ms. Maqsooda Bibi wd/o Maqbool Ahmad

- Ms. Nazia w/o Muhammad Tahir

- Ms. Sumaira d/o Khurshid Ahmad

30 December 27,2017

9-V DPCs/DPs/ Local Communities

2 - Ms. Zahida Parveen w/o Abdus Sattar

- Ms. Samina Kosar w/o Imran