7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 1/42
LAPORAN INTERIM PRESTASI PERKHIDMATAN
PEMBEKALAN ELEKTRIK DI MALAYSIA
INTERIM REPORT ON THE PERFORMANCE OF THE
ELECTRICITY SUPPLY SERVICES IN MALAYSIA
UNTUK SEPARUH TAHUN PERTAMA 2010
FOR THE FIRST HALF YEAR OF 2010
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 2/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Jabatan Kawal Selia Pembekalan dan Pasaran ElektrikElectricity Supply and Market Regulation Department - 2 -
Bil. / No. KANDUNGAN / CONTENTS
1.0 PEMBEKALAN DAN PERMINTAAN BEKALAN ELEKTRIK
ELECTRICITY SUPPLY AND DEMAND 1.1 Kehendak Maksimum dan Kapasiti Terpasang
Maximum Demand and Installed Generation Capacity
2.0 JUALAN TENAGA ELEKTRIK
SALES OF ELECTRICITY
2.1 Jualan Tenaga Bulanan TNB, SESB, Sarawak Energy Berhad (SEB) dan NUR
Monthly Sales of Energy of TNB, SESB Sarawak Energy Berhad (SEB) and NUR
2.2 Jualan Tenaga Tahunan TNB, SESB, Sarawak Energy Berhad (SEB) dan NUR
Yearly Sales of Energy of TNB, SESB Sarawak Energy Berhad (SEB) and NUR
3.0 KEBOLEHARAPAN (RELIABILITY) BEKALAN ELEKTRIK
RELIABILITY OF ELECTRICITY SUPPLY
3.1 Statistik Gangguan Bekalan – TNB
Statistics of Supply Interruptions - TNB
3.2 Statistik Gangguan Bekalan – SESB
Statistics of Supply Interruptions - SESB
3.3 Statistik Gangguan Bekalan – SEB
Statistics of Supply Interruptions - SEB
3.4 Statistik Gangguan Bekalan – NURStatistics of Supply Interruptions - NUR
3.5 Sistem Pengagihan TNB
Distribution System of TNB
3.5.1 System Average Interruption Duration Index (SAIDI)
3.5.2 System Average Interruption Frequency Index (SAIFI)
3.5.3 Customer Average Interruption Duration Index (CAIDI)
3.6 Sistem Pengagihan SESB
Distribution System of SESB
3.6.1 System Average Interruption Duration Index (SAIDI)
3.6.2 System Average Interruption Frequency Index (SAIFI)
3.6.3 Customer Average Interruption Duration Index (CAIDI)
3.7 Sistem Pengagihan SEB
Distribution System of SEB
3.7.1 System Average Interruption Duration Index (SAIDI)
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 3/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Jabatan Kawal Selia Pembekalan dan Pasaran ElektrikElectricity Supply and Market Regulation Department - 3 -
3.8 Sistem Pengagihan NUR
Distribution System of NUR
3.8.1 System Average Interruption Duration Index (SAIDI)
3.9 Prestasi Sistem Penghantaran di Semenanjung Malaysia
Performance of Transmission System in Peninsular Malaysia
4.0 PUNCA GANGGUAN BEKALAN ELEKTRIK
CAUSES OF ELECTRICITY SUPPLY INTERRUPTIONS
4.1 Punca Gangguan Bekalan Elektrik – TNB
Causes of Electricity Supply Interruptions - TNB
4.2 Punca Gangguan Bekalan Elektrik – SESB
Causes of Electricity Supply Interruptions - SESB
4.3 Punca Gangguan Bekalan Elektrik – SEB
Causes of Electricity Supply Interruptions - SEB
4.4 Punca Gangguan Bekalan Elektrik – NURCauses of Electricity Supply Interruptions - NUR
5.0 KUALITI BEKALAN
POWER QUALITY
5.1 Insiden Voltage Dips – TNB
Incidents of Voltage Dips – TNB
5.2 Insiden Voltage Dips – NUR
Incidents of Voltage Dips - NUR
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 4/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Jabatan Kawal Selia Pembekalan dan Pasaran ElektrikElectricity Supply and Market Regulation Department - 4 -
1.1 KEHENDAK MAKSIMUM DAN KAPASITI PENJANAANMAXIMUM DEMAND AND INSTALLED GENERATION CAPACITY
Gambarajah 1 : Kehendak Maksimum dan Kapasiti Penjanaan di Semenanjung Malaysia – Separuh Tahun Pertama 2010
Figure 1 : Maximum Demand and Installed Generation Capacity in Peninsular Malaysia for the First Half Year of 2010
21,817 21,817 21,817
14,24514,890 15,072
0
5,000
10,000
15,000
20,000
25,000
1st Quarter 2nd Quarter
(MW)
Installed Generation Capacity Maximum Demand
2009
2010 2010
Gambarajah 2 : Kehendak Maksimum dan Kapasiti Penjanaan di Sabah – SeparuhTahun Pertama 2010
Figure 2 : Maximum Demand and Installed Generation Capacity in Sabah for the First Half Year of 2010
903
968# 968
719760 773
0
200
400
600
800
1,000
1st Quarter 2nd Quarter
(MW)
I nst al le d Ge ne rat io n C ap ac it y Max im um De man d
20092010 2010
1.0 PEMBEKALAN DAN PERMINTAAN BEKALAN ELEKTRIKELECTRICITY SUPPLY AND DEMAND
Nota / Note :
# 1) Mulatugas tarbin gas65 MW bagi kitar terbukaFasa 1 di RanhillPowertron Sdn. Bhd. padaMac 2010
Commissioning of the first phase 65 MW open cycle gas turbine in Ranhill Powertron II Sdn. Bhd. in March 2010.
Sumber / Source :Tenaga Nasional Berhad
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 5/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Jabatan Kawal Selia Pembekalan dan Pasaran ElektrikElectricity Supply and Market Regulation Department - 5 -
Gambarajah 3 : Kehendak Maksimum dan Kapasiti Penjanaan di Sarawak – SeparuhTahun Pertama 2010
Figure 3 : Maximum Demand and Installed Generation Capacity in Sarawak for the First Half Year of 2010
1,230 1,230
1,349
9961,027
1,067
0
200
400
600
800
1,000
1,200
1,400
1st Quarter 2nd Quarter
(MW)
Installed Generation Capacity Maximum Demand
20092010 2010
Gambarajah 4 : Kehendak Maksimum Bulanan NUR Distribution Sdn. Bhd.
Figure 4 : Monthly Maximum Demand of NUR Distribution Sdn. Bhd.
91 9195
10199 101 101
106109
111 112110
103106
109
114 117120
125 124125
130 130 132131
134137
140 139 138
80
90
100
110
120
130
140
150
Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec
(MW)
Month
2008 2009 2010
1.0 PEMBEKALAN DAN PERMINTAAN BEKALAN ELEKTRIKELECTRICITY SUPPLY AND DEMAND
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 6/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Jabatan Kawal Selia Pembekalan dan Pasaran ElektrikElectricity Supply and Market Regulation Department - 6 -
2.1 JUALAN TENAGA BULANAN TNB, SESB, SARAWAK ENERGY BERHAD(SEB) DAN NURMONTHLY SALES OF ELECTRICITY OF TNB, SESB, SARAWAK ENERGY
BERHAD (SEB) AND NUR
Gambarajah 5 : Jualan Tenaga Bulanan Oleh TNB (GWj) untuk Separuh Tahun Pertama2010
Figure 5 : Monthly Sales of Electricity (GWh) of TNB for the First Half Year of 2010
0.00
500.00
1,000.00
1,500.00
2,000.00
2,500.00
3,000.00
3,500.00
Jan Feb Mar Apr May June
1,488 1,4091,558 1,660 1,631 1,643
2,465 2,412 2,3252,649 2,636 2,614
3,353 3,402
2,967
3,501 3,4133,533
5 6 5 6 5 597 81 91 89 88 8422 21 21 24 23 23
E n e r g y S
a l e s ( G W h )
Month
Domestic Commercial Industrial Mining Public Lighting Agriculture Gambarajah 6 : Jualan Tenaga Bulanan Oleh SESB (GWj) untuk Separuh Tahun
Pertama 2010Figure 6 : Monthly Sales of Electricity (GWh) of SESB for the First Half Year of 2010
0.00
20.00
40.00
60.00
80.00
100.00
120.00
Jan Feb Mar Apr May June
107
92
103
120110 112
129 121 119 145 139 136
10197
89
104 99 98
3 5 4 4 4 4
E n
e r g y S a l e s ( G W h )
Month
Do me stic Co mme rcia l In du stria l P ub lic L ig htin g
2.0 JUALAN TENAGA ELEKTRIKSALES OF ELECTRICITY
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 7/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Jabatan Kawal Selia Pembekalan dan Pasaran ElektrikElectricity Supply and Market Regulation Department - 7 -
Gambarajah 7 : Jualan Tenaga Sarawak Energy Berhad (GWj) untuk Separuh TahunPertama 2010
Figure 7 : Sales of Electricity (GWh) by Sarawak Energy Berhad for the First Half Year of
2010
0
200
400
600
800
1000
1200
Domestic Commercial Industrial Public Lighting
625
1080 1085
38
E n e r g y S a l e s ( G W h )
Category of Consumers Gambarajah 8 : Jualan Tenaga Bulanan NUR Distribution Sdn. Bhd. (GWj) untuk
Separuh Tahun Pertama 2010Figure 8 : Monthly Sales of Electricity (GWh) of Nur Distribution Sdn. Bhd. For the First
Half Year of 2010
0.0
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
90.0
100.0
Jan Feb Mac Apr Mei Jun
0.45 0.570.51 0.52
0.510.63
2.53 2.38 2.89 2.87 2.75 2.70
84.5278.10
89.32 88.49 91.25 87.50
0.12 0.110.13
0.13 0.11 0.11
E n e r g y S a l e s ( G W h )
Month
Domestic Commercial Industrial Public Lighting
2.0 JUALAN TENAGA ELEKTRIKSALES OF ELECTRICITY
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 8/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Jabatan Kawal Selia Pembekalan dan Pasaran ElektrikElectricity Supply and Market Regulation Department - 8 -
2.2 JUALAN TENAGA TAHUNAN TNB, SESB, SEB DAN NURYEARLY SALES OF ELECTRICITY OF TNB, SESB, SEB AND NUR
Gambarajah 9 : Jumlah Jualan Tenaga (GWj)oleh TNB untuk :i) Separuh Tahun Pertama 2008, 2009 dan
2010ii) Sepanjang Tahun 2006 Hingga 2009
Figure 9 : The Total Electricity (GWh) of TNB for : i) First Half Year of 2008, 2009 and 2010 ii) In the Year 2006 to 2009
0
5000
10000
15000
20000
2006 2007 2008 2009 2008(Jan-June)
2009(Jan-June)
2010(Jan-June)
1436615,351 16,017
17,124
7,933 8,408 9,389
(GWh)
Year
Domestic
0
10000
20000
30000
2006 2007 2008 2009 2008(Jan-June)
2009(Jan-June)
2010(Jan-June)
2385925,83727,190
28,287
13,438 13,75315,101(GWh)
Year
Commercial
0
10000
20000
30000
40000
50000
2006 2007 2008 2009 2008(Jan-June)
2009(Jan-June)
2010(Jan-June)
37835 39,046 40,07236,608
20,258 16,95620,168
(GWh)
Year
Industrial
0
20
40
60
2006 2007 2008 2009 2008(Jan-June)
2009(Jan-June)
2010(Jan-June)
3833 35
53
1725
32(GWh)
Year
Mining
0
500
1000
1500
2006 2007 2008 2009 2008(Jan-June)
2009(Jan-June)
2010(Jan-June)
854 908 9541,093
475 486 531
(GWh)
Year
Public Lighting
0
50
100
150
200
250
2007 2008 2009 2008(Jan-June)
2009(Jan-June)
2010(Jan-June)
186
225 245
109 117 134
(GWh)
Year
Agriculture
0
20,000
40,000
60,000
80,000
100,000
2006 2007 2008 2009 2008(Jan-June)
2009(Jan-June)
2010(Jan-June)
77,00881,360 84,493 83,411
42,230 39,746 45,355
(GWh)
Year
Total
2.0 JUALAN TENAGA ELEKTRIKSALES OF ELECTRICITY
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 9/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Jabatan Kawal Selia Pembekalan dan Pasaran ElektrikElectricity Supply and Market Regulation Department - 9 -
Gambarajah 10 : Jumlah Jualan Tenaga (GWj)oleh SESB untuk :
i) Separuh Tahun Pertama 2008, 2009 dan2010
ii) Sepanjang Tahun 2006 Hingga 2009
Figure 10 : The Total Electricity (GWh) of SESB for :
i) First Half Year of 2008, 2009 and 2010 ii) In the Year 2006 to 2009
0
500
1000
1500
2006 2007 2008 2009 2008(Jan-June)
2009(Jan-June)
2010(Jan-June)
9371,035 1,090 1,204
443584 644
(GWh)
Year
Domestic
0
500
1000
1500
2000
2006 2007 2008 2009 2008(Jan-June)
2009(Jan-June)
2010(Jan-June)
1,1031,238 1,321
1,504
535727 789
(GWh)
Year
Commercial
0
500
1000
1500
2006 2007 2008 2009 2008(Jan-June)
2009(Jan-June)
2010(Jan-June)
889993 1,017
1,099
415526 588
(GWh)
Year
Industrial
0
10
20
30
40
50
2006 2007 2008 2009 2008(Jan-June)
2009(Jan-June)
2010(Jan-June)
3945 47
49
2024 25
(GWh)
Year
Public Lighting
0
1,000
2,000
3,000
4,000
2006 2007 2008 2009 2008(Jan-June)
2009(Jan-June)
2010(Jan-June)
2,9683,312 3,474
3,856
1,626 1,860 2,045
(GWh)
Year
Total
2.0 JUALAN TENAGA ELEKTRIKSALES OF ELECTRICITY
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 10/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Jabatan Kawal Selia Pembekalan dan Pasaran ElektrikElectricity Supply and Market Regulation Department - 10 -
Gambarajah 11 : Jumlah Jualan Tenaga (GWj)oleh SEB untuk :
i) Separuh Tahun Pertama 2008, 2009 dan2010
ii) Sepanjang Tahun 2006 Hingga 2009
Figure 11 : The Total Electricity (GWh) of SEB for :
i) First Half Year of 2008, 2009 and 2010 ii) In the Year 2006 to 2009
0
500
1000
1500
2006 2007 2008 2009 2008(Jan-June)
2009(Jan-June)
2010(Jan-June)
1,0401,098 1,132
1,249
554 597 625
(GWh)
Year
Domestic
0
500
1000
1500
2000
2006 2007 2008 2009 2008(Jan-June)
2009(Jan-June)
2010(Jan-June)
1,324 1,421 1,4971,623
734 780
1,080
(GWh)
Year
Commercial
0
500
1000
1500
2000
2006 2007 2008 2009 2008(Jan-
June)
2009(Jan-
June)
2010(Jan-
June)
1,627 1,691 1,7261,606
880785
1,085
(GWh)
Year
Industrial
0
20
40
60
80
2006 2007 2008 2009 2008(Jan-June)
2009(Jan-June)
2010(Jan-June)
5462 66 62
34 36 38
(GWh)
Year
Public Lighting
0
1,000
2,000
3,000
4,000
5,000
2006 2007 2008 2009 2008(Jan-June)
2009(Jan-June)
2010(Jan-June)
4,045 4,272 4,421 4,540
2,087 2,1982,828
(GWh)
Year
Total
2.0 JUALAN TENAGA ELEKTRIKSALES OF ELECTRICITY
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 11/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Jabatan Kawal Selia Pembekalan dan Pasaran ElektrikElectricity Supply and Market Regulation Department - 11 -
Gambarajah 12 : Jumlah Jualan Tenaga (GWj)oleh NUR Distribution Sdn. Bhd. untuk :
i) Separuh Tahun Pertama 2008, 2009 dan2010
ii) Sepanjang Tahun 2006 Hingga 2009
Figure 12 : The Total Electricity (GWh) of NUR Distribution Sdn. Bhd. for :
i) First Half Year of 2008, 2009 and 2010 ii) In the Year 2006 to 2009
0.0
2.0
4.0
6.0
2006 2007 2008 2009 2008(Jan-June)
2009(Jan-June)
2010(Jan-June)
4.14.6
5.2 5.5
2.6 2.73.2
(GWh)
Year
Domestic
0.0
5.0
10.0
15.0
20.0
25.0
2006 2007 2008 2009 2008(Jan-June)
2009(Jan-June)
2010(Jan-June)
24.0
20.321.8
23.5
11.4 11.3
16.1(GWh)
Year
Commercial
0.0
200.0
400.0
600.0
800.0
1000.0
2006 2007 2008 2009 2008
(Jan-
June)
2009
(Jan-
June)
2010
(Jan-
June)
525.1 590.9
763.8
916.1
351.6420.4
519.2
(GWh)
Year
Industrial
0.0
0.5
1.0
1.5
2.0
2006 2007 2008 2009 2008(Jan-June)
2009(Jan-June)
2010(Jan-June)
1.8 1.7 1.7 1.6
0.9 0.8 0.7
(GWh)
Year
Public Lighting
0.0
200.0400.0
600.0
800.0
1000.0
2006 2007 2008 2009 2008
(Jan-June)
2009
(Jan-June)
2010
(Jan-June)
555.0 617.6
792.5
946.8
301.2
435.3539.2
(GWh)
Year
Total
2.0 JUALAN TENAGA ELEKTRIKSALES OF ELECTRICITY
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 12/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Jabatan Kawal Selia Pembekalan dan Pasaran ElektrikElectricity Supply and Market Regulation Department - 12 -
3.1 STATISTIK GANGGUAN BEKALAN – TNBSTATISTICS OF SUPPLY INTERRUPTIONS - TNB
Gambarajah 13 : Bilangan Gangguan BekalanElektrik di Semenanjung Malaysia untuk :i) Separuh Tahun Pertama 2008, 2009 dan
2010ii) Sepanjang Tahun 2006 Hingga 2009
Figure 13 : Numbers of Electricity Supply Interruptions in Peninsular Malaysia for : i) First Half Year of 2008, 2009 and 2010 ii) In the Year 2006 to 2009
020,00040,000
60,00080,000
100,000120,000
2006 2007 2008 2009 2008(Jan-June)
2009(Jan-June)
2010(Jan-June)
55,52374,058
112,064 108,708
48,298 56,773 49,800
N
u m b e r
Year
Unscheduled Interruptions in Peninsular Malaysia
01,0002,000
3,0004,0005,0006,0007,000
2006 2007 2008 2009 2008(Jan-June)
2009(Jan-June)
2010(Jan-June)
1,0912,348
5,3306,262
1,364
3,7063,099
N
u m b e r
Year
Scheduled Interruptions in Peninsular Malaysia
020,000
40,00060,00080,000
100,000120,000
2006 2007 2008 2009 2008(Jan-June)
2009(Jan-June)
2010(Jan-June)
56,61476,406#
117,394 114,971
49,662 60,479 52,899
N u m b e r
Year
Total Interruptions in Peninsular Malaysia
3.0 KEBOLEHARAPAN (RELIABILITY) BEKALAN ELEKTRIKRELIABILITY OF ELECTRICITY SUPPLY
Nota / Note :
# Mulai September 2007,
TNB menggunapakaisistem pemantauan danpelaporan prestasi sistempembekalan denganmenggunakan software baru iaitu TOMS (Total Outage Management System).
From September 2007,application of new monitoring and reporting system on performance of supply system using the new software, i.e. Total Outage Management System (TOMS).
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 13/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Jabatan Kawal Selia Pembekalan dan Pasaran ElektrikElectricity Supply and Market Regulation Department - 13 -
Gambarajah 14 : Purata Bilangan GangguanBekalan Elektrik Bulanan di Semenanjung Malaysia:
i) Separuh Tahun Pertama 2008, 2009 dan2010
ii) Sepanjang Tahun 2006 Hingga 2009
Figure 14 : Monthly Average of Electricity Supply Interruptions in Peninsular Malaysia for : i) First Half Year of 2008, 2009 and 2010
ii) In the Year 2006 to 2009
0
2,000
4,000
6,000
8,000
10,000
12,000
4,718
6,367
9,783 9,581
8,277
10,080
8,817
N u m b e r
Year
Gambarajah 15 : Jumlah Kumulatif BilanganGangguan Bekalan Elektrik bagi Negeri-negeri diSemenanjung Malaysia untuk Separuh Tahun
Pertama 2008, 2009 dan 2010
Figure 15 : Total Number of Supply Interruptions in Various States in Peninsular Malaysia for the First Half Year of 2008, 2009 and 2010
0
2000
4000
6000
8000
10000
12000
8 4 1
4 ,
1 8 2
5 ,
1 9 7
3 ,
6 7 7
7 ,
3 6 7
6 ,
4 1 1
4
2 ,
7 5 9
1 ,
3 2 6
8 ,
5 3 7
2 ,
4 5 4
1 ,
3 3 3
5 ,
5 7 4
1 ,
0 6 7
5 ,
4 0 7
4 ,
6 0 9
5 ,
9 8 7
8 ,
4 1 0
6 ,
7 3 8
4
3 ,
2 7 8
2 ,
4 6 4
1 0 ,
0 5 2
3 ,
3 7 6
2 , 0 1 3
7 ,
0 7 4
4 1 4
4 ,
2 2 6
3 ,
8 0 6
6 ,
1 6 4
7 , 7
8 3
6 ,
4 1 4
1 1
3 ,
2 9 6
1 , 9
5 2
9 ,
1 4 4
2 ,
8 2 9
2 , 0
1 4
4 ,
8 4 6
N u m b e r
State
2008 (Jan-June) 2009 (Jan-June) 2010 (Jan-June)
3.0 KEBOLEHARAPAN (RELIABILITY) BEKALAN ELEKTRIKRELIABILITY OF ELECTRICITY SUPPLY
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 14/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Jabatan Kawal Selia Pembekalan dan Pasaran ElektrikElectricity Supply and Market Regulation Department - 14 -
Gambarajah 16 : (a) Peratusan BilanganGangguan Bekalan Elektrik Keseluruhan Mengikut
Bahagian Terlibat di Semenanjung Malaysia untuk :i) Separuh Tahun Pertama 2009 dan 2010ii) Sepanjang Tahun 2008 dan 2009
Figure 16 : (a) Percentages of Total Number of Supply Interruptions in Peninsular Malaysia
Based on the Component of Network for : i) First Half Year of 2009 and 2010 ii) In the Year 2008 and 2009
10.2% 10.6% 9.9% 11.5%
21.8% 19.3% 20.1%22.5%
68.0% 70.0% 70.0% 66.0%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
2008 2009 2009 (Jan-June) 2010 (Jan-June)
(%)
Underground Cable Substation Overhead Line (b) Peratusan Tahun 2009 (Jan-Jun)Percentages in 2009 (Jan-June)
UndergroundCable9.87%
Substation20.06%
OverheadLine
70.07%
(c) Peratusan Tahun 2010 (Jan-Jun)Percentages in 2010 (Jan-June)
UndergroundCable
11.55%
Substation22.47%
OverheadLine
65.98%
Nota / Note : Tidak termasuk gangguan bekalan voltan tinggiExcluding high voltage supply interruptions
3.0 KEBOLEHARAPAN (RELIABILITY) BEKALAN ELEKTRIKRELIABILITY OF ELECTRICITY SUPPLY
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 15/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Jabatan Kawal Selia Pembekalan dan Pasaran ElektrikElectricity Supply and Market Regulation Department - 15 -
3.2 STATISTIK GANGGUAN BEKALAN - SESBSTATISTICS OF SUPPLY INTERRUPTIONS - SESB
Gambarajah 17 : Bilangan Gangguan BekalanElektrik di Negeri Sabah untuk :i) Separuh Tahun Pertama 2008, 2009 dan 2010ii) Sepanjang Tahun 2006 Hingga 2009
Figure 17 : Numbers of Electricity Supply Interruptions in Sabah for : i) First Half Year of 2008, 2009 and 2010 ii) In the Year 2006 to 2009
05,000
10,00015,00020,00025,000
2006 2007 2008 2009 2008(Jan-June)
2009(Jan-June)
2010(Jan-June)
22,43620,006 19,484 18,227
9,901 8,841 9,203
N u
m b e r
Year
Unscheduled Interruptions in Sabah
01,000
2,0003,0004,000
2006 2007 2008 2009 2008(Jan-June)
2009(Jan-June)
2010(Jan-June)
3,321 3,583
2,4273,550
1,1231,711 1,773
N u m b e r
Year
Scheduled Interruptions in Sabah
05,000
10,00015,00020,00025,00030,000
2006 2007 2008 2009 2008(Jan-June)
2009(Jan-June)
2010(Jan-June)
25,757 23,589 21,911 21,777
11,024 10,552 10,976
N
u m b e r
Year
Total Interruptions in Sabah
Nota : Tidak termasuk gangguan pada sistem penghantaran dan penjanaanNote : Excluding interruptions in transmission and generation system
3.0 KEBOLEHARAPAN (RELIABILITY) BEKALAN ELEKTRIKRELIABILITY OF ELECTRICITY SUPPLY
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 16/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Jabatan Kawal Selia Pembekalan dan Pasaran ElektrikElectricity Supply and Market Regulation Department - 16 -
Gambarajah 18 : Purata Bilangan GangguanBekalan Elektrik Bulanan di Negeri Sabah untuk :
i) Separuh Tahun Pertama 2008, 2009 dan 2010ii) Sepanjang Tahun 2006 Hingga 2009
Figure 18 : Monthly Average of Electricity Supply Interruptions in Sabah for :
i) First Half Year of 2008, 2009 and 2010 ii) In the Year 2006 to 2009
0
500
1,000
1,500
2,000
2,500 2,1461,966
1,826 1,815 1,8371,759 1,829
N u m b e r
Year
3.0 KEBOLEHARAPAN (RELIABILITY) BEKALAN ELEKTRIKRELIABILITY OF ELECTRICITY SUPPLY
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 17/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Jabatan Kawal Selia Pembekalan dan Pasaran ElektrikElectricity Supply and Market Regulation Department - 17 -
3.3 STATISTIK GANGGUAN BEKALAN – SEBSTATISTICS OF SUPPLY INTERRUPTIONS - SEB
Gambarajah 19 : Bilangan Gangguan BekalanElektrik di Negeri Sarawak untuk :i) Separuh Tahun Pertama 2008, 2009 dan
2010ii) Sepanjang Tahun 2006 Hingga 2009
Figure 19 : Numbers of Electricity Supply Interruptions in Sarawak for : i) First Half Year of 2008, 2009 and 2010 ii) In the Year 2006 to 2009
0
2,000
4,0006,000
8,000
2006 2007 2008 2009 2008(Jan-June)
2009(Jan-June)
2010(Jan-June)
6,279 6,489 6,301 6,040
3,153 2,887 3,313
N u m b
e r
Year
Unscheduled Interruptions in Sarawak
0
5001,000
1,500
2006 2007 2008 2009 2008(Jan-June)
2009(Jan-June)
2010(Jan-June)
1,1301,426 1,816 1,828
940 891 789
N u m b e r
Year
Scheduled Interruptions in Sarawak
02,0004,0006,000
8,000
2006 2007 2008 2009 2008(Jan-June)
2009(Jan-June)
2010(Jan-June)
7,4097,915 8,117 7,868
4,093 3,778 4,102
N u m
b e r
Year
Total Interruptions in Sara wak
3.0 KEBOLEHARAPAN (RELIABILITY) BEKALAN ELEKTRIKRELIABILITY OF ELECTRICITY SUPPLY
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 18/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Jabatan Kawal Selia Pembekalan dan Pasaran ElektrikElectricity Supply and Market Regulation Department - 18 -
Gambarajah 20 : Purata Bilangan GangguanBekalan Elektrik Bulanan di Negeri Sarawak untuk :
i) Separuh Tahun Pertama 2008, 2009 dan 2010ii) Sepanjang Tahun 2006 Hingga 2009
Figure 20 : Monthly Average of Electricity Supply Interruptions in Sarawak for :
i) First Half Year of 2008, 2009 and 2010 ii) In the Year 2006 to 2009
600
610
620
630640
650
660
670
680
690
660
676
656
682
630
684
N u m b e r
Year
`
3.0 KEBOLEHARAPAN (RELIABILITY) BEKALAN ELEKTRIKRELIABILITY OF ELECTRICITY SUPPLY
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 19/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Jabatan Kawal Selia Pembekalan dan Pasaran ElektrikElectricity Supply and Market Regulation Department - 19 -
3.4 STATISTIK GANGGUAN BEKALAN – NURSTATISTICS OF SUPPLY INTERRUPTIONS - NUR
Gambarajah 21 : Bilangan Gangguan BekalanElektrik di Kulim Hi-Tech Park (KHTP) yangdilaporkan oleh NUR Distribution Sdn. Bhd. untuk :i) Separuh Tahun Pertama 2008, 2009 dan
2010ii) Sepanjang Tahun 2006 Hingga 2009
Figure 21 : Numbers of Electricity Supply Interruptions in Kulim Hi-Tech Park (KHTP) by NUR Distribution Sdn. Bhd. for : i) First Half Year of 2008, 2009 and 2010 ii) In the Year 2006 to 2009
0
20
40
2006 2007 2008 2009 2008(Jan-June)
2009(Jan-June)
2010(Jan-June)
3240
3530
19 12
22
N u m b e
r
Year
Unscheduled Interruptions of NUR Distribution Sdn. Bhd.
0
50
100
2006 2007 2008 2009 2008(Jan-June)
2009(Jan-June)
2010(Jan-June)
51
6556
70
2127 30
N u m b e r
Year
Scheduled Interruptions of NUR Distribution Sdn. Bhd.
0
50
100150
2006 2007 2008 2009 2008(Jan-June)
2009(Jan-June)
2010(Jan-June)
83 105 91 100
40 3952
N u m b e r
Year
Total Interruptions of NUR Distribution Sdn. Bhd.
3.0 KEBOLEHARAPAN (RELIABILITY) BEKALAN ELEKTRIKRELIABILITY OF ELECTRICITY SUPPLY
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 20/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Jabatan Kawal Selia Pembekalan dan Pasaran ElektrikElectricity Supply and Market Regulation Department - 20 -
Gambarajah 22 : Purata Bilangan GangguanBekalan Elektrik Bulanan di Kulim Hi-Tech Park
(KHTP) yang dilaporkan oleh NUR DistributionSdn. Bhd. untuk :i) Separuh Tahun Pertama 2008, 2009 dan
2010ii) Sepanjang Tahun 2006 Hingga 2009
Figure 22 : Monthly Average of Electricity Supply Interruptions in Kulim Hi-Tech Park
(KHTP) Reported by NUR Distribution Sdn. Bhd.for : i) First Half Year of 2008, 2009 and 2010 ii) In the Year 2006 to 2009
0
2
4
6
8
10
7
9
88
7 7
9
N u m b e r
Year
3.0 KEBOLEHARAPAN (RELIABILITY) BEKALAN ELEKTRIKRELIABILITY OF ELECTRICITY SUPPLY
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 21/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Jabatan Kawal Selia Pembekalan dan Pasaran ElektrikElectricity Supply and Market Regulation Department - 21 -
3.5 SISTEM PENGAGIHAN TNBDISTRIBUTION SYSTEM OF TNB
3.5.1 SYSTEM AVERAGE INTERRUPTION DURATION INDEX (SAIDI)
Jadual 1 : SAIDI (Minit/Pelanggan/Tahun) bagiNegeri-Negeri di Semenanjung Malaysia untuk :i) Separuh Tahun Pertama 2008, 2009 dan
2010ii) Sepanjang Tahun 2007 Hingga 2009
Table 1 : SAIDI (Minutes/Customer/Year) for the Various States in Peninsular Malaysia for : i) First Half Year of 2008, 2009 and 2010 ii) In the Year 2007 to 2009
Tahun
Year
Indek SAIDIKeseluruhan
Overall SAIDI (Minutes)
Negeri Paling TinggiIndeks SAIDI
State with Highest SAIDI
Negeri Paling Rendah IndeksSAIDI
State with Lowest SAIDI
2007 75.7 Pahang (108.4) WP Putrajaya/Cyberjaya (2.1)
2008 87.3 Johor (120.5) WP Putrajaya/Cyberjaya (6.6)
2009 66.1 P.Pinang (111.3) WP Putrajaya/Cyberjaya (0.2)
2008 (Jan-Jun) 37.5 Melaka (51.8) WP Putrajaya/Cyberjaya (5.9)
2009 (Jan-Jun) 33.9 Kelantan (52.8) WP Putrajaya/Cyberjaya (0.19)
2010 (Jan-Jun) 49.1 Perak (99.8) WP Putrajaya/Cyberjaya (7.8)
Gambarajah 23 : SAIDI (Minit/Pelanggan/Tahun) di Semenanjung Malaysia untuk Separuh TahunPertama 2010
Figure 23 : SAIDI (Minutes/Customer/Year) in Peninsular Malaysia for the First Half Year of 2010
0.00
20.00
40.00
60.00
80.00
100.00 87.3
66.1
37.534.0
49.1#
7.0 8.3 8.7 8.7 8.6 7.8
32.8&
6.5 5.8 5.4 5.1 5.1 5.1
SAIDI
Nota / Notes :# - Mulai Januari 2010, TNB telah mengambil langkah untuk mempertingkatkan sistem pelaporan SAIDI
yang lebih tepat dengan menggabungkan perisian-perisian TOMS , eCIBS dan ERMS . Perisian baru ini dipanggil Enhanced TOMS .From January 2010, TNB has taken steps to improve on the data collection and recording, with the integration of TOMS, eCIBS and ERMS into a new system called Enhanced TOMS.
& - SAIDI dikira menggunakan perisian lama (TOMS ).SAIDI calculated using old software namely TOMS.
3.0 KEBOLEHARAPAN (RELIABILITY) BEKALAN ELEKTRIKRELIABILITY OF ELECTRICITY SUPPLY
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 22/42
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 23/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Jabatan Kawal Selia Pembekalan dan Pasaran ElektrikElectricity Supply and Market Regulation Department - 23 -
3.5.2 SYSTEM AVERAGE INTERRUPTION FREQUENCY INDEX (SAIFI)
Gambarajah 25 : SAIFI (Bil. Gangguan/Pelanggan/Tahun) di Semenanjung Malaysia untuk
Separuh Tahun Pertama 2010Figure 25 : SAIFI (No. of Interruption/Customer/Year) in Peninsular Malaysia for the First Half
Year of 2010
0.00
0.20
0.40
0.60
0.80
1.00 0.87
0.76
0.38 0.39
0.63
0.070.10 0.12 0.13 0.11 0.10
SAIFI
Nota / Note : SAIFI pada tahun 2010 dikira menggunakan perisian baru (Enhanced TOMS )
SAIFI in 2010 is calculated using new software namely Enhanced TOMS
Gambarajah 25 : SAIFI (Bil. Gangguan/Pelanggan/Tahun) Terkumpul bagi Negeri-Negeri diSemenanjung Malaysia untuk Separuh Tahun Pertama 2008, 2009 dan 2010
Figure 25 : SAIFI (No. of Interruption/Customer/Year) for the Various States in Peninsular Malaysia for the First Half Year of 2008, 2009 and 2010
Pe rlis Kedah P. Pina ng Pe ra k Sela ngo rWP KualaLumpur
WP Putrajaya/ Cyberjaya
N. S emb ila n Me la ka Jo ho r P ah an g Te re ng ga nu K ela nt anPeninsularMalaysia
2008(Jan-June) 0.36 0.37 0.57 0.49 0.32 0. 1 0.02 0.30 0.45 0.40 0.36 0.44 0.45 0.38
2009(Jan-June) 0.29 0.48 0.67 0.44 0.28 0. 7 0.000 0.33 0.43 0.34 0.36 0.44 0.73 0.39
2010(Jan-June) 0.03 0.97 0.74 1.21 0.44 0.26 0.04 0.42 0.40 0.66 0.41 0.69 0.87 0.63
0.00
0.20
0.40
0.60
0.80
1.00
1.20
1.40
SAIFI
3.0 KEBOLEHARAPAN (RELIABILITY) BEKALAN ELEKTRIKRELIABILITY OF ELECTRICITY SUPPLY
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 24/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Jabatan Kawal Selia Pembekalan dan Pasaran ElektrikElectricity Supply and Market Regulation Department - 24 -
3.5.3 CUSTOMER AVERAGE INTERRUPTION DURATION INDEX (CAIDI)
Gambarajah 27 : CAIDI (Minit/Pelanggan Terlibat/Tahun) di Semenanjung Malaysia untuk
Separuh Tahun Pertama 2010Figure 27 : CAIDI (Minutes/Interrupted Customer/Year) in Peninsular Malaysia for the First Half
Year of 2010
0.00
20.00
40.00
60.00
80.00
100.00
120.00100.7
86.8
97.1
87.1
77.9
99.6
82.8
72.767.2
78.3 77.5
CAIDI
Gambarajah 28 : CAIDI (Minit/Pelanggan Terlibat/Tahun) Terkumpul bagi Negeri-Negeri diSemenanjung Malaysia untuk Separuh Tahun Pertama 2008, 2009 dan 2010
Figure 28 : CAIDI (Minutes/Interrupted Customer/Year) for the Various States in Peninsular Malaysia for the First Half Year of 2008, 2009 and 2010
Perlis Keda h P. Pinan g Pe rak Selango rWP KualaLumpur
WPPutrajaya/ Cyberjaya
N . Sembi lan Melak a J ohor Pahang Terengganu Ke lantanPeninsularMalaysia
2008(Jan-June) 78.51 101.47 66.09 57.54 99.96 122.45 381.26 115.02 116.07 121.68 97.07 59.14 86.79 97.08
2009(Jan-June) 91.5 90.15 69.42 71.36 102.71 89.41 94 121.31 61.50 114.66 95.32 48.83 72.64 87.07
2010(Jan-June) 78.99 75.62 81.01 82.40 90.70 95.80 205.23 94.73 91.37 76.73 86.78 47.63 50.75 77.87
0.0
50.0
100.0
150.0
200.0
250.0
300.0
350.0
400.0
CAIDI(in Minutes)
3.0 KEBOLEHARAPAN (RELIABILITY) BEKALAN ELEKTRIKRELIABILITY OF ELECTRICITY SUPPLY
Supply interruptions on 14 May2008 caused by third partiesworks (damage to cables).
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 25/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Jabatan Kawal Selia Pembekalan dan Pasaran ElektrikElectricity Supply and Market Regulation Department - 25 -
3.6 SISTEM PENGAGIHAN SESBDISTRIBUTION SYSTEM OF SESB
3.6.1 SYSTEM AVERAGE INTERRUPTION DURATION INDEX (SAIDI)
Gambarajah 29 : SAIDI (Minit/Pelanggan/Tahun) diNegeri Sabah untuk :i) Separuh Tahun Pertama 2008, 2009 dan
2010ii) Sepanjang Tahun 2007 Hingga 2009
Figure 29 : SAIDI (Minutes/Customer/Year) in Sabah for : i) First Half Year of 2008, 2009 and 2010 ii) In the Year 2007 to 2009
0
500
1000
1500
2000
2500
3000
2007 2008 2009 2008
(Jan-June)
2009
(Jan-June)
2010
(Jan-June)
1,379
1,078
739580
423 271
607778
2,129
421
709
243
1,9871,856
2,868
1,0011,132
513
SAIDI
Year
Distr ibution Transmission & Generation Total SA IDI
3.0 KEBOLEHARAPAN (RELIABILITY) BEKALAN ELEKTRIKRELIABILITY OF ELECTRICITY SUPPLY
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 26/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Jabatan Kawal Selia Pembekalan dan Pasaran ElektrikElectricity Supply and Market Regulation Department - 26 -
3.6.2 SYSTEM AVERAGE INTERRUPTION FREQUENCY INDEX (SAIFI)
Gambarajah 30 : SAIFI (Bil.Gangguan/Pelanggan/Tahun) di Negeri Sabahuntuk :i) Separuh Tahun Pertama 2008,2 009 dan
2010ii) Sepanjang Tahun 2007 Hingga 2009
Figure 30 : SAIFI (No’s of Interruption/Customer/Year) in Sabah for : i) First Half Year of 2008, 2009 and 2010 ii) In the Year 2007 to 2009
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
2007 2008 2009 2008
(Jan-June)
2009
(Jan-June)
2010
(Jan-June)
23.9
20.1
16.9
10.39.0 8.38.5 8.3
19.1
4.66.6
3.1
32.3
28.4
36.0
14.9 15.6
11.4
SAIFI
Year
Distr ibution Transmission & Generation Total SA IFI
3.0 KEBOLEHARAPAN (RELIABILITY) BEKALAN ELEKTRIKRELIABILITY OF ELECTRICITY SUPPLY
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 27/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Jabatan Kawal Selia Pembekalan dan Pasaran ElektrikElectricity Supply and Market Regulation Department - 27 -
3.6.3 CUSTOMER AVERAGE INTERRUPTION DURATION INDEX (CAIDI)
Gambarajah 31 : CAIDI (Minit/PelangganTerlibat/Tahun) bagi Negeri Sabah untuk :i) Separuh Tahun Pertama 2008, 2009 dan 2010ii) Sepanjang Tahun 2007 Hingga 2009
Figure 31 : CAIDI (Minutes/Interrupted Customer/Year) in Sabah for : i) First Half Year of 2008, 2009 and 2010 ii) In the Year 2007 to 2009
0.00
20.00
40.00
60.00
80.00
100.00
120.00
2007 2008 2009 2008
(Jan-June)
2009
(Jan-June)
2010
(Jan-June)
57.853.5
43.6
56.6
47.0
32.8
71.9
94.3
111.4
91.0
107.9
78.2
61.565.4
79.6
67.372.7
45.2
CAIDI
(in Minutes)
Year
Distr ibution Transmission & Generation Total CA IDI
3.0 KEBOLEHARAPAN (RELIABILITY) BEKALAN ELEKTRIKRELIABILITY OF ELECTRICITY SUPPLY
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 28/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Jabatan Kawal Selia Pembekalan dan Pasaran ElektrikElectricity Supply and Market Regulation Department - 28 -
3.7 SISTEM PENGAGIHAN SEBDISTRIBUTION SYSTEM OF SEB
3.7.1 SYSTEM AVERAGE INTERRUPTION DURATION INDEX (SAIDI)
Gambarajah 32 : SAIDI (Minit/Pelanggan/Tahun)SEB untuk :i) Separuh Tahun Pertama 2008, 2009 dan
2010ii) Sepanjang Tahun 2007 Hingga 2009
Figure 32 : SAIDI (Minutes/Customer/Year) of SEB for : i) First Half Year of 2008, 2009 and 2010 ii) In the Year 2007 to 2009
0
50
100
150
200
250
300
350303
273
216
139117 99
SAIDI
Year
3.0 KEBOLEHARAPAN (RELIABILITY) BEKALAN ELEKTRIKRELIABILITY OF ELECTRICITY SUPPLY
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 29/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Jabatan Kawal Selia Pembekalan dan Pasaran ElektrikElectricity Supply and Market Regulation Department - 29 -
3.8 SISTEM PENGAGIHAN NURDISTRIBUTION SYSTEM OF NUR
3.8.1 SYSTEM AVERAGE INTERRUPTION DURATION INDEX (SAIDI)
Gambarajah 33 : SAIDI Keseluruhan dan Industri(Untuk Pengguna Voltan Tinggi) di Kulim Hi-TechPark (KHTP) yang dilaporkan oleh NURDistribution Sdn. Bhd. untuk :i) Separuh Tahun Pertama 2008, 2009 dan
2010ii) Sepanjang Tahun 2007 Hingga 2009
Figure 33 : Total SAIDI and Industrial SAIDI (for High Voltage Customers only) in Kulim Hi-Tech Park (KHTP) Reported by NUR Distribution Sdn.Bhd. for : i) First Half Year of 2008, 2009 and 2010 ii) In the Year 2007 to 2009
0
20
40
60
80
100
120
140
2006 2007 2008 2009 2010 (Jun)
125
49
2.50 2.82 6.081.091 2.889
0 0.154 0
SAIDI
Year
Overall SAIDI Industrial SAIDI
SAIDI was high because there were twofaults on 11 kV cables, each affecting
number of customers. One of the se faultswas caused by a third party digging up
the cable.
There were two faultson 11 kV cables.
3.0 KEBOLEHARAPAN (RELIABILITY) BEKALAN ELEKTRIKRELIABILITY OF ELECTRICITY SUPPLY
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 30/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Jabatan Kawal Selia Pembekalan dan Pasaran ElektrikElectricity Supply and Market Regulation Department - 30 -
3.9 PRESTASI SISTEM PENGHANTARAN DI SEMENANJUNG MALAYSIAPERFORMANCE OF TRANSMISSION SYSTEM IN PENINSULAR
MALAYSIA
Jadual 2 : Statistik Pelantikan Sistem Penghantaran dengan Kehilangan Beban50 MW Ke Atas untuk Separuh Tahun Pertama 2009
Table 2 : Statistics of Transmission System Tripping with a Load Loss of 50 MW and Above for the First Half Year of 2010
Perkara / Indicators Jan Feb Mar Apr May June
Bilangan Pelantikan
No. of Tripping without Load Shedding 0 1 0 0 0 1
Bilangan Lucutan Beban
No. of Tripping with Load Shedding 0 0 0 0 0 0
Kehilangan Beban Maksimum (MW)
Maximum Load Loss (MW)56 61.5
Tenaga Yang Tidak Dibekalkan SemasaPelantikan (MWj)
Unsupplied Energy due to Tripping (MWh)
112.1 57.3
Purata Tenaga Tidak Dibekalkan SetiapPelantikan (MWj)
Average Unsupplied Energy per Trip (MWh)
112.1 57.3
Purata Tempoh Setiap Pelantikan(Jam:Minit)
Average Duration per Trip (Hour)
2:00 0:56
Tenaga Tidak Dibekalkan SemasaLucutan Beban (MWj)
Unsupplied Energy During Load Shedding (MWh)
0 0 0 0 0 0
3.0 KEBOLEHARAPAN (RELIABILITY) BEKALAN ELEKTRIKRELIABILITY OF ELECTRICITY SUPPLY
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 31/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Jabatan Kawal Selia Pembekalan dan Pasaran ElektrikElectricity Supply and Market Regulation Department - 31 -
Gambarajah 34 : Bilangan Pelantikan SistemPenghantaran di Semenanjung Malaysia denganKehilangan Beban 50 MW ke Atas untuk :i) Separuh Tahun Pertama 2008, 2009 dan
2010ii) Sepanjang Tahun 2007 Hingga 2009
Figure 34 : Number of Transmission System Tripping in Peninsular Malaysia with a Load Loss of 50 MW and Above for : i) First Half Year of 2008, 2009 and 2010 ii) In the Year 2007 to 2009
0
1
2
3
4
5
6
78
9
2007 2008 2009 2008
(Jan-June)
2009
(Jan-June)
2010
(Jan-June)
9
6
2
4
0
2
1
0 0 0 0 0
N o .
o f I n c i d e n t s
Year
No. of Tripping without Load Shedding
No. of Tripping with Load Shedding
3.0 KEBOLEHARAPAN (RELIABILITY) BEKALAN ELEKTRIKRELIABILITY OF ELECTRICITY SUPPLY
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 32/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Jabatan Kawal Selia Pembekalan dan Pasaran ElektrikElectricity Supply and Market Regulation Department - 32 -
4.1 PUNCA GANGGUAN BEKALAN ELEKTRIK – TNBCAUSES OF ELECTRICITY SUPPLY INTERRUPTIONS - TNB
Gambarajah 35 : Punca-Punca Gangguan Bekalan Elektrik Tidak Berjadual diSemenanjung Malaysia
Figure 35 : Causes of Unscheduled Electricity Supply Interruptions in Peninsular Malaysia
2010 (Jan-June)
Natural
disasters*0.10%
Equipment
Failures2.05% Damaged by
Third Parties
13.50%
Process and
Quality ofWork#56.70%
Unknown15.50%
Trees
10.00%
Others##
2.15%
Total of Interruptions = 49,800
(2007-2009)
Naturaldisasters*12.79%
EquipmentFailures2.22%
Damaged byThird Parties
13.59%
Process andQuality of
Work#44.80%
Unknown13.63%
Trees7.69%
Others##5.28%
Total of Interruptions = 294,830
4.0 PUNCA GANGGUAN BEKALAN ELEKTRIKCAUSES OF ELECTRICITY SUPPLY INTERRUPTIONS
Nota :
* (angin, ribut, banjir, tanahruntuh dan lain-lain);
## (Pepasangan kena langgar,kecacatan rekabentuk,kerosakan geganti, transient overload , shorting ,pencerobohan/perbuatankhianat)
# (sambungan tidak baik, mutukerja, beban lampau dansenggaraan)
Notes :
* (wind, storm, flood, land slides and etc.);
## (ageing of insulation, design defect, relay malfunction, transient overload,encroachment/vandalism,maloperation of protection)
# (loose contact, quality of work,overloading and maintenance)
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 33/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Jabatan Kawal Selia Pembekalan dan Pasaran ElektrikElectricity Supply and Market Regulation Department - 33 -
4.2 PUNCA GANGGUAN BEKALAN ELEKTRIK – SESBCAUSES OF ELECTRICITY SUPPLY INTERRUPTIONS - SESB
Gambarajah 36 : Punca-Punca Gangguan Bekalan Elektrik Tidak Berjadual diNegeri Sabah
Figure 36 : Causes of Unscheduled Electricity Supply Interruptions in Sabah
2010 (Jan-June)
NaturalDisasters*
8.6%
Overload7.6%
Third PartyDamage10.8%
Trees15.9%
InstallationFault/Damage
37.2%
Others/No DataKey in/Shut
Down10.3%
Unknown8.4%
Transient1.2%
Total of Interruptions = 9,203
(2007 – 2009)
Natural Disasters*10.8%
Overload7.5%
Third PartyDamage13.0%
Trees15.8%
InstallationFault/Damage
22.6%
Others/No DataKey in/Shut Down
7.9%
Unknown19.3%
Transient3.1%
Total of Interruptions = 57,718
Nota : * (angin, ribut, banjir, tanah runtuh dan lain-lain)
Note : * (wind, storm, flood, land slides and etc.)
4.0 PUNCA GANGGUAN BEKALAN ELEKTRIKCAUSES OF ELECTRICITY SUPPLY INTERRUPTIONS
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 34/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Jabatan Kawal Selia Pembekalan dan Pasaran ElektrikElectricity Supply and Market Regulation Department - 34 -
4.3 PUNCA GANGGUAN BEKALAN ELEKTRIK – SEBCAUSES OF ELECTRICITY SUPPLY INTERRUPTIONS - SEB
Gambarajah 37 : Punca-Punca Gangguan Bekalan Elektrik Tidak Berjadual SEBFigure 37 : Causes of Unscheduled Electricity Supply Interruptions of SEB
2010 (Jan-June)
Natural Disasters*2.7%
Overload10.2%
IncorrectOperation /
Settings0.2%
EquipmentFailures20.9%
Third PartyDamage10.2%
Transient47.2%
Others8.6%
Total of Interruptions = 3,313
(2007 – 2009)
Natural Disasters*3.9%
Overload5.5%
Incorrect Operation / Settings
0.2%
Equipment Failures
25.7%
Third PartyDamage10.1%
Transient42.5%
Others12.2%
Total Interruptions = 18,830
Nota : * (angin, ribut, banjir, tanah runtuh dan lain-lain)
Note : * (wind, storm, flood, land slides and etc.)
4.0 PUNCA GANGGUAN BEKALAN ELEKTRIKCAUSES OF ELECTRICITY SUPPLY INTERRUPTIONS
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 35/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Jabatan Kawal Selia Pembekalan dan Pasaran ElektrikElectricity Supply and Market Regulation Department - 35 -
4.4 PUNCA GANGGUAN BEKALAN ELEKTRIK – NURCAUSES OF ELECTRICITY SUPPLY INTERRUPTION - NUR
Gambarajah 38 : Punca-Punca Gangguan Bekalan Elektrik Tidak Berjadual NURDistribution
Figure 38 : Causes of Unscheduled Electricity Supply Interruptions of NUR Distribution
2010 (Jan-June)
EquipmentFailure22.7%
Overload31.8%
InferiorWorkmanship
31.8%
Third PartyDamage13.6%
Total Interruptions = 22
(2007-2009)
Natural Disasters*5.7%
Equipment Failure
31.4%
Overload13.3%
IncorrectOperation/ Settings1.87%
InferiorWorkmanship
28.6%
Third Party
Damage19.0% Others
1.0%
Total Interruptions = 105
Nota : * (angin, ribut, banjir, tanah runtuh dan lain-lain)
Note : * (wind, storm. Flood, land slides and etc.)
4.0 PUNCA GANGGUAN BEKALAN ELEKTRIKCAUSES OF ELECTRICITY SUPPLY INTERRUPTIONS
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 36/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Jabatan Kawal Selia Pembekalan dan Pasaran ElektrikElectricity Supply and Market Regulation Department - 36 -
5.1 INSIDEN VOLTAGE DIPS – TNBINCIDENTS OF VOLTAGE DIPS - TNB
Gambarajah 39 : Bilangan Insiden Voltage Dips yang dilaporkan di Kawasan-KawasanPerindustrian Utama di Semenanjung Malaysia untuk Separuh Tahun Pertama 2008, 2009 dan
2010Figure 39 : Number of Voltage Dips Incidents Reported in Major Industrial Estates in Peninsular
Malaysia for the First Half Year of 2008, 2009 and 2010
5
0 05
10 0
3
14
0
5
16
24
73
6
0 02
0 0 0
17
11
0 2
75
50
10 0 0 0 1
3
9 9
04
11
18
56
0
20
40
60
80
N o .
o f I n c i d e n t s
Industrial Areas
2008 (Jan-Jun) 2009 (Jan-Jun) 2010 (Jan-Jun)
5.0 KUALITI BEKALAN(POWER QUALITY)
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 37/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Jabatan Kawal Selia Pembekalan dan Pasaran ElektrikElectricity Supply and Market Regulation Department - 37 -
Gambarajah 40 : Bilangan Pengguna Terlibat dalam Insiden Voltage Dips untuk Separuh TahunPertama 2008, 2009 dan 2010
Figure 40 : Number of Customers in the Major Industrial Estates Affected by Voltage Dips for the First Half Year of 2008, 2009 and 2010
60 0
81 0 0 3
22
08
30
70
148
70 0 2 0 0 0
2216
0 27 10
66
1 0 0 0 0 1 3
13 16
0 4
16
38
92
0
20
40
60
80
100
120
140
160
T o t a l
C u s t o m e r s A f f e c t e d
Industrial Areas
2008 (Jan-Jun) 2009 (Jan-Jun) 2010 (Jan-Jun)
5.0 KUALITI BEKALAN(POWER QUALITY)
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 38/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Jabatan Kawal Selia Pembekalan dan Pasaran ElektrikElectricity Supply and Market Regulation Department - 38 -
5.3 INSIDEN VOLTAGE DIPS – KULIM HI-TECH PARK (KHTP)INCIDENTS OF VOLTAGE DIPS – KULIM HI-TECH PARK (KHTP)
Gambarajah 41 : Bilangan Insiden Voltage Dips di KHTP yang dilaporkan oleh NUR DistributionSdn. Bhd. Untuk Separuh Tahun Pertama 2008 Hingga 2010
Figure 41 : Number of Voltage Dips in Kulim Hi-Tech park Reported by NUR Distribution Sdn.Bhd. For the First Half Year of 2008 to 2010
0
2
4
6
8
10
12
14
16
Jan Feb Mar Apr May Jun TotalIncidents
(Jan-June)
4
1
3
1
2
4
15
1
3 3
0
4
5
16
3
01
0
1
4
9
N o . o f I n c i d e n t s R e p o r t e d
Month
2008 (Jan-June) 2009 (Jan-June) 2010 (Jan-June)
5.0 KUALITI BEKALAN(POWER QUALITY)
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 39/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Jabatan Kawal Selia Pembekalan dan Pasaran ElektrikElectricity Supply and Market Regulation Department - 39 -
Gambarajah 42 : Bilangan Pengguna Terlibat Dalam Insiden Voltage Dips di KHTP UntukSeparuh Tahun Pertama 2008 Hingga 2010
Figure 42 : Number of Customers in Kulim Hi-Tech Park Affected by Voltage Dips For the First Half Year of 2008 to 2010
0
2
4
6
8
10
12
14
16
18
Jan Feb Mar Apr May Jun TotalCustomers
Affected(Jan-June)
2
0 0 0
12
3
17
0 0
18
0 0 0
18
12
00 0 0
2
14
N o . o f C u s t o m e r s A f f e c t e d
R e p o r t e d
Month
2008 (Jan-June) 2009 (Jan-June) 2010 (Jan-June)
5.0 KUALITI BEKALAN(POWER QUALITY)
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 40/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Jabatan Kawal Selia Pembekalan dan Pasaran ElektrikElectricity Supply and Market Regulation Department - 40 -
Gambarajah 43 : Insiden Voltage Dips yangdilaporkan Menjejaskan Bekalan KepadaPengguna di KHTP untuk :
i) Separuh Tahun Pertama 2008, 2009 dan2010
ii) Sepanjang Tahun 2007 Hingga 2009
Figure 43 : Incidents of Voltage Dips Affecting Consumers in KHTP for : i) First Half Year of 2008, 2009 and 2010
ii) In the Year 2007 to 2009
0
10
20
30
40
2007 2008 2009 2008 (Jan-June) 2009 (Jan-June) 2010 (Jan-June)
1 1 2 0 0 1
26 26
29
15 16
8
N o .
o f I n c i d e n t s
Year
External (Originated from TNB's Transmission System)
Internal (Originated from NUR's Distribution System)
Gambarajah 44 : Pecahan Bilangan InsidenVoltage Dips yang Melibatkan Pengguna untuk :
i) Separuh Tahun Pertama 2008, 2009 dan2010ii) Sepanjang Tahun 2007 Hingga 2009
Figure 44 : Number of Voltage Dips Incidents Affecting Customers and Not Affecting
Customers in KHTP for : i) First Half Year of 2008, 2009 and 2010 ii) In the Year 2007 to 2009
0
5
10
15
20
25
30
35
2007 2008 2009 2008(Jan-June)
2009(Jan-June)
2010(Jan-June)
16
9
54
1 2
11 18
26
11 15
7
No. of Dips
Year
Voltage Dips Not affecting customers
Voltage Dips affecting customers
5.0 KUALITI BEKALAN(POWER QUALITY)
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 41/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Jabatan Kawal Selia Pembekalan dan Pasaran ElektrikElectricity Supply and Market Regulation Department - 41 -
Gambarajah 45 : Taburan Insiden Voltage Dips di KHTP Pada Tahun 2007 Hingga 2010
(Sehingga Jun) Berdasarkan Standard IEC 61000-4-11 (Class 3)Figure 45 : Incidents of Voltage Dips in KHTP for Year 2007 to 2010 (as at June) Plotted Base on
IEC 61000-4-11 (Class 3)
0.0
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
90.0
100.0
0 400 800 1200 1600 2000 2400 2800 3200 3600 4000
P e r c e n t o f E q u i p m e n t N o m i n a l V o l t a g e ( % )
Duration (milliseconds)
Nur-2007 Nur-2008 Nur-2009 Nur-2010
Customer's Resposibility
Utility's Resposibility
20
5.0 KUALITI BEKALAN(POWER QUALITY)
7/28/2019 Interim Report on the Performance of the Electricity Supply Services in Malaysia
http://slidepdf.com/reader/full/interim-report-on-the-performance-of-the-electricity-supply-services-in-malaysia 42/42
Laporan Interim Separuh Tahun Pertama 2010Interim Report for the First Half Year of 2010
Gambarajah 46 : SARFI70 Bagi NUR untuk :
i) Separuh Tahun Pertama 2008, 2009 dan 2010ii) Sepanjang Tahun 2007 Hingga 2009
Figure 46 : SARFI 70 of NUR for :
i) First Half Year of 2008, 2009 and 2010 ii) In the Year 2007 to 2009
0 0
1
0 0
1
4
2
1
1 1
0
0
1
2
3
4
5
2007 2008 2009 2008 (Jan-June) 2009 (Jan-June) 2010 (Jan-June)
Internal Causes External Causes
Disediakan oleh : Jabatan Kawal Selia Pembekalan dan Pasaran Elektrik
Suruhanjaya Tenaga
Prepared by : Electricity Supply and Market Regulation Department
Energy Commission
5.0 KUALITI BEKALAN(POWER QUALITY)