integrity management of thums cement lined · pdf fileoil & gas pipeline mechanical...

25
Integrity Management of Thums Integrity Management of Thums Cement Lined Pipelines Cement Lined Pipelines

Upload: phamkiet

Post on 10-Feb-2018

224 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Integrity Management of Thums Cement Lined · PDF fileOil & Gas Pipeline Mechanical Integrity • Chemical Inhibition • Pipeline Cleaning Program (Pigging) • DOT Regulated •

Integrity Management of Thums Integrity Management of Thums Cement Lined PipelinesCement Lined Pipelines

Page 2: Integrity Management of Thums Cement Lined · PDF fileOil & Gas Pipeline Mechanical Integrity • Chemical Inhibition • Pipeline Cleaning Program (Pigging) • DOT Regulated •

Thums Subsea PipelinesThums Subsea Pipelines

White

Chaffee

Freeman

Grissom

Original Pipelines installed in 1966Oil , Gas and Water (J-lines) Pipelines

Pier J

Page 3: Integrity Management of Thums Cement Lined · PDF fileOil & Gas Pipeline Mechanical Integrity • Chemical Inhibition • Pipeline Cleaning Program (Pigging) • DOT Regulated •

Thums Subsea PipelinesThums Subsea Pipelines

•• 8 Subsea Pipelines Transport Oil and 8 Subsea Pipelines Transport Oil and Gas to Pier JGas to Pier J

•• Steel LinesSteel Lines•• 66””, 8, 8””,12,12”” and 14and 14”” lineslines•• Water cut in Oil Pipeline ranges from 5% to 70%Water cut in Oil Pipeline ranges from 5% to 70%

•• 4 4 ““JJ--lineslines”” Transport Water fromTransport Water fromPier J to the Islands for RePier J to the Islands for Re--injectioninjection

•• Internally cement Coated LinesInternally cement Coated Lines•• 1212””, 14, 14”” and 18and 18”” lineslines•• Produced water (5ppm oil)Produced water (5ppm oil)

Page 4: Integrity Management of Thums Cement Lined · PDF fileOil & Gas Pipeline Mechanical Integrity • Chemical Inhibition • Pipeline Cleaning Program (Pigging) • DOT Regulated •

Oil & Gas Pipeline Mechanical IntegrityOil & Gas Pipeline Mechanical Integrity

• Chemical Inhibition

• Pipeline Cleaning Program (Pigging)

• DOT Regulated

• Monitoring Program (Inspection Surveys )

• Cathodic Protection

Page 5: Integrity Management of Thums Cement Lined · PDF fileOil & Gas Pipeline Mechanical Integrity • Chemical Inhibition • Pipeline Cleaning Program (Pigging) • DOT Regulated •

•• Cathodic Protection SurveysCathodic Protection Surveys

•• Corrosion InhibitionCorrosion Inhibition

•• Pressure TestingPressure Testing

•• Internal Inspection SurveyInternal Inspection Survey

JJ--Line Mechanical Integrity ProgramLine Mechanical Integrity Program

Page 6: Integrity Management of Thums Cement Lined · PDF fileOil & Gas Pipeline Mechanical Integrity • Chemical Inhibition • Pipeline Cleaning Program (Pigging) • DOT Regulated •

• Generate a potential profile along the entire Pipeline Length

• Test connection to the pipeline is onshore• A silver/silver chloride reference electrode is towed above

the pipeline• Test connection is Maintained to the pipe by spooling out

a light gauge insulated wire

• The pipe-to-electrolyte potential is measured• The polarized potential of the pipeline is measured by cycling rectifiers "ON" and "OFF"

J-Line: CP Over-the-line Survey

Page 7: Integrity Management of Thums Cement Lined · PDF fileOil & Gas Pipeline Mechanical Integrity • Chemical Inhibition • Pipeline Cleaning Program (Pigging) • DOT Regulated •

JJ--Line Line : C: CP Over-the-line Survey

-850

Page 8: Integrity Management of Thums Cement Lined · PDF fileOil & Gas Pipeline Mechanical Integrity • Chemical Inhibition • Pipeline Cleaning Program (Pigging) • DOT Regulated •

•• Heavy residual inhibitor concentrations from Heavy residual inhibitor concentrations from IslandsIslands

•• Pipelines also Treated Continuously with small Pipelines also Treated Continuously with small dosage of Corrosion Inhibitor dosage of Corrosion Inhibitor

•• Corrosion coupons analyzed Corrosion coupons analyzed to track deposit buildto track deposit build--up up that may affect Water Qualitythat may affect Water Quality

JJ--Line Line : : Chemical Corrosion Inhibition

Page 9: Integrity Management of Thums Cement Lined · PDF fileOil & Gas Pipeline Mechanical Integrity • Chemical Inhibition • Pipeline Cleaning Program (Pigging) • DOT Regulated •

• Pipeline is Internally Cement Coated

• Pipelines not able touse UT Smart Pigor MFL Technology

• Video Camera Technology will allow documented visual internal inspections

JJ--Line: Video Inspection SurveyLine: Video Inspection Survey

Page 10: Integrity Management of Thums Cement Lined · PDF fileOil & Gas Pipeline Mechanical Integrity • Chemical Inhibition • Pipeline Cleaning Program (Pigging) • DOT Regulated •

• Determined that Tethered Crawler Video Camera would be used (Fiber optics, zoom lens)

• Ability to Move Cameraback/forward

• Able to pull equipment out if stuck

• Camera allows for magnification of Corrosion areas or other anomalies

JJ--Line: Pipeline Video SurveyLine: Pipeline Video Survey

Page 11: Integrity Management of Thums Cement Lined · PDF fileOil & Gas Pipeline Mechanical Integrity • Chemical Inhibition • Pipeline Cleaning Program (Pigging) • DOT Regulated •

• Use of Crawler required installation of Pig Launchers / Receivers

• 2007/2008 Installed Launchers / Receivers • Allow for Cleaning of the Pipelines• Access for the Inspection Tool

•• Project Cost was approx $2.1MMProject Cost was approx $2.1MM

JJ--Line: Pipeline Video SurveyLine: Pipeline Video Survey

Page 12: Integrity Management of Thums Cement Lined · PDF fileOil & Gas Pipeline Mechanical Integrity • Chemical Inhibition • Pipeline Cleaning Program (Pigging) • DOT Regulated •

JJ--Line: Pipeline Video SurveyLine: Pipeline Video Survey

Page 13: Integrity Management of Thums Cement Lined · PDF fileOil & Gas Pipeline Mechanical Integrity • Chemical Inhibition • Pipeline Cleaning Program (Pigging) • DOT Regulated •

JJ--Line: Pipeline Video SurveyLine: Pipeline Video Survey

Page 14: Integrity Management of Thums Cement Lined · PDF fileOil & Gas Pipeline Mechanical Integrity • Chemical Inhibition • Pipeline Cleaning Program (Pigging) • DOT Regulated •

JJ--Line: Pipeline Video SurveyLine: Pipeline Video Survey

Page 15: Integrity Management of Thums Cement Lined · PDF fileOil & Gas Pipeline Mechanical Integrity • Chemical Inhibition • Pipeline Cleaning Program (Pigging) • DOT Regulated •

JJ--Line: Pipeline Video SurveyLine: Pipeline Video Survey

Page 16: Integrity Management of Thums Cement Lined · PDF fileOil & Gas Pipeline Mechanical Integrity • Chemical Inhibition • Pipeline Cleaning Program (Pigging) • DOT Regulated •

JJ--Line: Pipeline Video SurveyLine: Pipeline Video Survey

Page 17: Integrity Management of Thums Cement Lined · PDF fileOil & Gas Pipeline Mechanical Integrity • Chemical Inhibition • Pipeline Cleaning Program (Pigging) • DOT Regulated •

JJ--Line: Pipeline Video SurveyLine: Pipeline Video Survey

• Lines were Pigged to remove solids

• 5 & 8 lb Foam pigs were used

Page 18: Integrity Management of Thums Cement Lined · PDF fileOil & Gas Pipeline Mechanical Integrity • Chemical Inhibition • Pipeline Cleaning Program (Pigging) • DOT Regulated •

• Initial Survey was in Water

• Lines then pigged to Nitrogen for Better Clarity

•• Crawler Survey distance inhibited byCrawler Survey distance inhibited by•• Condensation in PipelinesCondensation in Pipelines•• Friction from the Tether lineFriction from the Tether line

•• Problems with Crawler Orientation due to Problems with Crawler Orientation due to Piping BendsPiping Bends

JJ--Line Line : Pipeline Video Survey: Pipeline Video Survey

Page 19: Integrity Management of Thums Cement Lined · PDF fileOil & Gas Pipeline Mechanical Integrity • Chemical Inhibition • Pipeline Cleaning Program (Pigging) • DOT Regulated •

JJ--Line Line : : Video Survey

Launcher / ReceiverLauncher / ReceiverPiping BendsPiping Bends

Page 20: Integrity Management of Thums Cement Lined · PDF fileOil & Gas Pipeline Mechanical Integrity • Chemical Inhibition • Pipeline Cleaning Program (Pigging) • DOT Regulated •

Thums JLThums JL--1 Pipeline Video Survey1 Pipeline Video Survey

Page 21: Integrity Management of Thums Cement Lined · PDF fileOil & Gas Pipeline Mechanical Integrity • Chemical Inhibition • Pipeline Cleaning Program (Pigging) • DOT Regulated •

ChaffeeFreeman

Grissom

Pier J

White

JJ--Line Line : : Video Survey

4000’

5000/6100’

5000 / 8100’

4700/8400’2000 3000

2900

1800

Surveyed 70% of the J-lines

Page 22: Integrity Management of Thums Cement Lined · PDF fileOil & Gas Pipeline Mechanical Integrity • Chemical Inhibition • Pipeline Cleaning Program (Pigging) • DOT Regulated •

• Good Visual of the Pipeline Condition

• Internal Cement coating appears to be in good condition

•• Good Weld IntegrityGood Weld Integrity

•• Successful HydrotestSuccessful Hydrotest

••

JJ--Line Line : : Video Survey Summary

Page 23: Integrity Management of Thums Cement Lined · PDF fileOil & Gas Pipeline Mechanical Integrity • Chemical Inhibition • Pipeline Cleaning Program (Pigging) • DOT Regulated •

Thums JLThums JL--1 Pipeline Video Survey1 Pipeline Video SurveyVIDEO_TS\VTS_01_1.VOB

Jlinempeg1.mpg Jlinempeg2.mpg

Page 24: Integrity Management of Thums Cement Lined · PDF fileOil & Gas Pipeline Mechanical Integrity • Chemical Inhibition • Pipeline Cleaning Program (Pigging) • DOT Regulated •

•• Improve the Quality of Inspections for Improve the Quality of Inspections for the Internally Cement Lined Pipelinesthe Internally Cement Lined Pipelines•• Investigate use of a Investigate use of a ““ModifiedModified”” MFL toolMFL tool

•• Investigate use of a Tethered Eddy Current Investigate use of a Tethered Eddy Current Inspection ( SLOFEC)Inspection ( SLOFEC)

•• Continue to investigateContinue to investigateother Inspectionother InspectionTechnologiesTechnologies

JJ--Line Integrity Plan ForwardLine Integrity Plan Forward

Page 25: Integrity Management of Thums Cement Lined · PDF fileOil & Gas Pipeline Mechanical Integrity • Chemical Inhibition • Pipeline Cleaning Program (Pigging) • DOT Regulated •

Questions?