integration procedure dfx vertical part in the tunnel

19
logo area Integration procedure DFX vertical part in the Tunnel R. Betemps, Y. Yang, M. Amparo

Upload: others

Post on 24-Oct-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Integration procedure DFX vertical part in the Tunnel

logo

area

Integration procedure DFX

vertical part in the Tunnel

R. Betemps, Y. Yang, M. Amparo

Page 2: Integration procedure DFX vertical part in the Tunnel

logo

area

Summary

Integration of the DFX in the Tunnel

Tunnel space and working area

DFX unit.

SC link (DSH) with the splice box

Integration process.

R. Betemps 2

Page 3: Integration procedure DFX vertical part in the Tunnel

logo

area

Integration of the DFX in the Tunnel

Reference document for integration EDMS XXXXX

We considerer for the image the point 5L (more critical)

R. Betemps 3

Page 4: Integration procedure DFX vertical part in the Tunnel

logo

area

Integration of the DFX in the Tunnel

R. Betemps 4

Page 5: Integration procedure DFX vertical part in the Tunnel

logo

area

Integration of the DFX in the Tunnel

R. Betemps 5

Page 6: Integration procedure DFX vertical part in the Tunnel

logo

area

Tunnel view for installation Not beam pipe

Free space below the final position

R. Betemps 6

Page 7: Integration procedure DFX vertical part in the Tunnel

logo

area

Tunnel view for installation

R. Betemps 7

Page 8: Integration procedure DFX vertical part in the Tunnel

logo

area

DFX unit

2 sub unit for the DFX

Vertical

Dimensions : 800 x 800 X1750

R. Betemps 8

Horizontal

Dimensions :

Page 9: Integration procedure DFX vertical part in the Tunnel

logo

area

SC link (DSH) with the splice box

End of the SC link DSHx :

R. Betemps 9

Page 10: Integration procedure DFX vertical part in the Tunnel

logo

area

Integration process vertical unit

Top Flange in position

DFX preparation (vertical unit)

SC link (DSHx) in assembling position

Welding & welding check

Move SC link DSHx & DFX in final position

Welding of the accessory

Close the vacuum chamber and adjust the fixation to the top flange

Bend the NbTi busbar

R. Betemps 10

Page 11: Integration procedure DFX vertical part in the Tunnel

logo

area

Top Flange in position

R. Betemps 11

Page 12: Integration procedure DFX vertical part in the Tunnel

logo

area

DFX preparation (vertical unit)

R. Betemps 12

Page 13: Integration procedure DFX vertical part in the Tunnel

logo

area

SC link (DSHx) in assembling position

R. Betemps 13

Page 14: Integration procedure DFX vertical part in the Tunnel

logo

area

Welding & welding check

R. Betemps 14

Page 15: Integration procedure DFX vertical part in the Tunnel

logo

area

Move SC link DSHx & DFX in final position

R. Betemps 15

Page 16: Integration procedure DFX vertical part in the Tunnel

logo

area

Welding of the accessory

R. Betemps 16

Page 17: Integration procedure DFX vertical part in the Tunnel

logo

area

Close the vacuum chamber and adjust the

fixation to the top flange

R. Betemps 17

Page 18: Integration procedure DFX vertical part in the Tunnel

logo

area

Bend the NbTi busbar

R. Betemps 18

Page 19: Integration procedure DFX vertical part in the Tunnel

logo

area

Thank you

R. Betemps 19