integration of aerial imagery, lidar and tls for modelling the melbourne cricket ground (mcg)
TRANSCRIPT
![Page 1: Integration of Aerial Imagery, LiDAR and TLS for modelling the Melbourne Cricket Ground (MCG)](https://reader030.vdocuments.site/reader030/viewer/2022021418/58ee103d1a28ab26498b45db/html5/thumbnails/1.jpg)
![Page 2: Integration of Aerial Imagery, LiDAR and TLS for modelling the Melbourne Cricket Ground (MCG)](https://reader030.vdocuments.site/reader030/viewer/2022021418/58ee103d1a28ab26498b45db/html5/thumbnails/2.jpg)
Confidential 2
![Page 3: Integration of Aerial Imagery, LiDAR and TLS for modelling the Melbourne Cricket Ground (MCG)](https://reader030.vdocuments.site/reader030/viewer/2022021418/58ee103d1a28ab26498b45db/html5/thumbnails/3.jpg)
Integration of Imagery, LiDAR and TLS for modelling the Melbourne Cricket Ground (MCG)
Braith McClure, General Manager Surveying | AAM Pty Ltd 19th November 2015
![Page 4: Integration of Aerial Imagery, LiDAR and TLS for modelling the Melbourne Cricket Ground (MCG)](https://reader030.vdocuments.site/reader030/viewer/2022021418/58ee103d1a28ab26498b45db/html5/thumbnails/4.jpg)
Confidential 4
AAM and the MCG – A long History
• Construction Surveying • Aerial Imagery • LiDAR • Ground Surveying • Dilapidation Surveys • Cadastral Surveying
• Feature surveys • Title surveys .
![Page 5: Integration of Aerial Imagery, LiDAR and TLS for modelling the Melbourne Cricket Ground (MCG)](https://reader030.vdocuments.site/reader030/viewer/2022021418/58ee103d1a28ab26498b45db/html5/thumbnails/5.jpg)
Confidential 5
1. Past works at “the G” 2. Recent P40 Scans of the G to determine Volume 3. Integration with AAM K2Vi models
Todays Agenda
![Page 6: Integration of Aerial Imagery, LiDAR and TLS for modelling the Melbourne Cricket Ground (MCG)](https://reader030.vdocuments.site/reader030/viewer/2022021418/58ee103d1a28ab26498b45db/html5/thumbnails/6.jpg)
Confidential 6
Great Southern Stand
• Construction of new stands – demolition of old • 2006 Commonwealth Games - preparation
![Page 7: Integration of Aerial Imagery, LiDAR and TLS for modelling the Melbourne Cricket Ground (MCG)](https://reader030.vdocuments.site/reader030/viewer/2022021418/58ee103d1a28ab26498b45db/html5/thumbnails/7.jpg)
Confidential 7
Surveying – Leica 1010, 1100 and 1200
• Complex Construction – radial grids – 8 centres • Staggered over several years to allow ongoing use
![Page 8: Integration of Aerial Imagery, LiDAR and TLS for modelling the Melbourne Cricket Ground (MCG)](https://reader030.vdocuments.site/reader030/viewer/2022021418/58ee103d1a28ab26498b45db/html5/thumbnails/8.jpg)
Confidential 8
AAM involved in all works
• Progressing construction/cover/uncover and recover • Certification of tracks
![Page 9: Integration of Aerial Imagery, LiDAR and TLS for modelling the Melbourne Cricket Ground (MCG)](https://reader030.vdocuments.site/reader030/viewer/2022021418/58ee103d1a28ab26498b45db/html5/thumbnails/9.jpg)
Confidential 9
MCG – Scan to determine Volume – Featuring the Leica P40
• AAM with CR Kennedy negotiated to access the turf • Iconic Australian stadium, popular culture icon • Half day of scanning • Determine the volume for Spatial Sciences Conference • ABC Radio and Television interview
• Public interest
![Page 10: Integration of Aerial Imagery, LiDAR and TLS for modelling the Melbourne Cricket Ground (MCG)](https://reader030.vdocuments.site/reader030/viewer/2022021418/58ee103d1a28ab26498b45db/html5/thumbnails/10.jpg)
Confidential 10
MCG – Scan to determine Volume – Featuring the Leica P40
![Page 11: Integration of Aerial Imagery, LiDAR and TLS for modelling the Melbourne Cricket Ground (MCG)](https://reader030.vdocuments.site/reader030/viewer/2022021418/58ee103d1a28ab26498b45db/html5/thumbnails/11.jpg)
Confidential 11
MCG – Scan to determine Volume – Featuring the Leica P40
• 1 MCG = 1,574,000m3
• = 1,574 Megalitres
• = 1.574 Gigalitres. • Equivalent to:
• Rio Tinto mined 37 MCGs in 2014
• Melbourne water use on Monday – 68% of the MCG
• Hong Kong Fresh water – 1.7 times MCG daily
• Hong Kong Seawater (flushing) – 0.5 times MCG
• 630 Olympic swimming pools to fill the MCG
• 9837 London busses
![Page 12: Integration of Aerial Imagery, LiDAR and TLS for modelling the Melbourne Cricket Ground (MCG)](https://reader030.vdocuments.site/reader030/viewer/2022021418/58ee103d1a28ab26498b45db/html5/thumbnails/12.jpg)
"Most of our documents and drawings are in two-dimensional format, so that way we'll be able to understand the volume of the MCG - how many swimming pools it is, how many people you could potentially put in here, so it's great for us," he said. - Peter Wearne – GM Facilities, MCC
![Page 13: Integration of Aerial Imagery, LiDAR and TLS for modelling the Melbourne Cricket Ground (MCG)](https://reader030.vdocuments.site/reader030/viewer/2022021418/58ee103d1a28ab26498b45db/html5/thumbnails/13.jpg)
Confidential 13
Integrate ground survey with 3D GIS • 3D GIS Tools to support decision making • Rigorous Spatial Foundation
City model of Melbourne included input from: • Leica Pegasus and ALS60 LiDAR units • DMC55, DMC45, DMC121 camera systems
Integration of “macro” city models and “micro” data capture • New inputs including ground based data capture • MLS and TLS – typical inputs
![Page 14: Integration of Aerial Imagery, LiDAR and TLS for modelling the Melbourne Cricket Ground (MCG)](https://reader030.vdocuments.site/reader030/viewer/2022021418/58ee103d1a28ab26498b45db/html5/thumbnails/14.jpg)
Confidential 14
• Multi-purpose 3D Spatial Infrastructure
• Smart cities – many things to many people
• More and more detail demanded
• Concept planning now advancing to detail design
• Master planning is now BIM integration
• Textured models are now immersive interaction
• AAM Leading the integration of myriad of datasets
Mature use of 3D GIS – Rapid Evolution to SMART CITIES
![Page 15: Integration of Aerial Imagery, LiDAR and TLS for modelling the Melbourne Cricket Ground (MCG)](https://reader030.vdocuments.site/reader030/viewer/2022021418/58ee103d1a28ab26498b45db/html5/thumbnails/15.jpg)
Confidential 15
Anticipating the future in Smart Cities:
15
3D City Model as a Legal and Design Framework
• 3D Cadastre Strata 3D buildings with Property Base and LIS associativity • BIM integration in 3D 3D GIS tools to accept and ingest BIM submissions
• Internet of things Digital world to represent reality
All requires Data Integration, Visualisation, Access and Usability A whole conference in itself!
![Page 16: Integration of Aerial Imagery, LiDAR and TLS for modelling the Melbourne Cricket Ground (MCG)](https://reader030.vdocuments.site/reader030/viewer/2022021418/58ee103d1a28ab26498b45db/html5/thumbnails/16.jpg)
Confidential 16
Smart Buildings inside Smart Cities
![Page 17: Integration of Aerial Imagery, LiDAR and TLS for modelling the Melbourne Cricket Ground (MCG)](https://reader030.vdocuments.site/reader030/viewer/2022021418/58ee103d1a28ab26498b45db/html5/thumbnails/17.jpg)
Confidential 17
![Page 18: Integration of Aerial Imagery, LiDAR and TLS for modelling the Melbourne Cricket Ground (MCG)](https://reader030.vdocuments.site/reader030/viewer/2022021418/58ee103d1a28ab26498b45db/html5/thumbnails/18.jpg)
Confidential 18