integrating pathway hub: a prime contractor model

12
Copyright 2011 Right Care Integrating Pathway Hub: A Prime Contractor Model Dr. Alan Nye Director Pennine MSK Partnership Ltd January 2014 Online Learning Series Right Care for Populations

Upload: mervyn

Post on 23-Feb-2016

31 views

Category:

Documents


0 download

DESCRIPTION

Online Learning Series Right Care for Populations. Integrating Pathway Hub: A Prime Contractor Model. Dr. Alan Nye Director Pennine MSK Partnership Ltd January 2014. What’s the Problem?. System of Care Micro-commissioning complex care pathways Perverse incentives – PbR - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Integrating Pathway  Hub:  A Prime Contractor Model

Copyright 2011 Right Care

Integrating Pathway Hub: A Prime Contractor Model

Dr. Alan NyeDirector Pennine MSK Partnership LtdJanuary 2014

Online Learning Series Right Care for Populations

Page 2: Integrating Pathway  Hub:  A Prime Contractor Model

2

What’s the Problem?System of Care

• Micro-commissioning complex care pathwayso Perverse incentives – PbRo KPIs process driven not population level

improvement or patient experienceo No effective performance management

of care• Lack of true clinical leadership • Separation from clinical accountability from

financial responsibility

Page 3: Integrating Pathway  Hub:  A Prime Contractor Model

3

Integrating Hub Model

Page 4: Integrating Pathway  Hub:  A Prime Contractor Model

4

Oldham

Page 5: Integrating Pathway  Hub:  A Prime Contractor Model

5

Pennine MSK• Primary Care based organisation

commissioned by NHS Oldham to provide non admitted care in rheumatology, orthopaedics and chronic pain

• Consultant led – provide 97% rheumatology and take patients to point of listing in Orthopaedics

• From May 2011 control £23m programme budget for MSK using prime vendor model

• Psychological medicine for chronic pain• 9,500 new referrals a year• Deliver traditional hospital based services

from community – biologics and infusions• GP and Registrar training

Page 6: Integrating Pathway  Hub:  A Prime Contractor Model

6

Programme Budget Commissioning

Different from standard care

• Commission for defined population with a defined budget

• Commissioners have population quality based KPIs

• Have prime contractor which shares responsibility for care co-ordination and performance management

Page 7: Integrating Pathway  Hub:  A Prime Contractor Model

7

NHS Oldham Programme Budget’s

MSK - £23m - Pennine MSK 1st May 2011

Primary Care• Local enhanced services

Community Care• Pennine MSK• Physiotherapy, podiatry

Secondary Care• All activity included

Page 8: Integrating Pathway  Hub:  A Prime Contractor Model

8

Delivering Integration

• Commissioner will focus on clinical outcomes rather than process metric

• Patients at the centre of our redesign

• Work with third sector• Use self management and self

referral were clinically appropriate

Page 9: Integrating Pathway  Hub:  A Prime Contractor Model

9

Pennine MSK Impact

Reducing per capita cost whilst maintaining quality

Page 10: Integrating Pathway  Hub:  A Prime Contractor Model

10

Pennine MSK ImpactReducing per capita cost whilst maintaining quality

Page 11: Integrating Pathway  Hub:  A Prime Contractor Model

11

Building on success…

• In 2013 Oldham has developed Programme Budget Commissioning for a Mental Health programme

• Over the coming year the CCG will develop this approach over a whole range of programmes.

Page 12: Integrating Pathway  Hub:  A Prime Contractor Model

12

Online Learning Series Right Care for Populations

Follow Right Care online• Subscribe to get a weekly digest

of our blog alerts in your inbox, • Receive occasional eBulletins • Follow us on Twitter

@qipprightcare

Find the full series at:

www.rightcare.nhs.uk/resourcecentre

Join our network:

www.rightcare.nhs.uk/network