Steel Plate Cutting and Welding Shop
StructuralAssembly Hall
Pipe SpoolFabrication Shop
Piping NDEShop
Pipe SpoolPaint Blast Shops
Ambient/TemperatureControlled Warehouse
Administation/Engineering O�ces
#2 PaintBlast Shops
Out�tting andPre-Assembly
Area300m x 120m
Out�tting andPre-Assembly
Area350m x 120m
Out�tting andPre-Assembly
Area300m x 280m
Out�tting andPre-Assembly
Area325m x 230m
Out�tting andPre-Assembly
Area300m x 230m
#1 PaintBlast Shops
Pipe SpoolLaydown
180m x 160m
AssemblyArea
680m x 520m
Integrated Workflow
Receipt and storage of all equipment and materials
Cut steel plates and shapes move into the structural assembly workshop
Completed structural blocks move from the assembly workshop into the structural blast and paint shops
Pipe spool fabrication
Pipe spools move into pipe blast and paint
Completed pipe spools move to laydown area.
Painted structural blocks move to the pre-assembly area for pipe spool and outfitting installation
Complete sections move from the pre-assembly area to primary assembly area for final assembly and pre-commissioning
#3 Skidway (2 skid rails with nominal capacity - 12,000MT)
#2 Skidway - (4 skid rails with nominal capacity - 25,000MT)
#1 Skidway - (3 skid rails with 312 MT/m capacity)
Quayside loadout via skidways or SPMT (14m water depth)