integrated refining & gasification rbc 9 2009

17
1 06/26/22 © 2009 General Electric Company. GE Energy Gasification Integrated Refining and Gasification

Upload: rcarpe

Post on 12-Jun-2015

273 views

Category:

Documents


1 download

DESCRIPTION

Presented at the ERTC Coking & Gasification Conference in Budapest, Hungary 2009

TRANSCRIPT

Page 1: Integrated Refining & Gasification   Rbc 9 2009

1

04/13/23

© 2009 General Electric Company.

GE Energy

Gasification

Integrated Refining and Gasification

Page 2: Integrated Refining & Gasification   Rbc 9 2009

2

04/13/23

© 2009 General Electric Company.

Agenda

Tough challenges ahead

Coke piles everywhere

Gasification can help

Case studies

GE experience

GE technology leadership

Summary

Page 3: Integrated Refining & Gasification   Rbc 9 2009

3

04/13/23

© 2009 General Electric Company.

How will your refinery remain profitable?

Source: Mitretek, GTC 20001For a typical 150MBPD refinery to meet Tier II specs

Tough challenges ahead for refiners• Crude getting heavier/sour (more petcoke)

• Emissions rules shrinking coke segment

• Shrinking Fuel Oil demand

• Need to create value from bottom products

Excess coke, deficit hydrogen

• Plant & fuel level emissions mandates

• Increased hydrogen demand +38MMscfd1

• Increasing costs of power and gas

+

Page 4: Integrated Refining & Gasification   Rbc 9 2009

4

04/13/23

© 2009 General Electric Company.

Gasification … one way to break free

• Removes NG price volatility from H2 and fuel costs

• Revalues existing/planned bottoms to power, H2, syngas, CTL

• Increased flexibility in crude selection (opportunity crudes, differentials)

• Become a power exporter vs importer

Page 5: Integrated Refining & Gasification   Rbc 9 2009

5

04/13/23

© 2009 General Electric Company.

H2 feedstock is “piling up” in your plant

60

70

80

90

100

110

120

2005 2020

Global petcoke production Mt/yr

A growing problem

Source: Mitretek, GTC 20001Jacobs Consultancy – Alberta Petcoke ForecastERCB – Alberta’s Energy Reserves 2007

•Global petcoke production to increase 50% by 2020

•Alberta held inventories of more than 50MM tons in 2007

•More than 220MM MT in Alberta long-term storage by 2020

Increasing glut of inventory

But … “It has the potential of becoming a future energy resource through a process called gasification and could possibly reduce the demand for natural gas.” - Energy Resources Conservation Board

Mitretek, GTC 2000

ERCB – Alberta’s Energy Reserves 2007

0

10

20

30

40

50

60

1977 1983 1989 1995 2001 2007

MM tons

Page 6: Integrated Refining & Gasification   Rbc 9 2009

6

04/13/23

© 2009 General Electric Company.

Petcoke makes a great gasifier feed

Source: DTE Petcoke

$0.00

$2.00

$4.00

$6.00

$8.00

$10.00

$12.00

$14.00

Ja

n-9

8

Ju

l-9

8

Ja

n-9

9

Ju

l-9

9

Ja

n-0

0

Ju

l-0

0

Ja

n-0

1

Ju

l-0

1

Ja

n-0

2

Ju

l-0

2

Ja

n-0

3

Ju

l-0

3

Ja

n-0

4

Ju

l-0

4

Ja

n-0

5

Ju

l-0

5

Ja

n-0

6

Ju

l-0

6

Ja

n-0

7

Ju

l-0

7

$ / M

MB

tu

USGC Pet Coke Henry Hub Monthly #6 Oil, NY 3%S CAPP Coal, 1%S FOB Big Sandy

Historically low price vs natural gas

• Has a very high BTU content• Low ash content – no need to “melt rocks”• No transportation costs “Refinery Mine-Mouth”• Eliminate coke logistics needs (shipping, marketing, liability)

Page 7: Integrated Refining & Gasification   Rbc 9 2009

7

04/13/23

© 2009 General Electric Company.

Synergies with existing refinery

• Coke handling facility for feed and slag disposal• Reuse SMR & steam boilers for backup• Disposal of RCRA wastes, off spec oils, heavy cycle oil, resid, etc.

Source: NETL, Tomlinson, “Potential of Gasification in the Refining Industry,” June 2000

Page 8: Integrated Refining & Gasification   Rbc 9 2009

8

04/13/23

© 2009 General Electric Company.

GE Gasificati

on

Gas Cooling

Oxygen

Visbreaker Tar

Sulfur

Sulfur Removal

& Recovery

Steam to Refinery

Power to Grid

Sarlux S.r.l. Refinery Polygeneration

GE Combined Cycle

Hydrogen

Production

H2 to Refinery

150 t/h

551 MW

40,000 Nm3/h

LP =85 t/h

Wastewater

Pretreatment

Filter Caketo metals reclaimer

Steam to Refinery MP =

100 t/h

90+% availability (no

spare)

Licensee/Owner: Sarlux S.r.l

Operator: SARAS S.p.A.

Location: Sarroch (Cagliari), Sardinia, Italy

Startup: 2001

Feedstock: Visbreaker tar

Design Capacity: 50 t/h (per gasifier)

Gasifier Size: 3 x 900 ft³

Power BlocK: 550MW – 3x109E CC Units

Page 9: Integrated Refining & Gasification   Rbc 9 2009

Gasification reduces plant emissions

Refinery before gasification

DM 12/07/90 Authority limits

Refinery after GE gasification technology

0200400600800

100012001400160018002000

S0x NOx Particulates

1700

400

74

500

200

52 80 50 10

*Data provided with permission of ISAB Energy Services on behalf of ERG

Em

iss

ion

s (

mg

/Nm

3)

Page 10: Integrated Refining & Gasification   Rbc 9 2009

10

04/13/23

© 2009 General Electric Company.

Average availability 93%*

Average reliability 96%*

Best availability 95%

Best reliability 99%

Speed…recent startups Project Contract to Gasifier First-year

Mechanical Completion Configuration availabilityA 30 months 2+1 900 ft³ @ 40 bar 92%B 26 months 2+1 450 ft³ @ 40 bar 86%C 24 months 1+1 900 ft³ @ 85 bar 90%D 32 months 2+1 450 ft³ @ 65 bar 94%E 32 months 2+1 900 ft³ @ 65 bar 90%F 34 months 3+1 450 ft³ @ 40 bar N/AG 34 months 2+1 450 ft³ @ 40 bar N/AH 26 months 2+1 450 ft³ @ 65 bar N/AI 33 months 2+1 900 ft³ @ 65 bar N/A

Availability increasing with experience

* Customer supplied data

3 yr

ava

ilab

ility

Page 11: Integrated Refining & Gasification   Rbc 9 2009

11

04/13/23

© 2009 General Electric Company.

GE Energy: gasification leadership

GE Energy’s Experience

• Gasification leader since 1948

• 65 facilities worldwide (+20 under construction)

• ~120 gasification vessels in operation

• 1966: first heavy fuel oil gasification

• 27 plants today on liquid fuels

• 27 turbines with syngas

• 1MM+ operating hours

• 33 projects globally that separate CO2

Page 12: Integrated Refining & Gasification   Rbc 9 2009

12

04/13/23

© 2009 General Electric Company.

GE gasification experience

0

5

10

15

20

25

30

35

Gas Liquid Solid

Operating E/C

Experience by regions

Experience by feedstock type

2027

16

218

0

5

10

15

20

25

30

35

40

Gas Liquid Solid

Nu

mb

er

of

pla

nts

31

17 15

12

7

0

5

10

15

20

25

30

35

40

45

50

Asia EU N. America

Nu

mb

er o

f p

lan

ts

Page 13: Integrated Refining & Gasification   Rbc 9 2009

13

04/13/23

© 2009 General Electric Company.

GE gasification experience

0

5

10

15

20

25

30

35

Gas Liquid Solid

Operating E/C

Experience by feedstock type

Experience by end products produced

17

107

16

6 7

4

7

3

1

5

0

5

10

15

20

25

Ammonia &Derivatives

Methanol &Derivatives

CO Acetic Acid Oxochemicals Power, Steam,H2

Other Products

Nu

mb

er

of

pla

nts

1

13

30

19

1

15

4

0

5

10

15

20

25

30

35

40

Asphalt/Asphaltenes Coal & Blends Refinery Products Natural Gas

Nu

mb

er

of

pla

nts

Page 14: Integrated Refining & Gasification   Rbc 9 2009

14

04/13/23

© 2009 General Electric Company.

GE Energy & Schlumberger alliance

Accelerate IGCC with CCS technology…

With combined expertise…

• GE Energy–IGCC –Carbon capture technology

• Schlumberger Carbon Services–Geologic storage–Site selection, characterization & qualification

To deliver… Technical & commercial certainty for CCS

Page 15: Integrated Refining & Gasification   Rbc 9 2009

15

04/13/23

© 2009 General Electric Company.

High Plains Gasification Advanced Technology Center

• World-class gasification research facility• Joint development with U of Wyoming • High efficiency feed system• Powder River Basin coals• Adv technologies• Operability & controls• Fuel flexibility• Expected COD 2012

Developing the next generation of gasification technologies

Page 16: Integrated Refining & Gasification   Rbc 9 2009

16

04/13/23

© 2009 General Electric Company.

Summary

www.ge-energy.com/[email protected]

Tough challenges ahead

Coke piles everywhere

Gasification can help

Case studies

GE experience

GE technology leadership

Page 17: Integrated Refining & Gasification   Rbc 9 2009

17

04/13/23

© 2009 General Electric Company.

GE Energy

Gasification

Integrated Refining and Gasification