integrated project delivery · chris bayley, p.eng, pmp •project manager and professional...
TRANSCRIPT
![Page 1: Integrated Project Delivery · Chris Bayley, P.Eng, PMP •Project Manager and professional Engineer with 20 years’ experience in the oil, gas and energy industries. •Managed](https://reader033.vdocuments.site/reader033/viewer/2022050119/5f4fb231205a7515db1be88b/html5/thumbnails/1.jpg)
Integrated Project Delivery
![Page 2: Integrated Project Delivery · Chris Bayley, P.Eng, PMP •Project Manager and professional Engineer with 20 years’ experience in the oil, gas and energy industries. •Managed](https://reader033.vdocuments.site/reader033/viewer/2022050119/5f4fb231205a7515db1be88b/html5/thumbnails/2.jpg)
Landon Lonsberry, P.Eng
• Experienced Project Engineer and Project Manager on high profile pipeline replacement and abandonment/decommissioning projects.
• Subject matter expert on pipeline decommissioning and abandonment.
• Authored decommissioning standards, developed and executed pipeline cleaning runs, developed and navigated regulatory applications and hearings, and estimated future decommissioning and abandonment projects.
• Presenter at pipeline conferences and member of industry committees looking to establish guidelines for the abandonment of aging pipeline infrastructure.
![Page 3: Integrated Project Delivery · Chris Bayley, P.Eng, PMP •Project Manager and professional Engineer with 20 years’ experience in the oil, gas and energy industries. •Managed](https://reader033.vdocuments.site/reader033/viewer/2022050119/5f4fb231205a7515db1be88b/html5/thumbnails/3.jpg)
Chris Bayley, P.Eng, PMP
• Project Manager and professional Engineer with 20 years’ experience in the oil, gas and energy industries.
• Managed scope, schedule, budget, quality, and safety of front-end engineering and detailed design phases of major pipeline projects.
• Experienced in providing support during the construction phase and coordinating project turnover to operations.
• Champion of collaborative project management, aligning the interests of all stakeholders, and creating a successful team environment to achieve a common goal.
![Page 4: Integrated Project Delivery · Chris Bayley, P.Eng, PMP •Project Manager and professional Engineer with 20 years’ experience in the oil, gas and energy industries. •Managed](https://reader033.vdocuments.site/reader033/viewer/2022050119/5f4fb231205a7515db1be88b/html5/thumbnails/4.jpg)
ABOUT PLEX PROJECTS
We are a team of engineers and project managers
with a strong set of experience in complex pipeline
projects. We understand favorable projects will
result from accommodating effective stakeholder
engagement, safety, risk management, regulatory
and environmental compliance, and cost and
schedule certainty.
Our team understands the entirety of pipeline
projects from the pipeline owner’s perspective and
as such have adopted a unique delivery model
focused on driving quality, safety, cost, and
schedule certainty.
By engaging the key team members throughout
the project lifecycle, Plex ensures that Precise
planning results in effective execution.
![Page 5: Integrated Project Delivery · Chris Bayley, P.Eng, PMP •Project Manager and professional Engineer with 20 years’ experience in the oil, gas and energy industries. •Managed](https://reader033.vdocuments.site/reader033/viewer/2022050119/5f4fb231205a7515db1be88b/html5/thumbnails/5.jpg)
OUR WHY
The vision of Plex was borne out of our frustrations while
managing major pipeline projects for Canada’s largest pipeline
company. Using the traditional approach to deliver pipeline
projects created a disconnect between engineering design and
construction that consistently led to costly change orders and
schedule delays, poor quality, and broken relationships.
We utilize the fundamental alignment of interests and collaboration
to consistently and reliably execute projects on schedule and on-
budget without the creation of adversarial interactions typically
created by conventional project delivery methods.
![Page 6: Integrated Project Delivery · Chris Bayley, P.Eng, PMP •Project Manager and professional Engineer with 20 years’ experience in the oil, gas and energy industries. •Managed](https://reader033.vdocuments.site/reader033/viewer/2022050119/5f4fb231205a7515db1be88b/html5/thumbnails/6.jpg)
Traditional Project Delivery
![Page 7: Integrated Project Delivery · Chris Bayley, P.Eng, PMP •Project Manager and professional Engineer with 20 years’ experience in the oil, gas and energy industries. •Managed](https://reader033.vdocuments.site/reader033/viewer/2022050119/5f4fb231205a7515db1be88b/html5/thumbnails/7.jpg)
Traditional Project Delivery
As the Project kicks off and changes against the original agreement
occur, EPCs and contractors are driven to protect their profit margins and
win the next project.
Owners want to see the facility or pipeline operating at the planned start
time. From an owner’s perspective the sooner they can realize operating
revenues the better.
![Page 8: Integrated Project Delivery · Chris Bayley, P.Eng, PMP •Project Manager and professional Engineer with 20 years’ experience in the oil, gas and energy industries. •Managed](https://reader033.vdocuments.site/reader033/viewer/2022050119/5f4fb231205a7515db1be88b/html5/thumbnails/8.jpg)
Example: Cromer Cleaning Project
• Installation of temporary traps
• Loading of a Cleaning Train
• Multiple batches of chemistry and water
• Propel Cleaning Train using N2
• Receipt and disposal of the cleaning train
• Collection of Samples from water
![Page 9: Integrated Project Delivery · Chris Bayley, P.Eng, PMP •Project Manager and professional Engineer with 20 years’ experience in the oil, gas and energy industries. •Managed](https://reader033.vdocuments.site/reader033/viewer/2022050119/5f4fb231205a7515db1be88b/html5/thumbnails/9.jpg)
Example Project Results
• Contractor - $500 K →$2.5 MM
• Engineering Consultant - $50 K → $125 K
• Schedule - 1.5 months → 3.5 months
![Page 10: Integrated Project Delivery · Chris Bayley, P.Eng, PMP •Project Manager and professional Engineer with 20 years’ experience in the oil, gas and energy industries. •Managed](https://reader033.vdocuments.site/reader033/viewer/2022050119/5f4fb231205a7515db1be88b/html5/thumbnails/10.jpg)
Single Contract
Shared Risk
Shared Compensation
Project Owner
EPCM Consultant Pipeline Contractor
![Page 11: Integrated Project Delivery · Chris Bayley, P.Eng, PMP •Project Manager and professional Engineer with 20 years’ experience in the oil, gas and energy industries. •Managed](https://reader033.vdocuments.site/reader033/viewer/2022050119/5f4fb231205a7515db1be88b/html5/thumbnails/11.jpg)
Integrated Project Delivery
1. Early involvement of key participants
• EPCM and Pipeline Contractor selected together
2. Shared risk and reward based on project outcome
3. Jointly developed and validated targets
• Workshops in early phases of projects to openly share
corporate targets. The parties need to be able to openly
discuss their goals and concerns and to trust the
information being provided by their prospective teammates.
4. Reduced liability exposure
• Alternate contract document
5. Joint project control
• Open communication throughout project lifecycle
![Page 12: Integrated Project Delivery · Chris Bayley, P.Eng, PMP •Project Manager and professional Engineer with 20 years’ experience in the oil, gas and energy industries. •Managed](https://reader033.vdocuments.site/reader033/viewer/2022050119/5f4fb231205a7515db1be88b/html5/thumbnails/12.jpg)
Integrated Project Delivery
“IPD achieves statistically significant improvements in 14 metrics
across six performance areas: quality, schedule, project changes,
communication among stakeholders, environmental, and financial
performance. The major contribution of this paper is demonstrating that
IPD provides higher quality facilities faster and at no significant cost
premium.”
Quantifying Performance for the Integrated Project Delivery System as Compared to Established Delivery Systems
Mounir El Asmar, Ph.D., M.ASCE 1; Awad S. Hanna, Ph.D., F.ASCE 2; and Wei-Yin Loh, Ph.D.https://www.ipda.ca/research-performance/industry-research
Mosaic Centre,
Edmonton, AB
![Page 13: Integrated Project Delivery · Chris Bayley, P.Eng, PMP •Project Manager and professional Engineer with 20 years’ experience in the oil, gas and energy industries. •Managed](https://reader033.vdocuments.site/reader033/viewer/2022050119/5f4fb231205a7515db1be88b/html5/thumbnails/13.jpg)
Integrated Project Delivery
EVALUATION OF INTEGRATED PROJECT DELIVERY ON THE PERFORMANCE OF CONSTRUCTION PROJECTSby Andrew W. Olsen https://minds.wisconsin.edu/bitstream/handle/1793/66682/MS_Thesis_Olsen_Andrew.pdf?sequence=1
![Page 14: Integrated Project Delivery · Chris Bayley, P.Eng, PMP •Project Manager and professional Engineer with 20 years’ experience in the oil, gas and energy industries. •Managed](https://reader033.vdocuments.site/reader033/viewer/2022050119/5f4fb231205a7515db1be88b/html5/thumbnails/14.jpg)
Example: Right-of-Way Planning Utilizing IPD
![Page 15: Integrated Project Delivery · Chris Bayley, P.Eng, PMP •Project Manager and professional Engineer with 20 years’ experience in the oil, gas and energy industries. •Managed](https://reader033.vdocuments.site/reader033/viewer/2022050119/5f4fb231205a7515db1be88b/html5/thumbnails/15.jpg)
Example: Construction Execution Planning Utilizing IPD
![Page 16: Integrated Project Delivery · Chris Bayley, P.Eng, PMP •Project Manager and professional Engineer with 20 years’ experience in the oil, gas and energy industries. •Managed](https://reader033.vdocuments.site/reader033/viewer/2022050119/5f4fb231205a7515db1be88b/html5/thumbnails/16.jpg)
Benefits
• Efficient execution, resulting in:
• higher productivity to achieve schedule
milestones
• repeatable cost certainty
• open communication resulting in improved
quality metrics
• fewer changes required during field work
• Improved relationships with external stakeholders
• Improved team culture, leading to increased morale and retention
• Faster integration into operations
![Page 17: Integrated Project Delivery · Chris Bayley, P.Eng, PMP •Project Manager and professional Engineer with 20 years’ experience in the oil, gas and energy industries. •Managed](https://reader033.vdocuments.site/reader033/viewer/2022050119/5f4fb231205a7515db1be88b/html5/thumbnails/17.jpg)
Benefits
• Creates Alignment within the IPD team
• Creates Visibility - removes excuses and creates accountability
• Creates Empowerment by
• getting the right information
• to the right person
• in the right format
• at the right time
• Creates Benchmarking for continuous improvement
![Page 18: Integrated Project Delivery · Chris Bayley, P.Eng, PMP •Project Manager and professional Engineer with 20 years’ experience in the oil, gas and energy industries. •Managed](https://reader033.vdocuments.site/reader033/viewer/2022050119/5f4fb231205a7515db1be88b/html5/thumbnails/18.jpg)
![Page 19: Integrated Project Delivery · Chris Bayley, P.Eng, PMP •Project Manager and professional Engineer with 20 years’ experience in the oil, gas and energy industries. •Managed](https://reader033.vdocuments.site/reader033/viewer/2022050119/5f4fb231205a7515db1be88b/html5/thumbnails/19.jpg)
The Plex Value Proposition
• Resources are provided at cost
• Development of high value engineering and execution plans
• Development of a highly accurate project estimate based on the
team’s input
• Generation of a fixed price contract for the construction of the
project
• EPCM Consultant’s and Pipeline Contractor’s profits contingent upon successfully meeting the project objectives
![Page 20: Integrated Project Delivery · Chris Bayley, P.Eng, PMP •Project Manager and professional Engineer with 20 years’ experience in the oil, gas and energy industries. •Managed](https://reader033.vdocuments.site/reader033/viewer/2022050119/5f4fb231205a7515db1be88b/html5/thumbnails/20.jpg)
Next Steps
• Determine an appropriate project for IPD implementation
• Create a Team
• Project Owner
• EPCM Consultant (Plex)
• Pipeline Contractor
• Steering Committee
• Plan and Execute!
![Page 21: Integrated Project Delivery · Chris Bayley, P.Eng, PMP •Project Manager and professional Engineer with 20 years’ experience in the oil, gas and energy industries. •Managed](https://reader033.vdocuments.site/reader033/viewer/2022050119/5f4fb231205a7515db1be88b/html5/thumbnails/21.jpg)
Additional Reading
• Integrated Project Delivery Alliance (www.ipda.ca)
• Industry Research
• Tools
• “The IPD Framework”
• Chandos Construction https://www.chandos.com/expertise/integrated-project-delivery/
• Mosaic Centrehttps://www.primedmosaiccentre.com/how-we-did-it/volume-3-ipd-process/
• “Basis for an Integrated Project Delivery Team”
![Page 22: Integrated Project Delivery · Chris Bayley, P.Eng, PMP •Project Manager and professional Engineer with 20 years’ experience in the oil, gas and energy industries. •Managed](https://reader033.vdocuments.site/reader033/viewer/2022050119/5f4fb231205a7515db1be88b/html5/thumbnails/22.jpg)
CONTACT US
We look forward to collaborating with you.
Landon Lonsberry P.Eng
President and CEO
780.999.9145
Chris Bayley P.Eng, PMP
Vice President and COO
780.982.7327
![Page 23: Integrated Project Delivery · Chris Bayley, P.Eng, PMP •Project Manager and professional Engineer with 20 years’ experience in the oil, gas and energy industries. •Managed](https://reader033.vdocuments.site/reader033/viewer/2022050119/5f4fb231205a7515db1be88b/html5/thumbnails/23.jpg)