integrated greenhouse project phase 0 (2003/4) seeda 2003 seed funding - £40k

18
‘Greening the Greenhouse’ at The Living Rainforest: From Biomass to EC Flagship? Low Carbon Buildings Programme 2, Opening Event, BRE Watford, 2 June 2008

Upload: marcos

Post on 11-Jan-2016

26 views

Category:

Documents


0 download

DESCRIPTION

‘Greening the Greenhouse’ at The Living Rainforest: From Biomass to EC Flagship? Low Carbon Buildings Programme 2, Opening Event, BRE Watford, 2 June 2008. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Integrated Greenhouse Project Phase 0 (2003/4) SEEDA 2003 Seed funding - £40k

‘Greening the Greenhouse’ at The Living Rainforest:

From Biomass to EC Flagship?

Low Carbon Buildings Programme 2, Opening Event, BRE Watford, 2 June 2008

Page 2: Integrated Greenhouse Project Phase 0 (2003/4) SEEDA 2003 Seed funding - £40k

Creating a sustainability experience, connecting global and local issues

& promoting sustainable ways of living to

safeguard future communities and ecosystems

Page 3: Integrated Greenhouse Project Phase 0 (2003/4) SEEDA 2003 Seed funding - £40k

Integrated Greenhouse ProjectPhase 0 (2003/4)

SEEDA 2003Seed funding - £40k

GreenSys 2004Established partnerships with Professor Gerard Bot and team at Wageningen University, and the renewable energy team at TV Energy

Page 4: Integrated Greenhouse Project Phase 0 (2003/4) SEEDA 2003 Seed funding - £40k

EC Life Environment Unit

2.3m € funding Integrated Greenhouse

Project

Page 5: Integrated Greenhouse Project Phase 0 (2003/4) SEEDA 2003 Seed funding - £40k

Integrated Greenhouse ProjectPhase 1 (2005/6)

Human Impact Building

Purpose: To demonstrate sustainable low-carbon design, operation and use

Page 6: Integrated Greenhouse Project Phase 0 (2003/4) SEEDA 2003 Seed funding - £40k

Our Heating Journey… from oil to local wood chip

... the first public indoor rainforest garden to convert to wood chip heating

CO2 emissions per unit of energy supplied

0

50

100

150

200

250

300

350

400

450

Gra

ms

of

CO

2 p

er

kW

h

Woodfuelled heat

Wind power

Solar PV m-si

Solar PV p-Si

Natural gas heating

Light fuel oil heating

Page 7: Integrated Greenhouse Project Phase 0 (2003/4) SEEDA 2003 Seed funding - £40k
Page 8: Integrated Greenhouse Project Phase 0 (2003/4) SEEDA 2003 Seed funding - £40k
Page 9: Integrated Greenhouse Project Phase 0 (2003/4) SEEDA 2003 Seed funding - £40k
Page 10: Integrated Greenhouse Project Phase 0 (2003/4) SEEDA 2003 Seed funding - £40k
Page 11: Integrated Greenhouse Project Phase 0 (2003/4) SEEDA 2003 Seed funding - £40k

• Integration, part 1: biomass & oil

– continuity of supply?– put all heating devices ‘behind the heat storage

bunker’?

• Integration, part 2: ground source heat storage & biomass

Some Lessons

Page 12: Integrated Greenhouse Project Phase 0 (2003/4) SEEDA 2003 Seed funding - £40k

Integrated Greenhouse ProjectPhase 2 (2007/8)

Green Greenhouse / Vertical Soil Heat Exchanger (VSHE)

The Problem

Unsustainable food (crop) production in energy-wasteful greenhouses, using non-renewable energy

Lack of integration of greenhouses with other buildings

Lack of investment in low-carbon design

Confusion about what is ‘best practice’ among growers and government

Page 13: Integrated Greenhouse Project Phase 0 (2003/4) SEEDA 2003 Seed funding - £40k

Download presentations at www.livingrainforest.org/seminardownloads.htm

Page 14: Integrated Greenhouse Project Phase 0 (2003/4) SEEDA 2003 Seed funding - £40k

Direct energy expended by various sectors of agriculture in the UK by use in 2005

(from: Warwick HRI 2007).

Page 15: Integrated Greenhouse Project Phase 0 (2003/4) SEEDA 2003 Seed funding - £40k

Horticulture 101• Fruit & vegetables account for 2.5-3%

of UK greenhouse gas emissions (Garnett, 2006)

• UK horticulture accounts for about 28% of all energy used in UK agriculture

• UK protected crops covering 749 ha used 3,318 GWh / year (Warwick HRI, 2007)

Page 16: Integrated Greenhouse Project Phase 0 (2003/4) SEEDA 2003 Seed funding - £40k

Integrated Greenhouse ProjectPhase 2 (2007/8)

Green Greenhouse / Vertical Soil Heat Exchanger (VSHE)

Page 17: Integrated Greenhouse Project Phase 0 (2003/4) SEEDA 2003 Seed funding - £40k

Let’s build a sustainable future

together • Blue sky thinking is needed

• Boldness or bust

• Beyond immediate CO2 reductions to potential for long term behaviour change (production methods, consumption patterns)

Page 18: Integrated Greenhouse Project Phase 0 (2003/4) SEEDA 2003 Seed funding - £40k

Good Luck!

The Living Rainforestwww.livingrainforest.org

Integrated Greenhouse Projectwww.livingrainforest.org/ig T: (01635) 202444

Karl [email protected]