integrated development plan idp 2011-15.pdf(v) cllr s. o serothwane (head economic and land...
TRANSCRIPT
1. ExecutiveCommitteeMembers(i) CllrN.JMahlake (Mayor)(ii) CllrP.AMohlala (HeadTechnicalServices)(iii) CllrM.AMalatjie (PortfolioDeputyTechnicalServices)(iv) CllrS.DNkosi (HeadCorporateServices)(v) CllrS.OSerothwane (HeadEconomicAndLandDevelopment)(vi) Cllr.M.EMakgoga (PortfolioDeputyChairpersonEconomicAndLandDevelopment)(vii) CllrS.CMphogo (HeadFinance)(viii) CllrL.DMoraba (PortfolioDeputyChairpersonFinance)(ix) CllrM.RKhoza (HeadCommunityServices)(x) CllrR.RManotwane (PortfolioDeputyChairpersonCommunityServices)
2. AddressesThe Greater Tubatse Municipality
01 Kastania street , Burgersfort
P O Box 206 , Burgersfort, 1150
Tel: (013 231 1000
Fax:( 013 231 7467
Website: http://www.tubatse.gov.za
3. ContactsM.F. Mokoko R.R. Molapo
Acting Municipal Manager Director Strategic Planning
Email: [email protected] Email: [email protected]
GENERAL INFORMATION
3
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
FOREWORD BY THE MAYOR
Majority of the people of Tubatse are celebrating delivery of services,
whilst there are yet many others who are still waiting.
This is as a result of the legacy of apartheid and colonial oppression
which cannot be outdone within a short period, however the ANC
led government is determined to achieve the mission of building
a better South Africa, Limpopo, Sekhukhune and Tubatse for all.
Of significance were programmes and projects that responded to the following key tenets as crafted then: Institutional Development and Organizational transformation, Basic service delivery, Local Economic development, financial viability and Good Governance. Transient to the actualization of the mentioned tenets, spatial rationale demanded due attention that was intermittently observed for institutional reporting.
The IDP process took queue from key national calls to drive service delivery and economic de-velopment. . To mention but a few these are: State of the nation’s address, turnaround strate-gies, outputs for outcome nine(9) most relevant to Lo-cal Government and signifi-cant to these, community inputs from public partici-pation and results of the 2010 community satisfac-tion survey.
4
Key to thes are the inputs amassed from the several engagements held. Few conclusions were drawn with
due acknowledgements that Greater Tubatse faces challenges related to poor Revenue collection systems,
significant Electrification backlog, Poor roads infrastructure and maintenance plans and Limited capacity to
manage waste.
The Greater Tubatse Municipal vision is, “a developed platinum city for the benefit of all.”
We believe that through this vision, this municipality will be able to build a united, no-sexist, democratic and
prosperous Tubatse.
Our 2011/16 IDP document will be utilized as a tool to realize the above stated vision and the following key
areas have been prioritized:
- Institutional development and transformation
- Basic services delivery
- Local economic development
- Financial viability and management
- Good Governance and public participation and
- Spatial rationale
We are confident of the future and believe that our relationship and partnership with the community, Magoshi
and business and all stakeholders in Tubatse should be responsive, cautious and honest, focusing on good
governance, poverty eradication and sustainable development.
Working together we can develop Tubatse as South Africa’s first democratic platinum city for the benefit
of all.
I thank you.
MAYOR
CLLR N.J MAHLAKE
5
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
The Municipal systems act has introduced the notion of integrated development planning in-order to promote
local democracy, integration of programmes and socio development for the local communities.
The Greater Tubatse Municipality has indeed for the past ten years lived to its commitments of improving the
quality of life of the people of Tubatse. A lot has been done and a lot more needs o be done during the next
five years. The 2011/16 IDP document for the Greater Tubatse Municipality is a five year programme for the
municipality and is focusing on the six local government strategic agenda items and the national priorities for
development.
Roads and other municipal infrastructure calls for adept focus and appropriate management systems inclusive
of detailed and well resourced maintenance plans. Limitations to these unfortunately undermine elements
like revenue collection, community confidence and others. The topography of Greater Tubatse create stress
to sustenance of access roads to key destinations given that mild rains easily wash away such amenities.
The Integrated Development Plan for 2006/11 has come and gone with its successes and limitations. To
mention but a few successes, the municipality has been recognised to perform well on Expanded Public Works
programme in the past year. Amidst electricity capacity challenges and limited budget provision over the years,
70% of households enjoy the basic amenity of their households being electrified. The compilation of the IDP
as a municipality has been acknowledged to be of good standard over the past two years and this is incumbent
upon the current and coming administration to maintain and sustain the standard.
In summary the municipality consolidated the focus areas for the coming five years in the following manner for
which appropriate strategies are drawn and these will be subject to annual reviews
- Capacity building programmes for both Councillors, Officials and Ward Committees
- Systems development and improvements
- Construction and maintenance of roads
- Constructions and maintenance of small access bridges
- Electrification and new connections to households
- Development and maintenance of sports facilities
- Refuse removal
- Capacitating and maintaining the municipal public works programme and
- Implementation of Mayor’s special programme and intensify the public participation programme etc.
The overall budget for the 2011/12 financial year is R 250 546 970 and an amount of R 54 700 00 will be utilised
as capital expenditure and R 195 846 971 for operational purposes.
I thank you.
M.F MOKOKO
Acting Municipal Manager
ExEcuTIvE suMMARY BY THE AcTING MuNIcIpAL MANAGER
6
SECTION 1: EXECUTIVE SUMMARY 2
1.1 Greater Tubatse Municipality 2
1.2 Legal framework 3
1.2.1 Bill of Rights (The Constitution of the Republic of South Africa) 3
1.2.2 Objects of Local Government (Section 152) 3
1.2.3 Municipal Systems Act, Act 32 of 2000 3
1.3 Powers and functions of GTM 4
1.4 MEC’’S assessment reports 4
1.5 Local Government Key Performance Areas 5
1.6 National Outcomes 5
SECTION 2: PREPARATORY PHASE 10
2.1 11/16 IDP processes/methodology 10
2.2 IDP Process Plan 10
2.3 GTM Revised IDP Process plan (2011/2012 – 2015/2016.) 12
2.4 IDP and Budget Structures and responsibilities 12
SECTION 3: SITUATIONAL ANALYSIS 16
3.1 Population and Demographics 16
3.2 Special Focus Groups 17
3.3 Spatial Analysis 19
3.3.1 Spatial patterns 19
3.3.2 Roads 20
3.3.3 Topography 20
3.3.4 Land Tenure System/ Apartheid Legacy 20
3.3.5 Mining Belt 21
3.3.6 Delimitation of Municipal wards 22
3.3.7 Conservation Areas 23
3.3.8 Rural Settlements 24
3.3.9 Land claims 25
3.3.10 Landownership 25
3.3.11 Climate and Environmental Analysis 26
3.4 Infrastructure and Basic Services Analysis 35
TABLE OF cONTENTs
7
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
3.4.1 Water 35
3.4.2 Sanitation 38
3.4.3 Electricity 39
3.4.4 Housing 42
3.4.5 Waste and Refuse Removal 45
3.4.6 Roads and Storm water 46
3.4.7 Transport 49
3.4.8 Cemeteries 50
3.5 Local Economic Development 51
3.5.1 Economic Profile of GTM 51
3.5.2 Comparative and Competitive advantages of the local economy 56
3.6 Socio Economic Analysis 57
3.6.1 Education 57
3.6.2 Health and Social Development 58
3.6.3 Health facilities 60
3.6.4 Safety and Security 61
3.6.5 Disaster Management 62
3.6.6 Sports, Arts and Culture 62
3.6.7 Post Offices 63
3.7 Good Governance and Public Participation 63
3.7.1 Communication 63
3.7.2 Public participation 64
3.7.3 Ward Committees 64
3.7.4 Community Development Workers 64
3.7.5 Traditional Leadership 64
3.7.6 Intergovernmental Relations 64
3.7.7 Special focus Groups 65
3.7.8 Audits 65
3.7.9 Risk management 77
3.7.10 Fraud and Anti corruption 78
3.8 Financial Viability and Management 78
8
3.8.1 Municipal Sources of Revenue 78
3.8.2 Credit and Debt Control 80
3.8.3 Investments 80
3.8.4 Budget and Treasury 80
3.8.5 Revenue Management 80
3.8.6 Supply Cain Management 81
3.8.7 Asset Management 81
3.9 Municipal Transformation and Organisational Development 81
3.9.1 Council 81
3.9.2 Staff Component 82
3.9.2.1 Skills profile and needs for both Councillors and Officials 83
3.9.3 Legal services 84
3.9.4 Labour relations 84
3.9.5 Information Technology 84
3.9.6 Occupational Health and Safety 85
3.9.7 Policies and plans for GTM 86
3.9.8 Organisational Performance Management System (OPMS) and Performance Management System (PMS) 87
3.9.9 Ranked needs of Greater Tubatse Municipality 88
3.9.10 Organogram 88
3.9.11 SWOT ANALYSIS 97
3.9.11.1 Economic and Land Development 97
3.9.11.2 Departments: Executive Support. 98
3.9.11.3 Financial Services 99
3.9.11.4 Community Services Department 101
3.9.11.5 Strategic Planning 102
3.9.11.6 Technical services 103
3.9.11.7 Corporate services 105
SECTION 4: STRATEGY CHAPTER 110
4.1 Vision for Greater Tubatse Municipality 110
4.2 Mission statements for Greater Tubatse Municipality 110
4.3 Values for the Greater Tubatse Municipality 111
9
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
4.4 Summary of the Strategy Chapter 111
4.5 KPA 1: Institutional Development and Transformation 112
4.6 KPA 2: Basic Services 112
4.7 KPA: 3 Local Economic Development 113
4.8 KPA: Financial Viability 113
4.9 KPA: 5 Good Governance and Public Participation 114
4.10 KPA: 6 Spatial Rationale 114
SECTION 5: MEDIUM TERM REVENUE AND EXPENDITURE FRAMEWORK 118
5.1 Revenue 118
5.2 Expenditure 119
SECTION 6: PROJECTS 124
6.1 Greater Tubatse Municipal Projects & Programmes 124
6.2 Sekhukhune District Municipality 134
6.2.1 Water and Sanitation Projects 134
6.3 Sector Departmental Projects 134
6.3.1 Submissions from Dept.Agriculture 134
6.3.2 Projects from Department of Health 136
6.3.3 Projects from Roads and Transport 136
6.3.4 Projects from DWAE 136
6.3.5 Submissions from LEDET 138
6.3.6 Projects from Department of Education 138
6.3.7 Submissions of Housing Projects by DLGH 140
6.3.8 Submissions from Department of Environmental Affairs 141
6.3.9 Community Works Programme Projects 141
6.4 ESCOM priority list 142
6.4.1 Villages that will benefit from Alternative Source of Energy/ None Grid/ Solar Systems 144
6.5 SUBMISSIONS FROM LOCAL MINES 144
6.5.1 Submissions from Marula mine 144
6.5.2 Submissions from Twickenham mine 145
6.5.3 Submissions from Dwarsriver Mine 145
6.5.4 Submissions from XSRATA 146
10
6.5.5 Submissions from Modikwa mine 147
6.5.6 Submissions from Der Brochen mine 147
6.5.7 Submissions from Phoka Thaba Platinum mine 148
6.5.8 Submissions from Two Rivers mine 148
SECTION 7: INTEGRATION 152
7.1 Spatial Development Framework 152
7.2 Land Use Management Scheme 152
7.3 Integrated Waste Management Plan 153
7.4 Employment Equity Plan 153
7.5 Workplace Skills Plan 153
7.6 HIV/AIDS Plan 153
7.7 LED Strategy 154
7.8 Revenue Enhancement Plan 154
7.9 Disaster Management Plan 154
7.10 Capital Investment Framework 154
7.11 Integrated Transport Plan 154
7.12 Risk Management Plan 154
7.13. Water Services and Maintenance Strategy (Sekhukhune District) 155
11
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
1.1 Greater Tubatse MunicipalityThe Greater Tubatse municipality was established after the Local Government elections of 2000. It comprise thirty one (31)
wards represented by one Ward Councillor per ward and is administered by a local Authority of which main offices are located
in Burgersfort.
The municipality is a category B municipality as determined in terms of the Municipal structures Act, Act 117 of 1998. It is a
municipality with collective system as contemplated in the Act.
GTM is located north of the N4 highway, Middelburg, Belfast and Nelspruit, east of the N1 highway, Groblersdal and South
of Polokwane. The area of Jurisdiction is approximately 4 550 km and is known as the middelveld as it is located between the
Highveld and lowveld regions. It forms part of the Sekhukhune District Municipality within the borders of the Limpopo Province.
Map 1: shows location of GTM
sEcTION 1:ExEcuTIvE suMMARY
2
1.2 Legal framework1.2.1 BillofRights(TheConstitutionoftheRepublicofSouthAfrica)
• The Bill of rights is a cornerstone of democracy in South Africa. It enshrines the rights of all people in the
country and affirms the democratic values of human dignity; equality and freedom.
• The state must respect, protect, promote and fulfil the rights in the bill of rights.
• The rights in the Bill of rights are subjected to the limitations contained or referred for in section 36, or
elsewhere in the bill.
1.2.2 ObjectsofLocalGovernment(Section152)
The objects of local Government are, to provide democratic and accountable government for local communities,
to ensure the provision of services to communities in a sustainable manner, to promote social and economic
development, to promote a safe and healthy environment, and to encourage the involvement of communities and
community organisation in the matters of local government.
A municipality must strive, within its financial and administrative capacity, to achieve the objects set out in the act.
1.2.3 MunicipalSystemsAct,Act32of2000
• Section 23 of the act stipulates that a Municipality must undertake developmentally oriented planning so as
to ensure that it strives to achieve the objects of local government set out in section 152 of the Constitution;
gives effect to its developmental duties as required by section 153 of the Constitution and together with other
organs of state contributed to the progressive realisation of the fundamental rights contained in section 24, 25,
26, 27 and 29 of the Constitution.
3
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
1.3 Powers and functions of GTMThe following powers and functions are assigned to the GTM In terms of the Municipal Structures Act of 1998 and the
Demarcations Board:
Table1: below reflects GTM power and functions for GTM: FuNcTION AuTHORIsED pROvIDED BY
Water and sanitation No GSDM
Electricity Reticulation No ESKOM
Municipal Roads Yes GTM
Other roads (District and Provincial) No GSDM and Limpopo Department Transport
Housing No Limpopo DPLGH
Building regulations Yes GTM
Local tourism Yes GTM
Fire fighting No GSDM
Street lighting Yes GTM
Traffic and Parking Yes GTM
Trading regulations Yes GTM
Local sports facilities yes GTM
Municipal planning yes GTM
Municipal public transport Yes GTM
Storm water No GSDM
Municipal airport Yes GTM
Billboards and advertising Yes GTM
Control of liquor and food outlet and street trading Yes GTM
Local amenities yes GTM
Waste and Cleansing yes GTM
1.4 MEC’S assessment reportsSection 32 (1) (a) of the Municipal systems act, act 32 of 2000 mandates the municipal manager of a municipality to submit a
copy of the integrated development plan as adopted by council of the municipality, and any subsequent amendment to the plan,
to the MEC for local government in the Province within 10 days of the adoption or amendment of the plan.
The Greater Tubatse municipality adopted its 2010/111 IDP review on the 30th May 2009 and was submitted to the MEC on the 05th June
2009.
Table 2: below are comments from the MEC for the 2010/111 IDP review document:FuNcTIONs FINDINGs REcOMMENDATIONs
KPA 1. Spatial Rationale Analysis: spatial analysis information indicated and hierarchy of settlements
None
Strategies: spatial objectives are clearly articulated To be maintained
Projects: spatial projects indicated None
Integration: SDF and LUMS are available Maintain status quo
4
FuNcTIONs FINDINGs REcOMMENDATIONs
KPA 2:Infrastructure and basic service deliveryWATER AND SANITATION Analysis: Water and sanitation challenges and back-
logs are indicatedMaintain status quo
Strategies: water and sanitation strategies outlined Maintain status quo
Projects: water and sanitation projects indicated Maintain status quo
Integration: no indication of WSDP Indication must be made that water and sanitation issues are addressed by Sekhuk-hune District WSDP
ENERGY and ELECTRICITY Analysis: indication of electricity backlogs is made Maintain status quo
Strategies: strategies are indicated Maintain status quo
Projects: electricity and energy projects indicated Maintain status quo
Integration: no energy master plan indicated GTM must develop energy master plan
ROADS, STORM WATER AND PUBLIC TRANSPORT
Analysis: indication of backlogs on roads, storm water drainage and public transport challenges is made
Maintain status quo
Strategies: clear indication of strategic objectives for water, storm water drainage and public transport
Maintain status quo
Projects: roads and storm water drainage projects indicated
Indicate public transport projects in the next IDP
Integration: no roads master plan Develop roads master plan
WASTE MANAGEMENT Analysis: waste management backlogs indicated Maintain status quo
Strategies: strategies indicated Maintain status quo
Projects: waste management projects indicated Maintain status quo
Integration: indication of availability of IWMP Maintain status quo
LOCAL ECONOMIC DEVEL-OPMENT
Analysis: no indication of local skills base Indicate the skills base, challenges and op-portunities and the number of jobs created through LED
Strategies: LED strategic objectives indicated Maintain status quo
Projects: LED projects indicated Maintain status quo
Integration: LED strategy available Maintain status quo
GOOD GOVERNANCE AND PUBLIC PARTICIPATION
Analysis: relationship with traditional leaders indicated Maintain status quo
Strategies: Good Governance and public participation strategies outlined
Maintain status quo
Projects: Good Governance projects indicated Maintain status quo
Integration: no indication of public participation plan Develop public participation strategy
FINANCIAL VIABILITY Analysis: indication is made on financial standing, source of revenue and financial policies
Maintain status quo
Strategies: financial strategic objectives indicated Maintain status quo
Projects: finance projects indicated Maintain status quo
Integration: 5/3 financial plans available Maintain status quo
MUNICIPAL TRANSFORMA-TION AND ORGANISATION-AL DEVELOPMENT
Analysis: skills needs indicated Maintain status quo
Strategies: municipal transformation and organisational development strategies indicated
Maintain status quo
Projects: organisational development projects indicated Maintain status quo
Integration: no institutional plans available Develop institutional plan
5
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
1.5 Local Government Key Performance AreasThis document was prepared in relation to the Local Government Strategic agenda which are:
• Spatial rationale
• Basic service delivery
• Local economic development
• Good Governance and Public participation
• Financial viability
• Institutional development and Transformation
1.6 National OutcomesThere are 12 National Outcomes as approved by the National Government. This document focuses mainly on the National
Outcome Number 09 which is more related to Local Government operations.
• Quality basic education
• A long and healthy life for all South Africans
• All people in South Africa are and feel safe
• Decent employment through inclusive economic growth
• An efficient, competitive and responsive economic infrastructure network
• Skilled and capable workforce to support inclusive growth path
• Vibrant, equitable, sustainable rural communities contributing towards food security for all
• Sustainable human settlement and improved quality of household life
• Responsive, accountable, effective and efficient local government system
• Protect and enhance our environmental assets and natural resources
• Create a better South Africa, a better Africa and a better world
• An efficient, effective and development orientated public service and an empowered, fair and inclusive citizenship.
6
In order to ensure certain minimum quality standards of the IDP process and Proper co-ordination between and within the spheres
of government, the Preparation of the planning process must be regulated in terms of the Municipal Systems Act, 2000. Following is
summary of IDP processes which GTM undertook during the development of the 2011/16 IDP document.
2.1 11/16 IDP processes/methodology2.1.1 Analysisphase
During this phase, the municipality conducted a desk top analysis where by researches or information was collated
through internet and other relevant sources. A report was then developed and the Municipality constituted a team to
scrutinise the report. The information was then compiled into a document and was submitted to council for approval
and was then used to consult with various stake holders for inputs and or comments.
2.1.5 Strategyphase
The Greater Tubatse Municipal strategic planning session was fully internally facilitated. The Executive Committee
and Management of the Municipality formed a team that attended the session and was held in the municipal building
in Burgersort town.
Summary of the situational analysis was developed whereby key problems were identified and presented to the
session and a matrix was employed to analyse the information
This is the phase whereby the Municipality develops Vision statement, mission statements, objectives, strategies etc.
During this phase the Municipality also considers the relevance and applications of National policy guidelines in the
local context e.g the Local government strategic agenda, making sure that the government outcomes are built in the
municipal strategies, considering the provincial policies like Limpopo economic growth and development plan etc.
2.1.3. Projectphase
Projects and programmes were formulated and elementary costing exercise was conducted during this phase.
Projects from Sector departments, mining houses and other stakeholders were presented during this phase for
alignment.
2.1.4. Integrationphase
During this phase, projects are agreed upon and integrated programmes for the projects were identified.
2.2. IDP Process PlanSection 28(1) of the Local Government Municipal Systems act, Act 32 2000 stipulates that each Municipal Council, within a
prescribed period after the start of its elected term, must adopt a process set out in writing to guide the planning, drafting,
adoption and review of its integrated development Plan.
In responding to the above statutory obligation, the Greater Tubatse Municipality adopted the process plan for the drafting and
adoption of the 2011/12-2015/16 IDP document on the 31st August 2010 as resolution number A115/2010
sEcTION 2:pREpARATORY pHAsE
10
Table 3: below is the process plan for the drafting and adoption of the 2011/12-2015/16 IDP: pLANNING AcTIvITY REspONsIBLE TIME scHEDuLE
TIME SCHEDULE RESPONSIBLE TIME SCHEDULEPHASE 1: ANALYSISTable time schedule outlining deadlines Strategic dept. August 2010
Establish committees and forums Strategic dept. August 2010
Compilation of existing information Strategic dept September 2010
Community and stakeholder analysis Strategic dept September 2010
Reconciling existing information and community stakeholder analysis Strategic dept September 2010
Municipal wide analysis All September 2010
Spatial analysis ELD and strategic dept October 2010
Socio economic gender differentiation Strategic dept. October 2010
In-depth analysis of priority issues Strategic dept October 2010
Consolidation of priority issues analysis Strategic dept. October 2010
PHASE 2: STRATEGIESVision All October 2010
Working objectives All October 2010
Strategic guidelines All October 2010
Creation of conditions for public debate on analysis Strategic dept. and Ex-ecutive support
November 2010
PHASE 3:PROJECTSPLANNING ACTIVITY RESPONSIBLE TIME SCHEDULE
Formulation of IDP steering committee Strategic dept November 2010
Establishing preliminary budgets Strategic dept and Finance
November 2010
Design project and programme proposals All November 2010
Involvement of project proposals All November 2010
Setting indicators for objectives All November 2010
Cost/budget estimates sources of financing All November 2010
PHASE 4:INTEGRATIONScreening of draft project proposals All December 2010
Integrating projects and programmes Strategic dept December 2010
Integrating sector programmes Strategic dept December 2010
5 year capital investment programme All December 2010
Integration of sector plans in the IDP All January 2011
Performance management indicators All February 2011
PHASE 5: APPROVALAdoption of draft IDP by council Council March 2011
Providing opportunity for comments from the District, Provincial, and National Government
Council April 2011
Providing opportunity for comments from the IDP representative forum All April 2011
Providing opportunity for comments from the public All April 2011
Incorporate comments from IDP Representative forum, Public, District, Pro-vincial and National Government.
Strategic dept April 2011
Final adoption of IDP by Council Council May 2011
Submission of the final IDP to District, Province and National Government Strategic ept June 2011
11
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
2.3 GTM Revised IDP Process plan (2011/2012 – 2015/2016.)Circular No: 54, issued by COGTA, mandated all municipalities to revisit their IDP/Budget process plans due to the Local
Government elections scheduled for May 2011.
The Greater Tubatse Municipality therefore revised its process plan to comply with the above stated circular and below is the
revised process plan for GTM:
DATE AcTIvITY REspONsIBILITY
26th January SDBIP Adjustment (ELD, Finance, Technical and Strategic.
Strategic
28th January Finalize Adjustment AMM
29th January Draft outstanding PA’S Executive Support
31 Jan – 01 Feb Strategic Planning session (2nd phase) Strategic Dept.
02nd – 10th February Consolidate Strategic planning report in doc. Strategic Dept.
03rd February Audit Committee meeting AMM
15th February Possible Special ExCo Executive Support
17th February EconomicGrowthInterrogativeSession ELD
25TH February Council Meeting ( approval of Draft IDP/Budget Executive support
01st Mar – 31st March Public Participation Executive support/ Strategic Plan-ning
21st April Special ExCo (IDP/Budget) Executive Support
28th April Special Council (IDP/Budget) Executive Support
09 May Submission of final documents to MEC Strategic Dept.
2.4 IDP and Budget Structures and responsibilitiesThe 2011/16 IDP process plan requires the Municipality to establish forums and committees
with different responsibilities. The Committees will be responsible for the day to day monitoring
of the development of the IDP with special emphasis on technical matters whereas on the other
hand the IDP structures will be used as a vehicle during the consultation processes.
Table 4: below reflects IDP structures and respective responsibilities:
sTRucTuRE REspONsIBILITIEs
Municipalcouncil Consider and adopt a process planConsider, adopt and approve the IDP and budget
Executive committee chaired by the Mayor
Decide on the process planBe responsible for the overall management, co-ordination and monitoring of the process and drafting of the IDP, or to delegate this function to Municipal ManagerApprove nominated persons to be in charge of the different roles, activities and responsibilities of the process and drafting.
Ward councillors Link the planning process to their constituencies or wardsBe responsible for organising public consultation and participationEnsure that the annual business plans and municipal budgets are linked to and based on the IDP.
IDP Manager Prepare the process planUndertake the overall management and co-ordination of the planning processEnsure that all relevant actors are appropriately involvedNominate persons in charge of different rolesBe responsible for the day-to-day management of the drafting process
12
sTRucTuRE REspONsIBILITIEs
IDP Manager Ensure that the planning process is participatory, strategic and implementation orientated and is aligned with and satisfies sector planning requirementsRespond to comments on the draft IDP from the public, horizontal alignment with other spheres of government to the satisfaction of the CouncilEnsure proper documentation of the results of the planning of the IDP document, andAdjust the IDP in accordance with the MEC for Local Government’s proposalsEven if the Municipal Manager delegates some of the functions to the IDP Manager, he or she is still accountable for the entire process.
HeadsofDepartmentsandOfficials/Steeringcommittee
Provide relevant technical, sector and financial information to be analysed for determining priority issuesContribute technical expertise in the consideration and finalisation of strategies and identification of projectsProvide departmental operational capital,Budgetary information
HeadsofDepartmentsandOfficials/Steeringcommittee
Responsible for preparing amendments to the draft IDP for submissions to municipal council for approval a
IDP representative forum
Represent the interests of their constituencies in the IDP processProvide an organisational mechanism for discussion, negotiation and decision making between stake-holders and the municipalityEnsure communication between all stake-holders representatives, and Monitor the performance of the planning and implementation process
IDP Representative forum code of conductMeeting schedules must be adhered toAgenda facilitation and documentation of meetingsAlign their activities with the responsibilities of the forum as outlined in the IDPRegular reporting to constituenciesRequire majority for any issue to be resolved
13
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
3.1 Population and DemographicsThe population statistics for Greater Tubatse Local Municipality vary greatly depending on the source of information used.
According to the Community survey conducted by Statistics South Africa, 2007, the total population of this municipality is
approximately 343 468 with 66 611 households which makes Greater Tubatse Local Municipality a municipality with highest
population in the District. It also appears from 1996 to 2007 community survey results that there has been a positive population
growth in most of the local municipalities
Table 5: Population figures. Source: (Stats SA CS 2007) MuNIcIpALITY pOpuLATION 1996 % pOpuLATION 2007 %
Makhuduthamaga 267 951 30 262 726 24.4
Greater Tubatse 228 531 26 343 468 31.4
Elias Motsoaledi 217 198 24 247 488 22.6
Greater Marble Hall 95 911 11 124 510 11.4
Fetakgomo 83 947 9 112 232 10.2
Sekhukhune District 893 538 100 1 090 424 100
Table 6: below indicates population by gender and age: Source: (STATSA CS 2007) AGE MALE FEMALE GRAND TOTAL
0 – 4 22878 21999 44877
5 – 9 20271 22517 42788
10 – 14 22440 23354 45794
15 – 19 19349 19811 39160
20 – 24 15907 19112 35019
25 – 29 13245 14505 27750
30 – 34 10667 11582 22249
35 – 39 7324 8828 16152
40 – 44 6076 9519 15595
45 – 49 4952 7109 12061
50 – 54 4180 6448 10628
55 – 59 3241 3993 7234
60 – 64 2552 4075 6627
65 – 69 2256 3015 5271
70 – 74 1484 3086 4570
75–79 1124 2618 374280–84 362 1322 168485+ 355 1911 2266Grand Total 158663 184804 343467
The projected population growth within the growth points over the period 2005 to 2015 shows that it will be more than
double. This will have far more serious implications for the demand for services in the Municipal area; this is due to the mining
activities taking place around the area.
Table 7: below indicates projected population growth in some areas of the Municipality: AREA 2005 2010 2015
Burgersfort 13389 24525 28431
sEcTION 3:sITuATIONAL ANALYsIs
16
AREA 2005 2010 2015
Steelpoort 4015 9845 11414
Ohrigstad 1313 2115 2621
Total 18 717 36 485 42 466
The age group below 18 years comprise approximately 51% of the population, meaning the population is largely young. The
female ratio is almost equal at the age of between 0 and 17 years. This substantially changes when comparing male-female
distribution in the economical active age cohorts, i.e. 19-65 years where there are more women.
Table 8: Below indicate age cohorts: Source: (STATS CS 2007)AGE GROup MALE FEMALE TOTAL %
0-17 67 895 68 990 136 885 51%
8-64 49 252 70 351 119 603 44%
65+ 4 182 9 446 13 627 5%
Total 121 329 148 787 270 116 100%
Table 9: below indicates language frequently spoken in Households Source: (GTM households Survey 2007)
EN
GLI
sH
AFR
IkA
AN
s
IsIx
HO
sA
IsIZ
uLu
sE
pE
DI
sE
sO
TH
O
sIs
WA
TI
xIT
sO
NG
A
Ts
HIv
EN
DA
OT
HE
Rs
207 340 224 532 46 592 572 1864 822 38 406
3.2 Special Focus GroupsAccording to the survey conducted by the Greater Tubatse municipality in 2007, there are various focus groups which the
municipality has identified and needs to put more effort on. Statistics for the Focus groups such as youth, women and disabled
were developed and the following has been recorded:
17
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
Table 10: (Source STATSA survey 2007)
MA
LE
FEM
ALE
Age
gro
ups
Sig
ht (b
lind/
seve
re v
isua
l lim
itatio
n)
Hea
ring
(dea
f
Com
mun
icat
ion
(spe
ech
impa
irmen
t)
Phy
sica
l (ne
eds
whe
elch
air
Inte
llect
ual (
serio
us d
ifficu
lties
in le
arni
ng)
Em
otio
nal (
beha
viou
ral
Mul
tiple
dis
abili
ties
Sig
ht (b
lind/
seve
re v
isua
l lim
itatio
n)
Hea
ring
(dea
f
Com
mun
icat
ion
(spe
ech
impa
irmen
t)
Phy
sica
l (ne
eds
whe
elch
air
Inte
llect
ual (
serio
us d
ifficu
lties
in le
arni
ng)
Em
otio
nal (
beha
viou
ral
Mul
tiple
dis
abili
ties
Tota
l
0 - 4 - - - 31 76 142 - 5 29 - - - - - 283
5 - 9 39 69 66 211 69 - - - - - 123 - 70 - 647
10 - 14 92 72 35 - 70 161 - 165 - 13 198 54 - - 860
15 - 19 - 42 61 23 - 42 42 60 - - - 54 - - 324
20 - 24 - - 67 46 72 64 - 62 123 34 176 111 138 - 893
25 - 29 - - 58 124 89 18 - - - 70 185 68 - - 612
30 - 34 115 178 58 144 44 54 - - 85 - 126 60 125 42 1031
35 - 39 127 - - 169 - 219 - 59 - - 165 - 68 - 807
40 - 44 112 - 62 119 - 101 - 161 59 - 42 - - - 656
45 - 49 - - - 147 - - 42 123 61 - 201 84 34 - 692
50 - 54 62 - - 85 54 - - 175 - - 95 - 73 - 544
55-59 67 42 - 62 - 204 - - - 59 282 - - - 71660-64 198 - 121 133 - - - - - - 42 - - - 49465-69 143 59 - 78 - - - - - - 42 - 73 - 39570-74 40 - - 13 - 31 - 144 - - - - - - 22875-79 - - - - - - 42 - - - 35 - - - 7780-84 - - - - - - - 97 22 - - - - - 11985+ - - - - - - - - 104 - 77 - - - 181Total 995 462 528 1385 474 1036 126 1051 483 176 1789 431 581 42 9559
18
3.3 Spatial Analysis
3.3.1 Spatial patterns
The spatial patterns of the Greater Tubatse Municipality are shaped by 4 features, which collectively create a distinct
spatial character of the municipality, namely:
• Roads
• Mining belt
• Topography
• Apartheid tenure arrangements
Map 2: indicates structuring or development settlements
19
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
3.3.2 Roads
These are the most decisive structuring element of the municipality with three major corridors forming the central nerve system
of the municipality along which major spatial activities are taking place, namely:
(a) Dilokong and Burgersfort (R37) Corridor
(b) Stoffberg (R555) Corridor; and
(c) Ngwaabe Corridor to Jane Furse
(d) The Hoedspuit (R36) Corridor
The major roads either allow formation of nodes or settlements at certain appropriate points along the road which become
an anchor of spatial development agglomeration, e.g. Burgersfort, Ohrigstad and Steelpoort or smaller settlements such as
Kgautswana, Alverton, Penge, etc. or a continuous band of spatial development along a longer road section, e.g. settlements
between Mecklenburg and Driekop and Burgersfort or along the Ngwaabe Corridor.
3.3.3 Topography
The GTM area is highly mountainous hence development occurs mostly in valleys. Settlements sizes are small and scattered
due to extensive broken terrain. In fact the ridges and the mountains form linear dividers between the settlements. “In certain
areas the topography is very steep creating mountainous terrain which is impossible for inhabitation. The ridges further divide
the municipal areas creating pockets of homogenous compositions, which determine growth and development potential”
(GSDM: Central Tubatse-Driekop, Praktiseer and Burgersfort: Trends Report and Detail Development Plans; )
The terrain dictates that larger settlement development occurs mainly in flat, low lying areas in-between the mountain ranges.
Generally the roads run at the bottom of the basin/ valleys. It is therefore not surprising that the major roads, i.e. R555, R37
and R36 and Jane Furse/ Ngwaabe road) for most part run parallel to rivers. The position of cross-link roads is dictated by
topography that is flatter to allow the road to pass through at reasonable flat grades. Where these roads passes through wide
basin, particularly in rural hinterlands, an array of settlements has grown around these major roads. In other words there
is clustering of series of settlements for almost the entire length of the road, e.g. Mecklenburg-Driekop (R37), Mapareng
-Tswenyane (R36) and Mampuru to Eerste Geluk (parallel toR555). There is hardly undeveloped land between these settlements.
Even the scattered rural villages have located within more developable basin almost parallel to mountain range. The central
spine road (normally the bus and a taxi route) usually runs along the flatter alignment in the basin. Generally the settlements
are linear in form as they are bound by the undevelopable ridges on either side of the access through-road, usually located on
low-lying grounds adjacent to a stream.
3.3.4 Land Tenure System/ Apartheid Legacy
The apartheid policies expected African people to settle permanently only in demarcated areas of the former Lebowa territory
(i.e. scattered rural villages) while white people settled in the former Transvaal provincial area with few very compact
settlements/ towns (Burgersfort, Steelpoort & Ohrigstad). Land allocation procedures led by the tribal authorities myriad of
small settlements, further exacerbated by lack of formal settlement planning in former Lebowa government.
20
There is a clear and distinctive divide and pattern between the southern and northern areas of the municipality (with the R555
road as a buffer/ boundary). The southern part comprises mainly privately owned farms with intensive commercial agriculture
and a few compact towns/ settlements (Burgersfort, Steelpoort & Ohrigstad).
To the contrary, the northern part comprises mainly farms owned by the National Government of the Republic of South Africa,
the Limpopo Provincial Government and communities, with very few/ scarce incidences of private land ownership (recently by
mines). These areas are often characterized by scattered settlements as already explained. There is also an evident distinction
between these two areas in terms of socio-economic development (an apartheid legacy of separate development).
The continuation of historic pattern of ownership of land and current use makes it very difficult to reverse or restructure the
settlement and spatial patterns.
3.3.5 Mining Belt
The eastern limb of the Bushveld Igneous Complex (mining belt) is emerging as important structuring element of the
municipality’s spatial development, which will be increasingly dominant in future. The mining activities will affect
mainly the western quadrant of the municipality. It is expected that retail and service businesses will respond to the
opening of mines and the development of housing by also locating close to these areas. In time, this may eventually
alter the current fragmented spatial pattern by creating few large urban settlements, if the expected scale of mining
activities materialise.
Map 3: indicates mining belt development
21
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
Challenges facing land use in GTMCurrently the GTM has no unified land use management system across its municipal area. Historically parts of the
GTM area fell into self- governing territory of Lebowa and province of Transvaal. The apartheid laws resulted in
different land use and ownership regulations being applicable in the two areas.
The Black Laws Amendment Act 56 of 1944 specifically excluded the application of the provincial townships ordinances
in self governing territories. “Instead, separate regulations regarding township establishment and development in the
urban areas were published in terms of the Proclamation R293 of 1962 entitled Regulations for the Administration and
Control of Township in Black Areas promulgated in terms of the Black Administration Act 38 of 1927 and Development
Trust and Land Act 18 of 1936” (p102, van Wyk, Planning Law,1999). Evidently Praktiseer, Mecklenburg A and B, and
Ga-Mapodile were established in terms of this proclamation. Although Proclamation R293 has no elaborate land use
management system but it does make provision to alter the building and use of various facilities within the township
at the discretion of township superintendent, or Commissioner.
The rest of the traditional settlements and the land within former Lebowa territory were regulated in terms of
Proclamation R188 of 1969 called Black Areas Land Regulations. This proclamation “… contains measures to designate
areas for arable and residential allotment, to control, maintain and develop such land and to issue occupational
permits (Permission to Occupy Certificates) for residential, business, church, school and arable allotments” (p16,
Greater Tubatse Spatial Development Framework,2005). The proclamation however contains no land use planning
provisions.
Consequently development in these areas of the Greater Tubatse Municipality relies on other laws such as
Development Facilitation Act, Proclamation R293 of 1962, Less Formal Township Establishment Act, etc. that allows
specific use zones to be created through township application.
Development within the former Transvaal province part of GTM was regulated though the Town-Planning and Township
Ordinance 1986 (Ordinance No 15 of 1986). In terms of this Ordinance a Town-Planning scheme (Greater Tubatse Land
Use Scheme 2006) for Burgersfort, Steelpoort and Ohrigstad was promulgated, which provide detailed measures to
manage land uses within each scheme area. The application of this scheme generally excludes rural areas.
In order to overhaul the fractured or non-existent land use management in various parts of the municipality it is required
that the municipality must prepare a Land Use Management System that will cohere regulation and facilitation of
land development across the municipal area under a single system of management. This will afford the opportunity
to develop appropriate land development management procedures in the rural areas (former Lebowa territory) within
the same legal framework as the more developed urban nodes like Burgersfort and Steelpoort.
A draft document in this regard has been developed and is undergoing legal review before promulgation.
3.3.6 Delimitation of Municipal wards
During the past 10 (ten) years, Greater Tubatse Municipality was consisting of 29 wards and is currently having 31
(thirty one). This was published in June 2010 in terms of the Local Government Municipal Structures Act, 1998 (Act
22
No: 117 of 1998) and the Municipal Demarcation Board notice 186 of 2010.
The Municipality consists of approximately 166 villages, 5 formally proclaimed townships with 180 voting stations.
(xi) Map4:indicateswardsforGTM
3.3.7 Conservation Areas
The largest proportion of land in GTM area (probably in excess of 80%) is natural environment. The mines, agriculture
and urban development have barely encroached on these wilderness areas. The wilderness generally comprises of
bushveld and sparse grassland in limited parts of GTM. It is important to preserve the wilderness for posterity and
harvest plant and animal species in a manner that preserve the habitat.
The objectives of protecting habitats for animal and plant species occurring naturally in the wilderness area should be
conscious of subsistence requirements of local population and income generating tourism. The GTM area consists of
23
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
vast plains of bushveld, the rugged topography, natural features such as rivers, an abundance of wildlife, bird species
and flora. The expansive vacant land in the south and east is mainly owned by private individuals and in the north and
west by tribal authorities. An opportunity exists to revive and re-introduce indigenous species that were previously
endemic to the area.
Use of natural and biological resources will create or augment destinations for nature based tourism. Environmental
investigations will be necessary before specific habitats are set-aside for such purposes.
Unfortunately no environmental investigation has been conducted to determine whether any of the Red Data species
area is found in these areas.
These high-lying areas should be conserved to retain the natural vegetation and characteristics with the aim of
accommodating possible future tourism. The extensive natural environment provide opportunity for tourism activities
including caravan parks, hiking trails, mountain biking, sky diving, game parks, overnight accommodation, country
estate, etc. There are couple of cases where the environment has been kept in its natural states through a number of
private game and nature reserves.
Two areas in the municipal area have been identified as highly sensitive in terms of environment. The first lies on the
northern boundary of the region along the Olifants River stretching from the villages of Maretlwaneng and Makoloto
up to Morathong along the R527 to Hoedspruit. The area is endowed with forestry, deep gorges and waterfalls and
has been identified as the very sensitive environment area due to these features. The second is the area bordered by
the R36 to Hoedspruit on the west, by R532 to Bouke’s Luck on the south and the study area boundary on the north
east has been identified as one of the most sensitive area.
3.3.8 Rural Settlements
There are two categories of rural settlement envisaged in GTM viz the traditional homesteads in villages and the
country estate (see definition below) in aesthetical pleasant locals particularly around Ohrigstad. The rural settlements
are those settlements that are occurring outside the provincial, district and municipal growth points and population
concentration points (first order settlement) as articulated in the Limpopo Spatial Rationale, 2002. Essentially the
distinguishing characteristic of the rural and urban settlements is that in the former it is expected that the households
are to some degree for subsistence, economic or leisure reasons dependent on land livestock and wildlife.
The population concentration points i.e. Penge, Batau/Praktiseer, Ga-Masha and Ga-Masete are functional part of
urban areas and design of the built form reflect this though some households may still till land and keep livestock.
Whether or not the ploughing of land and animal husbandry is allowed, for purposes of settlement planning such
settlements should be treated as extension of urban settlements as the overwhelming majority of households earn
their living through employment in urban centres. All large scale and denser housing projects such that they require
urban engineering services should be located in growths points and to a very limited extent in population concentration
points. Consequently these settlements should receive priority in terms of bulk infrastructure.
24
3.3.9 Land claims
Approximately 50% of the land in Greater Tubatse Local Municipality is under claims. The claims are almost exclusively
in rural areas that were part of the former Lebowa territory. Only one claim is found in near an urban area, and that
is, in Steelpoort with none in Burgersfort and Ohrigstad. In the first quarter of 2007 the records of the Limpopo Land
Claims Commissioner indicated that, out of 52 land claims that were lodged in GTM, 13 have been gazetted and 39
are in the process of being gazetted. The offices of the Land Claims Commissioner in Greater Tubatse in Limpopo were
investigating the claims, as required in terms of the Restitution Act.
Nearly 48 % of land claims have been submitted by the communities, 24 % by tribal authority, and 18 % by individual
persons (private claimants). Successful land restitution is sometimes undermined by the profile of beneficiaries who,
mainly as a result of our colonial and racist past, have limited financial resources, skills, etc required for productive
utilisation of the land resources once handed over to them.
3.3.10 Landownership
The landownership investigation was conducted through Aktex (Deeds Web) in large farm areas and the Provisional
Valuation Roll was used in formally laid out settlements to establish trends discussed below
Table 11: indicated Land Situated Within Former-Lebowa Boundary NO. OF FARMs ExTENT OWNERsHIp %
35 69320.2347 Government of Lebowa SA Development Trust Tribal Land 56
25 43251.6938 RSA 37.4
7 11793.6509 Private 9.3
67 124365 100
Table 12: Properties within former “whites” Republic of South AfricaNO. OF FARMs ExTENT OWNERsHIp %
15 16208.0890 Government of Lebowa SA Development Trust Tribal Land 12
13 17404.8141 RSA 13
21 103343.2545 Private 75
49 136955.1576 100
The landownership within the former Lebowa area is predominantly in the hands of the State, Government of Lebowa,
SA Development Trust and a small proportion is privately owned. Some townships of GTM are owned by national
government as a result of pre-1994 constitutional negotiations that saw national government as the successor in-title
of all homeland government’s assets. However, some of these properties have been transferred to the local authority
that is an appropriate level of government where they should be managed, viz Praktiseer Extension 1 and 2, Ga-
Mapodile and Mecklenburg.
Penge on the other hand is not proclaimed as a township. It is owned by the provincial government of Limpopo and
there are processes underway to formalise it since 2001/2002 to date.
In the township of Tubatse Extension 1 the erven have been transferred to residents. However many residential erven;
some vacant and others built up; business erven, social facilities e.g. for churches, police stations, schools, crèches,
25
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
community halls etc, are owned by the Limpopo Province government. Ordinarily the management of most social
facility erven is a municipal function in terms of the constitution. This anomaly should therefore be corrected.
The balance of land within the former Lebowa territory that comprise of villages settled by various tribes or clans and
vast unoccupied woodlands is owned by Republic of South Africa, Government of Lebowa, South African Development
Trust and few traditional authorities.
Residents on the rural/ peri-urban settlements are allocated the land parcel that they are settled upon by traditional
authorities. They neither have formal title deed nor any other real right document to the land they occupy. Theoretically
these cause uncertainties as to the rights of the occupiers of the land who invariably improve it at their cost but
cannot dispose their properties to whomever by transferring title deeds at Deeds Office.
Challenges facing spatial development• The municipality does not own strategic or potential land in the area
• Majority of the land is under land claim
• Traditional Leaders are responsible for land allocation especially in the rural villages
• The area is mountainous and is full of dongas
• Scattered settlements poses threat to land development
3.3.10.1 Settlement Patterns
A stark contrast exists in the spatial structure of the GTM. These areas are associated with the division
of the apartheid planning policies of the past, i.e. the ‘former Lebowa homelands‘. The northern part is
very rural composition and subsistence-based, whilst the southern part is far more developed and has a
more diversified economy, see map below.
The map above shows the general land use patterns of the municipal area. The existing spatial patterns
of the GTM area is dispersed with limited hierarchy of functional order. The majority of settlements in
the area have low density per km². The majority of villages are located far apart which, of course, makes
the provision and maintenance of services very costly.
These villages are furthermore too small to attain the economic thresholds required to provide social
facilities in a cost-effective manner. Poor co-ordination amongst the relevant government departments,
both on local and provincial levels, further aggravates the situation as there is no hierarchy or functional
order in which priority areas are identified
3.3.11 Climate and Environmental Analysis
3.3.11.1 Climate
The weather conditions for Steelpoort, Ohrigstad and Burgersfort region as a whole is a sub-tropical by
nature and conducive to agricultural production. The summer tend to be extremely hot and humid with
26
temperatures often exceeding 35 degrees Celsius between the months of October and march, while the
winters tend to be warm during the day and cool to cold at night and in the early mornings.
3.3.11.2 Geology
The GTM is situated on the eastern side of the Bushveld Igneous Complex and the Transvaal geological
system and is therefore underlain by both sedimentary and volcanic rock formations. Owing to the
geological composition, the area is characterized by steep rising mountains, which are linked by
undulating river valleys.
Minerals are found in abundance in the Bushveld Igneous Complex, which has seen the establishment
of several mines in the area. The most fertile soils in the region are to be found in the lower lying areas
of Burgersfort and Steelpoort, which are deep, well-drained and characteristic of deep sandy/loamy
soils of exceptional quality. These soils are suitable for most agricultural purposes.
3.3.11.3 Settlements Hierarchy
The Limpopo Spatial Rationale, 2002 and the Limpopo Growth Development Strategy identify hierarchy
of settlements for the Limpopo Province, which provide a framework to analyse spatial development
trends in Greater Tubatse Local Municipality. The settlement hierarchy is as follows:
• First order settlements (Growth points)
• Second order settlements (Population concentration points)
• Third order settlements (Local Service Points)
• Fourth order settlements (Village service area
3.3.11.4 Growth Points
There are three categories of growth points. They are described in terms of their relative importance in
the proposed hierarchy
Population growth / concentration points are clusters of individual settlements with large numbers
of people and high population densities. GTM has three population growth points and this is where
most number of people is concentrated. The projected population growth within the growth points
as identified in the Limpopo Employment Growth and Development Plan over the period 2005 to 2015
which shows that it will be more than double. This will have far more serious implications for the
demand for services in the municipal area.
27
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
Table 13: Settlement Classification and Population 2005 to 2020: Source (Greater Tubatse Municipality)pOpuLATION pROJEcTIONs INcREMENTAL
pOpuLATIONGROWTH RATE
pLANNING pOpuLA-
TION (2002)
sETTLEMENT cLAssIFIcATION 2005 2010 2020 2005-2010
2010-2020
2005-2010
2010-2020
577 Growth Point: Burgersfort Total 600 8589 28431 7989 19842 70.3 12.7
14700 Growth Point: Driekop Total 15291 16155 18985 864 2830 1.1 1.6
11065 Growth Point: Ga-Kgwete Total 11510 12161 14291 651 2130 1.1 1.6
207 Growth Point: Ohrighstad Total 215 227 267 12 40 1.1 1.6
998 Growth Point: Penge Total 1038 1097 1289 59 192 1.1 1.6
2019 Growth Point: Steelpoort Total 2100 2219 2607 119 388 1.1 1.6
54569 Pop Concentration: Batau / Praktiseer Total
56762 59968 70475 3206 10507 1.1 1.6
804 Pop Concentration: Ga-Masete Total 836 883 1038 47 155 1.1 1.6
15475 Pop Concentration: Ga-Masha Total 16098 17007 19986 909 2979 1.1 1.6
34773 Third Order Settlements Total 36171 38213 44910 2042 6697 1.1 1.6
6952 Commercial Farm Land Total 7231 7640 8979 409 1339 1.1 1.6
115439 Tribal Areas Scattered Total 120080 126867 149085 6787 22218 1.1 1.6
257578 Grand Total 267932 291026 360343 23094 69317 1.7 2.2
3.3.11.5 Provincial Growth Points (PGPs):
Burgersfort is identified as a provincial growth point and is located where the sections of R555 and R37
are coterminous, virtually at the centres of the Greater Tubatse. It is one of the major trading towns in
Limpopo. It consists of higher order land uses such as retail shops, warehouses, government offices
(e.g. Municipal offices), transport interchange facilities, e.g. taxi and bus rank, railway station; social
facilities, etc. serving the hinterland of about 50 km. This town is located roughly in the geographic
centre of the municipal area and this makes it accessible to the majority of people. “Burgersfort is also
a municipal capital of Greater Tubatse Local Municipality, which increases its status in the region.
A number of housing developments are planned on the northeast side of Burgersfort. This has also
triggered numerous retail and service businesses. The town is also starting to experience problem
characteristic of growing urban area, viz, the growth of informal settlements, traffic congestion on
certain road section, rising land prices, declining capacity of bulk engineering infrastructure, etc. It
also seems that the recent housing development is not match by the required social facilities, such as
schools and halls. The town is among the fast growing small towns in and around Limpopo.
3.3.11.6 District Growth Points (DGPs):
Steelpoort is identified as the second order of settlement hierarchy within the GTM. Steelpoort in
comparison to Burgersfort, comprised more of manufacturing industries and mining related suppliers
whilst the latter is more dominated by the retail and service centre. This growth point mostly serves
the mining community. There are about six operating mines around the town. Steelpoort town is
characterised by a mixed used development; including heavy engineering enterprises; suppliers to the
29
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
mines; transport facilities; building material suppliers; distributors/ wholesale, medium density housing
and small retail component. About sixty per cent of industrial township, i.e. Steelpoort Ext 7 is occupied.
Some of the service businesses related to mining have even emerged in fringe areas in the former
Lebowa i.e. Tukakgomo and Eerste Geluk, Mapodile just south of Steelpoort.
3.3.11.7 Municipal Growth Points (MGP):
These municipal growth points serve mainly the surrounding farming areas and most have higher
order goods. However, in traditional rural villages the economic sector is relatively small. There are
few local businesses but supported by a large number of population (GSDM LED, 2003). In GTM the
municipal growth points are Ohrigstad, Driekop and Mecklenburg. These settlements except Ohrigstad
are expected to grow faster due to mining related development occurring around them. More services
need therefore to be rendered in these settlements. Ohrigstad is a small rustic town located along major
roads of R36. The town is stagnant with little building activity taking place. There are number of vacant
stands and business premises in Ohrigstad.
These properties are also poorly maintained. Mecklenburg is located in the former Lebowa homeland
territory along the R37 Dilokong Corridor. The settlement of Mecklenburg is anchored by the police
station, Mines and the hospital, and surrounded by the series of hills forming an amphitheatre around
an extensive flat land. The settlement is formed along the movement spine road (R37) and a number of
roads taking off this main route at almost regular intersection. Generally, the housing densities in these
areas are not more than 10 units per ha.
3.3.11.8 Population Concentration Points (PCPs):
These are clusters of individual settlements with large number of people and high population densities.
Usually these settlements have a small or no economic base but with meaningful social facilities and
a substantial number of people. “In most instances the PCPs form part of the settlement cluster that
also has one or more growth points within a cluster. The PCPs are mainly located adjacent to the tarred
road or intersections of main district roads which provide accessibility to job opportunities elsewhere”
(GTM SDF, 2005 p: 25). In GTM, there are currently four population concentration points: Riba Cross,
Bothashoek, Mashamothane and Praktiseer. Praktiseer is a fast growing settlement that is merging with
Bothashoek. Some of the informal settlements around the east and south of Praktiseer e.g. Gamatodi
are in the process of being formalized.
3.3.11.9 Local Service Points (LSP):
LSPs are those settlement with a population of 5 000 people or more and do not form part of any clusters.
Most of these settlements are dispersed and it is only in few instances where two or more settlements
are grouped to each other (GSDM ISDF, 2005). “The potential for self-sustained development is limited
by the lack of development in these settlements” (GTM SDF, 2005 p: 29).
30
However, some LSPs have a potential to develop based on population growth or servicing function
potential. Some of these settlements have well-developed social facilities and are big in size
compared to the third and fourth order settlements. The LSP settlements in GTM are; viz, Kgautswana,
Maakgongwane, Masakeng, Mophalema, Mampuru and Extension, Malokela A and B and Leboeng.
Most of these settlements are small in sizes, and are located a distance from each other and this makes
it difficult to provide public facilities unless these are sited adjacent to a movement route (taxi or buses).
3.3.11.10 Village Service Point:
This category of settlements in the settlement hierarchy has been identified to allow for circumstances
in mainly traditional rural areas where three or more settlements are located in such a way that they are
interdependent or linked to one another by means of a specific social- infrastructure. These settlements
are mutually dependent on these services. The settlements are small and have small number of people.
For instance, there is only one high school in Maretlwaneng, Maadiswane and Ga-mamogolo (North
West of Penge).
3.3.11.11 Corridor development
Limpopo Employment growth and development plan (LEGDP), was developed due to the need to put in
place a development framework that should guide growth and development in Limpopo. With its strong
emphasis on improving the quality of life and sustainable development, the LEGDP aims to create a
conductive environment for the people of the province and is identifying the following areas for corridor
development:
• Dilokong corridor
• Burgersfort Stoffberg corridor
• Mining belt development
3.3.11.12 Strategic Located land
There are a number of strategically located portions of land in various growth points of the municipality,
namely:
3.3.11.12.1 Strategic land in Burgersfort
• Steelpoortsdrift 296 KT
• Appiesdoorndraai 298 KT (portions owned by National Government)
• Dresden 304 KT
• Viljoenshoop 301 KT
• Praktiseer 275 KT
All the above portions are owned by the national government (Department of Rural
Development and Land Reform). Processes are already underway by the municipality
to have the land transferred from the National government to the municipality in
31
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
order to develop integrated human settlements. In other instances (Praktiseer) the
municipality has already taken further steps to plan for settlement expansion in order
to accommodate the increasing pressure to occupy the land in search of proximity to
conventional services and work opportunities.
3.3.11.12.2 Strategic land in Steelpoort (privately owned)
• Olifantspoortjie 219 KT (some undeveloped portions thereof)
• Goudmyn 337 KT (some undeveloped portions thereof)
Funding is required to purchase the undeveloped portions from the current owners for
integrated human settlements and expansion of the town.
3.3.11.12.3 Topography
The northern part of the GTM is mountainous, thereby presenting engineering
challenges as far as the development and provision of infrastructure is concerned.
The southern part of the GTM is high-lying and has a more moderate topography. The
management of the koppies, valleys and the mountain ranges in the area is critical
to ensure environmental sustainability. The GTM area is highly mountainous hence
development occurs mostly in valleys. Settlements sizes are small and scattered due
to extensive broken terrain. In fact the ridges and the mountains form linear dividers
between the settlements. “In certain areas the topography is very steep creating
impossible mountainous terrain which is barely inhabited. The ridges further divide
the municipal areas creating pockets of homogenous composition, which determine
growth and development potential” (GSDM: Central Tubatse-Driekop, Praktiseer and
Burgersfort: Trends Report and Detail Development Plans).
The terrain dictates that larger settlement development occurs mainly in flat, low
lying areas in-between the mountain ranges. Generally the roads run at the bottom
of the basin/ valleys. It is therefore not surprising that the major roads, i.e. R555,
R37 and R36 and Jane Furse to Lydenburg road for most part run parallel to rivers.
The position of cross-link roads is dictated by topography that is flatter to allow the
road to pass through at reasonable flat grades. Where these roads pass through wide
basin, particularly in former Lebowa homeland motley of settlements have grown
around these major roads. In other words there is clustering of series of settlements
for almost the entire length of the road, e.g. Mecklenburg-Driekop (R37), Mapareng
-Tswenyane (R36) and Mampuru to Eerste Geluk (parallel toR555).
In former ‘white areas’ the spatial development is contrasting as it tends to be more
nodular therefore not continuous. For example, there is approximately 20 km of vacant
of intervening land between Steelpoort and Burgersfort and about 50 km between
Burgersfort and Ohrigstad along R555. This land need to be managed properly for the
expansion or growth of Burgersfort, Steelpoort and Ohrigstad towns.
32
Even the scattered rural villages have located within more developable basin almost
parallel to mountain range. The central spine road (normally the bus and a taxi route)
usually runs along the flatter alignment in the basin.
3.3.11.13 Rivers
There are three main rivers in the GTM, namely the Spekboom, Steelpoort and the Olifants, which is the
largest. The existence and topography of these water sources present an opportunity to create water
storage facilities. The construction of De hoop dam in the Steelpoort River which will be finalised in
2011 will have major benefits for agriculture, as well as for general development in the region. There
is a need to carefully assess the water needs of the area, taking into consideration the development of
the mining industry, which in itself need large quantities of water. Given the present water needs in the
municipal area, an increase in storage facilities or the expansion of the existing storage facilities needs
to be investigated.
Due to the lack of waterborne sewerage infrastructure in many of the villages, one of the major
challenges is the pollution occurring in these rivers. These rivers are a major source of drinking water
for the communities who do not have access to piped water. These rivers are also used for irrigation
purposes for agricultural activities within the municipal area.
3.3.11.14 Air quality and pollution
Air pollutants are defined as substances which, when present at high enough concentrations, produce
significant negative impacts on people and/or the environment. The main or key pollutants that are
likely to be detected in the district include SO2, NOX, CO, PM and VOCs. The origin and health impacts
associated with these pollutants will be discussed in a later chapter.
The Tubatse Local Municipality is found in the Northern eastern part of the District. The main towns
in the area are Burgersfort and Steelpoort. The main activity in this area is the mining of chrome and
platinum. There are also three chrome smelters in the area. This then means that the area is likely to
have air pollutants like sulphur dioxide, nitrous oxides, chromium (VI) and particulate matter. There is
also significant traffic in the area due to the transportation of minerals which introduces a substantial
pollution from the vehicles. Other pollutants like pesticides can also emanate from the farms around
Orighstad towards Burgersfort, of which the extent has not yet been determined.
One key element, which is of paramount importance for the Greater Tubatse is to put real time air
pollution monitoring measures in place as soon as is practically feasible, so as to determine the extent of
the problem and/or the concentrations of air pollutants in the area of jurisdiction, since air pollution has
economic and social implications. This will also allow for accurate dispersion modelling. Currently, the
district has three passive air quality monitoring stations which are being monitored by an independent
company. The pollutants being monitored include SO2, NOX and Fallout dust. The results that are being
obtained indicate the following:
33
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
Table 14: Air Quality Monitoring Station Positions in Tubatse (source GSDM air quality management strategy)
NAME OF THE FARM sTATION NuMBER
cOORDINATEs
Lion Ferrochrome 01 S24º49’10.1” E30º07’36.2”
Transmix 02 S24º39’46.3” E30º17’27.9”
Modikwa 03 S24º37’49.3” E30º09’04.3”
Table 15: Average Monthly SO2 concentrations in Tubatse (source GSDM air quality management strategy)
sAMpLE ID MONTHLY sO2 RsA/
spEc (ppB)
MAY/JuN AvERAGE
JuN/JuL AvERAGE
JuL/AuG AvERAGE
AuG/sEp AvERAGE
sEp/OcT AvERAGE
Lion Ferr 50 1.4 3.0 2.2 1.8 0.2
Transmix 50 1.0 1.7 0.6 0.3 0.1
Modikwa 50 1.5 2.0 0.9 0.2 0.2
Table 16: Average Monthly NOX concentrations in Tubatse (source GSDM air quality management strategy)
sAMpLE ID MONTHLY NOx RsA/
spEc (ppB)
MAY/JuN AvERAGE
JuN/JuL AvERAGE
JuL/AuG AvERAGE
AuG/sEp AvERAGE
sEp/OcT AvERAGE
Lion Ferr 80 10.4 11.3 16.0 7.8 5.2
Transmix 80 18.9 19.4 17.0 8.6 7.1
Modikwa 80 13.4 13.9 6.5 4.1 5.9
Table 17: Average Monthly Dust Fallout results (30 Day Average mg/m2/day) in Tubatse (source GSDM air quality management strategy)
sAMpLE ID MONTHLY DusT RsA/
spEc MG/M2/DAY
MAY/JuN AvERAGE
JuN/JuL AvERAGE
JuL/AuG AvERAGE
AuG/sEp AvERAGE
sEp/OcT AvERAGE
Lion Ferr 1200 377.00 - - -
Transmix 1200 119.00 169.00 499.31 504.25 537.18
Modikwa 1200 107.00 279.03 285.98 295.07
Surface pollution
The Municipality has outsourced the refuse removal services in Burgersfort Town and the contract
which was supposed to elapse on 31 October 2009 has been extended up to 2013.The Service
Provider appointed is The Waste Group Ingwe and Bauba Marumo Waste Management. The said Joint
Venture shared responsibilities for Burgersfort town whereby Bauba Marumo Waste Management is
responsible for refuse collection & street cleaning and picking up a litter while The Waste Group Ingwe
is responsible for the management of landfill site.
All the waste is collected and dumped at Burgersfort municipal landfill site. Empty cans, bottles, plastics
and paper are the most dumped litter in the areas of Burgersfort, Ohrigstad, Praktiseer, Steelpoort and
Ga-mapodile. There are no formal litter picking done in the rural areas of Greater Tubatse Municipality.
Old mining areas such as Penge, Taung, and Krommelenboog etc are regarded as the most hazardous
areas due to the asbestos remains exposed either by rain and life stock.
34
Emphasis must also be made on the mines and agricultural activities that are currently taking place in
the area in making sure that they are restricted from using hazardous chemicals that might result as a
threat to the environment. There is a need for the Municipality to develop Environmental management
policy and strategy in making sure that the environment is managed properly. Total amount of waste
collected for 2008/09 in Greater Tubatse amounts to 32 341 m³.
Challenges facing environment in GTM
• Lack of by-laws.
• Excess littering by hawkers in the areas of Burgersfort, Steelpoort and Ohrigstad
• Community with little education on environmental issues
• The Municipality has insufficient capacity on environmental management issues
• Mining activities causing serious threat to environment
• High Traffic volume
3.4 Infrastructure and Basic Services Analysis
3.4.1 Water
GTM is currently not either water services provider or authority. The Sekhukhune district municipality is the Water
services Authority. Due to the rapid growth of the municipality, GTM has made an application to the Minister and MEC
for local government to be designated as both the water and sanitation Authority and is still a-waiting for a response.
Due to its status as both water authority and provider, Sekhukhune District Municipality is also responsible for the
development of the Water Sector plans.
There are four main sources of water within GTM:
• Abstraction from surface sources within the area of jurisdiction (dams, springs, large rainwater collectors such
as natural rock surfaces or streams).
• There are 3 main rivers in GTM from which water is collected, i.e. Spekboom, Steelpoort, Tubatse and Olifants
rivers.
• Abstraction from groundwater sources within the area of jurisdiction (boreholes or dug wells);
• Purchase from external sources (e.g. bottled water)
There are five water schemes within the Greater Tubatse Local Municipality. These are:
• Lebalelo water scheme (northern portion)
• Penge local sources (north eastern portion)
• Lower Steelpoort Tubatse water supply scheme (central portion)
• Blyde Local source (eastern portion)
• De Hoop 1,8, and 13 water scheme (western portion)
35
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
Table 18: indicates 4 (four) water purification plants in Tubatse local municipality: NAME cApcITY REQuIREMENT
Burgersfort water treatment works 5ml/day Increase capacity
Steelpoort water treatment plant 2ml/day Increase capacity
Praktiseer water treatment plant 5ml/day Increase capacity
Penge water treatment plant Refurbishment
Historically, piped potable water at GTM was available only in the towns of Burgersfort, Steelpoort and Ohrigstad,
few ‘black” formal townships e.g. Praktiseer and Eerste Geluk, mines and public institutions, e.g. hospital, police
stations, etc. Most public institutions had their own supply system, mainly from boreholes. Recently the water supply
network has been extended for domestic uses to many villages within the former Lebowa homeland territory. In the
rural or peri-urban areas, water is provided mainly through standpipes on the streets. It is therefore not surprising
that “17 % of the people obtain their water from natural resources which includes rivers, streams and rainfall, 51.8
% of people obtain water from public taps, 6.8% from a borehole and only 12.3% from an on-site tap”. Based on the
census survey, 2007, it is expected that the proportion of urban households will increase gradually in future as people
move from scattered (remote) villages to denser population concentration points where more services are available.
The voluntary movement of young people away from remote rural settlements will reduce water demand at these
places in future and will increase water demand at the concentration points where the people are moving to. It is
important to prioritise planning of larger and denser settlements where people are migrating towards for service
delivery to ensure greater impact.
The protracted drought in Sekhukhune region has forced the public authorities to speed up the extension of water
network or delivery of water through tanks in the rural / peri-urban areas. This demand has been exacerbated by
the increasing densification of few settlements where population is gravitating towards. The recent proliferation of
mining activities, edging closer to twenty in the municipal area will be more than double the amount of water required
in the future. In this regard the estimated total mining water demand was between 27.2 and 38.5 millilitres per day
in 2005 and is projected to be between 76.1 and 100.1 by 2020.
The recent investigation by the Department of Water Affairs confirmed that most feasible option to improve water
supply in this drought stricken region was to construct De Hoop dam and bulk raw water distribution system with
connections of Olifants via Lebalelo Water Scheme. The construction of the dam has commenced and will only be
functional in 2010. Following are figures indicating water access by households in the area:
Table 19: indicates Source: comparative information on basic services 2009: COGTA sERvIcE TOTAL
HOusE-HOLDs
HOusE-HOLDs
AccEss
HOusEHOLDs AccEss pER-
cENTAGE
HOusEHOLDs BELOW BAsIc LEvEL/ BAck-
LOGs
HOusEHOLDs BE-LOW BAsIc LEvEL/BAckLOGs pER-
cENTAGE
Water 66 611 53 026 79.3% 13 759 20.7%
The Greater Tubatse Municipality has entered into a Public Private Partnership project with the National Treasury
for the conducting of study which commenced in June 2009 on water supply and reticulation in the area, however
there are currently five known categories of consumer profile; viz. households, mines, industrial, commercial and the
36
others, which refers to users such as irrigation, institutional, etc. There is no available database on the number of
commercial users in Greater Tubatse Local Municipality. However, it can be noted that there is a spatial concentration
of commercial activities at urban nodes i.e. Burgersfort, Steelpoort and Ohrigstad.
Total consumption (for commercial activities) can be estimated as a small fraction of domestic consumption and is
unlikely to change much in the foreseeable future. Other consumers include agriculture and government institutional
users” (GSDM WSP, 2005, p: 38). The commercial users are highly competitive users with well established water
rights.
Mines and Smelters are by far the greatest consumers of water in Greater Tubatse municipality, followed by irrigation
and domestic use. The (mines) water needs are likely to increase even further in the medium term. Irrigation needs
are also likely to increase considerably with the re- establishment of former government irrigation schemes (RESIS
Project by Department of Agriculture) that is currently underway. The spatial plan should take cognisance of the
need to extend water infrastructure particularly to meet water requirements of mines and households. Table below
indicates different water sources in GTM.
3.4.1.1 Free basic water
The municipality is providing free basic water services to its communities especially in the areas falling
within the then Lebowa borders. Most of the households in Greater Tubatse can be defined as poor
or indigent – where the total income is below R1, 500 per month. Present, approximately 60% of the
households in Greater Tubatse fall into this category, however the municipality updates its Indigent
Register on annual basis. These are the households to which Free Basic Water must be supplied, and
to whom the Equitable Share subsidy applies. The Municipality has last updated its Indigent Policy and
Register for provision of Free Basic Services during 2008/09 financial year.
Table 20: below indicates free basic water service backlogs. Source: basic services publication: 2009: COGTAsERvIcE TOTAL
HOusE-HOLDs
TOTAL INDIGENT HOusE-
HOLDs REG-IsTERED
TOTAL INDIGENT HOusE-HOLDs sERvED
TOTAL INDI-GENT HOusE-HOLD sERvED IN A pERcENT-
AGE
TOTAL HOusE-HOLDs sERvED
TOTAL HOusE-HOLD sERvED As A pERcENT-
AGE
Free basic water
66 611 39 000 41 610 105.5% 41 610 105.5%
Water critical challenges
• Aging infrastructure
• Drought
• Lack of financial resources
• Topography of the area
• Informal and scattered settlements
• GTM Municipality not water authority
37
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
3.4.2 Sanitation
The Water Services Provider status which has been delegated to GTM in towns of Burgersfort, Steelpoort and
Ohrigstad also includes the provisioning of sanitation services to the identified areas. Only 8.5 % of households
have access to waterborne sewerage systems and they are concentrated in and around Burgersfort, Steelpoort and
Ohrigstad. The three towns within Tubatse Municipality are served with potable and waterborne sewer system. In
rural areas, it is estimated that 25% of all villages are served to RDP level of service. Generally, sanitation facilities
in some villages are in poor state (GSDM Cross Border Feasibility Study, 2003). Most industrial consumers are in the
existing urban centres (e.g. Burgersfort) and discharge their effluent into the municipal sewers for treatment at the
Waste Water Treatment Works.
Table 20: indicates the list of the current status of Wastewater Treatment Works is indicated below:LOcATION TYpE pREsENT cApAcITY REQuIREMENT
Burgersfort Conventional 1.5Ml/day Increase capacity
Praktiseer Ponds 0.4Ml/day Increase capacity
Penge Conventional Under construction
Ga-mapodile Ponds Needs proper fencing and increase capacity
Ohrigstad Septic tanks Construction of new sewerage system
Steelpoort Conventional 0.5ml/day Increase capacity
The Steelpoort sewerage plant is refurbished to cater for the development taking place in the area and to eliminate
overcapacity to the facility. There is a clear overloading of the plant due to chemical toilet and septic tank discharged
at treatment works. However there is a planned sewerage works downstream for Steelpoort and Winterveldt.
Almost 5.5 % of the households use VIP (Ventilated Improved Toilets) toilets with no bucket system in use. In terms
of the National Sanitation Policy, there is a variety of forms or equivalent of VIP as long as it meets certain criteria, in
terms of cost, structures, health benefits and environmental impact. Bucket latrines are the most obvious that do not
meet RDP requirements and are not in existence in GTM.
Table21: below indicates sanitation services by households: Source: basic services publication: 2009: COGTAsERvIcE TOTAL
HOusE-HOLDs
HOusEHOLDs AccEss TO sANITATION
HOusEHOLDs AccEss TO sANITATION
IN A pERcENT-AGE
HOusEHOLDs BE-LOW BAsIc LEvEL/
BAckLOGs
pERcENTAGE BAck-LOGs
Sanitation 66 611 10 193 19.3% 53 736 80.7%
The envisaged increase urbanisation within the GTM will invariably require substantial investment in bulk sanitation
infrastructure.
38
Table 22: below indicates household by type of toilet facility in GTM. TOILET TYpE cs 2007 2008-09
Flush toilets (connected to sewerage system) 4796 5221
Flush toilets with septic tanks 865 1112
Dry toilet facility 2931 2931
Chemical toilets 4330 4567
Pit latrine with ventilation (VIP) 46961 47411
None 6728 6278
Sanitation challenges
• Water treatment plants over capacity
• Aging infrastructure
• Informal settlements
• GTM not water and sanitation authority
• Limited resources
3.4.3 Electricity
GTM is not the electricity Authority nor Provider and this is the sole competency of ESKOM. The municipality is only
responsible for the coordination of the service by making sure that communities are consulted and by compiling a
priority list. The only provider of electricity in the region is ESKOM; which has installed basic infrastructure to provide
electricity to the communities. For most part, the rural population has no electricity. Lack of access to electricity to
some villages poses a problem to the GTM as it impacts negatively on local economic development and community
projects.
It is important that ESKOM and DME speed up the process of electrification by making sure that all communities
have access to electricity by 2014 as set in the millennium targets. According to the report presented by ESCOM,
in August 2009, indication was made that a total number of 144 villages within the jurisdiction of the Greater
Tubatse municipality is already electrified and 56 villages are still without electricity. ESCOM has connected 37 650
households and a total of 28 961 households are without electricity. DME, ESKOM and Greater Tubatse municipality
have developed electricity priority list, which will be used as a guiding tool for the electrification of villages within
the area of Tubatse.
For the 2009/10 financial year ESKOM has electrified Dresden village benefitting 600 households. The municipality
with the assistance of the Department of Cooperative Governance and Traditional Affairs has electrified Tswenyane
village (245 connections), Lepelle village (210 connections), Bokome village (218 connections), Ditentseng village
(262 connections) and Kalkfontein (358 connections). An overall amount of R11 760m has been utilised to electrify
the above stated villages.
ESKOM has developed a District Wide Energy Master Plan which will also assist in fast racking electrification of
villages within the Greater Tubatse Municipal area of jurisdiction.
39
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
Table 23: below indicates total number of households with electricity and backlogs: Source: basic services publications 2009: COGTA
sERvIcE TOTAL HOusE-HOLDs
HOusEHOLDs WITH AccEss
HOusEHOLD AccEss IN pER-
cENTAGE
HOusEHOLDs BELOW sERvIcE/BAckLOGs
BAckLOG pERcENTAGE
Electricity 66 611 37 650 63.3% 28 961 29.7%
Table 24: below indicates villages electrified by GTM during 2006/07 to 2010/11 FYpROJEcT NAME HOusE-
HOLDs BENEFITED
BuDGET sTATus
06/07 07/08 08/09 09/10 10/11
Installation of communal lights in Ohrigstad
230 3.0m Complete
Installation of Apollo lights 32 692 1.5m Complete
Electrification of Magakala and Manoke villages
2 147 5.0m Complete
Electrification of Kalkfontein, Ditenseng, Bokome, Lepelle and Tswenyane villages
1 293 11.7m Complete
Electrification of Ga-Maepa village
200 2.0m
Electrification of Kgotlopong village
423 4.2m
Electrification of Maahlashi village
297 2.9m
Table 25: below indicates backlog electrification per Village: Source: Stats SA CS2007 vILLAGE TOTAL BAckLOGs
Shakung(MorokeCluster) 630
Motloulela(MalokelaCluster) 410
Modubeng(MalokelaCluster) 700
Ga-phala(Malokelacluster) 225
Malokela(Malokelacluster) 850
Kgopaneng(Malokelacluster) 280
Maakubu(Malokelacluster) 620
Moshira(Malokelacluster) 300
Makgalane 540
Banareng 660
Makopung 563
Mokutung 2 60
Malaeneng 439
Mapareng 480
Sekopung 360
Makofane/Pidima 240
Ga-Malepe/Ga-Moraba/Ga-Motshana 110,50,300
Ga-Mokgotho/Maretlwaneng/Mankele 370,290
Segorong/Mamogolo/lefahla 256,70,45
Kgotlopong/Taung/Matokomane/Makotaseng 2700
Madikane 312
Senyatho 530
40
vILLAGE TOTAL BAckLOGs
Radimpsa 420
Sekhwakhwaila 390
Dithamaga 38
Leboeng/Newstands 439
Phadishanong 545
Driekop-France 1500
Mandelapark 680
Kampeng 610
Magologolo 188
Maputle 393
Dibakwane 290
Barelong/Barcelona 261
Kutollo 350
Koppie
Buffelshoek
Table 26: below indicates other source of energy used per household:sOuRcE OF ENERGY cENsus 2008/09
Gas 104 67
Paraffin 2931 5679
Solar 156 77
Wood 22890 22890
Animal dug 666 666
Free Basic Electricity
The main challenges facing GTM revolves around the electricity capacity in the area as outlined by Eskom. Improved
awareness in terms of the collection of tokens by beneficiaries also needs to be improved. Currently only 22.1% of
the total households in GTM are receiving Free Basic Electricity.
Table 27: below indicates total number of households receiving free basic electricity and backlogs. Source: public service publication 2009: COGTA
sERvIcE TOTAL HOusE-HOLDs
TOTAL INDIGENT HOusE-HOLDs
TOTAL HOusE-
HOLDs Ac-cEss
HOusEHOLD sERvED
pERcENTAGE
BAckLOGs BAckLOGs pERcENTAGE
Free basic electricity
66 611 39 000 6 471 22.1% 32 529 70.8%
Challenges
• GTM not electricity authority
• Highest electricity backlogs in the district
• No electricity capacity available in the area
• No accurate indigent register for the provisioning of free basic electricity
• Limited resources
41
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
3.4.4 Housing
Bulk of the 66 611 units within GTM are found in rural and peri-urban settlements. For historically reasons these rural
or peri-urban settlements occurred within the former Lebowa homeland part of the municipality. Generally these rural
settlements are very small with most of them comprising of less than 1000 housing units. There are close to 180
settlements spread across the GTM area. Although the settlements are scattered they are only found in the northern
and north-western parts of the municipal area with private housing developments taking place in the southern part
of the GTM.
The biggest complex of settlements occur around the Praktiseer/ Bothashoek /GaMatodi and Riba-cross where about
40 000 people reside, which is more than 15% of the total population. Another expansive cluster of settlements is
the band along R37 (Dilokong Corridor) that includes Mecklenburg and Driekop. There are other eight clusters of
settlements that are comprised of relatively fewer housing units. These include a linear grouping of settlements
(Parallel to R555) from Mampuru in the south to Eerste-Geluk in the north.
The Mampuru - Eerste Geluk settlements mainly accommodate people working in the mines, retail and industries
around Steelpoort. The other clusters of settlements are around Alverton- Maahlashi, Kgotlopong-Kgautswana,
Matokomane-Taung, Mabotsha, Ga-Moraba, Maakubu- Motloulela, Mapareng-Tswenyane, Ga-Maepa, Ga-malekane
and Penge and its environs.
The majority of these settlements are unplanned. There are however few planned and formal housing development
within the GTM that were planned prior to 1994 i.e. Mecklenburg A and B, Penge, Driekop, Mapodile/Eerste Geluk and
Praktiseer. These settlements except Mecklenburg A and B and Driekop in the main enjoy full engineering services
like waterborne sewerage, water connected to plumbing fixtures inside the house, some or most roads are surfaced
with asphalt, regular waste disposal and electricity. These settlements together provide about 6000 residential erven.
The unplanned villages generally have poor services characterized by gravel roads, self-made pit toilets and lack
of electricity and solid waste disposal. However in most settlements water is provided through standpipes at least
along the main roads. As stated above, historically the former “white towns” of Burgersfort, Steelpoort and Ohrigstad
had limited housing stock. Before the recent housing development associated with the expansion of platinum group
minerals mining activities there were only 405 formal houses in these towns (299 on township erven and 106 on farm
portion) as late as 2001/2002. High level of engineering services was generally provided in these areas including
housing on the farm portions. In the farm portions there was reliance to on-site services, e.g. septic tanks, water
boreholes, etc.
Until very recently the formal housing stock in the entire municipal area was about formally demarcated housing
erven estimated to be about 6000, which is just 10% more of the total housing stock. A significant number of housing
in these areas is still rudimentary in terms of quality of material and construction technology. Most of these houses
are in Driekop, Mecklenburg and parts of Praktiseer, This underscores the importance of formalizing housing in peri-
urban settlements in appropriate locations so that the residents can have more secure tenure so that high level of
engineering and several services can be extended and housing could be improved.
42
Table 28: indicates the Greater Tubatse Housing Backlog source: Source: Greater Tubatse Municipal IDP Housing Chapter
WARD NO. NuMBER AND TYpE OF HOusING uNITs WARDs BAsED WAITING LIsTs
SETTLEMENT NAME
INFO
RM
AL
BA
CK
YAR
D
HO
STEL
TRA
DIT
ION
AL
FAR
M
SUB
-TO
TAL
SOC
IAL
GA
P
BO
ND
ED
SUB
TOTA
L
TOTAL
Ward 1 65 1 184 250 0 250 155
Ward2(Steelpoort) 144 4 215 363 500 500 863 201
Ward3 66 0 128 194 0 194 117
Ward4 48 1 143 192 0 192 172
Ward5 67 3 53 123 0 123 298
Ward6 49 3 346 398 0 398 198
Wad7 201 11 88 300 0 300 152
Ward8 179 4 116 299 0 299 271
Ward9 20 0 109 129 0 129 168
Ward10 75 0 52 127 0 127 232
Ward11 277 2 84 363 0 363 269
Ward12 41 1 117 159 0 159 183
Ward13(Praktiseer)
255 3 28 286 2500 2500 2786 115
Ward 14 203 4 90 297 0 297 152
Ward15 33 0 119 152 0 152 259
Ward16 23 2 311 356 0 336 237
Ward17 18 0 61 79 0 79 413
Ward18(Burgersfort)
51 4 400 455 3500 3500 3955 290
Ward19 8 3 108 119 0 119 191
Ward20 49 1 154 204 0 204 266
Ward21 48 0 31 79 0 79 175
Ward22 21 2 257 280 0 280 163
Ward23 59 2 151 212 0 212 187
Ward 24 25 0 353 378 0 378 156
Ward 25 312 3 80 395 2000 2000 2395 339
Ward 26 53 0 238 291 0 291 160
Ward 27 150 4 180 334 0 334 150
Ward 28 5 3 375 384 0 384 177
Wad 29 23 9 203 235 0 235 152
2568 70 0 4775 0 7413 5000 0 3500 8500 15913 5989
43
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
Table 29: below indicates household by type of main dwelling in GTM (source stats SA.CS 2007)HOusING TYpE cENsus 2001 cENsus 2007
House or brick on a separate stand or yard 36222 48497
Traditional dwelling/huts/structures made of traditional material 9568 7593
Flat in block of flats 364 66
Town/cluster/semi detached house(simple, duplex, triplex) 208 66
House/flat room in backyard 520 1132
Informal dwelling/shark in backyard 1404 1998
Not in back yard e.g. in an informal/squatter camp settlement 3276 5528
Room/flat not back yard but on a shared property 312 733
Caravan or tent 156 66
Private ship/boat 00 00
Workers’ hostel(bed/room) 00 733
Other 00 198
Table 30: Housing needs for the period 2008-2012 TYpE 2007 2008 2009 2010 2011 2012
TRADITIONAL 5440 5518 5590 5659 5726 5790
INFORMAL 3677 3729 3778 3825 3870 3913
BACKYARD 1574 1597 1617 1637 1657 1675
TOTAL 10691 10844 10985 11121 11253 11378
% growth per annual 1.4 1.3 1.2 1.2 1.1 1.3
In terms of the report prepared by EastCon for Steelpoort Valley Producers Forum about 8500 additional housing
is required to accommodate new mining workers and their families in the short term. These housing units will be
distributed as follows: Burgersfort (3500) Praktiseer (2500 residential erven), Driekop (2000 residential erven) and
Steelpoort (500 residential erven). In 2003, specific sites were identified to locate the required housing units.
The proposed housing development at Driekop (part of Dilokong Corridor) is located on the eastern side of Modikwa
Mine but on the western side of R37 on the farm Hendricksplaats 281 KT. At Burgersfort, housing is proposed in
five different locations on portions of farms Leeuwvallei 297 KT, Appiesdoorndraai 297 KT, Witgatboom 316 KT and
Mooifontein 313 KT. These farms are vacant properties from eastern, to northern and western parts of the existing
town.
At Praktiseer the proposed development is located to the east and south of the existing township of Praktiseer 275
KT and Appiesdoorndraai respectively. At Steelpoort a medium income housing i.e. Steelpoort Extension 1 and 4 was
recently completed on the portion of Goudmyn 337kT on the western side of R555. Between 2002 – 2008 residential
township of Burgersfort Extensions 10, 15, 16, 26, 30 and 34 in Burgersfort town yielding just more than 2500 erven
were approved. This is a testimony to rapid demand for housing.
44
Housing challenges
• Staffing shortages with only one person (building inspector) working on housing in the municipality.
• Lacking of experience/expertise regarding technical aspects around housing in the municipal area.
• Poor communication and information dissemination between Limpopo Provincial Government and the local
authority regarding housing matters.
• Lacking of consumer education for housing beneficiaries.
• The bulk water, sanitation and electricity network in and around the various Development Nodes will have to
be extensively upgraded to cater for projected future growth.
• No land within the municipal area belongs to the municipality, while some of the land portions belonging to the
other spheres of government are subject to land claims.
3.4.5 Waste and Refuse Removal
Waste management services are rendered in a few areas of GTM by the municipality or independent contractors in
private properties. Dumping and burning of waste is the more common way of disposing waste.
Most villages in Tubatse do not have access to this service. The rate of improvement in refuse removal has also
been very slow. Starting off a low base of only 4 729 in 2007/08 of the households having their refuse removed by
municipality weekly, the situation only improved to 4707 of the households receiving the service by 2009.
Table 31: indicates Basic services publications 2009 COGTAsERvIcE TOTAL
HOusE-HOLDs
HOusEHOLD AccEss TO
sERvIcE
pERcENTAGE HOusEHOLDs
AccEss TO sERvIcE
BAckLOGs TO sERvIcE
pERcENTAGE BAckLOGs TO
sERvIcE
Refuse removal 66 611 4 707 7.1% 61 904 92.9%
Table 32: below shows other means of refuse removal by type per household:REFusE BY TYpE cENsus 2001 cENsus 2007 2009
At least once a week 3484 4729 8557
Less often 312 733 733
Communal refuse dump 260 932 932
Own refuse dumps 33852 50454 50454
No refuse disposal 14092 8926 8926
Other 00 67 67
Table 32: indicates the areas or villages receiving refuse removal services in GTM: source GTM Accounts 2009AREA NO: OF HOusEHOLD REcEIvING sERvIcE
Ohrigstad 190
Praktiseer 2332
Steelpoort 230
Burgersfort 1264
Ga-mapodile 691
Solid waste disposal and industrial waste disposal infrastructure is needed as there has been an emergence of many
industries thus the high demand. There is a little of these waste disposal facilities in place within GTM, some are not
regulated to ensure environmental soundness, health and hygiene.
45
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
The municipality renders waste collection and cleaning service. Waste is collected and deposited in landfill sites. Bins
and containers are provided in public areas for collection of waste. Waste collection is done on Monday to Friday. In
Burgersfort business and household waste is collected daily except on Sundays. However, waste is not collected in
time and it was reported that the personnel is not enough for the rendering of efficient service. In year 2005 it was
estimated that 50 000 tons of waste was generated throughout GTM but only 5% was collected.
The projected population in 2025 is 415 000 which will generate 75 000 tons of waste. This would require significantly
improved operations on parts of the local authority to extend its service to all households and substantially improve
landfill capacity. The Municipality has initiated a Public Private Partnership on Waste Management Project which will
assist in alleviating the waste removal backlogs as experienced in the area. The National Treasury has supported
the initiative and has funded the project with an amount of R5 million during the 2008/09 financial year. Section 78
processes are already done and the municipality is looking forward to commence with the second phase which is the
procurement stage.
CHALLENGES
• Permit of the existing landfill site has expired; Department of Environmental Affairs and Tourism was approached
for the extension of the license.
• Companies and communities utilizing municipal landfill site not paying the service and this affects revenue
negatively.
• BY-laws not yet gazetted to regulate illegal dumping.
3.4.6 Roads and Storm water
The road network of Greater Tubatse is approximately 1 318 km in extent. 39 % of this is a surfaced road and the
61% is comprised of un-surfaced roads. This means the majority of the nodes depend on un-surfaced roads for access
to socio-economic opportunities (GTM Local Economic Development -Phase 2, 2007). These un-surfaced roads are
particularly found in scattered villages. Most of these roads are poorly maintained and thus transport routes are
limited by deteriorating roads.
In its quest to upgrade the standard of roads in the area, the municipality has created a public works unit which
was officially launched on the 10 September 2008. These roads are mainly used by buses and taxis to transport
passengers in the area. Both surfaced and un-surfaced roads deteriorate during rainy seasons and lack of storm water
drainage and bridges worsen the problem.
Table 34: below indicates road ownership in terms of kilometres: NAME pAvED GRAvEL EARTH TRAcks
SANRAL 173km
RAL 127km 103km
DISTRICT roads 15km 381km
GTM roads 76km 194km 249km
46
Table 35: below indicates roads and storm-water projects implemented during the 2006/07 to 2010/11 financial years:
pROJEcT NAME HOusEHOLDs BENEFITED
BuDGET sTATus
06/07 07/08 08/09 09/10 10/11
Upgrading of Mapodile road 727 2.5m Complete
Upgrading of Ohrigstad roads 230 3.5m Complete
Upgrading of Praktiseer roads 4 800 4.8m Complete
Upgrading of Burgersfort roads 2 000 6.2m Complete
Upgrading of Ngwaabe roads 3 980 3.8m Complete
Upgrading of Praktiseer roads 4 800 4.1m Complete
Upgrading of Burgersfort roads 32 682 8.8m Complete
Upgrading of Ngwaabe roads 3 980 4.5m Complete
Upgrading of Burgersfort public transport interchange facility
32 692 14m Complete
Upgrading of Praktiseer roads 4 800 3.7m 5.5m Complete
Upgrading of Praktiseer roads 4 800 Complete
Upgrading of Burgersfort roads 32 692 complete
Ga-malekane bridge 9 161 5.4m 7.7m
Riba cross to Ga-Riba road 3 817 3.5m Complete
Regravelling of Ga-moraba road(ward 26)
300 2.6m Complete
Regravelling of Kgautswane road 1 163 2.8m Complete
Upgrading of Praktiseer roads 4 800 5.4m Complete
Upgrading of Ohrigstad roads 230 4.9m Complete
Construction of Tukakgomo bridge
553 1.5m Complete
Construction of manyaka bridge 677 1.5m Complete
Construction of Mareseleng bridge
2 268 4.5m Complete
Upgrading of Burgersfort roads 32 692 4.8m On-going
Development of bridges for Mandela, Molongwane and Taung villages
3 366 1.2m Complete
Upgrading of Praktiseer roads 4 800 3.2m On-going
Upgrading of Ngwaabe roads 4 852 2.5m On-going
Construction of Tidintitsane bridge
396 1.7m Complete
Upgrading of Bothashoek roads 2 495 4.4m Complete
Construction of Lekgwareng bridge
310 1.9m Complete
Construction of Makofane bridge 816 1.9m Complete
Upgrading of Ga-phala to Modubeng bridge
1 325 4.4m Complete
Construction of Leboeng access road
2 611 4.3 On-going
47
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
Table35: below indicates backlogs on Municipal roads: Source GTM roads and storm water infrastructure asset management plan 2008
WARD NO: EsTIMATED kM AssuMED TOTAL HOusEHOLDs
EsTIMATED HOusE-HOLDs AFFEcTED
1 20 2 356 471
2 80 100 80
3 50 1 664 832
4 10 1 664 166
5 30 1 664 499
6 20 1 664 333
7 50 1 664 832
8 20 1664 333
9 10 1 664 166
10 20 1664 333
11 80 1 664 1 331
12 60 1 664 998
13 10 1 384 138
14 20 2 412 482
15 30 2 594 778
16 50 1 664 832
17 50 1 664 832
18 20 50 10
19 50 1 664 832
20 40 1 664 666
21 30 1 664 499
22 10 2 100 210
23 30 1 664 499
24 30 1 664 499
25 10 2 1OO 210
26 60 1 664 998
27 30 1 664 499
28 10 1 664 166
29 70 2 733 1 913
There is however a fair road networks system that links most areas in Tubatse with major provincial road such as
R555, R36 and R37. R37 (which has recently become a national road) connects GTM to other municipal areas and it
forms part of the Dilokong Corridor. The poor conditions of roads make public transport critical to the movement of
goods and service. But this is undermined by the fact that the settlements are dispersed and have low population
densities leaving public transport less frequent.
The busiest roads are Road R37 and R555. These serve also as the main collector routes from the major urban
nodes such as Burgersfort, Driekop, Mecklenburg, Steelpoort and Bothashoek and the respective villages. These
urban nodes are main areas where passengers are concentrated hence are perceived as the major generators of
traffic. The mining activities along Road R37 and the villages located along this road generate high volumes of public
transport on this route. It was therefore recommended in the Local Economic Development report that the widening
and rehabilitation of R37 should be prioritized.
48
The conditions of the roads result in traffic congestion, accidents, high repair and maintenance cost...etc which
combine to reduce productivity. Lack of maintenance and upgrade of roads increase the economic inefficiencies of
the road transport services. There is a need to encourage haulage of goods, to and from the mines to rail system,
particularly those in bulk.
3.4.7 Transport
The Greater Tubatse municipality has developed an integrated transport plan which indicates that the municipality
has two modes of transport found in the area, viz, railway and road transport. The road transport is the common public
transport to provide service to the community in remote areas, i.e. buses (Greater North Transport) and mini-taxis. It
also serves as the mode to transport raw materials to and from the mines including agricultural products.
The route utilisation survey recorded 405 taxi vehicles and 18 Great North Transport buses and a number of other
private bus transport companies like, Sekhukhune express, Mahlangu bus services and Thembalethu bus services are
providing service in this municipal area.
Unregulated and influx of Mini taxis operating as metered taxis within the Burgersfort and Steelpoort areas are
posing a threat to road users as majority of them are not road-worthy. The survey also showed a high volume of
weekend operations to transport shoppers from rural hinterlands to Burgersfort. The taxi route survey showed that
there were 71 taxi and bus routes in Greater Tubatse Municipality but in this survey the outward bound and inward
bound route were individually identified.
These routes virtually penetrate all the villages around the urban centres of Burgersfort, Steelpoort and Ohrigstad.
The spatial structure of GTM particularly the radial nature of public transport into and from Burgersfort town sees
this town function as a focal point but there is no real inter-modal system to speak of. The buses and the taxis do not
feed each other but generally compete along the same routes. The buses however tend to pick the denser routes,
Burgersfort function as transport interchange where passengers can change routes within the GTM area or beyond.
In terms of destination Burgersfort functions as fulcrum of the local taxi movement with the rest going to either
Ohrigstad or Steelpoort. There are long distance taxis operating from three urban nodes going to areas beyond
municipal boundaries such as Polokwane, Witbank, Jane Furse, Middleburg, Tembisa and Johannesburg. Railway
transport of general freight is only rendered in Ohrigstad, Burgersfort and Steelpoort. There is no passenger train
service, particular referring to daily commuter service, operating in the area. The Greater Tubatse municipality
in partnership with the department of Transport is busy with the construction of multimodal transport facility in
Burgersfort town and a taxi rank around Driekop area. Few transport facilities are available in the area and their state
is as follows:
The availability of stable public transport and different modes of transport (taxis and buses) is a strength that is
acknowledged in GTM area. However lack of infrastructure has become a challenge. There is lack of public transport
facilities and as such the overwhelming majority of the taxi facilities are informal. The National department of
transport, Provincial department of transport together with the municipality are busy with the development of plans
49
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
for the integrated modal transport facility in the Burgersfort town which will also add value to the transport service
after its completion. There are only seven identified formal public transport facilities:
• One in Praktiseer
• Four in Burgersfort
• One in Steelpoort
• One in Ohrigstad
The state of taxi ranks is as follows:
• - 28.6 % of taxi facilities are on street facilities
• - 85.7% of taxi facilities are informal facilities;
• - 8.6 % of taxi facilities have lighting;
• - 17.6 % of taxi facilities are paved;
• - 2.9 % of taxi facilities have public phones;
• - 14.3% of taxi facilities have offices
• - 11.4 % of taxi facilities have shelters; and
• - 14.3 % of taxi facilities have ablution facilities
Challenges facing Transport
• Insufficient taxi rank infrastructure
• Most of the Mini or metered taxis not road worthy
• Traffic congestion
• No transport facilities in some parts of the municipality especially in rural areas.
• Mushrooming of pick up points within town by mini taxis
• Mini taxi operating beyond their boundaries
• Delay by the department of road and transport to issue permits for taxis.
3.4.8 Cemeteries
There are 4 (four) well developed or formal cemeteries in the Greater Tubatse municipality’s area of jurisdiction. The
four cemeteries were developed by the municipality during the last three financial years. Praktiseer cemetery site is
the largest in the area followed by Penge, Ga-Mapodile and Ohrigstad cemeteries.
Community members in rural areas are using community grave yards which are not well fenced, have no ablution
facilities and no water to drink during funeral processes. Several requests were received from the communities
during the IDP consultative meetings for the development of better cemeteries. The municipality has identified 1 (one)
cemetery from each ward for fencing and construction of ablution facilities using the EPWP Allocation received during
2010/11 financial year. This process will be facilitated until majority of graveyards in rural areas are well developed
50
Table 36: below indicates cemeteries projects implemented during 06/07 financial year to 10/11 FY
pROJEcT NAME HOusEHOLDs BENEFITED
BuDGET sTATus
06/07 07/08 08/09 09/10 10/11
Upgrading of Mapodile cemetery 727 Complete
Upgrading of Ohrigstad cemetery 300 Complete
Upgrading of Praktiseer cemetery 4 800 Complete
Upgrading of Penge cemetery 300 Complete
Challenges
• There are still villages where people use their backyards or kraals as graveyards
• Lack of land for the development of Burgersfort Cemetery
• The cemeteries which were developed at Praktiseer, Ohrigstad and Mapodile are falling apart because of poor
workmanship during construction.
3.5 Local Economic Development
3.5.1 Economic Profile of GTM
The Greater Tubatse Municipality has adopted an LED strategy in 2007 which makes emphasis that the area has a
high level of poverty and unemployment of which indication of the following programmes and thrusts are made to
improve the status of the economy:
Table 37: indicates programmes and thrusts pROGRAMME THRusTs
Sector development Mining cluster developmentHorticulture developmentMeat cluster developmentTourism cluster developmentNodal developmentInformal sector development
2. Economic infrastructure support 2.1 Road and transport 2.2 Water 2.3 Electricity 2.4 Telecommunication 2.5 Infrastructure investment plan 2.6 Enterprise development
3.Social development 3.1Educationandskillsdevelopment3.2Housing3.3Health
4.Institutional/Governance reform 4.1Regulatoryframework4.2Waste&Environmentalmanagement4.3financialmanagement4.4LEDdirectoratecapacitybuilding
The northern area of the GTM is economically the most marginal region of the Limpopo province, and had no
economic base. The area is solely dependent on government handouts and migrant labour income for survival. With
the development of mines in GTM, the area is currently benefitting economically from the mines in many ways,
however the economic melt-down experienced during 2008 and 2009 has left most of the mining industries with no
option but to seize operations and some mines had to retrench their employees.
51
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
This has left the municipality and its communities in drastic economic difficulties due to the fact that some of the
residents are un-able to pay for the services rendered by either the municipality or the private sector. The Limpopo
Employment Growth and Development Plan for 2009 suggests programmes that will improve the economic status of
the Province like: integrated poverty reduction programme, Building Material manufacturing Programme, SMME’s and
Co-operatives and the integration of the National Youth Agency Programmes into the provincial programmes.
The following sections will give a broad overview of the four sectors contributing to the economy in the GTM:
• Agriculture
• Mining
• Manufacturing
• Trade
• Tourism
Table 38: below indicates Highest Education level or Skills level: Source GTM Household Survey 2007.
NO
sc
HO
OLI
NG
GR
AD
E 0
-GR
AD
E
2 GR
AD
E 3
–7
GR
AD
E 8
- 1
2
GR
AD
E 1
2 p
Lus
O
TH
ER
DIp
LOM
A
BA
cH
ELO
R
DE
GR
EE
HO
NO
uR
s
MA
sT
ER
s
pH
.D
40 956 33 824 64 892 99 580 6 296 3 386 968 174 64 36
Table 39: below indicates employment by gender : Source: Stats SA survey 2007 MALE FEMALE GRAND TOTAL
Employed 26842 18479 45321
Unemployed 20868 30683 51551
Not economically active 36785 53911 90696
Unspecified 2954 2356 5310
Institutions 441 244 685
Grand Total 87890 105673 193563
Table 40: below indicates jobs created through LED initiativesBENEFIcIARIEs YEARs vARIENcEs
2009 2010
Youth 212 578 366
Women 324 702 378
Disabled 01 10 9
Total 537 1290 753
52
Table 41: indicates income level by gender and race: Source Stats SA survey 2007
INcOME LEvEL MALE FEMALE GRAND TOTAL
Black Coloured Indian or Asian
White Black Coloured Indian or Asian
White
No income 52831 38 - 59 77264 76 35 164 130467
R1 - R400 2067 - - - 4460 - - 14 6541
R401 - R800 3004 38 - - 4980 - - 4 8026
R801 - R1 600 7812 76 - - 8333 - - 27 16248
R1 601 - R3 200 7019 - 24 4 2920 58 12 4 10041
R3 201 - R6 400 6629 - - 4 1826 - - 90 8549
R6 401 - R12 800 2775 - - 81 677 - - 123 3656
R12 801 - R25 600 524 38 12 152 196 - - 42 964
R25 601 - R51 200 62 - 12 109 64 - - 33 280
R51 201 - R102 400 30 - - - - - - - 30
R102 401 - R204 800 74 - - - - - - - 74
R204 801 or more - - - - - - - - 0
Response not given 3909 - 12 56 3957 - - 67 8001
Institutions 420 - - 21 232 - - 12 685
GRAND TOTAL 87156 190 60 486 104909 134 47 580 193562
Tourism
Tourism in GTM is underdeveloped as most tourist attraction places are found beyond the boundaries of GTM,
particularly the world’s famous Blyde River Canyon and a couple of game farms e.g. Kruger National Park, Malamala
Game Reserve, etc east of the municipal area. However the municipal area has a potential to develop tourism industry
by way of adopting two different strategies with regard to tourisms cluster development as indicated in the GTM
LED strategy. The first is to promote a small number of high-impact projects as identified in the GSDM Tourism Development strategy and the second is to promote small, local community tourism projects that can be financially sustainable. The area is very rich in tourist attractions particularly cultural diversity, historic places and the natural beauty of the land associated with dramatic topography. The eastern part of the municipal area (around length of R36) is a better place to lead the exploitation of tourism potential, as it is the part of the well-marketed Panaroma Route.
The Panaroma route “leads through the rugged mountain range of the northern Drakensburg, passes through the north-eastern part of Great Escarpment, the inland Plateau declines abruptly and steeply and opens up a fantastic views of plains of the low-veld on thousands metres below” (www.africa-explore.co.za/ct-panaroma_route html. The four tourist attractions in the northern reaches of the route, namely, The Strydom Tunnel, Abel Erasmus Pan, Museum of Man and Echo Caves are within the GTM area.
Ohrigstad as a stop-over centre for tourist travelling to various destinations along Panaroma Route will have to provide more restaurants, rest rooms, entertainment facilities, and overnight accommodation facilities such as hotels, guest houses.
The good views that include the dramatic vantage points, river systems, natural landscape, and the green valleys of
the eastern part of Greater Tubatse will serve as attractions for tourist and transient residents with a wide range of
places of interests such as game farms, farmstays, etc.
53
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
There are number of tourism potential areas within the former Lebowa territory that has not been explored viz
Mahubehube Caves in Bothashoek, Mankele and Ga-Mokgotho water-falls and dramatic topographical relief around
Penge, discontinued mining settlement of Penge and Taung , old coach wagon in Leboeng, King Sekhukhune statue at
Tjate and miraculous trees (with healing powers) at Phiring. These tourist attractions related to the generally ignored
cultural history and areas of African people. Lack of convenient access, support infrastructure including marketing and
on-site infrastructure and facilities are impacting negatively on tourism exploitation within the area.
Tjate heritage site as identified above as one of the potential tourism projects in Tubatse has been budgeted for by
Sekhukhune District municipality. The Limpopo Employment growth and Development plan has identified Tjate as one
of the fag-ship projects to be implemented during the financial year under review. Work is been done and the project
is currently at phase 5 of the proposed scope of work.
The existence of the world re-known Panorama route nearby provides an opportunity to divert some of the tourist
already in the area to these forgotten attractions. Opening up another tourism route linking these attractions is the
key first step to promote rural natural and cultural attraction spots.
Ohrigstad is ideally located to be used as the base or stop over from which to explore the Blyde River Canyon,
Bourkei’s Luck Potholes, God’s Window, Three Rondavels and game reserves. Unfortunately there are very few
overnight accommodations in this town and environs.
There are a number of identified accommodation establishments, i.e., country game lodges, in Ohrigstad and
Burgersfort namely, Iketla Lodge, Hannah Game Lodge, khumula lodge, water-gat lodge, Lapeng lodge, Gethlane
lodge, kusile quest house, snowy owl guest lodge, khaya ndlovu guest lodge, Hosanna guest lodge, Didingwe river
lodge, Rooi ivoor lodge, Burgersfort town lodge, Ruud’s country lodge, Lalalanga chalets, Mantsibi guest lodge,
Helmon’ palace, van zyl’s chalets, Bonamanzi lodge, Senare Lodge and George Steelpoort Lodge.
3.5.1.1 Agriculture and forestry
Farming is an important economic resource as a wide range of products are cultivated owing to good soil
conditions, the sub-tropical climate and reasonable access to water. The following type of products is
produced: fruit, vegetables, grain, cotton, citrus, maize, tobacco and meat. The main resources that en-
courage agricultural production are the Olifants, Steelpoort and Spekboom Rivers, which provide water
to the region. These sources of natural water are essential for present and long term irrigation of crops.
Potential land for agricultural purpose is found on the river banks of three above mentioned rivers,
however some of the land is not used optimally e.g. the land at Penge on the river bank of Olifants river
and others.
No other region in the GTM reveals a higher potential for desertion, resultant from overgrazing over a
prolonged period by a highly impoverished rural population that struggles to plan and control their area.
Their lack of skills prevents them from managing their resource for long-term production. This type of
farming makes the region vulnerable to periodic droughts that affect both the regional resources and the
potential to generate work opportunities for the unemployed.
54
3.5.1.2 Mining
The intrusion of the Volcanic Bushveld Igneous Complex into the sedimentary rock of the Transvaal sys-
tem resulted in great metamorphism, which caused the introduction of many minerals including chrome,
vanadium, platinum, asbestos and magnetite in the area.
• Chrome is mined extensively at Dwars-river, Dooringbosch, Tweefontein and Lannex mine and the
product is exported by rail and sea to overseas destinations.
• The following chrome mines are still under prospection; Lwala mine and Mooihoek mine.
• Vanadium is mined and smelted at only one mine and this product caters for most of the demand
in the country.
• Platinum is found in the well-known Merensky Ridge and this resource accounts for more than
50% of all platinum resources on earth and is mined at Helena (XSTRATA), Thorncliff (XSTRATA),
Mototolo (XSTRATA), Marula mine, Twickenham mine, Modikwa mine, Two- rivers mine and De
Brochen mine.
• The following platinum mines are still under prospection, Phokathaba mine, Spitzkop mine, Groot-
boom mine, Nkwe platinum mine and Tjate mine.
• Two Andalusite mines exist in the areas of Segororng and Modubeng, which are Rhino minerals
and Annesley havecroft mines.
• Granite is mined at Elephant’s river mine near Tjate village.
• Clay is mined at one mine and most of the product is used for manufacturing of cat litter.
• Asbestos was mined at Penge and Taung, but because asbestos products have been banned
worldwide, the mines were closed down and are currently the areas are being rehabilitated.
• Slate is mined at Saringa mine near Kgautswane village and is used to manufacture roof and floor
tiles.
• Silica is mined for the production of sand and stone aggregate, and serves as a flux in the chrome
smelting process.
• Magnetite is an iron-ore mined at Goede Hoop and transported to Witbank for the production of
steel in the Highveld Steel Plant.
• Magnisite was mined extensively in the Burgersfort area, but as it does not meet the required
standard anymore, mining operations were ceased.
• There are currently three chrome smelters operating in the area, Lion Ferrochrome (XSTRATA), ASA
Metals at Ga-Maroga village and Tubatse Ferrochrome in Steelpoort.
Although there are several mines in the area, the existing resources remain unexploited. Investment in
this sector is important as it brings with it investment in infrastructure, results in creation of job opportu-
nities and generates many other economic spin-offs. The lack of economic growth in the region warrants
special attention and support to optimise the available opportunities. However, cognisance should be
taken of the outflow of money from the mines in Greater Tubatse to other regions.
55
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
General Challenges facing economic development
• Brain drain
• High level of illiteracy
• Lack of infrastructure for agriculture and tourism development
• Migration and immigration
• High level of HIV/AIDS
3.5.2 Comparative and Competitive advantages of the local economy
Greater Tubatse Municipality has significant mining and manufacturing (ferrochrome smelters) sectors, but unemploy-
ment is still significantly above the provincial average. Information from different sources suggests that the new min-
ing developments that have already been around could reduce unemployment from 73% (expanded unemployment
rate definition) in 2001 to 44% in 2010.
Further reduction in the unemployment rate will depend on effective intervention by public sector institutions to fa-
cilitate economic sector diversification through competitive cluster value-chain development. This implies upstream
development in the manufacturing and trade sector to provide essential items in the mining supply chain by local
Entrepreneurs. It also implies side-stream development in the form of construction and Urban renewal. This approach
is consistent with the Limpopo Employment Growth and Development Plan.
Constraints to cluster development include:
• Lack of infrastructure, with reference to water reticulation, poor road conditions, electricity and sanitation
• Land ownership limitations in former homeland areas and inappropriate land use management
• Shortage of skills , particularly in the local labour force and among unemployed people
• Institutional capacity limitations in Local Government, with specific reference to economic development man-
agement capacity
Clusters affect competition in three broad ways that both reflect and amplify the parts of the platinum belt, namely:
• Increasing the current productivity of constituent firms or industries
• Increasing the capacity of cluster participants for innovation and productivity growth
• Stimulating new business formation that supports innovation and expands cluster
Most cluster advantages rest on the external economies or spill-over across firms, industries and institutions of
various sorts. Thus a cluster is system of interconnected firms and industries whose role is bigger than the sum of
its parts. These three broad influences of clusters on competition depend on personal relationship, face-to-face com-
munication and networks of individuals and institutions that interact. Within GTM local economic development our
cluster building blocks are the following:
• Mining cluster development
• Tourism cluster development
• Horticulture cluster development
56
• Nodal development
• Informal sector development
• Economic infrastructure development
Following projects are been implemented by the municipality and are driven by the LED strategy, some are still on
planning stages
• Mining input supply park
• Fresh produce market
• Institutionalization of informal trading
• Formalisation of both Mashifane park and Burgersfort EXT 10
• Praktiseer commercial development EXT 11 (support NDPG)
• Tourism strategy development
• Multimodal transport facility
3.6 Socio Economic Analysis
3.6.1 Education
The quality of education for the African population has long been poor and insufficient in terms of standard require-
ments. The Limpopo province’s education achievements lag behind those of other provinces. For example, the literacy
rate of the Limpopo province was 73.6% in 1991, while average literacy in South Africa was 82.2%. Population
Development Program (PDP) indicators suggest that, in 1991 nearly one in every ten children of a school going age
did not attend school.
According to the Education Atlas of the Education Foundation, which gives detailed data for 1991, the overall pupil/
classroom ratio for African pupils was 56:1 in the southern region of GTM. In addition to the inadequate education
facilities, costs are generally also high, as families spend on average R710 .00 per child per year on tuition, uniforms
and books, which is extremely high given the overall subsistence existence that it lead in this region.
There are 247 schools (primary and secondary) situated in GTM. Steelpoort, Ohrigstad and Burgersfort have one pri-
mary school each with Burgersfort having additional private primary schools. The Department of education Limpopo
has developed two state of the art schools namely Nthame Primary School at Riba – Cross and Batubatse Primary
School at Praktiseer. Generally in rural or semi-rural areas such as this, the predominance of primary schools is not
unusual as many pupils leave school at the earliest possible time to find employment to assist and support the family.
The privileged scholars, who can afford to further their education, either attend the secondary schools in the area or
secondary schools located in larger towns outside the area.
57
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
Table 42: Below indicates education level by gender: Source Stats SA survey 2007 MALE FEMALE GRAND TOTAL
Some Primary Education 44213 50700 94913
Completed Primary Education 9615 10337 19952
Some Secondary Education 49353 57027 106380
Completed Secondary Education 8766 8226 16992
Certificate with/without Std 10/Gr 12 3277 2968 6245
Diploma with/without Std 10/Gr 12 2203 2281 4484
Degree & Higher 1314 717 2031
No schooling 14399 27899 42298
Unspecified 2151 2385 4536
Institutions 503 270 773
Grand Total 135794 162810 298604
The expansion of the mining activities in the GTM area presents an opportunity to address unemployment in the area.
However, the low skills levels pose a threat in this regard. Education should be geared towards meeting the skills
needs of the growing economy as a result of the mining activities. The FET (Further Education and Training) facility at
Dr CN Phatudi College is assisting majority of the Young people in acquiring different skills in the area. There are no
tertiary education facilities like Technikons and Universities in the areas of GTM. Plans are underway to develop a
Technical school by the Mining houses in consultation with the Municipality and the Limpopo Provincial Department
of education.
Challenges
• Shortage of classrooms in some schools within the municipality
• Shortage of high schools
• Children still crossing the busy R37 road and got involved in accidents
3.6.2 Health and Social Development
Welfare facilities in the GTM fall under the jurisdiction of the Department of Health and Social Development of the
Limpopo Province. Although there are still challenges in terms of distribution of welfare services, the population
within the GTM has fair access to social welfare services. SASSA indicates that a big portion of the State resources
are spent in the form of child grant in the Area of Greater Tubatse Municipality especially in areas that are predomi-
nantly rural. Many of the beneficiaries are either fostered, old aged, need support one way or the other hence they
receive different forms of grant, issues contributing to high dependency rate on grants range from amongst others,
orphans resulting from HIV/AIDS related death, child-headed households
58
Table 43: below shows statistics on grant beneficiaries in GTM (SASA Annual Performance 2009/10)
MONTH
cs
G
cs
G E
xT
W/v
DG
Op
G
AG
E
cD
G
FcG
Q7
FcG
Q7
DG
Q7
cs
G
sD
R
GIA
DEC 09 1320 - - 313 95 - 17 213 - 01 08 - 02
NOV09 545 - - 160 96 - 46 105 - - - - 01
OCT09 833 01 - 332 122 - 13 129 - - - - 03
SEP09 837 12 - 109 82 - 08 137 - - - - 05
AUG09 415 08 - 136 71 - 02 11 - - - - 01
JUL09 347 - - 140 64 - 06 30 - - - - -
JUN 10 2972 - - 248 357 - 18 153 - - - - 07
MAY10 1361 - - 135 155 - 06 59 - - - 250 02
APR10 270 - - 13 10 - 03 07 - - - - -
MAR10 615 86 - 157 189 12 07 608 01 - 07 100 01
FEB10 248 132 - 51 68 14 15 41 - - 06 - 02
JAN10 246 81 - 36 23 19 02 72 - - 02 2200 -
TOTAL 10045 320 - 1830 1332 45 149 1565 01 01 26 2550 24
Food insecurity occurs when people are under-nourished, a state that usually arises when their food intake falls
below their minimum calorie (energy) requirements. Under-nourishment can be the result of several factors, including
the physical unavailability of food e.g. during drought or an inability to purchase food because of financial constraints.
Food insecurity is therefore an extreme revealing indicator of poverty levels in the municipality.
Food insecurity is very complex, however it involves a multiple factors like land availability, access to natural re-
sources and socio-economic circumstances of communities. The national Department of Agriculture undertook a
comprehensive livelihoods survey in the area of Sekhukhune in both 2004 and 2006. The survey highlights that some
of the areas facing the worst levels of food insecurity in Greater Tubatse at the following villages:
Table 44: below shows levels of food insecurity in GTM vILLAGE scORE
Ga-Mamapuru 42.86
Ga-Masha 42.85
Santeng 42.85
Pidima 42.85
Kgautswane 42.78
Tshehlwaneng 42.70
Factors that give rise to food insecurity within the Greater Tubatse are food price increase, petrol hikes, growing costs
of producing food, an increase in the number o individuals within households, violence, theft and illnesses etc. There
is also evidence that ongoing water scarcity and limited economic opportunities within the area limit the ability of its
residents to adapt and cope to external stresses and shocks.
59
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
3.6.3 Health facilities
There are 11 medical facilities in the GTM, which mainly constitute regional clinics that provide localised inputs to
the community. The Dilokong Hospital is the biggest hospital followed by Mecklenburg, HC Boschof and Penge health
centre. There are Clinics scattered in the area, i.e. Burgersfort, Bothashoek, Praktiseer, Ga-makofane, Motshana, Ga-
mashabela, Ga-motodi, Ga-rantho Ga-riba, Leboeng, Malokela, Mampuru, Montwaneng, Mophalema, Phiring, Taung,
Motlolo and Ga-selala. There are three clinics located respectively in Steelpoort, Ohrigstad and Burgersfort, which
were previously the responsibility of the National Health Department and hence, these clinics offer improved service
to those scattered across the region. Specialist treatment is exclusively available at the major hospitals outside of
the municipal area, where sustainable health care is at an optimum.
General Challenges facing health services:
• Lack of access to health services.
• Shortage of doctors in Government Hospital.
• Shortage of medication in clinics.
• Lack of mobile clinics and the irregular services provided by Mobile clinics that are there must be attended to.
• The long distances and/ or poor road conditions make hospitals and Clinics inaccessible
• Clinics should operate on a 24 hour basis.
• The stipend for Home-based carers must be adjusted upwards.
• Ill-treatment of community members by officials at clinics
• Response of ambulance services need to be addressed
• Poor services in clinics e.g. nurses sleeping while on duty
3.6.3.1 HIV and AIDS
HIV and AIDS is increasingly becoming a major public health problem and accounting for the highest
number of deaths in the country. Statistics already indicates that one out of five people are HIV positive.
Apart from addressing preventative and curative approaches it is important to address social conditions
aggravating the vulnerability of communities to HIV and AIDS, such as poverty especially among rural
women. Linkages between community care and support services and health facilities should be devel-
oped to ensure holistic approach to the handling of the epidemic.
Dependency ratio will increase dramatically in the short term and decline in the medium to long term
(10 to 15 years) source: Town and Regional Planning Commission Report. The Impact of HIV and AIDS
on Planning Issues is enormous as the change of demographics is rapid and unpredictable. The Town
and Regional Planning Commission Report indicate that the number of orphans will increase resulting in
children headed households. This is already a problem especially in housing with an increase in children
headed households.
The economy will be affected negatively as the household income will increasingly be spent on medi-
cal costs initially, and finally resulting in loss of income. In order to fight against this pandemic HIV and
AIDS, GTM has developed local HIV and AIDS strategy to address the pandemic appropriately.
60
Table 45: HIV and AIDS Stats: Source: Limpopo – Facility Indicator Data 2008-09sORT DATA ELEMENTs NAME GRAND TOTAL
128 HIV pre-test counselled (excluding antenatal) 25 011
129 HIV client tested( excluding antenatal) 16 136
130 HIV test positive – new ( excluding antenatal) 3 186
133 Antenatal client tested for HIV 7 314
134 Antenatal client tested for HIV-new 1 236
135 Nevirapine dose to woman at antenatal or labour 881
136 Live birth to woman with HIV 630
137 Nevirapine close to baby born to woman with HIV 621
138 HIV test of baby born to HIV woman at 9 months 249
139 HIV test positive of baby born to HIV pos woman at 9 months 25
140 Blood drawn for CD4 5 035
141 Referral to ART service point for ART assessment-new 345
142 Registered ART patient 4 906
143 Registered ART patient on any adult regimen 4 550
144 Sexual assault case-new 75
145 Sexual assault case-new given ARV prophylaxis 68
146 Occupational HIV exposure-new case 6
147 Occupational HIV exposure case given ARV prophylaxis-new 6
148 HIV positive new patient screened for TB 1 216
149 HIV positive new patient with confirmed TB 83
150 HIV positive new patient started on INH prevention therapy 36
151 HIV positive new patient started on Co-trimoxazole prophylaxis 1 129
155 Scheduled dose issued(within 3 days) ART any regimen 4541
156 Scheduled dose defaulted(>3 days) ART any regimen 18
157 Impatient days-ART patient 2
General Challenges facing HIV/AIDS• Insufficient drop in centres• Most orphaned children are not in foster care due to long children procedures• Inaccessible ARV sites and HIV and AIDS support groups• Insufficient co-ordination of HIV and AIDS data from private agencies e.g. private medical facili-
ties, mining institution and nongovernmental organisation.
3.6.4 Safety and Security There are currently five police stations within the GTM, namely Burgersfort, Leboeng, Mecklenburg, Ohrigstad and Tubatse police stations. There are three satellite police stations in the area, namely Penge, Driekop and Ga-Mapodile. Various types and degrees of crimes are reported in various police stations on daily basis i.e. rape, murder, armed rob-bery, and house breaking. Penge satellite police station has recorded the lowest levels of crime, whereas the Tubatse station has recorded the highest in the region followed by Mecklenburg and then Leboeng.
Community Policing Forums (CPFs) have been established in several areas with varying degrees of success. Magis-trate courts are also available in the following areas of Burgersfort, Leboeng, Mecklenburg and Tubatse police sta-
tions. There is a need for the development and implementation of a crime prevention strategy in the area.
61
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
The department of Safety and Security and Liaison deployed 13 personnel as safety ambassadors in various wards
within the municipal area. The Deployed personnel work jointly with SAPS and Municipal officials in driving a pro-
gramme of anti crime and creating awareness through public co-ordination. The area itself is composed of rural and
urban settlements with more influx of foreign nationals in particular, the mining industries. Crime rate is relatively
high with the following statics recorded:
Table 46: Table below indicates crime rates in GTM: source SAPS crime situation 2010 cRIME NAME pERcENTAGE
House robbery 16%
ATM blasting 75%
Business robbery 15%
Rape 18%
Armed robbery 10%
Car hijackings 25%
Assaults 64%
Theft of copper 66%
General theft (including shop lifting) 80%
Domestic related crimes 74%
The following areas are regarded as flash points within the vicinity of the Greater Tuba-tse municipality:• Burgersfort town, Steelpoort town, Manoke village, Dresden village, Riba cross Village, Bothashoek village,
Mashamothane village, Praktiseer, Moroke village, Diphale village, Driekop village.
3.6.5 Disaster ManagementDisaster management service is shared service between GTM and Sekhukhune District Municipality in terms of the Municipal demarcation board and Municipal systems Act, Act 32 of 2000. The Municipality established disaster management sub unit in 2007 whose role is to co-ordinate disaster management related issues.
General Challenges facing Disaster Management• Unit is unable to assist victims with necessary relief material e.g. tents, blankets and food parcels due to lack
of funding
3.6.6 Sports, Arts and Culture Well-developed sport and recreation facilities generally exist at the urban schools and mines. Hence, these facili-ties are placed in the urban areas and are therefore not accessible to the extended rural population. A formal sports facility (Ntoampe sports facility) has been constructed in the Moroke area through the assistance of the Provincial department of sports arts and culture and Transnet.
The rural villages often have some informal sport facilities such as an open soccer field used for community sports. However, these are just open pitches in the communities that do not have the necessary infrastructure to develop
sustainable sports and recreation precincts.
62
For the 2010 soccer tournament, the Greater Tubatse municipality has been accorded an opportunity to host the tour-
nament on a big screen. The screen will be mounted at Ntoampe sports facility in Moroke village. The municipality is
therefore charged with a responsibility of developing strategy on how the said event will be hosted.
There are currently three community centres within the GTM and are Leboeng, Kgautswane and Kgopaneng Thusong
centres. The Ga-mapodile community centre in Ward 7; built by XSTRATA is still under construction and is earmarked
to be completed by 2010. GTM has progressively constructed two community halls during the 2008/09 financial for
Driekop and Mokgotho village in ward 16. During the 2009/10 financial year, the municipality has budgeted for the
construction of another two community halls in both Leboeng and Tjate village. Various mining houses have also build
community halls as part of their social labour plans in areas like, Ga-selala, Mandagshoek and Legabeng village near
Ga-Maroga.
In areas without community hall facilities, School halls and church buildings are often used by communities during
elections, community meetings, etc.
3.6.7 Post Offices
There are at least five post offices in Greater Tubatse Municipality which are at Burgersfort, Ohrigstad, Steelpoort,
Driekop and Penge. Lobby boxes are found in areas like Leboeng, Praktiseer, Ga-Mapodile, Ngwaabe, and Moroke,
and other rural areas. The South African Post offices has developed lobby-boxes which assist in making the services
accessible to communities. There is a need for the South African Post Office Services to expand the services to other
rural and marginalised areas
3.7 Good Governance and Public Participation
3.7.1 Communication
The Greater Tubatse municipality has developed its communication strategy in 2008 and is reviewed on annual basis.
There is a dedicated communication unit available in GTM which serves as a key driver of the strategy. The unit is
attached to the Executive support department and has three officials.
There are several means of communications used e.g. print media and electronic media. The municipality also uses
its web-site for communication purposes. Several structures such as Ward Councillors, Ward committees, Community
Development workers and Magoshi are also used as vehicles for communication in the area.
The Municipality communicates its planning processes and the implementation of both the IDP and Budget using the
media for both internal and external communication.
Plans are underway to make arrangements with Tubatse community radio station for a slot every Thursday whereby
Municipal information can be communicated.
63
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
3.7.2 Public participation
Greater Tubatse Municipality has established its public participation unit in 2006. The unit comprise four officials
focusing on special programmes and public participation. Community development workers and ward committees are
linked to this unit for reporting purposes and alignment. Public participation strategy is in place to guide activities
that have to be undertaken by the unit. The Unit has also established clusters for the purpose of public participation
processes for the IDP and the Budget. Public gatherings are the sole responsibilities of the Public participation unit.
3.7.3 Ward Committees
The municipality comprises of 29 wards with 10(ten) ward committee members each. The ward councillor serves as
the chairperson of the ward committee. Training for ward committees is conducted each year to assist with the day
to day running of the ward. Annual Schedule of meetings is submitted to the office of the Speaker each year. This
will assist the Speaker to track down minutes of the said meetings and monitor functionality of the ward committees
in different wards. The Greater Tubatse municipality budgeted for the provision of sty-pens to the ward committees
which is paid on monthly basis.
3.7.4 Community Development Workers
There are 27(Twenty Seven) community development workers appointed by office of the Premier in the Greater Tuba-
tse municipality. An intensive training or capacity building was conducted by the OTP through the University of Venda.
All CDWs in the GTM have graduated as qualified community development workers.
3.7.5 Traditional Leadership
The Greater Tubatse municipality had 29 wards and is currently having 31 (thirty one) wards and a larger portion of
the municipality is predominantly rural. With its rural nature, the area is administered by Traditional Leaders and are
responsible for the day to day running of the traditional authorities including land allocation in the rural areas .Major-
ity of the land claims in the Greater Tubatse municipality are lodged by Traditional Leaders.
There are 23 (twenty three) recognised Traditional Leaders and 11(eleven) are serving in the Greater Tubatse munici-
pality as members of the Council. The relationship between Traditional Leaders and the Municipality is generally good
and therefore needs to be maintained.
3.7.6 Intergovernmental Relations
Intergovernmental relations is a cross cutting function in all departments, however the Greater Tubatse municipality
has created a unit in the strategic planning department to deal specifically with IGR matters. The unit is staffed with
2 (two) members. The Municipality has approved Customer Care Framework during 2009/10 financial year which lays
a foundation for the IGR matters in the municipality. The unit is also responsible for the day to day handling of the
Presidential queries as raised on the hotline by way of referring them to relevant departments for investigation and
attention. The unit is also responsible for reporting to the President progress in terms of solving all queries as raised
on the hotline.
64
3.7.7 Special focus Groups
Greater Tubatse Municipality has appointed officials to deal with special focus groups such as Disabled, Youth,
Women and Children. The Municipality has also created a forum that deals specifically with matters relating to dis-
ability and the forum is functional.
3.7.8 Audits
Internal Audit for the municipality has been developed and is functional. Audit committee for the municipality is also
formulated and is reporting directly to Council as required by law. The Risk Management Strategy of the Greater
Tubatse municipality is identifying risk areas which need to be monitored on daily basis. The audit plan which is
developed by the Internal Audit unit is linked or integrated into the risk strategy and serves as a vehicle to monitor
progress and processes followed during the risk reduction phase. Annual financial statements are prepared annually
and are submitted to the Auditor General for auditing.
The municipality is annually developing action plans to deal with issues or comments in the management letter raised
by the Auditor General. For the past two years, the Greater Tubatse municipality did not get a clean audit report and
as a result the management has developed or created a position of a risk management officer who will be responsible
for the day to day implementation, monitor, and report, evaluate and review of the risk management strategy.
3.7.8.1 Internal Audits
Below are internal audit findings for the 2009/10 financial year.
Table 47: Performance Information Review
NO. DETAILED FINDINGs
1. Lack of procedures manual for guiding the process of collecting, processing and monitoring performance information.
2. Insufficient portfolio of evidence to substantiate quarterly reports.
3. Reports not made public through municipal website.
4. Key performance indicators in the SDBIP are not linked to a specific budget.
5 Lack of Management Information System (MIS) to manage and facilitate effective performance information reporting.
6 Inaccurate reporting against the key performance indicators in the quarterly performance report.
7 Quarterly reports not submitted.
Table 48: Performance Audit on Technical ServicesNO DETAILED FINDINGs
1. Project Business plan is not comprehensively achieved and not coordinated with community services.
2. There is no proof that service providers were assessed to determine if they had adequate capacity and competence to carry out the work tendered for.
3. There is no documentary evidence that the quality of work performed by the contractors was adequately monitored by the municipality.
4. Municipal Infrastructure Grant Management Information System (MIG) (MIS) was never used by the project management unit (PMU).
5. A fully fleshed project management unit was not established and adequately capacitated.
65
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
Table 49: Disasters ManagementNO DETAILED FINDINGs
1. Inadequate Recording and registering of disasters.
2. Disaster information not validated.
3. Non implementation of approved disaster management structure.
4. Lack of communication structure.
5. Late response to the reported disaster incidents.
6. Lack of disaster recovery and business continuity policy and procedures.
7. In adequate movement and issuing of disaster relief materials.
8. Movement and issuing of disaster relief materials not reported to relevant stakeholders
Table 50: Supply Chain ManagementNO DETAILED FINDINGs
1 Lack of contract management and administration.
2 Lack of supplier clearance checks prior to awarding of contracts
3 Lack of contracts register by Legal Department.
4 Invoice not signed by the relevant head of department.
5 No blacklisting of suppliers for inferior services or goods.
6 Payment packs not stamped “PAID” after processing of payment.
7 Required number of quotations not obtained.
8 Supplier’s database not adequately maintained.
Table 51: Economic and Land DevelopmentNO. DETAILED FINDINGs
1. LED forum meetings not held.
2. Preliminary actions for the implementation of the LED Strategy not undertaken.
3. No evidence of monitoring and evaluation of Implementation of LED strategy.
4. Projects not implemented.
5. Vacant positions within the Economic and Land Development Section.
6. Inadequate policy and procedure manual that guides processing and administration of Land use and Town planning applications
7. No screening committee to provide strategic guidance and to ensure that land use and town planning applications are efficiently and effectively administered.
8 No proper register in place to effectively administer application processing.
9 No evidence that applications were evaluated by the technical and finance department.
10 Site inspection not done by town planner.
Table 52: Performance Management for Second QuarterNO. MATTERs RAIsED
1 Lack of performance agreements for Section 57 Managers
2 Lack of Performance Management System (Electronic)
3 The reported actual performance results are not complete and substantiated by relevant source documentation
4 Non compliance with Section 45 of the Municipal System Act
5 Targets were not specific, measurable and time bound
66
Table 53: Asset ManagementNO DETAILED FINDINGs
1 Movement and transfer of assets policy not communicated.
2 Municipal assets not properly bar-coded
3 Unauthorised movement of asset to another location.
4 Inaccurate asset register.
5 Municipal assets not properly safeguarded
6 Asset disposal committee not in place.
7 In adequate adverting for auctioning of municipal assets
8 Municipal asset not regularly verified.
Table 54: Corporate GovernanceNO DETAILED FINDINGs
1. Lack of central Partnership Governance Framework
2. The municipality does not keep any transcript records as evidence for decisions taken at High Courts
3. No measure in place to safeguard employees against conflicts of interest
4. No effective Audit Committee in the municipality
5. No effective Risk Management and Whistle-blowing policy
6. Information loaded on the website is not updated on a regular basis
7. Code of conduct not communicated to employees
Table 55: Human Resources ManagementNO DETAILED FINDINGs
1 Some of the Policies and procedures are not approved.
2 Declaration of interest not always done by the interview panel members.
3 No reference checks performed
4 Overtime not pre-authorised
5 Overtime worked not in terms of regulation
6 Inadequate monitoring of leave management
7 Retention Strategy not in place
8 Succession plan not in place
9 Recruitment forms not in employee’s personnel files
10 Exit interviews were not always conducted
Table 56: Performance Management SystemNO DETAILED FINDINGs
1. Lack of performance agreements for Section 57 Managers.
2. Lack of Performance Management System (Electronic).
3. The reported actual performance results are not complete and substantiated by relevant source documentation.
4. Non compliance with Section 45 of the Municipal System Act.
5. Targets were not specific, measurable & time bound.
67
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
Table 57: Document management systemNO. DETAILED FINDINGs
1. No policies and procedures in place for Document Management Systems
2. Records are not classified in accordance with the Minimum Information Security Standards
3. Confidential records of the municipality are not kept in a centralized secured place
4. No structured system/framework for document management systems
5. Access to the Registry is not restricted
6. No forms of request are completed when records are requested from the registry
7. There is no separate register for recording confidential and sensitive records
8. Disposals of financial records not done in accordance with the National Archive and Records Services of South Africa
Table 58: Information Technology general control reviewNO. DETAILED FINDING
1 There were no change management policies and procedures or practices relating to normal and emergency changes
2 There were no human resource policies and procedures relating to recruitment, retention and termination of ICT personnel
3 The disaster recovery policies and procedures for IT Infrastructure are not yet formally ap-proved
4 No Facilities Management policies and procedures or practices were in place
5 There were no operations management policies and procedures or practices in place.
6 There was inadequate Logical Access management
Table 59: Occupational Health and safetyNO. DETAILED FINDINGs
1. Non implementation of Occupational Health and Safety policy
2. Health and Safety inspection not conducted regularly.
3. Lack of disaster recovery and business continuity policy and procedures.
4. Non compliance with the relevant regulations.
5. Non implementation of Record keeping in terms of the Occupational Health & Safety Act.
6. Non functional of the Health and Safety structure
Table 60: Financial Management Review
NO. DETAILED FINDINGs
1. Low Revenue Collection.
2. Debtors’ statements not delivered to all debtors.
3. Challenges affecting revenue base not addressed.
4. Unallocated Receipts.
5. Indigent Register not yet up to date.
6. Creditors Reconciliations not reconciled to statements.
7. Requisitions not signed by Head of Department.
68
Table 61: Inter-Governmental Relations ReviewNO. DETAILED FINDINGs
1 Minutes of District Intergovernmental Forums as per the IGR Act are not maintained.
2 There is no complaint handling register that is kept and maintained by the municipality.
3 Turnaround time for complaint handling process not established.
4 There is no Public Private Partnership Framework within the municipality.
5 Non compliance to Batho Pele Principles in relation to Consultation and Courtesy.
Table 61: Performance Management System 3rd Quarter 2009/2010NO. DETAILED FINDINGs
1. Lack of controls and procedures for employee goal setting and Performance
2. No proof that Section 57 Managers have been assessed based on the Quarterly Report and the Performance Agreement
Table 62:Inter-Governmental Relations ReviewNO. DETAILED FINDINGs
1 Minutes of District Intergovernmental Forums as per the IGR Act are not maintained.
2 There is no complaint handling register that is kept and maintained by the municipality.
3 Turnaround time for complaint handling process not established.
4 There is no Public Private Partnership Framework within the municipality.
5 Non compliance to Batho Pele Principles in relation to Consultation and Courtesy.
3.7.8.2 Auditor General‘s Report Table 63: Below are the Audit Findings and Action plan for 2009/10 financial year:
NO suMMARY cLAssIFIcATION AcTION pLAN TO ADDREss AuDIT QuERIEs
1 Accumulated surplus –difference between the annual financial statements and the trial balance
Financial Year-end reconciliation for balance sheet/statement of financial statements preparation. This reconciliation should form part of the audit pack to be submit-ted to the Auditors.
2 Non compliance with section 15 of the MFMA
Compliance (Non AFS) Develop compliance checklist for monthly reviews
3 Approved cash manage-ment policy not in place
Compliance (Non AFS) Perform monthly reconciliation s along with the monthly management pack for review by designated officials.
4 Bank reconciliations not reviewed by the account-ing officer
Compliance (Non AFS) Perform monthly reconciliations along with the management pack review by designated officials
5 Contravention of section 9 of the MFMA
Control Perform monthly reconciliation along with the monthly management pack for review by designated officials
6 Cash and cash equiva-lents prior year error
Financial Perform monthly reconciliations along with the monthly management pack for review by designated officials.
7 Petty cash reconciliation not performed
Control Perform monthly reconciliations along with the monthly management pack for review by designated officials
8 Cash and bank journal entries lack of supporting documents
Financial Perform monthly reconciliations along with the monthly management pack for review by designated officials
69
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
NO suMMARY cLAssIFIcATION AcTION pLAN TO ADDREss AuDIT QuERIEs
9 Prior year audit findings raised : contravention of section 131 (1) of the MFMA
Compliance (Non AFS) Compile action plan to address all man-agement letter queries and portable mat-ters in the AU
10 Accounting policies dis-closed not applicable
Financial Compile checklist for compilation of An-nual Financial Statements, including reviews of Accounting policies therein applied.
11 Annual financial state-ments disclosure
Financial Compile a checklist for compilation of Annual Financial Statements, including review of Accounting policies therein ap-plied.
12 Employee cost: 21 % va-cancy rate
Compliance (Non AFS) Management to come –up with the deci-sion on implementation thereof
13 Employee costs – over-time
Compliance (Non AFS) Compile monthly report for monitoring of leave records and statistics for appropri-ate management action.
14 Employee cost- Annual leave
Compliance (Non AFS) Compile monthly report for monitoring o leave records and statistics for appropri-ate management action.
15 Contravention of section 5 of the unemployment insurance contribution Act No.4 of 2002
Compliance (Non AFS) Develop a checklist of all relevant regu-laratory and legislative framework and ensure that it is covered by Internal Audit in the Compliance Review audits to en-sure adherence.
16 Overtime policy not in place
Compliance (Non AFS) Develop Overtime Policy for approval and adoption by Council
17 Employee cost –leave accrual non compli-ance of section 7 (3) of the South African Local Government Association (SALGA)
Compliance (Non AFS) Develop a checklist of all relevant regu-latory and legislative frameworks and ensure that it is covered by Internal Audit in the Compliance Reviews audit to en-sure adherence.
18 Employee costs- Annual leave
Control Implementation and compliance to rel-evant and applicable policies to manage human resources effectively.
19 Employee costs – Sick leave
Control Implementation and compliance to rel-evant and applicable policies to manage human resource effectively.
20 Employee costs - other leave
Control Implementation and compliance to rel-evant and applicable policies to manage human resource effectively.
21 Employee costs – leave encashment
Control Implementation and compliance to rel-evant and applicable policies to manage human resource effectively.
22 Employee costs –termi-nations
Control Implementation and compliance to rel-evant and applicable policies to manage human resource effectively.
23 Employees costs ap-pointments
Control Implementation and compliance to rel-evant and applicable policies to manage human resource effectively.
24 Employee costs – Leave a crucial
Financial Calculation of annual provision in accor-dance with the legislative framework
70
NO suMMARY cLAssIFIcATION AcTION pLAN TO ADDREss AuDIT QuERIEs
25 Task team report Compliance (Non AFS) Any task team report commissioned and since been completely by the respective task team appointed should be made available to the auditors in the event that it is requested.
26 contravention of section 125 (2) of the MFMA
Compliance (Non AFS) Aggressive application of the MFMA prior year visions. Implementation of Internal Audit Recommendations with respect to issue of non
27 Inventory valuation Development of accounting policy in preparation of annual financial state-ments
28 Investments prior year error
Financial Address all prior year audit findings prior to commencements of next scheduled audit. Engage with auditor general to en-sure issues are
29 Expenditure –operating leases
Financial Adhere to financial requirement in ac-cordance with the applicable reporting standards.
30 Audit committee: contra-vention of section 166 of the MFMA
Financial Ensure compliance to audit committee charter
31 Audit committee meet-ings
Compliance (Non AFS) Ensure compliance to audit committee charter
32 Excessive legal costs in-curred
Operating expenditure Review of legal costs incurred and de-vise measures o minimise the spend. This cost is however driven by external factors.
37 VAT input claimed in the incorrect financial year
Financial Review of vat reconciliations to ensure correct treatment thereof in the financial records of the municipality
38 Expenditure – payments exceeding 30 days
Financial Implement controls to ensure compli-ance to financial and operational policies
39 Expenditure – quotations Compliance (Non AFS) Implement controls to ensure compli-ance to financial and operational policies
40 Expenditure – payment vouchers not signed by the delegated official
Control Implement controls to ensure compli-ance to financial and operational policies
41 Water and sanitation ex-penditure overstated
Financial Compliance with the provisions con-tained in the relevant and applicable legislation, service level agreements in place to ensure compliance and accu-rate revenue recognition
42 Systems description not in place
Financial Compile a listing of all critical financial processes and develop system descrip-tions to assist users in understanding and executing
43 Management comments not satisfactory
Control Timely preparations for the annual fi-nancial year audit through preparation of audit packs to assist with substantive responses. Implement a robust process for addressing audit queries and review of the responses thereof.
44 Subsequent events –pro-cedures not established to identify subsequent events
Control Implementation of applicable procedures to identify subsequent events and incor-porate this as part of Annual Financial Statements compilation checklist.
71
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
NO suMMARY cLAssIFIcATION AcTION pLAN TO ADDREss AuDIT QuERIEs
45 Purchase and payables – system description
Compliance (Non AFS) Compile a listing of all critical financial processes and develop system descrip-tions to assist users in understanding and executing
46 Purchases and payable – system description
Financial Review of financial statements items disclosure to ensure appropriate clas-sification
47 Unallocated receipts Financial Implementation of the statements items disclosure to ensure appropriate classi-fication
48 VAT input incorrectly clas-sified as liability
Financial Review of vat reconciliations to ensure correct treatment thereof in the financial records of the municipality
48 VAT input incorrectly clas-sified as liability
Financial Review of vat reconciliations to ensure correct treatment thereof in the financial records of the municipality
49 Difference between the creditors age analysis and the annual financial statements
Financial Development of a creditor’s ledger, sub ledger and preparation of monthly rec-onciliations of individual suppler state-ments to invoices. Review of year end cumulative reconciliation as part of an-nual financial statements compilation preparations.
50 Sundry creditors – debit balance
Financial Review of annual financial statements items for correct account classification and disclosure thereof.
51 Unrecorded liabilities Financial Develop subsequent event procedures to be carried after year end to determine unrecorded liabilities
52 Accrued expenses not recognised at year end
Financial Incorporated accrual computations as part of year end preparation for annual financial statements.
53 Trade creditors – no cred-itors listing
Control Development of a creditor ledger, sub ledger and preparation of monthly rec-onciliation of individual supplier state-ments to invoices. Review of year end cumulative reconciliation as part of an-nual financial statements compilation preparations.
54 Other payables – no ac-cruals listing
Control Development of a creditor’s ledger, sub ledger and preparation of monthly rec-onciliations of individual supplier state-ments to invoices. Review of year end cumulative reconciliation as part of An-nual Financial Statements compilation preparations.
55 VAT input claimed in the incorrect financial year
Financial Review of vat reconciliation to ensure correct treatment thereof in the financial records of the municipality
56 VAT input not claimed Financial Review of vat reconciliations to ensure correct treatment thereof in the financial records of the municipality
72
NO suMMARY cLAssIFIcATION AcTION pLAN TO ADDREss AuDIT QuERIEs
57 Individual reconciliation performance
Control Development of a creditor’s ledger, sub ledger and preparation of monthly rec-onciliations of individual supplier state-ments to invoices. Review of year end cumulative reconciliation as part of the Annual Financial Statements compila-tion preparations.
58 Reconciliation of the creditors control account not performed
Control Development of creditor’s ledger, sub ledger and preparations of monthly rec-onciliations of individual supplier state-ments to invoices. Review of year end cumulative reconciliation as part of An-nual Financial Statements compilation preparations.
59 Trade creditors – year end statements not pro-vided for audit purposes
Control Development of creditor’s ledger, sub ledger and preparations of monthly rec-onciliation of individual supplier state-ments to invoices. Review of year end cumulative reconciliation as part of An-nual Financial Statements compilation preparations.
60 VAT input – capital na-ture difference between trial balance and general ledger
Financial Review of vat reconciliations to ensure correct treatment thereof in the financial records of the municipality
61 Assignment of the re-sponsibility of drafting the IDP to the Municipal Manager
Compliance (Non AFS) Responsibility to compile the IDP should be delegated by the Municipal Manager to the relevant municipal official. Key performance indicators should be identi-fied and linked to the IDP for use in moni-toring and review of performance and ef-fective implementation thereof.
62 Inadequate information reported in the Annual Performance report
Performance informa-tion
Responsibility to compile the IDP should be delegated by the Municipal Manager to relevant municipal officials. Key per-formance indicators should be identified and linked to the IDP for use in monitor-ing and review of performance and effec-tive implementation thereof.
63 Inadequate time given to community to comment on the final draft IDP
Performance informa-tion
Public participation time should be in-creased to allow for inputs from the com-munity
64 Documents that must be made public not pub-lished on the website
Performance informa-tion
Critical municipal documents should be identified for listing in the municipal web-site.
65 Inconsistencies in report-ing performance informa-tion
Performance informa-tion
Key performance indicators should be identified and linked to the IDP for use in monitoring and review of performance and effective implementation thereof.
66 Measures to improve per-formance not disclosed for certain KPI’s
Performance informa-tion
Key performance indicators should be identified and linked to the IDP for use in monitoring and review of performance and effective implementation thereof.
67 Key performance indica-tors not budgeted
Performance informa-tion
Key performance indicators should be identified and linked to the IDP for use in monitoring and review of performance and effective
73
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
NO suMMARY cLAssIFIcATION AcTION pLAN TO ADDREss AuDIT QuERIEs
68 Incorrect actual perfor-mance recorded in the annual performance re-port
Performance informa-tion
Key performance indicators should be identified and linked to the IDP for use in monitoring and review of performance and effective
69 Key performance indica-tors not budgeted
Performance informa-tion
Key performance indicators should be identified and linked to the IDP for use in monitoring and review of performance and effective
70 Inadequate controls over performance information
Performance informa-tion
Key performance indicators should be identified and linked to the IDP for use in monitoring and review of performance and effective
71 Project score cards not development during the setting of targets
Performance informa-tion
Key performance indicators should be identified and linked to the IDP for use in monitoring and review of performance and effective implementation thereof.
72 Key performance indica-tor not reported in the an-nual performance report
Financial Key performance indicators should be identified and linked to the IDP for use in monitoring and review of performance and effective implementation thereof.
73 Difference between the fixed assets register and the annual financial state-ments
Financial Correctly update assets transactions on the asset register (additions, disposal, transfer, revaluations and write –up or write down, depreciation) in accordance with accounting policy for assets and national treasury minimum requirement for a complaint asset register. Ensure assets annual financial disclosure note ties to the updated asset register of the municipality
74 Property plant and equip-ment difference between the general ledger and the annual financial state-ments
Financial Correctly upstate assets transaction on the asset register (additions, disposal, transfers, revaluations, and write-up or write down, depreciation) in accordance with accounting policy for assets and national treasury minimum requirement for a complaint asset register. Ensure assets annual financial disclosure note ties to the updated asset register of the municipality
75 Property plant and equip-ment difference between the general ledger and the annual financial state-ments
Financial Correctly upstate assets transaction on the asset register (additions, disposal, transfers, revaluations, and write-up or write down, depreciation) in accordance with accounting policy for assets and national treasury minimum requirement for a complaint asset register. Ensure assets annual financial disclosure note ties to the updated asset register of the municipality
76 Fixed assets register –non compilation of sec-tion (63) of the MFMA
Compliance (Non AFS) Correctly upstate assets transaction on the asset register (additions, disposal, transfers, revaluations, and write-up or write down, depreciation) in accordance with accounting policy for assets and national treasury minimum requirement for a complaint asset register. Ensure assets annual financial disclosure note ties to the updated asset register of the municipality
74
NO suMMARY cLAssIFIcATION AcTION pLAN TO ADDREss AuDIT QuERIEs
77 Depreciation –system verification weaknesses
Financial Correctly upstate assets transaction on the asset register (additions, disposal, transfers, revaluations, and write-up or write down, depreciation) in accordance with accounting policy for assets and national treasury minimum requirement for a complaint asset register. Ensure assets annual financial disclosure note ties to the updated asset register of the municipality
78 Property plant and equip-ment system verification weakness
Financial Correctly upstate assets transaction on the asset register (additions, disposal, transfers, revaluations, and write-up or write down, depreciation) in accordance with accounting policy for assets and national treasury minimum requirement for a complaint asset register. Ensure assets annual financial disclosure note ties to the updated asset register of the municipality
79 Fixed assets physical verification competencies
Financial Annual performance of asset count and verification, updating asset register with the relevant findings from the verification exercise
80 Fixed assets physical verification existence
Financial Annual performance of asset count and verification, updating asset register with the relevant findings from the verification exercise
81 Assets with no cost in the fixed asset register
Financial Correctly update assets transactions on the asset register (additions, disposal, transfers, revaluations, and write-up or write down, depreciatin0 in accordance with accounting policy for assets and national treasury minimum requirement for a complaint asset register. Ensure assets annual financial disclosure note ties to the updated asset register of the municipality.
82 Difference in depreciation as per asset register and financial statements
Control Correctly update assets transactions on the register (additions, disposal, trans-fers, revaluation, and write-up or write down, depreciation) in accordance with accounting policy for assets and national treasury minimum requirement for a compliant asset register. Ensure assets annual financial disclosure note ties to the updated asset register of the munici-pality.
83 Water infrastructure of community assets accu-mulated depreciation
Financial Review assets for impairment and apply appropriate provisions provided within the financial reporting standard on im-pairment of assets.
84 Understatement of com-munity assets accumu-lated depreciation
Control Correctly update assets transactions on the asset register (additions, disposal, transfers, revaluations and write-up or write down, depreciation) in accordance with accounting policy for assets and national treasury minimum requirement for a complaint asset register. Ensure asset annual financial disclosure note ties to the updated asset register of the municipality.
75
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
NO suMMARY cLAssIFIcATION AcTION pLAN TO ADDREss AuDIT QuERIEs
85 Weakness identified re-valuation of fixed assets
Financial Correctly update assets transactions on the asset register (additions, transfers, disposals, revaluations and write-up or write down, depreciation) in accordance with accounting policy for assets and national treasury minimum requirement for a complaint asset register. Ensure assets annual financial disclosure note ties to the updated asset register of the municipality
86 Assets from completed projects not capitalised
Financial Correctly update assets transactions on the asset register (additions, transfers, disposals, revaluations and write-up or write down, depreciation) in accordance with accounting policy for assets and national treasury minimum requirement for a complaint asset register. Ensure assets annual financial disclosure note ties to the updated asset register of the municipality
87 Debtors average collec-tion period
Compliance (Non AFS) Debtor data cleansing and implementa-tion of the debt management and credit control policies. Monitoring and review of Debt collector’s efforts in recovery of long outstanding debt and collection through development of performance indicators.
88 Difference between the debtors age analysis and the annual financial state-ments
Financials Preparations of monthly management packs and supporting reconciliations
89 77% total debtors out-standing as per age anal-ysis at year end 30 June 2009 are more 90 days
Control Debtor data cleansing and implementa-tion of the debt management and credit control policies. Monitoring and review of Debt collectors efforts in recovery of long outstanding debt and collection through development
90 Debtors outstanding for more than 12 years
Control Debtor data cleansing and implementa-tion of the debt management and credit control policies. Monitoring and review of Debt collectors efforts in recovery of long outstanding debt and collection through development
91 New indigents debtors application forms were not verified by an official or municipal agent ap-pointed by council
Control Implementation of the indigent policy
92 Trade receivables not dis-closed correctly in the an-nual financial statements
Compliance ( Non AFS) Compilation of annual financial disclo-sure checklist to assist with the prepara-tion of annual financial year audit
93 VAT liability incorrectly recognised as an asset
Financial Review of vat reconciliations to ensure correct treatment thereof in the prepara-tion of Annual Financial Year Audit
94 Bad debts policy used by the municipality not dis-closure
Control Compilation of annual financial disclo-sure checklist to assist with the prepara-tion of annual financial year audit
76
NO suMMARY cLAssIFIcATION AcTION pLAN TO ADDREss AuDIT QuERIEs
95 Traffic fine revenue un-derstated
Financial Development of measures and accept-able procedures to be applied in ac-counting for traffic revenue in consulta-tion with the Auditor general
96 Overstatement of water and sanitation revenue
Financial Compliance with the provisions con-tained in the relevant and applicable legislation, service level agreements in place to ensure compliance and accu-rate revenue recognition
97 Revenue interest income difference between bank certificate and the gen-eral ledger
Financial Monthly review of bank reconciliations and corroborate to supporting documen-tation for competencies.
98 Infrastructure projects CIDB projects
Value for money Effective monitoring and reporting on infrastructure projects through review of progress against service level agree-ments and effective project.
3.7.9 Risk management
The Greater Tubatse Municipality has adopted a Risk Management Strategy in June 2010 and is reviewed annually
to suite the current situation or circumstances. Objective of the risk management strategy is to identify asses and
prioritise the risks that need to be managed in order to achieve the vision, mission and strategic objectives of the
municipality. The following risk areas are identified in the risk management strategy:
REF RIsk INHERENT RATING
1 Inadequate information and communications technology 252 Inadequate financial management 253 Fraud and corruption 254 Inadequate compliance with Legislation and policies 25
5 Inadequate business continuity management 256 Inadequate implementation of supply chain management process and systems 207 Inadequate infrastructure 168 Inadequate funding to fulfill mandate 169 Inadequate financial accounting 16
10 Inadequate inter-governmental relations 16
11 Ineffective implementation of spatial development framework 16
12 Inadequate monitoring and evaluation 16
13 Inadequate service delivery infrastructure 16
14 Poor payment culture 16
15 Poor tenure system 16
16 Inadequate technical capacity 16
17 Inadequate funding 16
18 Inadequate human resource management 16
19 Inadequate monitoring of projects 16
20 Inadequate stakeholder engagement 12
21 Inadequate implementation of governance systems 12
77
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
REF RIsk INHERENT RATING
22 Impaired reputation of the municipality 12
23 Inadequate communication systems (Internal and external) 12
24 Inadequate community participation 12
25 Inadequate disaster management 9
26 Local reliance on commodities 6
27 Lack of revenue generation in rural area 4
28 High service delivery expectations 4
29 Poor perceptions 4
3.7.10 Fraud and Anti corruption
Greater Tubatse Municipality has adopted the Fraud and Anti corruption Strategy in May 2008, however no implemen-
tation of the strategy was witnessed due to lack of resources. Risk Management Officer was appointed in 2010 and it
was agreed that the Risk Officer will be currently responsible for the implementation of the Strategy until such time
that Risk Manager and Additional Risk Officer are appointed. The Municipality is also planning to develop a fraud and
Corruption Policy during the 2011/12 financial year.
Fraud and Corruption in its wider meaning, and as referred to in the document, includes any conduct or behaviour
where a person accepts, agrees or offers any gratification for him/her or for another person where the purpose is to
act dishonestly or illegally, such behaviour also includes the misuse of material or information, abuse of a position of
authority or a breach of trust or violation of duty.
The following forms of corruption are identified in the GTM fraud and Corruption strategy:
• Bribery
• Embezzlement
• Fraud
• Extortion
• Abuse of power
• Conflict of interest
• Abuse of privileged information
• Favouritism and
• Nepotism
3.8 Financial Viability and Management
3.8.1 Municipal Sources of Revenue
A Municipality has to generate its own revenue by way of levying its Clients on the services rendered and receive
income from National Government for a Municipality to be able to perform its powers and functions as in terms of
section 152 of the Constitution of the Republic of South Africa. It is in this context that the National Government has
to allocate some resources in a form of Grants for Municipalities to be able to render services.
78
3.8.1.1 Grants received by GTM
Section 214(1) of the Constitution of the Republic of South Africa, 1996 requires an Act of Parliament to
provide for the equitable division of revenue raised nationally among the National, Provincial and Local
Spheres of Government and any other allocation to Provinces, Local Government or Municipalities from
the National Government’s share of revenue, and conditions on which those allocations may be made.
Table 64: below indicates revenue received from Grants and subsidies for the 2010/11 F/Y sOuRcE AMOuNT
Equitable share Councillor contribution 3 168 000
Equitable shares 91 358 000
Finance management grant 1 000 000
Municipal support grant 750 000
MIG funds 28 884 576
PMU funds 1 375 456
City development strategy grant 1 250 000
IRMA grant 4 300 000
Electrification grant 9 000 000
LGSETA 250 000
Institutional grant 1 200 000
EPWP grant 870 000
3.8.1.2 GTM Own sources of revenue
GTM is collecting revenue by way of levies, tax and services mainly from the proclaimed areas such as
Burgersfort, Steelpoort, Ohrigstad, Ga-Mapodile and Praktiseer. The municipality has also developed
traffic stations which generate income by way of traffic fines and testing of motor vehicles within the
area.
Table 64: following indicates own revenue by source for the 2010/11 F/Y: sOuRcE AMOuNT
Assessment rates 37 000 000
Refuse management fees 4 500 000
Sewerage fees 4 080 000
Water 9 616 084
Building plans and inspection fees 530 000
Cemeteries fees 70 000
Clearance certificate 30 000
Drivers licences 800 000
Interests on outstanding debtors 2 817 055
Learners licences 805 000
Libraries fees 1 000
Outdoor advertisement 30 000
Rent on property 350 000
Traffic fines 3 300 00
Interests on investments 650 000
79
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
Offsetting of depreciation 2 400 000
Bulk water contribution 1 000 000
Table 65: below indicates GTM cash flow for 2009/10 financial year:MONTH INcOME
OWN GRANT TOTAL INcOME
ExpENDITuRE OpERATION
ExpENDITuRE cApITAL
July 4 495 041 33 141 148 37 636 189 11 258 178 1 096 770
August 3 908 967 750 000 4 658 967 13 969 459 3 082 551
September 4 317 926 - 4 317 926 11 737 750 3 005 922
October 4 783 778 228 375 5 012 151 11 976 790 445 257
November 4 340 109 4 500 000 8 840 109 11 038 730 2 451 485
December 4 181 441 24 783 287 28 964 728 12 619 570 4 066 249
January 4 386 088 - 4 386 088 4 428 633 11 071 033
February 2 874 981 3 667 471 6 542 452 9 366 781 20 443 267
March 4 481 822 18 587 465 23 069 287 9 905 762
April 9 502 046 - 9 502 046 9 269 204
May 4 204 120 - 4 204 120 9 594 200
June 4 012 820 228 375 4 241 195 17 963 600
3.8.2 Credit and Debt Control
Creditors and Debt collection manual was adopted in terms with chapter 9 of the municipal Systems act, act 32 of
2000. Purpose of this policy is to ensure that credit control forms part of the municipality’s financial system and to
disclose the intension of the Council to standardise procedures for each individual case.
3.8.3 Investments
The Greater Tubatse municipality has adopted an investment of funds policy and principle in 2008. The policy is aimed
at gaining the highest possible return without undue risk during those periods when funds are not needed. Its main
objectives are that effective cash management must be met at all times, efficient cash collection procedure, effective
payment of creditors, management of investment in inventories and investment of surplus cash.
There were no investments made or budgeted for by the Greater Tubatse municipality during the 2009/10financial
year.
3.8.4 Budget and Treasury
The municipality has developed a unit which manages the budgetary and treasury issues. The unit is in the finance
section and its main objectives are to develop a budget process plan which is linked to the IDP process plan. The unit
has to oversee the implementation of the plan and to manage activities culminating during the development of the
budget. It must develop a credible and realistic budget which is linked or integrated to the IDP.
80
3.8.5 Revenue Management
Greater Tubatse municipality has a unit that deals with revenue management. The unit was developed in 2000 and its
main objectives are to effectively manage the day to day income of the municipality. Procedure manual is being de-
veloped in November 2008 for the control over cash funds, depositing and receiving of funds by municipal employees.
Valuation roll for the municipality is in place and is reviewed regularly. The following are also used for the manage-
ment of funds in GTM; rates policy, credit control policy, indigent policy, indigent register and audit standards.
3.8.6 Supply Cain Management
The municipality has developed and adopted a supply management policy in 2005, which is reviewed regularly to
suite current circumstances. It is managed by supply chain management unit that forms part of the finance depart-
ment. The unit comprises of a Manager and four other officials who runs the activities of the unit
3.8.7 Asset Management
Asset management policy was approved By GTM in 2008. Objectives of the policy is to govern the management of
assets owned by GTM (both operational and financial) to ensure that they are managed, controlled, safeguarded and
used in an efficient and effective manner.
Asset management register for the municipality was compiled during 2008/09 financial year and is updated regularly.
The municipality created asset management unit which comprises of one senior manager who will always keep track
of all municipal assets and is reporting to the Chief Financial Officer.
3.9 Municipal Transformation and Organisational Development
3.9.1 Council
GTM has a Council made up of 57 Councillors comprising 29 ward Councillors and 28 PR Councillors. It has a collective
executive system headed by the Mayor, while the Council is chaired by the Speaker elected in terms of Section 48 and
Section 36 of the Municipal Structures Act (117 of 1998) respectively.ANC is the majority party in the council, it com-
prises of 52(fifty two) councillors followed by PAC with only 2(two) and UIF, NVP and DA with one representative each.
GTM committees were established following the provisions of Section 80 of the Municipal Systems Act of 2000.
There are 11 Traditional Leaders seconded by the Limpopo House of Traditional Leaders serving in the GTM council.
81
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
Table 66: below shows representation of different Political parties and Traditional Leaders in the CouncilsTAkEHOLDER NuMBER
Africa National Congress 52
Pan African Congress 2
Democratic Alliance 1
UIF 1
NVP 1
Traditional Leaders 11
The relationship between the Council and Traditional Leaders in GTM is sound as there are no serious incidents
reported between the two parties. The Municipality also comprises of 28 CDWs appointed by Office of the Premier
to assist in fast racking development in the area. 29 ward committee structures were launched and work-shopped by
the municipality through office of the speaker in 2008. Each ward comprises of 10 members of the ward committee
with the ward councillor being the chairperson of the structure. An amount of R1.2 million was budgeted during the
2009/10 financial year for the sustainability of the structures.
Table 67: Section 79 committees of the Municipal Systems Act NAME OF cOMMITTEE DATE
EsTABLIsHED
Rules Committee 2009
Oversight Committee
Audit committee 2009
Municipal public Accounts committee 2010
Town planning committee 2010
Geographic names committee 2008
Petition and Ethics committee 2010
Table 68: Section 80 Committees established in GTM cOMMITTEE DATE
EsTABLIsHED
Finance Committee March 2006
Corporate Services Committee March 2006
Economic, Land and Development committee March 2006
Community Services Committee March 2006
Technical Services Committee March 2006
Strategic Planning Committee March 2006
3.9.2 Staff Component
The Community Services Department is by far the largest, followed by Corporate Services and Technical services
respectively. While the larger allocation of staff to technical services is welcome, the size of Corporate Services
compared to Community Services seems anomalous. There is a high vacancy rate within the departments of which
such posts needs to be filled. The GTM Council has raised a moratorium that there should be no new appointments
made during the 2008/09 financial year and that the Municipality must conduct staff assessment during the financial
year under review.
82
Table 69: below indicates Organizational Structure analysis 2010/11 FY Source: GTM Organogram 2010DEpARTMENT TOTAL NO
pOsTs NO: FILLED
pOsTs vAcANT pOsITIONs
BuDGETED uNBuDGETED TOTAL
Municipal manager’s office 8 6 2 0 2
Finance 60 34 3 23 26
Community services 88 58 0 30 30
Corporate services 54 38 0 16 16
Technical services 93 57 2 34 36
Strategic planning 17 8 0 9 9
Economic and Land 40 18 1 21 22
Executive support 34 24 1 9 10
TOTAL 394 243 9 142 151
3.9.2.1 Skills profile and needs for both Councillors and Officials
Municipalities are required in terms of the Skills Development Act no 97 of 1998 to facilitate training
for capacity building in order to address skills gaps created as a result of the past. GTM pays the skills
development levy on a monthly basis as required by the Skills Development Levies Act no 9 of 1999.
A skills audit is conducted on an annual basis to inform the Workplace skills plan which guides all the
training to be conducted throughout the year, the Workplace skills plan and Annual Training Report s are
then submitted annually to the LGSETA; budget is allocated for both councillors and officials.
GTM has a training committee which comprises of labour, Management and council; its role is to ensure
that all training activities are done in consultation with all relevant stakeholders.
Table 70: below indicates the skills needs for Councillors and Officials: Source GTM WSP 2010FINANcE ADMIN TEcHNIcAL AND pROJEcT
MANAGEMENTLEGAL AND cORpORATE
MANAGEMENT AND LEADERsHIp
44 26 55 75 65
The implementation of planned programmes is minimal due to cash flow problems.
Table 71: below indicates skills interventions as in the 2009/10 WSP and Annual training reportFINANcE ADMIN sOcIAL/cOMMu-
NITY/EcONOMIcDEvELOpMENT &
pLANNING
LEGAL AND cOR-pORATE
MANAGEMENT AND LEADERsHIp
NO: OF INTERvEN-
TIONs
NO OF pEOpLE
NO: OF IN-TERvEN-TIONs
NO: OF pEOpLE
NO: OF INTER-vENTIONs
NO: OF pEOpLE
NO: OF INTERvEN-
TIONs
NO: OF pEOpLE
NO: OF INTERvEN-
TIONs
NO: OF pEO-pLE
6 39 3 14 6 96 4 19 3 7
TOTAL NO OF INTERVENTIONS : 22TOTAL NO OF PEOPLE TRAINED : 175
83
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
3.9.3 Legal services
During the financial year under review; the Municipality experienced high number of law-suits as a result of adminis-
trative decision that were either right or wrong. It should be noted that administrative actions of the Municipality can
be only challenge if they are erratic and or in other instances, Citizens and business challenges actions taken by the
Municipality if such actions are made to be sound or prudent.
Table 72: Following are cases against the municipality for the F/Y 2009/10NAME AMOuNT cLAIMED ExpENDITuRE TO DATE sTATus
Ipeleng Group 8 000 000 2 100 000 Supreme court
Mopicon construction 2 000 000 00 Awaiting trial
Mmalekgowa Trading 650 000 50 000 Awaiting trial
Limpopo Road Binders 700 000 Funded by DPLGH Awaiting trial
Amelia Mashego 1 000 000 Funded by DPLGH Awaiting trial
Kgoete Justice 150 000 Awaiting trial
Challenges facing legal
• Cases drag through different financial years and take long to be finalised
• Litigation too expensive
• Lack of resources
• Insufficient understanding of legal procedures by the Municipal personnel
3.9.4 Labour relations
Greater Tubatse Municipality subscribes to all legislation regulating employment relations within the workplace. La-
bour relations sub-unit has been established with the sole mandate of ensuring a balance with regard to employment
practices within the workplace.
GTM has a functional Local Labour Forum constituted in line with the SALGBC main collective agreement. The com-
mittee sits on a monthly to discus s issues relating to employment relations.
Several activities were witnessed wherein employees were exercising their rights by raising their grievances through
the relevant channels as presented by SALGABC.
During the year under review the municipality had six grievances ending in arbitration of which only two were award-
ed in favour of the Municipality.
3.9.5 Information Technology
The IS audit was carried out in accordance with the International Standards on Auditing of the International Auditing
and Assurance Standards Board (IAASB) and the Standards for Information Systems Auditing of the Information Sys-
tems Audit and Control Association (ISACA). The effectiveness of the general controls surrounding the IT environment
at the municipality was measured against the internationally accepted Control Objectives for Information and Related
Technology (COBIT) framework and industry best practices.
84
Table 73: below indicates IT risks as identified by the auditcLAssIFIcATION DEscRIpTION
High Weaknesses that could seriously compromise the system of internal control and data integ-rity and should therefore be addressed as soon as possible.
Medium Matters that are important to the system of internal control and the reduction of overall risk, but do not require immediate attention.
Low Suggested improvements that would enhance internal control efficiency, but are not vital to the system of internal control.
Challenges associated with IT in GTM
• IT security policy not in place and responsibility for internal control and security had not been assigned to a
specific employee.
• No change control policy and procedures were in place.
• No formal backup and restoration procedures were in place and the informal backup process was found to be
inadequate.
• The service level agreements (SLAs) for the Payday, E-Venus and Cash-drawer systems were not monitored.
3.9.6 Occupational Health and Safety
GTM has established occupational Health safety sub-units one during the 2006/07 financial year within the Human
Resource Unit. The functions of the unit are guarded to advance the objects of Occupational Health and Safety Act,
85 of 1993.
The sub-unit performs the following functions in an effort to ensure health and safety within the workplace.
• Enforcement or implementation of Occupational Health and Safety Act.
• Responsible for all administrative duties related to OHS including policy formulation and reviewing.
• Conducting health and safety workshop, meetings and seminars.
• Providing full range of Employee assistance programme, that is assisting employee with solving problem which
might affect him from executing his/her duties
The sub-unit is currently manned by the Health and Safety Officer who is also responsible for Employee Wellness. A
Health and Safety Committee is functional which has also been established as per legislative requirement and also
there are six health and safety reps in place. The committee meets on quarterly basis .Committee members have thus
far received training on First Aid Level one.
The challenges within the unit are:
• Decentralized protective clothing and equipment budget. Departments are procuring on their own protective
clothing and equipment of which in some instances does not comply with legislative provisions and the result
is high injury incidences.
• Cash flow challenges
• Understaffing within the unit.
85
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
3.9.7 Policies and plans for GTM pOLIcY/pLAN sTATus DATE AppROvED
Integrated SDF Approved June 2007
LUMS Approved June 2007
Integrated waste management plan Approved
Employment equity plan Approved 2007
Workplace skills plan Approved September 2007
HIV/AIDS plan Approved October 2008
LED strategy Approved June 2007
Housing sector plans Draft
Revenue enhancement plan Approved May 2009
Disaster management plan Approved 2008
Capital investment plan Approved April 2008
Environment management plan None (district)
Energy master plan None (ESKOM)
Water services development plan None (district)
Integrated transport plan Approved 2004
Risk management strategy and plan Approved 2008
5 year investment plan Approved April 2008
Consolidated infrastructure plan Draft
Roads and storm water management plan Approved 2008
Water sector plan Draft
Investment of funds policy Approved May 2008
Credit control policy and debt control manual Approved February 2006
Water services operations and maintenance strategy(GSDM) Approved June 2007
Water services by-laws(GSDM) Approved June 2007
Asset management policy Approved April 2007
Supply chain management policy Approved June 2006
Fleet management policy Approved June 2007
Performance management policy Approved 2007
Communication strategy Approved 2008
Customer Care Framework Approved 2010
Public participation policy Draft 2010
Mayor and Speaker discretionary policy Draft 2010
Mangement of public gathering policy Draft 2010
Delegation of powers and functions policy Review 2010
Rules of order policy Review 2010
IT policy Approved 2009
Street by-law Gazetted
Management and control of Hostel by-law Gazetted
Informal street trading by-law Gazetted
Waste management by-law Gazetted
Traffic by-law Gazetted
Noise abatement Gazetted
Hiring of community by-law Gazetted
86
pOLIcY/pLAN sTATus DATE AppROvED
Electricity by-law Gazetted
Crematories and crematoria by-law Gazetted
Emergency services by-law Gazetted
Licensing and control of establishment that sell food to the public by-law
Gazetted
Municipal Turnaround Strategy Approved 2010
Granting aid Draft 2010
3.9.8 Organisational Performance Management System (OPMS) and Performance Management
System (PMS)
The Greater Tubatse municipality has adopted its performance management policy during the year 2007. A perfor-
mance management unit was established during 2007 which is currently focusing on the organisational performance
management system. Immediately after the adoption of the IDP and budget, the municipality develops service deliv-
ery and budget implementation plans (SDBIP) which will serve as business plans for individual departments within
the municipality. The adopted SDBIP is integrated into the performance contracts of the section 57 employees for
implementation.
Performance management review workshops are conducted on quarterly basis. After every performance manage-
ment review session, a report is tabled to the EXCO lekgotla which comprises of management and members of the
Executive committee. Purpose of this sitting will be to monitor progress in terms of the implementation of the IDP and
budget and to propose reviews where necessary.
The EXCO lekgotla report also has to serve before Executive committee and to council for directions and adoption.
Half yearly report (section 72report) is developed from the quarterly reports generated during the EXCO lekgotla
sessions. Municipal annual service delivery reports are generated from this process on annual basis which amongst
others will inform the formulation of the annual report.
After the adoption of the annual report by the municipal council, the oversight committee scrutinises the report and
makes final recommendations to the council for the adoption of the final oversight report which will then be open for
public consumption.
3.9.8.1 Individual PMS
Greater Tubatse Municipality’s performance management system is not fully operational. Only section
57 managers have signed performance contracts with the municipality and plans are underway to cas-
cading the performance management to the level-one Managers, and other staff members for perfor-
mance monitoring and evaluation.
87
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
3.9.9 Ranked needs of Greater Tubatse Municipality
The following 10 needs are ranked in-accordance with the order of their priority:
1. Water
2. Electricity
3. Roads and storm water drainage
4. Waste removal
5. Housing
6. Cemeteries
7. Land acquisition
8. Hawkers stalls
9. Sports and recreational facilities
10. Street and traffic lights
3.9.9.1 Administrative Structure
EXPENDITURE
ENVIRO-NMENTAL
TRAFFIC & PROTECTION
SERVICES
SOCIALSERVICES DISASTER CEMETARIES
REVENUE BUDGET ADMIN SECRETARIAT IDP PMS IGRPUBLICPARTICIPATION
COMMUNI-TIONSLEGAL HUMAN
RESOURCES
FINANCIAL SERVICES
PMU WATER SEWARAGE ROADS &STORMWATER REFUSE
TECHNICAL SERVICES ECONOMIC & LAND DEVELOPMENT COMMUNITY SERVICES
STRATEGIC PLANNINGCORPORATE SERVICES EXECUTIVE SUPPORT
MUNICIPAL MANAGER
TOWN PLANNING LAND & DEVELOPMENT
ADMINISTRATIVE STRUCTURE
3.9.10 Organogram
GREATER TUBATSE MUNICIPALITYORGANIZATIONAL STRUCTURE
General Council
Office of the Mayor
Section 80Committees
ExecutiveCommittee
Office of theMunicipal Manager
Municipal InstitutionalManagement &Administration
Office of the Speaker
Section 79 Committees
Office of the Chief Whip
88
MUNICIPAL MANAGER’S OFFICE
Personal Assistant
Secretary Admin Clerk
Risk managementOfficer
Internal Auditor
Internal Audit Clerk
Municipal Manager
DIRECTORATES:Finance
Corporate ServicesExecutive Support
Community ServicesEconomic and Land Development
Strategic PlanningTechnical Services
Manager in theMunicipal Manager’s office
FINANCE DEPARTMENT
CFO
Deputy CFO
ManagerExpenditure
ManagerRevenue
ManagerBudget & Reporting
Manager SupplyChain Management
Manager Informationand Technology
FINANCE DEPARTMENT CONTINUEDEXPENDITURE:
ManagerExpenditure
Deputy ManagerExpenditure
Assistant ManagerExpenditure
Chief AccountantExpenditure
Accountant Expenditure(Creditors)
Admin ClerkX 2
Admin ClerkX 2
Accountant Expenditure(Payroll)
89
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
FINANCE DEPARTMENT CONTINUEDREVENUE:
Manager Revenue
Deputy Manager Revenue
Chief AccountantRevenue x 2
Senior Clerk
Admin Clerk x 3
Cashier x 6
Senior Clerk
Admin Clerk
Accountant Billing Accountant Credit Control Accountant AssessmentRates
Senior Clerk
Admin Clerk x 2
Cashier x 4
FINANCE DEPARTMENT CONTINUEDBUDGET AND REPORTING:
ManagerBudget and Reporting
Assistant ManagerBudget and Reporting
Admin Assistant
Messenger x 5
FINANCE DEPARTMENT CONTINUEDSUPPLY CHAIN MANAGEMENT:
Deputy ManagerAssets
Assets Officer Fleet ManagementOfficer
ProcurementOfficer x 3
Admin Assistant x 2
Admin Clerk
Manager SupplyChain management
90
FINANCE DEPARTMENT CONTINUEDINFORMATION AND TECHNOLOGY:
Manager Informationand Technology
Assistant ManagerInformation and Technology
IT Clerk IT Clerk
IT OfficerTelephone Systems
IT OfficerSoftware
IT OfficerNetwork
COMMUNITY SERVICES DEPARTMENT
Director Community Services
ManagerTraffic Registration and
Licensing
Assistant ManagerDisaster
Manager SocialServices
Assistant ManagerEnvironment, Parks &
Recreation
Secretary
COMMUNITY SERVICES CONTINUEDSOCIAL SERVICES:
Manager SocialServices
Librarian x 2
Assistant Librarianx 3
Sports and Arts MPCCCoordinator HIV & Aids Coordinator Chief Librarian Social Facilitator
91
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
COMMUNITY SERVICES CONTINUEDENVIRONMENT, PARKS & RECREATION:
Assistant ManagerEnvironment, Parks & Recreation
Supervisor:Environment, Parks and Recreation
Cemetery Foreman Parks & Recreation Foreman
General Worker x 5 General Assistant x 14
Driver
COMMUNITY SERVICES CONTINUEDTRAFFIC & LICENSING:
Manager Traffic & Licensing
Examiner ofDriving Licenses
x 5
Superintendant Licensing
SuperintendantVehicles Steelpoort
Examiner ofVehicles x 4
AssistantSuperintendent
VTS
SuperintendentRegistering Authority
AssistantSuperintendent
Snr LicensingOfficer
Clerk
E Natis Clerkx 8
SuperintendantTraffic
Assistant Superintendant
x 2
Traffic Officerx 10
Senior AssClerk
Clerk x 2
Assistant Superintendant
Traffic
GeneralAssistant
Traffic Wardenx 3
Messenge of Court
Chief: Traffic OfficerLogistics & Admin
Chief: Traffic OfficerOperationalChief Licensing Officer
Pitman x 2
COMMUNITY SERVICES CONTINUEDDISASTER MANAGEMENT:
Assistant ManagerDisaster
-Disaster Coordinator
Assistant Coordinator x 2
Admin Assistant
92
CORPORATE SERVICES DEPARTMENT
Secretary
ManagerCorporate Administration
ManagerHuman Resources
ManagerLegal Services
DirectorCorporate Services
CORPORATE SERVICES DEPARTMENT CONTINUEDCORPORATE ADMINISTRATION:
ManagerCorporate Administration
Admin Assistant Receptionist x 2
Records OfficerArea HeadMapodile
Admin Assistant Admin Assistant
Area Head Ohrigstad
Admin Officer
Area HeadPraktiseer
Records Clerk
Admin Clerk Driver/Messenger
Admin Clerk
CORPORATE SERVICES DEPARTMENT CONTINUEDHUMAN RESOURCES:
Manager Human Resources
HR CLERK
Senior HR OfficerOHS and Labour Relations
Senior HR OfficerEmployee Benefits and
Personnel Administration
Senior HR OfficerTraining/Recruitment and
Organizational Development
OHS Officer
Cleaners x 16
Labor RelationsOfficer
SupervisorCleaners
Assistant HR OfficerEmployee benefits and
Personnel Administration
Assistant HROfficer Recruitment
and Training
HR Officer :Training and
Development
HR Officer:Work study
93
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
CORPORATE SERVICES DEPARTMENT CONTINUEDLEGAL SERVICES:
ManagerLegal Services
Legal officer
CORPORATE SERVICES DEPARTMENT CONTINUEDHUMAN RESOURCES:
Manager Human Resources
HR CLERK
Senior HR OfficerOHS and Labour Relations
Senior HR OfficerEmployee Benefits and
Personnel Administration
Senior HR OfficerTraining/Recruitment and
Organizational Development
OHS Officer
Cleaners x 16
Labor RelationsOfficer
SupervisorCleaners
Assistant HR OfficerEmployee benefits and
Personnel Administration
Assistant HROfficer Recruitment
and Training
HR Officer :Training and
Development
HR Officer:Work study
TECHNICAL SERVICES DEPARTMENT
DirectorTechnical Services
Secretary
ManagerPMU Municipal Engineer Manager
Waste ManagementManager
Roads and Storm Water
TECHNICAL SERVICES DEPARTMENTPROJECT MANAGEMENT UNIT
ManagerPMU
Technician x 3
Admin Officer
94
TECHNICAL SERVICES DEPARTMENTMUNICIPAL ENGINEER
Municipal Engineer
Technician
SupervisorSewerage
Foreman Foreman
Electrician
Admin Clerk
SupervisorWater
GeneralAssistants x 4
PumpOperator x 3 Pump Operator General
Assistant x 4
Technician
Supervisor
Admin Officer
TECHNICAL SERVICES DEPARTMENTROADS & STORMWATER/ PUBLIC WORKS UNIT
ManagerRoad & Storm Water
Machine Operator/ Grader x 6 Truck Driver x 2 TLB Driver x 2 Driver Foreman
General Assistantx 14
TECHNICAL SERVICES DEPARTMENTREFUSEManager
Waste
SupervisorWaste
Truck Driver Street Cleaner x 13 General Assistant x 8
Admin Officer
95
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
STRATEGIC PLANNING DEPARTMENT
Director
ManagerIDP
IDP Officer x 21 Vacant
Assistant IDP Officer
ManagerPMS
PMS Officer x 2
Assistant PMS Officer
ManagerIGR
Assistant Manager IGR
IGR Officer
Coordinator AssistantIGR OFFICER
Secretary Admin Officer
Admin Assistant x 2
ECONOMIC AND LAND DEVELOPMENT DEPARTMENT
Secretary
ManagerDevelopment Planning
Services
ManagerHousing & Property Management
& Building Control
ManagerLocal Economic Development
Director
ECONOMIC AND LAND DEVELOPMENT CONTINUEDDEVELOPMENT PLANNING SERVICES
ManagerDevelopment Planning Services
Admin Assistant
Assistant ManagerTown Planning
GIS Specialist
Town PlannerSpatial Planning x 2
Town PlannerLand Use GIS Technician
DatabaseAdministrator
Driver Mayor
ProtocolOfficer
EXECUTIVE SUPPORT DEPARTMENT
Municipal Secretary
Assistant Municipal Secretary
AdminAssistant x 2 Typist
Admin Support:Chief Whip Office
SecretaryMayor's Office
Special ProgrammesOfficer x 3 Driver
PublicParticipation
Social Facilitatorx 2
Secretary Officeof the Speaker Admin Officer
ManagerCommunication
Spokesperson
Communication Officer
Admin Assistant
Director
SecretaryDirector’s Office
ManagerOffice of the Mayor
Manager Special Programmes
ManagerCommunity Participation
CommitteeSecretary x 3
AdminOfficer
Report Coordinator
BodyguardMayor
96
3.9.11 SWOT ANALYSIS
3.9.11.1 KPA: Spatial rationale and Local Economic development
Economic and Land Development
Town planning and Local economic development
sTRENGTH WEAkNEss OppORTuNITIEs THREATs
Land policies in place, LUMS,SDF, Building regulations
Booming of mines in the area.
Illegal land invasions.
Four qualified town planners in place, one is a registered profes-sional.
Top land developers are investing in the area.
Non cooperation of tra-ditional leaders on land management issues.
GIS established (sys-tem in place with one specialist).
Inadequate applica-tions and equipments
Potential to create PPP Topographical shapes of the area hampers more land develop-ment.(for human settle-ments and other related developments)
Inadequate personnel Formalization of some rural areas
Most of the land is privately owned.
Local Economic Development
sTRENGTHs WEAkNEss OppORTuNITIEs THREATs
LED strategy in place Business linkages with mines
LED unit established LED Unit understaffed Potential for tourism Government agricultural projects not properly supported by communi-ties.
LED Forum not func-tional
Potential for agricul-tural growth
Land invasion on poten-tial agricultural projects.
Integration of LED forum / IDP forum
Poor relationship be-tween mines, munici-pality and communities.
High unemployment rate
Mines not beneficiating
Poor skills based on major economic sec-tors.
FET College available for development of required skills
FET College not well equipped
Business support unit established (LIBSA & LEDET)
Ineffective engagement with provincial sector departments
Potential growth of BEE in the mining industry
KPA: Good Governance and Public Participation.
97
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
3.9.11.2 Departments: Executive Support.
Communication Unit, Secretariat, Public participation, Special programme
sTRENGTH WEAkNEss OppORTuNITIEs THREATs
Communication unit in place with two person-nel.
Insufficient personnel Local radio station established.
Local news papers available.
Communication strat-egy in place.
Not well resourced Local news papers available.
Inadequate civic education.
Website in place Inadequate skills and personnel
GCIS available Local news papers available.
No clear job descrip-tions/delegation
Established communi-cation forums e.g. ward committees.
Decentralized advertis-ing.
Web site not fully functional
Secretariat unit
sTRENGTH WEAkNEss OppORTuNITIEs THREATs
Unit in place. No clear job descrip-tions.
Support by the district municipality
Policies and systems available
Inadequate skills. Separation of powers bill available.
Audio recording system available
No backup systems (records)
No proper filing sys-tems
Late submissions of agenda items by de-partments.
Inadequate communi-cation
Public participation unit
sTRENGTH WEAkNEss OppORTuNITIEs THREATs
Unit in place The unit is under-staffed.Inadequate capacity.
Public participation policy in place.
Public participation strategy in place
Established and func-tional ward committees
Late submissions of reports by ward com-mittees.
CDW’s in place Lack of cooperation by CDW’s.
No clear line of report-ing for CDW’s.
98
Special Programmes
sTRENGTH WEAkNEss OppORTuNITIEs THREATs
Unit in place Understaffed, operate without a manager
Programmes are in place and functional.(Youth, elderly, local AIDS council, moral re-generation movement, disability forum and geographic names)
Children and Gender forums dysfunctional.
Local HIV and AIDS policy in place
No policies ( youth, children, people with disability, gender and elderly)
National ministry on children, women and disabled and National youth development agency are in place.
NYDA not accessible, the agency is not yet cascaded to municipal level
Local youth council launched.
KPA: Financial viability
3.9.11.3 Financial Services
Information technology, supply chain management, Asset management, Revenue and Expenditure
sTRENGTH WEAkNEss OppORTuNITIEs THREATs
Fraud prevention strategy.
Supply chain policy.
Asset management policy.
IT systems in place. No IT Master plan in compliant to Legislative requirement
Policies in place but pending approval
Physical access control system in place but not yet commissioned
No off site data storage solution in place
ICT infrastructure and resources in place
Frequent network con-nectivity downtime
Website and Email in place
Inadequate of website content management
Expenditure
sTRENGTH WEAkNEss OppORTuNITIEs THREATs
The unit is in place with seven employees.
No clear supervision and communication with service providers.
Municipal finance man-agement act is in place to regulate financial matter.
99
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
Venus financial sys-tems in place.
Total disregard of legis-lation during procure-ment processes.
Pay day system in place.
The municipality is not price conscious.
Procedure manuals in place.
Inadequate specialized equipments.
Monthly and quarterly Reports generated and submitted in time.
Uncontrolled study leaves.
Inadequate participa-tion during budgetary processes.
Inadequate manage-ment of budget.
Revenue
sTRENGTH WEAkNEss OppORTuNITIEs THREATs
Revenue enhancement strategy is in place.
Cash flow problems. Low payments rate by Government depart-ments and rate payers.
Indigent policy. Data base is not ac-curate.
Indigent register. Debt collector
Credit control policy in place.
Inadequate control over service provision
Lengthy legal pro-cesses for recovery of debts.
Monthly and quarterly Reports generated and submitted in time.
Inadequate manage-ment of service provid-ers.
Qualified audit opinion
Assets Management Unit
sTRENGTH WEAKNESS OPPORTUNITIES THREATSThe unit in place with one employee.
Inadequate staff. The security company not responsible for the loss of municipal property.
Asset management policy in place.
Unauthorized movement of assets.
Asset audit system in place.
Asset registers GRAB compliant.
The asset management policy not fully communi-cated and implemented.
Violation of asset man-agement policy.
Inadequate security for municipal assets.
KPA’s: Basic services delivery
100
3.9.11.4 Community Services Department
Environment parks and cemetery, Social services, Traffic and licensing and Disaster management
sTRENGTH WEAkNEss OppORTuNITIEs THREATs
Unit in place with one supervisor and ten general assistants.
The unit is acutely under staffed.
Unproductive work force.
Good stakeholder rela-tions
No local environmental management plan.
District environmental management plan in place.
Availability of working tools.
Poor workmanship of some facilities during construction
Vandalism
Good relationship with stakeholders.
Lack of cemetery management system for newly built cemeteries.
Availability of recre-ational parks
Shortage of recreational parks
Lack of response by potential sponsors
Availability of munici-pal cemeteries
Lack of cemetery and crematorium in Burgers-fort
Accessibility of MIG to develop cemetery and crematorium
Land Availability
Social Services
sTRENGTH WEAkNEss OppORTuNITIEs THREATs
Unit in place with one manager and 04 as-sistant librarians and 02 officers.
skills match and short-age
HIV/AIDS local response strategy in place
lack of HIV/AIDS Coordinator to drive the implementation
Viable stakeholder rela-tions E.g. Public, Pri-vate & NPO’s, CBO’s.
Social influxHigh HIV/AIDS infec-tion rate.
Available community facilities
Poor workmanship of some facilities during construction
Incomplete and non handing over to end user depts.
Availability of health and social facilities.
Vandalism
Accessibility of MIG to develop sports and recreational facilities.
Lack of sporting, arts recreational facilities.
Availability of potential sponsors.
Land Availability
Functional Libraries Shortage of libraries Availability of potential sponsors
Good stakeholder rela-tions.
Land availability
101
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
Traffic & Licensing
sTRENGTH WEAkNEssEs OppORTuNITIEs THREATs
Suitably qualified personnel
Shortage of staff
Lack of dedication by traffic officers.
Non functionality of robots that impacts on the schedules of law enforcement officers.
High rate of Accidents during none functioning of the robots.
Available working tools Inadequate working tools
Accessible registration and licensing centers.
Good stakeholder rela-tions
80/20 apportionment for licensing fees.
Disaster Management
sTRENGTH WEAkNEss OppORTuNITIEs THREAT
Functional Unit with 01 coordinator and assistant.
District intervention in terms of disasters of greater magnitude.
Flood line settlements
Rapid response by the unit
Functional disaster forum
Good stakeholder rela-tions
KPA’s: Local economic development, Good governance and public participation and Institutional devel-
opment
3.9.11.5 Strategic Planning
IDP, PMS and IGR
sTRENGTH WEAkNEssEs OppORTuNITIEs THREATs
IDP Unit in place with three officials.
IDP forum not fully functional
DLGH support and District support
Rely on STATSSA for data.
Credible IDP in place.
IDP forum available. Inconsistent represen-tation by members.
IDP Sub-steering com-mittee established for proof reading of the document.
IDP Sub-steering committee not having adequate skills.
Shortage of sector plans
None compliance to IDP process plan
Public participation not fully attended to
102
Performance Management System
sTRENGTH WEAkNEss OppORTuNITIEs THREATs
Effective PMS in place
Insufficient staff and resources in the unit
District and provincial support thorough the District and provincial for a
PMS policy, Manuel and framework are in place
PMS not fully implemented, it is implemented only at institutional and senior management level
Availability of PMS legislations
Turnaround strategic is fully implemented
IGR
sTRENGHTs WEAkNEssEs OppORTuNITIEs THREATs
IGR Unit is in place with 2 officials
Unit is understaffed SALGA IGR FORUM, DISTRICT BATHO PELE FORUM
Inconsistency of the forum
Customer Care framework adopted by Council
Incapacity to deal with the volume of Presiden-tial queries within the required time
SADC MOU
Draft IGR Strategy Non availability of the Ambassadorship frameworkNon implementation of the IGR framework
Draft language policy PANSALB Litigation by Minority groups
KPA: Basic service delivery
3.9.11.6 Technical services
Waste Management, Water and Sanitation, Project Management, Roads and Transport and Electricity
sTRENGHTs WEAkNEssEs OppORTuNITIEs THREATs
Waste management unit in place with 21 general assistants and one supervisor.
Unit is understaffed Support from Depart-ment of Water Affairs and Environment
Lack environmental awareness campaigns
Integrated waste man-agement plan in place.
Waste management plan not reviewed
Waste management by-law in place.
Inadequate equipment for waste management
Registered with Insti-tute for Waste Manage-ment of Southern Africa
Unit operates on a loss
103
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
Inadequate enforce-ment of waste manage-ment by-law
Waste management partially outsourced
License for Burgersfort landfill site has expired
High waste manage-ment services backlog
Inadequate beneficia-tion on waste manage-ment projects
Water and Sanitation (GTM not water services authority nor provider)
sTRENGHTs WEAkNEssEs OppORTuNITIEs THREATs
District WSDP in place GTM not water services authority nor provider
Institutional Social Development (ISD) in place
District WSDP not reviewed to suit the cur-rent status
Support from local mines
High water services backlog
District Municipality outsourced O&M to Lepelle water services (Turn around time)
Vandalism of water infrastructure
Aging infrastructure
Poor maintenance of the existing infra-structure in rural and townships
Project Management Unit
sTRENGHTs WEAkNEssEs OppORTuNITIEs THREATs
PMU established with three technicians and one admin officer
No PMU manager Access support from Bigen Africa, DPLGH,COGTA, & Public Works
Inadequate funding for implementation of the projects
Reports submitted to stakeholders in time
Capital projects imple-mented in time
Job creation through EPWP programmes
Project steering com-mittees in place
Project steering commit-tees are incapacitated
Poor workmanship
Roads and Storm water
104
sTRENGHTs WEAkNEssEs OppORTuNITIEs THREATs
Integrated Roads Mas-ter Plan in place
Inadequate equipments for road maintenance
Support from SANRAL & RAL
Poor maintenance on Provincial and National roads
Roads and storm water unit in place
Poor maintenance of equipments
Municipal Public Works programmes in place
High backlog of access roads and access bridges
Integrated Transport plan in place
Lack environmental awareness campaigns
GTM not water services authority nor provider
District WSDP not reviewed to suit the current status
Electricity
sTRENGHTs WEAkNEssEs OppORTuNITIEs THREATs
Dedicated official ap-pointed for electricity programme
No electricity plan Support from ESCOM & DE
GTM not electricity authority
Support from local mines
High electricity backlog
Inadequate electricity capacity
KPA: Institutional development and Transformation
3.9.11.7 Corporate services
Human Resource Unit, Legal services and Administration
sTRENGTH WEAkNEss OppORTuNITIEs THREATs
Availability of HR Poli-cies Training
Poor work ethic Access to Support by the District, Provincial and SALGA
Non compliance with the Employment Equity Act
Poor personnel records keeping
Availability of Office Space
Inadequate HR systems
Communication Infra-structure
Work Skills Plan – dedicated Skills De-velopment Facilitator
Lack of capacity in per-sonnel OD / work study
105
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
Functional Training Committee
Decentralized training budget
None compliance to Skills
Audit Process by end-users
90% of vacant posi-tions are filled
Lack of Job descriptions
Lack of Individual per-formance Management Systems
Resignation of em-ployees from critical positions
Competition with private sectors over personnel
sTRENGTH WEAkNEss OppORTuNITIEs THREATs
Functional Labour Relation sub-unit
Functional Local Labour Forum
Employee Benefits administration func-tional
Occupational Health and Safety Committee functional
Shortage of personnel in the OHS subunit
Lack of Occupational Health and Safety plan ( Evacuation plan, Emer-gency response plan, EAP plan and Employee HIV and Aids plan)
Lack of personnel in em-ployees wellness program.
Legal Unit
sTRENGTH WEAkNEss OppORTuNITIEs THREATs
Timeous response to litigation matters
Access to support by DLGH
Land invasion
Contracted Attorney
Vetting of contract and Service Level Agree-ments within 14 days
Not all stake holders are consulted during vetting of SLA
Some SLA are still with end-users departments
Appointment of Service providers without comple-tion/signing of SLA
By-laws in place By-laws not being imple-mented
Lack of personnel
106
Administration Unit
sTRENGTH WEAkNEss OppORTuNITIEs THREATs
Competent personnel
Improved communication between the satellite and the main office.
Availability of office space No maintenance plan for satellite offices.
File plan not yet ad-opted by council
Inadequate personnel
Lack of security man-agement plan
Poor security Services
Poor management of contracts
Inadequate front line skills
Corporate Image deteriorated
None functional elec-tronic record manage-ment system
Risk assessment of building ( Certificate of safety from engineers)
Building can col-lapse
107
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
Chapter 5 of the Municipal Systems Act 32 of 2000 stipulates the core components of integrated development plans must reflect the
following:
• (c) the council ‘s development priorities and objectives for its elected term, including its local economic development aims and its
internal transformation needs;
• (d) the council‘s development strategies which must be aligned with any national or provincial sectoral plans and planning require-
ments binding on the municipality in terms of legislation.
Methodology and Processes followed during the development of the strategy chapter
• Sector departments were engaged from 29th November 2010 to 10th December 2010 to conduct SWOT Analysis and develop
departmental strategies.
- Status quo analysis key findings presentation.
- SWOT analysis for various KPA’s and functions
- Departmental strategy formulation
• Municipal Strategic Planning Workshop was held on the 15th December 2010 and 09th -11th February 2011 and the following was
discussed:
- High level status quo analysis presentations
- Austerity measures presented by HOD
- Formulation of Vision, mission and values
- Development of strategic objectives and strategies
- Projects and programmes identification and costing
4.1 Vision for Greater Tubatse MunicipalityA vision is a compelling picture of the future. It involves the heart and minds of the Employees and Councillors of the Municipality to
motivate them towards co-operation to create the idealised destination.
The Vision statement of the Greater Tubatse Municipality is:
“A developed platinum city for the benefit of all”
4.2 Mission statements for Greater Tubatse MunicipalityA mission describes the purpose of a municipality. It describes the focus for the municipal area. The mission addresses the
objects of local government as stipulated in Section 152 of the Constitution that is based on:
• democratic and accountable governance;
• sustainable services;
• social and economic development;
• safe and healthy environment; and
• Encourages community involvement.
sEcTION 4:sTRATEGY cHApTER
110
The mission statements for Greater Tubatse Municipality are:
• Local accountable democracy through active community participation
• Economic advancement to fight poverty and unemployment
• Accessible, needs-satisfying services rendering in a sustainable and affordable manner
• Municipal transformation and institutional development and
• Environmental management to ensure a balance between safe human settlements and the economic base of the munici-
pality
4.3 Values for the Greater Tubatse Municipality Values underline the behavioural characteristics of the GTM. It guides the people within the municipality towards the achieve-
ment of the mission and ultimately the vision of the municipality by not necessarily outlining solutions how this will be done
but rather the manner in which it is accomplished.
The following are Values of the Greater Tubatse Municipality:
• Mutual Respect
• Commitment
• Transparency
• Accountability
• Discipline
4.4 Summary of the Strategy Chapter
111
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
4.5 KPA 1: Institutional Development and Transformation pROBLEM sTATEMENT OBJEcTIvEs sTRATEGY OuTcOMEs sTRATEGIc pROJEcTs
Skills shortage To develop a credible skills planning institu-tional mechanism
Skills Development A skilled and capable workforce to support inclusive growth
Developing Workplace skills plan
Inadequate utilization of workforce
To ensure effective utilization of the available workforce
Conduct a research development and innovation in human capital
A skilled and capable workforce to support inclusive growth
Skills audit and place-mentOrganizational Re-engineering
Development of job descriptions
Poor work ethics To build a disciplined organizational culture
Facilitate change management
A development orientated public service and inclusive citizenship
Enforcement of em-ployee code of conduct
Limited power and functions To acquire additional powers and func-tions that will impact positively on basic services
Transfer of water services authority and provision to the local municipality
Acquire electricity license
Acquire housing ac-creditation
An efficient, competi-tive and responsive economic infrastruc-ture network
Engagement with Dis-trict and local govt.
Apply for supply of electricity in the Urban and township areas
Applying for housing accreditation
4.6 KPA 2: Basic ServicespROBLEM sTATEMENT OBJEcTIvEs sTRATEGIEs OuTcOMEs sTRATEGIc pROJEcTs
Inadequate development and maintenance of mu-nicipal infrastructure
High roads backlogs
To improve develop-ment and mainte-nance of municipal infrastructure
To improve acces-sibility and mobility of transport
Improve infrastruc-tural development and maintenence
Review and implement integrated transport plan and road master plan
An efficient, effective and responsive eco-nomic infrastructure network
An efficient, effective and responsive eco-nomic infrastructure network
Stakeholder engagement
Review and Implement the environmental man-agement plan
Review and implement integrated transport plan and road master plan and infrastructure manage-ment plan
Inadequate access to waste management services
To improve access to waste management services
Review waste man-agement implemen-tation plan
A responsive, ac-countable effective and efficient local government system
Extension of services. Review of current waste management contract. PPP project.
High electricity backlogs (28000 HH)
To facilitate in-creased allocation of grid electricity
Increase capacity for engagement
An efficient, effective and responsive eco-nomic infrastructure network
Stakeholder engagement
High water and sanitation backlogs
To facilitate in-creased allocation of water and sanitation projects in GTM
Increase capacity for engagements
An efficient, effective and responsive eco-nomic infrastructure network
Stakeholder engagement
High housing backlogs To facilitate in-creased allocation of housing projects in GTM
Increase capacity for engagement
An efficient, effective and responsive eco-nomic infrastructure network
Stakeholder engagement
112
4.7 KPA: 3 Local Economic Development
pROBLEM sTATEMENT OBJEcTIvE sTRATEGY OuTcOME sTRATEGIc pROJEcT
Limited benefit from min-ing opportunities
To Improve stake-holder relationship
facilitate access to opportunities
Decent employment through inclusive economic growth
Coordinated benefit model for communities (SLP)
Limited benefit from stake-holder initiated projects and planning
To improve municipal support, planning and financing To improve support to small business and cooperatives
Facilitate integrated planning culture
Decent employment through inclusive economic growth
Structure institutional-izationCredible IDP
Limited skills appropriate for mining employment
To facilitate resourc-ing of the available learning facilities
Resource and influ-ence transforma-tion of the learning outcome
A skilled and capable workforce to support inclusive growth
Harness provisions of LEGDP and local LED Strategy
High unemployment rate To reduce unemploy-ment rate
Facilitate creation of 1000 jobs /A through CWP and others
A responsive and ac-countable , effective and efficient local government
Implement CWP and other related pro-grammes
4.8 KPA: Financial Viability pROBLEM sTATEMENT OBJEcTIvEs sTRATEGIEs OuTcOME sTRATEGIc pROJEcT
Poor budget management(planning, implementation and review)
To improve budget planning manage-ment processes across departments
Facilitate compre-hensive budget processes across departments
Responsive and bud-get implementation
Establish budget steer-ing committee
Poor revenue collection To improve revenue collection
Develop and imple-ment revenue en-hancement strategy
Improve quality of services
Improve revenue collection
Reduction of debtors
Improved cash flow
Implement revenue strategy
Responsive services maintenance pro-gramme in billing areas
Inadequate asset manage-ment
To ensure account-able and effective as-set management
Facilitate effective use of asset man-agement
Proper management of asset by respec-tive asset users
Establish asset steering committee
Monthly reporting on assets use
Inadequate implementation of SCM policy
Ensure legislative compliance of SCM policy
Enforcement of SCM policy
Legislative compli-ance with the policy
Monitoring monthly re-porting on compliance
113
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
4.9 KPA: 5 Good Governance and Public Participation pROBLEM sTATEMENT OBJEcTIvEs sTRATEGIEs OuTcOME sTRATEGIc pROJEcT
Inadequate communication To ensure council is portrayed in ways that restores trust in local government
Improve stakeholder relation
Development orientated public service and inclusive citizenship
Updated website;Review and implementa-tion of communication strategyCivic education pro-grammesMedia house relationsImplement public partici-pation strategyImprove IGR
Limited functionality of the oversight tools PMSRiskAudit CommitteeWard Committee
To improve perfor-mance monitoring and evaluation
Improve oversight environment
Responsive account-able, effective and efficient local govern-ment system
Review of the PMS framework;Strengthening of the RISK and Audit unit’s functionality;Ward committee capaci-tating
Limited guidelines/policies of special programmesLimited functionality of forumsConflicting roles of CDWs and council structures
Enable institutional environment for func-tionality of forums
Strengthening the IGR environment
Responsive account-able, effective and efficient local govern-ment system
Policy development /guidelinesMaximised linkagesCapacity building of forums
Inadequate enforcement of by-laws
To promote enforce-ment of municipal by-laws
Facilitate enforce-ment of the gazette municipal by-laws
All people in South Africa protected and feel safe
Stakeholder engage-mentContract managementFinalization of the appointment of peace officers
4.10 KPA: 6 Spatial RationalepROBLEM sTATEMENT OBJEcTIvEs sTRATEGY OuTcOMEs sTRATEGIc pROJEcT
Land invasion on potential agricultural projects and earmarked development by communities.
To facilitate formal acquisition an requi-site use of land
Land acquisition and improvement OF stakeholder relation
Sustainable human settlement and improved quality of household life
Implementation of SDF
Enforcement of LUMS
Formalization of settle-ments.
Lack of Municipal owned land.
To facilitate formal acquisition an requi-site use of land
Land acquisition Sustainable human settlement and improved quality of household life
Land acquisition.
Inadequate stakeholder relations
To strengthen rela-tionship
Diverse engagement modalities.
Responsive, ac-countable, effective and efficient local government systems.
Formation of Forums.
Delayed finalization of Land claims
To facilitate finaliza-tion of land claims
Strengthening en-gagement capacity.
Sustainable human settlement and improved quality of household life
114
5.1 Revenue ITEM BuDGET YEAR BuDGET YEAR +1 BuDGET YEAR +2
2011/12 20012/3 2013/14
PROPERTY RATES (40,700,000) (44,770,000) (49,247,000)
SALE OF WATER - UNITS (11,534,692) (12,688,162) (13,956,978)
SALE OF WATER -PREPAID (693,000) (762,300) (838,530)
SEWERAGE CHARGES (2,948,000) (3,242,800) (3,567,080)
REFUSE REMOVAL CHARGES (6,050,000) (6,655,000) (7,320,500)
EQUITABLE SHARE COUNCILLOR CONTRIBUTION (3,730,000) (393,800) (4,167,000)
EQUITABLE SHARE (110,407,000) (122,281,000) (130,313,000)
EQUITABLE SHARE FREE BASIC ELECTRICITY - - -
FINANCE MANAGEMENT GRANT (1,250,000) (3,000,000) (3,300,000)
GRANT MUNICIPAL SUPPORT (CAPACITY BUILD) (790,000) (800,000) (900,000)
INSTITUTIONAL GRANT (913,500) (1,004,850) (1,105,335)
LGSETA - TRAINING - - -
GRANTS - INTERGRATED NAT ELECTRIFICATION - - -
GRANTS - MIG FUNDS (2,065,550) (2,407,550) (2,529,000)
NEIGBOUR DEVELOP PARTNER (CAPITAL GRANT) - - -
EXP PUBLIC WORKS PROG INCENTIVE GRANT - - -
CITY / DEVELOPMENT STRATEGY - - -
INVESTMENTS (165,000) (181,500) (199,650)
LATE PAYMENT (1,049,400) (1,154,340) (1,269,774)
INTEREST ON OUTSTANDING DEBTORS (3,098,761) (3,408,637) (3,749,501)
RENT - HOUSING (420,000) (462,000) (508,200)
ADVERTISING SIGNS (33,000) (36,300) (39,930)
BUILDING PLANS & INSPECTIONS (250,000) (275,000) (302,500)
BURIAL FEES (60,000) (66,000) (72,600)
CLEARANCE CERTIFICATES (18,145) (19,960) (21,955)
CONNECTION FEES - WATER (15,746) (17,321) (19,053)
FINES - LIBRARY AND LOST BOOKS (1,100) (1,210) (1,331)
LICENSING - COMMISSION ON VEHICLE REGIST (2,000,000) (2,200,000) (2,420,000)
LICENSING - DRIVERS LICENSES (1,100,000) (1,210,000) (1,331,000)
LICENSING - LEARNER LICENSES (1,100,000) (1,210,000) (1,331,000)
LICENSING - CHANGE OF LIC/ APPL FEES (832,000) (915,200) (1,006,720)
LICENSING - PERMITS (10,000) (11,000) (12,100)
LICENSING - HAWKERS (30,000) (33,000) (36,300)
MEMBERSHIP FEES (5,000) (5,500) (6,050)
SUNDRY INCOME - - -
WATER BULK CONTRIBUTION (440,000) (484,000) (532,400)
VALUATION CERTIFICATE (583) (641) (705)
IRMA AND ACCESS PAVING to COMMUNITY HALL (leboeng) 2,300,000
SUB-TOTAL DIRECT OPERATING INCOME -192,915,477 -211,022,570 -231,563,242
INCOME FOREGONE 1,600,000 1,760,000 1,936,000
TOTAL OPERATING INCOME -191,315,477 -209,262,570 -229,627,242
sEcTION 5: MEDIuM TERM REvENuE AND ExpENDITuRE FRAMEWORk
118
5.2 Expenditure BuDGET
ITEM Year Year +1 Year +2
2011/12 20012/3 2013/14
EMPLOYEE SAL AND ALLOWANCE 78,352,647 84,620,858 91,390,527
COUNCILLORS REMUNERATION 17,339,676 18,726,850 20,224,998
ADVERTISEMENTS 385,000 423,500 465,850
ALLOWANCES TRADITIONAL LEADERS 88,000 96,800 106,480
AUDIT COMMITTEE 150,000 150,000 150,000
AUDIT FEES - INTERNAL 280,000 308,000 338,800
AUDIT FEES - EXTERNAL 1,750,000 2,000,000 2,250,000
BANK CHARGES 275,000 302,500 332,750
BOOK REPLACEMENTS 17,600 19,360 21,296
BURIALS - NEEDY PERSONS 38,500 42,350 46,585
BURSARY FUND 330,000 363,000 399,300
COLLECTION COST 500,000 700,000 90,000
COMMUNICATION SYSTEM - - -
COORDINATED BENEFIT MODEL FOR COMMUNITIRES (SLP) 30,000 40,000 50,000
CITY DEVELOPMENT STRATEGY 1,375,000 1,512,500 1,663,750
DEPARTMENTAL BUSINESS PLANS - - -
DISATER PLAN REVIEW 30,000 - -
MAYOR’S DISCRETIONERY FUND 110,000 121,000 133,100
ENTERTAINMENT PUBLIC 264,000 290,400 319,440
SPEAKER’S DISCRETIONERY FUND 46,200 50,820 55,902
EVENTS &SPECIAL PROJECTS 209,000 229,900 252,890
E & S CHILDREN PROGRAMMES 22,000 24,200 26,620
E & S YOUTH PROGRAMMES 275,000 302,500 332,750
E & S DISABILITY 374,000 411,400 452,540
E & S GENDER 55,000 60,500 66,550
E & S ELDERY 33,000 36,300 39,930
E & S GEOGRAPHIC NAMES CHANGE 22,000 24,200 26,620
E & S HIV/AIDS 110,000 121,000 133,100
E & S MORAL REGENERATION MOVEMENT 50,000 55,000 60,500
E & S ISSUE BASED IMIBIZOS 50,000 50,000 50,000
E & S EXCO OUTREACH 150,000 200,000 250,000
E & S SOLMA 700,000 800,000 900,000
E & S IDP/PM/BUDGET FORUM 50,000 60,000 70,000
E & S MAYORS Special Program 1,500,000 1,000,000 1,000,000
E & S TRAINING OF WARD COMMITEES 120,000 130,000 140,000
E & S TRAINING OF COUNCILLORS - 400,000 500,000
E & S TRAINING OF FORUMS 50,000 50,000 50,000
E & S SUPPORT SECURED LINKAGES 500,000 1,000,000 1,000,000
E & S INSTITUTIONALISATION OF INFORMAL SECTOR 1,000,000 - -
E & S RELOCATION OF BEACONS IN URBAN TOWNSHIP 1,000,000 3,200,000 3,400,000
119
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
BuDGET
ITEM Year Year +1 Year +2
2011/12 20012/3 2013/14
E & S ENGAGEMENT WITH MAGOSHI 50,000 60,000 70,000
E & S AUDIT URBAN PROPERTIES FOR COMPLIANCE 50,000 60,000 70,000
E & S DEVELOP OF BUILDONG PLANS FOR BGF. S/POORT & O/STAD 500,000 300,000 100,000
E & S PLANING / SURVEY OF MASHIFANE PARK 800,000 600,000 -
FREE BASIC ELECTRICITY EXPENSES 3,500,000 3,850,000 4,235,000
FREE BASIC WATER EXPENSES - - -
FUEL 715,000 786,500 865,150
GIS 610,000 671,000 738,100
GRANTS IN AID 330,000 363,000 399,300
IDP PROCESS 235,000 258,500 284,350
INTER GOVERNMENTAL RELATION 220,000 242,000 266,200
INDIGENTS (COUNCIL CONTRIBUTION) 55,000 60,500 66,550
IMPLEMENTATION MFSA GRANT 1,250,000 1,375,000 1,512,500
INSPECTORATE FEES 66,000 72,600 79,860
RECORDS MANAGEMENT 110,000 121,000 133,100
INSURANCE - GENERAL 440,000 484,000 532,400
EMPLOYEES WELLNESS PROGRAMME 280,500 308,550 339,405
LED STAKEHOLDER FORUM 44,000 48,400 53,240
LED PROJECTS 1,000,000 1,100,000 1,210,000
IT SYSTEM 550,000 605,000 665,500
LEGAL FEES 2,000,000 2,200,000 2,420,000
NOTICE BOARDS - - -
DEBT COLLECTION 650,000 715,000 786,500
OCCUPATIONAL HEALTH & SAFETY 200,000 300,000 400,000
PERIODICALS 50,000 - 30,000
POLICIES & BY-LAWS 100,000 40,000 30,000
PLANNING FEES - - -
PMS MANAGEMENT 220,000 242,000 266,200
PMU ADMINISTRATION - - -
PMU SKILLS DEVELOPMENT GRANT - - -
POSTAGE & TELEGRAMS 1,100 1,210 1,331
PRINTING & STATIONERY 798,600 878,460 966,306
PROTECTIVE EQUIPMENT 368,500 405,350 445,885
RENT OF EQUIPMENT & OFFICES 1,870,000 2,057,000 2,262,700
RENT OF CEVIC CENTRE 11,600,000 11,600,000 11,600,000
RENT OF FURNITURE 2,164,800 2,381,280 2,619,408
RENT OF IT NETWORK 2,706,000 2,976,600 3,274,260
LEASE OF GRADERS 970,000 1,067,000 1,173,700
STOCK & MATERIAL - - -
STATUTORY LEVIES - STAFF 220,000 242,000 266,200
SUNDRY EXPENSES 33,000 36,300 39,930
120
BuDGET
ITEM Year Year +1 Year +2
2011/12 20012/3 2013/14
SYSTEMS - FINANCIAL 200,000 430,000 460,000
SYSTEMS - TELEPHONE 250,000 150,000 160,000
SYSTEMS - SECURITY - CCTV 5,800,000 800,000 1,000,000
SYSTEMS - WEBSITE 140,000 150,000 160,000
SYSTEMS - WIRELESS & I.C.A.S.A 200,000 300,000 400,000
SYSTEMS - PREPAID WATER 150,000 400,000 450,000
SYSTEMS - INTERNAL AUDIT 150,000 165,000 181,500
TELEPHONE EXPENSES 567,600 624,360 686,796
TOWNSHIP ESTABLISHMENT 550,000 605,000 665,500
TRAINING - STAFF 800,000 850,000 900,000
TRAINING - COUNCILLORS 300,000 330,000 363,000
VALUATION COSTS 260,000 286,000 314,600
VALUATION COURT EXPENSES 58,300 64,130 70,543
WARD COMMITTEES 3,720,000 4,092,000 4,501,200
CASH COLLECTION COST (DEPOSIT FEES) - - -
PROFESSIONAL SERVICES 165,000 181,500 199,650
PROFESSIONAL SERVICES (CONTRACTED) 6,699,000 7,368,900 8,105,790
SECURITY SERVICES 8,778,500 9,656,350 10,621,985
SECURITY BANKING SERVICES 229,790 252,769 278,046
REDEMPTION EXTERNAL 2,724,700 2,997,170 3,296,887
R & M OF CEMETRY 33,000 36,300 39,930
R & M OF MACHINERY & EQUIPMENT 1,258,755 1,384,631 1,523,094
R & M OF OFFICE FURNITURE & EQUIPMENT 33,000 36,300 39,930
R & M OF PIPELINES - - -
R & M OF STREETS AND PLANT 3,436,450 3,780,094 4,158,104
R & M OF LIGHTS & ROBOTS 990,000 1,089,000 1,197,900
R & M OF VEHICLE & MACHINERY 187,000 205,700 226,270
DEPARTMENTAL: ELECTRICITY 1,760,000 1,936,000 2,129,600
DEPRECIATION ON ASSETS 2,970,000 3,267,000 3,593,700
CONTRIBUTIONS TO BAD DEBTS RESERVE 3,322,000 3,654,200 4,019,620
SUB-TOTAL EXPENDITURE (GROSS) 191,540,524 203,303,730 218,904,149
121
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
6.1 Greater Tubatse Municipal Projects & Programmes
pR
OJE
cT
NO
:
sTRATEGIcpROJEcT
uN
pA
ck
ED
p
RO
JEc
T N
O:
uN
pA
ck
ED
p
RO
JEc
Ts
sO
uR
cE
OF
FuN
DIN
G
IND
IcA
TO
Rs
BuDGETR vALuEs
kpA 1 11/12 12/13 13/14 14/15 15/16
1.1 Developing Work-place skills plan
1.1.1 Work place skills plan
GTM % progress development of WSP
0 0 0 0 0
1.2 Skills audit and placement
1.2.1 Skills Audit GTM % progress skills audit 0 0 0 0 0
1.2.2 Placement GTM % progress placement 0 0 0 0 0
1.2.3
1.2.3.1 Training Staff GTM % progress training 800k 850k 900k 950k 1m
1.3 Organizational Re-engineering
1.3.1 Work Study GTM % progress work study 0 0 0 0 0
1.3.2 Job Descriptions GTM % progress development of job descriptions
0 0 0 0 0
1.3.3 Job Evaluation GTM % progress job evalu-ations
0 0 0 0 0
1.4 Enforcement of employee code of conduct
1.4.1 Sign off for code of conduct
GTM % progress singing off code of conduct
0 0 0 0 0
1.4.2 Procurement of legislative banners and national symbols
GTM % progress procurement of national symbols
50k 0 30k 0 30k
1.4.2 Occupational health and safety programme
GTM % progress implementa-tion of health and safety programme
200k 300k 400k 500k 600k
1.5 Engagement with District and local govt.
1.5.1 Task Team GTM % progress development of task team
0 0 0 0 0
1.5.2 Progress reports GTM # of reports generated 0 0 0 0 0
1.6 Apply for supply of electricity in the Urban and town-ship areas
1.6.1 Task Team GTM % progress development of task team
0 0 0 0 0
1.6.2 Progress reports GTM # of reports generated 0 0 0 0 0
1.7 Applying for hous-ing accreditation
1.7.1 Task Team GTM % progress establish-ment of task team
0 0 0 0 0
1.7.2 Progress reports GTM # of reports generated 0 0 0 0 0
1.8 Contract manage-ment
1.8.1 Vetting of con-tracts
GTM # of contracts vetted 0 0 0 0 0
1.8.2 Service level agreement
GTM # of service level agree-ment signed
0 0 0 0 0
1.8.3 Development of by-laws
GTM # of by-laws developed 50k 40k 30k 20k 10k
1.8.5 Revisit existing maintenance contract.
GTM # of maintenance con-tracts revisited
0 0 0 0 0
1.8.6 Review current waste manage-ment contract.
GTM % progress review of waste management contract
0 0 0 0 0
sEcTION 6:pROJEcTs
124
pR
OJE
cT
NO
:
sTRATEGIcpROJEcT
uN
pA
ck
ED
p
RO
JEc
T N
O:
uN
pA
ck
ED
p
RO
JEc
Ts
sO
uR
cE
OF
FuN
DIN
G
IND
IcA
TO
Rs
BuDGETR vALuEs
kpA 1 11/12 12/13 13/14 14/15 15/16
1.8.7 Review disaster response plan
GTM % progress review of disaster response plan
30k 0 0 0 0
1.8.8 Develop pauper policy
GTM % progress development of pauper policy
50k 0 0 0 0
2.1 Extension of ser-vices.
2.1.1
Roads & storm water
2.1.1.1 Alverton access bridge
MIG % progress develop-ment of bridge
3.1m 0 0 0 0
2.1.2.2 Dresden access bridge
MIG % progress develop-ment of bridge
3.1m 0 0 0 0
2.1.2.3 Maropong ac-cess bridge
MIG % progress develop-ment of bridge
3.45m 0 0 0 0
2.1.2.4 Mokobola access bridge
MIG % progress develop-ment of bridge
3.45m 0 0 0 0
2.1.2.5 Molawetsi ac-cess bridge
MIG % progress develop-ment of bridge
3.45m 0 0 0 0
2.1.2.6 Motlolo access bridge
MIG % progress develop-ment of bridge
3.42m 0 0 0 0
2.1.2.7 Mapodile sports complex
MIG % progress development of complex
2.0m 3.0m 2.2m 0 0
2.1.2.8 Burgersfort inter-nal street
MIG % progress development of streets
2.5m 4.0m 5.4m 7.0m 8.5m
2.1.2.9 Ngwaabe access roads
MIG % progress development of road
1.5m 3.0m 0 0 0
2.1.2.10 Praktiseer inter-nal streets
MIG % progress development of street
2.5m 4.0m 5.4m 6.0m 7.0m
2.1.2.11 Ohrigstad inter-nal streets
MIG % progress development of streets
2.5m 3.0m 0 0 0
2.1.2.12 Kampeng access bridge
MIG % progress development of bridge
0 2.9m 0 0 0
2.1.2.13 Phiring access bridge
MIG % progress development of bridge
0 3.0m 0 0 0
2.1.2 Electricity
2.1.2.1 Maahlashi DoE % progress electrifica-tion of village
517K 0 0 0 0
2.1.2.2 Mafarafara DoE % progress electrifica-tion of village
2.86m 0 0 0 0
2.1.2.3 Malepe DoE % progress electrifica-tion of village
1.43m 0 0 0 0
2.1.2.4 Moraba DoE % progress electrifica-tion of village
910k 0 0 0 0
2.1.2.5 Motshana DoE % progress electrifica-tion of village
3.9m 0 0 0 0
2.1.2.6 Mokgotho DoE % progress electrifica-tion of village
4.55m 0 0 0 0
2.1.2.7 Maretlwaneng DoE % progress electrifica-tion of village
2.86m 0 0 0 0
125
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
pR
OJE
cT
NO
:
sTRATEGIcpROJEcT
uN
pA
ck
ED
p
RO
JEc
T N
O:
uN
pA
ck
ED
p
RO
JEc
Ts
sO
uR
cE
OF
FuN
DIN
G
IND
IcA
TO
Rs
BuDGETR vALuEs
kpA 1 11/12 12/13 13/14 14/15 15/16
2.1.2.8 Mankele DoE % progress electrifica-tion of village
1.69m 0 0 0 0
2.1.2.9 Mamogolo DoE % progress electrifica-tion of village
1.08m 100k 0 0 0
2.1.2.10 Lefahla DoE % progress electrifica-tion of village
0 900k 0 0 0
2.1.2.11 Kutollo DoE % progress electrifica-tion of village
0 4.8m 0 0 0
2.1.3 Establishment of libraries
2.1.3.1 Refurbishment of Burgersfort library
MIG % progress refurbish-ment of Burgersfort library
0 0 1.5m 0 0
2.1.3.2 Establishment of rural libraries
MIG % progress establish-ment of rural libraries
0 0 0 0 0
2.1.4 Establishment of cemeteries
2.1.4.1 Establishment of Burgersfort cemetery
MIG % progress establish-ment of Burgersfort cemetery
0 0 0 2m 0
2.1.4.2 Establishment of Praktiseer 2nd cemetery
GTM % progress establish-ment of Praktiseer cemetery
0 200k 300k 0 0
2.1.4.3 Fencing of Rural cemeteries
MIG % progress fencing of Rural cemeteries
3.5m 4m 4.5m 5m 5.4m
2.1.5.1 Purchase of disaster vehicles
GTM % progress purchase of disaster vehicle
250k 250k 250k 0 0
2.1.5.2 Provision of disaster relief material
GTM % progress provision of disaster relief material
100k 100k 100k 100k 100k
2.1.6.1 Establishment of 7 parks
GTM % progress establish-ment of parks
0 0 0 0 0
2.1.8 Waste manage-ment
GTM % progress manage-ment of waste
4.9m 5.4m 5.9m 6.4m 6.9m
2.1.7 Establishment of sport and culture complexes and events
2.1.7.1 Establishment of Ngwabe sport complex
MIG % progress establish-ment of sports complex
0 500k 500k 1m 1m
2.1.7.2 Establishment of Ohrigstad sport complex
MIG % progress establish-ment of sports complex
0 500k 500k 1m 1m
2.1.7.3 Establishment of Driekop sport complex
MIG % progress establish-ment of sports complex
0 500k 500k 1m 1m
2.1.7.4 Establishment of Praktiseer sport complex
MIG % progress establish-ment of sports complex
0 500k 500k 1m 1m
126
pR
OJE
cT
NO
:
sTRATEGIcpROJEcT
uN
pA
ck
ED
p
RO
JEc
T N
O:
uN
pA
ck
ED
p
RO
JEc
Ts
sO
uR
cE
OF
FuN
DIN
G
IND
IcA
TO
Rs
BuDGETR vALuEs
kpA 1 11/12 12/13 13/14 14/15 15/16
2.1.7.5 Establishment of Leboeng Sport complex
MIG % progress establish-ment of sports complex
0 500k 500k 1m 1m
2.1.8 Development of arts and culture centre
MIG % progress development of arts & culture centre
0 1m 2m 2m 0
2.1.9.1 Establishment of Burgersfort test-ing station
MIG % progress establish-ment of Burgersfort testing station
0 200k 1m 0 0
2.1.9.2 Extension of Praktiseer testing station
MIG % progress extension of Praktiseer station
0 0 1m 0 0
2.1.9.3 Upgrading of Steelpoort road worthy centre
MIG % progress upgrading of Steelpoort road worthy centre
0 0 0 2m 0
2.1.9.4 Establishment of vehicle pound
MIG % progress establish-ment of Vehicle pound
0 0 0 1.5m 0
2.2 PPP Project. 2.2.1 Refuse removal National Treasury
% progress implementa-tion of refuse removal project
2.2.2 Food for waste National Treasury
% progress implementa-tion of refuse food for waste project
2.2.3 Recycling National Treasury
% progress implementa-tion of recycling project
2.2.4 Land fill site National Treasury
% progress implementa-tion of land fill site
3.1 Coordinated ben-efit model for com-munities (SLP)
3.1.1 Draft Document GTM % progress development of document
0 0 0 0 0
3.1.2 Engagement sessions
GTM # of engagement ses-sions held
30k 40k 50k 60k 70k
3.1.3 MOU sign of support
GTM % progress signing of M.O.U
0 0 0 0 0
3.2 Institutionalization of Structures and IDP
3.2.1 IGR Structures GTM % progress establish-ment of IGR structures
0 0 0 0 0
3.2.2 Beneficiary structures
GTM # of meetings held with beneficiary structures
20k 20k 20k 20k 20k
3.2.3 Credible IDP
3.2.3.1 Status quo analysis
GTM % progress development of status quo analysis
30K 30K 30K 30K 30K
3.3 Harness provisions of LEGDP and lo-cal LED Strategy
3.3.1 Engagement of appropriate stakeholders (Mines & FET)
GTM % of stakeholder engagement meetings resolutions implemented
0 0 0 0 0
3.3.2 Fresh Produce market
GTM % progress facilitation of fresh produce market
0 0 0 0 0
127
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
pR
OJE
cT
NO
:
sTRATEGIcpROJEcT
uN
pA
ck
ED
p
RO
JEc
T N
O:
uN
pA
ck
ED
p
RO
JEc
Ts
sO
uR
cE
OF
FuN
DIN
G
IND
IcA
TO
Rs
BuDGETR vALuEs
kpA 1 11/12 12/13 13/14 14/15 15/16
3.3.3 Development of DJate heritage site
GTM % progress facilitation of development of Djate heritage site
0 0 0 0 0
3.3.4 Poverty allevia-tion projects
GTM # of poverty alleviation projects funded
700k 800k 900k 1m 1.1m
3.3.5 Mining supply park
GTM % progress facilitation of mining supply park
0 0 0 0 0
3.3.6 Institutionalisa-tion of informal business sector
GTM % progress institution-alisation of informal businesses
1m 0 0 0 0
3.4 Implement CWP and other related programmes
3.4.1 Jobs created by;
3.4.1.1 In-house projects GTM # of in-house jobs cre-ated
0 0 0 0 0
3.4.1.2 Mines GTM # of jobs created by mines
0 0 0 0 0
3.4.1.3 Business GTM # of jobs created retail 0 0 0 0 0
3.4.1.4 Social institutions GTM # of jobs created by social institutions
0 0 0 0 0
3.4.1.5 Farming GTM # of jobs created by farms
0 0 0 0 0
3.4.1.6 Tourism GTM # of jobs created by tourism
0 0 0 0 0
3.4.1.7 CWP GTM # of jobs created by CWP
0 0 0 0 0
3.4.1.8 Government offices
GTM # of jobs created by Government
0 0 0 0 0
3.4.1.9 Others GTM # of jobs created by others
0 0 0 0 0
3.4.2 Establishment of employment data system
GTM % progress establish-ment of employment data system
0 0 0 0 0
4.1 Promote function-ality of Budget steering committee
4.1.1 Promote functionality of Budget steering committee
GTM % progress promotion of functionality of budget steering committee
0 0 0 0 0
4.2 Implement revenue Enhancement strategy.
4.2.1 *Campaigns GTM # of revenue campaigns held
0 0 0 0 0
4.2.2 *Debtor data cleansing
GTM % progress cleansing of Debtor data
0 0 0 0 0
4.2.3 *Debt Arrange-ments
GTM % progress arrange-ments of debts
0 0 0 0 0
4.2.4 Reduction of municipal service debts
GTM % progress in reducing debts.
0 0 0 0 0
128
pR
OJE
cT
NO
:
sTRATEGIcpROJEcT
uN
pA
ck
ED
p
RO
JEc
T N
O:
uN
pA
ck
ED
p
RO
JEc
Ts
sO
uR
cE
OF
FuN
DIN
G
IND
IcA
TO
Rs
BuDGETR vALuEs
kpA 1 11/12 12/13 13/14 14/15 15/16
4.2.6 Suppliers pay-ments manage-ment
GTM % compliance to 30 days payment time
0 0 0 0 0
4.2.7 Creditors recon-ciliation
GTM % reconciliation of all payment transactions
0 0 0 0 0
4.2.8 Conditional grants manage-ment
GTM % compliance to grant expenditure conditions
0 0 0 0 0
4.2.9 Cash manage-ment and invest-ments
GTM R-value of cash avail-able to monthly expendi-ture commitments
0 0 0 0 0
4.2.9 Statutory pay-ments
GTM % compliance to statu-tory obligations
0 0 0 0 0
4.2.10 Pay roll manage-ment
GTM % accuracy in payroll management
0 0 0 0 0
4.3 Responsive ser-vices maintenance program in billing areas.
4.3.1 Monetary provi-sion for basic maintenance
Collection of mu-nicipal services billed
GTM % progress monetary provision for basic main-tenances conducted
% collection of billed revenue
0 0 0 0 0
4.4 Establish asset steering commit-tee.
4.4.1 Reports gener-ated from the system
GTM % implementation of resolutions from asset steering committee
200k 210k 220k 230k 240k
4.4.2 Replacement and repairs of assets
GTM % progress replacement and repair of assets
5m 5m 5m 5m 5m
4.5.5 Wireless System & I.C.A.S.A
GTM % progress maintenance of wireless system
400k 400k 400k 400k 400k
4.5.6 Prepaid Water System
GTM % progress maintenance f prepaid system
350k 400k 450k 500k 550k
4.5.7 Internal audit systems
GTM % progress maintenance f internal audit system
200k 0 0 0 0
4.6 Implementation of the audit action plan
4.6.1 Internal Audit GTM # of internal audits undertaken
0 0 0 0 0
4.6.2 External Audit GTM # of external audits undertaken
# of reports produced
1.75m 2m 2.25m 2.5m 2.75m
4.6.3 Audit Committee GTM # of audit committee meetings held
# of audit reports pro-duced
150k 150k 150k 150k 150k
129
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
pR
OJE
cT
NO
:
sTRATEGIcpROJEcT
uN
pA
ck
ED
p
RO
JEc
T N
O:
uN
pA
ck
ED
p
RO
JEc
Ts
sO
uR
cE
OF
FuN
DIN
G
IND
IcA
TO
Rs
BuDGETR vALuEs
kpA 1 11/12 12/13 13/14 14/15 15/16
4.7 Review and Implementation of IT plan
4.7.1 Desktop support GTM Turnaround time for desktop support
0 0 0 0 0
4.8.2 Support for small businesses
GTM % budget allocated to small businesses
0 0 0 0 0
4.8.3 Small businesses subcontracted
GTM % of tenders subcon-tracted to small busi-nesses
0 0 0 0 0
4.2.4 Procurement to local bussi-nesses
% procurement to local businesses
0 0 0 0 0
5.1 • Updated web-site;
5.1.1 Information col-lating
GTM % progress collating information
0 0 0 0 0
5.1.2 legislative com-pliance
GTM % progress legislative compliance
0 0 0 0 0
• Review and implementation of communica-tion strategy
5.1.3 Status quo analysis
GTM % progress compilation of status quo analysis
0 0 0 0 0
5.1.4 Final approval GTM % progress approval of communication strategy
0 0 0 0 0
5.1.5 Implementation plan for Focus areas
GTM % progress implementa-tion of communication strategy
0 0 0 0 0
• Civic education programmes
5.1.6 Talk shows
GTM # talk shows held
0 0 0 0
5.1.7 Issue based imbizos
GTM # of Imbizos held 50k 50k 50k 50k 50k
5.1.8 Newsletters GTM # of news letters pro-duced
250k 260k 270k 280k 290k
5.1.9 Media release GTM # media statements released
50k 50k 50k 50k 50k
5.1.10 Marketing and branding
GTM % progress marketing and branding of the municipality
600k 700k 800k 900k 1m
Implement public participation strategy
5.1.11 EXCO Outreach GTM % EXCO outreaches issues addressed
150k 200k 250k 300k 350k
5.1.12 SOLMA GTM # SOLMA conducted 700k 800k 900k 1m 1.2m
5.1.13 IDP/PMS/Budget Forums
GTM # IDP/PMS/Budget forums held
50k 60k 70k 80k 90k
5.1.14 Establishment of project steering committees
GTM # of project steering committees established
0 0 0 0 0
5.1.15 Mayors special programmes
GTM % progress implementa-tion of Mayor’s special programmes
2.7m 2.8m 2.9m 3m 3.1m
Implementation of PMS
5.2.1 Development of SDBIP
GTM % progress development of SDBIP
0 0 0 0 0
130
pR
OJE
cT
NO
:
sTRATEGIcpROJEcT
uN
pA
ck
ED
p
RO
JEc
T N
O:
uN
pA
ck
ED
p
RO
JEc
Ts
sO
uR
cE
OF
FuN
DIN
G
IND
IcA
TO
Rs
BuDGETR vALuEs
kpA 1 11/12 12/13 13/14 14/15 15/16
5.2.2 Development and signing of performance agreements
GTM % progress development and signing of P.A
0 0 0 0 0
5.2.3 Management review
GTM # management reviews conducted
100k 0 0 0 0
5.2.5 Individual as-sessments
GTM % progress conducting of individual assess-ments
0 0 0 0 0
5.2.6 Half yearly report GTM % progress development of Half yearly report
0 0 0 0 0
5.2.7 Annual report GTM % progress development of Annual report
0 0 0 0 0
5.2.8 Printing of An-nual reports
GTM # reports printed 0 0 0 0 0
5.2 • Review of the PMS framework;
5.2.1 Incentive model GTM % progress development of incentive model
0 0 0 0 0
5.2.2 Cascading pro-grammes
GTM % progress cascading of PMS to other levels
0 0 0 0 0
5.3 • Strengthening of the RISK and Audit unit’s functionality;
5.3.1 Capacity addition GTM % progress capacitating Risk and Audit unit
430k 450k 460k 470k 480k
5.3.2 Compliance GTM % progress compliance to legislation
0 0 0 0 0
• Council’s struc-tures capacitat-ing
5.2.5 Establishment and induction of Councillors
GTM % progress induction of Councillors
350k 0 0 0 0
5.2.6 Training of ward committees
GTM % progress training of ward committees
120k 130k 140k 150k 160k
5.2.7 Inauguration of new Council
GTM % progress inauguration of council
50k 0 0 0 0
5.2.9 Training of coun-cillors
GTM 300K 400K 500K 600K 700K
5.2.10 Training of forums
GTM % progress training of forums
50K 50K 50K 50K 50K
• Policy develop-ment /guidelines
5.2.11 Draft Policy GTM # of policies developed 0 0 0 0 0
5.2.12 Approval GTM # policies approved 0 0 0 0 0
Intergovernmental relations
5.3.1 Presidential hotline
GTM # presidential queries responded in time
0 0 0 0 0
5.3.2 Implementation of IGR strategy
GTM % implementation of IGR strategy
100k 120k 130k 140k 150k
5.3.4 Implementation of customer care framework
GTM % implementation of customer care frame-work
50k 60k 70k 80k 90k
5.3.4 Implementa-tion of language policy
GTM % implementation of language policy
0 0 0 0 0
131
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
pR
OJE
cT
NO
:
sTRATEGIcpROJEcT
uN
pA
ck
ED
p
RO
JEc
T N
O:
uN
pA
ck
ED
p
RO
JEc
Ts
sO
uR
cE
OF
FuN
DIN
G
IND
IcA
TO
Rs
BuDGETR vALuEs
kpA 1 11/12 12/13 13/14 14/15 15/16
• Maximised link-ages/advocacy
5.4.1 T.O.R for linkage arrangements
GTM % progress T.O.R link-age development
0 0 0 0 0
5.4.2 Support secured linkages
GTM % progress securing linkages for T.O.R
Incentives for ward committees
5.4.3. Ward committee incentives
GTM % progress payment of ward committee incen-tives
3,720m 4,2m 4,8m 5,3m
Systems manage-ment
5.4.4 Wireless System & I.C.A.S.A
GTM % progress maintenance of wireless system
400k 400k 400k 400k 400k
5.4.5 Prepaid Water System
GTM % progress maintenance f prepaid system
350k 400k 450k 500k 550k
4.5 Monitoring monthly reporting on com-pliance
5.4.6 Financial Sys-tems
GTM % progress maintenance of financial systems
400k 430k 460k 490k 520k
5.4.7 Telephone Sys-tems
GTM % progress maintenance of telephone systems
250k 150k 160k 170k 180k
5.4.8 CCTV GTM % progress maintenance of CCTV
500k 800k 1.2m 1.4m 1.6m
5.4.8 Website System GTM % progress maintenance of website system
140k 150k 160k 170k 180k
5.4.9 Internal audit systems
GTM % progress maintenance f internal audit system
200k 0 0 0 0
5.4.10 External Audit GTM # of external audits undertaken
# of reports produced
1.75m 2m 2.25m 2.5m 2.75m
5.4.11 Audit Committee GTM # of audit committee meetings held
# of audit reports pro-duced
150k 150k 150k 150k 150k
4.5 Monitoring monthly reporting on com-pliance
5.4.12 Financial Sys-tems
GTM % progress maintenance of financial systems
400k 430k 460k 490k 520k
6.1 Implementation of SDF
6.1.1 Demarcation of sites
GTM # of sites demarcated 1.5M 1.5M 1M 1M 1M
6.1.2 Engagement with developers
GTM % progress engagement with developers
0 0 0 0 0
6.1.3 Relocation of beacons in urban townships
GTM % progress relocation of beacons in Urban and Townships
2,8m 3,2m 3,4m 3,6m 3,8
6.1.4 Engagement with Magoshi
GTM % progress engagement with Magoshi
50k 60k 70k 80k 90k
6.1.5 GIS database GTM % progress establish-ment of GIS
1,5m 1,5m 600k 500k 300k
Enforcement of LUMS
6.1.5 Audit urban properties for compliance
GTM % progress Auditing of Urban properties for compliance
50k 60k 70k 80k 90k
132
pR
OJE
cT
NO
:
sTRATEGIcpROJEcT
uN
pA
ck
ED
p
RO
JEc
T N
O:
uN
pA
ck
ED
p
RO
JEc
Ts
sO
uR
cE
OF
FuN
DIN
G
IND
IcA
TO
Rs
BuDGETR vALuEs
kpA 1 11/12 12/13 13/14 14/15 15/16
6.1.6 Development of building plans for BGF, Steelpoort & Ohrigstad
GTM % progress develop-ment of building plans for BGF, Steelpoort and Ohrigstad
1m 300k 100k 100k 100k
Formalization of settlements.
6.1.7 Planning/ survey of Mashifane park
GTM % progress formalisation of Mashifane park
800k 600k 0 0 0
6.2 Land acquisition. Facilitating trans-fer of strategic govt land to the Municipality; Steelpoortdrift, Aapiesboomen, Aapiesdoring-draai
GTM % progress facilitation of transfere of strategic govt land to the Munici-pality
0 0 0 0 0
133
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
6.2 Sekhukhune District Municipality
6.2.1 Water and Sanitation Projects
pROGRAMME OBJEcTIvEs cATEGORY pROJEcTs sTATus
BuDGET RAND vALuE
TOTAL 11/12 12/13 13/14
To supply sanitation to basic level of service
Sanitation Batau & Ga Manoke Sani-tation
Design R 33 439 475 R 33 439 475 0.00 0.00
MIG and District Infrastructure Development Programme
To supply sanitation to basic level of service
Sanitation Burgersfort WWTW 7Ml (new Plant)
Design R 130 000 000 7 000 000 R 62 000 000 R 61 000 000
MIG and District Infrastructure Development Programme
To supply sanitation to basic level of service
Sanitation Dithabaneng VIP Sanitation Design R 1 100 000 1 100 000 0.00 0.00
MIG and District Infrastructure Development Programme
To supply sanitation to basic level of service
Sanitation Mahlashi, Makosaneng and Motokomane
Design R3 274 592 R3 274 592 0.00 0.00
MIG and District Infrastructure Development Programme
To supply water Water Mooihoek Tubatse Bulk Water Supply Scheme Phase 3
Ongoing R 56 000 000 R56 000 000 0.00 0.00
MIG and District Infrastructure Development Programme
To supply water Water Mooihoek Command Resevoir
New R16,582,748.00 R16,582,748.00 0.00 0.00
MIG and District Infrastructure Development Programme
To supply water Water Mafolopark – Motwaneng BWS
New R 4 428 705 R 1 800 000 R 2 628 705 0.00
MIG and District Infrastructure Development Programme
To supply water Water Praktiseer Water Supply Design R 27 500 000 R 9 500 000 R 18 000 000 0.00
MIG and District Infrastructure Development Programme
To supply water Water Reservoir SB (0.8ML/day) (Montwaneng)
Design R 3 324 754 R 3 324 754 0.00 0.00
MIG and District Infrastructure Development Programme
To supply water Water Taung reticulation Design R 9 000 000 R 9 000 000 0.00 0.00
6.3 Sector Departmental Projects
6.3.1 Submissions from Dept.AgricultureNO. pROJEcT NAME LOcAL
MuNIcIpALITYpROJEcTs DEscRIpTION / TYpE OF
sTRucTuREIMpLEMENT-ING AGENT
OvERALL BuDGET
pLANNING AND DEsIGN IMpLEMENTATION pERIOD AND BuDGET
FY BuDGET 167 7/12 154 10/13 143 11/14 134 4/15 125 15/16
1 2 Tubatse Piggeries Tubatse Construction of 2 x 25 sow units LDA 50 500 00 - - 50 500 00 - - - -
2 Moketeng Poultry Tubatse Broiler production, fencing 1 ha, equipping borehole, construction of 2 x 1000 capacity houses, electrification.
LDA 1000000 1000000 0 0 0 0
3 Cattle handling facilities Tubatse Construction of a basic cattle handling facility LDA 60 000 182 8/11 0 60 000 0 0 0 0
4 Cattle handling facilities Tubatse Construction of basic cattle handling facility LDA 60 000 182 8/11 0 60 000 0 0 0
0 Cattle handling facilities Tubatse Construction of a basic cattle handling facility LDA 60 000 182 8/11 0 60 000 0 0 0 0
6 Leolo Tubatse Soil conservation LDA 433460 - 0 433460 0 0 0 0
7 Praktiseer Pump Station Tubatse Rehabilitation of irrigation scheme LDA 1000 000 200 9/10 0 500 000 500 000 0 0 0
8 Sterkspruit Tubatse Rehabilitation of irrigation scheme LDA R12 100 000 167 7/12 R 1 100 000 0 10 450 000 R550 000 0 0
9 Boschkloof Tubatse Rehabilitation of irrigation scheme LDA R22 000 000 154 10/13 R2 000 000 0 0 R19 m R1m 0
10 Steelpoortdrift Tubatse Rehabilitation of irrigation scheme LDA R7 920 000 134 4/15 R720 000 0 0 0 0 R7 200 000
134
6.2 Sekhukhune District Municipality
6.2.1 Water and Sanitation Projects
pROGRAMME OBJEcTIvEs cATEGORY pROJEcTs sTATus
BuDGET RAND vALuE
TOTAL 11/12 12/13 13/14
To supply sanitation to basic level of service
Sanitation Batau & Ga Manoke Sani-tation
Design R 33 439 475 R 33 439 475 0.00 0.00
MIG and District Infrastructure Development Programme
To supply sanitation to basic level of service
Sanitation Burgersfort WWTW 7Ml (new Plant)
Design R 130 000 000 7 000 000 R 62 000 000 R 61 000 000
MIG and District Infrastructure Development Programme
To supply sanitation to basic level of service
Sanitation Dithabaneng VIP Sanitation Design R 1 100 000 1 100 000 0.00 0.00
MIG and District Infrastructure Development Programme
To supply sanitation to basic level of service
Sanitation Mahlashi, Makosaneng and Motokomane
Design R3 274 592 R3 274 592 0.00 0.00
MIG and District Infrastructure Development Programme
To supply water Water Mooihoek Tubatse Bulk Water Supply Scheme Phase 3
Ongoing R 56 000 000 R56 000 000 0.00 0.00
MIG and District Infrastructure Development Programme
To supply water Water Mooihoek Command Resevoir
New R16,582,748.00 R16,582,748.00 0.00 0.00
MIG and District Infrastructure Development Programme
To supply water Water Mafolopark – Motwaneng BWS
New R 4 428 705 R 1 800 000 R 2 628 705 0.00
MIG and District Infrastructure Development Programme
To supply water Water Praktiseer Water Supply Design R 27 500 000 R 9 500 000 R 18 000 000 0.00
MIG and District Infrastructure Development Programme
To supply water Water Reservoir SB (0.8ML/day) (Montwaneng)
Design R 3 324 754 R 3 324 754 0.00 0.00
MIG and District Infrastructure Development Programme
To supply water Water Taung reticulation Design R 9 000 000 R 9 000 000 0.00 0.00
6.3 Sector Departmental Projects
6.3.1 Submissions from Dept.AgricultureNO. pROJEcT NAME LOcAL
MuNIcIpALITYpROJEcTs DEscRIpTION / TYpE OF
sTRucTuREIMpLEMENT-ING AGENT
OvERALL BuDGET
pLANNING AND DEsIGN IMpLEMENTATION pERIOD AND BuDGET
FY BuDGET 167 7/12 154 10/13 143 11/14 134 4/15 125 15/16
1 2 Tubatse Piggeries Tubatse Construction of 2 x 25 sow units LDA 50 500 00 - - 50 500 00 - - - -
2 Moketeng Poultry Tubatse Broiler production, fencing 1 ha, equipping borehole, construction of 2 x 1000 capacity houses, electrification.
LDA 1000000 1000000 0 0 0 0
3 Cattle handling facilities Tubatse Construction of a basic cattle handling facility LDA 60 000 182 8/11 0 60 000 0 0 0 0
4 Cattle handling facilities Tubatse Construction of basic cattle handling facility LDA 60 000 182 8/11 0 60 000 0 0 0
0 Cattle handling facilities Tubatse Construction of a basic cattle handling facility LDA 60 000 182 8/11 0 60 000 0 0 0 0
6 Leolo Tubatse Soil conservation LDA 433460 - 0 433460 0 0 0 0
7 Praktiseer Pump Station Tubatse Rehabilitation of irrigation scheme LDA 1000 000 200 9/10 0 500 000 500 000 0 0 0
8 Sterkspruit Tubatse Rehabilitation of irrigation scheme LDA R12 100 000 167 7/12 R 1 100 000 0 10 450 000 R550 000 0 0
9 Boschkloof Tubatse Rehabilitation of irrigation scheme LDA R22 000 000 154 10/13 R2 000 000 0 0 R19 m R1m 0
10 Steelpoortdrift Tubatse Rehabilitation of irrigation scheme LDA R7 920 000 134 4/15 R720 000 0 0 0 0 R7 200 000
135
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
6.3.2 Projects from Department of HealthNO pROJEcT NAME LOcAL MuNIcI-
pALITYpROJEcTs DEscRIpTION / TYpE OF
sTRucTuREIMpLEMENTING
AGENTOvERALL BuDGET
pLANNING AND DEsIGN IMpLEMENTATION pERIOD AND BuDGET
FY BuDGET 2011/12 2012/13 2013/14 2014/15 2015/16
1 Dilokong Hospital Revi-talisation
Tubatse Hospital District DPW 2 000 Multiple 0 2 000 0 0 0 0
2 HC Boshoff CHC Tubatse Community Health Centre DPW 65 139 2004/05 7 000 R1 000 0 0 0 0
3 Sekhukhune Malaria Unit (Naboomkopies)
Tubatse Malaria Camp SAKHIWO HS 6 329 2010/11 633 2 000 0 0 0 0
4 Leboeng EMS Tubatse Ambulance base SAKHIWO HS 5 326 2010/11 533 1 626 0 0 0 0
5 Mecklenburg hospital Tubatse Accommodation SAKHIWO HS 6 532 2009/10 563 285 0 0 0 0
6.3.3 Projects from Roads and TransportNO pROJEcT NAME LOcAL MuNIcI-
pALITYpROJEcTs DEscRIpTION / TYpE OF
sTRucTuREIMpLEMENTING
AGENTOvERALL BuDGET
pLANNING AND DEsIGN IMpLEMENTATION pERIOD AND BuDGET
FY BuDGET 2011/12 2012/13 2013/14 2014/15 2015/16
1 Dilokong Hospital Revi-talisation
Tubatse Hospital District DPW 2 000 Multiple 0 2 000 0 0 0 0
2 HC Boshoff CHC Tubatse Community Health Centre DPW 65 139 2004/05 7 000 R1 000 0 0 0 0
3 Sekhukhune Malaria Unit (Naboomkopies)
Tubatse Malaria Camp SAKHIWO HS 6 329 2010/11 633 2 000 0 0 0 0
4 Leboeng EMS Tubatse Ambulance base SAKHIWO HS 5 326 2010/11 533 1 626 0 0 0 0
5 Mecklenburg hospital Tubatse Accommodation SAKHIWO HS 6 532 2009/10 563 285 0 0 0 0
6.3.4 Projects from DWAENO pROJEcT NAME LOcAL MuNIcI-
pALITYpROJEcTs DEscRIpTION / TYpE OF
sTRucTuREIMpLEMENTING
AGENTOvERALL BuDGET
pLANNING AND DEsIGN IMpLEMENTATION pERIOD AND BuDGET
FY BuDGET 2011/12 2012/13 2013/14 2014/15 2015/16
1 Intermodal public trans-port facility
Tubatse Intermodal public transport facility (Burgersfort CBD)
LDRT R353m 2010/11 & 2011/12
R43m R50m R40m R110m R110m
PUBLIC AND FREIGHT TRANSPORT PUBLIC AND FREIGHT TRANSPORT
2 Extension of traffic station to multipurpose traffic centre
Tubatse Extension of traffic station to multipurpose traffic centre (Dilokong)
LDRT R16m 2010/11 R693 100 80 R3 157 459 20 0 0 0 0
3 Mashamothane (R37) to Bothashoek to Praktiseer
Tubatse Road preventative maintenance and rehab
LDRT R10m 2010/11 R1m R9m 0 0 0 0
4 Aapiesdooringdraai (P169/3) to Praktiseer to Maphoko to Penge
Tubatse Road preventative maintenance and rehab
LDRT R7m 2010/11 R700 000 R6 3m 0 0 0
5 R37 , P33/2 to P169/2 Tubatse Road preventative maintenance and rehab
LDRT R15m 2010/11 R1 5m R13 5m 0 0 0 0
6 Ohrigstad (P8/2&P8/3) to Erasmas pass
Tubatse Road preventative maintenance and rehab
LDRT R15m 2010/11 R43m R1 5m R13 5m 0 0 0
7 Ga-Malekane to Tshehl-waneng to Jane Furse to Nebo to Monsterlus
Tubatse / Makhuduthama-ga
Road preventative maintenance and rehab
LDRT R10m 2010/11 R1m R9m 0 0 0 0
8 D2346 to P169/1 and P169/2
Tubatse Road preventative maintenance and rehab
LDRT R7m 2010/11 R700 000 R6 3m 0 0 0 0
9 Extension of Dilokong Traffic station to Multipur-pose centre
Tubatse Extension of Dilokong Traffic station to Multipurpose centre
LDRT R16m R3.1m 0 0 0 0
10 Praktiseer Motor vehicle testing centre
Tubatse Motor vehicle testing Pit LDRT R2.5m 0 0 R2.4m 0 0
136
6.3.2 Projects from Department of HealthNO pROJEcT NAME LOcAL MuNIcI-
pALITYpROJEcTs DEscRIpTION / TYpE OF
sTRucTuREIMpLEMENTING
AGENTOvERALL BuDGET
pLANNING AND DEsIGN IMpLEMENTATION pERIOD AND BuDGET
FY BuDGET 2011/12 2012/13 2013/14 2014/15 2015/16
1 Dilokong Hospital Revi-talisation
Tubatse Hospital District DPW 2 000 Multiple 0 2 000 0 0 0 0
2 HC Boshoff CHC Tubatse Community Health Centre DPW 65 139 2004/05 7 000 R1 000 0 0 0 0
3 Sekhukhune Malaria Unit (Naboomkopies)
Tubatse Malaria Camp SAKHIWO HS 6 329 2010/11 633 2 000 0 0 0 0
4 Leboeng EMS Tubatse Ambulance base SAKHIWO HS 5 326 2010/11 533 1 626 0 0 0 0
5 Mecklenburg hospital Tubatse Accommodation SAKHIWO HS 6 532 2009/10 563 285 0 0 0 0
6.3.3 Projects from Roads and TransportNO pROJEcT NAME LOcAL MuNIcI-
pALITYpROJEcTs DEscRIpTION / TYpE OF
sTRucTuREIMpLEMENTING
AGENTOvERALL BuDGET
pLANNING AND DEsIGN IMpLEMENTATION pERIOD AND BuDGET
FY BuDGET 2011/12 2012/13 2013/14 2014/15 2015/16
1 Dilokong Hospital Revi-talisation
Tubatse Hospital District DPW 2 000 Multiple 0 2 000 0 0 0 0
2 HC Boshoff CHC Tubatse Community Health Centre DPW 65 139 2004/05 7 000 R1 000 0 0 0 0
3 Sekhukhune Malaria Unit (Naboomkopies)
Tubatse Malaria Camp SAKHIWO HS 6 329 2010/11 633 2 000 0 0 0 0
4 Leboeng EMS Tubatse Ambulance base SAKHIWO HS 5 326 2010/11 533 1 626 0 0 0 0
5 Mecklenburg hospital Tubatse Accommodation SAKHIWO HS 6 532 2009/10 563 285 0 0 0 0
6.3.4 Projects from DWAENO pROJEcT NAME LOcAL MuNIcI-
pALITYpROJEcTs DEscRIpTION / TYpE OF
sTRucTuREIMpLEMENTING
AGENTOvERALL BuDGET
pLANNING AND DEsIGN IMpLEMENTATION pERIOD AND BuDGET
FY BuDGET 2011/12 2012/13 2013/14 2014/15 2015/16
1 Intermodal public trans-port facility
Tubatse Intermodal public transport facility (Burgersfort CBD)
LDRT R353m 2010/11 & 2011/12
R43m R50m R40m R110m R110m
PUBLIC AND FREIGHT TRANSPORT PUBLIC AND FREIGHT TRANSPORT
2 Extension of traffic station to multipurpose traffic centre
Tubatse Extension of traffic station to multipurpose traffic centre (Dilokong)
LDRT R16m 2010/11 R693 100 80 R3 157 459 20 0 0 0 0
3 Mashamothane (R37) to Bothashoek to Praktiseer
Tubatse Road preventative maintenance and rehab
LDRT R10m 2010/11 R1m R9m 0 0 0 0
4 Aapiesdooringdraai (P169/3) to Praktiseer to Maphoko to Penge
Tubatse Road preventative maintenance and rehab
LDRT R7m 2010/11 R700 000 R6 3m 0 0 0
5 R37 , P33/2 to P169/2 Tubatse Road preventative maintenance and rehab
LDRT R15m 2010/11 R1 5m R13 5m 0 0 0 0
6 Ohrigstad (P8/2&P8/3) to Erasmas pass
Tubatse Road preventative maintenance and rehab
LDRT R15m 2010/11 R43m R1 5m R13 5m 0 0 0
7 Ga-Malekane to Tshehl-waneng to Jane Furse to Nebo to Monsterlus
Tubatse / Makhuduthama-ga
Road preventative maintenance and rehab
LDRT R10m 2010/11 R1m R9m 0 0 0 0
8 D2346 to P169/1 and P169/2
Tubatse Road preventative maintenance and rehab
LDRT R7m 2010/11 R700 000 R6 3m 0 0 0 0
9 Extension of Dilokong Traffic station to Multipur-pose centre
Tubatse Extension of Dilokong Traffic station to Multipurpose centre
LDRT R16m R3.1m 0 0 0 0
10 Praktiseer Motor vehicle testing centre
Tubatse Motor vehicle testing Pit LDRT R2.5m 0 0 R2.4m 0 0
137
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
NO pROJEcT NAME LOcAL MuNIcI-pALITY
pROJEcTs DEscRIpTION / TYpE OF sTRucTuRE
IMpLEMENTING AGENT
OvERALL BuDGET
pLANNING AND DEsIGN IMpLEMENTATION pERIOD AND BuDGET
FY BuDGET 2011/12 2012/13 2013/14 2014/15 2015/16
11 Alverton (D2537) to Rietfontein to Kgautswane(P116/1)
Tubatse Upgrade (gravel to tar) RAL R135m R108m R27m 0 0 0
12 Mankele road and Bridge Tubatse Upgrade from gravel to tar RAL R43.6m R43.6m 0 0 0 0
13 Maredi to Senyatho bridge
Tubatse Upgrade from gravel to tar RAL R40m R40m 0 0 0 0
6.3.5 Submissions from LEDETwNO pROJEcT NAME IMpLEMENTING
AGENTOvERALL BuDGET
IMpLEMENTATION pERIOD AND BuDGET
2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Development of a CA-SINO
LEDET R240m R240m
Development of mining supply park
LEDET
Maandagshoek 3 and 4 dumps
LEDET R70m
Tshepong chrome mine LEDET R6.5m
Khumong chrome mine LEDET R3.26m
Vanadium and Magnetite explorations
LEDET R10.5m
6.3.6 Projects from Department of Education
NO pROJEcT NAME LOcAL MuNIcIpALITY
pROJEcTs DEscRIpTION
/ TYpE OF sTRucTuRE
IMpLEMENT-ING AGENT
OvERALL BuDGET
IMpLEMENTATION pERIOD AND BuDGET
2011/12 2012/13 2013/14 2014/15 2015/16
Burgersfort (Driekop)
Tubatse New secondary school
LDOE 0 17,865 13,572 0 0
Itireleng Tubatse New primary school
LDOE 0 22,725 00 0
Morewane Primary
Tubatse New Primary school
LDOE 0 4,764 22,725 26,765 0
Maelebe primary school
Tubatse Sanitation DWAF 0 0 0 0 0
Mokabudi pri-mary
Tubatse Sanitation DWAF 0 0 - -
Kgoboko primary Tubatse Sanitation DWAF 0 0 - - -
Mampuru pri-mary -2
Tubatse Sanitation DWAF 0 - - - -
Taung high Tubatse Sanitation DWAF 0 - - - -
Teleki high Tubatse Sanitation DWAF 0 - - - -
Mante primary Tubatse Sanitation DWAF 0 - - - -
Magantshe primary
Tubatse Sanitation DWAF 0 - - - -
Penge Tubatse Sanitation DWAF 0 - - - -
Nkotwane sec-ondary
Tubatse Sanitation DWAF 0 - - - -
Matsiri primary Tubatse Sanitation DWAF 0 - - - -
138
NO pROJEcT NAME LOcAL MuNIcI-pALITY
pROJEcTs DEscRIpTION / TYpE OF sTRucTuRE
IMpLEMENTING AGENT
OvERALL BuDGET
pLANNING AND DEsIGN IMpLEMENTATION pERIOD AND BuDGET
FY BuDGET 2011/12 2012/13 2013/14 2014/15 2015/16
11 Alverton (D2537) to Rietfontein to Kgautswane(P116/1)
Tubatse Upgrade (gravel to tar) RAL R135m R108m R27m 0 0 0
12 Mankele road and Bridge Tubatse Upgrade from gravel to tar RAL R43.6m R43.6m 0 0 0 0
13 Maredi to Senyatho bridge
Tubatse Upgrade from gravel to tar RAL R40m R40m 0 0 0 0
NO pROJEcT NAME LOcAL MuNIcIpALITY
pROJEcTs DEscRIpTION
/ TYpE OF sTRucTuRE
IMpLEMENT-ING AGENT
OvERALL BuDGET
IMpLEMENTATION pERIOD AND BuDGET
2011/12 2012/13 2013/14 2014/15 2015/16
Mmutlane Tubatse Sanitation DWAF 0 - 0 - -
Shorwane Tubatse Sanitation DWAF 0 - 0 - -
Moisele Primary Tubatse Sanitation DWAF 0 - 0 - -
Masha Tubatse Sanitation DWAF 0 - 0 - -
Tibamoshito Primary
Tubatse Sanitation DWAF 0 - 0 - -
Dikgageng Tubatse Sanitation DWAF 0 - 0 - -
Mohlarutse secondary
Tubatse Sanitation DWAF 0 - 0 - -
Mashak-waneneng secondary
Tubatse Sanitation DWAF 0 - 0 - -
Marota primary Tubatse Sanitation DWAF 0 - 0 - -
Masenyeletje Primary
Tubatse Sanitation DWAF 0 - 0 - -
Itirele primary Tubatse Sanitation DWAF 0 - 0 - -
Kanama Tubatse Water DWAF 0 - - - -
Tantanyane Tubatse Water DWAF 0 - - - -
Mamogolo Tubatse Water DWAF 0 - - - -
Mapiti Tubatse Water DWAF 0 - - - -
Mabu Tubatse Water DWAF 0 - - - -
Nkgomeleng Tubatse Water DWAF 0 - - - -
Mohlope Tubatse Water DWAF 0 - - - -
Paepae Tubatse Water DWAF 0 - - - -
Shai Tubatse Water DWAF 0 - - - -
Phogole Tubatse Water DWAF 0 - - - -
Ntibaneneg Tubatse Water DWAF 0 - - - -
Mape Tubatse Water DWAF 0 - - - -
Tantanyane Tubatse Rehabilitation /additions at old schools
LDPW 0 - - - -
Gowe Tubatse Rehabilitation / additions at old schools
LDPW 0 - - - -
139
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
6.3.7 Submissions of Housing Projects by DLGH
NO pROJEcT NAME
LOcAL Mu-NIcIpALITY
pROJEcTs DEscRIpTION
/ TYpE OF sTRucTuRE
IMpLEMENTING AGENT
OvERALL BuDGET
IMpLEMENTATION pERIOD AND NuMBER OF ALLOcATIONs
2011/12 2012/13 2013/14 2014/15 2015/16
1. Rural housing development
Riba cross /polaseng
DLGH 100
2. Ga-phasha DLGH 95
3. Mampuru DLGH 94
4. Ga-manyaka DLGH 87
5. Ga-kgoete DLGH 100
6. Paeng DLGH 26
7. Kgautswane DLGH 26
8. Ga-rantho DLGH 87
9. Ga-riba DLGH 50
10. Motlolo DLGH 50
11. lebalelo DLGH 26
12. Moloyi DLGH 26
13. Matsheretsane DLGH 26
14. Phadishanong 26
15. Legoleng 26
16. Makgwareng 26
17. Mashamothane 284
18. Ga-Rantho 90
19. Ga-Maepa 152
20. Tsakane 63
21. Dithamaga/Maganagobuswa/Tukakgomo/Kalk-fontein
200
22. Makgopa 113
23. Swale
24. Seelane
25. Matlammotse
26. Malaeneng
27. Moshate
28. Marapong
29. Tidintsane
30. Sefufule
31. Maakgake
32. Morapaneng
33. Ditwebeleng 4
34. Difataneng 152
35. Mashemong
36. Maditameng
37. Kampeng
38. Gowe
140
6.3.8 Submissions from Department of Environmental Affairs
NO pROJEcT NAME
pROJEcTs DEscRIpTION / TYpE OF sTRucTuRE
IMpLEMENT-ING AGENT
OvERALL BuDGET
IMpLEMENTATION pERIOD AND BuDGET
2011/12 2012/13 2013/14 2014/15 2015/16
1. Control of bush encroachment at Ga-Riba (Lapholaena corrifolia)
DAE 10m 10m 0 0 0 0
2 Tufa conservation at Phiring DAE 7.5m 7.5m 0 0 0 0
3 Tukakgomo soil conservation project
DAE 8m 8m 0 0 0 0
6.3.9 6.3.9 Community Works Programme ProjectspROJEcT
NO:sTRATEGIc pROJEcT
uNpAckED pROJEcTs BuDGET BuDGETR vALuEs
11/12 12/13 13/14 14/15 15/16 15/16
Building and fencing of commu-nity centre - Dithamaga
R 20 000 R 20 000 0 0 0 0
Establishment of community garden - Dithamaga
R 30 000 R30 000 0 0 0 0
Establishment of goat project - Dithamaga
R 75 000 R 75 000 0 0 0 0
Fencing of graveyard - GaKgwete R 30 000 R 30 000 0 0 0 0
Building of pit toilets at graveyard – GaMampuru A
R 15 000 R 15 000 0 0 0 0
Installation of water pipes in the village – GaMampuru A
R 35 000 R 35 000 0 0 0 0
Establishment of goat project – GaMampuru A
R 75 000 R 75 000 0 0 0 0
Installation of poles at mentioned fields – GaMampuru B
R 10 000 R 10 000 0 0 0 0
Building of pit toilets at graveyard – GaMampuru B
R 15 000 R 15 000 0 0 0 0
Provision of parking lot at school – GaMampuru B
R 20 000 R 20 000 0 0 0 0
Development of parks – GaMa-mpuru B
R 35 000 R 35 000 0 0 0 0
Fencing community garden – GaMampuru B
R 30 000 R 30 000 0 0 0 0
Building of crèche – GaMampuru B
R 50 000 R 50 000 0 0 0 0
Rehabilitation of fence at grave-yard - GaMashishi
R 20 000 R 20 000 0 0 0 0
Building of pit toilet at graveyard - GaMashishi
R 15 000 R 15 000 0 0 0 0
141
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
6.4 ESCOM priority list
pROJ-EcT NO:
sTRATEGIc pROJEcT
uNpAckED pROJEcT
NO:
uNpAckED pROJEcTs
sOuRcE OF FuNDING
INDIcA-TORs
BuDGETR vALuEs & TOTAL cONNEcTIONs
11/12 12/13 13/14 14/15 15/16
Electrifi-cation of villages
Shakung ESCOM 7.98m 0 0 0 0
Moshira ESCOM 6.747m 0 0 0 0
Modubeng ESCOM 3.363m 0 0 0 0
Malokela ESCOM 850
Motloulela ESCOM 410
Ga-phala ESCOM 225
Kgopaneng ESCOM 280
Maakubu ESCOM 535
Moshira ESCOM 300
Electrifi-cation of villages
Shakung ESCOM 7.98m 0 0 0 0
Moshira ESCOM 6.747m 0 0 0 0
Modubeng ESCOM 3.363m 0 0 0 0
Malokela ESCOM 850
Motloulela ESCOM 410
Ga-phala ESCOM 225
Kgopaneng ESCOM 280
Maakubu ESCOM 535
Moshira ESCOM 300
Makofane/Sekopung/Pidima
ESCOM 600
Mokutung ESCOM 185
Makgalane ESCOM 540
Banareng ESCOM 660
Makopung ESCOM 563
Malaeneng ESCOM 493
Mapareng ESCOM 480
Taung/ma-tokomane/makotaseng
ESCOM 2000
Podile ESCOM 550
Selala/man-yaka/Maepa/mphethi
ESCOM 2470
Phiring ESCOM 1235
Madikane ESCOM 312
Senyatho ESCOM 530
Radimpsa ESCOM 420
Sekhwakh-waila
ESCOM 390
142
pROJ-EcT NO:
sTRATEGIc pROJEcT
uNpAckED pROJEcT
NO:
uNpAckED pROJEcTs
sOuRcE OF FuNDING
INDIcA-TORs
BuDGETR vALuEs & TOTAL cONNEcTIONs
11/12 12/13 13/14 14/15 15/16
Dithamaga ESCOM 38
Leboeng new satnds
ESCOM 545
phadishanong ESCOM 545
Ditensing ESCOM 525
Bokome ESCOM 525
Driekop france
ESCOM 1500
Mandela park ESCOM 680
Kampeng ESCOM 610
Magololo ESCOM 393
Maputle ESCOM 290
Dibakwane ESCOM 261
Barcelona ESCOM
Burgersfort ext.10
ESCOM
Alternative Electrifi-cation of villages
Taung ESCOM * 0 0 0 0
Matokomane ESCOM * 0 0 0 0
Koppie ESCOM * 0 0 0 0
Mokutung ESCOM * 0 0 0 0
Makotaseng ESCOM * 0 0 0 0
Makgalane ESCOM * 0 0 0 0
Makopung ESCOM * 0 0 0 0
Banareng ESCOM * 0 0 0 0
Mapareng ESCOM * 0 0 0 0
Malaeneng ESCOM * 0 0 0 0
Makofane ESCOM * 0 0 0 0
Sekopung ESCOM * 0 0 0 0
Pidima ESCOM * 0 0 0 0
Leboeng New stands
ESCOM * 0 0 0 0
143
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
6.4.1 Villages that will benefit from Alternative Source of Energy/ None Grid/ Solar SystemspROJEcT
NO:sTRATEGIc pROJEcT
uNpAckED pROJEcT
NO:
uNpAckED pROJEcTs
sOuRcE OF FuNDING
INDIcA-TORs
BuDGETR vALuEs
11/12 12/13 13/14 14/15 15/16
Alternative Electrification of villages
Taung ESCOM * 0 0 0 0
Matokomane ESCOM * 0 0 0 0
Koppie ESCOM * 0 0 0 0
Mokutung ESCOM * 0 0 0 0
Makotaseng ESCOM * 0 0 0 0
Makgalane ESCOM * 0 0 0 0
Makopung ESCOM * 0 0 0 0
Banareng ESCOM * 0 0 0 0
Mapareng ESCOM * 0 0 0 0
Malaeneng ESCOM * 0 0 0 0
Makofane ESCOM * 0 0 0 0
Sekopung ESCOM * 0 0 0 0
Pidima ESCOM * 0 0 0 0
Leboeng New stands
ESCOM * 0 0 0 0
6.5 SUBMISSIONS FROM LOCAL MINES
6.5.1 Submissions from Marula minepROJEcT
NO:sTRATEGIc pROJEcT
uNpAckED pROJEcT
NO:
uNpAckED pROJEcTs
BuDGET INDIcATORs BuDGETR vALuEs
11/12 12/13 13/14 14/15 15/16
Electrical engi-neering infrastruc-ture for villages in ward 8 and 10.
14m 4m 4m 4m 2m 0
Water supply and reticulation network in ward 8 and 10.
16m 500k 4m 6m 3m 2.5m
School infrastruc-ture development.
7.5m 3.5m 1m 1m 1m 1m
Hydroponics project
310k 310k
Hydroponics project 2
2.8m 700k 1.5m 310k 200k 100k
Brick making project
225k 125k 100k
Chrome project 22.5m
Community road 9.1m 4m 4m 1.1m
Business Support Unit
5.1m 800k 960k 970k 1.1m 1.3m
Housing Develop-ment
105m 5m 20m 45m 25m 10m
144
6.5.2 Submissions from Twickenham minepROJEcT
NO:sTRATEGIc pROJEcT
uN-pAckED pROJEcT
NO:
uN-pAckED
pROJ-EcTs
BuDGET INDIcATORs BuDGETR vALuEs
11/12 12/13 13/14 14/15 15/16
Electrifica-tion
R3,700 000 R3,7m 0 0 0 0
OVC Comple-tion
R300,000 R300k 0 0 0 0
Farmer Support
R2,500,000 R2,5m 0 0 0 0
Road R3,000,000 R3m 0 0 0 0
Communi-ty Access Bridge
R2,000, 000 R2m 0 0 0 0
Water Provision
R6,400,000 R6,4m 0 0 0 0
School Infra-structure Upgrading
R2,200,000 R2,2m 0 0 0 0
Feasibil-ity study- Communi-ty Centre/Multipur-pose cen-tre
R2,900,000 R2,9 0 0 0
6.5.3 Submissions from Dwarsriver MinepROJEcT
NO:sTRATEGIc pROJEcT
uN-pAckED pROJEcT
NO:
uNpAckED pROJEcTs
BuDGET INDIcATORs BuDGETR vALuEs
11/12 12/13 13/14 14/15 15/16
Early Child-hood Develop-ment Project
R 2.5m R 2.5m 0 0 0 0
Olive tree project
R 2.5m R 2.5m 0 0 0 0
Electrification project (Solar System)
R 500k R 500k 0 0 0 0
Building Local Trade Stores
R 500k R 500k 0 0 0 0
Water project R 500k R 500k 0 0 00 0
Building of 10 VIP toilets
R 200k R 200k 0 0 0 0
145
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
Preparation of Slab for container Fencing in of clinic area Toilets for the clinic
R 200k R 200k 0 0 0 0
LIBSA incubation program
R 200 000
R 200 000
0 0 0 0
6.5.4 Submissions from XSRATA
pROJEcT NO:
sTRATEGIc pROJEcT
uN-pAckED pROJEcT
NO:
uNpAckED pROJ-EcTs BuDGET INDIcATORs BuDGET
R vALuEs
11/12 12/13 13/14 14/15 15/16
Crop production and hydroponics gardening
13.5m 5.7m 7.8m 0 0 0
Bophelong home based care
690k 540k 150k 0 0 0
Craft and needle-work centre
700k 600k 100k 0 0 0
Welding centre 650k 200k 150k 0 100k 200k
Jewellery making centre
500k 300k 100k 100k 0 0
Nkholeng poultry farm
1m 900k 100k 0 0 0
MPCC 6.2m 6.2m 0 0 0 0
Access Road – Mpuru (1.5km
R2m
Creche at Mpuru R1.5m
Agricultural Projects-MDHK and Matimatjatji
Water provision at Mpuru
Water provision at Maroga
R2m
Electricity Supply at Maroga (France Village)
Arts and Craftwork Business – Beads Manufacturing
R1m
Pension Paypoint Facility at Seuwe
Orchard establish-ment e.g. Citrus Fruit – Maandag-shoek
R300k
Water provision at Hwashi
146
Access Road Seuwe
R 2m
Building bridges Mpuru and Mam-phahlane
Arts and Craftwork Business – Pottery Manufacturing
Multi-purpose Centre (library) Sehlaku
R8.8m
Tribal Office at Diphale
Biodiesel project
6.5.5 Submissions from Modikwa mine
pROJEcT NO:
sTRATEGIc pROJEcT
uNpAckED pROJEcT
NO:
uNpAckED pROJEcTs
BuDGET INDIcATORs BuDGET R vALuEs
11/12 12/13 13/14 14/15 15/16
Mamphahlane ac-cess road(3km)
R1.5k R2.0m
Upgrading of Driekop-Mam-phahlane access road(11km)
R1.0m
Mamphahlane Tribal office
R1.5m
Sehlaku Tribal office R2.0m
Maroga water project R1.5m
Mpuru creche R5.0m
Mpuru access road R1.0m
Agricultural projects at MDHK and mati-matjatji
R2.0m
Mandaagshoek water
R2.0m R2.0m
6.5.6 Submissions from Der Brochen minepROJEcT
NO:sTRATE-
GIc pROJ-EcT
uNpAckED pROJEcT NO:
uNpAckED pROJEcTs
BuDGET INDIcATORs BuDGET R vALuEs
11/12 12/13 13/14 14/15 15/16
Kalkfontein olive farming
R3.0m R3.0m 0 0 0
Kalkfontein processing plant
0 R2.5m R3.0m 0 0
Construction of clinic
0 0 R4.0m 0 0
147
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
6.5.7 Submissions from Phoka Thaba Platinum minepROJEcT
NO:sTRATEGIc pROJEcT
uNpAckED pROJEcT NO:
uNpAckED pROJEcTs
BuDGET INDIcATORs BuDGET R vALuEs
11/12 12/13 13/14 14/15 15/16
Maan-daagshoek water project
R1.0m 0 0 0 0
Tar surfac-ing of road D4170(2km)
0 R7.8m 0 0 0
Upgrade of crossing soc-cer field
R1.8m 0 0 0 0
Establish-ment of local company to transport chrome
R240k 0 0 0 0
6.5.8 Submissions from Two Rivers minepROJ-
EcT NO:sTRATEGIc pROJEcT
uNpAckED pROJEcT NO:
uNpAckED pROJEcTs
BuDGET INDIcATORs BuDGET R vALuEs
11/12 12/13 13/14 14/15 15/16
Ikageng Project R300k 0 0 0 0
Community storage support at Buffelshoek
R216K 0 0 0 0
Community storage facility at kalkfontein
R216k 0 0 0 0
Day care infrastructure at Steelpoort park
R216k 0 0 0 0
148
7.1 Spatial Development Framework
The Greater Tubatse Municipality has adopted its Spatial Development Framework in June 2007. The GTM Spatial Develop-
ment Framework is aligned with the Provincial Development Strategy (PGDS) with its strong emphasis on improving the quality
of life and sustainable development; the PGDS is informed by the National Spatial Development Plan and all provincial docu-
ments that have a bearing on growth and development in Limpopo.
The aim of a Spatial Development Framework is to provide general direction of preferred land use which therefore guide
decision-making and over a multi-year period aimed at the creation of integrated and habitable built and natural environment.
In other words the SDF aims at informing the decision of different organs of state as well as creating a framework to guide and
facilitate spatial investment of both private and public sector entities
The SDF aims in addressing the following deliverables:
• Existing policies, plans, resolutions and by-laws in the municipality pertaining to spatial issues
• The municipal-wide spatial issues ( in relation to the needs and the projects identified)
• The settlement spatial patterns and dysfunctionalities.
• Identification and analysis of the existing nodal points
• Major structuring elements, urbanisation trends and spatial implications
• Strategic roads and transportation networks
• Municipal investment and spending patterns
• Location and trends of basic services and infrastructure
• Location of low income houses
• Environment conservation and sensitive areas and the impact which development may have on the environment
• Areas of agricultural potential ad land currently affected by land claims
• Major sporting nodes or areas with relevant infrastructure
• Spatial relationship between urban and rural areas
• Relationship between the spatial issues and the vision of the municipality
7.2 Land Use Management Scheme GTM Land – Use Management Scheme has been developed in terms of the provision of section 18 of the Town Planning and
Township ordinance, 1986. Its main objectives are to protect and control Land environment, handling and drainage of storm
water, excavations etc.
A consent granted by the municipality by virtue of the provisions of the scheme does not entitle any person the right to use any
land, or to erect or use buildings thereon in any manner or for any purpose which is prohibited by the provisions of any condi-
tions registered against the title deed under which land is held, or imposed by legislation in respect of such land.
sEcTION 7:INTEGRATION
152
7.3 Integrated Waste Management Plan GTM has developed its Waste Management Plan in June 2007. Its main objectives are to enable the municipality to progres-
sively develop an Integrated Waste Management System. GTM Waste Management Plan is aligned with the White Paper on
Integrated pollution and Waste Management (2000) and the National Waste Management Strategy (NWMS 1999).
Purpose of the plan is to enable the municipality to progressively develop an integrated waste management system capable of
delivering waste management services to all households and businesses.
National policy requires municipalities to implement an IWMS where the focus is to prevent and minimisation of waste, recy-
cling of waste and treatment that is able yo reduce the potential of harmful impacts of waste.
The plan projects that it will take the municipality about 20 years from 2005 to achieve the goal of 100% service.
7.4 Employment Equity PlanGTM has adopted its employment equity plan in June 2007. Its main objectives are to meet the objects of the Employment
equity Act No. 53 of 1998. The plan is aligned with the municipal budget, GTM organisational structure and the IDP.
7.5 Workplace Skills Plan A Workplace Skills Plan for the Greater Tubatse Municipality was adopted in September 2007 and its main objectives are to
capacitate employees with necessary skills in order to maximise service delivery in municipal workplace. This was developed
in terms with SAQA requirements and is reviewed annually for its alignment with the IDP.
7.6 HIV/AIDS Plan The Constitution of the Republic of South Africa (1996) in section 152(1) and section 153 states that the role of local govern-
ment is to give priority to basic needs of the community ; and provide a safe and healthy environment, where communities and
community organizations are involved in the matters of local government.
The GTM has developed its HIV/AIDS Plan in 2009 and is aligned with the framework for an integrated local government
response to HIV/Aids developed by the provincial and local government (2007) and the HIV and AIDS and STI strategy plan for
South Africa 2007-2011.
Following are HIV and AIDS and STI strategic plan for South Africa 2007-2011 developed by the South African National Aids
Council:
• Partnership
• Leadership
• Capacity building
• Communication
• Equal access
• Protecting rights of the children
• Targeting vulnerable groups
153
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6
7.7 LED Strategy GTM has developed its LED Strategy in June 2007 and is aligned with the Limpopo Growth and Development Strategy, Provin-
cial Spatial Framework, National Spatial Development Perspectives and ASGISA.
7.8 Revenue Enhancement Plan Revenue Enhancement Plan for the Greater Tubatse Municipality was adopted in April 2008. Its main objectives are to put in
place systems and programmes that will assist the municipality in maximising its revenue collection. The plan is aligned with
the PGDS, NSDP, GTM LED strategy and other provincial and national documents that inform growth and development.
7.9 Disaster Management PlanMain objects of the Disaster Management Plan are to identify and implement disaster risk reduction measures to reduce the
vulnerability of communities and infrastructure at risk. The plan was adopted in 2008. The plan is aligned with the GSDM
disaster management plan.
The plan is in line with national policy (National Disaster Management Framework).
The Disaster management plan for the Greater Tubatse municipality comprises various plans like:
• District disaster management framework
• Disaster Hazard, vulnerability and risk plan
• Disaster risk reduction plan
• Disaster response and recovery plan
• Guidelines to establish the disaster management advisory forum and volunteer contingent.
7.10 Capital Investment FrameworkThe CIF for the Greater Tubatse Municipality is developed in accordance with the local government: Municipal Finance Man-
agement Act (MFMA) Act No:56 of 2003 and the investment and PPP regulations for the MFMA published in Government
Gazette 27431 of 2005.
7.11 Integrated Transport Plan Greater Tubatse Municipality has adopted its plan in 2004. The plan and development framework in integrated with land de-
velopment objectives(LDOs) integrated development plans (IDPs) prepared in terms of provincial development planning legisla-
tion, such as guide plans, structure plans, development plans, policy plans or other plans affecting the development of land,
prepared by other relevant sphere of government.
7.12 Risk Management Plan A Risk Management Plan for the Greater Tubatse Municipality was adopted in June 2008 in conjunction with section 62 and
79 of the MFMA. Its objectives are to provide a level of assurance that current significant risks are effectively and improving
decision making and planning, promote less risk averse culture in which the taking of calculated risk in pursuit of opportunities
154
to benefit the organisation is encouraged and to provide sound basis for integrated risk management and basis for integrated
risk management and internal control as components of good corporate governance.
GTM has identified the following strategic risks pertaining to each residual risk:
• Office space
• Lack of finance
• Poor intergovernmental relations
• Lack of land ownership
• Fraud and corruption
• Harm to reputation
• Loss of investments by investors
• Unclear roles and responsibilities
• Ineffective internal communication
• Brain drain
• Dependence on contractors
• High staff turn over
• Natural disaster
7.13 Water Services and Maintenance Strategy (Sekhukhune District)The plan seek to achieve the following key objectives: Analyse the current level of service to the communities, determine the
desired level of service by the community, determine future demand and forecasts, lifecycle of assets including background
data, routine maintenance plan and information flow requirements.
155
I N T E G R AT E D D E V E L O P M E N T P L A N - 2 0 1 1 - 1 6