integra company profile
TRANSCRIPT
1 Pub - G01.1-2010
PT. Integra Automasi An Automation and Control Company
Address :
Komp. Mutiara Taman Palem Blok B7-51,
Jl. Kamal Raya Outer Ring Road,
Cengkareng - Jakarta Barat
Indonesia – 11730
Phone : 62-21-5435 6505
Fax : 62-21-5435 6506
Website: www.integra-automasi.com
Email: [email protected]
2 Pub - G01.1-2010
Integra Automasi was established on September 2004.
We provide total solution of instrumentation and control from engineering,
procurement, construction, and maintenance services.
Our people have been involved in various projects in oil and gas, petrochemical, power
generation and water industry.
VISION
To be a reputable instrumentation, control, and automation system integrator
To be a high quality service provider in outsourcing of service and maintenance
MISSION
1. To be well-known and trusted company to deliver quality services to our
customer.
2. We always develop win-win relationship, trust, and long term commitment with
our partners and vendors.
3. We create a friendly, honest, creative, innovative and enjoyable environment for
our people.
4. We consistently are growing the business, revenue, and profitability to our
shareholder.
5. Integra continuously build a mutual benefit relationship to university as our
commitment in contributing to country sustainable educational development.
CREDO
LOYAL, INNOVATIVE, FOCUS, ENERGY
3 Pub - G01.1-2010
PRODUCTS AND SERVICES
PROJECTS
Our projects experiences located from South Sumatera, Jambi, Jakarta, Central Java,
East Java, East Kalimantan, and South Sulawesi.
4 Pub - G01.1-2010
PROJECT REFERENCES - 2004
Control Panel Modification – PT. PALYJA - Jakarta
PT. Palyja is operator of water treatment plant in cooperation with PT. PAM Jakarta. The
job is upgrading the existing control panel of Lebak Bulus Pumping Station.
Fire and Gas HMI Development NEDO Project, Pertamina UP V - Balikpapan
HMI - In-touch Wonderware to monitor Sieger Gas Detection System in the area of
Pertamina Refinery UP V Balikpapan.
5 Pub - G01.1-2010
PROJECT REFERENCES - 2005
Smith Metering System Depot Cikampek, Pertamina UPMS
Depot Cikampek was built to cover fuel distribution in north part of West Java area
Service Repair of Electric Actuator, Total Indonesie - Balikpapan
6 Pub - G01.1-2010
Water and Steam Sampling Analyzer System, PLN UBP Suralaya, PT. Indonesia Power
Water and sampling analyzer is a continuous analyzer for monitoring conductivity,
silica content, and pH of steam and water from boiler.
7 Pub - G01.1-2010
PROJECT REFERENCES - 2006
Chevron SAPI Gas Handling Facilities, Chevron Indonesia - Balikpapan
The plant is operated by Hanover at Senipah, East Kalimantan.
The job is installation of field instrument, wiring termination, panel supply, flow
computer setting and configuration, until commissioning
Metering System, Terminal Tanjung Uban, Pertamina UPMs I Medan
We have done installation, wiring, and commissioning of instrumentation and control
for 3 metering skids at Terminal Tanjung Uban, Pertamina UPMs I. Medan. Terminal
Tanjung Uban is tank farm storing facility for Premium, Kerosene, and Diesel Fuel.
8 Pub - G01.1-2010
Timber Tracking - Smart Device Application
Application Development project of Timber Tracking system consist of
2D barcode smart device reader scan
.Net application database of Timber validation & Reporting
WiFi data transformation and XML Web Service collaboration between PC /
Server and smart device (handheld)
9 Pub - G01.1-2010
LPG Metering System Upgrading, Pertamina RU III Plaju Palembang
Panel complete with PLC, PC and HMI Development using In-touch WonderWare.
Cabling and Termination for DCS System, UBP Tanjung Priok, PT. Indonesia Power
10 Pub - G01.1-2010
Oil and Gas Volume Lifting Monitoring, Ditjen MIGAS
The scope are Installing the panel complete with PLC, PC and HMI Development. The
HMI is using Intouch wonderware for monitoring Volume Lifting :
Cico – Tanjung Santan
Medco Energy – FSO Laksmiati
Petrocina - FSO Federal 1
Pertamina EP KM-3 Plaju
Pertamina EP PT. Pusri
Conoco Philips – TGI Pulau Pemping
11 Pub - G01.1-2010
Open Access Monitoring HMI SCADA, BPH MIGAS
Open Access project is a BPH Migas Project that purpose to connect and get production
data from servers database each Gas station which is under BPH Migas authority.
12 Pub - G01.1-2010
PROJECT REFERENCES - 2007
Depot Automation, Pertamina Depot Plumpang UPms III
Installation, wiring and commissioning of instrumentation and control 50 Rotork
Actuator, HMI, and PLC programming at Depot Plumpang UPms III.
13 Pub - G01.1-2010
Prover Relocation-Metering System, Pertamina Depot Plumpang UPms III
Relocation of Pipeprover from Tanjung Priok Jetty Meter to Plumpang Depot Balongan
Pipeline Metering system.
14 Pub - G01.1-2010
Upgrading Metering System, Pertamina Depot Plumpang UPms III
Upgrading of metering system, including installation of instrumentation, wiring
termination, panel, HMI & PLC programming.
Connector SAP Reporting System, Pertamina Depot Plumpang
SAP is an ERP (Enterprise Resources Planning) program which used on central office PT.
Pertamina in Jakarta to manage reporting from all Pertamina depot in Indonesia. This
project is developing Connector SAP Program based on SAP database in central office
so that can make a report more effective, real-time, accurate and reliable
15 Pub - G01.1-2010
Service Repair of Electric Actuator, Pertamina Aviation DPPU Ngurah Rai - Denpasar
The scope of work are from checking local-remote indication actuator, repair and
change actuator parts which not work properly, and disassembly some actuators from
valves to get over hole service, re-assembly actuators onto valves, re-setting and
commissioning.
It is including testing command and feedback from and to Yamatake DCS
Installation of Electric Actuator and ESDV, Pertamina Depot Rewulu - Teras
The project scopes are installation, wiring and commissioning of instrumentation,
electric actuator and ESDV (Emergency Shut Down Valve) at Depot Pertamina Rewulu -
Teras.
16 Pub - G01.1-2010
PROJECT REFERENCES - 2008
Metering and ATG System-Banyu Urip Development, Pertamina EP CEPU
Scope of work:
Metering system complete with coriolis massflow meter, master meter, flow
computer, and skid meter
ATG (automatic tank gauging).
Fuel Management System, STPI (Sekolah Tinggi Penerbangan Indonesia), Curug
Scope of work: Refueling System, ATG (automatic tank gauging) and HMI and Database
application
17 Pub - G01.1-2010
Turbine Management Control, Pertamina RU IV - Cilacap
Scope of work: HMI and Engineering termination.
18 Pub - G01.1-2010
Upgrading of Metering system, Pertamina RU V, Balikpapan
Scope of work: HMI (Human Machine Interface) Development, PLC Programming,
Engineering, and Wiring termination.
Lube Oil Metering system, Pertamina Produksi Pelumas Jakarta – Tanjung Priuk
19 Pub - G01.1-2010
Scope of work: HMI (Human Machine Interface) Development, Engineering, and Wiring
termination.
20 Pub - G01.1-2010
PROJECT REFERENCES – 2009
Actuator Control for Tank inlet/outlet Depo Ujungpandang, Pertamina UPMs VII
Scope of work: HMI (Human Machine Interface) Development, Integration with ATG
System, and Wiring Termination
10 km Crude Oil Pipeline, Petriochina Tuban
21 Pub - G01.1-2010
Ugrading Metering System – Patra Tehnik, Pertamina RU V Balikpapan
Scope of work:
HMI (Human Machine Interface)
Configuration of Thermo Fisher Flow Computer
Radar Tank Gauging – PT Indonesia Power [UBP Priok] – PT PLN (persero)
Scope of work: Supply Radar Tank Gauging, configuration & Installation, Tank Side &
wiring termination, Field Control Unit [PLC+Display], HMI (Human Machine Interface)
22 Pub - G01.1-2010
23 Pub - G01.1-2010
Inventory Monitoring & Control – PT Pertamina (persero) UPMs IV – 5 Depo Jawa Tengah
Scope of work: Actuator installation, configuration & termination, Servo ATG
integration, PLC programming & installation, HMI (Human Machine Interface),
Connector to MySAP Pertamina.
DEPO TEGAL
24 Pub - G01.1-2010
Depo MAOS
Depo CILACAP
25 Pub - G01.1-2010
DEPO PENGAPON - SEMARANG
DEPO CEPU