institutionalizing community based disaster preparedness in bangladesh dhaka, november 2013
TRANSCRIPT
![Page 1: Institutionalizing Community Based Disaster Preparedness In Bangladesh Dhaka, November 2013](https://reader036.vdocuments.site/reader036/viewer/2022072005/56649f415503460f94c60998/html5/thumbnails/1.jpg)
Institutionalizing Community Based
Disaster PreparednessIn Bangladesh
Dhaka, November 2013
![Page 2: Institutionalizing Community Based Disaster Preparedness In Bangladesh Dhaka, November 2013](https://reader036.vdocuments.site/reader036/viewer/2022072005/56649f415503460f94c60998/html5/thumbnails/2.jpg)
BACKGROUND
• Geographical location, land characteristics, multiplicity of rivers, monsoon pattern and climate change along with over population, mismanagement, lack of awareness render highly vulnerability in Bangladesh
• Human induced hazards caused by deforestation, environmental degradation, exploitation of natural resources and unplanned urban structures have further aggravated the situation.
• There is a strong need for a harmonized effort to strengthen
the capacities of those working within the local, district and
national institution on DRR.
![Page 3: Institutionalizing Community Based Disaster Preparedness In Bangladesh Dhaka, November 2013](https://reader036.vdocuments.site/reader036/viewer/2022072005/56649f415503460f94c60998/html5/thumbnails/3.jpg)
POLICY CONTEXT • DM Policy are well defined in Bangladesh. Ministries and
Departments are dedicated to overseeing DRR. Government has initiated flagship projects like the CDMP
• SoD is addressing DRR through DMCs at district, Upazilla, Union, Pourashva and CC levels.
• NPDM developed to strengthen national and local DRR.
• Strengthening of DDMCs at Upazilla and Union, Pourashva and City Corporation are key for effective implementation of the Disaster Management (DM) Act.
![Page 4: Institutionalizing Community Based Disaster Preparedness In Bangladesh Dhaka, November 2013](https://reader036.vdocuments.site/reader036/viewer/2022072005/56649f415503460f94c60998/html5/thumbnails/4.jpg)
NEED FOR COMPREHENSIVE APPROACH
• Ensuring effective functioning of DMCs
• Mainstreaming DRR into ADPs
• Replication and sustainability
![Page 5: Institutionalizing Community Based Disaster Preparedness In Bangladesh Dhaka, November 2013](https://reader036.vdocuments.site/reader036/viewer/2022072005/56649f415503460f94c60998/html5/thumbnails/5.jpg)
Disaster Risk Assessment
Disaster Risk Reduction / Contingency
Planning
Resource Mobilization
Implementation of the Plans
Monitoring and Learning
CBDP
![Page 6: Institutionalizing Community Based Disaster Preparedness In Bangladesh Dhaka, November 2013](https://reader036.vdocuments.site/reader036/viewer/2022072005/56649f415503460f94c60998/html5/thumbnails/6.jpg)
OPERATIONAL STRATEGY
• Develop CBDP institutionalisation Plan
• Master Trainer (MT) resource Pool
• Conducting risk assessment
• Ward Disaster Management Committee
• Inclusion
• Developing RRAP
• Establishment of localized emergency response
• Risk Reduction Action Plan contributing to ADP • On going Monitoring and Evaluation
![Page 7: Institutionalizing Community Based Disaster Preparedness In Bangladesh Dhaka, November 2013](https://reader036.vdocuments.site/reader036/viewer/2022072005/56649f415503460f94c60998/html5/thumbnails/7.jpg)
Union and Ward Disaster Management Committee
District Master Trainers Pool
District Disaster Management Committee
Department of Disaster Management
Community Risk Assessment
RRAP Preparation at Union Union Contingency Plan
District Contingency Plan
National Budget Preparation
National Contingency Plan
Disaster resilient development and mitigation activities
Preparedness Volunteers, buffer stock, mock
drills, mass awareness
June
February February
June
April
Resource
MINISTRIES AND LINE DEPARTMENTSNational plan, policy and guidelines
Facil
itatio
n of
TO
T –
Oct
/Nov
Facil
itatio
n of
Tra
inin
g –
Nov/
Dec
January
Oct-Feb June/July
RRAP validation at Upazila
March/April
Resource
RRAP submission at District
March/April
Upazila Contingency Plan
March
Upazila (Sub District) Disaster Management Committee
Trained persons on Disaster Preparedness
COMMUNITY
Trained persons on Disaster Preparedness
National Master Trainers Pool
![Page 8: Institutionalizing Community Based Disaster Preparedness In Bangladesh Dhaka, November 2013](https://reader036.vdocuments.site/reader036/viewer/2022072005/56649f415503460f94c60998/html5/thumbnails/8.jpg)
Ward(Ward Councilor, WDMC)
National Master Trainers Pool
City Corporation Masters Trainers
Pool
Trained persons on Disaster
Preparedness
City Corporation Disaster Management Committee
Department of Disaster Management
Urban Risk Assessment
RRAP Preparation at ward Ward Response Plan
City Corporation Response Plan
National Budget Preparation
National Response Plan
Disaster Resilient Development(Small Scale Mitigation)
Preparedness (urban volunteers, buffer stock, mock
drills, mass awareness)
June
February February
June
April
Resource
MINISTRIES AND LINE DEPARTMENTSNational plan, policy and guidelines
Facil
itatio
n of
TO
T –
Oct
/Nov
Facil
itatio
n of
Tra
inin
g –
Nov/
Dec
January
Oct-Feb June/July
RRAP Submission at City Corporation
March/April
Resource
COMMUNITY
![Page 9: Institutionalizing Community Based Disaster Preparedness In Bangladesh Dhaka, November 2013](https://reader036.vdocuments.site/reader036/viewer/2022072005/56649f415503460f94c60998/html5/thumbnails/9.jpg)
MONITORING AND EVALUATION
• Monitoring and evaluation • Accountability and Participation will be observed
quantitative and qualitative and Joint monitoring
• DRR will be integrated into development
• DM policy framework is enhanced by strong
coordination and evidence based advocacy to
MoDM&R and MoLGR&D.
![Page 10: Institutionalizing Community Based Disaster Preparedness In Bangladesh Dhaka, November 2013](https://reader036.vdocuments.site/reader036/viewer/2022072005/56649f415503460f94c60998/html5/thumbnails/10.jpg)
EXPECTED OUTCOME • ADPs will be developed at Upazila and District level based
on CRA and RRAP• Contingency Plan developed and updated by DMCs
• DMCs will conduct and monitor risk assessment• Increased community resilience , Mock drills tested regularly• Community and resources mobilized
• District MT provides regular training all level DMCs• Risk informed RRAP and DRR mainstreamed into
development
• Law, Policies, Orders, Guidelines and Codes are properly implemented
![Page 11: Institutionalizing Community Based Disaster Preparedness In Bangladesh Dhaka, November 2013](https://reader036.vdocuments.site/reader036/viewer/2022072005/56649f415503460f94c60998/html5/thumbnails/11.jpg)
CONTINUATION
• Self-rolled-out CBDP from local to national level• CBDP will be led by Government DM structures
• ADP will be developed factoring in RRAP• MT Resource pool will be available
• CRA, URA and Harmonized Training Module will ensure ‘buy-in’ of stakeholders to the process.
• National and District level MTs will be in place and continuation
• Inclusive and mainstreamed CBDP into development
![Page 12: Institutionalizing Community Based Disaster Preparedness In Bangladesh Dhaka, November 2013](https://reader036.vdocuments.site/reader036/viewer/2022072005/56649f415503460f94c60998/html5/thumbnails/12.jpg)
THANK YOU VERY MUCH