Various Carpentry Jobs
Sealed quotations are invited for various carpentry works in Director’s Residence & Director’s Office
IDRBT premises, and should be addressed to the Director, IDRBT, Masabtank, Hyderabad, so as to
reach IDRBT not later than 17.00 hrs
1. The Institute reserves the right to accept or reject any or all the quotations in full or in part without
assigning any reasons thereof and also reserves the right to accept the quotation of any firm partly
or fully.
2. The quotation shall be valid for a period of 60
3. The firm is requested to quote unit rates and amounts separately in the enclosed Performa (Bill of
Quantity) only. (Annexure - 3)
4. The firm shall furnish Earnest Money Deposit in the
IDRBT, Hyderabad for a sum of Rs 16
would be released after completion of Defects Liability Period (DLP) of one year from the date of
completion of work to the successful bidder OR on submission of Bank Guarantee for said amount
and said period. Quotation, which is not accompanied by EMD in the form of DD / BG, will not be
considered. However, EMD will be returned to the unsuccessful bidder after placing the work
with successful bidder.
5. The rates quoted shall be inclusive of all taxes, duties, levies, transport, packing, forwarding
charges, and installation charges etc.
6. TDS will be deducted from the payments made to the firm as per IT rules. The firm has to
details of PAN card and Bank details for
7. The payments for the work will be
Residence & Director’s Office in IDRBT premises, Hyderabad.
8. The firm may consult Institute’s Engineer (Cell: 9617773419) and should thoroughly acquaint
themselves with the nature and scope of the work before quoting, if required.
9. The entire work shall be completed within
Liquidated Damages (LD) at the rate of 0.25% of the tender cost per week for the delay in
completion of work beyond the stipulated period with an upper ceiling of 5% of the contract amount
will be levied.
10. The following terms of payment will apply to the contract.
a) 95% of the quoted rate will be released after completion work an actual measurement basis.
b) Balance 5% of the quoted rate will be released after expiry of defects liability period of one year
OR on submission of Bank Guarantee for said amount for said period
Signature & Seal with date of the bidder
INSTITUTE FOR DEVELOPMENT AND RESEARCH IN BANKING TECHNOLOGY
Various Carpentry Jobs in Director’s Residence and Office, IDRBT premises
Sealed quotations are invited for various carpentry works in Director’s Residence & Director’s Office
, and should be addressed to the Director, IDRBT, Masabtank, Hyderabad, so as to
17.00 hrs on 15.02.2016 with an EMD of Rs 16,000/-.
The Institute reserves the right to accept or reject any or all the quotations in full or in part without
assigning any reasons thereof and also reserves the right to accept the quotation of any firm partly
all be valid for a period of 60 days from the date of opening of the same.
The firm is requested to quote unit rates and amounts separately in the enclosed Performa (Bill of
The firm shall furnish Earnest Money Deposit in the form of a Demand Draft in favour of
BT, Hyderabad for a sum of Rs 16,000/-. The EMD does not carry any interest and the same
be released after completion of Defects Liability Period (DLP) of one year from the date of
ccessful bidder OR on submission of Bank Guarantee for said amount
and said period. Quotation, which is not accompanied by EMD in the form of DD / BG, will not be
considered. However, EMD will be returned to the unsuccessful bidder after placing the work
The rates quoted shall be inclusive of all taxes, duties, levies, transport, packing, forwarding
charges, and installation charges etc.
TDS will be deducted from the payments made to the firm as per IT rules. The firm has to
details of PAN card and Bank details for receiving payment through EFT.
The payments for the work will be done by IDRBT Hyderabad & the work is to be done at Director’s
Residence & Director’s Office in IDRBT premises, Hyderabad.
lt Institute’s Engineer (Cell: 9617773419) and should thoroughly acquaint
themselves with the nature and scope of the work before quoting, if required.
shall be completed within 60 days from the date of work order,
Damages (LD) at the rate of 0.25% of the tender cost per week for the delay in
completion of work beyond the stipulated period with an upper ceiling of 5% of the contract amount
The following terms of payment will apply to the contract.
of the quoted rate will be released after completion work an actual measurement basis.
Balance 5% of the quoted rate will be released after expiry of defects liability period of one year
OR on submission of Bank Guarantee for said amount for said period.
Signature & Seal with date of the bidder
INSTITUTE FOR DEVELOPMENT AND RESEARCH IN BANKING TECHNOLOGY
IDRBT premises
Sealed quotations are invited for various carpentry works in Director’s Residence & Director’s Office in
, and should be addressed to the Director, IDRBT, Masabtank, Hyderabad, so as to
The Institute reserves the right to accept or reject any or all the quotations in full or in part without
assigning any reasons thereof and also reserves the right to accept the quotation of any firm partly
days from the date of opening of the same.
The firm is requested to quote unit rates and amounts separately in the enclosed Performa (Bill of
form of a Demand Draft in favour of
The EMD does not carry any interest and the same
be released after completion of Defects Liability Period (DLP) of one year from the date of
ccessful bidder OR on submission of Bank Guarantee for said amount
and said period. Quotation, which is not accompanied by EMD in the form of DD / BG, will not be
considered. However, EMD will be returned to the unsuccessful bidder after placing the work order
The rates quoted shall be inclusive of all taxes, duties, levies, transport, packing, forwarding
TDS will be deducted from the payments made to the firm as per IT rules. The firm has to submit
is to be done at Director’s
lt Institute’s Engineer (Cell: 9617773419) and should thoroughly acquaint
from the date of work order, failing which
Damages (LD) at the rate of 0.25% of the tender cost per week for the delay in
completion of work beyond the stipulated period with an upper ceiling of 5% of the contract amount
of the quoted rate will be released after completion work an actual measurement basis.
Balance 5% of the quoted rate will be released after expiry of defects liability period of one year
Page 2 of 22 Signature & Seal with date of the bidder
11. The details of similar work done of value not less than Rs 5.00 lakh during the last 2 years may be
furnished.
12. The firm shall make good all the damages caused to the Institute’s property during the execution of
the work at no extra cost.
13. All the debris & wastage generated during the course of work and balance unused material has to
be removed from the site by the contractor at his own cost as instructed by the EIC from time to
time.
14. The quoting firm shall be fully responsible for all type of loss, damages during the execution of the
work including Mishap / Accident to any person.
15. The firm should quote on the above terms and conditions as per the enclosed bill of quantities and
no deviations are being allowed. The quotation will not be considered if any deviation found in the
above terms and conditions.
16. The EMD will be forfeited, if the firm fails to execute the work after placing the work order.
17. The materials proposed to be used should primarily be approved by Institute’s Engineer before
installation and the work is to be carried out in consultation with Institute’s Engineer from time to
time.
18. Makes of materials proposed to use in the above project (Annexure -1 list enclosed)
19. Drawings of the work are enclosed in Annexure – 2.
20. The firm shall produce the Original bills of the raw materials procured.
21. No price escalation would be allowed in the entire tenure of the work.
22. The firm is liable to do any work that is related to satisfactory completion of the entire work & is
beyond the scope of the tender up to a maximum of 10% of the tendered amount. The payments
for such work would be made on mutually agreed rates.
23. The bidder can’t sub-let the work without the prior written permission of the principle employer.
UNDERTAKING
We have read and understood the above mentioned terms and conditions and hereby convey our
acceptance of the same as it is.
Date :
Place:
Page 3 of 22 Signature & Seal with date of the bidder
Annexure - 1
Sl. No Item Make / Manufacture
(with ISI mark of approved quality)
1. Cement A.C.C., Ultra Tech,
2. Reinforcement Steel &
Structural Steel SAIL, TISCO, IISCO, Vizag Ispat, ISI approved Make.
3. Ceramic Tiles, Ceramic, non skid tiles, wall tiles Kajaria, H & R Johnson Tiles ISI approved make
4. Glass Modi, Saint Gobain, AIS, ISI approved make.
5. Ply wood Green Lam, Kit ply ISI approved make of water proof & white ant
proof of required thickness.
6. Laminated Sheets Greenlam, Century, Euro or Eq. ISI approved make (one mm thick).
7. Paints Asian Paints, I.C.I. British Paints ISI approved make.
(insulation exterior & interior and synthetic enamel of apcolite)
8.
Hardware:
a. Aluminum Hinges, Tower Bolts,
Door Stoppers, Aldrops, handles –
b. Brass hinges, Aldrops, safety
chain, Handles Tower Bolt –
c. Door Locks –
d. Cup Board Locks
Jyothi, Classic with ISI Mark.
Bush or Equivalent Make
Godrej.
Euro or Equivalent Make
9. Water Proofing Brush Bond, Chemicals Fosroc /Sika/ Dr. Fixit.
10. Cement Putty Birla/ JK
11. Aluminum sections Jindhal/ Hindalco
12. Anti termite Pilot wood preservative (anti termite)
Page 13 of 22 Signature & Seal with date of the bidder
Annexure – 3
ESTATE DEPARTMENT, IDRBT, MASAB TANK, HYDERABAD
Making of Wooden cupboards in Director's Residence and Cupboard & Magazine Stand in Director's Office
No. Description of Item UOM Qty. Rate(In Rs.) Rate in Words Amount(In Rs.)
A DIRECTOR'S RESIDENCE-MASTER BEDROOM (2ND FLOOR)
1
Removal of the existing wooden cupboard including disposal of all debris so produced.Thereafter application of water proof and termite proof treatment. The rates must include the cost of labour, tools & tackles,water proof and termite proof chemicals, transport machines and all items required for satisfactory completion of the work & all applicable taxes if any.
LS 1.00
2
Dismantling and removal of debris of Wall for carving a window of size 4' X 4'6" at specified location as directed by EIC. The rates must include the cost of labour, tools & tackles, transport machines and all items required for satisfactory completion of the work & all applicable taxes if any.
LS 1.00
3
Making of RCC Lintel and finishing of the edges of the dismantled wall including necessary painting of all new or existing surfaces as required for fixing of Aluminium Window.The rates must include the cost of labour, tools & tackles, Reinforcement Steel, Cement, Sand, bricks, paints, paint brushes, putty, transport machines and all items required for satisfactory completion of the work & all applicable taxes if any.
LS 1.00
Page 14 of 22 Signature & Seal with date of the bidder
4
Providing and fixing of Aluminum Window with two shutters fixed with 5 MM thick glass opening outside the room and two shutters fixed with SS 304 Grade Mesh opening inside the room. All aluminium Surfaces to be Powder Coated. The rates must include the cost of labour, tools & tackles, Heavy Duty Aluminum sections of gauge 1.5 MM, Heavy Duty aluminium I-Max hinges of 1 Feet 8 nos., 5 MM thick transparent glass, Rubber Gaskets, SS 304 Grade Mesh, transport machines and all items required for satisfactory completion of the work & all applicable taxes if any. REF. DWG. NO.: 01/DB/03
SQFT 18.00
5
Providing and fixing of Wooden cupboard of depth 2' made of 18 MM Plywood and having internal partitions as described in the drawing. Each Cupboard shall contain 5 drawers all having roller supports. The outer surfaces shall be Laminated with 1.0 MM thick laminate of desired shade and interiors to be laminated with 0.8 MM thick white laminates.The rates must include the cost of labour, tools & tackles,18 MM Fire proof, water proof and Termite proof Plywood, Laminates, SS Hinges, Roller and Channels for Drawer, Brass Drawer Knobs, Brass Handles, Heavy Duty 3/4 inch SS pipe for hangers(removable type), transport machines and all items required for satisfactory completion of the work & all applicable taxes if any. REF. DWG. NO.: 01/DB/03, 08/DB/01
SQFT 85.00
Page 15 of 22 Signature & Seal with date of the bidder
6
Providing and fixing of Glass shutter with frame to existing Shelf. The frame must be made of Teak Wood of section 3 Inches X 1.5 Inches embedded to the walls. The 2 shutters to have 8 MM Toughened glass, width of which would be half of the total available width and height being complete available. The glass shutter would have two Teak Wood Beadings of 3 Inches Height and 1 Inch Thickness One in the top and the other in the bottom, fixed to the main frame with pivot hinges at top and bottom. All the teak wood surfaces are to be Polished with approved shade. Magnetic press lock is to be provided.The rates must include the cost of labour, tools & tackles, BT Teak Wood, Wood Polish, 8 MM thick toughened transparent glass, pivot hinges(8 nos.) any minor civil work that is required for aesthetic purpose, transport machines and all items required for satisfactory completion of the work & all applicable taxes if any. REF. DWG. NO.: 02/DB/01
SQFT 30.00
A. SUB TOTAL OF MASTER BEDROOM (2ND FLOOR)
B DIRECTOR'S RESIDENCE-GUEST BEDROOM (2ND FLOOR)
1
Removal of the existing wooden cupboard including disposal of all debris so produced.Thereafter application of water proof and termite proof treatment. The rates must include the cost of labour, tools & tackles,water proof and termite proof chemicals, transport machines and all items required for satisfactory completion of the work & all applicable taxes if any.
LS 1.00
Page 16 of 22 Signature & Seal with date of the bidder
2
Providing, making and fixing of Wooden cupboard of depth 1'6" made of 18 MM Plywood and having internal partitions as described in the drawing. Each Cupboard shall contain 5 drawers all having roller supports. The outer surfaces shall be Laminated with 1.0 MM thick laminate of desired shade and interiors to be laminated with 0.8 MM thick white laminates.The rates must include the cost of labour, tools & tackles,18 MM Fire proof, water proof and Termite proof Plywood, Laminates, Roller and Channels for Drawer, SS Hinges, Brass Drawer Knobs, Brass Handles, Heavy Duty 3/4 inch SS pipe for hangers(removable type), transport machines and all items required for satisfactory completion of the work & all applicable taxes if any. REF. DWG. NO.: 03/DB/01,08/DB/01
SQFT 53.00
B. SUB TOTAL OF GUEST BEDROOM (2ND FLOOR)
C DIRECTOR'S RESIDENCE-READING ROOM (2ND FLOOR)
1
Removal of the existing wooden cupboard including disposal of all debris so produced.Thereafter application of water proof and termite proof treatment. The rates must include the cost of labour, tools & tackles,water proof and termite proof chemicals, transport machines and all items required for satisfactory completion of the work & all applicable taxes if any.
LS 1.00
Page 17 of 22 Signature & Seal with date of the bidder
2
Providing,making and fixing of Book Shelf of 1 Feet Depth. The frame is to be made of 18 MM Ply wood laminated with 1.00 MM thick Decolam sheet of approved make and shade. The internal Horizontal partitions to be made of 12 MM Thick Toughened glass with appropriate supports as directed by the EIC. The shutters to be made of 8 MM thick Toughened glass With Teak Wood Beading with polishing of desired shade, at the top and bottom and fixed to the main fraim through pivot hinges. The rates must include the cost of labour, tools & tackles, BT Teak Wood, Wood Polish,18 MM, Fire proof,water proof & Termite proof PlyWood, 8 MM & 12 MM thick toughened transparent glass, pivot hinges( 24 nos.), Brass Handles/Knobs, transport machines and all items required for satisfactory completion of the work & all applicable taxes if any. REF. DWG. NO.: 04/DB/01
SQFT 50.00
3
Providing, making and fixing of Wooden cupboard of depth 1'6" made of 18 MM Plywood and having internal partitions as described in the drawing. Each Cupboard shall contain 2 drawers all having roller supports. The outer and inner surfaces shall be Laminated with 1.0 MM thick laminate of desired shade. The Wooden Cup board shall have 2 Glass shutters made of 8 MM thick Toughened glass with teak wood beading and pivot hinges at the top and bottomThe rates must include the cost of labour, tools & tackles,18 MM Fire proof, water proof and Termite proof Plywood, Laminates, Roller and Channels for Drawer, Pivot Hinges, Brass Drawer Knobs, Brass Handles, transport machines and all items required for satisfactory completion of the work & all applicable taxes if any. REF. DWG. NO.: 05/DB/01
SQFT 21.00
C. SUB TOTAL OF READING ROOM (2ND FLOOR)
Page 18 of 22 Signature & Seal with date of the bidder
D DIRECTOR'S RESIDENCE- BEDROOM (1ST FLOOR)
1
Removal of the existing wooden cupboard including disposal of all debris so produced.Thereafter application of water proof and termite proof treatment. The rates must include the cost of labour, tools & tackles,water proof and termite proof chemicals, transport machines and all items required for satisfactory completion of the work & all applicable taxes if any.
LS 1.00
2
Providing and fixing of Wooden cupboard of depth 2' made of 18 MM Plywood and having internal partitions as described in the drawing. Each Cupboard shall contain 5 drawers all having roller supports. The outer surfaces shall be Laminated with 1.0 MM thick laminate of desired shade and interiors to be laminated with 0.8 MM thick white laminates.The rates must include the cost of labour, tools & tackles,18 MM Fire proof, water proof and Termite proof Plywood, Laminates, SS Hinges, Roller and Channels for Drawer, Brass Drawer Knobs, Brass Handles, Heavy Duty 3/4 inch SS pipe for hangers(removable type), transport machines and all items required for satisfactory completion of the work & all applicable taxes if any. REF. DWG. NO.: 06/DB/01, 08/DB/01
SQFT 60.00
Page 19 of 22 Signature & Seal with date of the bidder
3
Providing making and fixing of Wooden computer table with keyboard tray and two side tables all exterior visible survfaces to be Laminated with 1.00 MM thick Decolam sheet of approved make and shade and interior surfaces with 0.8 MM thick White decolam sheet. Two 12 mm Toughened glass shelves over the head are also to be provided. Refer to the Drawing for details. The rates must include the cost of labour, tools & tackles,18 MM Fire proof, water proof and Termite proof Plywood, Laminates, SS Hinges, Roller and Channels for Keyboard tray, Brass Drawer Knobs, Brass Handles,12 MM Toughened glass shelves with proper supports, transport machines and all items required for satisfactory completion of the work & all applicable taxes if any. REF. DWG. NO.: 06/DB/01
SQFT 60.00
D. SUB TOTAL OF BEDROOM (1ST FLOOR)
E DIRECTOR'S RESIDENCE- STAIRCASE CUPBOARD (GROUND FLOOR)
1
Removal of the existing wooden cupboard including disposal of all debris so produced.Thereafter application of water proof and termite proof treatment. The rates must include the cost of labour, tools & tackles,water proof and termite proof chemicals, transport machines and all items required for satisfactory completion of the work & all applicable taxes if any.
LS 1.00
Page 20 of 22 Signature & Seal with date of the bidder
2
Providing and fixing of Wooden cupboard of depth 1'4" made of 18 MM Plywood and having internal partitions as described in the drawing. The outer surfaces shall be Laminated with 1.0 MM thick laminate of desired shade and interiors to be laminated with 0.8 MM thick white laminates.The rates must include the cost of labour, tools & tackles,18 MM Fire proof, water proof and Termite proof Plywood, Laminates, SS Hinges, Brass Knobs, Brass Handles, transport machines and all items required for satisfactory completion of the work & all applicable taxes if any. REF. DWG. NO.: 07/DB/01
SQFT 50.00
E. SUB TOTAL OF STAIRCASE CUPBOARD (GROUND FLOOR)
F DIRECTOR'S OFFICE
1
Removal of the existing wooden cupboard including disposal of all debris so produced.Thereafter application of water proof and termite proof treatment. The rates must include the cost of labour, tools & tackles,water proof and termite proof chemicals, transport machines and all items required for satisfactory completion of the work & all applicable taxes if any.
LS 1.00
Page 21 of 22 Signature & Seal with date of the bidder
2
Providing and fixing of new cupboard and wall paneling matching the existing panels and cup boards with 18 MM thick Plywood and laminated with 4 mm thick Veneer of approved brand with matching teak wood beading where required along with spray polish of external and internal surfaces matching the shade of existing furniture.The rates must include the cost of labour, tools & tackles,18 MM Fire proof, water proof and Termite proof Plywood, Laminates, Brass Hinges, , Brass Knobs, Brass Handles, Polish, transport machines and all items required for satisfactory completion of the work & all applicable taxes if any.A Sample is available in the institute premises for reference. Size of Wall Panel: 12' X 10' Size of Cup Board: 8'6" X 2'6"
LS 1.00
3
Supply and making of magazine stand (L=3'6" X H= 2'9" X D=8.5") for keeping/ display of Various sizes of magazines. The stand is to be made of 12 mm thick Plywood with 4 mm thick Veneer lamination with 0.5 X 4 MM Teak Wood Beading wherever required along with spray polish of desired shade matching the tone of existing furniture. The front of the stand to have 4 MM glass partitions to facilitate the proper display of the magazines. a sample is available at the premises for reference. The rates must include the cost of labour, tools & tackles,12 MM Fire proof, water proof and Termite proof Plywood, Laminates, 4 MM toughened transparent glass, Polish, transport machines and all items required for satisfactory completion of the work & all applicable taxes if any. REF. DWG. NO.: 01/DO/01
SQFT 11.00
F. SUB TOTAL OF DIRECTOR'S OFFICE
G MISCELLANEOUS
Page 22 of 22 Signature & Seal with date of the bidder
1
Providing and fixing of Ceramic vitrified tiles wherever required of shade matching the existing floor in that area. The rates must include the cost of labour, tools & tackles, cost of vitrified tiles, cement, sand, pointing material, transport machines and all items required for satisfactory completion of the work & all applicable taxes if any.
SQFT 250.00
2
Painting of walls and ceiling wherever required with application of 1 coat of putty and 2 coats of distemper of the colour matching the existing colour of the surrounding. The rates must include the cost of labour, tools & tackles, cost of paint, paint brushes,Putty, Minor civil touchup work , transport machines and all items required for satisfactory completion of the work & all applicable taxes if any.
SQFT 250.00
G. SUB TOTAL OF MISCELLANEOUS
GRAND TOTAL:
ADDITIONAL DISCOUNTS(%):
DISCOUNT AMOUNT:
GROSS AMOUNT:
Amount in Words: Rs.