ONE Nation Grid Frequency
(Dec 4, 2014)
1
Installed Capacity during 12th and 13th Plans
2
(in MW)
*88537 MW planned capacity + 9624 MW additional capacity, + about 25000 MW capacity under construction, and about 33000 MW of renewable capacity
Plan-Wise Generation Addition (Region - Wise)
Up to July 2014
(Actual) (A)
Balance in XII Plan (B)
Addition in XIII Plan
(C)
Total (End of XIII Plan)
(D = A+B+C)
NR 64387 20929 16890 102206
WR 91847 36709 20262 148818
SR 57232 38650 23076 118958
ER 33881 12738 31195 77813
NER 2910 3511 8202 14623
Bhutan 1416 3066 2120 6602
Total 251673 115603 101745 469020
3
Transmission System Required upto 13th Plan Condition Transmission Lines (400kV and above
system) (values in ckm)
At end of 11th
Plan
Expected
Addition in 12th
Plan
Expected
by end of 12th
Plan
Expected
Addition in
13th Plan
Expected
by end of
13th Plan
HVDC Bipole lines 9432 7440 16872 10600 27472
765 kV 5250 27000 32250 22200 54450
400 kV 106819 38000 144819 30000 174819
Total 121501 72440 193941 62800 256741
Substations (AC & HVDC) (400kV and
above)
At end of 11th Plan
Expected Addition in 12th Plan
Expected
by end of 12th Plan
Expected Addition in 13th
Plan
Expected
by end of 13th Plan
HVDC Terminals:
HVDC back-to-back 3000 0 3000 0 3000
HVDC Bipole terminals 6750 12750 19500 15000 34500
Total- HVDC Terminal Capacity, MW
9750 12750 22500 15000 37500
AC Substations
765 kV 25000 149000 174000 79000 253000
400 kV 151027 45000 196027 49000 245027
Total- AC Substation capacity, MVA
176027 194000 370027 128000 498027
Total Fund requirement would be about Rs 2,60,000 Crore (assuming about Rs. 100,000 crore for 220kV and below systems)
57080
69458
180000
200000
0
50000
100000
150000
200000
250000
X Plan XI Plan XII Plan (Proposed) XII Plan (Estimated)
Investment Trend in Transmission Sector
Private
State
Central
Total
Rs.
in C
rs.
ONE Nation Grid Frequency
Mumbai
Hyderabad
Chennai Bangalore
Thiruvananthapuram
Delhi
Jaipur
Ahmadabad
Bishwanath Chariali
Agra
Gwalior
Mumbai
Hyderabad
Chennai Bangalore
Thiruvananthapuram
Delhi
Jaipur
Ahmadabad
Bishwanath Chariali
Agra
Gwalior
Evolving Voltage Landscape
5
ONE Nation Grid Frequency
NR
Present IR Capacity: 40,650 MW
Picture does not include various 132kV
lines aggregating 600 MW of IR capacity
14,230MW
NER
ER
SR
5,720MW
3,630MW
6,490MW
1,260MW
8,720MW
WR
5100 14100
28000
68050 IR Power Transfer Capacity (at the end of Plan period)
National Grid – Present and Envisaged
Planned IR Capacity: 68,050 MW
17,930MW 16,920MW
12,790MW
5,820MW 3,630MW
Envisaged
Existing
2002 2007 2012 2017
6
Major Transmission works
High Capacity Corridors
11 Nos of High Capacity Corridors under implementation
Total Investment : About Rs. 65000 Crs.
Commissioning started progressively, major portion to be commissioned by 2014-15
Tr. Schemes agreed (to be implemented by POWERGRID)
About 20,000 CKMs., 13 New S/s, 50,000 MVA
3 nos. SVCs, 13 nos. STATCOMs, 4 nos. Fault Limiters
Total Investment : About Rs. 42000 Crs.
Cluster of Generation
pockets
Cluster of Concentrated
Demand pockets
Creation of Transmission Highways
Other ISTS Transmission Schemes
Under bidding process
7000 CKMs, 9 New S/s
Total Est. Cost : About Rs. 15000 Crs.
Approved
Transmission Lines
HVDC – 1750 ckm
765 kV – 9000 ckm
400 kV – 7050 ckm
220 kV - 500 ckm
132 kV -270 ckm
Other ISTS Transmission Schemes
Approved
Substations
HVDC – 2 nos
765 kV – 8 nos.
400 kV – 8 nos.
220 kV - 1 no.
Transformation capacity – 35000 MVA
Total Cost – Rs. 73000 Cr.
One Nation One Grid
Strengthening of Existing Transmission Corridors
11
Northern Region:
o Singrauli – Anpara 400 kV S/c line o Meerut – Muzaffarnagar 400 kV S/c line o Ballabagarh – Badarpur 220 kV S/c line
Southern Region:
o Kolar – Hosur 400 kV D/c line o Kaiga – Guttur 400 kV D/c line
Eastern Region:
o Maithon RB – Maithon 400 kV D/c line o Maithon – Raghunathpur 400 kV line o Jeypore – Jayanagar 220 kV D/c line
North Eastern Region:
o Biswanath Chariyali – Balipara 400 kV 2XD/c line o Balipara – Bongaigaon 400 kV D/c line o Byrnihat –Misa 220 kV D/c line (to be upgraded
to 400 kV High capacity line)
Green Energy Corridors
• Huge transmission & control infrastructure requirement for Grid integration of large scale renewables
• Development of Green Energy Corridors in 12th plan (ISTS): Rs 12,992 Cr
• High Capacity Inter State Transmission corridors for grid integration of Renewables (Estimated Cost : Rs 9100Cr)
• Line – 2600 ckt km, Transformation Capacity : 18,000 MA, New S/s- 6 nos.
Green Energy Corridors
• Development of Green Energy Corridors in 12th plan
• Control infrastructure Dynamic reactive Compensation at strategic locations (SVCs/STATCOMs) Estimated Cost : Rs 1204Cr
PMUs/WAMS on pooling stations and interconnection with centralized control centre for real time information, monitoring and control
Estimated Cost : Rs 473Cr
Establishment of Renewable Energy Management Centers (REMC) Estimated Cost : Rs 234Cr
Deployment of Energy Storage Systems Estimated Cost : Rs 2,000Cr
One Nation One Grid
Transmission requirement for Desert Power
• Short term requirement : end of 13th Plan (2021-22) - Envisaged capacity : 11GW - HVDC Bipole : 4 nos. (2 nos. VSC based) - Estimated investment : Rs 20,000Cr
• Medium term transmission requirement for 14th & 15th Plan (2022-32) : - Envisaged capacity : 119GW - HVDC Bipole : 10 nos. (8 nos. VSC based) - Estimated investment : Rs 1,85,000Cr
• Long term transmission requirement (2032-50) : - Envisaged capacity : 170GW - HVDC Bipole : 26 nos. (18 nos. VSC) - Estimated investment : Rs 2,45,000Cr
Total transmission investment requirement in Deserts : Rs 4,50,000 Cr
About 315 GW renewable generation capacity envisaged in deserts (Rann of Kutch /Gujarat,
Thar/Rajasthan,Ladakh/J&K and Lahul & Spiti/Himachal) by 2050
Transmission requirement for Solar UMPPs
• Transmission scheme associated with Sambhar Solar Ultra Mega project (4000MW)
(Estimated Cost : Rs 8,000Cr)
•Transmission scheme associated
with Ladakh (Leh/Kargil) Solar Ultra
Mega project (10,000MW)
(Estimated Cost : Rs 29,000Cr)
Future Business Potential in RE
• MNRE has envisaged 234GW Renewable Capacity mainly through wind & solar by 2030
• MNRE has also formulated accelerated solar scale up targets of 100GW by 2022
• Huge transmission & control infrastructure requirement for grid integration of large scale renewables
• Development of Green Energy Corridors in 12th plan (ISTS): Rs 12,992 Cr
• High Capacity Inter State Transmission corridors for grid integration of Renewables (Estimated Cost : Rs 9100Cr) • Line – 2600 ckt km, Transformation Capacity : 18,000 MA, New S/s- 6 nos.
Future Business Potential in RE
• Development of Green Energy Corridors in 12th plan
• Control infrastructure Dynamic reactive Compensation at strategic locations (SVCs/STATCOMs) Estimated Cost : Rs 1204Cr
PMUs/WAMS on pooling stations and interconnection with centralized control centre for real time information, monitoring and control
Estimated Cost : Rs 473Cr
Establishment of Renewable Energy Management Centers (REMC) Estimated Cost : Rs 234Cr
Deployment of Energy Storage Systems Estimated Cost : Rs 2,000Cr
Future Business Potential in RE
• Transmission scheme associated with Sambhar Solar Ultra Mega project (4000MW)
(Estimated Cost : Rs 8,000Cr)
• Transmission scheme associated with Ladakh (Leh/Kargil) Solar Ultra Mega project (10,000MW)
(Estimated Cost : Rs 29,000Cr)
19