installation manual - solarmarkt · t c u d o r p 6 s n o i t a c fi i c e p s ... option 2.1 -...
TRANSCRIPT
2
Safety warnings
3
Manual for Maxem Plus and Pro Energy Manager.
Publication Date: May 15, 2017
Safety Information
Liability
• Onlytobeinstalledbyacertifiedelectrician.
• Completely follow the instructions given in this manual.
• Use this device only for the purpose it is designed for, as described in this
manual.
• Maxem works only after online activation.
• Failure to follow the above warnings can lead to an incorrect Maxem installation.
This can lead to over current of the grid connection, damage to installations and
chargingstations,electricshocksorfire.
All information in this document is the copyright and intellectual property of Cohere Energy
SolutionsB.V.Materialinthisdocumentmaynotbemodified,reproducedorcopied,inpart
or in whole, without the explicit written consent of Cohere Energy Solutions B.V. Additional
information is available upon request.
Maxem is a registered trademark of Cohere Energy Solutions B.V.
S M A R T C H A R G I N G C O N T R O L L E RC H A R G E S M A R T E R
Product symbols statements
©2017 COHERE ENERGY SOLUTIONS B.V.
Tip Warning
Symbols in this document
Questions or improvements
If you see any errors or defects, if you have ideas about how to improve this manual or the Maxem system, please send an email with your feedback to [email protected].
Cohere is not responsible for the installation of Maxem and for any damage arising from not
following the installation manual correctly. Nor for damage resulting from typographical
errors or misinterpretations of text or images.
Install and use this product only after careful reading of the manual.
This product is double insulated.
Indoor use only.
Product contains electronics. Do not throw it in the household waste.
This product is designed for overvoltage category III.
This product meets all the requirements set by the EU for
product safety.
Index
What is Maxem? 5
Productspecifications 6
Installation requirements 8
Fuse settings of charging stations 10
Installation Steps
01 - Mounting on the wall 11
02 - Installing kWh-meter for main grid connection 12
Option 2.1 - Installing kWh-meter Maxem Plus (<80A) 12
Option 2.2 - Installing kWh-meter Maxem Pro (>80A) 14
03 - Installing kWh-meter for solar panels 17
04 - Connecting charging stations
Option 4.1 - Connecting KEBA charging stations 18
Option 4.2 - Connecting ICU charging stations 20
Option 4.3 - Connecting EV-Box charging stations 21
05 - Connecting Maxem 23
06-Configurationandcommissioning 24
Appendix 1 - Troubleshooting 27
Appendix2-Configuring65AkWh-meter 29
Appendix 3 - Crimping RJ connectors 30
EU Declaration of Conformity 31
What is Maxem?
From the main grid panel, Maxem measures the energy use in the house and the energy
generation of solar panels. Based on this information, it manages the power between the
building and multiple charging stations. This way there is no risk of over current on the grid
connection and it is easier to utilize the produced solar power. Also more charging stations
can be installed than normal.
4 5
Safely install more charging stations athigher power without the risk of overloading the grid connection. Maxem controls the charge capacity of each charging station per second.
More charging stations
Install up to 250 charging stations to let the charge park grow over time with the increase electric vehicles. Maxem is easily expanded.
Flexible expansion
Maxem optimizes energy flows in the building.
Maxem
Grid
Maxem measures the power generation of solar panels. Maxem is able to control the charging stations based on this generation. This way you make 100% use of your own renewable energy!
Solar panels
Maxem optimizes the power consumption of the main grid connection to prevent over current. This way you can save significantly on an expensive grid upgrade.
01 - Voorbereidingen vooraf
Content of the box
A
A
167
184
55.50
SECTION A-A
Client:
Rev. nr:
1:1Units:
1/2
CES-01 - Enclosure
MHVol. (mm³):
mm
Sheet:
Scale:
-
CohereDate:
Drawn:
File reference:Drawing name:
-Material:17-02-2016
Maxem 4 Assembly
A3
Stereo Design | Zamenhofstraat 150 - unit 336 | 1022AG | Amsterdam | Netherlands | T: +31 (0) 20 636 0671 | M: [email protected]
<0,2x45° or R<0,2
Ra 0,8 um
Default length tolerances: DIN 7168
±20'Default angle tol.:
Finish:
Default edges:
Roughness:
Tol.: ±0,1 ±0,2 ±0,3 ±0,5 ±0,8Dim.: 0-6 7-30 31-120 121-400 401-1000
Optional Solar kWh-meter
1x Maxem including mounting plate
1x RS485 cable (1m)
1x Power cable (1m)
4x Screws 3x20
2x RJ10 4P4C connector
Productspecifications
Specifications
SETOK
1 2 3
1xSolarkWh-meter(<65)
P1 port
A
A
167
184
55.50
SECTION A-A
Client:
Rev. nr:
1:1Units:
1/2
CES-01 - Enclosure
MHVol. (mm³):
mm
Sheet:
Scale:
-
CohereDate:
Drawn:
File reference:Drawing name:
-Material:17-02-2016
Maxem 4 Assembly
A3
Stereo Design | Zamenhofstraat 150 - unit 336 | 1022AG | Amsterdam | Netherlands | T: +31 (0) 20 636 0671 | M: [email protected]
<0,2x45° or R<0,2
Ra 0,8 um
Default length tolerances: DIN 7168
±20'Default angle tol.:
Finish:
Default edges:
Roughness:
Tol.: ±0,1 ±0,2 ±0,3 ±0,5 ±0,8Dim.: 0-6 7-30 31-120 121-400 401-1000
Input/output ports and LED indicators
Current transformers solar panels
Free power measurement port
Current transformers grid connection
RS485 port 1
RS485 port 2
RS2RS1P1 CT3CT2CT1
6 7
SETOK
1 2 3
1x Direct kWh-meter 3-phase 80A
Optional Ethernet switch
1x Ethernet switch with power supply
1x Network cable
1x RS485 splitter
1x Network cable (1m)
1x RS485 cable(1m)
kWh-meter for Maxem Plus
1x Indirect kWh-meter 3-phase
kWh-meter for Maxem Pro
3x Split-core current transformer250A, 500A of 1000A
SETOK
1 2 3
O.OFF O.OFF O.OFF O.OFF
SETOK
1 2 3
1x 10A Circuit breaker
Dimensions 184mm(L)x167mm(W)x55mm(H)
Weight 700g
Working temperature 10°C to 35°C
Storage temperature 0°Cto60°C
Maximal humidity 80%
Protection class II (double insulated)
Seal IP20
Operational level 0 to 2,000 m
EMC EN61326-1(2013),EN61000-3-2,61000-3-3
Safety EN61010-1(2010),EN61010-2-30(2010)
Immunity EN61326-1(2013)
Overvoltage category 300V/CAT III
Input power 110-240V.50/60Hz.Maximum2,75W
Ethernet port to charging stations
Ethernet port to Internet Router
Power supply
Necessary tools
• A correct circuit breaker or earth leakage circuit breaker with proper safety fuse value.
See p. 10 to determine the fuse settings.
• Schuko sockets for 230V power supply Maxem (if not already available).
• UTP(CAT5orCAT6)datacableforconnectingchargingstationstoMaxem.
• RJ45 (8P8C) connectors for UTP cable.
• Cable end sleeves for UTP cores (only for Tesla Wall Connector or EV-Box).
Necessary materials• Free space for Maxem with connected wiring at the bottom.
• Free Schuko 230V socket to power Maxem or free space to place a new one.
• Free Ethernet port for Internet connected modem or router.
• An UTP cable must be pulled (or already be available) from Maxem to the charging
station.
• Maxem Plus:
• Free space in grid panel for kWh-meter: 7 modules / 123 mm on DIN-rail.
• Maxem Pro:
• Free space in grid panel for kWh-
meter:4modules/76mmon
DIN-rail.
• Free space in grid panel for 10A
circuitbreaker:4modules/76
mm on DIN-rail.
• For Ethernet connected charging
stations:
• Free space for ethernet switch.
• Free space for wall socket for
power supply of ethernet
switch.
Environmental Requirements
01 - Voorbereidingen voorafInstallation requirements
Wired Internet connection
With Maxem Plus/Pro compatible charging stations
ICU EVe mini*KEBA P20/P30 C-series ICU EVe*
*ICU charging stations have to be ordered ‘Maxem Ready’.
**Compatibility of Maxem with multiple EV-Boxes is still in development. Check the Maxem website for the
latest overview of compatible charging stations.
98
A
A
167
184
55.50
SECTION A-A
Client:
Rev. nr:
1:1Units:
1/2
CES-01 - Enclosure
MHVol. (mm³):
mm
Sheet:
Scale:
-
CohereDate:
Drawn:
File reference:Drawing name:
-Material:17-02-2016
Maxem 4 Assembly
A3
Stereo Design | Zamenhofstraat 150 - unit 336 | 1022AG | Amsterdam | Netherlands | T: +31 (0) 20 636 0671 | M: [email protected]
<0,2x45° or R<0,2
Ra 0,8 um
Default length tolerances: DIN 7168
±20'Default angle tol.:
Finish:
Default edges:
Roughness:
Tol.: ±0,1 ±0,2 ±0,3 ±0,5 ±0,8Dim.: 0-6 7-30 31-120 121-400 401-1000
184mm
55,50mm
20mm
70mm
20mm20mm
Maxem
167mm
EV-Box Home** EV-Box Business**(G3 controller)(G3 controller)
Maxem must be connected to a wired Internet connection. The following is needed:
• Modem or router connected to Internet.
• A DHCP connection from the network to Maxem.
• Maxem should be able to do DNS requests.
• Maxem may also be placed in a DMZ (demilitarized zone) on a separate VLAN.
• Outbounddatatrafficmustbepossibleoverports80,443,1194t/m1200and9090.
• Phillips screwdriver, size small.
• Slotted screwdriver, size mini < 3mm.
• Slotted screwdriver size large.
• RJ45 (8P8C) crimper.
• RJ10 (4P4C) crimper.
• Cable Tester for UTP cables.
• Internet connected smartphone, tablet or laptop.
If you wish to make the charging system future proof, then take the following attention
points into account:
• AccordingtotheMode3protocoloftheIEC62196electricvehiclesneedatleast6Ato charge
• NotethatvehicleswithaRenaultChameleoncharger(RenaultZoe)needatleast13Aon3-phaseor6Aon1-phasetocharge.
• Thenumberofelectricvehiclesthatareabletochargeat32A(1-phaseor3-phasewill increase substantially in the coming years.
01 - Voorbereidingen voorafFuse setting of charging stations
Mount Maxem on a clean, moisture-free wall. Use the supplied mounting plate and
screwsforthis.TakeintoaccountsufficientspacearoundMaxem.
01 - Mounting on the wall
Wiring at the bottom
70mm
20mm
20mm20mm
A.
Maxemisacontrolsystemthatregulatestheloadofthechargingstation.Maxemoffersan
intelligent layer of protection on top of the circuit breakers. This is done in the following way:
• When an over current is measured on the main grid connection, the power of the
charging stations is immediately adjusted downwards.
• When the over current is too high, Maxem is able to pause one or more charging
stations until more capacity is available again.
Therefore it is possible to fuse the charging stations at a higher rate than normal. All charging
stations can be fused at their maximum power capacity, but a fuse of a single charging
station may never be higher than the capacity of the main grid connection.
Maxem protects against over current
Points of attention to install future proof
1110
02 - Installing kWh-meter grid connection
Open the grid panel with the
appropriate tools.
Place the kWh-meter on a DIN rail in
the installation cabinet such that it
measures the entire grid connection
(immediately after the main circuit
breaker). Connect the power cables
according to the wiring diagram below.
Switchoff themaincircuitbreaker in
the grid panel.
A.
B.
C.
Currentflowmaingrid connection
O.OFF O.OFF O.OFF O.OFF
SETOK
1 2 3
Wiring diagram direct kWh-meter in a TN grid with neutral
Numbered
connection points
on kWh-meter
Connection RS485 cable on kWh-meter
Connect the RS485 cable on the kWh-
meter as follows:
• PortC:Greenwire
• PortB:Whitewire
• PortA:Brownwire
D.
Connect the RS485 cable to port RS1 on Maxem.
A
A
167
184
55.50
SECTION A-A
Client:
Rev. nr:
1:1Units:
1/2
CES-01 - Enclosure
MHVol. (mm³):
mm
Sheet:
Scale:
-
CohereDate:
Drawn:
File reference:Drawing name:
-Material:17-02-2016
Maxem 4 Assembly
A3
Stereo Design | Zamenhofstraat 150 - unit 336 | 1022AG | Amsterdam | Netherlands | T: +31 (0) 20 636 0671 | M: [email protected]
<0,2x45° or R<0,2
Ra 0,8 um
Default length tolerances: DIN 7168
±20'Default angle tol.:
Finish:
Default edges:
Roughness:
Tol.: ±0,1 ±0,2 ±0,3 ±0,5 ±0,8Dim.: 0-6 7-30 31-120 121-400 401-1000
RS1
E.
RS1 port for kWh-meter
Set the address of the kWh meter to ‘100’. This allows Maxem to configure itself
automatically.
F.
Do not forget to set the correct address to the kWh meter. Maxem will not work properly without correct configuration of the kWh meter.
Go to menu.
Navigation through the ABB A43 / A44 kWh-meter menu
If you see this icon in the kWh meter display, there is an active data connection with Maxem.
Scroll through the menu or set value higher or lower.
Press to adjust a setting.
Press to enter a menu item or to accept an adjustment.
RS485RS485 Address
Location of the addressing function in the menu structure on the kWh-meter.
100
1312
Option 2.1 - Installing kWh-meter Plus (<80A)
SETOK
1 2 3
Ensure that the current transformers are connected in the right direction and to the correct phases on the kWh-meter. Incorrect installation can lead to over current on the grid connection.
Configureprimaryamperage*
Configuresecondaryamperage*
Primary amperagePri
Sec Secondaryamperage
Set the address of the kWh-meter to ‘100’. This allows Maxem to configure itself
automatically.
F.
Do not forget to set the correct address to the kWh meter. Maxem will not work properly without correct configuration of the kWh meter.
Location of the addressing function in the menu structure on the kWh-meter.
100
Configure theprimaryandsecondary
amperage of the current transformers
in the kWh-meter. These values can be
found on the current transformers.
F.
Location of primary and secondary values in menu structure.
Primary
value
Secondary
value
14 15
Wiring diagram of indirect kWh-meter in a TN grid with neutral.
Current transformer
Numbered
connection points
on kWh-meter
Place the kWh meter on a DIN rail in the grid panel
Protect the indirect kWh-meter with
the included 10A circuit breaker.
Connect the split-core current
transformers such that they measure
the entire grid connection (immediately
after the main circuit breaker).
Make sure that there is no dirt or grease on the inside of the closure of the split-core current transformer. This may result in inaccuracy in the measurement and thereby over current on the main grid connection.
Click the split-core current
transformers around the power
cables. Use the included tie-wrap to
secure the current transformer tightly
to the power cable.
Grid panel
Grid connection
A.
B.
C.
D.
Connect the split-core current transformers and the power supply of the 10A circuit
breaker to the kWh meter according to the diagram below.
E.
P2
P1
Note that the current direction follows the arrow on the split-core current transformer.
Option 2.2 - Installing kWh-meter Pro (>80A)
SETOK
1 2 3
500/5A
03 - Installing kWh-meter for solar panels
Connect the RS485 cable on the kWh-meter as follows:
• PortC:Greenwire
• PortB:Whitewire
• PortA:Brownwire
Place the kWh-meter on a DIN-rail in the grid panel.
Connect it such that it masures the output of the solar inverter.
A.
B.
C.
Connect the included RS485 splitter to the RS1 port on
Maxem.
A
A
167
184
55.50
SECTION A-A
Client:
Rev. nr:
1:1Units:
1/2
CES-01 - Enclosure
MHVol. (mm³):
mm
Sheet:
Scale:
-
CohereDate:
Drawn:
File reference:Drawing name:
-Material:17-02-2016
Maxem 4 Assembly
A3
Stereo Design | Zamenhofstraat 150 - unit 336 | 1022AG | Amsterdam | Netherlands | T: +31 (0) 20 636 0671 | M: [email protected]
<0,2x45° or R<0,2
Ra 0,8 um
Default length tolerances: DIN 7168
±20'Default angle tol.:
Finish:
Default edges:
Roughness:
Tol.: ±0,1 ±0,2 ±0,3 ±0,5 ±0,8Dim.: 0-6 7-30 31-120 121-400 401-1000
RS1Set the address of the kWh-meter to 001. This allows
Maxem to configure itself. See appendix 2 on how to
configuretheaddress.
SETOK
1 2 3
Grid panel
Solar panels
Curr
ent d
irec
tion
Connection RS485 cable on kWh-meter
D.
F.
RS1 port for RS485 splitter
Connect the kWh-meters for both the main grid connection
and solar panels to the RS485 splitter.
E.
Connect the RS485 cable on the kWh-meter as follows:
• PortC:Greenwire
• PortB:Whitewire
• PortA:Brownwire
F.
SETOK
1 2 3
Connection RS485 cable on kWh-meter
Press for 2 seconds to access the main or go ‘up’ in the menu.
Scroll through the menu or set value higher or lower.
Press to enter a menu item or to accept an adjustment.
Press to adjust a setting.
Navigation through the ABB B23 / B24 kWh-meter menu
If you see this icon in the kWh meter display, there is an active data connection with Maxem.
Connect the RS485 cable to port RS1 on Maxem.E.
A
A
167
184
55.50
SECTION A-A
Client:
Rev. nr:
1:1Units:
1/2
CES-01 - Enclosure
MHVol. (mm³):
mm
Sheet:
Scale:
-
CohereDate:
Drawn:
File reference:Drawing name:
-Material:17-02-2016
Maxem 4 Assembly
A3
Stereo Design | Zamenhofstraat 150 - unit 336 | 1022AG | Amsterdam | Netherlands | T: +31 (0) 20 636 0671 | M: [email protected]
<0,2x45° or R<0,2
Ra 0,8 um
Default length tolerances: DIN 7168
±20'Default angle tol.:
Finish:
Default edges:
Roughness:
Tol.: ±0,1 ±0,2 ±0,3 ±0,5 ±0,8Dim.: 0-6 7-30 31-120 121-400 401-1000
RS1
RS1 port for kWh-meter
16 17
Option 4.1 - Connecting KEBA charging stations
Install a circuit breaker or earth leakage circuit breaker at the maximal
power available. See page 10.
Follow the installation instructions of the charging stations. These can
be found in the installation manual of the charging station.
RouteasuitableUTP (CAT5orCAT6)cable fromall chargingstations toMaxemand
attach RJ45 connectors on both sides of the cable.
Connect the UTP cables to the Ethernet Switch and connect one of ports on the
Ethernet Switch ETH port on Maxem.
A.
B.
D.
E.
04 - Connecting charging stations
Connect the power supply of the charging stations so that the load of L1, L2 and L3 is
evenly distributed. The table below shows the standard distribution.
C.
KEBA 1
A
A
167
184
55.50
SECTION A-A
Client:
Rev. nr:
1:1Units:
1/2
CES-01 - Enclosure
MHVol. (mm³):
mm
Sheet:
Scale:
-
CohereDate:
Drawn:
File reference:Drawing name:
-Material:17-02-2016
Maxem 4 Assembly
A3
Stereo Design | Zamenhofstraat 150 - unit 336 | 1022AG | Amsterdam | Netherlands | T: +31 (0) 20 636 0671 | M: [email protected]
<0,2x45° or R<0,2
Ra 0,8 um
Default length tolerances: DIN 7168
±20'Default angle tol.:
Finish:
Default edges:
Roughness:
Tol.: ±0,1 ±0,2 ±0,3 ±0,5 ±0,8Dim.: 0-6 7-30 31-120 121-400 401-1000
Maxem
Ethernet switch
KEBA 2 KEBA n
Maxem and KEBA P20 / P30s with a switch connected.
It is advisable to test the network cable with the help of a cable tester.
Set DSW 1.3 to ON. Smart charging will
be activated.
Set DIP switches on DSW1 to the maximum available power.
DSW1.6Off
DSW1.7Off
DSW1.8Off
10A
13A
16A
20A
25A
32A
See the KEBA P20 / P30 installation manual for more information.
SwitchthepowersupplyoftheKEBAP20/P30off(theDIPswitchsettingswillonlybe
activated after a charging station reset).
F.
G.
H.
DSW1 - Power (block above)DSW2 - Addressing (block below)
A
A
167
184
55.50
SECTION A-A
Client:
Rev. nr:
1:1Units:
1/2
CES-01 - Enclosure
MHVol. (mm³):
mm
Sheet:
Scale:
-
CohereDate:
Drawn:
File reference:Drawing name:
-Material:17-02-2016
Maxem 4 Assembly
A3
Stereo Design | Zamenhofstraat 150 - unit 336 | 1022AG | Amsterdam | Netherlands | T: +31 (0) 20 636 0671 | M: [email protected]
<0,2x45° or R<0,2
Ra 0,8 um
Default length tolerances: DIN 7168
±20'Default angle tol.:
Finish:
Default edges:
Roughness:
Tol.: ±0,1 ±0,2 ±0,3 ±0,5 ±0,8Dim.: 0-6 7-30 31-120 121-400 401-1000
Data activity on ETH poort Maxem
Data activity on ETH poort KEBA P20 of P30
UTP-cable with RJ45 connectors
DIP switch settings for setting the maximum power.
18 19
Charging
station
Phase
distribution# 1 L1 – L2 – L3# 2 L3 – L1 – L2# 3 L2 – L3 – L1# 4 L1 – L2 – L3# 5 L3 – L1 – L2#6 L2 – L3 – L1# 7 L1 – L2 – L3# n
Standard phase distribution Maxem
Option 4.2 - Connecting ICU charging stations
Install a circuit breaker or earth leakage circuit breaker at the maximal
power available. See page 10.
Follow the installation instructions of the charging stations. These can
be found in the installation manual of the charging station.
RouteasuitableUTP(CAT5orCAT6)cablefromallchargingstationstoMaxemand
attach RJ45 connectors on both sides of the cable.
Connect the UTP cables to the Ethernet Switch and connect one of ports on the
Ethernet Switch ETH port on Maxem.
The charging station firmware may need to be updated. This can be done via ICU Connect. ICU can assist you with this.
A
A
167
184
55.50
SECTION A-A
Client:
Rev. nr:
1:1Units:
1/2
CES-01 - Enclosure
MHVol. (mm³):
mm
Sheet:
Scale:
-
CohereDate:
Drawn:
File reference:Drawing name:
-Material:17-02-2016
Maxem 4 Assembly
A3
Stereo Design | Zamenhofstraat 150 - unit 336 | 1022AG | Amsterdam | Netherlands | T: +31 (0) 20 636 0671 | M: [email protected]
<0,2x45° or R<0,2
Ra 0,8 um
Default length tolerances: DIN 7168
±20'Default angle tol.:
Finish:
Default edges:
Roughness:
Tol.: ±0,1 ±0,2 ±0,3 ±0,5 ±0,8Dim.: 0-6 7-30 31-120 121-400 401-1000
Data activity on ETH port Maxem
ETH port ICU UTP-cable with RJ45 connectors
A.
B.
D.
E.
Connect the power supply of the charging stations so that the load of L1, L2 and L3 is
evenly distributed. The table below shows the standard distribution.
C.
It is advisable to test the network cable with the help of a cable tester.
ICU 1
A
A
167
184
55.50
SECTION A-A
Client:
Rev. nr:
1:1Units:
1/2
CES-01 - Enclosure
MHVol. (mm³):
mm
Sheet:
Scale:
-
CohereDate:
Drawn:
File reference:Drawing name:
-Material:17-02-2016
Maxem 4 Assembly
A3
Stereo Design | Zamenhofstraat 150 - unit 336 | 1022AG | Amsterdam | Netherlands | T: +31 (0) 20 636 0671 | M: [email protected]
<0,2x45° or R<0,2
Ra 0,8 um
Default length tolerances: DIN 7168
±20'Default angle tol.:
Finish:
Default edges:
Roughness:
Tol.: ±0,1 ±0,2 ±0,3 ±0,5 ±0,8Dim.: 0-6 7-30 31-120 121-400 401-1000
Maxem
Ethernet switch
ICU 2 ICU n
Maxem and ICU charging stations connected with a switch.
Option 4.3 - Connecting EV-Box charging stations
Install a circuit breaker or earth leakage circuit breaker at the maximal power available.
See page 10.
Follow the installation instructions of the charging stations. Connect
the EV-Box Satellites to theHub in a hub-satellite configuration. The
instructions for this can be found in the installation manual of the
charging station.
RouteasuitableUTP(CAT5orCAT6)cablefromtheEV-BoxhubtoMaxem.(Toprevent
electromagnetic interference with distances greater than 25m, it is recommended to
useFTPCAT6cable.Maximumdistanceis50m).
A.
B.
D.
Connect the power supply of the charging stations so that the load of L1, L2 and L3 is
evenly distributed. The table below shows the standard distribution.
C.
Hub Satellite 1 Satellite n
Maxem and EV-Boxes in a Hub - Satellite configuration
A
A
167
184
55.50
SECTION A-A
Client:
Rev. nr:
1:1Units:
1/2
CES-01 - Enclosure
MHVol. (mm³):
mm
Sheet:
Scale:
-
CohereDate:
Drawn:
File reference:Drawing name:
-Material:17-02-2016
Maxem 4 Assembly
A3
Stereo Design | Zamenhofstraat 150 - unit 336 | 1022AG | Amsterdam | Netherlands | T: +31 (0) 20 636 0671 | M: [email protected]
<0,2x45° or R<0,2
Ra 0,8 um
Default length tolerances: DIN 7168
±20'Default angle tol.:
Finish:
Default edges:
Roughness:
Tol.: ±0,1 ±0,2 ±0,3 ±0,5 ±0,8Dim.: 0-6 7-30 31-120 121-400 401-1000
Maxem
20 21
Charging
station
Phase
distribution# 1 L1 – L2 – L3# 2 L3 – L1 – L2# 3 L2 – L3 – L1# 4 L1 – L2 – L3# 5 L3 – L1 – L2#6 L2 – L3 – L1# 7 L1 – L2 – L3# n
Standard phase distribution Maxem
Charging
station
Phase
distribution# 1 L1 – L2 – L3# 2 L3 – L1 – L2# 3 L2 – L3 – L1# 4 L1 – L2 – L3# 5 L3 – L1 – L2#6 L2 – L3 – L1# 7 L1 – L2 – L3# n
Standard phase distribution Maxem
Connect the RJ10 4P4C connector to the RS2 port on Maxem.
Connect the 2 wires of the data cable to the green 4-pole Phoenix connector and
connect this connector to the designated port on the EV-Box modem:
• Connect wire 1 (orange-white) to Port A.
• Connect wire 2 (orange) to Port B.
• The remaining ports do not need to be connected.
A
A
167
184
55.50
SECTION A-A
Client:
Rev. nr:
1:1Units:
1/2
CES-01 - Enclosure
MHVol. (mm³):
mm
Sheet:
Scale:
-
CohereDate:
Drawn:
File reference:Drawing name:
-Material:17-02-2016
Maxem 4 Assembly
A3
Stereo Design | Zamenhofstraat 150 - unit 336 | 1022AG | Amsterdam | Netherlands | T: +31 (0) 20 636 0671 | M: [email protected]
<0,2x45° or R<0,2
Ra 0,8 um
Default length tolerances: DIN 7168
±20'Default angle tol.:
Finish:
Default edges:
Roughness:
Tol.: ±0,1 ±0,2 ±0,3 ±0,5 ±0,8Dim.: 0-6 7-30 31-120 121-400 401-1000
RS2 port for EV-Box Hub
Diagram of the controller of the EV-Box Hub connected to Maxem.
Pin 1Pin 2
12V/DC
ABGND
Lip on top
F.
G.
RS2
Wires for strain relief
Crimp the included RJ10 4P4C connector to the data cable on the Maxem side:
• Connect wire 1 (orange-white) to Pin 1.
• Connect wire 2 (orange) to Pin 2.
• Connect two other wires as a strain relief.
E.
Connect Maxem to the Internet-connected modem or router with the included network
cable.
A
A
167
184
55.50
SECTION A-A
Client:
Rev. nr:
1:1Units:
1/2
CES-01 - Enclosure
MHVol. (mm³):
mm
Sheet:
Scale:
-
CohereDate:
Drawn:
File reference:Drawing name:
-Material:17-02-2016
Maxem 4 Assembly
A3
Stereo Design | Zamenhofstraat 150 - unit 336 | 1022AG | Amsterdam | Netherlands | T: +31 (0) 20 636 0671 | M: [email protected]
<0,2x45° or R<0,2
Ra 0,8 um
Default length tolerances: DIN 7168
±20'Default angle tol.:
Finish:
Default edges:
Roughness:
Tol.: ±0,1 ±0,2 ±0,3 ±0,5 ±0,8Dim.: 0-6 7-30 31-120 121-400 401-1000
Ethernet port to Internet Router
A
A
167
184
55.50
SECTION A-A
Client:
Rev. nr:
1:1Units:
1/2
CES-01 - Enclosure
MHVol. (mm³):
mm
Sheet:
Scale:
-
CohereDate:
Drawn:
File reference:Drawing name:
-Material:17-02-2016
Maxem 4 Assembly
A3
Stereo Design | Zamenhofstraat 150 - unit 336 | 1022AG | Amsterdam | Netherlands | T: +31 (0) 20 636 0671 | M: [email protected]
<0,2x45° or R<0,2
Ra 0,8 um
Default length tolerances: DIN 7168
±20'Default angle tol.:
Finish:
Default edges:
Roughness:
Tol.: ±0,1 ±0,2 ±0,3 ±0,5 ±0,8Dim.: 0-6 7-30 31-120 121-400 401-1000
Connect Maxem to a wall socket in the meter cabinet with the supplied 230V power
cable.
Check if all parts are connected to Maxem.A.
B.
C.
A
A
167
184
55.50
SECTION A-A
Client:
Rev. nr:
1:1Units:
1/2
CES-01 - Enclosure
MHVol. (mm³):
mm
Sheet:
Scale:
-
CohereDate:
Drawn:
File reference:Drawing name:
-Material:17-02-2016
Maxem 4 Assembly
A3
Stereo Design | Zamenhofstraat 150 - unit 336 | 1022AG | Amsterdam | Netherlands | T: +31 (0) 20 636 0671 | M: [email protected]
<0,2x45° or R<0,2
Ra 0,8 um
Default length tolerances: DIN 7168
±20'Default angle tol.:
Finish:
Default edges:
Roughness:
Tol.: ±0,1 ±0,2 ±0,3 ±0,5 ±0,8Dim.: 0-6 7-30 31-120 121-400 401-1000
05 - Connecting Maxem
22 23
Power supply
06-Configurationandcommissioning
In case of unsuccessful installations Maxem is unable to send a power limiting value to the charging stations, resulting in OVERLOAD OF THE GRID CONNECTION. Therefore, make sure that the installation has been successful!
Turn on the charging stations or reboot them by cutting the power supply for at least
30 seconds. Wait at least 1 minute for the charging stations to boot.
Connect the 230V power to Maxem.
A.
B.
Maxemhastobeconfiguredviatheonlineconfigurationtool.Gotothewebsite
andfollowtheconfigurationsteps:
install.maxem.io
C.
LED indications on Maxem
RS2RS1P1 CT3CT2CT1
Central LED indicator
LED indicators
input/output ports
LED indication MeaningStatus
communication
LEDisoff NothingisconfiguredonMaxem -
LED is green Communication is OK.
LED is redCommunication is expected, but is not detected.
LEDflashesgreen/red
Communication detected, but is differentthanexpected.
LED indication Meaning
Burns continuously Maxem works correctly.
Flashes 4x Maxem has no Internet connection.
Flashes 2x Maxem returns to factory settings.
Flashes continuously Maxem is booting.
If you have problems with commissioning, please contact: +31 20 7708 713
Fillouttheconfigurationoftheinstallationinthetablebelow.D.
# Serial number charging station
Number of sockets*
Power per socket
Fuse Phase distribution**
Phases Amps L1 Charger
L2 Charger
L3 Charger
1 1 / 2 A 1f / 3f A
2 1 / 2 A 1f / 3f A
3 1 / 2 A 1f / 3f A
4 1 / 2 A 1f / 3f A
5 1 / 2 A 1f / 3f A
6 1 / 2 A 1f / 3f A
7 1 / 2 A 1f / 3f A
8 1 / 2 A 1f / 3f A
9 1 / 2 A 1f / 3f A
10 1 / 2 A 1f / 3f A
11 1 / 2 A 1f / 3f A
12 1 / 2 A 1f / 3f A
13 1 / 2 A 1f / 3f A
14 1 / 2 A 1f / 3f A
15 1 / 2 A 1f / 3f A
16 1 / 2 A 1f / 3f A
17 1 / 2 A 1f / 3f A
18 1 / 2 A 1f / 3f A
19 1 / 2 A 1f / 3f A
Configurationinstallation
Main grid connection Fuse: A
Sub grid panel Present*: yes / no Fuse: A
Solar panels Present*: yes / no Fuse: A
Charging station brand □ EV-Box □ ICU □ KEBA
Number of charge sockets
*Strikethrough what does not apply**Specify how the each phase is connected to each charging station. Enter the appropriate phase of the main grid connection in each of the boxes.
Completetheconfigurationofallconnectedchargingstationsinthetablebelow.E.
24 25
Providetheuserwiththemanualandthecompletedconfigurationtables.F.
# Serial number charging station
Number of sockets*
Power per socket
Fuse Phase distribution**
Phases Amps L1 Charger
L2 Charger
L3 Charger
20 1 / 2 A 1f / 3f A
21 1 / 2 A 1f / 3f A
22 1 / 2 A 1f / 3f A
23 1 / 2 A 1f / 3f A
24 1 / 2 A 1f / 3f A
25 1 / 2 A 1f / 3f A
26 1 / 2 A 1f / 3f A
27 1 / 2 A 1f / 3f A
28 1 / 2 A 1f / 3f A
29 1 / 2 A 1f / 3f A
30 1 / 2 A 1f / 3f A
31 1 / 2 A 1f / 3f A
32 1 / 2 A 1f / 3f A
33 1 / 2 A 1f / 3f A
34 1 / 2 A 1f / 3f A
35 1 / 2 A 1f / 3f A
36 1 / 2 A 1f / 3f A
37 1 / 2 A 1f / 3f A
38 1 / 2 A 1f / 3f A
39 1 / 2 A 1f / 3f A
40 1 / 2 A 1f / 3f A
41 1 / 2 A 1f / 3f A
42 1 / 2 A 1f / 3f A
43 1 / 2 A 1f / 3f A
44 1 / 2 A 1f / 3f A
45 1 / 2 A 1f / 3f A
46 1 / 2 A 1f / 3f A
47 1 / 2 A 1f / 3f A
48 1 / 2 A 1f / 3f A
49 1 / 2 A 1f / 3f A
50 1 / 2 A 1f / 3f A
Appendix 1 - Troubleshooting
• Verify that Maxem’s network connection is active. If there is an active data
connection,anorangeLEDflashesontheMaxemLANport.
• Verify that there is an Internet connection on the connected router.
• Verify that the UTP cable is properly connected using a cable tester.
• Make sure Maxem is able to make a DHCP connection to the network.
• Make sure Maxem is able make DNS requests over the network.
• RestartMaxembyturningitoffandon.AnyproblemswithIPaddressingcanbe
solved this way.
• RS485 connected charging stations: Check whether the RJ10 (4P4C) connector is
securely plugged in. See Appendix 3 how to crimp RJ connectors.
• Ethernet-connected charging stations: Verify that there is an active data connection
with the charging station (visible by a green and orange LED). If not, check whether
the RJ45 connectors are properly crimped.
• Restartthechargingstationbyturingitoffandonagain.
• MakesurethechargingstationrunsfirmwarewhichiscompatiblewithMaxem.
• Maxemsoftwareisnotconfigured.Gotothewebsiteinstall.maxem.iotorunthe
configurationtool.
• Check what the maximum charging power of the car is. For example, the Tesla Model
S requires a dual charger to charge on 3x24A. A Model S with a single charger charges
upto3x16A.
• For KEBA charging stations: Check whether the DIP switches are set correctly.
• Thefuseforthechargingstationissettoolowortoohighintheconfigurationof
Maxem. A Cohere employee can help you to customize this.
Maxem does not connect to the online back end
The charging station is not detected or not detected correctly
The car charges too slow or too fast
26 27
*Strikethrough what does not apply**Specify how the each phase is connected to each charging station. Enter the appropriate phase of the main grid connection in each of the boxes.
• The kWh-meter(s) have to be set correctly. If the address is not set correctly, the
Maxem install wizard will not recognize the kWh-meter.
• Iftheaddressissetat16andcannotbechanged,thisindicatesthattheprotocol
settings are incorrect. Make sure the kWh-meter is set as follows: Protocol: Modbus.
Parity:Even.Baudrate:19200.
• The kWh-meter is not connected correctly to the power supply. This can also be seen
on the display of the kWh-meter where the kWh value does not go up. Connect the
power supply to the kWh-meter correctly.
• The phase distribution of the power supply of the charging stations is not correctly
configuredonMaxem’s.Checkthephasedistributionandcommunicatethisto
Cohere.
• Restartthechargingstation(powerofftheMCB,wait10seconds,thenpowerupthe
MCB again). Make sure the charging cable is not connected to the car.
• EV-Box • Thechargingstationisrunningonoutdatedfirmware.Contact
EV-Boxforafirmwareupdate.Restartthechargingstationafter
the update.
• Maxem set a power value outside of the the charging stations
range.MakesuretheEV-Boxissettoatminimum6Aand
maximum to the fuse of the charging station.
• ICU • Thechargingstationisrunningonoutdatedfirmware.Contact
ICUAlfenforafirmwareupdate.Restartthechargingstation
after the update.
• There is an authorization issue so that the charging station does
not receive permission to start a charging session. Contact ICU
Alfentoconfigurethisonline.
• KEBA • The charging station is not set smart charge ready. Make sure DIP
switch 1.3 is turned on.
• Tesla Wall
Connector
• The charging station is not set to Slave (F mode). The red LED
indicatorflashes4xontheWallConnector.SetittoSlave(F
Mode).
The values in the web portal are not logical
One or more cars do not start charging
28 29
Maxem is able tomeasure different devices using an externalMID certified kWhmeter.
In order for the communication to function correctly, the kWh-meter must be set to the
corresponding address. Here’s how to do this:
Location of the addressing function in the menu structure.
SETOK
1 2 3
Number of devices
Type of device
Standard addressing on kWh-meter
Appendix2-Configuring65AkWh-meter
Node Address
Main grid connection 100
Solar #1 001
Solar #2 011
Charging station #1 002
Charging station #2 012
Heat pump #1 004
Heat pump #2 014
Example addresses
Node Address
Main grid connection 100
Solar 001
Charging station 002
Heat pump 004
Device
Press for 2 seconds to access the main or go ‘up’ in the menu.
Scroll through the menu or set value higher or lower.
Press to enter a menu item or to accept an adjustment.
Press to adjust a setting.
Navigation through the ABB B23 / B24 kWh-meter menu
If you see this icon in the kWh meter display, there is an active data connection with Maxem.
234
1
TroubleshootingAppendix 3 - Crimping RJ-connectors
30
Required tools and material
• Crimping pliers (suitable for RJ10 and / or RJ45 plugs)
• Scissors or cutters
• Sharp (Stanley) knife
• RJ10 or RJ45 plugs
Steps
Cut the wires in a straight line with a pair of pliers in order to have them all with the
same length.
Strip approximately 3 cm of the outer cover with a sharp (Stanley) knife. The individual
wires should not be damaged.
A.
B.
Insert the wires into the RJ10 or RJ45 connector. Make sure that the wires are placed in
the correct order. For the RJ10 connector it is recommended to place 2 additional wires
for strain relief.
C.
Make sure that the wires are inserted deep enough into the connector in order to have
themfirmlyfixed.
D.
Place the connector with the inserted cable into the pliers. Clench it in order to have
thewiressecuredandexposed. Itmaybenecessary toclench thepliersfirmly two
times or more.
E.
Double-check that all cores are fully inserted. If this is not done correctly, the cable
will not work properly.1234
12345678
4P4C (RJ10)
Lip on top side
8P8C (RJ45)
Lip on top side
Connection diagram
Wires for strain relief
We,
Cohere Energy Solutions B.V.Willem de Zwijgerlaan 3501055 RD Amsterdam, Nederland
following the provision of the following EC Directives:• 2006/95/ECTheLowVoltageDirective• 2004/108/EEC The Electromagnetic Compatibility Directive
Hereby declare that the product: Maxem Energy Manager 4.0 is in conformity with the applicable requirements of the following documents:
Emissions• EN61326-1(2013)• EN61000-3-2(2006)+A1(2009)+A2(2009)• EN61000-3-3(2008)
Immunity• EN61326-1(2013)
Safety• EN61010-1(2010),• EN61010-2-030(2010)• EN61010-2-023
Signee Date Place Signature
Jan Willem HeinenCEO
1August2016 Amsterdam
TroubleshootingEU Declaration of Conformity
31
C H A R G E S M A R T E RWillem de Zwijgerlaan 350 | 1055 RD | Amsterdam | The Netherlands+31(0)207708713|[email protected]|www.cohere.eu