installation instruction rio/domingo rio - palmex installation domin… · 2) for better wind...

3
RIO middle junction 5 cm 1) IMPORTANT: As you start a new row, the new row of leaves must start half way along the leaf below (like brick-laying). Therefore, every other row starts with only a half leaf to fill the gap. INSTALLATION INSTRUCTION RIO/DOMINGO 3) For the first row: place leaves 20 cm (7’’ 7/8 ) above the bottom of the roof. The second row of leaves should be installed 5 cm (2’’) above the first one. Install the third row 12,5 cm (4’’ 7/8 ) above the second one. 2) From one row to another, the leaves must overlap by at least 5 cm (2’’). 4) From the third row onwards, each following row of leaves should be installed keeping an invariable 12,5 cm (4’’ 7/8 ) spacing with the previous one below. 1 2 3 4 1st row 5cm 20cm 2nd row 12,5cm 12,5cm 12,5cm 12,5cm 12,5cm

Upload: others

Post on 14-May-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: INSTALLATION INSTRUCTION RIO/DOMINGO RIO - Palmex Installation Domin… · 2) For better wind protection, Palmex wind clips are recommended. 3) An additional row of nails can also

RIO middle

junction

5 cm

1st raw

3rd raw12cm12cm

12cm

2nd raw

1) IMPORTANT: As you start a new row, the new row of leaves must start half way along the leaf below (like brick-laying). Therefore, every other row starts with only a half leaf to fill the gap.

INSTALLATION INSTRUCTION RIO/DOMINGO

3) For the first row: place leaves 20 cm (7’’7/8) above the bottom of the roof. The second row of leaves should be installed 5 cm (2’’) above the first one. Install the third row 12,5 cm (4’’7/8) above the second one.

2) From one row to another, the leaves must overlap by at least 5 cm (2’’).

4) From the third row onwards, each following row of leaves should be installed keeping an invariable 12,5 cm (4’’7/8) spacing with the previous one below.

1 2

3 4

12,5cm

20cm5cm

5cm

1st row

5cm20cm 2nd row

12,5cm 12,5cm12,5cm

12,5cm12,5cm

Page 2: INSTALLATION INSTRUCTION RIO/DOMINGO RIO - Palmex Installation Domin… · 2) For better wind protection, Palmex wind clips are recommended. 3) An additional row of nails can also

RIO wire-coilround-headed nails

wire-coil nailswith plastic pellets

20cm

5cm

For the finishing touches (ridge, angles, hips and valleys), use our patented accessories. 7

5) Screws recommended for fixing leaves in place: wire-coil round-headed nails OR wire-coil nails with plastic pellets.

6) For extra protection against water infiltration and for aesthetic reasons, add our patented Palmex ridge or add another row of leaves at both ends (and on both sides) on the very top of the roof, extending 12,5 cm (4’’7/8) on either side of the roof (both sides must first be finished).

1) For metal roofing structures, use metal screws or alternatively, install horizontal wooden lattes across the roof onto which the leaves can then be placed.

Optional

5

6

Page 3: INSTALLATION INSTRUCTION RIO/DOMINGO RIO - Palmex Installation Domin… · 2) For better wind protection, Palmex wind clips are recommended. 3) An additional row of nails can also

RIO 13cm

option 1-3

2) For better wind protection, Palmex wind clips are recommended.

3) An additional row of nails can also be added 13 cm (5’’) from the top of each leaf forming a quincunx with the first row of nails.

4) For a more waterproof finish, an under-layer of water-proof sheeting can be added prior to instal-ling Palmex leaves.

Options

1) For a cleaner look along the edges, use regular paper scissors to trim the first (bottom) row of leaves so they line up with the second row.