NODE B (Compact Smart 9312 )INSTALLATION & COMMISSIONING DOCUMENT
1. Refer Installation Guide (PDF File) for Installation. Snapshot of Node B with Cabling shown below .
DDF INSTALLATION
Pair/ Shield FunctionPCM 1 Receive 1PCM 2 Receive 2PCM 3 Receive 3PCM 4 Receive 4PCM 5 Receive 5PCM 6 Receive 6PCM 7 Receive 7PCM 8 Receive 8PCM 9 Transmit 1PCM 10 Transmit 2PCM 11 Transmit 3PCM 12 Transmit 4PCM 13 Transmit 5PCM 14 Transmit 6PCM 15 Transmit 7PCM 16 Transmit 8
2. Before Power ON of Node B , Ensure the following :-
(a) TRCU power cable is connected to 32 Amps MCB .(b) D2U shelf Power cable is connected to 10 Amps MCB.(c) Grounding of Node B is connected to IGB (refer to installation).(d) Check the Voltage with multimeter at Node B end .
Data and software requirements:
a. Laptop with Windows XP with Internet explorer or mozillab. Cross LAN Cablec. Alcatel Node-B commissioning docd. Java6 update5e. Node-B software UNB06D00205f. IP sheet
3. Connecting Laptop Locally to NODE B .
(a) Cross LAN Cable is Required(b) Java should be Installed in the Laptop (set up file is attached)(c) Change the IP Address of Laptop , As given Below
Connect to the TIL Port ( Port 1 of XCCM Card) .
Go to Internet Explorer and open the U
And following Window will appear
Put your name and Default Path where you want to save all Commissioning Reports .
And Following Board Screen will Appear
Upgrade the Node B Software to “ UNB06D00205”
4. Software Upgrade Procedure
Go to the Tools then Software upgrade then New software download , As shown below
Below Window will appear
Just show the Path where you have kept UNB06D00205 software and Select FILE0_UNDB06D00205 , As shown Below
And Click “Choose a Delievery File “:
Close the Connection ( Internet Explorer) and Reconnect . Once reconnected the new software will have username and password.
Username: nodebPassword: nodeblnx
6. Procedure for Change of I&C Parameters (PCM , IP Address and IMA)
(a) Before making Changes , Save I&C Parameters
Save with name “OLD I&C site name”.
(b) Now Change I&C Parameters , only (PCM , IP Address and IMA)
Reference:Existence of a DHCP Server = NOBTS IP address = 10.136.110.XX (get from excel sheet)OMC-B IP address =
10.136.130.164
OMC-B Port = 6301OMC-B VP identifier = 1OMC-B VC identifier = 32Subnetwork Mask =
255.255.255.0
BTS Port = 6301
IMA Modification:
Choose PCM&IMA Tab
Select IMA
SENDING CHANGES OF I&C PARAMETERS TO NODEB
Press Send to IBTS
Change in progress (20secs)
Success Message
SAVE CHANGES IN I&C PARAMETERS
Select Save I&C parameters
Change file name to “new_sitename.til”, press save
RESET NodeB (to activate changes in I&C parameters)
Reset in connected Mode
Confirm reset windowNote: NodeB will reset for approximately 5 mins.
Reconnect to BTS
7. MCA Backup File
Confirmation that MCA file copied on default directory
8. Global Inventory File
Go to Files Global Inventory File