instalaciones electricas-metrados
DESCRIPTION
METRADOS DE UNA VIVIENDA DE TRES NIVELESTRANSCRIPT
NOMBRES:SANDRO DANIEL VENERO SONCCOMIJAEL ZUBILETA CANSAYA
PRIMER NIVEL SEGUNDO NIVEL
Incidencias de luminarias Incidencias de luminarias
Circuito I
L lum long cant Subtotal total
Circuito I
L lum
1 a 2 2.34 2 4.68 1 a 2
2 a 3 2.46 3 7.38 2 a 3
3 a 4 1.46 2 2.92 2 a 4
4 a 5 1.31 2 2.62 2 a 5
5 a 6 2.66 2 5.32 5 a 6
6 a 7 2.89 3 8.67 31.59
Circuito I
L interrp long cant Subtotal total
Circuito I
L interrp
1 3.76 2 7.52 1
3 2.31 3 6.93 3
4 2.55 2 5.1 4
5 2.16 2 4.32 5
7 3.48 3 10.44 6
34.31
Circuito I
L tablero long cant Subtotal total
Circuito I
L tablero
1 4.71 2 9.42 1
9.42 79.086
Circuito II
L interrp long cant Subtotal total
Circuito II
L lum
1 a 2 2.04 2 4.08 1 a 2
2 a 3 1.91 2 3.82 2 a 3
3 a 4 2.17 2 4.34 1 a 4
4 a 5 1.64 2 3.28 4 a 5
3 a 7 2.14 2 4.28 5 a 6
19.8 1 a 7
7 a 8
8 a 9
Circuito II
L lum long cant Subtotal total 8 a 10
1 3.14 2 6.28
2 4.16 2 8.32
Circuito II
L interrp
3 3.88 2 7.76 2
4 1.88 2 3.76 3
7 2.89 2 5.78 4
31.9 5
6
Circuito IIL tablero long cant Subtotal total 7
1 4.93 2 9.86 8
9.86 64.638 9
10
Circuito III
L lum long cant Subtotal total
Circuito III
1 a 2 1.52 2 3.04Circuito II
L tablero
2 a 3 2.29 2 4.58 1
3 a 4 1.33 2 2.66
4 a 5 1.34 2 2.68
2 a 6 2.86 2 5.72
6 a 7 2.56 3 7.68 CONDUCTOR TOTAL
7 a 9 2.18 2 4.36
9 a 8 1.38 3 4.14 TOTAL NIVEL 1
1 a 10 2.8 2 5.6 TOTAL NIVEL 2
40.46 TOTAL NIVEL 3LONG. TOTAL
Circuito III
L lum long cant Subtotal total
1 3.38 2 6.76
2 3.3 2 6.6
3 2.27 2 4.54
4 2.33 2 4.66
5 2.5 2 5
7 3.61 3 10.83
8 2.56 3 7.68
10 4.52 2 9.04
55.11
Circuito III
L tablero long cant Subtotal total
1 4.12 2 8.24
8.24 109.0005
SEGUNDO NIVEL TERCER NIVEL
Incidencias de luminarias Incidencias de luminarias
long cant Subtotal total
Circuito I
L lum
2.24 2 4.48 1 a 2
2.23 2 4.46 2 a 3
2.64 2 5.28 2 a 4
4.01 3 12.03 2 a 5
3.31 2 6.62 32.87 5 a 6
long cant Subtotal total
Circuito I
L interrp
2.25 2 4.5 1
1.93 2 3.86 3
2.88 2 5.76 4
2.62 3 7.86 5
1.93 2 3.86 25.84 6
long cant Subtotal total
Circuito I
L tablero
4.71 2 9.42 1
9.42 37.023
long cant Subtotal total
Circuito II
L lum
1.8 3 5.4 1 a 2
3.54 2 7.08 2 a 3
3.31 2 6.62 1 a 4
3.71 2 7.42 4 a 5
1.8 2 3.6 5 a 6
4.04 3 12.12 1 a 7
1.83 3 5.49 7 a 8
2.6 2 5.2 8 a 9
2 2 4 56.93 8 a 10
long cant Subtotal total
Circuito II
L interrp
3.82 3 11.46 2
1.71 2 3.42 3
3.15 2 6.3 4
3.15 2 6.3 5
2.5 2 5 6
3.34 2 6.68 7
1.66 2 3.32 8
2.59 2 5.18 9
2.68 2 5.36 53.02 10
long cant Subtotal totalCircuito II
L tablero
4.93 2 9.86 1
9.86 125.8005
CONDUCTOR TOTAL
LOG. CONDUCTORES
252.7245
162.8235
162.8235578.3715
TERCER NIVEL
Incidencias de luminarias
long cant Subtotal total
2.24 2 4.48
2.23 2 4.46
2.64 2 5.28
4.01 3 12.03
3.31 2 6.62 32.87
long cant Subtotal total
2.25 2 4.5
1.93 2 3.86
2.88 2 5.76
2.62 3 7.86
1.93 2 3.86 25.84
long cant Subtotal total
4.71 2 9.42
9.42 37.023
long cant Subtotal total
1.8 3 5.4
3.54 2 7.08
3.31 2 6.62
3.71 2 7.42
1.8 2 3.6
4.04 3 12.12
1.83 3 5.49
2.6 2 5.2
2 2 4 56.93
long cant Subtotal total
3.82 3 11.46
1.71 2 3.42
3.15 2 6.3
3.15 2 6.3
2.5 2 5
3.34 2 6.68
1.66 2 3.32
2.59 2 5.18
2.68 2 5.36 53.02
long cant Subtotal total
4.93 2 9.86
9.86 125.8005
NOMBRES:SANDRO DANIEL VENERO SONCCOMIJAEL ZUBILETA CANSAYA
TOMACORRIENTE
TUBOS
DE tablero @1 1@2 1@3 3@4 4@5 5@6
circuito I L tubo
1.45 0.45 0.45 0.45 0.45 0.45
1.12 3.45 4.05 6.28 3.1 3.16
0.45 0.45 0.45 0.45 0.45 0.45
3.02 4.35 4.95 7.18 4 4.06
DE tablero @1 1@2 1@3 3@4 4@5 5@6
circuito II L tubo
1.45 1.3 0.45 0.45 0.45 0.45
1.05 1.8 3.5 6.28 3.1 3.16
1.3 0.45 0.45 0.45 0.45 0.45
3.8 3.55 4.4 7.18 4 4.06
DE tablero @1 1@2 1@3 3@4 4@5 5@6
circuito III L tubo
1.5 1.3 1.3 1.3 0.45 0.45
2.29 2.07 1.03 1.17 2.87 3.05
1.3 1.3 1.3 0.45 0.45 0.45
5.09 4.67 3.63 2.92 3.77 3.95
CONDUCTORES
DE tablero @1 1@2 1@3 3@4 4@5 5@6
circuito I L cond
3 0.45 0.45 0.45 0.45 0.45
1.12 3.45 4.05 6.28 3.1 3.16
0.45 0.45 0.45 0.45 0.45 0.45
4.57 4.35 4.95 7.18 4 4.06
DE tablero @1 1@2 1@3 3@4 4@5 5@6
circuito II L cond
3 1.3 0.45 0.45 0.45 0.45
1.05 1.8 3.5 6.28 3.1 3.16
1.3 0.45 0.45 0.45 0.45 0.45
5.35 3.55 4.4 7.18 4 4.06
DE tablero @1 1@2 1@3 3@4 4@5 5@6
circuito III L cond
3 1.3 1.3 1.3 0.45 0.45
2.29 2.07 1.03 1.17 2.87 3.05
1.3 1.3 1.3 0.45 0.45 0.45
6.59 4.67 3.63 2.92 3.77 3.95
INC tubo 82.51 1.53
18(3)
28.94 INC cond 174.68 9.70
18
INC tierra 87.34 4.85
18
28.34
INC curva 36 2
18
25.23 82.51
TOTAL DE CONDUCTOR
257.187 3 771.561
30.57
29.97
26.81 174.68
9
SUSTENTO DE METRADOSCod. DESCRIPCIÓN (Partida /ambientes) Medidas Parcial Total
Largo Ancho Alto24.00.00 INSTALACIONES ELECTRICAS
24.01.00 SALIDA PARA ALUMBRADO EN TECHO/INTERRUPTOR BIPOLAR SIMPLE
1º NIVEL 17.00 17.00 17.00
2º NIVEL 15.00 15.00 15.00
3º NIVEL 15.00 15.00 15.00
24.02.00 SALIDA DE PARED (BRAQUETES) CON PVC
1º NIVEL 2.00 2.00 2.00
24.03.00 SALIDA PARA SPOT-LIGHT CON PVC
1º NIVEL 2.00 2.00 2.00
2º NIVEL 1.00 1.00 1.00
3º NIVEL 1.00 1.00 1.00
24.04.00 SALIDA PARA TOMACORRIENTES
24.04.01 SALIDA PARA TOMACORRIENTES BIPOLARES DOBLE CON PVC
1º NIVEL 17.00 17.00 17.00
2º NIVEL 27.00 27.00 27.00
3º NIVEL 27.00 27.00 27.00
71.00
26.00.00 TABLERO
26.01.00 TABLERO DISTRIBUCION CAJA METALICA CON 12 POLOS
1º NIVEL 2.00 2.00 2.00
2º NIVEL 1.00 1.00 1.00
3º NIVEL 1 1.00 1.00
26.02.00 SALIDA PARA INTERRUPTOR
26.02.01 INTERRUPTOR THERMOMAGNETICO MONOFASICO 3x30A
1º NIVEL 18.00 18.00 18.00
2º NIVEL 15.00 15.00 15.00
3º NIVEL 15.00 15.00 15.00
26.03.00 CONEXIÓN A LA RED EXTERNA Y MEDIDORES 1.00 1.00 1.00
26.04.00 POZO-CONEXIÓN A TIERRA EN SISTEMA , TOMACORRIENTES 1.00 1.00 1.00
NºVeces
10
SUSTENTO DE METRADOSUnd
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
TOTAL
PZA
PZA
PZA
PZA
PZA
PZA
GLB
GLB
NOMBRES:SANDRO DANIEL VENERO SONCCOMIJAEL ZUBILETA CANSAYA
PRESUPUESTO
metrado
Partida Nº DescripcionUnd Cant
01.00.00 INSTALACIONES ELECTRICAS
01.02.00 SALIDA DE ALUMBRADO EN TECHO PRIMER NIVEL UND 17
01.02.00 SALIDA DE ALUMBRADO EN TECHO SEGUNDO Y TERCER NIVEL UND 30.00
01.03.00 TUBERIA PVC - SAP 20 MM M 771.56
01.04.00 LUMINARIA DE CENTRO DE LUZ FLUORECENTE ADOSABLE UND 47.00
01.05.00 LUMINARIA BRAQUETE BLOBO UND 2.00
01.06.00 LUMINARIA SPOT ADOSABLE UND 2.00
01.07.00 SALIDA DE TOMACORRIENTE DOBLE UND 71.00
01.08.00 CONDUCTOR THW 4MM2 TOMACORRIENTE M 1,543.12
01.09.00 CONDUCTOR THW 4MM2 LUMINARIA M 578.15
01.10.00 TABLEROS DISTRIBUCION CAJA METALICA CON 12 POLOS UND 1.00
01.11.00 CONEXION A LA RED EXTERNA Y MEDIDORES GLB 1.00
01.12.00 POZO-CONEXION A TIERRA EN SISTEMA ,TOMACORRENTES GLB 1.00
Costo directo 28209.16
GASTOS GENERALES 10% 2820.916
UTILIDAD 6% 1692.549
SUBTOTAL 32722.62
IMPUESTO (IGV) 18% 5890.072
TOTAL PRESUPUESTO 38612.69
P.U Sub total Total
30.46555012062 517.91
27.57 826.98
9.01 6,953.56
243.27 11,433.65
167.85 335.70
161.85 323.70
12.26 870.37
2.15 3,311.80
2.19 1,266.07
734.08 734.08
1,037.79 1,037.79
597.51 597.51
28,209.16
NOMBRES:SANDRO DANIEL VENERO SONCCOMIJAEL ZUBILETA CANSAYA
POR EL REGLAMENTO DE METRADOS VIGENTEAnálisis de precios unitarios
Partida 01.01.00 SALIDA DE ALUMBRADO EN TECHO PRIMER NIVELRendimiento 40.00 UND/DIA
Código Descripción Insumo UnidadMano de Obra
47 OPERARIO HH47 OFICIAL HH47 PEON HH
Materiales12 CAJA OCTOGONAL LIVIANO SAP UND72 CURVA PVC - SAP 20 MM. UND72 UNION PVC - SAP 20 MM. UND72 CONECTORES PVC - SAP 20 MM. UND30 PEGAMENTO LT
Equipos37 HERRAMIENTAS MANUALES %MO
Partida 01.02.00 SALIDA DE ALUMBRADO EN TECHO SEGUNDO Y TERCER NIVELRendimiento 40.00 UND/DIA
Código Descripción Insumo UnidadMano de Obra
47 OPERARIO HH47 OFICIAL HH47 PEON HH
Materiales12 CAJA OCTOGONAL LIVIANO SAP UND72 CURVA PVC - SAP 20 MM. UND72 UNION PVC - SAP 20 MM. UND72 CONECTORES PVC - SAP 20 MM. UND30 PEGAMENTO LT
Equipos37 HERRAMIENTAS MANUALES %MO
Partida 01.03.00 TUBERIA PVC - SAP 20 MMRendimiento 80.00 M/DIA
Código Descripción Insumo UnidadMano de Obra
47 OPERARIO HH47 OFICIAL HH47 PEON HH
Materiales11 TUBERIA PVC - SAP 20 MM M72 UNION PVC - SAP 20 MM UND30 PEGAMENTO LT
Equipos37 HERRAMIENTAS MANUALES %MO
Partida 01.04.00 LUMINARIA DE CENTRO DE LUZ FLUORECENTE ADOSABLERendimiento 20.00 UND/DIA
Código Descripción Insumo UnidadMano de Obra
47 OPERARIO HH47 OFICIAL HH47 PEON HH
Materiales11 LUMINARIA DE CENTRO DE LUZ FLUORECENTE ADOSABLE UND30 CINTA AISLANTE RLL
Equipos37 HERRAMIENTAS MANUALES %MO
Partida 01.05.00 LUMINARIA BRAQUETE GLOBORendimiento 20.00 UND/DIA
Código Descripción Insumo UnidadMano de Obra
47 OPERARIO HH47 OFICIAL HH47 PEON HH
Materiales11 LUMINARIA BRAQUETE BLOBO UND11 SOCKET E/27 SEGÚN ESPESIFICACIONES UND30 CINTA AISLANTE RLL
Equipos37 HERRAMIENTAS MANUALES %MO
Partida 01.06.00 LUMINARIA SPOT ADOSABLE Rendimiento 20.00 UND/DIA
Código Descripción Insumo UnidadMano de Obra
47 OPERARIO HH47 OFICIAL HH47 PEON HH
Materiales11 LUMINARIA SPOT ADOSABLE UND30 CINTA AISLANTE RLL
Equipos37 HERRAMIENTAS MANUALES %MO
Partida 01.07.00 SALIDA DE TOMACORRIENTE DOBLE Rendimiento 40.00 UND/DIA
Código Descripción Insumo UnidadMano de Obra
47 OPERARIO HH47 OFICIAL HH47 PEON HH
Materiales11 CAJA RECTANGULAR F.G. SEL UND
72 CURVA PVC - SEL 20 MM DIAMETRO. UND72 UNION PVC - SEL 20 MM DIAMETRO. UND72 CONECTOR PVC - SEL 20 MM DIAMETRO. UND30 PEGAMENTO LT
Equipos37 HERRAMIENTAS MANUALES %MO
Partida 01.08.00 CONDUCTOR THW 4MM2 TOMACORRIENTESRendimiento 300.00 M/DIA
Código Descripción Insumo UnidadMano de Obra
47 OPERARIO HH47 OFICIAL HH47 PEON HH
Materiales6 CONDUCTOR THW 4MM2 M
Equipos37 HERRAMIENTAS MANUALES %MO
Partida 01.09.00 CONDUCTOR THW 4MM2 LUMINARIASRendimiento 150.00 M/DIA
Código Descripción Insumo UnidadMano de Obra
47 OPERARIO HH47 OFICIAL HH47 PEON HH
Materiales6 CONDUCTOR THW 4MM2 M
Equipos37 HERRAMIENTAS MANUALES %MO
Partida 01.10.00 TABLEROS DISTRIBUCION CAJA METALICA CON 12 POLOS
Rendimiento 2.00 UND/DIA
Código Descripción Insumo UnidadMano de Obra
47 OPERARIO HH47 OFICIAL HH47 PEON HH
Materiales12 TABLERO GABINETE METAL BARRA BRONCE 12 POLOS UND12 INTERRUCTOR TERMOMAGNETICO DE 2 X 40 A UND12 INTERRUCTOR TERMOMAGNETICO DE 2 X 20A UND12 INTERRUCTOR TERMOMAGNETICO DE 2 X 30A UND12 INTERRUCTOR DIFERENCIAL DE 2 X 25A UND
Equipos37 HERRAMIENTAS MANUALES %MO
Partida 01.11.00 CONEXION A LA RED EXTERNA Y MEDIDORESRendimiento 1.00 GLB/DIA
Código Descripción Insumo UnidadMano de Obra
47 OPERARIO HH47 OFICIAL HH47 PEON HH
Materiales19 CONEXION A LA RED EXTERNA Y MEDIDORES GLB
Equipos37 HERRAMIENTAS MANUALES %MO
Partida 01.12.00 POZO-CONEXION A TIERRA EN SISTEMA ,TOMACORRENTESRendimiento 1.00 GLB/DIA
Código Descripción Insumo UnidadMano de Obra
47 OPERARIO HH
47 OFICIAL HH47 PEON HH
Materiales64 TIERRA M3
5 PIEDRA CHANCADA DE 3/4" M35 ARENA GRUESA M3
19 CABLE TW # 2 AWG - 35 MM2. M21 CEMENTO PORTLAND TIPO I (42.5KG) BOL19 VARILLA DE COBRE DE 1/2" x 2.50m UND19 MARCO Y TAPA FO. GO. P/MEDIDOR 1/2"-3/4" UND72 TUB. PVC SAP P/INST. ELECT. DE 1" M72 CURVA PESADO PVC SAP P/INST. ELECT. 1" UND
Equipos37 HERRAMIENTAS MANUALES %MO
POR EL REGLAMENTO DE METRADOS VIGENTEAnálisis de precios unitarios
SALIDA DE ALUMBRADO EN TECHO PRIMER NIVEL metrado 17.00Costo unitario directo por : UND 28.09
Cuadrilla Cantidad Precio Parcial
0.10 0.020 17.83 0.361.00 0.200 14.50 2.901.00 0.200 13.17 2.63
5.89 100.1402 47
1.000 4.50 4.50 76.500 12
3.290 2.20 7.24 123.046 72
3.290 1.50 4.94 83.895 72
3.290 1.50 4.94 83.895 72
0.020 15.00 0.30 5.100 30
21.91
0.050 5.89 0.290.29 5.00701 37
SALIDA DE ALUMBRADO EN TECHO SEGUNDO Y TERCER NIVEL metreado 30.00Costo unitario directo por : UND 26.22
Cuadrilla Cantidad Precio Parcial
0.10 0.020 17.83 0.361.00 0.200 14.50 2.901.00 0.200 13.17 2.63
5.89 176.718 47
1.000 4.50 4.50 135.000 12
2.930 2.20 6.45 193.380 72
2.930 1.50 4.40 131.850 72
2.930 1.50 4.40 131.850 72
0.020 15.00 0.30 9.000 30
20.04
0.050 5.89 0.290.29 8.8359 37
metrado 771.56Costo unitario directo por : M 8.96
Cuadrilla Cantidad Precio Parcial
0.10 0.010 17.83 0.181.00 0.100 14.50 1.451.00 0.100 13.17 1.32
2.95 2272.476 47
1.000 5.50 5.50 4243.580 11
0.050 1.30 0.07 50.151 72
0.020 15.00 0.30 231.468 30.000
5.87
0.050 2.95 0.150.15 113.62 37
LUMINARIA DE CENTRO DE LUZ FLUORECENTE ADOSABLE metrado 47.00Costo unitario directo por : UND 242.41
Cuadrilla Cantidad Precio Parcial
0.10 0.040 17.83 0.711.00 0.400 14.50 5.801.00 0.400 13.17 5.27
11.78 553.716 47
1.000 230.00 230.00 10810.000 11
0.010 4.00 0.04 1.880 30
230.04
0.050 11.78 0.590.59 27.69 37
metrado 2.00Costo unitario directo por :UND 147.66
Cuadrilla Cantidad Precio Parcial
0.10 0.040 17.83 0.711.00 0.400 14.50 5.800.80 0.320 13.17 4.21
10.73 21.455 47
1.000 130.00 130.00 260.000 11
1.000 6.00 6.00 12.000 11
0.100 4.00 0.40 0.800 30
136.40
0.050 10.73 0.540.54 1.07276 37
metrado 2.00Costo unitario directo por :UND 141.66
Cuadrilla Cantidad Precio Parcial
0.10 0.040 17.83 0.711.00 0.400 14.50 5.800.80 0.320 13.17 4.21
10.73 21.455 47
1.000 130.00 130.00 260.000 11
0.100 4.00 0.40 0.800 30
130.40
0.050 10.73 0.540.54 1.07276 37
metrado 71.00Costo unitario directo por : UND 11.69
Cuadrilla Cantidad Precio Parcial
0.10 0.020 17.83 0.361.00 0.200 14.50 2.901.00 0.200 13.17 2.63
5.89 418.233 47
1.000 2.20 2.20 156.200 11
2.000 0.90 1.80 127.800 72
2.000 0.30 0.60 42.600 72
2.000 0.30 0.60 42.600 72
0.020 15.00 0.30 21.300 30
5.50
0.050 5.89 0.290.29 20.91 37
metrado 1,543.12Costo unitario directo por : M 2.12
Cuadrilla Cantidad Precio Parcial
0.10 0.003 17.83 0.051.00 0.027 14.50 0.391.00 0.027 13.17 0.35
0.79 1211.987 47
1.000 1.30 1.301.30 2006.056 6
0.050 0.79 0.040.04 60.60 37
metrado 578.15Costo unitario directo por : M 2.95
Cuadrilla Cantidad Precio Parcial
0.10 0.005 17.83 0.101.00 0.053 14.50 0.771.00 0.053 13.17 0.70
1.57 908.176 47
1.000 1.30 1.301.30 751.597 6
0.050 1.57 0.080.08 45.41 37
TABLEROS DISTRIBUCION CAJA METALICA CON 12 POLOS metrado 1.00
Costo unitario directo por : UND 693.70
Cuadrilla Cantidad Precio Parcial
0.10 0.400 17.83 7.131.00 4.000 14.50 58.001.00 4.000 13.17 52.68
117.81 117.812 47
1.000 80.00 80.00 80 12
1.000 70.00 70.00 70 12
1.000 40.00 40.00 40 12
2.000 40.00 80.00 80 12
2.000 150.00 300.00 300 12
570.00
0.050 117.81 5.895.89 5.8906 37
metrado 1.00Costo unitario directo por : GLB 997.41
Cuadrilla Cantidad Precio Parcial
0.10 0.800 17.83 14.261.00 8.000 14.50 116.001.00 8.000 13.17 105.36
235.62 235.624 47
1.000 750.00 750.00750.00 750 19
0.050 235.62 11.7811.78 11.7812 37
POZO-CONEXION A TIERRA EN SISTEMA ,TOMACORRENTES metrado 1.00Costo unitario directo por : GLB 557.13
Cuadrilla Cantidad Precio Parcial
0.10 0.800 17.83 14.26
1.00 8.000 14.50 116.001.00 8.000 13.17 105.36
235.62 235.624 47
1.4000 26.05 36.47 36.47 64
0.0600 60.00 3.60 3.6 5
0.0300 60.00 1.80 1.8 5
5.0000 15.44 77.20 77.2 19
0.5000 18.50 9.25 9.25
1.0000 140.00 140.00 140 19
1.0000 35.00 35.00 35 19
5.0000 1.04 5.20 5.2 72
1.0000 1.20 1.20 1.2 72
309.72
0.0500 235.62 11.7811.78 11.7812 37
sub total 32,722.62
47 12 72 30 37 11 6
6273.416 781.500 1017.4674 270.348 313.67 15741.780 2757.653
0.19 0.02 0.03 0.01 0.01 0.48 0.08
5 AGREGADO GRUESO 0.0001650
6 ALAMBRE Y CABLE DE COBRE DESNUDO 0.0842736
11 ARTEFACTO DE ALUMBRADO EXTERIOR 0.4810672
12 ARTEFACTO DE ALUMBRADO INTERIOR 0.0238826
19 CABLE NYY Y NKY 0.0306271
21 CEMENTO PORTLAND TIPO I 0.0002827
30 DOLAR MAS INFLACION DEL MERCASO USA 0.0082618
37 HERRAMIENTA MANUAL 0.0095857
39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.1379310
47 MANO DE OBRA 0.1917150
64 TERRAZO 0.0011145
72 TUBERIA DE PVC 0.0310937
1.0000000
19 21 5 64 39
1002.2 9.25 5.4 36.47 4,513.46 28209.16
0.03 0.00 0.00 0.00 0.14 1.000000000000000
0 03 ACERO DE CONSTRUCCION CORRUGADO
0 04 AGREGADO FINO
0 05 AGREGADO GRUESO
0 06 ALAMBRE Y CABLE DE COBRE DESNUDO
0 07 ALAMBRE Y CABLE TIPO TW Y THW
0 08 ALAMBRE Y CABLE TIPO WP
0 09 ALCANTARILLA METALICA
0 10 APARATO SANITARIO CON GRIFERIA
0 11 ARTEFACTO DE ALUMBRADO EXTERIOR
0 12 ARTEFACTO DE ALUMBRADO INTERIOR
0 13 ASFALTO
0 14 BALDOSA ACUSTICA
0 15 BALDOSA ASFALTICA
0 16 BALDOSA VINILICA
0 17 BLOQUE Y LADRILLO
0 18 CABLE TELEFONICO
0 19 CABLE NYY Y NKY
0 20 CEMENTO ASFALTICO
0 21 CEMENTO PORTLAND TIPO I
0 22 CEMENTO PORTLAND TIPO II
0 23 CEMENTO PORTLAND TIPO V
0 24 CERAMICA ESMALTADA Y SIN ESMALTAR
0 25 CERRAJERIA IMPORTADA (Reagrupado en el 30)
0 26 CERRAJERIA NACIONAL
0 27 DETONANTE
0 28 DINAMITA
0 29 DOLAR
0 30 DOLAR MAS INFLACION DEL MERCASO USA
0 31 DUCTO DE CONCRETO
0 32 FLETE TERRESTRE
0 33 FLETE AEREO
0 34 GASOLINA
0 37 HERRAMIENTA MANUAL
0 38 HORMIGON
0 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR
0 40 LOSETA
0 41 MADERA EN TIRAS PARA PISO
0 42 MADERA IMPORTADA PARA ENCOFRADO Y CARPINTERIA
0 43 MADERA NACIONAL PARA ENCOFRADO Y CARPINTERIA
0 44 MADERA TERCIADA PARA CARPINTERIA
0 45 MADERA TERCIADA PARA ENCOFRADO
0 46 MALLA DE ALAMBRE
0 47 MANO DE OBRA
0 48 MAQUINARIA Y EQUIPO NACIONAL
0 49 MAQUINARIA Y EQUIPO IMPORTADO
0 50 MARCO Y TAPA DE FIERRO FUNDIDO
0 51 PERFIL DE ACERO
0 52 PERFIL DE ALUMINIO
0 53 PETROLEO DIESSEL
0 54 PINTURA LATEX
0 55 PINTURA TEMPLE
0 56 PLANCHA DE ACERO LAC
0 57 PLANCHA DE ACERO LAF
0 59 PLANCHA DE ASBESTO-CEMENTO
0 60 PLANCHA DE POLIURETANO
0 61 PLANCHA GALVANIZADA
0 62 POSTE DE CONCRETO
0 63 POSTE DE FIERRO (Reagrupado en el 65)
0 64 TERRAZO
0 65 TUBERIA DE ACERO NEGRO
0 66 TUBERIA DE ASBESTO-CEMENTO
0 68 TUBERIA DE COBRE
0 69 TUBERIA DE CONCRETO SIMPLE
0 70 TUBERIA DE CONCRETO REFORZADO
0 71 TUBERIA DE FIERRO FUNDIDO
0 72 TUBERIA DE PVC
0 73 DUCTOS Y ACCESORIOS TELEFONICOS DE PVC
0 74 TUBERIA DE PVC PARA ELECTRICIDAD (SAP)
0 75 TUBERIA DE PVC PARA ELECTRICIDAD (SEL)(Reag.74)
0 76 VALVULA DE BRONCE IMPORTADA (Reagrupado 30)
0 77 VALVULA DE BRONCE NACIONAL
0 78 VALVULA DE FIERRO FUNDIDO NACIONAL
0 79 VIDRIO INCOLORO NACIONAL
0 80 CONCRETO PREMEZCLADO
NOMBRES:SANDRO DANIEL VENERO SONCCOMIJAEL ZUBILETA CANSAYA
47 12 72 30MO AL TB DR
0.19171 0.02388 0.03109 0.00826
MANO DE OBRA 47 MO 0.19ARTEFACTO DE ALUMBRADO INTERIOR 12 AL 0.02
TUBERIA DE PVC 72 TB 0.031DOLAR MAS INFLACION DEL MERCASO USA 30 DR 0.01
HERRAMIENTA MANUAL 37 HM 0.01ARTEFACTO DE ALUMBRADO EXTERIOR 11 AE 0.48ALAMBRE Y CABLE DE COBRE DESNUDO 6 AC 0.08
CABLE NYY Y NKY 19 CY 0.03CEMENTO PORTLAND TIPO I 21 CP 0.000
AGREGADO GRUESO 5 AG 0.000TERRAZO 64 TR 0.001
INDICE GENERAL DE PRECIOS AL CONSUMIDOR39.00 GGU 0.141.0000000000
POLINOMICA ES: 0.192 (Mr/Mo)COMPROBACION 1.00000
37 11 6 19 21 5 64 39HM AE AC CY CP AG TR GGU
0.00959 0.48107 0.084274 0.030627 0.00028 0.00017 0.00111 0.13793
MONOMIOSMO 0.19 MO 0.19AE 0.50 AE 0.50TB 0.039 TBCY 0.07HM 0.01 HMACTR 0.095AC 0.08 GGU 0.13793CY 0.03 1.00000TR 0.002
GGU 0.13791.0000
0.505 (Ae/Ao) 0.070 (TbCy/ToCo) 0.095(HmAcTr/HoAoTo)0.138 (Gur/Guo)
Código Descripción
0 01 ACEITE0 02 ACERO DE CONSTRUCCION LISO0 03 ACERO DE CONSTRUCCION CORRUGADO0 04 AGREGADO FINO
1.0000 0 05 AGREGADO GRUESO0 06 ALAMBRE Y CABLE DE COBRE DESNUDO0 07 ALAMBRE Y CABLE TIPO TW Y THW0 08 ALAMBRE Y CABLE TIPO WP0 09 ALCANTARILLA METALICA0 10 APARATO SANITARIO CON GRIFERIA0 11 ARTEFACTO DE ALUMBRADO EXTERIOR0 12 ARTEFACTO DE ALUMBRADO INTERIOR0 13 ASFALTO0 14 BALDOSA ACUSTICA0 15 BALDOSA ASFALTICA0 16 BALDOSA VINILICA0 17 BLOQUE Y LADRILLO0 18 CABLE TELEFONICO0 19 CABLE NYY Y NKY0 20 CEMENTO ASFALTICO0 21 CEMENTO PORTLAND TIPO I0 22 CEMENTO PORTLAND TIPO II0 23 CEMENTO PORTLAND TIPO V0 24 CERAMICA ESMALTADA Y SIN ESMALTAR0 25 CERRAJERIA IMPORTADA (Reagrupado en el 30)0 26 CERRAJERIA NACIONAL0 27 DETONANTE0 28 DINAMITA0 29 DOLAR0 30 DOLAR MAS INFLACION DEL MERCASO USA0 31 DUCTO DE CONCRETO0 32 FLETE TERRESTRE0 33 FLETE AEREO0 34 GASOLINA0 37 HERRAMIENTA MANUAL0 38 HORMIGON0 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR0 40 LOSETA0 41 MADERA EN TIRAS PARA PISO0 42 MADERA IMPORTADA PARA ENCOFRADO Y CARPINTERIA0 43 MADERA NACIONAL PARA ENCOFRADO Y CARPINTERIA0 44 MADERA TERCIADA PARA CARPINTERIA0 45 MADERA TERCIADA PARA ENCOFRADO0 46 MALLA DE ALAMBRE0 47 MANO DE OBRA 0 48 MAQUINARIA Y EQUIPO NACIONAL
0 49 MAQUINARIA Y EQUIPO IMPORTADO0 50 MARCO Y TAPA DE FIERRO FUNDIDO0 51 PERFIL DE ACERO 0 52 PERFIL DE ALUMINIO0 53 PETROLEO DIESSEL0 54 PINTURA LATEX0 55 PINTURA TEMPLE0 56 PLANCHA DE ACERO LAC0 57 PLANCHA DE ACERO LAF0 59 PLANCHA DE ASBESTO-CEMENTO0 60 PLANCHA DE POLIURETANO0 61 PLANCHA GALVANIZADA0 62 POSTE DE CONCRETO0 63 POSTE DE FIERRO (Reagrupado en el 65)0 64 TERRAZO0 65 TUBERIA DE ACERO NEGRO 0 66 TUBERIA DE ASBESTO-CEMENTO0 68 TUBERIA DE COBRE0 69 TUBERIA DE CONCRETO SIMPLE0 70 TUBERIA DE CONCRETO REFORZADO0 71 TUBERIA DE FIERRO FUNDIDO0 72 TUBERIA DE PVC 0 73 DUCTOS Y ACCESORIOS TELEFONICOS DE PVC0 74 TUBERIA DE PVC PARA ELECTRICIDAD (SAP)0 75 TUBERIA DE PVC PARA ELECTRICIDAD (SEL)(Reag.74)0 76 VALVULA DE BRONCE IMPORTADA (Reagrupado 30)0 77 VALVULA DE BRONCE NACIONAL0 78 VALVULA DE FIERRO FUNDIDO NACIONAL0 79 VIDRIO INCOLORO NACIONAL0 80 CONCRETO PREMEZCLADO
ACERO DE CONSTRUCCION LISOACERO DE CONSTRUCCION CORRUGADO
ALAMBRE Y CABLE DE COBRE DESNUDOALAMBRE Y CABLE TIPO TW Y THWALAMBRE Y CABLE TIPO WPALCANTARILLA METALICAAPARATO SANITARIO CON GRIFERIAARTEFACTO DE ALUMBRADO EXTERIORARTEFACTO DE ALUMBRADO INTERIOR
CEMENTO PORTLAND TIPO ICEMENTO PORTLAND TIPO IICEMENTO PORTLAND TIPO VCERAMICA ESMALTADA Y SIN ESMALTARCERRAJERIA IMPORTADA (Reagrupado en el 30)CERRAJERIA NACIONAL
DOLAR MAS INFLACION DEL MERCASO USA
HERRAMIENTA MANUAL
INDICE GENERAL DE PRECIOS AL CONSUMIDOR
MADERA EN TIRAS PARA PISOMADERA IMPORTADA PARA ENCOFRADO Y CARPINTERIAMADERA NACIONAL PARA ENCOFRADO Y CARPINTERIAMADERA TERCIADA PARA CARPINTERIAMADERA TERCIADA PARA ENCOFRADO
MAQUINARIA Y EQUIPO NACIONAL
MAQUINARIA Y EQUIPO IMPORTADOMARCO Y TAPA DE FIERRO FUNDIDO
PLANCHA DE ACERO LACPLANCHA DE ACERO LAFPLANCHA DE ASBESTO-CEMENTOPLANCHA DE POLIURETANOPLANCHA GALVANIZADA
POSTE DE FIERRO (Reagrupado en el 65)
TUBERIA DE ACERO NEGRO TUBERIA DE ASBESTO-CEMENTO
TUBERIA DE CONCRETO SIMPLETUBERIA DE CONCRETO REFORZADOTUBERIA DE FIERRO FUNDIDO
DUCTOS Y ACCESORIOS TELEFONICOS DE PVCTUBERIA DE PVC PARA ELECTRICIDAD (SAP)TUBERIA DE PVC PARA ELECTRICIDAD (SEL)(Reag.74)VALVULA DE BRONCE IMPORTADA (Reagrupado 30)VALVULA DE BRONCE NACIONALVALVULA DE FIERRO FUNDIDO NACIONALVIDRIO INCOLORO NACIONALCONCRETO PREMEZCLADO