Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 Inspection and enforcement approach Results of work 31 groups of inspectors from 10 RI CEI [email protected]

Upload: alika-hays

Post on 31-Dec-2015

27 views

Category:

Documents


1 download

DESCRIPTION

Inspection and enforcement approach Results of work 3 1 groups of inspectors from 10 RI CEI [email protected]. Introduction. Results of work - 31 working groups Inspection approach Enforcement approach. Inspection approach. Preparatory phase Proper control - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Inspection and enforcement approach Results of work 3 1  groups of inspectors from 10 RI CEI

Integrated and Planned Enforcement of Environmental LawPhare Twinning Project CZ03/IB/EN/01

Inspection and enforcement approach

Results of work 31 groups of inspectors from 10 RI CEI

[email protected]

Page 2: Inspection and enforcement approach Results of work 3 1  groups of inspectors from 10 RI CEI

Integrated and Planned Enforcement of Environmental LawPhare Twinning Project CZ03/IB/EN/01

Introduction

• Results of work - 31 working groups

• Inspection approach

• Enforcement approach

Page 3: Inspection and enforcement approach Results of work 3 1  groups of inspectors from 10 RI CEI

Integrated and Planned Enforcement of Environmental LawPhare Twinning Project CZ03/IB/EN/01

Inspection approach

• Preparatory phase

• Proper control

• Further variants of procedure

• (Enforcement)

Page 4: Inspection and enforcement approach Results of work 3 1  groups of inspectors from 10 RI CEI

Integrated and Planned Enforcement of Environmental LawPhare Twinning Project CZ03/IB/EN/01

Preparatory phase

• Inspector qualifications• Survey of pollution sources• Plan of control• Selection of subject• Documents for control

Page 5: Inspection and enforcement approach Results of work 3 1  groups of inspectors from 10 RI CEI

Integrated and Planned Enforcement of Environmental LawPhare Twinning Project CZ03/IB/EN/01

Proper control

• Announced-unannounced• Preventive-integrated-multimedia• Control of documentation• Control of compliance on site• Sampling for documentation

Page 6: Inspection and enforcement approach Results of work 3 1  groups of inspectors from 10 RI CEI

Integrated and Planned Enforcement of Environmental LawPhare Twinning Project CZ03/IB/EN/01

Follow up variants of approach

• Follow up procedure in relation to behavior of subject

• Consideration of corrective measures-sanctions

• …..

Page 7: Inspection and enforcement approach Results of work 3 1  groups of inspectors from 10 RI CEI

Integrated and Planned Enforcement of Environmental LawPhare Twinning Project CZ03/IB/EN/01

Enforcement approach

• Preceeding steps• Initial phase• 1st soft variant of procedure• Second variant in frame of current law• 3rd „tight“ variant of procedure• Follow-up procedure

Page 8: Inspection and enforcement approach Results of work 3 1  groups of inspectors from 10 RI CEI

Integrated and Planned Enforcement of Environmental LawPhare Twinning Project CZ03/IB/EN/01

Soft variant

• Warning of unsufficiency of compliance, date of correction• Control of corrections• In case of non-compliance-sanction

Page 9: Inspection and enforcement approach Results of work 3 1  groups of inspectors from 10 RI CEI

Integrated and Planned Enforcement of Environmental LawPhare Twinning Project CZ03/IB/EN/01

Moderate variant in frame of current legislation

• In case of not so important non-compliance to impose only symbolic penalty

Page 10: Inspection and enforcement approach Results of work 3 1  groups of inspectors from 10 RI CEI

Integrated and Planned Enforcement of Environmental LawPhare Twinning Project CZ03/IB/EN/01

Tight variant of procedure

• Direct imposing of sanction