inservice welding spu
DESCRIPTION
SADATRANSCRIPT
WPS No. 11/WPS-HOTTAPPING/API/KRS/2014 Supporting PQR No. 11/PQR-HOTTAP/API/KRS/2014
Contractor Name PT. KALIRAYA SARI Welding Process (es) SMAW & GTAW
Applicable Code (s) API 1104 (2005 Edition) Addendum 2007 Appendix B Date Rev. 0.1
1. Perform horizontal welding/groove weld with following temper bead sequence.
2. Perform circum welding/fillet weld on each side with following temper bead sequence.
3. Perform NDT by UT+MT+RT on horizontal welding (groove weld).
4. Perform NDT by MT only on circum welding (fillet weld).
TECHNIQUE
String or Weave Bead Root Bead = String ; Others = Weave (Max 2 x Ø Elec.)
Type External Clamp
Removal of Clamp After Minimum 50% Root Pass Completion Shall not occur until the root and hot pass are completed
N/A
Welding Position Incline 45 Degree N/A
Temperature (°C) min. N/A Max. 15 minutes (actual to be recorded)
Heated width (mm) N/A (actual to be recorded)
Heating Method N/A
Measurement Method N/A
Interpass Temperature Max. = 200°C
Root Horizontal 3.2 DCSP 110.0 - 110.5 23.5 - 24.0 52.0 - 53.0 74.33 - 77.72 GTAW
Hot Horizontal 3.2 DCSP 110.0 - 110.5 23.5 - 24.0 52.0 - 53.0 74.33 - 77.72 GTAW
Fill Horizontal 3.2 DCRP 125.0 - 126.0 24.5 - 25.0 62.0 - 63.0 74.08 - 77.43 SMAW
Cap Horizontal 3.2 DCRP 125.0 - 126.0 24.5 - 25.0 62.0 - 63.0 74.08 - 77.43 SMAW
1&Others Vertical Up 3.2 DCRP 125.0 - 126.0 24.5 - 25.0 62.0 - 63.0 74.08 - 77.43 SMAW
Prepared by, Approved by, Reviewed by,
PT. KALIRAYA SARI PT. KALIRAYA SARI TOTAL E&P Indonesie
Erwin Ivo Slamet Wahyudi
Welding Engineer QA/QC Coordinator
POST WELD HEAT TREATMENT (PWHT)
ELECTRICAL CHARACTERISTIC
RemarksElectrode
W E L D I N G P A R A M E T E R
Polarity Ampere (A) Voltage (V)Travel Speed
(mm/min)Heat Input
(KJ/in)
G A S
PRELIMINARY - WELDING PROCEDURE SPECIFICATION (P-WPS)
MAIN PROCEDURE
16-December-2014
A A
Material Spec.N/A
WELDING SEQUENCE
Pipe move up
REPAIR METHOD
WELDING POSITION
0.4 m/s - 1.2 m/sFlow Speed LINE-UP CLAMP
Min. number of Run before cooling down
E.7018-G A 5.5 / Gr. 3 ESAB OK.48.08
PREHEAT
PassWelding Direction
FILLER METAL
AWS Spec. / Group No.
Trade NameSize (mm)
CIRCUMFERENTIAL WELDING
Completion First Layer & Start of Second Layer
Completion Second Layer & Start of 3rd Layer
Confirmation of Defect Removal
TIME BETWEEN PASS (ES)
( actual to be record )
Method of Defect Removal
B
Pipe API 5L X42 Ø 12'' Thk 6 mm
A
BASE METALS
Base Metal Group C% Ceq% PCm% Manufacturer
Chemical Composition
Cut From Pipe API 5L X42 Ø 14''
Thk 14.28 mm
Mixture Flow Rate
Chemical CompositionArgon 99.99% 8 - 15 ltr/min
Gas Cup Size 4, 5, 6, 7, 8
ShieldingGas
Thickness ( T ) B = 6 mm A = 14.28 mm Ø 2.4 mm EWTH-2
Outside Diameter 323.85 mmInitial & Interpass Cleaning Power Grinding / Wire Brushing
Tungsten electrode size Ø and type
E.7018-G A 5.5 / Gr. 3 ESAB OK.48.08
ER70S-6 A 5.18 / Gr. 5 ESAB OK.12.64
E.7018-G A 5.5 / Gr. 3 ESAB OK.48.08
LONGITUDINAL WELDINGER70S-6 A 5.18 / Gr. 5 ESAB OK.12.64
Actual to be recorded
Actual to be recorded