innovex energy proposal to augment or replace diesel...

26
Lumitech Confidential 1 Innovex Energy proposal to Augment or Replace Diesel powered Base Stations June 2009 Innovex Energy proposal for Ericsson

Upload: leduong

Post on 07-Jun-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Innovex Energy proposal to Augment or Replace Diesel ...innovex.co.ke/wp-content/uploads/Innovex-proposal-for-Ericsson.pdf · Innovex Energy proposal to Augment or Replace Diesel

Lumitech Confidential 1

Innovex Energy proposal to Augment or Replace Diesel powered Base Stations

June 2009

Innovex Energy proposal for Ericsson

Page 2: Innovex Energy proposal to Augment or Replace Diesel ...innovex.co.ke/wp-content/uploads/Innovex-proposal-for-Ericsson.pdf · Innovex Energy proposal to Augment or Replace Diesel

Lumitech Confidential 2

Responsible Green Solutions Within Reach.

HONEST. AFFORDABLE. RELIABLE.

Page 3: Innovex Energy proposal to Augment or Replace Diesel ...innovex.co.ke/wp-content/uploads/Innovex-proposal-for-Ericsson.pdf · Innovex Energy proposal to Augment or Replace Diesel

Lumitech Confidential 3

Lumitech Imaging Innovex Energy Ltd.

Agenda

Problem Statement

Solar vs. Diesel

CA Strategy & Portfolio Council Impact Innovex Energy Ltd. Introduction

Recommendations

Page 4: Innovex Energy proposal to Augment or Replace Diesel ...innovex.co.ke/wp-content/uploads/Innovex-proposal-for-Ericsson.pdf · Innovex Energy proposal to Augment or Replace Diesel

Lumitech Confidential 4

Lumitech Imaging Innovex Energy Ltd.

Innovex Energy Ltd. Introduction

Our Presence Local office in Kenya International resources in China and USA

Our Knowledge Expertise in Renewable Energy Expertise in IT, Telecoms and Project Management

Our Resources One Stop Shop for Renewable Energy Management across entire supply chain

Page 5: Innovex Energy proposal to Augment or Replace Diesel ...innovex.co.ke/wp-content/uploads/Innovex-proposal-for-Ericsson.pdf · Innovex Energy proposal to Augment or Replace Diesel

Lumitech Confidential 5

Lumitech Imaging Innovex Energy Ltd.

The growing cost of

maintaining Diesel Powered

Base Stations has become

cost prohibitive

Problem Statement

Page 6: Innovex Energy proposal to Augment or Replace Diesel ...innovex.co.ke/wp-content/uploads/Innovex-proposal-for-Ericsson.pdf · Innovex Energy proposal to Augment or Replace Diesel

Lumitech Confidential 6

Lumitech Imaging Innovex Energy Ltd.

Why Choose Solar- Wind

Cellular Base Station are a great beneficiary of a green solution

Huge Cost Savings!!

Maintenance Free

One Time Investment

High MTBF (mean time between failure)

Environmental Friendly

Page 7: Innovex Energy proposal to Augment or Replace Diesel ...innovex.co.ke/wp-content/uploads/Innovex-proposal-for-Ericsson.pdf · Innovex Energy proposal to Augment or Replace Diesel

Lumitech Confidential 7

Lumitech Imaging Innovex Energy Ltd.

Solution Options

Generator + Solar

Generator + Solar + Turbine

Solar (need batteries) + Wind

Solar (need batteries) --- Reliability?

May be able to add products over time to scale to support maximum load

Page 8: Innovex Energy proposal to Augment or Replace Diesel ...innovex.co.ke/wp-content/uploads/Innovex-proposal-for-Ericsson.pdf · Innovex Energy proposal to Augment or Replace Diesel

Lumitech Confidential 8

Lumitech Imaging Innovex Energy Ltd.

Cell Base Station Solar Diagram

*Illustrative pending site evaluation

Page 9: Innovex Energy proposal to Augment or Replace Diesel ...innovex.co.ke/wp-content/uploads/Innovex-proposal-for-Ericsson.pdf · Innovex Energy proposal to Augment or Replace Diesel

Lumitech Confidential 9

Lumitech Imaging Innovex Energy Ltd.

Site Configuration (need verification)

RBS 2111 (DC) 3X2 configuration

Shelter 3X2 (2X1.5 ton)

Battery 48V 600AH , HBL make

Power Plant 48V 150A

PIU (15KVA)

DG 15KVA, 16Hrs daily running

EB supply not available at site

Power source for equipment through DG & Battery only

These are baseline assumptions which

require site visit and verification

Page 10: Innovex Energy proposal to Augment or Replace Diesel ...innovex.co.ke/wp-content/uploads/Innovex-proposal-for-Ericsson.pdf · Innovex Energy proposal to Augment or Replace Diesel

Lumitech Confidential 10

Lumitech Imaging Innovex Energy Ltd.

Solar Only Diesel + Solar

Potential Solutions

DG running reduced from 16 hrs to 3hrs daily.

Rest 21 hrs powered by solar and Battery

Reduction of pollution by reducing DG running by 13hrs

Existing available space utilized to install solar panel at site

Solar panel of 2.4KWp (30 No. of 80Watt panel) installed.

Solar charge controller (MPPT type 80A)

Connection of charge controller to battery

Solar can be introduced over time to replace diesel but to realize benefits to Ericsson

immediately

Page 11: Innovex Energy proposal to Augment or Replace Diesel ...innovex.co.ke/wp-content/uploads/Innovex-proposal-for-Ericsson.pdf · Innovex Energy proposal to Augment or Replace Diesel

Lumitech Confidential 11

Lumitech Imaging Innovex Energy Ltd.

Innovex Energy product quality and reliability

All products are CE, TUV, IS09001, Solar light CE, Solar Panel CE, and ROHS and high-tech enterprises certificates.

They are qualified by the CE ultimate European body for regulatory and certification, which is also

approved by Kenya Bureau of Standards (KEBS)

These products are used in Europe, United States, Asia, the Middle East, Russia, Africa etc. countries.

Page 12: Innovex Energy proposal to Augment or Replace Diesel ...innovex.co.ke/wp-content/uploads/Innovex-proposal-for-Ericsson.pdf · Innovex Energy proposal to Augment or Replace Diesel

Lumitech Confidential 12

Lumitech Imaging Innovex Energy Ltd.

Solar vs. Diesel cost comparison C

um

ula

tive C

ost

of

Ow

ners

hip

Time Est. Break-Even 3 years for solar+wind 2 Year for solar only

Savings due to Solar-Wind

Assumptions: Initial cost of Diesel 2.5M kshs, and 1M kshs per year ongoing cost. Replace every 3 years assuming 24 hrs of operation Initial equipment cost 3kW Turbine – est. 1.2M kshs,1kW Solar System – est. 4M kshs

Est. Ongoing Diesel Cost

1M kshs/Year

Est. Ongoing Solar-Turbine

Cost

$0 kshs/Year

5.2M

2.5M

Diagram is for solar only

Page 13: Innovex Energy proposal to Augment or Replace Diesel ...innovex.co.ke/wp-content/uploads/Innovex-proposal-for-Ericsson.pdf · Innovex Energy proposal to Augment or Replace Diesel

Lumitech Confidential 13

Lumitech Imaging Innovex Energy Ltd.

Project High Level Proposal

Phase 1

Phase 2

Phase 3

Phase 4

Project Plan

Requirements

Gathering

and sourcing

Execution

Test and

Support

Est. One month per 5 sites w/ parts onsite

Project Team: Innovex Energy Director Project Manager Design Engineer Installation Crew

Innovex Energy can have engineers on site in 24 hours upon approval

Page 14: Innovex Energy proposal to Augment or Replace Diesel ...innovex.co.ke/wp-content/uploads/Innovex-proposal-for-Ericsson.pdf · Innovex Energy proposal to Augment or Replace Diesel

Lumitech Confidential 14

Lumitech Imaging Innovex Energy Ltd.

General Scope and Time Plan

Page 15: Innovex Energy proposal to Augment or Replace Diesel ...innovex.co.ke/wp-content/uploads/Innovex-proposal-for-Ericsson.pdf · Innovex Energy proposal to Augment or Replace Diesel

Lumitech Confidential 15

Lumitech Imaging Innovex Energy Ltd.

Resource Profiles

Michael Schneider (USA) – Director

– MS Industrial Engineering, MBA

Nick Svenson – Design Engineer (Solar planning, installation)

– BA Electrical Engineering

James Gatihi - Project Manager (14 years of Product Engineering)

– BA Computer Science, MBA

TBD – Engineering and Install Crew

The company maintains a stable workforce with backgrounds in Mechanical Engineering, Civil Engineer/Project Manager, Production Manager. Specialized in manage engineering projects using multi-discipline engineering and procurement individually or with client team’s construction partners if needed.

Page 16: Innovex Energy proposal to Augment or Replace Diesel ...innovex.co.ke/wp-content/uploads/Innovex-proposal-for-Ericsson.pdf · Innovex Energy proposal to Augment or Replace Diesel

Lumitech Confidential 16

Lumitech Imaging Innovex Energy Ltd.

Next Steps

Design a cell station diesel conversion program

Kickoff a small pilot to convert a few stations to standardize process, confirm feasibility, gauge workmanship and project execution.

Schedule a Site Assessment to finalize on all solution components and sizing.

Complete a geographical-Environmental analysis

Develop a roadmap to cover cell towers Ericsson wishes to convert.

Page 17: Innovex Energy proposal to Augment or Replace Diesel ...innovex.co.ke/wp-content/uploads/Innovex-proposal-for-Ericsson.pdf · Innovex Energy proposal to Augment or Replace Diesel

Lumitech Confidential 17

Lumitech Imaging Innovex Energy Ltd.

Thanks for your time and consideration.

Nairobi Office Innovex Ltd, 35951_00200, Nairobi

Tel: 254-720-814272, Fax: 254-20 2462877 Daniel Karuku – [email protected]

USA Office Innovex Ltd, 101 S. Santa Cruz Ave, PO Box 532

Los Gatos, CA 95030 Tel: 408 8499153, Fax: 254-20 2462877 James Gatihi– [email protected]

Page 18: Innovex Energy proposal to Augment or Replace Diesel ...innovex.co.ke/wp-content/uploads/Innovex-proposal-for-Ericsson.pdf · Innovex Energy proposal to Augment or Replace Diesel

Lumitech Confidential 18

Lumitech Imaging Innovex Energy Ltd.

Regional considerations

Locations: North Rift, NE Province, Upper Eastern, Upper Coast.

Average annual max. sun exposure 7 hours

Page 19: Innovex Energy proposal to Augment or Replace Diesel ...innovex.co.ke/wp-content/uploads/Innovex-proposal-for-Ericsson.pdf · Innovex Energy proposal to Augment or Replace Diesel

Lumitech Confidential 19

Lumitech Imaging Innovex Energy Ltd.

Assumptions

Site can accommodate both solar and wind technology

Cell station requires the need for remote monitoring

Page 20: Innovex Energy proposal to Augment or Replace Diesel ...innovex.co.ke/wp-content/uploads/Innovex-proposal-for-Ericsson.pdf · Innovex Energy proposal to Augment or Replace Diesel

Lumitech Confidential 20

Lumitech Imaging Innovex Energy Ltd.

Base Station Requirements

Maximum load is 2,300 watt

2,000L of diesel fuel used per month, replaced bi-monthly at a cost of KES 80 Per Liter

Area available 15Mx18M or 13Mx13M

Equipment can’t be below transmission equipment

2 Generators per site at a cost of 2M for off grid sites

Page 21: Innovex Energy proposal to Augment or Replace Diesel ...innovex.co.ke/wp-content/uploads/Innovex-proposal-for-Ericsson.pdf · Innovex Energy proposal to Augment or Replace Diesel

Lumitech Confidential 21

Lumitech Imaging Innovex Energy Ltd.

General Scope Detail 1 of 2

Equipment Supply and Delivery

– Customer PO in place

– Order Placement

– Delivery commitment

Implementation

1. Site and Solution Design – Radio capacity dimensioning – Other site load (OB light, yard lamp) – Power system autonomy – Hybrid system expansion

Page 22: Innovex Energy proposal to Augment or Replace Diesel ...innovex.co.ke/wp-content/uploads/Innovex-proposal-for-Ericsson.pdf · Innovex Energy proposal to Augment or Replace Diesel

Lumitech Confidential 22

Lumitech Imaging Innovex Energy Ltd.

2. Site Acquisition – Land size

– Shadow effect clearance

– Site environment, site access location

3. Civil Works and Mechanical Electrical – Tower works, battery room, fence & yard

– Electrical and grounding system

– Radio, Antenna, feeder works and dependency activity

4. Solar Power Equipment Implementation – Solar power equipment installation

– Testing and commissioning

– System Acceptance with Customer

General Scope Detail 2 of 2

Page 23: Innovex Energy proposal to Augment or Replace Diesel ...innovex.co.ke/wp-content/uploads/Innovex-proposal-for-Ericsson.pdf · Innovex Energy proposal to Augment or Replace Diesel

Lumitech Confidential 23

Lumitech Imaging Innovex Energy Ltd.

Solar Product Specifications

Size of module (wide and high) 1950*990*46(mm)

Frame Anodized Alum. Alloy 46mm thickness

Number of cells 72pcs

Maximum system voltage 1000V

NOCT (nominal operating cell temperature) - 45℃to +85 ℃

Insulation ﹥﹦100MOhm

Voltage standoff AC2000V, DC 3000V

Wind bearing 60m/s(200kg/sq.m)

Impact resistance hail impact test 227g steel ball fall down from 1m height

Encapsulated with toughened glass Low iron tempered glass with thickness of 3.2mm,light transmittance above91%

Conversion efficiency Cell conversion efficiency﹥15.75%

Quality guarantee 2 years product warranty,10 years 90% and 25years 80% of the power

Page 24: Innovex Energy proposal to Augment or Replace Diesel ...innovex.co.ke/wp-content/uploads/Innovex-proposal-for-Ericsson.pdf · Innovex Energy proposal to Augment or Replace Diesel

Lumitech Confidential 24

Lumitech Imaging Innovex Energy Ltd.

High Level BOQ

SPV panels 2.4KW MS structure with Hot dip GI, nuts, bolts, for fixing panels, Field Junction boxes with bus bar , fuse, blocking diodes, 25 meters of cable upto control Panel

Control Panel with T80 MPPT controllers , Two potential free contacts display, circuit breaker, connection to battery bank

600 AH Battery Bank (Used from existing Setup)

Page 25: Innovex Energy proposal to Augment or Replace Diesel ...innovex.co.ke/wp-content/uploads/Innovex-proposal-for-Ericsson.pdf · Innovex Energy proposal to Augment or Replace Diesel

Lumitech Confidential 25

Lumitech Imaging Innovex Energy Ltd.

Turbine Product Specifications

Page 26: Innovex Energy proposal to Augment or Replace Diesel ...innovex.co.ke/wp-content/uploads/Innovex-proposal-for-Ericsson.pdf · Innovex Energy proposal to Augment or Replace Diesel

Lumitech Confidential 26

Lumitech Imaging Innovex Energy Ltd.

Thanks for your time and consideration.

Nairobi Office Innovex Ltd, 35951_00200, Nairobi

Tel: 254-720-814272, Fax: 254-20 2462877 Daniel Karuku – [email protected]

USA Office Innovex Ltd, 101 S. Santa Cruz Ave, PO Box 532

Los Gatos, CA 95030 Tel: 408 8499153, Fax: 254-20 2462877 James Gatihi– [email protected]