Page 1: INJECTORS BLM BI-TB on Proton Injector start-up. Summary of actions 2 13/02/2014christos.zamantzas@cern.ch BLM SystemComments LINAC2 8 movable detectors

INJECTORS BLM BI-TB on Proton Injector start-up

Page 2: INJECTORS BLM BI-TB on Proton Injector start-up. Summary of actions 2 13/02/2014christos.zamantzas@cern.ch BLM SystemComments LINAC2 8 movable detectors

2

Summary of actions

13/02/[email protected]

BLM System CommentsLINAC2 8 movable detectors with BLECFT; no budget for new system

PSB Legacy Calibration of ACEMs on-going

New Under deployment; in parallel to legacy system

PS

Legacy Calibration of ACEMs on-going

New ACQ Cables ready; responsibility of acq. system under BI-SW

Diamond 2 detectors operational; no more cables available

SPS Refurbishment of crates; new HV power supplies; work in LSS1

Page 3: INJECTORS BLM BI-TB on Proton Injector start-up. Summary of actions 2 13/02/2014christos.zamantzas@cern.ch BLM SystemComments LINAC2 8 movable detectors

LEGACY SYSTEMS

Page 4: INJECTORS BLM BI-TB on Proton Injector start-up. Summary of actions 2 13/02/2014christos.zamantzas@cern.ch BLM SystemComments LINAC2 8 movable detectors

4

LINAC2 | PSB & PS Legacy Systems LINAC2

► Possibility for a new system briefly discussed, but finally no official request or budget allocation.

► Currently, 8 detectors with the BLECFT portable measurement system.

PSB & PS legacy systems ► All ACEMs removed for calibration► Approx. two more weeks needed► Afterwards, 2-3 days per machine for re-installation. ► 22 new detectors used (last batch available; end-of-life)

13/02/[email protected]

E. Effinger

Page 5: INJECTORS BLM BI-TB on Proton Injector start-up. Summary of actions 2 13/02/2014christos.zamantzas@cern.ch BLM SystemComments LINAC2 8 movable detectors

5

PS new acq. | SPS system PS new acquisition system

► New cables ready to be installed (< 1h)► Some small reduction in sensitivity to be expected ► Remaining tasks are with BI/SW

PS Diamond based system► Two Diamonds available (pos. 16 & 42)► New position requested (pos. 15), but no cable is available

SPS system► Refurbishment of all crates► Replacement of HV power supplies► Some cable changes in LSS1; with deprecation of one monitor

[email protected]

J. Emery

E. Effinger

E. Effinger

Page 6: INJECTORS BLM BI-TB on Proton Injector start-up. Summary of actions 2 13/02/2014christos.zamantzas@cern.ch BLM SystemComments LINAC2 8 movable detectors

NEW SYSTEM FOR PSB

Page 7: INJECTORS BLM BI-TB on Proton Injector start-up. Summary of actions 2 13/02/2014christos.zamantzas@cern.ch BLM SystemComments LINAC2 8 movable detectors

Cabling Diagram

7

Screen of HV BNC is open on the IC side to assure there is no ground loop. Internal screen to shield low frequency noise (GND only on electronics side, IC is floating). External screen to shield high frequency noise.

BNC

SMA

TRIAX

Connector Types:

13/02/2014 [email protected]

Ionization Chamber

50 ÷ 200 m ~ 1 m~ 1 m

CKC50 BNCSMA

AcquisitionCard

(BLEDP) External Screen 2

Internal Screen 1

Signal

HV PowerSupply(~1500 V)

HV BNC BNCBNC

Patch-cords

Page 8: INJECTORS BLM BI-TB on Proton Injector start-up. Summary of actions 2 13/02/2014christos.zamantzas@cern.ch BLM SystemComments LINAC2 8 movable detectors

BLM Cable installation in PSB New cable (CKC50) production run on tight schedule:

► Modification of the CKB50 specs ► Completed and delivered on-time

Re-installation in PSB► Conformity measured

(developed a test-bench) ► Completed on-time

Patch-Cords ► Several types needed

(length and connector type)► Currently under production

HV CablesSignal CablesSignal and HV Patch-Cords

13/02/2014 [email protected]

Page 9: INJECTORS BLM BI-TB on Proton Injector start-up. Summary of actions 2 13/02/2014christos.zamantzas@cern.ch BLM SystemComments LINAC2 8 movable detectors

9

BLM Detector Installation in PSB

Period Position Status Comment1 Internal ok  2 Internal ok  3 Internal ok  4 Internal ok  5 Internal ok  6 Internal ok  7 Internal ok BPM pickups8 External partially custom support9 Internal ok 1230uSv

10 Internal ok  11 External not custom support12 Internal not no access at the moment13 Internal ok RF cavity14 External ok displaced due to ion pump15 External not Extraction custom support16 Internal ok  

Three periods require special supports due to space restrictions. will be installed during technical stops

Patch-Cords not yet connected to the detectors planned for next week

No access in period 12 due to crane renovation scheduled for last week of February

Support with Detectors configuration

Tunnel installation:Very tight integration

13/02/[email protected]

Page 10: INJECTORS BLM BI-TB on Proton Injector start-up. Summary of actions 2 13/02/2014christos.zamantzas@cern.ch BLM SystemComments LINAC2 8 movable detectors

10

Status of PCB Development All prototypes verified and functional. Pre-Series production will need to cover needs till LS2. Contracts for the Acquisition and Mezzanine modules ready

– to be launched around March 2014.

Name Acronym

Number of Components

2010 2011 2012 2013 2014 2016/7

Prototype Development Pre-Series SeriesAcquisition Module BLEDP 1934 First Prototype

(1 piece)V1.0

(2 pieces)V2.0 & V2.1

(3 pieces) - Production V3.0(20 pieces)

Production V3.x(60-100 pieces)

Acquisition Backplane BLEBP 1173 - V1.0(2 pieces)

V2.0(1 piece)

Production V3.0(7 pieces) - Production V3.0

(10-15 pieces)

Processing Mezzanine BLEPM 210 - V1.0(1 pieces) - - Production V2.0

(20 pieces)Production V2.x(60-100 pieces)

Crate Main Panel BLEMP 52 - First Prototype(2 pieces)

V1.0(2 pieces)

Production V2.0(7 pieces) - Production V2.0

(10-15 pieces)

Crate Control Unit BLECU 180 - First Prototype(1 pieces)

Second Prototype(1 pieces)

Production V1.0(7 pieces) - Production V1.0

(10-15 pieces)

Acquisition Crate BLEAC 200 - First Prototype(1 pieces)

V1.0(2 pieces)

Production V2.0(7 pieces) - Production V2.0

(10-15 pieces)

Crate Programmer BLEJP 160 - - First Prototype(1 pieces)

Production V1.0(7 pieces) - Production V1.0

(10-15 pieces)

High Voltage Distribution BLEHV 100 - - - Production V1.0(7 pieces) - Production V1.0

(10-15 pieces)

13/02/[email protected]

Page 11: INJECTORS BLM BI-TB on Proton Injector start-up. Summary of actions 2 13/02/2014christos.zamantzas@cern.ch BLM SystemComments LINAC2 8 movable detectors

BLM Electronics installation in PSB All large components have

been installed:► Processing crate (VME64)► Acquisition crate► HV Distribution crate► Fan-trays► CIBUS

To be installed (currently under production):► Electronic cards► HV Power Supply crate► Signal Patch-cords

(SMA-to-TRIAX)

Rear viewFront viewRack in BAT42

13/02/2014 [email protected]

Page 12: INJECTORS BLM BI-TB on Proton Injector start-up. Summary of actions 2 13/02/2014christos.zamantzas@cern.ch BLM SystemComments LINAC2 8 movable detectors

12

Dust issue in PSB rack under the floating floor there is wood dust

► probably from cutting the panels when the new floor support was installed (?)

cooling fans will deposit it in the electronics Asked help from the PSB responsible (David Hay)

[email protected] 13/02/2014

Page 13: INJECTORS BLM BI-TB on Proton Injector start-up. Summary of actions 2 13/02/2014christos.zamantzas@cern.ch BLM SystemComments LINAC2 8 movable detectors

13

Thank you

[email protected]

Page 14: INJECTORS BLM BI-TB on Proton Injector start-up. Summary of actions 2 13/02/2014christos.zamantzas@cern.ch BLM SystemComments LINAC2 8 movable detectors

14

Reserved Slides

13/02/[email protected]

Page 15: INJECTORS BLM BI-TB on Proton Injector start-up. Summary of actions 2 13/02/2014christos.zamantzas@cern.ch BLM SystemComments LINAC2 8 movable detectors

15

New BLM System Overview

Page 16: INJECTORS BLM BI-TB on Proton Injector start-up. Summary of actions 2 13/02/2014christos.zamantzas@cern.ch BLM SystemComments LINAC2 8 movable detectors

Acquisition module (BLEDP)

16

Backplane connectionAnalogue inputs, power

and control SFP connectorsGigabit optical and/or

Ethernet links

FPGA Altera Cyclone IVJTAG connection

Local programming and diagnostics

Acquisition digitisation of 8

channels

Completed verification of version 2 of the printed circuit board

Completed design of version 3.- Noise reduction