Report Date: 10/26/2017 Infrared Thermographic Inspection Provided for Infrared Thermography Electrical Inspections Mechanical Inspections Roof Moisture Analysis Building Envelope / Heat Loss Power Quality Consulting Power Quality Surveys Load Studies Harmonic Content Analysi Power Metering Electrical Mapping/Documentatio 1-Line Electrical Drawings Panel Schedules Panel Identification / Labeling 1-Critical 60-Above NA 0 = 0% NA P: (513) 245-5951 F: (513) 741-9503 www.dynascantech.com

Upload: others

Post on 23-Mar-2020

14 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Infrared Thermographic Inspection IR Report_Medical.pdfThis defect report includes a load analysis, a visual inspection comment, and ... In accordance to the National Electrical Code

Margaret Ma y Health Margaret Mary Health

Report Date: 10/26/2017

Infrared Thermographic InspectionProvided for

Infrared Thermography

Electrical Inspections

Mechanical Inspections

Roof Moisture Analysis

Building Envelope / Heat Loss

Power Quality Consulting

Power Quality Surveys

Load Studies

Harmonic Content Analysi

Power Metering

Electrical Mapping/Documentatio

1-Line Electrical Drawings

Panel Schedules

Panel Identification / Labeling

1-Critical 60-Above NA0 = 0% NA

SAMPLE

P: (513) 245-5951 F: (513) 741-9503www.dynascantech.com

Page 2: Infrared Thermographic Inspection IR Report_Medical.pdfThis defect report includes a load analysis, a visual inspection comment, and ... In accordance to the National Electrical Code

Current Inspection No: 4213321 Mitchell AvenueMargaret Mary Health

Batesville, IN 47006Report Date: 10/26/2017Inspected By : O'Brien, TJ

Recently, a Dyna Scan Thermographer performed an Infrared Thermographic Inspection of the electrical distribution system at your facility. The objective of this inspection was to expose temperature extremes, which could be indicative of problems and defects in the electrical system.

An Infrared Imager detects radiated energy as heat emanating from the target. In utilizing this tool for examining electrical power circuitry, it must be recognized that temperatures indicative of defects will normally be observed only in circuits which are normally or heavily loaded. Scanning lightly loaded or de-energized circuits may produce inconclusive results.

This report is set up to list all distribution panels and current carrying devices in an organized manner. The electrical equipment and the results of the inspection are listed for each location. A defect report is provided for each problem area found during the inspection. This defect report includes a load analysis, a visual inspection comment, and recommendations for corrective action.

The report summary on the following page is an arbitrary guideline intended to provide perspective with respect to temperature differences between target areas and reference points. Take note that many variables may affect the temperature differences, most notably the ambient temperature, wind speed and circuit load.

Many electrical panels such as switchboards and motor control centers contain multiple circuits that may or may not be de-energized at the time of inspection. Dyna Scan technicians will identify in the equipment inventory in this report when it is obvious that equipment is not running at time of inspection. However, without taking load readings on every circuit in each individual panel, it is impossible to identify all equipment and circuits that are not under load.

If you should have any questions regarding the scan or this report, feel free to contact our office at any of the numbers below. We appreciate the opportunity to be of service to you and look forward to working with you in the future.

Sincerely,

Jim O'Brien - Director of Operations

Dyna Scan Technical Services

(513) 245-5951

NOTE-In the course of an Infrared Thermography Inspection on electrical distribution equipment, may times circuits are reported as being "overloaded." In general this statement is made on the basis of instantaneous amperage readings which have been found to be in excess of 80% of the overcurrent devices nameplate rating. In accordance to the National Electrical Code Articles 210-22(c) and 384-16(c) the total load on an overcurrent device shall not exceed 80% of its rating where in normal operation the load will continue for 3 hours or more (See NEC for exceptions).

P: (513) 245-5951 F: (513) 741-9503www.dynascantech.com

Amanda
Text Box
Page 3: Infrared Thermographic Inspection IR Report_Medical.pdfThis defect report includes a load analysis, a visual inspection comment, and ... In accordance to the National Electrical Code

Overview:

The Infrared Electrical Inspection was performed by Dyna Scan Technical Services, by a certified Infrared Thermographer. All of the items inspected are listed in this InspecTrend report. Any anomalies are listed in order of priority based on the component's temperature rise, as measured from a reference component of equal type and load at the time of the inspection. Dyna Scan Technical Services assumes no liability directly or indirectly as a result of this inspection.

Page 1Current Inspection No:

Previous Inspection No:

Priority Temp Rise Prior InspectionCurrent Inspection Percent Change

Margaret Mary Health , Margaret Mary Health

4213 October 9, 2017

Report Date: 10/26/2017

Margaret Mary Health

1-Critical 60-Above NA 3 = 38% NA

2-Serious 40 - 59 NA 0 = 0% NA

3-Important 11 - 39 NA 5 = 63% NA

4-Minor 1 - 10 NA 0 = 0% NA

5-Normal 0 NA 0 = 0% NA

Total Tested Problems:

Number of New Documented Problems:

Number of Tested re-occuring Problems:

Number of prior problems which were Not Tested this inspection :

Number of Total Open Problems :

Number of prior problems which tested Normal this inspection : NA

8

NA

0 = 0% NA

NA 8 =100%

8 NA

NA

NA

NA

Critical - Danger to life and limb, eminent danger to equipment.

Serious - Equipment failure is inevitable without immediate attention. Repair should be expedited ASAP

Important - If this is not redundant equipment, repair should be scheduled ASAP.

Minor - Problem is apparent and needs to be monitored on a regular basis.

Problem Severity Definitions:

P: (513) 245-5951 F: (513) 741-9503www.dynascantech.com

Amanda
Text Box
Amanda
Text Box
Amanda
Text Box
Amanda
Text Box
Page 4: Infrared Thermographic Inspection IR Report_Medical.pdfThis defect report includes a load analysis, a visual inspection comment, and ... In accordance to the National Electrical Code

Infrared Inspection Inventory

Test Statu Problem #Location / Name

Page: 1

TBT = To Be TestedNT/NL = Not Tested/No Load

NT/TC = Not Tested/Time ConstraintNT/UR = Not Tested/Under Repair

Equipment Test Status KeyCurrent Inspection No: 4213

321 Mitchell AvenueMargaret Mary Health

Batesville, IN 47006Report Date: 10/26/2017Inspected By

NT/NA = Not Tested/Not Accessible

O'Brien, TJ

Equipment Type

LOCATION: 71 BUILDING TESTED

LOCATION: BASEMENT TESTED

LOCATION: MAIN SWITCHGEAR ROOM TESTED

ATS 1 TESTEDATS

ATS EQ1 TESTEDATS

ATS EQ3 TESTEDATS

BHNSB1 (2 Sec) TESTEDSwitchgear

BHNDP1 TESTEDDistribution Panel

BHNDP2 TESTEDDistribution Panel

Transformer #4 TESTEDTransformer

Transformer #2 TESTEDTransformer

CT Scan NTNLDisconnect

100-1-A TESTEDDisconnect

BHEDP1 NTNADistribution Panel

LOCATION: SECONDARY SWITCHGEAR ROOM

TESTED

BHNDP4 TESTEDDistribution Panel

BHEDP1 TESTEDDistribution Panel

BLEQDP1 TESTEDDistribution Panel

BLNSB1 TESTEDSwitchgear

BLCRDP1 TESTEDBranch Panel

LOCATION: MECHANICAL ROOM TESTED

150 KVA TESTEDTransformer

BHCRDP1 TESTEDDistribution Panel

75 KVA TESTEDTransformer

BLLSDP1 TESTEDDistribution Panel

BHEQDP1 TESTEDDistribution Panel

MCC1 TESTEDMCC

Outside Sump TESTEDStarter Disconnect

Fire Pump ATS TESTEDStarter Disconnect

Fire controller TESTEDStarter Disconnect

P: (513) 245-5951 F: (513) 741-9503www.dynascantech.com

Amanda
Text Box
Page 5: Infrared Thermographic Inspection IR Report_Medical.pdfThis defect report includes a load analysis, a visual inspection comment, and ... In accordance to the National Electrical Code

Infrared Inspection Inventory

Test Statu Problem #Location / Name

Page: 2

TBT = To Be TestedNT/NL = Not Tested/No Load

NT/TC = Not Tested/Time ConstraintNT/UR = Not Tested/Under Repair

Equipment Test Status KeyCurrent Inspection No: 4213

321 Mitchell AvenueMargaret Mary Health

Batesville, IN 47006Report Date: 10/26/2017Inspected By

NT/NA = Not Tested/Not Accessible

O'Brien, TJ

Equipment Type

LOCATION: BOILER ROOM TESTED

Chiller Capacitor TESTEDDisconnect

Chiller Capacitor TESTEDStarter

Chiller Capacitor TESTEDDisconnect

Chiller Capacitor TESTEDStarter

100/1/A/2 TESTEDMCC (3 Sec)

Chiller #1 TESTEDStarter

Chiller #1 TESTEDControl Panel

HTP #1 TESTEDControl Panel

#170 TESTEDControl Panel

CWP #7 TESTEDStarter Disconnect

CWP #8 TESTEDStarter Disconnect

HWP 71-02 NTNLDisconnect

P5 TESTEDDisconnect

P4 TESTEDDisconnect

McQue Chiller 2 TESTEDControl Panel

McQue Chiller 2 TESTEDControl Panel

Low Water Pump TESTEDControl Panel

Sump Pump TESTEDControl Panel

P3 TESTEDDisconnect

P2 TESTEDDisconnect

P1 TESTED E1Disconnect

LOCATION: NEW ELECTRIC ROOM TESTED

EQ2 TESTEDATS

BHEQDP2 TESTEDDistribution Panel

Boiler 166 TESTEDDisconnect

Boiler 166 TESTEDControl Panel

Condinsate Pump TESTEDControl Panel

Pump Right TESTEDControl Panel

Pump Left TESTEDControl Panel

BLEQ2 TESTEDBranch Panel

P: (513) 245-5951 F: (513) 741-9503www.dynascantech.com

Amanda
Text Box
Page 6: Infrared Thermographic Inspection IR Report_Medical.pdfThis defect report includes a load analysis, a visual inspection comment, and ... In accordance to the National Electrical Code

Infrared Inspection Inventory

Test Statu Problem #Location / Name

Page: 3

TBT = To Be TestedNT/NL = Not Tested/No Load

NT/TC = Not Tested/Time ConstraintNT/UR = Not Tested/Under Repair

Equipment Test Status KeyCurrent Inspection No: 4213

321 Mitchell AvenueMargaret Mary Health

Batesville, IN 47006Report Date: 10/26/2017Inspected By

NT/NA = Not Tested/Not Accessible

O'Brien, TJ

Equipment Type

Ex Fan 1 TESTEDStarter

Ex Fan 4 TESTEDStarter

Ex Fan 7 TESTEDStarter

Ex Fan 9 TESTEDStarter

Hospital Vac (side 1) TESTEDControl Panel

Hospital Vac (side 2) TESTEDControl Panel

Med Air TESTEDControl Panel

Pump 1 TESTEDDisconnect

CP #14 TESTEDDisconnect

Pump #2 TESTEDDisconnect

Back Up Pump TESTEDStarter Disconnect

Chill Water Pump TESTEDDisconnect

#178 TESTEDDisconnect

BLEQ1 TESTEDBranch Panel

ACU-1 TESTED E2VFD

Elevator 1 TESTEDDisconnect

Elevator 2 TESTEDDisconnect

LOCATION: SHOP AREA TESTED

BLEQ4 TESTEDBranch Panel

LOCATION: UPS DATA CENTER TESTED

UPS TESTEDControl Panel

LOCATION: FIRST FLOOR TESTED

LOCATION: ER DEPT BUILDING CLOSET TESTED

1LCRB TESTEDBranch Panel

1LNBP3 TESTEDBranch Panel

1LNBP2 TESTEDBranch Panel

1LLSBP2 TESTEDBranch Panel

LOCATION: WOMENS IMAGING ELECT TESTED

1LNBP12 TESTEDBranch Panel

1LNBP11 TESTEDBranch Panel

1LNBP10 TESTEDBranch Panel

P: (513) 245-5951 F: (513) 741-9503www.dynascantech.com

Amanda
Text Box
Page 7: Infrared Thermographic Inspection IR Report_Medical.pdfThis defect report includes a load analysis, a visual inspection comment, and ... In accordance to the National Electrical Code

Infrared Inspection Inventory

Test Statu Problem #Location / Name

Page: 4

TBT = To Be TestedNT/NL = Not Tested/No Load

NT/TC = Not Tested/Time ConstraintNT/UR = Not Tested/Under Repair

Equipment Test Status KeyCurrent Inspection No: 4213

321 Mitchell AvenueMargaret Mary Health

Batesville, IN 47006Report Date: 10/26/2017Inspected By

NT/NA = Not Tested/Not Accessible

O'Brien, TJ

Equipment Type

1LCRBP10 TESTEDBranch Panel

1LCRBP11 TESTEDBranch Panel

1LLSBP10 TESTEDBranch Panel

LOCATION: CT HALLWAY TESTED

1HNDP1 TESTEDDistribution Panel

1LNBP5 TESTEDBranch Panel

LOCATION: CT ENTERANCE TESTED

1LCRBP4 TESTEDBranch Panel

1LNBP7 TESTEDBranch Panel

LOCATION: LAB HALL TESTED

1LCRBP3-A TESTEDBranch Panel

1LCRBP3-B TESTEDBranch Panel

LOCATION: LAB ROOM TESTED

1LNBP8 TESTEDBranch Panel

LOCATION: CLINICAL SUPPORT TESTED

Unnamed TESTEDBranch Panel

LOCATION: VITALS CLOSET TESTED

1L4 TESTEDBranch Panel

LOCATION: SAME DAY SURGERY TESTED

1LNBP1 TESTEDBranch Panel

1LNBP2 TESTEDBranch Panel

1LCRPB1 TESTEDBranch Panel

1LLSBP1 TESTEDBranch Panel

LOCATION: RADIOLOGY BREAK AREA TESTED

1LCRBP2 TESTEDBranch Panel

LOCATION: SECOND FLOOR TESTED

LOCATION: OB TESTED

2LECR1 TESTEDBranch Panel

LOCATION: MED SURG HALL TESTED

2LECR2A TESTEDBranch Panel

2LN1 Sec A TESTEDBranch Panel

P: (513) 245-5951 F: (513) 741-9503www.dynascantech.com

Amanda
Text Box
Page 8: Infrared Thermographic Inspection IR Report_Medical.pdfThis defect report includes a load analysis, a visual inspection comment, and ... In accordance to the National Electrical Code

Infrared Inspection Inventory

Test Statu Problem #Location / Name

Page: 5

TBT = To Be TestedNT/NL = Not Tested/No Load

NT/TC = Not Tested/Time ConstraintNT/UR = Not Tested/Under Repair

Equipment Test Status KeyCurrent Inspection No: 4213

321 Mitchell AvenueMargaret Mary Health

Batesville, IN 47006Report Date: 10/26/2017Inspected By

NT/NA = Not Tested/Not Accessible

O'Brien, TJ

Equipment Type

2LN1 Sec B TESTEDBranch Panel

2LN2A TESTEDBranch Panel

2LN2B TESTEDBranch Panel

2LECR2 TESTEDBranch Panel

LOCATION: MAINT CLOSET TESTED

2LELS1 TESTEDBranch Panel

LOCATION: LAB PENTHOUSE TESTED

MRI Exhaust TESTEDStarter Disconnect

HCP 71 04 TESTEDStarter Disconnect

PHEQBP1 TESTEDBranch Panel

VFD1 TESTEDControl Panel

VFD2 TESTEDControl Panel

CF 71 04 TESTEDDisconnect

CCP 71 04 NTNAControl Panel

EF 71 07 TESTEDStarter Disconnect

LOCATION: ER PENTHOUSE TESTED

EDPHEQ1 TESTEDBranch Panel

EDPLEQ1 TESTEDBranch Panel

EDPHN1 TESTEDDistribution Panel

EF2 TESTEDDistribution Panel

EF3 TESTEDDistribution Panel

CWP1 TESTEDStarter Disconnect

CWP2 TESTEDStarter Disconnect

LOCATION: OUTSIDE TESTED

LOCATION: ER PENTHOUSE TESTED

Chiller TESTEDControl Panel

480v Disc TESTEDDisconnect

Leibert 1 TESTEDDisconnect

Leibert 2 TESTEDDisconnect

Leibert 3 TESTEDDisconnect

Cooling Tower 1 TESTEDDisconnect

P: (513) 245-5951 F: (513) 741-9503www.dynascantech.com

Amanda
Text Box
Page 9: Infrared Thermographic Inspection IR Report_Medical.pdfThis defect report includes a load analysis, a visual inspection comment, and ... In accordance to the National Electrical Code

Infrared Inspection Inventory

Test Statu Problem #Location / Name

Page: 6

TBT = To Be TestedNT/NL = Not Tested/No Load

NT/TC = Not Tested/Time ConstraintNT/UR = Not Tested/Under Repair

Equipment Test Status KeyCurrent Inspection No: 4213

321 Mitchell AvenueMargaret Mary Health

Batesville, IN 47006Report Date: 10/26/2017Inspected By

NT/NA = Not Tested/Not Accessible

O'Brien, TJ

Equipment Type

Cooling Tower 2 TESTEDDisconnect

LOCATION: 32 BUILDING TESTED

LOCATION: BASEMENT TESTED

LOCATION: ELECTRIC ROOM TESTED

BLEQDP2 TESTEDDistribution Panel

EQ TESTEDATS

BLEDP1 TESTEDDistribution Panel

ATSCR TESTEDATS

BLCRDP2 TESTEDDistribution Panel

ATSLS TESTEDATS

BLLS1 TESTEDBranch Panel

PNL3 TESTEDBranch Panel

BLNDP1 TESTEDBranch Panel

S1 TESTED E3Distribution Panel

BLEQ1 TESTEDBranch Panel

BLLS2 TESTEDBranch Panel

BLNDP2 TESTEDBranch Panel

#56 TESTEDBranch Panel

#53-1 TESTEDBranch Panel

LOCATION: BOILER ROOM TESTED

24-1 NTNLDisconnect

24-2 NTNLDisconnect

19-1 NTNLDisconnect

19-2 TESTEDDisconnect

Boiler #18 TESTEDControl Panel

Boiler #25 TESTEDControl Panel

Boiler #25 TESTEDDisconnect

Make Up TESTEDDisconnect

35-1 TESTEDDisconnect

35-1 TESTEDStarter Disconnect

LOCATION: GENERATOR ROOM TESTED

P: (513) 245-5951 F: (513) 741-9503www.dynascantech.com

Amanda
Text Box
Page 10: Infrared Thermographic Inspection IR Report_Medical.pdfThis defect report includes a load analysis, a visual inspection comment, and ... In accordance to the National Electrical Code

Infrared Inspection Inventory

Test Statu Problem #Location / Name

Page: 7

TBT = To Be TestedNT/NL = Not Tested/No Load

NT/TC = Not Tested/Time ConstraintNT/UR = Not Tested/Under Repair

Equipment Test Status KeyCurrent Inspection No: 4213

321 Mitchell AvenueMargaret Mary Health

Batesville, IN 47006Report Date: 10/26/2017Inspected By

NT/NA = Not Tested/Not Accessible

O'Brien, TJ

Equipment Type

BLEQDP2-1 TESTEDBranch Panel

EMP TESTEDDisconnect

LOCATION: CAFÉ ENTERENCE HALL TESTED

6A EK1 TESTEDDistribution Panel

6B EK2 TESTEDBranch Panel

6C EK3 TESTEDBranch Panel

LOCATION: LAUNDRY TESTED

28-1 NTNADisconnect

28-2 NTNLDisconnect

Soap Dispenser NTNADisconnect

LOCATION: ELEVATOR ROOM TESTED

#41582 TESTEDDisconnect

LOCATION: GROUND FLOOR TESTED

LOCATION: STOREROOM AREA TESTED

Unnamed Cleveland TESTEDBranch Panel

EK1-10 TESTEDBranch Panel

LOCATION: PANTRY TESTED

BLEND P2-20 TESTEDBranch Panel

LOCATION: KITCHEN TESTED

BLEQ2 TESTEDBranch Panel

BLN3 TESTEDBranch Panel

BLN4 TESTEDBranch Panel

LOCATION: HOUSEKEEPING STORAGE TESTED

EW TESTEDBranch Panel

LOCATION: 1ST FLOOR TESTED

LOCATION: UNNAMED OFFICE TESTED

Unnamed TESTEDBranch Panel

LOCATION: HALL TESTED

ET TESTEDBranch Panel

G TESTEDBranch Panel

LOCATION: ELEVATOR ROOM TESTED

P: (513) 245-5951 F: (513) 741-9503www.dynascantech.com

Amanda
Text Box
Page 11: Infrared Thermographic Inspection IR Report_Medical.pdfThis defect report includes a load analysis, a visual inspection comment, and ... In accordance to the National Electrical Code

Infrared Inspection Inventory

Test Statu Problem #Location / Name

Page: 8

TBT = To Be TestedNT/NL = Not Tested/No Load

NT/TC = Not Tested/Time ConstraintNT/UR = Not Tested/Under Repair

Equipment Test Status KeyCurrent Inspection No: 4213

321 Mitchell AvenueMargaret Mary Health

Batesville, IN 47006Report Date: 10/26/2017Inspected By

NT/NA = Not Tested/Not Accessible

O'Brien, TJ

Equipment Type

BLEQDP2 TESTEDDisconnect

Car Lights TESTEDDisconnect

LOCATION: LACTATION AREA TESTED

ES TESTEDBranch Panel

LOCATION: CHAPEL AREA CLOSET TESTED

N TESTEDBranch Panel

LOCATION:CHILLER ROOM TESTED

Exhaust TESTEDStarter Disconnect

PLNDP1 TESTEDBranch Panel

AX 43 TESTEDControl Panel

AHU 32 TESTEDDisconnect

AHU 32 TESTEDVFD

PLNDP1 TESTEDDistribution Panel

LOCATION: OUTSIDE CAFÉ CHILLER TESTED

4th Floor AC Unit TESTED E4, E5Disconnect

LOCATION: 2ND FLOOR TESTED

LOCATION: HALL TESTED

Pnl 40 TESTEDBranch Panel

LOCATION: PHYSICAL THERAPY TESTED

Pnl 55 TESTEDBranch Panel

LOCATION: ADMINISTRATION TESTED

#2 TESTEDBranch Panel

#1 75 TESTEDBranch Panel

LOCATION: 3RD FLOOR TESTED

LOCATION: HALL TESTED

3LN1 TESTEDBranch Panel

LOCATION: NUTRITION CENTER AREA TESTED

Pnl 5 TESTEDBranch Panel

LOCATION: SLEEP LAB TESTED

BLLS 3 TESTED V1Branch Panel

LOCATION: DOCTOR BATHROOM TESTED

P: (513) 245-5951 F: (513) 741-9503www.dynascantech.com

Amanda
Text Box
Page 12: Infrared Thermographic Inspection IR Report_Medical.pdfThis defect report includes a load analysis, a visual inspection comment, and ... In accordance to the National Electrical Code

Infrared Inspection Inventory

Test Statu Problem #Location / Name

Page: 9

TBT = To Be TestedNT/NL = Not Tested/No Load

NT/TC = Not Tested/Time ConstraintNT/UR = Not Tested/Under Repair

Equipment Test Status KeyCurrent Inspection No: 4213

321 Mitchell AvenueMargaret Mary Health

Batesville, IN 47006Report Date: 10/26/2017Inspected By

NT/NA = Not Tested/Not Accessible

O'Brien, TJ

Equipment Type

#34 TESTEDBranch Panel

LOCATION: 4TH FLOOR TESTED

LOCATION: MAINT ROOM TESTED

PNL G TESTEDBranch Panel

LP1 TESTEDBranch Panel

LOCATION: AHU ROOM TESTED

Pnl #7 TESTEDBranch Panel

30 KVA TESTEDTransformer

Unnamed NTNAStarter Disconnect

Unnamed TESTEDStarter Disconnect

LOCATION: EX FAN ROOM TESTED

Laundry Rm TESTEDDisconnect

#5-5 TESTEDDisconnect

LOCATION: OUTSIDE TESTED

#3202 TESTEDDisconnect

LOCATION: HANSON CENTER TESTED

LOCATION: BASEMENT TESTED

LOCATION: MAIN ELECTRIC ROOM TESTED

MHNSB1 (3 Sec) TESTEDSwitchgear

BLN1 TESTEDBranch Panel

BLNDP1 TESTEDDistribution Panel

BTN1 TESTEDTransformer

BHNDP1 TESTEDDistribution Panel

BHN1 TESTEDBranch Panel

LOCATION: TRANSFER SWITCH ROOM TESTED

BLEQ1 TESTEDBranch Panel

BTEQ1 TESTEDTransformer

BLCR1 TESTEDBranch Panel

BTCR1 TESTEDTransformer

BLLS1 TESTEDBranch Panel

BTLLS1 TESTEDTransformer

P: (513) 245-5951 F: (513) 741-9503www.dynascantech.com

Amanda
Text Box
Page 13: Infrared Thermographic Inspection IR Report_Medical.pdfThis defect report includes a load analysis, a visual inspection comment, and ... In accordance to the National Electrical Code

Infrared Inspection Inventory

Test Statu Problem #Location / Name

Page: 10

TBT = To Be TestedNT/NL = Not Tested/No Load

NT/TC = Not Tested/Time ConstraintNT/UR = Not Tested/Under Repair

Equipment Test Status KeyCurrent Inspection No: 4213

321 Mitchell AvenueMargaret Mary Health

Batesville, IN 47006Report Date: 10/26/2017Inspected By

NT/NA = Not Tested/Not Accessible

O'Brien, TJ

Equipment Type

BHLS1 TESTEDBranch Panel

ATSLS TESTEDTransfer Switch

BHCR1 TESTEDBranch Panel

BHEDP1 TESTEDDistribution Panel

BHCRDP1 TESTEDDistribution Panel

ATS EQ TESTEDTransformer

BHEQDP1 TESTEDDistribution Panel

LOCATION: 1ST FLOOR TESTED

LOCATION: TELEPHONE ROOM TESTED

1LUPS1 TESTEDBranch Panel

LOCATION: ELECTRIC CLOSET TESTED

1LN2 TESTEDBranch Panel

1LN1 TESTED E8Branch Panel

1LCR1 TESTEDBranch Panel

1HN1 TESTEDBranch Panel

1HCR1 TESTEDBranch Panel

1HLS1 TESTEDBranch Panel

LOCATION: ELECTRIC ROOM BY ENTERANCE TESTED

1LN3 TESTEDBranch Panel

1LN4 TESTEDBranch Panel

1LLS1 TESTEDBranch Panel

1LCR2 TESTEDBranch Panel

LOCATION: 2ND FLOOR TESTED

LOCATION: ELECTRIC ROOM TESTED

2LN3 TESTEDBranch Panel

2LN4 TESTEDBranch Panel

2LCR2 TESTEDBranch Panel

2HCR1 TESTEDBranch Panel

LOCATION: 3RD FLOOR TESTED

LOCATION: PENTHOUSE TESTED

PHNDP1 TESTEDDistribution Panel

P: (513) 245-5951 F: (513) 741-9503www.dynascantech.com

Amanda
Text Box
Page 14: Infrared Thermographic Inspection IR Report_Medical.pdfThis defect report includes a load analysis, a visual inspection comment, and ... In accordance to the National Electrical Code

Infrared Inspection Inventory

Test Statu Problem #Location / Name

Page: 11

TBT = To Be TestedNT/NL = Not Tested/No Load

NT/TC = Not Tested/Time ConstraintNT/UR = Not Tested/Under Repair

Equipment Test Status KeyCurrent Inspection No: 4213

321 Mitchell AvenueMargaret Mary Health

Batesville, IN 47006Report Date: 10/26/2017Inspected By

NT/NA = Not Tested/Not Accessible

O'Brien, TJ

Equipment Type

PHN1 TESTEDBranch Panel

PHEQ1 TESTEDBranch Panel

PLN1 TESTEDBranch Panel

PLEQ1 TESTEDBranch Panel

MS-EF1 TESTEDStarter Disconnect

MS-EF2 TESTEDStarter Disconnect

LOCATION: OUTSIDE CHILLER TESTED

Chiller TESTED E6, E7Control Panel

P: (513) 245-5951 F: (513) 741-9503www.dynascantech.com

Amanda
Text Box
Page 15: Infrared Thermographic Inspection IR Report_Medical.pdfThis defect report includes a load analysis, a visual inspection comment, and ... In accordance to the National Electrical Code

Margaret Mary Health

Report Date: 10/26/2017Page: 1

LOCATION: 71 BUILDING LOCATION: BASEMENT LOCATION: BOILER ROOM

Severity: 3-Important

Recommendation:

Shut off power to assembly and inspect knife switch for proper blade tension and alignment. Clean blades thoroughly. Repair or replace parts as necessary.

Equipment Type: Disconnect

Target is the (B) phase knife switch on non-fused disconnect

Infrared Inspection Report

Comment:

Target Point

(B) Phase: 118 F

Reference Point

(C) Phase: 101 F

Temperature Difference

17 F

(B) Phase: 3.5

(C) Phase: 3.5

(A) Phase: 14

Load Test Results:

Rated Load:

% Rated Load:

Thermal Analysis:

Corrective Action LogDate: Person:

Repair Description:

Amps

Amps

Amps

Critical - Danger to life and limb, eminent danger to equipment.

Serious - Equipment failure is inevitable without immediate attention. Repair should be expedited ASAP

Intermediate - If this is not redundant equipment, repair should be scheduled ASAP.

Minor - Problem is apparent and needs to be monitored on a regular basis.

Problem Severity Definitions:

P: (513) 245-5951 F: (513) 741-9503www.dynascantech.com

Amanda
Text Box
Page 16: Infrared Thermographic Inspection IR Report_Medical.pdfThis defect report includes a load analysis, a visual inspection comment, and ... In accordance to the National Electrical Code

Margaret Mary Health

Report Date: 10/26/2017Page: 2

LOCATION: 71 BUILDING LOCATION: BASEMENT LOCATION: NEW ELECTRIC ROOM

Severity: 3-Important

Recommendation:

Deenergize and clean, inspect, and torque to specs the target connection

Equipment Type: VFD

Target is the (B) phase, load side connection. Excessive heat on left side contactor

Infrared Inspection Report

Comment:

Target Point

(B) Phase: 143 F

Reference Point

(C) Phase: 126 F

Temperature Difference

17 F

(B) Phase: 70

(C) Phase: 70

(A) Phase: 68

Load Test Results:

Rated Load:

% Rated Load:

Thermal Analysis:

Corrective Action LogDate: Person:

Repair Description:

Amps

Amps

Amps

Critical - Danger to life and limb, eminent danger to equipment.

Serious - Equipment failure is inevitable without immediate attention. Repair should be expedited ASAP

Intermediate - If this is not redundant equipment, repair should be scheduled ASAP.

Minor - Problem is apparent and needs to be monitored on a regular basis.

Problem Severity Definitions:

P: (513) 245-5951 F: (513) 741-9503www.dynascantech.com

Amanda
Text Box
Page 17: Infrared Thermographic Inspection IR Report_Medical.pdfThis defect report includes a load analysis, a visual inspection comment, and ... In accordance to the National Electrical Code

Margaret Mary Health

Report Date: 10/26/2017Page: 3

LOCATION: 32 BUILDING LOCATION: BASEMENT LOCATION: ELECTRIC ROOM

Severity: 3-Important

Recommendation:

Further investigation is required to determine the correct repair procedure.

Equipment Type: Distribution Panel

Target is the (A) phase fuse assembly in main switchgear

Infrared Inspection Report

Comment:

Target Point

(A) Phase: 148 F

Reference Point

(C) Phase: 112 F

Temperature Difference

36 F

(A) Phase:

(C) Phase:

(B) Phase:

Load Test Results:

Rated Load:

% Rated Load:

Thermal Analysis:

Corrective Action LogDate: Person:

Repair Description:

Amps

Amps

Amps

Critical - Danger to life and limb, eminent danger to equipment.

Serious - Equipment failure is inevitable without immediate attention. Repair should be expedited ASAP

Intermediate - If this is not redundant equipment, repair should be scheduled ASAP.

Minor - Problem is apparent and needs to be monitored on a regular basis.

Problem Severity Definitions:

P: (513) 245-5951 F: (513) 741-9503www.dynascantech.com

Amanda
Text Box
Page 18: Infrared Thermographic Inspection IR Report_Medical.pdfThis defect report includes a load analysis, a visual inspection comment, and ... In accordance to the National Electrical Code

Margaret Mary Health

Report Date: 10/26/2017Page: 4

LOCATION: 32 BUILDING LOCATION: 1ST FLOOR LOCATION: OUTSIDE CAFÉ CHILLER

Severity: 1-Critical

Recommendation:

Due to intense heat located at target area, un-repairable damage has likely occurred to equipment components. Recommend replacing all components associated with this defect. After fix, check with spot gun to insure a successful repair.

Equipment Type: Disconnect

Target is the (A) phase, line side, fuse clip on disconnect. Note: This is a critical defect. Staff was notified on-site

Infrared Inspection Report

Comment:

Target Point

(A) Phase: 230 F

Reference Point

(C) Phase: 112 F

Temperature Difference

118 F

(A) Phase:

(C) Phase:

Load Test Results:

Rated Load:

% Rated Load:

Thermal Analysis:

Corrective Action LogDate: Person:

Repair Description:

Amps

Amps

Amps

Critical - Danger to life and limb, eminent danger to equipment.

Serious - Equipment failure is inevitable without immediate attention. Repair should be expedited ASAP

Intermediate - If this is not redundant equipment, repair should be scheduled ASAP.

Minor - Problem is apparent and needs to be monitored on a regular basis.

Problem Severity Definitions:

P: (513) 245-5951 F: (513) 741-9503www.dynascantech.com

Amanda
Text Box
Page 19: Infrared Thermographic Inspection IR Report_Medical.pdfThis defect report includes a load analysis, a visual inspection comment, and ... In accordance to the National Electrical Code

Margaret Mary Health

Report Date: 10/26/2017Page: 5

LOCATION: 32 BUILDING LOCATION: 1ST FLOOR LOCATION: OUTSIDE CAFÉ CHILLER

Severity: 1-Critical

Recommendation:

Intense heat has likely caused damage to target. Recommend replacement of knifeswitch

Equipment Type: Disconnect

Target is the (B) phase knife switch on disconnect. Note: This is a critical defect. Staff was notified on-site

Infrared Inspection Report

Comment:

Target Point

(B) Phase: 193 F

Reference Point

(C) Phase: 105 F

Temperature Difference

88 F

(B) Phase:

(C) Phase:

Load Test Results:

Rated Load:

% Rated Load:

Thermal Analysis:

Corrective Action LogDate: Person:

Repair Description:

Amps

Amps

Amps

Critical - Danger to life and limb, eminent danger to equipment.

Serious - Equipment failure is inevitable without immediate attention. Repair should be expedited ASAP

Intermediate - If this is not redundant equipment, repair should be scheduled ASAP.

Minor - Problem is apparent and needs to be monitored on a regular basis.

Problem Severity Definitions:

P: (513) 245-5951 F: (513) 741-9503www.dynascantech.com

Amanda
Text Box
Page 20: Infrared Thermographic Inspection IR Report_Medical.pdfThis defect report includes a load analysis, a visual inspection comment, and ... In accordance to the National Electrical Code

Margaret Mary Health

Report Date: 10/26/2017Page: 6

LOCATION: HANSON CENTER LOCATION: OUTSIDE CHILLER Chiller

Severity: 1-Critical

Recommendation:

Further investigation is required to determine the correct repair procedure.

Equipment Type: Control Panel

Target is the (A) phase, load side contactor labeled "1M." NOTE: This is a critical defect. Staff was notified about issue while on site

Infrared Inspection Report

Comment:

Target Point

(A) Phase: 163 F

Reference Point

(C) Phase: 102 F

Temperature Difference

61 F

(A) Phase:

(C) Phase:

Load Test Results:

Rated Load:

% Rated Load:

Thermal Analysis:

Corrective Action LogDate: Person:

Repair Description:

Amps

Amps

Amps

Critical - Danger to life and limb, eminent danger to equipment.

Serious - Equipment failure is inevitable without immediate attention. Repair should be expedited ASAP

Intermediate - If this is not redundant equipment, repair should be scheduled ASAP.

Minor - Problem is apparent and needs to be monitored on a regular basis.

Problem Severity Definitions:

P: (513) 245-5951 F: (513) 741-9503www.dynascantech.com

Amanda
Text Box
Page 21: Infrared Thermographic Inspection IR Report_Medical.pdfThis defect report includes a load analysis, a visual inspection comment, and ... In accordance to the National Electrical Code

Margaret Mary Health

Report Date: 10/26/2017Page: 7

LOCATION: HANSON CENTER LOCATION: OUTSIDE CHILLER Chiller

Severity: 3-Important

Recommendation:

Deenergize and clean, inspect, and torque to specs the target connections

Equipment Type: Control Panel

Target is the (C) phase, line side, connection defect on 63 amp breaker. Amperage reading was not obtained during time of inspection

Infrared Inspection Report

Comment:

Target Point

(C) Phase: 94 F

Reference Point

(A) Phase: 82 F

Temperature Difference

12 F

(C) Phase:

(A) Phase:

Load Test Results:

63Rated Load:

% Rated Load:

Thermal Analysis:

Corrective Action LogDate: Person:

Repair Description:

Amps

Amps

Amps

Critical - Danger to life and limb, eminent danger to equipment.

Serious - Equipment failure is inevitable without immediate attention. Repair should be expedited ASAP

Intermediate - If this is not redundant equipment, repair should be scheduled ASAP.

Minor - Problem is apparent and needs to be monitored on a regular basis.

Problem Severity Definitions:

P: (513) 245-5951 F: (513) 741-9503www.dynascantech.com

Amanda
Text Box
Page 22: Infrared Thermographic Inspection IR Report_Medical.pdfThis defect report includes a load analysis, a visual inspection comment, and ... In accordance to the National Electrical Code

Margaret Mary Health

Report Date: 10/26/2017Page: 8

LOCATION: HANSON CENTER LOCATION: 1ST FLOOR LOCATION: ELECTRIC CLOSET

Severity: 3-Important

Recommendation:

Further investigation is required to determine the correct repair procedure.

Equipment Type: Branch Panel

Target is breaker #31, possible overload on 30 amp breaker. Feeds "Neon Sign"

Infrared Inspection Report

Comment:

Target Point

Breaker #31: 111 F

Reference Point

Breaker #36: 73 F

Temperature Difference

38 F

Breaker #31:

Breaker #36:

Load Test Results:

30Rated Load:

% Rated Load:

Thermal Analysis:

Corrective Action LogDate: Person:

Repair Description:

Amps

Amps

Amps

Critical - Danger to life and limb, eminent danger to equipment.

Serious - Equipment failure is inevitable without immediate attention. Repair should be expedited ASAP

Intermediate - If this is not redundant equipment, repair should be scheduled ASAP.

Minor - Problem is apparent and needs to be monitored on a regular basis.

Problem Severity Definitions:

P: (513) 245-5951 F: (513) 741-9503www.dynascantech.com

Amanda
Text Box
Page 23: Infrared Thermographic Inspection IR Report_Medical.pdfThis defect report includes a load analysis, a visual inspection comment, and ... In accordance to the National Electrical Code

INFRARED THERMOGRAPHIC INSPECTIONOF

VISUAL PROBLEMS

Provided for

Overview:

The Infrared Electrical Inspection was performed by Dyna Scan Technical Services, by a certified infrared Thermographer. All of the items inspected are listed in this InspecTrend report. Any anomalies are listed in order of priority based on the component's temperature rise, as measured from a reference component of equal type and load at the time of the inspection. Dyna Scan Technical Services assumes no liability directly or indirectly as a result of this inspection.

Current Inspection No:Prior Inspection No:

Priority Temp RisePrior

InspectionCurrent

Inspection

Percentof

Change

Margaret Mary Health , Margaret Mary Health

4213 October 9, 2017

Page 1

10/26/2017Report Date:

1-Critical NA 0 = 0% NA2-Serious NA 0 = 0% NA3-Important NA 1 =100% NA4-Minor NA 0 = 0% NA

Total Tested Problems:

Number of New Documented Problems:

Number of Tested re-occuring Problems:

Number of prior problems which were Not Tested this inspection :

Number of Total Open Problems

I hereby certify the above project was inspected by myself or under my direction and that the enclosed data is the direct result of this inspection.

* Summary of reoccuring problems on following page(s)

Number of prior problems which tested Normal this inspection :

Certification Level/No.:O'Brien, TJ

Certified Thermographer

Dyna Scan Technical Services

NA

1

NA

0 = 0% NA

NA 1 =100%

1 NA

NANA

NA

InspecTrend - Copyright © 2002-2003Logos Computer Solutions, Inc. All rights reserved. This document may not, in whole or in part, be copied, photocopied, reproduced, translated, or reduced to any electronic medium or machine-readable form without prior written consent.

This report was generated by InspecTrend and this inspection was performed by: Dyna Scan Technical Services

Amanda
Text Box
Page 24: Infrared Thermographic Inspection IR Report_Medical.pdfThis defect report includes a load analysis, a visual inspection comment, and ... In accordance to the National Electrical Code

321 Mitchell Avenue

Margaret Mary Health

Margaret Mary Health

Batesville, IN 47006

Report Date: 10/26/2017

Technician:Certification Level/No.:

O'Brien, TJCertified Thermographer

Is Chronic:

Operation Priority:

Current Prob No: Visual/1

1Page

Repair Priority:

Location/Equipment Information

File:File:

Date:Date:

FLIR8855.jpgFLIR8855.jpg

10/10/201710/10/2017

No

Critical to operation

3-Important

Time:Time:

10:10 AM10:10 AM

LOCATION: 32 BUILDING LOCATION: 3RD FLOOR LOCATION: SLEEP LAB BLLS 3

Visual Problem Documentation

Hazard Type: Missing Blanks

Recommendations: Repair as per the National Electric CodeWhat is the Cause: Missing Breaker Slot Covers

Consequences of Hazard: Unwanted entery of foreign objects into panel; Injury or death caused by contact to energized components

Asset ID: Branch Panel

Hazard Group: Missing BlankHazard Issue: Enclosure not sealed properly, this voids the UL listing.Observations: A number of branch panels were observed missing breaker slots. These enclosures not sealed properly, and thus voids the UL

listing. This is also an NEC violation. Other panels include, but not limited to: Pnl #40 (outside chiller area), Pnl #34 (Doctor bathroom)

Hazard Classification: Missing Blanks

Work Order#:

Barcode:

InspecTrend - Copyright © 2002-2003Logos Computer Solutions, Inc. All rights reserved. This document may not, in whole or in part, be copied, photocopied, reproduced, translated, or reduced to any electronic medium or machine-readable form without prior written consent.

This report was generated by InspecTrend and this inspection was performed by: Dyna Scan Technical Services

Amanda
Text Box