S.No. Tender No. Brief subject Type of tender (Open/Limited/Sin gle) Etender or Otherwise Date of Issue & closing of Tender Details of participants including quotes Time taken in awarding the tender from date of closing (days) Reason for delay, if any Payments Status with details M/s Braithwaite Burn and Jessop Construction Company Limites (Quoted Rate:Rs.1632067983.00) M/S SupremeBKBDeco (JV) (Quoted Rate:Rs.1342198273.00 M/s Senbo Engineering Ltd. (Quoted Rate:Rs.1607505642.00) M/s RKD Infrastrucure Pvt. Ltd. (Disqualify) M/s Civtect (India) Pvt. Ltd. (Quoted Rate:Rs213379200.00) M/s Dascon Sourav Commercial Pvt. Ltd. (Disqualify) M/s Bridge & Roof Co.(India) Ltd. (Quoted Rate:Rs.212877000.00 3 06/OT/RITES/HW/KOL/Soil Inv./Kona Exp./2016 Dated:07.11.2016 Geotechnical Investigation Work for construction of traffic dispersal system including flyover, ROB etc along Kona Expressway (NH 117) Open Etender Date of Issue:07.11.2016 Date of closing:17.02.2017 1. BPC Consultant India Pvt Ltd, Concept Building, Prince Park, Kolka 700099.Rs.28,87,657.71, 2. Shree Balaji Test House Pvt Ltd, FCA560B Chawla colony near water tank Faridabad121004.Rs. 28,89,739.66, 3. Sardip Consulting Engineers, CJ 147, Sector II ,Salt Lake, Kol70091. Rs. 36,12,549.33, 4. SKM Geosurvey, 6/26, M.M Ghosh Road, Kol70074. Rs. 38,41,188.53, 5. C E Testing Company Pvt Ltd,124A N S C Bose Road, Kol700092.Rs. 45,59,459.55, 6. Fugro Geotech India Pvt Ltd, Plot No. 51 Sector 6, Sanpada400705. Rs. 47,46,834.60, 7.CEG Test House and Research Centre Pvt Ltd, B11 G, Malviya Industrial Area, Jaipur302017. Rs. 61,41,737.75 4 days Work Order Issued on 21.02.2017 Work Order issued to agency M/s . BPC Consultant India Pvt Ltd, Concept Building, Prince Park, Kolkata700099 they failed to submitt the Performane Gaureenty within stipulated time period and even extended time , subsequently tender was cancelled. Construction of one no.road bridge over Uthala rivat Raghunathpur TPS in West Bengal. Open Normal Tender INFORMATION RELATED TO TENDERS INVITED BY HIGHWAY & PORTS DIVISION UPTO SEPTEMBER, 2017 SBU 33 (HIGHWAY/KOLKATA) 1st RA bill Rs.20235211 dated1.03.2016 2nd RA Bill Rs.36782254 dated29.03.2016 3rd RA Bill Rs.26896278 dated 1st July 2016 4th RA Bill Rs.24135043 dated 4.10.2016 5th RA Bill Rs.25874916 dated4.10.2016 6th RA Bill Rs.26895451.00 dated 07.12.2016 7th RA Bill Rs.28661883.00 dated23.02.2017 8th RA Bill Rs.21512162.00 dated 10.03.2017 9th RA Bill Rs.30214340.00 dated 19.04.2017 10th RA Bill Rs.3,09,21,242 dated 02.06.2017 11th RA Bill Rs.4,08,35,668.00 dated 28.06.2017 Project handed over to Kolkata RPO dated 09.06.2017 Date of Issue:18- 03-2016 Date of closing:21.09.2016 5 days LOA issued on 26-09-2016 - No payment Released Project handed over to Kolkata RPO dated 09.06.2017 1 79/OT/R/DVC/HW/BOKARBRIDGE/2014 Dated 20.10.2014 Construction of Bridge on river Konar along with its approach road etc. including road over bridge (ROB) on Gomoh Barkakana Railway Line at BTPS, DVC, Bokaro Open Normal Tender Date of issue 13.01.2014 Date of closing:24.12.2014 2 15/OT/RITES/HW/KOL/ DVC/RTPS/Uthala Bridge/2016 18.03.2016 12 days LOA issued on 06.01.2015

Upload: dokhuong

Post on 20-Mar-2018

224 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: INFORMATION RELATED TO TENDERS INVITED BY … … · Barojaguli in Hooghly and ... Providing one no of commercial Non AC Economy car (TATA Indica ... / 3(three) commercial Non A Tata

S.No. Tender No.  Brief subjectType of tender 

(Open/Limited/Single)

E‐tender or Otherwise

Date of Issue & closing of Tender

Details of participants including quotesTime taken in awarding the tender from date of closing 

(days)Reason for delay, if any Payments Status  with details

 M/s Braithwaite Burn and Jessop Construction Company Limites(Quoted Rate:Rs.1632067983.00) 

M/S Supreme‐BKB‐Deco (JV)(Quoted Rate:Rs.1342198273.00

M/s Senbo Engineering Ltd.(Quoted Rate:Rs.1607505642.00)

M/s RKD Infrastrucure Pvt. Ltd. (Disqualify)

M/s Civtect (India) Pvt. Ltd. (Quoted Rate:Rs213379200.00)

M/s Dascon Sourav Commercial Pvt. Ltd. (Disqualify)

M/s Bridge & Roof Co.(India) Ltd. (Quoted

Rate:Rs.212877000.003 06/OT/RITES/HW/KOL/Soil

Inv./Kona Exp./2016       Dated:07.11.2016

Geotechnical Investigation Work for construction of traffic dispersal system including flyover, ROB etc along 

Kona Expressway (NH 117)

Open E‐tender Date of Issue:07.11.2016   

Date of closing:17.02.2017

1. BPC Consultant India Pvt Ltd, Concept Building, Prince Park, Kolka700099.Rs.28,87,657.71,  2. Shree Balaji Test House Pvt Ltd, FCA‐560B Chawla colony near water tank Faridabad‐121004.Rs. 28,89,739.66,  3. Sardip Consulting Engineers, CJ 147, Sector II ,Salt Lake, Kol‐70091. Rs. 36,12,549.33, 4. SKM Geosurvey, 6/26, M.M Ghosh Road, Kol‐70074. Rs. 38,41,188.53,  5. C E Testing Company Pvt Ltd,124A N S C Bose Road, Kol‐700092.Rs. 45,59,459.55, 6. Fugro Geotech India Pvt Ltd, Plot No. 51 Sector 6, Sanpada‐400705. Rs. 47,46,834.60, 7.CEG Test House and Research Centre Pvt Ltd, B‐11 G, Malviya Industrial Area, Jaipur‐302017. Rs. 61,41,737.75

4 daysWork Order Issued on 

21.02.2017

Work Order issued to agency M/s . BPC 

Consultant India Pvt Ltd, Concept Building, Prince Park, Kolkata‐700099 they failed to submitt the Performane Gaureenty within stipulated time 

period and even extendedtime , subsequently tender was cancelled.

Construction of one no.road bridge over Uthala rive

at Raghunathpur TPS in West Bengal.

Open Normal Tender

INFORMATION RELATED TO TENDERS INVITED BY HIGHWAY & PORTS DIVISION UPTO SEPTEMBER, 2017

SBU 33 (HIGHWAY/KOLKATA)

1st RA bill Rs.20235211 dated1.03.2016

2nd RA Bill Rs.36782254 dated29.03.2016

3rd RA Bill Rs.26896278 dated 1st July 2016

4th RA Bill Rs.24135043 dated 4.10.2016

5th RA Bill Rs.25874916 dated4.10.2016

6th RA Bill Rs.26895451.00dated 07.12.2016

7th RA Bill Rs.28661883.00dated23.02.2017

8th RA Bill Rs.21512162.00dated 10.03.2017

9th RA Bill Rs.30214340.00dated 19.04.2017

10th RA Bill Rs.3,09,21,242dated 02.06.2017

11th  RA Bill Rs.4,08,35,668.00dated 28.06.2017

Project handed over to Kolkata RPO

dated 09.06.2017

Date of Issue:18-

03-2016

Date of

closing:21.09.20165 days

LOA issued on 26-09-2016-

No payment ReleasedProject handed over to Kolkata 

RPOdated 09.06.2017

1 79/OT/R/DVC/HW/BOKAROBRIDGE/2014

Dated 20.10.2014 

Construction of Bridge on river Konar along with its approach road etc. including road over bridge (ROB) on Gomoh Barkakana Railway Line at BTPS, DVC, Bokaro

Open Normal Tender  Date of issue 13.01.2014Date of 

closing:24.12.2014

2 15/OT/RITES/HW/KOL/

DVC/RTPS/Uthala

Bridge/2016

18.03.2016

12 daysLOA issued on 06.01.2015

Page 2: INFORMATION RELATED TO TENDERS INVITED BY … … · Barojaguli in Hooghly and ... Providing one no of commercial Non AC Economy car (TATA Indica ... / 3(three) commercial Non A Tata

4 07/LT/RITES/HW/KOL/RT330‐00013/2016 /GT  Dated: 31.10.2016

Geotechnical Investigation between Mogra‐Kampa‐Barojaguli in Hooghly and Nadia District of West Bengal, 

India

Limited Normal Tender Date of Issue:31.10.2016   

Date of closing:09.12.2016

1. Constell Consultants Pvt. Ltd, CF‐38, Sector‐1, Salt Lake City, Kolkata‐64.Rs. 11,99,289.00  2. M/s Chatterjee Construction Co. Post‐Kulti, Sanyasitala, Dist Burdwan, Pin‐713343. Rs. 8,74,747.83  3. Geo Xerox, 19, Ramkrishna Acharya Lane, Howrah‐711106.Rate not Quoted  4. M/s FUGRO Geotech(India) Pvt. Ltd., Plot No. 51, Sector‐6, Sanpada, Navi Mumbai‐400705.Rs. 13,27,456.00

5 DaysWork Order issued on 

14.12.2016

‐ 1st & Final Bill Released Rs 8,90,833.00dated.10.04.2017

5 09/LT/RITES/HW/KOL/RT330‐00026 /2016 / GT     Dated: 16.11.2016

Geo‐Technical Investigations at Siliguri Gate in Siliguri in the district of Darjeeling of West Bengal, India.

Limited Normal Tender Date of Issue:16.11.2016   

Date of closing:22.12.2016

1. M/s Geo Xerox, 5/1, Mohinath Porel lane, Salkia, Howrah, Pin‐711106. Rs. 1,50,880/‐ 2. M/s Solfon Engineers, 116/1 Benaras Road, Salkia, Howrah, Pin‐711106. Rs. 1,64,000/‐ 3.R.B. Testing, 72 Lenin Sarani, Durga Nagar, Siliguri‐734401.Rs.1,39,400.00/‐ 4. Mahananda Construction Co, 457 Bidhan Road, Siliguri‐734001. Rs. 1,39,400/‐

5 DaysWork Order issued on 

27.12.2016

‐ 1st & Final Bill Released Rs 1,39,400

dated.24.04.2017

6 10/LT/RITES/HW/KOL/HM/RT330‐00023/2016      Dated: 29.11.2016

Conducting Digital concrete hammer test,  Ultrasonic Pulse velocity test, Rebar scanning test for Health study 

of 5 Nos. Flyover/Bridges Construction by KMDAin Kolkata.

Limited Normal Tender Date of Issue:29.11.2016   

Date of closing:10.01.2017

1. M/s N P Designers, 14, K N Sen Road, Flat‐2C, Block‐ B, Kolkata‐700042. Rs. 11,99,000/‐  2. M/s Mythcon, Mahendra Enclave, BI‐B Space 4&5, AA‐32 P KananKolkata‐700101. Rs. 9,90,440/‐  3. M/s Integrated Project Management & Services, 74, Nehru Colony, Kolkata‐700040. Rs. 11,88,000/‐  4. M/s AIMIL Ltd. Sharach Tower, ^th Floor, C & D Block, 686, Anandpur, E M Bypass, Near Rubi General Hospital, Kolkata‐100107. Rs. 10,97,500.00/‐

5 daysWork Order issued on 

16.01.2017

‐ Not executed, RITES purchase the required equipments and conducted the test inhouse

7 02/OT/RITES/HW/KOL/DVC/RTPS/ROB/2016dated:20.10.2016

Construction of one no.4‐lane ROB over SH‐5 at Raghunathpur TPS in West Bengal

Open E‐tendering Date of Issue : 24.10.2016

Date of closing: 02.12.2016

No bidder participate in the Tender ‐ ‐ ‐

8 02/R/OT/RITES/HW/KOL/DVC/RTPS/ROB/2016dated:11.01.2017

Construction of one no.4‐lane ROB over SH‐5 at Raghunathpur TPS in West Bengal

Open E‐tendering Date of Issue : 17.01.2016

Date of closing: 14.02.2017

Extended upto 21.02.2017

(i) TRIVENI ENGICONS PRIVATE LIMITED3/6, H.S. TOWER , L ROAD JAMSHEDPUR India 831001

(ii) DINESHCHANDRA R AGARWAL INFRACON PVT. LTD.401‐The Grand Mall, SBI Zonal Office, S.M Road, Ambawadi, 

Ahmedabad. India 380015

Technical Evaluation is underway

validity of bids extended upto 20.07.2017

Work order not issued No PaymentProject handed over to Kolkata 

RPOdated 09.06.2017

9 12/LT/RITES/HW/KOL/AMC/Computer‐Printer/2017

dated 17.02.2017

Annual Maintainance Contract of  Desktop, Laptop and Printer, at Highway Division,56, C.R Avenue, Kolkata‐

700012

Limited Normal Tender Date of Issue : 17.02.2017

Date of closing: 23.03.2017

1. M/s M.I. Enterprise, 42/96, Dum Dum Road,Kolkata‐700 074‐(1/6Rs.1,23,750

2. M/s Ghosh Brothers, B‐303/H/2 APC Road, Kolkata‐700009‐(2/6)  Rs.1,25,500

3. M/s  Dream Digital, 73, APC Avenue, Kolkata‐700 030‐(3/6)  Rs.83,525

4. M/s S.P SYSCOM, 799/7 S.H.K Sarani, Kolkata‐700 074‐(4/6) Rs.1,26,600

5. M/s Paradigm Infosystem, 26/3, Hospital Road East, Prince Anwarshah Connector, South Purbachal, Kolkata‐700078‐(5/6)  

Rs.39,5306. M/s Jai Balaji Infosolution, 45/H/21/3 Beleghata Main Road, Kolk

700010‐(6/6) Rs.39,053

21 daysWork Order issued on 

:18.04.2017

‐ 1st Bill Rs. 22,455/‐ dated 22.05.2017

Page 3: INFORMATION RELATED TO TENDERS INVITED BY … … · Barojaguli in Hooghly and ... Providing one no of commercial Non AC Economy car (TATA Indica ... / 3(three) commercial Non A Tata

10 13/LT/RITES/HW/KOL/Vehicle/2017

dated 17.02.2017

Providing one no of commercial Non AC Economy car (TATA Indica, Wagon‐R, SANTRO or equivalent model) preferably white, on monthly rental basis for official use 

by RITES officials at site office of RITES Ltd, Dakshineswar site, Kolkata.’’

Limited Normal Tender Date of Issue : 24.02.2017

Date of closing: 15.05.2017

1. M/s Mondal Travels, Rasapunja, B.H. Road, Dist‐24 Parganas (S), Bishnupur, Kolkata‐700104 Rs.5,50,995

2. M/s Sahana Travels, 129/1D, Haltu, North Purbachal Road, Kolkat700078 Rs.5,40,885

8 daysWork Order issued on 

:23.05.2017

‐ 1st Bill Rs. 35,902/‐ dated 07.06.20172nd Bill Rs.32,286/‐dated 07.07.20173rd Bill Rs. 33,648/‐dated 04.08.20174th Bill Rs. 36,293/‐dated 09.10.2017

11 14/LT/RITES/HW/KOL/Kona Exp/GPR Survey/2017/ 

dated 28.02.2017 

Under Ground Utility Survey using GPR instrument for Kona Expressway from Vidyasagar Setu to NH‐6 Jn 

(length 6.0km, corridor width 30m)

Limited Normal Tender Date of Issue : 28.02.2017

Date of closing: 11.04.2017

1. M/s Softa Geotechnical Pvt Ltd., 57/4,Jessore Road, Champadali more,Barasat, Kolkata‐700124  Rs.4,52,196.00

2. M/s Mythcon, Mahendra Enclave, BL‐B Space 4&5,AA‐32, P Kanan, Kolkata‐700101,West Bengal,India Rs.5,24,223.00

1 DaysWork Order issued on 

:12.04.2017

‐ 1st  RA Bill Rs.3,61,756.00/‐ dated 30.06.2017

2 nd and Final RA Bill Rs. 90,439.00/‐03.10.2017

12 15/OT/RITES/HW/KOL/SoilInv./Kona Exp. /2017Dated 29.03.2017

Geotechnical Investigation work for preparation of Detailed Project Report (DPR) for Construction of Traffic Dispersal System along Kona Expressway (NH‐117) for 

upgraded Santragachi Railway Station and newly Constructed Santragachi Bus Terminus’

Open E‐tender Date of Issue : 30.03.2017

Date of closing: 23.06.2017

M/s Techpro Enginners Pvt. Ltd.103, Ratan Dham 12/483 Mc ROBERTS Ganj ,

Kanpur 208001

Work Order issued on :23.06.2017

‐ 1st RA Bill, Rs.9,00,722.00/‐Dated 08.09.2017

13 17/LT/RITES/HW/Kol/Kona Exp/3d‐animation/2017 

dated 08.07.2017 

3D modelling and animation work for Kona Expressway from Vidyasagar Setu to NH‐6 JN (length 6.5 km, 

average corridor width 30m)” 

Limited Normal Tender Date of Issue : 10.07.2017

Date of closing: 04.08.2017

1) M/s Pinnacle Infotech Solutions      SSB Sarani, Bidhannagar,      Durgapur, West Bengal,       PIN – 713212      Rs.5,76,000.002)  M/s Orbit Animate Pvt Ltd.       BG‐127, BG Block, Sector II, Salt Lake City,       Bidhannagar, West Bengal 700091       Rs.3,89,424.00

Work Order issued on.  09.08.2017

‐ 1st RA Bill, Rs. 3,11,539.00/‐Dated 3.10.2017

14 18/LT/RITES/HW/KOL/Supply‐Packed/Lunch/2017 

dated:24.07.2017

"Rate Contract"‐ for selection of catering vendor/ contractor supply graded sealed packed lunch in 

Highway Division at 56, C. R Avenue, 4th Floor, Kolkata‐700012

Limited Normal Tender Date of Issue : 24.07.2017

Date of closing: 17.08.2017 

1) M/s RFT Kitchen, 24, Sukanta Satani, Kolkata‐700060Rs. 6,81,120.00

2) M/s RFT Caterer, 220,Sodepur, 1st Lane, Kolkata‐700082Rs.7,04,880.00

Work Order not issued Tender was discharge due to only two bidders submitted  their bids and owner of the both agency is found to be same person . As per NIT 

Canvassing in connection with tender is strictlly prohibited.

‐ No payment Released

15 16/LT/RITES/HW/Bandel/Vehicle/2017 

dated:23.06.2017

providing 1(one)/ 02 (two)/ 3(three) commercial Non A

Tata Sumo/Swift Dezire/Travera/Xylo/Scorpio car or

equivalentmodelon monthlyrental basisfor officialuse

by RITES officials for Bandel & Adisaptagram ROB

Project.

Limited Normal Tender Date of Issue : 25th July,2017

Date of closing: Evaluatation underway

1) M/s M/s Anindita Saha, Tola Fatak, Nandan Kanan Lane, P.S‐ Chinshura, P.O‐Chinshura, Distt‐Hooghly, West Bengal, Pin‐712101, 

Rs.36,530.002) M/s Friends Travels, Sarkaripally, Ward No. 06, P.O‐Bansberia, 

Distt‐ Hooghly, West Bengal, Pin‐712502Rs.36,530.00

3) M/s Mondal Travels, Mankundu, Dakhin Para, R K Banerjee Sarani, Distt‐Hooghly, West Bengal.

Rs.35,00.00RITES Estimated Cost for three vehicle 24 months.

Work Order not issued Evaluation is underway

‐ No payment Released

Page 4: INFORMATION RELATED TO TENDERS INVITED BY … … · Barojaguli in Hooghly and ... Providing one no of commercial Non AC Economy car (TATA Indica ... / 3(three) commercial Non A Tata

16 19/LT/RITES/HW/Vehicle/2017 dated:26.09.2017

"Hiring of one (01) Commercial NON AC Economy

car(Swift Dzire Tour or equivalent model) dieseldriven

vehicle on monthly rental basis for RITES Officials for

official use at RITES LTD, Highway Division,56, C R

Avenue, 4th floor, kolkata‐700012”.

Limited Normal Tender Date of Issue :14.09.2017

Date of closing: Evaluatation underway

1. M/s Sahana Travels, 129/1D, Haltu, North Purbachal Road, Kolkat700078. Rs.5,56,589.18

2. M/s Tara Maa Travels, C/o‐ DebashisBasu, N.S.Road, Harinavi, Kolkata‐700148. Rs.5,27,035.78

3. M/s Mondal Travels, RASAPUNJA, B H Road, District‐24 Paraganas (S), Bishnupur, Kolkata‐700104. Rs.5,51,663.62

Work Order not issued Evaluation is underway

‐ No payment Released

17 20/LT/RITES/HW/KOL/Furniture/2017 Dt. 15.09.2017

Supply of two nos three seated Godrej make chair,

model‐Nano perch 3 seater with two arms & without

cushion BPMIX. for official use at RITES Ltd, Highway

Division, 56, C.R.Avenue, 4th Floor, Kolkata‐700 012.

Limited Normal Tender Date of Issue :15.09.2017

Date of closing: Evaluatation underway

1. M/s Phoenix Machines(p) ltd, 156A, Lenin Sarani, 505 kamalalaya centre, kolkata‐700013. Rs.35.804

2. M/s Godrej & Boyce Mfg. co. Ltd, 30, block‐GN, SECTOR‐V, Saltlake city, kolkata‐700091. Rs.35.984

3. M/s Design M, 462, Block‐FD, Sector‐III, Salt lake, Kolkata‐700106. Rs.35.948

Work Order not issued Evaluation is underway

‐ No payment Released

SBU 13 (PORTS & WATER WAYS)1 RITES/P&WR/AP/155/NPR‐

Survey/2015; Dated: 11.06.2015

Topographic and Bathymetry survey for Narsapur Port Limited Otherwise 15.06.2015/ 29.06.2015

1. M/s Seabird Surveys Pvt Ltd., , Mumbai: Rs.58 lakhs 2. M/s New Horizon Surveys Pvt Ltd.; Rs.32.40 lakhs   3. M/s STRABAG India Pvt. Ltd, Delhi: Rs.31.40 Lakhs   4)M/s Indomer Coastal Hydraulics Pvt LtdChennai: Rs.22.50 lakhs  5) M/s IIC Tech. Ltd, Hyd'bad: Rs.37 lakhs 6) M/s Fugro Survey India Pvt Ltd: Rs. 55,25,675/‐

35 days Work completed and 100% payment released. Payment of Rs.18.00 lakhs+ST (80% of Rs.22.50 lakhs) released in November‐15. Balance 20% payment of Rs.4.5 lakhs + service tax released on 08 th November‐2016

2 RITES/P&WR/AP/156/RAM‐Survey/2015; Dated: 15.06.2015

Topographic and Bathymetry survey for Ramayapatnam Port

Limited Otherwise 17.06.2015/ 29.06.2015

1. M/s Seabird Surveys Pvt Ltd., , Mumbai: Rs.58.80 lakhs 2. M/s Zenith Surveys Pvt Ltd., Mumbai; Rs.31.60 lakhs   3. M/s STRABAG India Pvt. Ltd, Delhi: Rs.33 Lakhs   4) M/s Indomer Coastal Hydraulics Pvt Ltd. Chennai: Rs.29.50 lakhs  5) M/s IIC Tech. Ltd, Hyd'bad: Rs.37 lakhs 6) M/s Fugro Survey India Pvt Ltd: Rs. 57,45,750/‐

51 days Project kept in abeyance on instructions from  Client

Work completed and 100% payment released. Payment of Rs.23.6 lakhs (80% of 29.5 lakhs)  +ST released in December‐15. Balance 20% payment i.e., Rs.5.9 lakhs + service tax released in 08 th November‐2016

3 RITES/P&WR/NW‐4/GEO‐TECH/162/2016; Dated:02.08.2016

Conducting Geotechnical Investigation for developmenof navigation ffrom Mukhtyala to Vijayawada Strectch of NW 4 on River Krishna

Limited Otherwise 02.08.2016/ 25.10.2016

1. M/s Mars Synergy Geotech Pvt Ltd., , Chennai: Rs. 19.19 lakhs 2. M/s S.M. Consultants, ,Secunderabad: Rs.21.50 lakhs  3. M/s IDDC Engineers Pvt. Ltd, ,Visakhapatnam: Rs.18.06 lakhs , 4. M/s Satya Assocoates , ,Visakhapatnam: Rs.15.44 lakhs  

8 days ‐ Work completed and 100% payment released. Payment of Rs 9,26,640/‐ (60% of 15.444 lakhs)  +ST released in January‐17. Balance 40% payment i.e., Rs 6,17,760/‐ + service tax released in  March‐2017

4 RITES/P&WR/MIZO/Survey/164/2016; Dated:29.11.2016

Conducting Hydrographic survey work on River Khawthlangtuipui‐Tuichawng in Lunglei district

Limited Otherwise 29.11.2016/ 13.12.2016

1. M/s New Horizon Service Pvt Ltd.: Rs. 10.25 lakhs 2. M/s Sea bird surveys Pvt Ltd.: Rs.8.40 lakhs   3. M/s Land and Coast: Rs.9.75 lakhs 

23 days ‐ Work completed and 10% LD has been imposed. Remaining payment of Rs 7,56,000/‐  +ST released in June‐17. 

5 RITES/P&WR/MAU/GT&Survey/165/2017; Dated:12.04.2017

Conducting Topographic survey, Bathmetric survey GT investigation and EIA for Marine development project at Fort Williams area of Port Louis in Mauritius

Limited Otherwise 12.04.2017/ 24.04.2017

1. M/s Frankpile International Ltd., Mauritius: USD 99,411  2. M/s VYYAASS Consulting Engineers, Mauritius .: USD 4,07,104   3. M/s Water Research Co Pvt Ltd, Mauritius USD 1,95,501.366

23 days ‐ Work in progress; 20% payement ($16560.8)  for GT investigation and 20% payment ($3321.4) for EIA studies totalling to $19882.2 has been released.

SBU 30 (HIGHWAY DESIGN PROJECTS)

Page 5: INFORMATION RELATED TO TENDERS INVITED BY … … · Barojaguli in Hooghly and ... Providing one no of commercial Non AC Economy car (TATA Indica ... / 3(three) commercial Non A Tata

1 RITES/HW/RT300‐00011/TOPO/2016 dated 02.03.2016

Topographic survey and strip plan for two packages:Package‐I: SH‐11A: Omarpur (NH34 Jn) – Lalgola – Bhagwangola ‐ Chunakhali (km 0/000 to km 56/400); and SH‐11: Chunakhali – Domkal – Jalangi ‐  Krishnanagar (km 89/972 to km 221/955) = 190km

Two Participants:1. Package‐I : M/s Pioneer Surveyors, Kolkata (Rs. 31,35,000/‐) &2. M/s ARK Services, Faridabad (Rs. 29,44,240/‐) 

Date of Award: 13.05.2016 (58 days)

‐ M/s ARK Services, Faridabad1. RA Bill1_Processed on 07.11.2016 for Rs. 10,15,762.80.2. RA Bill2_Processed on 13.02.2017 for Rs. 3,38,588.00.3. RA Bill3_Processed on 29.03.2017 for Rs. 6,77,175.00.

2 Package‐II: SH‐3: Krishnanagar – Hanskhali –Duttafulia – Helechna – Bongaon(km 0/000 to km 69/591); andMDR: Bongaon – Panchpota – Swarupnagar – Basirhat (Ghojadanga) (km 0/000 to km 61/220) = 140km

Two Participants:1. Package‐II: M/s Pioneer Surveyors, Kolkata (Rs. 23,10,000/‐); & 2. M/s ARK Services, Faridabad (Rs. 23,11,400/‐) 

Date of Award: 13.05.2016 (58 days)

‐ M/s Pioneer Surveyors, Kolkata1. RA Bill1_Processed on 03.11.2016 for Rs. 07,26,761.50.2. RA Bill2_Processed on 09.05.2017 for Rs. 2,42,253.80.

3 RITES/HW/RT300‐00011/RBT/2016 dated 01.03.2016

Inventory & Condition for Roads, Culverts/Bridges and Traffic Surveys for: i. SH‐11A: Omarpur (NH34 Jn) – Lalgola – BhagwangolaChunakhali (km 0/000 to km 56/400)ii. SH‐11: Chunakhali – Domkal – Jalangi ‐  Krishnanagar (km 89/972 to km 221/955)iii. SH‐3: Krishnanagar – Hanskhali –Duttafulia – Helechna – Bongaon (km 0/000 to km 69/591)iv. MDR: Bongaon – Panchpota – Swarupnagar – Basirhat (Ghojadanga) (km 0/000 to km 61/220) ‐ 330km

Limited Tender E‐tender DOI: 23.03.2016DOC: 12.04.2016

One Participant:1. M/s Xplorer Consultancy Services Pvt. Ltd., Gurgaon (Rs. 32,25,500/‐)2. After negotiation meeting held on 06.05.2016, the negotiated feeRs. 29,02,950/‐

Date of Award: 16.05.2016 (34 days)

‐  M/s Xplorer Consultancy Services Pvt. Ltd., Gurgaon1. RA Bill1_Processed on 06.10.2016 for Rs. 13,31,575.00.2. RA Bill2_Processed on 14.02.2017 for Rs. 16,64,469.00.

4 RITES/HW/RT300‐00012/TOPO/2016 dated 02.05.2016

Topographic survey and strip plan for two packages:Package‐II: Dhrol – Amram – Maliya Road section (89 Km)

Open Tender E‐tender DOI: 17.05.2016DOC: 03.06.2016

Two Participants:1. Package‐II : M/s Pioneer Surveyors, Kolkata (Rs. 36,49,000/‐); &2. M/s New Horizon Contultancy Services (NHCS), Seerampur, Hoogly, West Bengal (Rs. 16,28,700/‐) 

Date of Award: 03.06.2016 (22 days)

‐ M/s New Horizon Contultancy Services, HooglyPayment for an amount of Rs. 7,48,752/‐ (including Service Tax)has been processed to Finance Division on 08.09.2016.

5 RITES/HW/RT30000011/EIA‐SIA‐LPS/2016 dated 23.03.2016

EIA/EMP and SIA/RAP Studies including preparation of  Land Plan Schedules (LPS) for Consultancy Services for Project Management including preparation of Feasibility Study/Detailed Project Report of selected road stretches/ corridors for Two/ Four Laning with paved shoulder NH configuration under Bharatmala Project in the State of West Bengal.

Open E‐tender DOI: 23.03.2016DOC: 19.04.2016

Two Participant:1. M/s Overseas Min‐Tech Consultants, Tonk Road, Jaipur(Rs. 39,01,590/‐)2. M/s STUP Consultants Pvt. Ltd., Kolkata  (Rs. 48,00,015/‐)Date of Award: 26.05.2016

24 days ‐ M/s Overseas Min‐Tech Consultants, Tonk Road, Jaipur1. RA Bill1_Processed on 05.07.2017 for Rs. 2,24,340.00.

6 RITES/HW/NHAI/UP Roads/TOPO SURVEY/2016 dt. 4.1.2017

Topographic Survey ‐ Feasibillity Study for restructuring of Varanasi‐Hanumana Section of NH7 (Pcode: RT300 00034)

Quotations Otherwise 4.1.2017 1. M/s Prime Meridian (P) Ltd, Chennai ‐ Rs.15,75,000/‐ ; (2) M/s Pioneer Surveyors, Kolkata :  Rs.11,50,000/‐  (3) M/s Theovel Survey, Bangalore; Rs. 4,98,000/‐

15 daus ‐ Work awarded to M/s Theovel Survey, Bangalore for Rs.4,98,000/‐  on 19.1.2017. No payment released so far

Limited Tender E‐tenderDOI: 02.03.2016DOC: 15.03.2016

Page 6: INFORMATION RELATED TO TENDERS INVITED BY … … · Barojaguli in Hooghly and ... Providing one no of commercial Non AC Economy car (TATA Indica ... / 3(three) commercial Non A Tata

7 RITES/HW/RT300‐00012/TOPO/2016 dated 01.03.2016

Topographic survey and strip plan for two packages:Package‐I: Dwarka – Khambhalia – Devalia section (86 Km)

Two Participants:1. Package‐I: M/s Pioneer Surveyors, Kolkata (Rs. 19,10,000/‐) ; &2. M/s ARK Services, Faridabad (Rs. 20,21,000/‐) 

Date of Award: 13.05.2016 (58 days)

‐ M/s Pioneer Surveyors, KolkataPayment for an amount of Rs. 7,20,600/‐ done till date.(3,60,300/‐ paid in December 2016 against 1st bill, 1,20,100/‐ paid in April 2017 against 2nd bill and 2,40,200 paid in June 2017 against 3rd bill)

8 Package‐II: Dhrol – Amram – Maliya Road section (89 Km)

Two Participants:1. Package‐II: M/s Pioneer Surveyors, Kolkata (Rs. 14,69,000/‐); & 2. M/s ARK Services, Faridabad (Rs. 20,47,000/‐) 

Retender for 2016‐17 ‐ ‐

9 RITES/HW/RT300‐00012/RBT/2016 dated 01.03.2016

Inventory & Condition for Roads, Culverts/Bridges and Traffic Surveys for: 1. Dwarka – Khambhalia – Devalia section (86 Km)2. Dhrol – Amram – Maliya Road section (89 Km)

Limited Tender E‐tender DOI: 23.03.2016DOC: 12.04.2016

Two Participants:1. M/s Xplorer Consultancy Services Pvt. Ltd., Gurgaon (Rs. 24,31,900/‐);  2. M/s M. K. Soil Testing Laboratory, Ahmedabad (Rs. 14,07,000/‐) 

Date of Award: 16.05.2016 (34 days)

‐ M/s M K Soil Testing Laboratory, AhmedabadPayment for an amount of Rs. 11,51,100/‐ done till date.(5,11,600/‐ paid in March 2017 against 1st bill and 6,39,500/‐ paid in June 2017 against 2nd bill)

10 RITES/HW/RT300‐00012/TOPO/2016 dated 02.05.2016

Topographic survey and strip plan for two packages:Package‐II: Dhrol – Amram – Maliya Road section (89 Km)

Open Tender E‐tender DOI: 17.05.2016DOC: 03.06.2016

Two Participants:1. Package‐II : M/s Pioneer Surveyors, Kolkata (Rs. 36,49,000/‐); &2. M/s New Horizon Contultancy Services (NHCS), Seerampur, Hoogly, West Bengal (Rs. 16,28,700/‐) 

Date of Award: 03.06.2016 (22 days)

‐ M/s New Horizon Contultancy Services, HooglyPayment for an amount of Rs. 9,68,436/‐ done till date.(Rs 4,88,610 paid in September 2016 against 1st bill, Rs 1,62,870 paid in September 2016 against 2nd bill and Rs 3,16,956 paid in June 2017 against 3rd bill)

11 RITES/HW/RT300‐00012/EIA‐SIA‐LPS/2016 dated 23.03.2016

Carryout EIA/EMP and SIA/RAP Studies including preparation of Land Plan Schedules (LPS) for "Dwarka ‐ Khambhaliya ‐ Devariya" and "Dhrol ‐ Amran ‐ Maliya" 

Open Tender E‐tender DOI: 23.03.2016DOC: 19.04.2016

1. M/s Overseas Min‐Tech Consultants, Jaipur : Rs 31,90,775/‐ Date of Award: 21.06.2016 (64 days)

‐ M/s Overseas Min‐Tech Consultants, JaipurPayment for an amount of Rs. 

12 RITES/HWD/NHAI/BM‐13/West Bengal/2016/Vol‐11A dated 22.12.2016 (2ndCall)

Geo‐Technical Investigations for structures (Bridges/ROBs/RUBs/Interchanges/ Overpasses/Underpasses, etc. and Investigations for construction materials for Consultancy services for preparation of Feasibility Study/Detailed Project Report of selected road stretches/corridors for up‐gradation to Two/Four lane with paved shoulder NH configuration under Bharat Mala Project in the State of West Bengal (330km)" for the following road sections:i) SH‐11A: Omarpur (NH34 Jn) – Lalgola – BhagwangolaChunakhaliii) SH‐11: Chunakhali – Domkal – Jalangi ‐  Krishnanagar iii) SH‐3: Krishnanagar – Hanskhali –Duttafulia – Helechna – Bongaon iv) MDR: Bongaon – Panchpota – Swarupnagar – Basirhat (Ghojadanga) 

Limited Tender E‐tender DOI: 28.12.2016DOC: 09.01.2017

1. M/s C.E. Testing Co. Pvt Ltd (Rs. 71,87,900/‐),2. M/s Cengrs Geotehnical Pvt. Ltd. (Rs. 96,17,250/‐),3. M/s Xplorer Consultancy Services Pvt. Ltd. (Rs. 94,74,950/‐),4. M/s Constell Consultants Pvt. Ltd (Rs.83,34,750/‐)5. M/s Pioneer Surveyors (Rs. 58,44,145/‐),6. M/s CEG Test House and Research Centre Pvt Ltd (Rs. 80,75,500/‐),

Date of Award: 03.03.2017 (53 days)

LOA issued on  07‐03‐20171) M/s Pioneer Surveyors, Kolkata 1st RA bill Rs. 2,92,207/‐ + (ST) paid in July'2017 2)  M/s Pioneer Surveyors, Kolkat2nd RA bill Rs. 5,43,505.70/‐ (Including GST@ 18%) paid on 14.09.2017  3) M/s Pioneer Surveyors, Kolkata 3rd RA bill Rs. 8,43,634.72/‐ (Including GST@ 18%) paid on 26.09.2017  4) M/s Pioneer Surveyors, Kolkat4th RA bill Rs. 8,98,277.82/‐ (Including GST@ 18%) paid on 26.09.2017                                        

Limited Tender E‐tenderDOI: 01.03.2016DOC: 15.03.2016

Page 7: INFORMATION RELATED TO TENDERS INVITED BY … … · Barojaguli in Hooghly and ... Providing one no of commercial Non AC Economy car (TATA Indica ... / 3(three) commercial Non A Tata

13 Quotation No. RITES/HWD/NTPC‐Korba/DPR/RT300‐ 00029/ Geotech/ 2016/Vol‐4A dated 17.03.2017

Geo‐Technical and Material Investigations for Construction of bridge across Hasdeo River for future adyke of Korba Stage‐I & II at Koriyaghat in Korba district in Chhatisgarh state. 

Limited Tender E‐quotation DOI: 17.03.2017DOC: 22.03.2017

1. M/s Xplorer Consultancy Services Pvt. Ltd (Rs. 15,15,500/‐),2. M/s Cengrs Geotehnical Pvt. Ltd. (Rs. 18,58,000/‐),3. M/s C.E. Testing Co. Pvt Ltd (Rs. 17,30,500/‐),

Date of Award: 10.04.2017 (20 days)

LOA issued on  12‐04‐2017M/s Xplorer, Gurgaon 1st RA bill of Rs. 75,775/‐ + (ST) has been processed & submitted to Fin/HWD on 27.06.2017.  1) M/s Xplorer, Gurgaon 1st RA bill of Rs. 64408.25/‐ (including ST) paid on 21.07.2017.   2) M/s Xplorer, Gurgaon 2nd RA bof Rs. 151549.50/‐ (including ST) paid on 25.07.2017.  3)  M/s Xplorer, Gurgaon 3rd RA bof Rs. 514155.00/‐ (including GSTpaid on 03.08.2017.

14 RITES/HW/RT300‐00012/Geotech/2016 dated 05.01.2017

Geo‐Technical and Material Investigations for Project Management including praparation of Feasibility study/Detailed project report of selected road stretches/corridors for upgradation to Two/Four lane with paved shoulders NH configuration under Bharatmala Project in the State of Gujarat

Limited Tender E‐tender DOI: 05.01.2017DOC:19.01.2017

1. M/s M.K. Soil Testing Laboratory (Rs. 45,36,000/‐),2. M/s COS Consultancy Services (Rs. 63,72,500/‐),3.M/s CEG Test House and Research Centre Pvt Ltd. (Rs. 78,07,350/‐),4. M/s C.E. Testing Co. Pvt Ltd. (Rs.71,33,000/‐)5. M/s MAGMA Infrastructure Pvt Ltd. (Rs. 53,52,000/‐)

Date of Award: 08.03.2017 (49 days)

LOA issued on  08‐03‐2017Agency (M/s. MK Soil Laboratory has requested for extention  of time for alive the project. No Payment .

15

RITES/HW/DDA/DPR/4

015-30/GT WORK/2013,

Date: 18/09/2013

Consultancy Services for geometric design,

Structure Design/Drwaings, Preparation of detiled

estimates and Tender document for construction o

ROB cum Flyover of intersection coming in the

alignment of UER-II on Delhi Rohtak Railway Line

and NH-10-GeoTechnical work

Limited Otherwise

Issue date:

18/09/2013,

closing date-

30/09/2013

1.)M/s Indian Geo-technical Services, New Delhi- (9.63 lacs),

2) M/s C. E. testing Co. Pvt. Ltd., Kolkata- (14.82 lacs),

3) M/s Explore Engineering Consultants Pvt. Ltd-(11.48 lacs)

Letter of award date to

IGS: 29/11/2013, 59 days-

Final Payment to IGS

Released

16

RITES/HW/DDA/DPR/4

035-30/GT WORK/2014,

Date: 17/04/2014

Consultancy Services for flyover cum ROB on UER

I and FCI Godowns Delhi Karnal Railway line and

Alipur Road Junction_GeoTechnical workLimited Otherwise

Issue date:

17/04/2014,

closing date-

30/04/2014

1.) M/s Dhruv Consultancy Services, Mumbai - (26.25lacs),

2) M/s C. E. testing Co. Pvt. Ltd., Kolkata- (25.36 lacs),

3) Consulting Engineers Group Ltd. Jaipur- (24.51 lacs),

4) M/s Magma Infrastructure Pvt. Ltd. Delhi - (19.82 lacs),

5) M/s Indian Geo-technical Services, New Delhi- (23.89 lacs)

Letter of award to MIPL

date: 02/06/2014, 33 days-

Final payment release order to

MIPL, delhi on date 29th july

2016

17RITES/HW/DDA/2012:

Date: 28/08/2014

Consultancy Services of Detailed Design and

Drawings of ROB cum flyover on UER- I across

Delhi-Karnal Railway Line, FCI Godowns and Alipur

Road at Narela

Single Otherwise 28/08/2014M/s Chetan Infratech Consultants Pvt. Ltd, 7/11,13th Main

Road, BSK 1st, stage,Srinagar, Banglore-50, (6.00Lacs)

Letter of award date:

08/09/2014, 11 days- Final Payment Released

18RITES/HW/DDA/2012:

Date: 08/09/2014

Proof Checking of Detailed Design and Drawings of

ROB cum flyover on UER- I across Delhi-Karnal

Railway Line, FCI Godowns and Alipur Road at

Narela

Single Otherwise 8/9/2014

IIT Roorkee, Dr. Akhil Upadhyay, Department of Civil

Engineering, Indian Institute of Technology, Roorkee-247667,

(20.00 Lacs)

Letter of award date:

09/09/2014, 7 days- Final Payment Released

19RITES/HW/DDA/2012:

Date: 14/03/2016

Proof Checking of Detailed Design and Drawings of

ROB cum flyover on UER-II on Delhi Rohtak

Railway Line and NH-10

Single Otherwise 14/03/2016

IIT Roorkee, Dr. Akhil Upadhyay, Department of Civil

Engineering, Indian Institute of Technology, Roorkee-247667,

(32.00 Lacs)

Letter of award

date:17/03/2016, 3 days-

Final Payment Released, Date

November 2016

Page 8: INFORMATION RELATED TO TENDERS INVITED BY … … · Barojaguli in Hooghly and ... Providing one no of commercial Non AC Economy car (TATA Indica ... / 3(three) commercial Non A Tata

20

RITES/HW/NHAI/UP Roads/TOPO SURVEY/2016 dt. 4.1.2017

Topographic Survey ‐ Feasibillity Study for restructuring of Varanasi‐Hanumana Section of NH7 (Pcode: RT300 00034)

Quotations Otherwise 4.1.2017 1. M/s Prime Meridian (P) Ltd, Chennai ‐ Rs.15,75,000/‐ ; (2) M/s Pioneer Surveyors, Kolkata :  Rs.11,50,000/‐  (3) M/s Theovel Survey, Bangalore; Rs. 4,98,000/‐

15 daus ‐ Work awarded to M/s Theovel Survey, Bangalore for Rs.4,98,000/‐  on 19.1.2017. No payment released so far

21

RITES/HWD/NHAI/BM‐13/West Bengal/2016/Vol‐11A dated 22.12.2016 (2ndCall)

Geo‐Technical Investigations for structures (Bridges/ROBs/RUBs/Interchanges/ Overpasses/Underpasses, etc. and Investigations for construction materials for Consultancy services for preparation of Feasibility Study/Detailed Project Report of selected road stretches/corridors for up‐gradation to Two/Four lane with paved shoulder NH configuration under Bharat Mala Project in the State of West Bengal (330km)" for the following road sections:i) SH‐11A: Omarpur (NH34 Jn) – Lalgola – BhagwangolaChunakhaliii) SH‐11: Chunakhali – Domkal – Jalangi ‐  Krishnanagar iii) SH‐3: Krishnanagar – Hanskhali –Duttafulia – Helechna – Bongaon iv) MDR: Bongaon – Panchpota – Swarupnagar – Basirhat (Ghojadanga) 

Limited Tender E‐tender DOI: 28.12.2016DOC: 09.01.2017

1. M/s C.E. Testing Co. Pvt Ltd (Rs. 71,87,900/‐),2. M/s Cengrs Geotehnical Pvt. Ltd. (Rs. 96,17,250/‐),3. M/s Xplorer Consultancy Services Pvt. Ltd. (Rs. 94,74,950/‐),4. M/s Constell Consultants Pvt. Ltd (Rs.83,34,750/‐)5. M/s Pioneer Surveyors (Rs. 58,44,145/‐),6. M/s CEG Test House and Research Centre Pvt Ltd (Rs. 80,75,500/‐),

Date of Award: 03.03.2017 (53 days)

LOA issued on  07‐03‐20171) M/s Pioneer Surveyors, Kolkata 1st RA bill Rs. 2,92,207/‐ + (ST) paid in July'2017  2)  M/s Pioneer Surveyors, Kolkat2nd RA bill Rs. 5,43,505.70/‐ (Including GST@ 18%) paid on 14.09.2017  3) M/s Pioneer Surveyors, Kolkata 3rd RA bill Rs. 8,43,634.72/‐ (Including GST@ 18%) paid on 26.09.2017  4) M/s Pioneer Surveyors, Kolkata 4th RA bill Rs. 8,98,277.82/‐ (Including GST@ 18%) paid on 26.09.2017                                        

22

Quotation No. RITES/HWD/NTPC‐Korba/DPR/RT300‐ 00029/ Geotech/ 2016/Vol‐4A dated 17.03.2017

Geo‐Technical and Material Investigations for Construction of bridge across Hasdeo River for future adyke of Korba Stage‐I & II at Koriyaghat in Korba district in Chhatisgarh state. 

Limited Tender E‐quotation DOI: 17.03.2017DOC: 22.03.2017

1. M/s Xplorer Consultancy Services Pvt. Ltd (Rs. 15,15,500/‐),2. M/s Cengrs Geotehnical Pvt. Ltd. (Rs. 18,58,000/‐),3. M/s C.E. Testing Co. Pvt Ltd (Rs. 17,30,500/‐),

Date of Award: 10.04.2017 (20 days)

LOA issued on  12‐04‐2017M/s Xplorer, Gurgaon 1st RA bill of Rs. 75,775/‐ + (ST) has been processed & submitted to Fin/HWD on 27.06.2017.  1) M/s Xplorer, Gurgaon 1st RA bill of Rs. 64408.25/‐ (including ST) paid on 21.07.2017.   2) M/s Xplorer, Gurgaon 2nd RA bof Rs. 151549.50/‐ (including ST) paid on 25.07.2017.  3)  M/s Xplorer, Gurgaon 3rd RA bof Rs. 514155.00/‐ (including GSTpaid on 03.08.2017.

23

RITES/HW/RT300‐00012/Geotech/2016 dated 05.01.2017

Geo‐Technical and Material Investigations for Project Management including praparation of Feasibility study/Detailed project report of selected road stretches/corridors for upgradation to Two/Four lane with paved shoulders NH configuration under Bharatmala Project in the State of Gujarat

Limited Tender E‐tender DOI: 05.01.2017DOC:19.01.2017

1. M/s M.K. Soil Testing Laboratory (Rs. 45,36,000/‐),2. M/s COS Consultancy Services (Rs. 63,72,500/‐),3.M/s CEG Test House and Research Centre Pvt Ltd. (Rs. 78,07,350/‐),4. M/s C.E. Testing Co. Pvt Ltd. (Rs.71,33,000/‐)5. M/s MAGMA Infrastructure Pvt Ltd. (Rs. 53,52,000/‐)

Date of Award: 08.03.2017 (49 days)

LOA issued on  08‐03‐2017No Payment

Page 9: INFORMATION RELATED TO TENDERS INVITED BY … … · Barojaguli in Hooghly and ... Providing one no of commercial Non AC Economy car (TATA Indica ... / 3(three) commercial Non A Tata

24 RITES/HW/NHAI/UP/EIA_RR_LA/Tila /2010

Prepartion of Land Acquisition Plan , EIA and RAP for National Highways project in UP

Limited otherwise 28.05.2010 & running

1. Tila Consultants and Contractors Pvt. Ltd (Rs 27, 00,000). Variation amount for increase in length of NH 7 for Rs 5,40,000 approved in Sep 2013. Variation amount for revision due to new bypasses on NH 232A & NH 7 Rs 8,52,904/‐ approved in May 2017

 ( 28 days) ‐

Rs. 21,34,841 ( Bill No.1, Rs. 2,70,000 paid in Nov, 2010; Bill No. 2 for Rs.2,70,000 paid in Jan'2011; Bill No. 3  for Rs. 

5,00,727 paid in Feb'2012; Bill No. 4 for Rs. 3,33,818 paid in May, 2012, Bill No. 5 for Rs. 5,36,932 paid in August, 2013,  Bill No. 6 for Rs. 2,43,000 paid in July, 2016, Bill no 7 for Rs 3,65,113 paid on Dec 

28, 2016)

25

RITES/HW/NHAI/UP Roads/Topo Sur/2010

Package ‐4 ( Unnao  to Lalganj) Limited otherwise 12.02.2010

 M/s Theovel Survey, Bangalore; Rs. 16,87,600/‐ work order dated 12/02/2010 + Variation amount of Rs 1,38,750 tpwards additional DGPS Mar 2011, Variation Amount for additional bypasses for Rs 3,97,800/‐ dated 20/06/2016

 ( 11 days) ‐

 Payment to M/s Theovel Surveys  for Rs 5,91,120 recomended by Aug 2010, Rs 6,78,000 towards DGPS survey recomended by Dec 2010,  Rs 1,88,276 by Sep 2016, Rs 3,97,800 by Dec 2016, Rs 3, 27, 807 by June 2017.

26

RITES/HW/UT/CO/NBCC/VISSIM/2016

RoadSafety Auditof Pedestriansafety measureat T jn.Of Barapulaah elevated road with Aurobindo marg

Quotation  otherwise 03.08.2016 M/s Transaxiom (Rs. 85,000/‐)  ( 8 days)1st bill Rs.42,500/‐ paid in 

Sept'2016. Final bill Rs 42, 500 recommended in June 2017

27 RITES/HW/NHAI/UP Roads/TOPO SURVEY/2016 dt. 4.1.2017

Topographic Survey ‐ Feasibillity Study for restructuring of Varanasi‐Hanumana Section of NH7 (Pcode: RT300 00034)

Quotations Otherwise 4.1.2017 1. M/s Prime Meridian (P) Ltd, Chennai ‐ Rs.15,75,000/‐ ; (2) M/s Pioneer Surveyors, Kolkata :  Rs.11,50,000/‐  (3) M/s Theovel Survey, Bangalore; Rs. 4,98,000/‐

15 days ‐ Work awarded to M/s Theovel Survey, Bangalore for Rs.4,98,000/‐  on 19.1.2017. Payment of Rs 1,51,200 recommended in March 2017 andRs 2,36,115 recommended in June 2017

28

RITES/HW/NHAI/BRT(2TR/26)/RT300‐00027/EIA&SIA/2016

EIA EMP SIA RAP Studies including Preparation of LAP and Schedules and Project Clearances for FSR of West Bengal Road Project under Bharat Mala Scheme

Open

E‐tender

13.02.2017      /27.02.2017

 1. M/s Tila Consultant and Contractor Pvt.ltd.(RS 20,70,460/‐)    2. M/s Voyants Solutions Pvt.Ltd. (Rs 23,40,135/‐)               3. Overseas Mintech Consultants(Rs 35,84,625/‐)

LOA Issued on 16/05/2017 (78 days)

‐ Work awarded to M/s Voyants Solutions Pvt.Ltd., No Payment Released so far

29

RITES/HW/NHAI/TRAFFIC/BRT(2TR/26)/RT300‐00027/WB/2016

Traffic Survey for FSR of West Bengal Road Project under Bharat Mala Scheme

Quotations Otherwise 09.03.2017  /17.03.2017

1.TPA Engineering Consultancy Pvt.ltd.(Rs 7,46,000)                      2. Sharp Eye Traffic Survey and Data Services (Rs 6,99,000/‐)    

3.Highway Engineering Magnitude Consortium(Rs 6,48,400/‐)   4. Shweta Technophile Consultants Pvt. Ltd.(Rs 12,00,000/‐)  

5.Futurisistic Engineering and Traffic Surveyors(Rs 7,35,000/‐)     6.Matrix Surveys & Data Services (Rs 4,89,000/‐)   

LOA Issued on 05/04/2017 (19 days)

Work awarded to M/s Matrix Surveys & Data Services. Payment of Rs 2,81,175/‐ has been processed on 30.06.2017

30

RITES/HW/NHAI/BRT(2TR/26)/RT300‐00027/TS&SP/2016 dated 19.06.2017.

Topographic Survey and Strip Plan for Feasibility Study/Detailed Project Report for Two/ Four Laning of following road stretches for NH Connectivity to Backward Areas/Religious/Tourist Places under Bharat Mala Project in the State of West Bengal for 161 km length

Limited E Tender 19.06.2017/

05.07.2017

M/s DSR Survey Pvt. Ltd. (Rs. 71,56,450)M/s Pramitee Engineering and Surveys Pvt. Ltd (Rs. 51,52,000 )M/s Highway Engineering Magnitude Consortium (Rs. 50,31,250 )M/s Pioneer Surveyors (Rs. 38,63,839 )M/s Theovel Surveys (Rs. 71,32,944)M/s Subudhi Associates (Rs. 53,17,830 )

LOA issued on 19.07.2017 (14 days)

‐ Work awarded to M/s Pioneer Surveyors. No payment released so far.

Page 10: INFORMATION RELATED TO TENDERS INVITED BY … … · Barojaguli in Hooghly and ... Providing one no of commercial Non AC Economy car (TATA Indica ... / 3(three) commercial Non A Tata

31

RITES/HWD/GHY PWD/DPR/RT300‐00032 & RT300‐00033/GT/2017/Vo2B dated 08.08.2017

Geotechnical and Material investigations for construction of flyovers across Serabhati intersection between Ulubari ‐ Atgaon Road and Nepali Mandir ‐ Arya College Road and at the Super Market intersection between Paltan Bazar‐ Khanapara Road and Last gate ‐ Super Market Road in Guwahati in the State of Assam.

Limited Tender E‐quotation DOI: 08.08.2017DOC:18.08.2017

1. M/s C.E. Testing Co. Pvt Ltd (Rs. 15,97,000/‐),2. M/s  Constell Consultants Pvt. Ltd (Rs.19,23,000/‐),3. M/s Pioneer Surveyors (Rs. 18,98,000/‐),4. M/s Xplorer Consultancy Services Pvt. Ltd. (Rs. 15,22,000/‐),5. M/s Indian geotechnical services (Rs.14,80,000/‐),6. M/s Fargo Consultants Pvt Ltd (Rs. 13,16,000/‐),

LOA not issued yet to successful quotationer (M/s Fargo Consultants Pvt. Ltd).

The conceptual plan ofsaid subject has not beenapproved by client tilldate. So, LOA could notbe issued to successfulquotationer Extentionforthe validity period of thesaid subject work hasalready been taken &approved by thecompetent authority forthe successful quotationein this regard.

32

RITES/TI/HW/MBIU/2016/03 dated 15.11.2016 (Tender ID‐22862)

Supply, Installation and Commissioining of new hydarulic type Mobile Bridge Inspection Unit (MBIU) 02 nos at Jaipur and Hyderabad including operation & maintenance work.

Open E‐tender ( 2 packet system)

DOI: 17.11.2016DOC:01.12.2016

1. M/s Palfinger Cranes India Private Limited (Rs. 7,82,06,247.38/‐),2. M/s  Gemini Power Hydarulics Pvt. Ltd (Non‐responsive during Technical Evaluation),

104 daysLOA issued on 15.03.2017

MBIU reached at Jaipur on 03.10.2017 and at Hyderabad on 06.10.2017. RTO registration works in progress.No Payment Released.

Page 11: INFORMATION RELATED TO TENDERS INVITED BY … … · Barojaguli in Hooghly and ... Providing one no of commercial Non AC Economy car (TATA Indica ... / 3(three) commercial Non A Tata
Page 12: INFORMATION RELATED TO TENDERS INVITED BY … … · Barojaguli in Hooghly and ... Providing one no of commercial Non AC Economy car (TATA Indica ... / 3(three) commercial Non A Tata
Page 13: INFORMATION RELATED TO TENDERS INVITED BY … … · Barojaguli in Hooghly and ... Providing one no of commercial Non AC Economy car (TATA Indica ... / 3(three) commercial Non A Tata
Page 14: INFORMATION RELATED TO TENDERS INVITED BY … … · Barojaguli in Hooghly and ... Providing one no of commercial Non AC Economy car (TATA Indica ... / 3(three) commercial Non A Tata
Page 15: INFORMATION RELATED TO TENDERS INVITED BY … … · Barojaguli in Hooghly and ... Providing one no of commercial Non AC Economy car (TATA Indica ... / 3(three) commercial Non A Tata
Page 16: INFORMATION RELATED TO TENDERS INVITED BY … … · Barojaguli in Hooghly and ... Providing one no of commercial Non AC Economy car (TATA Indica ... / 3(three) commercial Non A Tata
Page 17: INFORMATION RELATED TO TENDERS INVITED BY … … · Barojaguli in Hooghly and ... Providing one no of commercial Non AC Economy car (TATA Indica ... / 3(three) commercial Non A Tata
Page 18: INFORMATION RELATED TO TENDERS INVITED BY … … · Barojaguli in Hooghly and ... Providing one no of commercial Non AC Economy car (TATA Indica ... / 3(three) commercial Non A Tata
Page 19: INFORMATION RELATED TO TENDERS INVITED BY … … · Barojaguli in Hooghly and ... Providing one no of commercial Non AC Economy car (TATA Indica ... / 3(three) commercial Non A Tata
Page 20: INFORMATION RELATED TO TENDERS INVITED BY … … · Barojaguli in Hooghly and ... Providing one no of commercial Non AC Economy car (TATA Indica ... / 3(three) commercial Non A Tata
Page 21: INFORMATION RELATED TO TENDERS INVITED BY … … · Barojaguli in Hooghly and ... Providing one no of commercial Non AC Economy car (TATA Indica ... / 3(three) commercial Non A Tata
Page 22: INFORMATION RELATED TO TENDERS INVITED BY … … · Barojaguli in Hooghly and ... Providing one no of commercial Non AC Economy car (TATA Indica ... / 3(three) commercial Non A Tata
Page 23: INFORMATION RELATED TO TENDERS INVITED BY … … · Barojaguli in Hooghly and ... Providing one no of commercial Non AC Economy car (TATA Indica ... / 3(three) commercial Non A Tata

704880

Page 24: INFORMATION RELATED TO TENDERS INVITED BY … … · Barojaguli in Hooghly and ... Providing one no of commercial Non AC Economy car (TATA Indica ... / 3(three) commercial Non A Tata