Page 1: Information Products for Remanufacturing: Tracing the ...mitiq.mit.edu/ICIQ/Documents/IQ Conference 2001... · shows fuel transfer computer problem Determine bad pump Remove Troub

The 6TH International Conference on Information Quality, Cambridge, Mass, USA

IQ-2001

Information Products for Remanufacturing: Tracing the Repair of an Aircraft Fuel-Pump

(Research-in-Progress)

Yang Lee, Tom Allen (IQ-2001 invited lunch speaker), Rich Wang

Page 2: Information Products for Remanufacturing: Tracing the ...mitiq.mit.edu/ICIQ/Documents/IQ Conference 2001... · shows fuel transfer computer problem Determine bad pump Remove Troub

IQ 2001 Conference, November 3, 2001

Points to be Made

Increasing importance of remanufacturing.Two types of supply chains

– Initial manufacturing (planned and predictable)– Remanufacture (unpredictable)Just-in-Time inventory management is difficult or impossible.Good forecasting of parts need will allow inventory management to approach JIT.Forecasting relies upon data and experience

– Information quality is critical for performance of the system.

Additional research

Page 3: Information Products for Remanufacturing: Tracing the ...mitiq.mit.edu/ICIQ/Documents/IQ Conference 2001... · shows fuel transfer computer problem Determine bad pump Remove Troub

IQ 2001 Conference, November 3, 2001

Increasing Importance of Remanufacture

Remanufacture is becoming increasingly important, particularly for products involving large initial investment.– Heavy construction equipment– Aircraft

Aircraft are flying far longer and logging far more flying hours than anticipated in original design.– 747-200, 727, B52, C135, C141

– Trucks & AutomobilesEnvironmental requirements will cause this need to spread to other products.

Page 4: Information Products for Remanufacturing: Tracing the ...mitiq.mit.edu/ICIQ/Documents/IQ Conference 2001... · shows fuel transfer computer problem Determine bad pump Remove Troub

IQ 2001 Conference, November 3, 2001

Two Supply Chains

One of the distinguishing features of Remanufacture is the existence of two supply chains for parts and components.– Parts arrive on the ‘carcass’.

Condition usually unknown until disassembly.

– Parts delivered through ‘normal’ supply chain.

Need usually unknown until disassembly.

Page 5: Information Products for Remanufacturing: Tracing the ...mitiq.mit.edu/ICIQ/Documents/IQ Conference 2001... · shows fuel transfer computer problem Determine bad pump Remove Troub

IQ 2001 Conference, November 3, 2001

‘Normal’ Supply Chain

Uncertainty of need disallows the use of ‘Just-in-Time’ inventory management.– Need unknown until disassembly and testing of

parts arriving via ‘carcass’.– Uncertainty can be reduced through use of

forecasting.Good forecasting allows us to approach Just-in-Time inventory control.Forecasting based on historical record.– Quality of historical record dependent upon quality

of information on which it is based.

Page 6: Information Products for Remanufacturing: Tracing the ...mitiq.mit.edu/ICIQ/Documents/IQ Conference 2001... · shows fuel transfer computer problem Determine bad pump Remove Troub

IQ 2001 Conference, November 3, 2001

Importance of Forecasting

Inventory management totally dependent upon performance of forecasting model.– Effective forecasting reduces uncertainty in

inventory need.– If forecasting were perfect, ‘JIT’ would be

attainable.Goal is therefore to come as close to JIT as possible.– Attainment of this goal heavily dependent upon

validity of input data.

Page 7: Information Products for Remanufacturing: Tracing the ...mitiq.mit.edu/ICIQ/Documents/IQ Conference 2001... · shows fuel transfer computer problem Determine bad pump Remove Troub

IQ 2001 Conference, November 3, 2001

The Submerged Fuel Pump

Single part tracked through replacement and remanufacture process.– Study uncovered complaints of ‘dirty data’

arriving at point of entry into historical record.– Corrections entered based on judgment of

experienced personnel.– Study initiated to determine sources of ‘dirty

data’.

Page 8: Information Products for Remanufacturing: Tracing the ...mitiq.mit.edu/ICIQ/Documents/IQ Conference 2001... · shows fuel transfer computer problem Determine bad pump Remove Troub

IQ 2001 Conference, November 3, 2001

The Submerged Fuel Pump

Similar part used on many aircraft.Two major components.– Pump.– Stator.

Page 9: Information Products for Remanufacturing: Tracing the ...mitiq.mit.edu/ICIQ/Documents/IQ Conference 2001... · shows fuel transfer computer problem Determine bad pump Remove Troub

IQ 2001 Conference, November 3, 2001

Stator (Physical) Flow

Depot needs a stator to repair the

pump

Ask Depot IM for stator

IM for stator

Fix the pump

Stator on hand in DLA?

Get stator from DLA storage

facility in Depot

DLAESOC

Urgent?

Urgent & compelling purchase

Depot IM asks DLA

IM for stator

DLA Contract Manager

Stator vendor

Yes

DLA Storage facility at

Depot

No

No

Yes

Yes

No

Page 10: Information Products for Remanufacturing: Tracing the ...mitiq.mit.edu/ICIQ/Documents/IQ Conference 2001... · shows fuel transfer computer problem Determine bad pump Remove Troub

IQ 2001 Conference, November 3, 2001

Pump Constituents by Roles & Contacts

Product ManagementSpecialist

(to be filled in)

PM(Phyllis Smith)

ES(Jane Doe)

Planner

Scheduler(Karen Kim)

MechanicShop

(Vernon Jordan)

Engineer(Chris Montalbano

Thomas Jones)

Repair contractingfor repair of end item

Contracting new buys

IM (John Doe)

Pump Vendor

------ Discuss problem about pump

(Joe Kennedy)

Page 11: Information Products for Remanufacturing: Tracing the ...mitiq.mit.edu/ICIQ/Documents/IQ Conference 2001... · shows fuel transfer computer problem Determine bad pump Remove Troub

IQ 2001 Conference, November 3, 2001

ADDITIONAL RESEARCH

1. Map physical flows, functional responsibilities, people, roles.

2. Map information flows, computer systems, people.3. Determine information input/output, queuing/process time,

dollar/performance costs, decisions made at each point.4. Collect historical data on use of parts.5. Test the sensitivity of the forecasting model to errors in the

data.6. Conduct Cost/Benefit analysis of possible improvements.

Page 12: Information Products for Remanufacturing: Tracing the ...mitiq.mit.edu/ICIQ/Documents/IQ Conference 2001... · shows fuel transfer computer problem Determine bad pump Remove Troub

IQ 2001 Conference, November 3, 2001

Tracing the Fuel Booster Pump

Page 13: Information Products for Remanufacturing: Tracing the ...mitiq.mit.edu/ICIQ/Documents/IQ Conference 2001... · shows fuel transfer computer problem Determine bad pump Remove Troub

IQ 2001 Conference, November 3, 2001

STATOR POSITION IN THE FUEL BOOSTER PUMP, EXPLODED VIEW

Page 14: Information Products for Remanufacturing: Tracing the ...mitiq.mit.edu/ICIQ/Documents/IQ Conference 2001... · shows fuel transfer computer problem Determine bad pump Remove Troub

IQ 2001 Conference, November 3, 2001

Aircraft from field

(base)

Depot for overhaul (Every 6

yrs.

Strip &Overhaul

Systems Operations

check (mechanic)

IAW JG (Job Guide)

Indicator shows fuel

transfer problem

Determine bad pump

Remove pump

Fill out forms +

data computer entry (?) IAW T.O.

NRTS

Base Suppl

y

Depot Repair

Station for parts

(Depot Shop)

Tear down

Fix parts from

bench stock or replace stator

Operational Check on test

standSell

Pump

Aircraft on flight line

Pilot or ground crew

discover problem

Problem entered

on Aircraft Forms (781A)

Mechanic troubleshoots (ref. T.O. &

JG)

Determine pump faulty

Remove pump

Troubleshoot the system

Data entry

WR/KH Tinker

Depot Level

Field Level

Unserviceable pump

Trouble-shoot

Spare pump on hand?

Yes

IM & Schedule

r

D035K Supply Info

System

AF Supply Storage Facility DO35A, DO 35K

Receive Pump

No

Install new pump

Another pump

available?i

Yes

Send requisition from SBSS to DO35A

No

CAMS

Pump Flow

In the repair shop

Fill out forms + data

computer entry (?) IAW T.O.

NRTS

Install new pump

Base Supply