“Invensys delivered a significant amount of flexibility and capabilities to the system design.” Derren Wicks Lead Maintenance Engineer Invensys Foxboro DCS System Key Power Station Upgrade Goals • GDF Suez initiated a plan to split control of a 14.7-kilometer gas pipeline running between its Teesside Power Station and a gas reception facility and a gas processing plant which provides dual natural gas fuel supplies for the plant • A robust solution was needed to replace signals originally collected by kilo-stream telemetry and then transmitted via analog telephone lines through a gateway to the distributed control system at the gas processing plant. • Relocate the control facilities and associated data to the control room at the TPS Challenge • The company mandated that the power station control system update occur live, because shutting down the natural gas supply pipeline would incur significant financial losses Invensys Operations Management Solutions: • Foxboro® I/A Series® Distributed Control System • Foxboro AIM*Historian • Wonderware® InTouch® HMI • Eurotherm® single-loop controllers Results • The Invensys® solution delivered greater system efficiencies as obsolete equipment was upgraded to current power facility control technology • GDF Suez benefited from improved engineering know-how that enables plant managers to better analyze possible problems and enhance and modify the control system as required • The power station now has improved overall safety since signal collection at much higher frequencies provides real-time data to more immediately identify and address potential issues INDUSTRY: POWER GDF Suez www.gdfsuez.com

Upload: vothu

Post on 13-Jul-2018

262 views

Category:

Documents


0 download

TRANSCRIPT

“Invensys delivered a significant amount of flexibility and capabilities to the system design.”

Derren Wicks Lead Maintenance Engineer

Invensys Foxboro DCS System Key Power Station Upgrade

Goals•GDFSuezinitiatedaplantosplitcontrolofa14.7-kilometergaspipelinerunningbetweenitsTeessidePowerStationandagasreceptionfacilityandagasprocessingplantwhichprovidesdualnaturalgasfuelsuppliesfortheplant

•Arobustsolutionwasneededtoreplacesignalsoriginallycollectedbykilo-streamtelemetryandthentransmittedviaanalogtelephonelinesthroughagatewaytothedistributedcontrolsystematthegasprocessingplant.

•RelocatethecontrolfacilitiesandassociateddatatothecontrolroomattheTPS

Challenge•Thecompanymandatedthatthepowerstationcontrolsystemupdateoccurlive,becauseshuttingdownthenaturalgassupplypipelinewouldincursignificantfinanciallosses

Invensys Operations Management Solutions: •Foxboro®I/ASeries®DistributedControlSystem•FoxboroAIM*Historian•Wonderware®InTouch®HMI•Eurotherm®single-loopcontrollers

Results•TheInvensys®solutiondeliveredgreatersystemefficienciesasobsoleteequipmentwasupgradedtocurrentpowerfacilitycontroltechnology

•GDFSuezbenefitedfromimprovedengineeringknow-howthatenablesplantmanagerstobetteranalyzepossibleproblemsandenhanceandmodifythecontrolsystemasrequired

•Thepowerstationnowhasimprovedoverallsafetysincesignalcollectionatmuchhigherfrequenciesprovidesreal-timedatatomoreimmediatelyidentifyandaddresspotentialissues

INDUSTRY:POWER

GDF Suezwww.gdfsuez.com

Redcar & Cleveland, United Kingdom–Basicphysicspointsoutthatyoucan’tmakemoreenergythanyouconsume.Butyoucanstillleveragetheelectricitygenerationprocess,squeezingeveryextrakilowattoutofthesystem.Combinedcyclegasturbinesdojustthat,divertingwasteheatproducedbyanaturalgas-fueledturbineintoasteamturbine.Thistypeofelectricitygenerationconfigurationachieveshighlevelsofefficiencysinceheatexhaust−thatwouldotherwisebereleasedintotheair−isre-usedinthecombinedpowergenerationprocess.

TheTeessidePowerStationinEnglandisthelargestcombinedcyclegasturbinefacilityinWesternEurope.Thesinglestationcanmeetnearly3percentoftheelectricitydemandforEngland,WalesandScotlandviaitseightnaturalgas-firedturbineswithatotalcapacityof1,875megawatts.In2008,GDFSuez,aFrenchmultinationalenergycompany,acquiredtheTeessidePowerStation,andembarkedonaplantmodificationprojectandupdateofthecontroltechnologyinfrastructurewithsolutionsfromInvensysOperationsManagement.

GDFSuez,formedbythemergerofGazdeFranceandSuezin2008,isoneoftheleadingenergyprovidersintheworld,globallyemploying200,000people.GDFSuezoperatesintheareasofelectricitygenerationanddistribution,naturalgasandrenewableenergy.Italsobecametheworld’slargestutilityaftertakingcontrolofBritain’sInternationalPower.ThecompanyhasbeenactiveintheUKsince1997,extendingitsbusinessthroughouttheentireenergyvaluechain,fromexplorationandproductionintheNorthSeatoenergysupplyandtechnicalservicestobusinesses.

A Handoff in Pipeline Control

Locatedona23-acresiteintheWiltonchemicalcomplexnearMiddlesbroughinthenortheastofEngland,theTeessidePowerStationalsoworksasacogenerationplant,providingsteamfortheWiltoncomplex.UntilitsacquisitionbyGDFSuez,theTeessidepowerplantwasoperated,maintainedandmanagedbyPXLtd.PXstilloperates,maintainsandmanagestheTeessidegas

processingplant(TGPP),whichdeliversprocessednaturalgasfueltoitsformerpowerplant.

ThescopeoftheupgradeprojectwastosecureandsplitthecontrolofthenaturalgaspipelinerunningundertheRiverTeesbetweenthepowerplantandthegasprocessingplant.ThisinvolvedreplacingboththeexistingFoxboroDistributedControlSystem(DCS)andMicoSolRemoteTerminalUnits(RTUs)–bothcontrolledbyTGPP–andbringingtheRTUsignalsintotheDCSlocatedattheTeessidepowerplant.Ineffect,thecontrolofthegaspipelinewouldbetransferredtotheTeessidePowerStation.

TheprincipletechnicalchallengewasthattheexistingsignalsfromtheRTUswerecollectedbytelemetryandtransmittedviaanalogtelephonelinesthroughagatewaytotheDCSatTGPP.Conversiontoarobust,highintegritysolutionwasneededtocollectthedatafromtheRTUs.Atthesametime,theexistingFoxboroandMicroSolsystemsweretobeupgradedtocurrentFoxborotechnology.

Thekeyrequirementfortheprojectwasthattheupgradetothenewcontrolsystembecompletedsafelyandeffectivelyconsequentlyitwasvitalthatthenewsolutiondemonstraterobustnessandreliability.Thecontrolsystemmodificationsalsohadtobecompletedinrealtime,withoutshuttingdownthegaspipelineandthusavoidingtheincursionofsignificantfinanciallosses.

Invensys Solution Relied onDiverse Capabilitie

TheTeessideprojectsignificantlyleveragedthediversecapabilitiesofferedbytheInvensyssolutionsportfolio.TheprojectwasbasedonaFoxboroI/ASeriesDCS.ItincludedFoxboroRTUsandtheMeshControlNetworkaswellasWonderwareInTouchhuman-machineinterface(HMI)softwareandsinglelooptemperatureandprocesscontrollersfromEurotherm.TheInvensysteamconsistedoffourpermanentmembers,andsomeoftheinitialengineeringworkwasperformedbyaleadengineerandapplicationengineersattheInvensysEngineeringExcellencecentreinBratislava,Slovakia.

TheFoxboroI/ASeriesisdesignedtoimproveTeesside’splant-wideoperations,performanceandassetutilization.TheFoxboroI/ASeriesfeaturesasignificantbreadthofcapabilitiesforprovidingoptimalperformancetooperators,engineersandmaintenancepersonnel.Notonlywillitmaximizepowerplantperformance,itenhancesbusinessoperationsinrealtime,allowingoperatorstofocusonmanagingprofitcontrol.Inaddition,theFoxboroI/ASeriesincorporatestheInvensys“continuouslycurrent”philosophywhichensuresthatthesystemisconstantlyinfusedwiththelatesttechnologieswhilemaintaininginteroperabilitywithearliergenerations.Thisassureseasyupgradesandsignificantlyreducestotalcostofownershipforthepowerplantoperators.

WonderwareInTouchprovidesadvancedgraphicvisualizationandisdesignedtomaximizeproductivity,optimizeusereffectiveness,increasequalityandlowerdevelopment,maintenanceandoperationalcostsbyfeaturingcustomgraphicalviewsofreal-timepowergenerationprocesses.

“Invensysdeliveredasignificantamountofflexibilityandcapabilitiestothesystemdesign,”saidDerrenWicks,LeadMaintenanceEngineer.“FoxboroI/AandWonderwareInTouchenabledourTeessidedevelopmentteamtoincorporateahugevolumeofsysteminformation.Theresultwaswewereabletofocusonreal-timecontrolactivitiesatthepowerplanttoensureallgenerationsystemswerecloselymonitoredandanyissuescouldbeeasilyandquicklyresolved.”

Inaddition,bothplantsrequirednewMeshControlNetworksegmentsaddingtotheircurrentlegacyFoxboroNodebussystemstohostthenewcontrolprocessors,andinturncontrolthenewFieldDeviceSystemInterfaces(FDSI)whicharethenconnectedtotheRTUnetworkinaredundantconfiguration.

TheTeessidePowerStationalsogainedanenterprise-widecapabilityforthecollection,storageandretrievalofhistoricaldatawiththeFoxboroAIM*Historian,whileanetworkarchitecturesolutionwasdevelopedwithassistancefromthird-partycommunicationstechnologyproviderBlackBoxNetworkSolutions.AIM*Historianprovidesenterprise-widecapabilityforthecollection,storageandretrievalofhistoricalprocessinformation.AIM*HistoriancanrunonbothI/ASeriessystemsandnetworkplatforms,andcancollectinformationfromawidevarietyofprocesscontrolenvironmentsincludingmostdistributedprocesscontrolsystemssuchastheI/ASeries.AIM*HistorianrepositoriesalsoareeasilyintegratedwithMicrosoftpersonalproductivityapplicationsandrelationaldatabases.

“Highlyefficientpower-generatingstationsliketheTeessideplantgenerateandconsumeincreasingandvariedamountsofhistoricaldata,”saidDerrenWicks.“Forsystemdevelopment,planningandplanningpurposes,weneedtostorethisinformationindefinitely,whilemakingthedatabothaccessibleandeasytoannotate.”

Invensysalsoprovidedanengineertoperformhazardandoperability(HAZOP)studiesandaSafetyIntegrityLevel(SIL)assessmentofthesystem.Thisresultedinarecommendationtoacquireanon-sitesafetysystemtomeetcurrentsafetyregulations.GDFSuezselectedaHIMatrixsafetysystemfromHimaSellaasequipmentfromthismanufacturerwasalreadyinuseattheTeessidePowerStationsite.TheInvensysteamdesignedasolutiontoconnecttheHIMatrixsafetysystemtotheFoxboroI/ASeriessystemtoensurethatallrelevantdataandalarmsweredisplayedonthe23operatorconsolesinthecentralcontrolroomatthepowerstation.

Fromthepositionofsafetyandhighintegrity,theHAZOPstudydeterminedthat,abackupsecondarysystemwasnecessary.Asaresult,theteamaddedaWonderwareinterfaceinthreeassociatedAboveGroundInstallations(AGI).Allplantcontrolinformationcanthenbemonitoredfromthislocationduringatelephonecommunicationsfailure.Inaddition,WonderwareInTouchsoftwarewasusedtocreatetherequiredinterfacetotheRTUs.

Uninterrupted Implementation Keeps Power Flowing

Theprojectwassuccessfullyexecutedintheallottedtimeframespecifiedandwithoutincurringashutdown.ExcellentcollaborationbetweentheGDFSuezandtheInvensysteamswerekeytoimplementingtheonlinetransferofthepowerfacilitycontrolsystemsfromoneplanttoanotherandalsoenabledtheTeessidePowerStationmanagerstocontinueproductionoperationsthroughouttheprojectupgrade.

Withthenewcontrolsysteminplace,theTeessidefacilityisoperatingwithamorerobusttechnologysolutionthatprovidessignificantlyhigherdegreesofvisibilityintoday-to-dayfacilityoperations.Asaresult,thecompanyisbetterabletocontroltheprocessandrespondfastertoanypotentialissuesthatmayimpactsafetyorproductivity.Andwhilethepowerfacilitycan’tescapethelawsofphysics,Invensyssolutionsareplayingamajorroleinhelpingplantmanagersgenerateelectricityatlowercostsandatthehighestlevelspossiblewithacombinedpowergenerationoperation.

[email protected]

St. [email protected]

[email protected]

К[email protected]

[email protected]

[email protected]

[email protected]

М[email protected]

[email protected]

[email protected]

www.wonderware.fi