industry academia interaction organised by petrotech, 2009

25
by B.S. NEGI Member Petroleum and Natural Gas Regulatory Board, India 1

Upload: ngotuyen

Post on 10-Feb-2017

234 views

Category:

Documents


7 download

TRANSCRIPT

Page 1: industry academia interaction organised by petrotech, 2009

byB.S. NEGI Member

Petroleum and Natural Gas Regulatory Board, India

1

Page 2: industry academia interaction organised by petrotech, 2009

• Oil & Gas Sector Overview Infrastructure

• Market Position• PNGRB

Regulations Notified Safety Related regulations

• Roll out plans Pipelines CGD

• ERDMP Provisions Accreditation

2

Page 3: industry academia interaction organised by petrotech, 2009

• Refining capacity – 148 MMTPA• Pipeline infrastructureNatural Gas –11000 km (including regional Network)Petroleum Product pipelines – 10000 km• CGD networks – 35 cities having gas supply, 13 Cities in Project stage 1.01 million house hold connected 1.12 million vehicle on CNG

Total infrastructure inadequate to meet the country’s requirements except oil

3

Page 4: industry academia interaction organised by petrotech, 2009

Govt. Controlled Liberalized

Mature

Nascent

OIL

GAS

MARKET

MARKET OPENING

Page 5: industry academia interaction organised by petrotech, 2009

Enforce retail & marketting service

obligation

Monitor prices & prevent restrictive

trade practices

Register & Authorise entities

Declare pipeline as common / contract

carrier

Perform other functions entrusted

by Central Government

Protect consumer interest by fostering

fair trade & competition

Regulate access & transportation rate

on common / contract carrier /

CGD network

Ensure adequate availability, and

equitable distribution

Functions of the Board

Lay down technical standards ,

specifications including safety

standards

Maintain databank of information

5

Page 6: industry academia interaction organised by petrotech, 2009

6

S No. Regulation Notified on

1 Levy of Fee and Other Charges 26-11-20072 Meetings of the Board 26-11-20073 Appointment of Consultants 30-11-20074 Conduct of Business, receiving and investigation

of complaints30-11-2007

5 Authorizing entities to Lay, Build, Operate or Expand City or Local Natural Gas Distribution networks

19-03-2008

6 Determination of Network Tariff for CGD Network and Compression Charges for CNG

19-03-2008

7 Exclusivity for City or Local Natural Gas Distribution Networks

19-03-2008

Page 7: industry academia interaction organised by petrotech, 2009

7

S No.

Regulation Notified on

8 Authorizing entities to Lay, Build, Operate or Expand Natural Gas Pipelines

06-05-2008

9 Affiliate Code of Conduct for Entities Engaged in Marketing of Natural Gas and Laying, Building, Operating or Expanding Natural Gas Pipeline

17-07-2008

10 Access Code for Common Carrier or Contract Carrier Natural Gas Pipelines

17-07-2008

11 T4S for City or Local Natural Gas Distribution Network

27-08-2008

12 Determination of Natural Gas Pipeline Tariff

20-11-2008

Page 8: industry academia interaction organised by petrotech, 2009

8

S No.

Regulation Notified on

13 T4S for Natural Gas Pipelines 22-8-08

14 Emergency Response and Disaster Management Plan 18-1-2010

15 Declaring pipeline as Common Carrier or Contract Carrier

21-04-09

16 Procedure for Standards Development Notified 17 Authorizing entities to Lay, Build,

Operate or Expand Petroleum Product Pipelines

1-9-2010

18 Methodology for determination of capacity for pipeline and CGD Networks

7-6-2010

19 Quality of Service for CGD Networks 1-9-2010

Page 9: industry academia interaction organised by petrotech, 2009

9

S No.

Regulation Notified on

20 Determination of Tariff for Petroleum Product pipelines

10-12-2010

21 Access Code for Petroleum Product pipelines

Under Preparation

22 Integrity Management System for Natural gas Pipelines

Under Preparation

23 Integrity Management System for Product Pipelines

Under Preparation

24 Integrity Management System for CGD Under Preparation

Page 10: industry academia interaction organised by petrotech, 2009

Sr No.

Entity GA(Operating) GAs (Construction)

Total

1 MGL 2 - 22 IGL 2* 2* 43 Aavantica 1 1 24 CUGL 2 - 25 Green Gas 2* - 26 Gujarat Gas 1 1* 27 MNGCL 1 - 18 TNGCL 1 - 19 BGL 2 1 310 Sabarmati 1 111 GAIL 1* - 112 HPCL 1* - 113 Gail Gas 2 2 4

Page 11: industry academia interaction organised by petrotech, 2009

Sr No.

Entity GA(Operating)

GAs (Construction)

Total

14 Charotar Gas 1 - 115 VMSS 1* - 116 Adani Eenergy 2* 6* 817 GSPC Gas 8 2* 1018 Siti Energy 1 0 119 Harayana City Gas 1 1 220 AGCl Assam 4 421 GEECL 1 122 G CGS Kolkata # 1 0 123 Saumya DSM 1 0 1

Total 40(35*) 16(13* ) 56(48)*Common GAs # Coal Gas

Page 12: industry academia interaction organised by petrotech, 2009

• Natural Gas Pipelines Existing 11000 Km expected to reach 25,000Km within next 4-5 years

• Product Pipelines Existing 10,000 Km expected to reach 12,000Km within next 4-5 years

• LNG Terminals From existing 2 operating terminals, expected to reach 10 by 4-5 years

• CGD Existing 48 GAs expected to reach 100 within next 2

years(2012) y next 5 years.(2016) 200 GAs

Page 13: industry academia interaction organised by petrotech, 2009

13

Page 14: industry academia interaction organised by petrotech, 2009

05/04/23 Email: [email protected] 14

State Gas Supply GA in Roll out Plan

Connecting P/L

Andhra Pradesh Existing 27 RNW, EWPL

Arunachal Pradesh

2014 01 Guwahati- Itanagar/Local NW

Assam Existing 13 RNWBihar 2013 11 JHPL, KBPLChhattisgarh 2014 05 SPPLDelhi NCT Existing 01 HVJ

Goa 2012 01 GPPLGujarat Existing 24 HVJ,RNW

Haryana Existing 13 HVJ

Page 15: industry academia interaction organised by petrotech, 2009

05/04/23 Email: [email protected] 15

State Gas Supply GA in Roll out Plan

Connecting P/L

Jharkhand 2013 08 JHPL, KBPL

J&K 2013 03 BSPL

Karnataka 2012 31 DBPL,CBMPLKerala 2012 14 KCBPLHimanchal Pradesh

2011 02 BNPL

MP Existing 22 HVJMaharashtra Existing 32 EWPL,DUPL,RNW

Manipur 2015 01 RNW

Meghalaya 2014 01 RNW

Page 16: industry academia interaction organised by petrotech, 2009

05/04/23 Email: [email protected] 16

State Gas Supply GA in Roll out Plan

Connecting P/L

Nagaland 2014 01 RNW

Orissa 2013 10 KBPL,SPPL

Pondicherry 2011 03 EWPL,RNW

Punjab 2011 11 DNPL,MBPL,BSPL

Rajasthan Existing 14 HVJ,MBPL,MBPLSikkim 2015 01 RNWTamilnadu Existing +2011 27 KCPL,CBPL,RN

WTripura Existing 01 RNWUP Existing 47 HVJ

Page 17: industry academia interaction organised by petrotech, 2009

05/04/23 Email: [email protected] 17

State Gas Supply GA in Roll out Plan

Connecting P/L

Uttarakhand 2011 09 HVJ

UT-Chandigarh 2011 o1 DNPL

UT-Daman 2011 02 DUPL

West Bengal 2012 11 JHPL,KBPL,DKPL

Page 18: industry academia interaction organised by petrotech, 2009

• Applicability Hydrocarbon processing units- Refinery, Gas Processing,

Pipelines- Natural Gas, Propane, Butane, LPG

Petroleum Product Pipelines LNG Terminals Commercial Petroleum Storage

Bottling Plants

CGD POL dispensing Stations Transportation of Petroleum products by road tankers

Page 19: industry academia interaction organised by petrotech, 2009

ERDMP Scope Identification of Emergencies

Mitigation measures attempt to reduce/ eliminate Risks/ Disaster

Develop plans for actions in case of Emergency or Disaster

Response in the event of Emergency or Disaster

Recovery plans- Post Emergency or Disaster

ERDMP Intent To develop an ERDMP as a ready reckoner for the team to act during

any emergency or disaster

To manage an emergency to- provide incidence management

organization, prevent casualties, reduce damage, maintain good and

effective public relations

Page 20: industry academia interaction organised by petrotech, 2009

Contents of ERDMP Regulations Classification of Emergencies; Regulation-6

Implementation of Schedules; Regulation-7

Consequences of defaults or non-compliance; Regulation-8

Statutory Requirements; Regulation-9

Pre-Emergency planning; Regulation-10

Emergency mitigation measures; Regulation-11

Emergency preparedness measures; Regulation-12

Emergency response procedures and measures; Regulation-13

Emergency organization and responsibilities; Regulation-14

Infrastructure requirements; Regulation-15

Declaration of on-site and off-site emergency; Regulation-16

Page 21: industry academia interaction organised by petrotech, 2009

Contents of ERDMP Regulations contd… Resources for controlling Emergencies; Regulation-17

Demographic information; Regulation-18

Medical facilities; Regulation-19

Evacuation; Regulation-20

Public relations and information to public; Regulation-21

Reporting of the incidence; Regulation-23

Emergency recovery procedures; Regulation-26 ERDMP for Tank trucks and Pipelines carrying petroleum products; Regulation-27

Integration of the ERDMP with NDMA guidelines and action plan; Regulation-29

Security threat plan and action plan to meet the eventualities; Regulation-30

Page 22: industry academia interaction organised by petrotech, 2009

• The Regulations Code of Practice for Emergency Response and Disaster management Plan

Various Regulations Various Schedules Schedule-I; Implementation Schedule (Reg. 7) Schedule-II; List of relevant statutes on management of Hazardous

substances (Reg.9(1))

Schedule-III; Basic Requirements of ERDMP(Reg.11.1)

Schedule-IV; Resources Mobilization (Men and Equipments)(Reg.11.2)

Schedule-V; Roles and Responsibilities of various stakeholders(Reg.22.0)

Schedule-VI; Incidence reporting Format (Reg. 23.0)

Schedule-VII; ERDMP for Pipelines carrying Petroleum Products(Reg.27.0)

Page 23: industry academia interaction organised by petrotech, 2009

• The Schedules Contd… Schedule-VIII; Incidence reporting Format(Reg.28.1)

Schedule-IX; ERDMP for Pipelines carrying Petroleum Products(Reg.28.2)

Various Chick Lists Check List-I; Emergency Response and Disaster Management Plan

Hazards Identification( Reg.10.1(d)) Check List-II; Incident Prevention Measures (Reg.11.3(xii))

Check List-III; Mutual Aid and Mock-drills ( Reg.12.1(j))

Check List-IV;ERDMP Resource Measures/ Infrastructure(Reg.13.0)

Check List-V; Review and Updation of ERDMP(Reg.14.2.1(a))

Check List-VI; Availability of Resources(Internal/External) (Reg.17.0(5))

Check List-VII;ERDMP Recovery Measures (Reg.26.0(2))

Page 24: industry academia interaction organised by petrotech, 2009

• Preparation of ERDMP document by concerned entity Applicability as per Regulation-3

Format given in ERDMP Regulations

• Accreditation by TPA approved by PNGRB On the recommendation of QCI

• Check list for TPA1. Check-list the related Regulations applicable to an entity as specified in

Regulation-3

2. ERDMP Document prepared by entity is ( Conformity with provisions of

concerned ERDMP Regulations( as check-listed at (1) above)

3. Check for the contents in the ERDMP document w.r.t. Regulations listed at (1)

above

4. Does in TPA’s opinion the ERDMP document prepared by the entity meet the

intent of the Regulations ?

Page 25: industry academia interaction organised by petrotech, 2009