industrial manlift scaffold catalog
DESCRIPTION
Industrial Man Lifts Scaffold Catalog. Call to order, (888) 730-8377. Friendly staff always standing by to answer any questions or take your order.TRANSCRIPT
Frame Scaffold CatalogFrame Scaffold CatalogFrame Scaffold Catalog
www.industrialmanlifts.com
Scaffolding * Accessories * Plank Components
IndustrialManlifts Your aerial access solution provider
ABOUT US Industrial Man Lifts sales begin with customer service, as we aim to provide you with information on what best meets the needs of your projects and business cycle. We know that every company is different, and every project is unique.
Scaffolding * Accessories * Plank Components
Please contact us at 1-888-730-8377 so our specialists can consult and quote you on the products which you need to complete your projects and tasks. Contact Details 1299 66th St. N. #41694 St. Petersburg, FL 33743, USA Office: 888-730-8377 Email: [email protected] [email protected]
1. Cover 2. About Us 3. Product Index 4. Technical > Lock Styles, Cross Brace & Guard Rail Specifications 5. Technical > Frame and Coupling Pin Specifications/Specs. 6. Technical > Cross Brace & Diagonal Gooser Specifications/Specs. 7. βSnap-Onβ Style > Frames 8. βSnap-Onβ Style > Accessories 9. βSnap-Onβ Style > Parts List 10. βWBβ or Flip Lock Style Frames 11. βWBβ or Flip Lock Style Accessories 12. βWBβ or Flip Lock Style Parts List 13. βSWβ or Drop Lock Style > Frames 14. βSWβ or Drop Lock Style > Accessories 15. βSWβ or Drop Lock Style > Parts List 16. Scaffold Accessories > Page 1 17. Scaffold Accessories > Page 2 18. Scaffold Accessories > Page 3 19. Scaffold Accessories > Page 4 20. Scaffold Accessories > Page 5 21. Scaffold Accessories > Page 6 22. Scaffold Accessories > Parts List - Page 1 23. Scaffold Accessories > Parts List - Page 2 24. Miscellaneous Scaffolding > Products 25. Miscellaneous Scaffolding > Parts List 26. Rolling Scaffold > Products 27. Rolling Scaffold > Parts List 28. Scaffold Plank > Products 29. Scaffold Plank > Parts List 30. Post Shores > Technical 31. Technical / Informational > A Plank/Decks 32. Technical / Informational > Load Chart 33. Technical / Informational > Tips on Scaffold Safety 34. Technical / Informational > New OSHA Rules for Scaffolding 35. Technical / Informational > Codes of Safe Practices 36. Back Cover
PRODUCT INDEX
TECHNICAL
LOCK STYLES Our standard stocked locking devices
Standard lock styles on frames typically stocked are as followed:
Button Head Rivet (Snap On Style) Flip Lock (Flip Lock / βWBβ Style) Drop Lock (Drop Lock / βSWβ Style)
Cross Braces &
Guard Rail Styles
Lock: Fixed mechanism/device which Cross Braces and or Guard Rail affix to. Lock spacing: Distance to which Cross Braces and or Guard Rail affix to. Lock spacing on frames determines size of Cross or Rail needed. Example: 10β x 48β (10 ft. between frames x 48β lock spacing).
4
Alternate locks on frames are subject to availability such as: Fast Lock, Speed Lock, C Lock, V Lock, Bolt & Stud, etc. * Alternate locks shown on page 13 of the accessories section. Inquire if you are looking for anything not listed or shown.
Button Head Rivet
Flip Lock Drop Lock
Punched Hole
Double Punched
Hole
Snap On
TECHNICAL
FRAME and COUPLING PIN SPECIFICATION/SPECS
βSWβ or Drop Lock Style Usually standard lock spacing is: 4β 1st Lock: measured down from top of leg at 6β (our standard). 8-1/2β for special orders. Standard Lock: Drop Lock Alternative Locks: none Hole Position: 2 1/2β at a 45 degree angle Tube Size: 1.69β x .090 Wall Thickness Coupling Pin: 1 7/16β w/ 1β Collar. Fixes into frame with a Spring Retainer.
Snap-On Style Usually standard lock spacing is: 4β 1st Lock: measured down from top of leg at 6 1/2β except 5β x 5β Frames are 9β down. Standard Lock: Button Head Rivet Alternative Locks: Flip Lock, Drop Lock Hole Position: 2β at a 90 degree angle Tube Size: 1 5/8β x .090 Wall Thickness Coupling Pin: 1 5/16β w/ 1/8β Collar. Fixed in frame with a Roll Pin.
βWBβ or Flip Lock Style Usually standard lock spacing is: 4β 1st Lock: measured down from top of leg at 7β Standard Lock: Flip Lock (βWBβ), Fast Lock (βWRβ). Alternative Locks: Drop Lock Hole Position: 2 1/2β at a 90 degree angle Tube Size: 1 5/8β x .090 Wall Thickness Coupling Pin: 1 5/16β w/ No Collar. Fixes into frame with a Spring Retainer.
5
Additional frames specifications available on other styles of frames.
All frames prices INCLUDE coupling pins and retaining pins.
Please consult your sales representative for more product information.
TECHNICAL
CROSS BRACE SPECIFICATIONS/SPECS
6
Add 2β to dimension (D) for overall length on Punched Hole style. Add 3β to dimension (D) for overall length on Snap-On Style
B A
12β
18β
24β
27 3/4β
36β
42β
45β
48β
2β0β 3β0β 4β0β 5β0β 6β0β 7β0β 8β0β 10β
13 7/16β
26 7/8β
15β
30β
17β
34β
18 5/16β
36 5/8β
21 5/8β
43 1/4β
24 3/16β
48 3/8β
25 1/2β
51β
26 7/8β
53 11/16β
19β
38β
20 1/8β
40 1/4β
21 5/8β
43 1/4β
22 5/8β
45 1/2β
25 1/2β
51β
27 11/16β
55 5/16β
28 13/16β
57 5/8β
30β
60β
24 3/4β
49 1/2β
25 5/8β
51 1/4β
26 13/16β
53 5/8β
27 3/4β
55 7/16β
30β
60β
31 7/8β
63 13/16β
32 7/8β
65 3/4β
33 15/16β
67 7/8β
30 5/8β
61 3/16β
31 5/16β
62 5/8β
32 5/16β
64 5/8β
33 1/16β
66 1/8β
35β
70β
36 5/8β
73 1/4β
37 1/2β
75β
38 7/16β
76 13/16β
36 1/2β
73β
37 1/8β
74 1/4β
37 15/16β
75 7/8β
38 9/16β
77 1/8β
40 1/4β
80 1/2β
41 11/16β
83 3/8β
42 7/16β
84 15/16β
43 1/4β
86 1/2β
42 7/16β
84 7/8β
43β
86β
43 11/16β
87 5/16β
44 1/4β
88 1/2β
45 11/16β
91 3/8β
47β
93 15/16β
47 5/8β
95 5/16β
48 3/8β
96 3/4β
48 3/8β
96 3/4β
48 13/16β
97 5/8β
49 1/2β
99β
50β
100β
51 1/4β
102 1/2β
52 3/8β
104 13/16β
53β
106β
53 11/16β
107 3/8β
60 5/16β
120 5/8β
110 3/4β
121 3/8β
61 3/16β
122 3/8β
61 5/8β
123 3/16β
62 5/8β
125 1/4β
63 9/16β
127 3/16β
64 1/16β
128 3/16β
64 5/8β
129 1/4β
C
D
C
D
C
D
C
D
C
D
C
D
C
D
C
D
DIAGONAL GOOSER SPECIFICATIONS/SPECS
Use on a 3β Wide Frame and a 7β Bay
7β x 3β = 91-3/8β 10β x 3β = 125-5/16β
Measured Center of Cup To
Center of Cup
All measurements are βOn Centerβ
Use on a 5β Wide Frame and a 10β Bay
7β x 5β = 103-1/4β 10β x 5β = 134-3/16β
SNAP ON STYLE FRAMES
3β x 6β8β Walk Thru
3β x 10β8β Apartment Frame
1-5/8β tubing -
Holes are at a 90 degree angle. Hole
Spacing is at 2β
3β x 4β Walk Thru
3β x 6β8β Ladder Frame
Coupling Pins come installed
with Sellock (Roll) Pins
Standard Color of Frames: Green
3β x 40β Box Frame
5β x 5β Box Frame
3β x 20β Box Frame
5β x 6β8β Dbl. Ladder Box Frame
1st Lock is 6β from top of leg.
βSnap Onβ Lock example
7
Snap On Cross Brace
Half Rung S.O.
Assorted sizes available
βSnap Onβ Style Saddle Pin
1-5/16β Coupling Pin w/ 1/8β collar
SNAP ON STYLE ACCESSORIES
8
Half Coupling Pin Welded on end of Side Bracket.
As Standard: Coupling Pins come installed
with Sellock (Roll) Pins
(with Snap On Style).
Snap On Guard Rail
βSnap Onβ
End Accessory Example
Guard Rail Post w/ Rivets
24β Extension Base Plate
βfixedβ
Side Brackets
(Angle Iron)
With Coupling Pin
With Rod
SNAP ON PARTS LIST
Frames - (width x height) CJ2020BO - 2β x 20β Box Frame S.O. CJ2040BO - 2β x 40β Box Frame S.O. CJ24BO - 2β x 4β Box Frame S.O. CJ25LD - 2β x 5β Ladder Frame S.O. CJ268LD - 2β x 6β8β Ladder Frame S.O. CJ24WT - 2β x 4β Walk Thru Frame S.O. CJ25WT - 2β x 5β Walk Thru Frame S.O. CJ268WT - 2β x 6β8β Walk Thru Frame S.O. CJ288AP - 2β x 8β8β Apartment Frame S.O. CJ2108AP - 2β x 10β8β Apartment Frame S.O. CJ 320BO - 3β x 20β Box Frame S.O. CJ340BO - 3β x 40β Box Frame S.O. CJ34BO - 3β x 4β Box Frame S.O. CJ35LD - 3β x 5β Ladder Frame S.O. CJ368LD - 3β x 6β8β Ladder Frame S.O. CJ34WT - 3β x 4β Walk Thru Frame S.O. CJ35WT - 3β x 5β Walk Thru Frame S.O. CJ368WT - 3β x 6β8β Walk Thru Frame S.O. CJ388AP - 3β x 8β8β Apartment Frame S.O. CJ3108AP - 3β x 10β8β Apartment Frame S.O. CJ3118AP - 3β x 11β8β Apartment Frame S.O. CJ440BO - 4β x 40β Box Frame S.O. CJ468WT - 4β x 6β8β Walk Thru Frame S.O. CJ468HS - 4β x 6β8β Walk Thru Frame w/ Hockey S.O. CJ 520BO - 5β x 20β Box Frame S.O. CJ540BO - 5β x 40β Box Frame S.O. CJ54BO - 5β x 4β Box Ladder Frame S.O. CJ55BO - 5β x 5β Box Ladder Box S.O. CJ568BO - 5β x 6β8β Box Frame S.O. CJ54DB - 5β x 4β Dbl. Ladder Box Frame S.O.
9
Accessories CJ532SG - 5β x 32β Snap-On Cross Brace CJ54SG - 5β x 4β Snap-On Cross Brace CJ732SG - 7β x 32β Snap-On Cross Brace CJ74SG - 7β x 4β Snap-On Cross Brace
Accessories (contβd.) CJ2SG - 2β Snap-On Guard Rail CJ3SG - 3β Snap-On Guard Rail CJ5SG - 5β Snap-On Guard Rail CJ7SG - 7β Snap-On Guard Rail CJ10SG - 10β Snap-On Guard Rail CJGRPSO - Guard Rail Post S.O. (2 Rivet) CJCPSO - Corner Post S.O. (3 Rivet) CJGRPAF - Guard Rail Post S.O. w/ 18β Access Ladder CJHBSO - Hoist & Bracket S.O. (see Accessories page for wheel) CJ75ST - 7β x 5β Stair Tower w/ Hand Rails CJ768ST - 7β x 6β8β Stair Tower w/ Hand Rails CJSTEB - Stair Tower Entry Bar CJ3EB - End Bar S.O. CJ2HR - 2β Half Rung S.O. CJ3HR - 3β Half Rung S.O. CJ5HR - 5β Half Rung S.O. CJ10CP - 1-5/16β Coupling Pin w/ 1/8β Collar CJRP - Sellock (Roll) Pin CJ2SP - 2β Hole Saddle Pin / 90 degree CJ12ST - 12β Angle Iron Side Bracket w/ Stud CJ12SO - 12β Angle Iron Side Bracket w/ Socket CJ20ST - 20β Angle Iron Side Bracket w/ Stud CJ20SO - 20β Angle Iron Side Bracket w/ Socket CJ24SO - 24β Angle Iron Side Bracket w/ Socket CJ30SO - 30β Angle Iron Side Bracket w/ Socket CJ36SO - 36β Angle Iron Side Bracket w/ Socket
***Alternate locks used on this style of frame is βFlip Lockβ or βDrop Lockβ.
βWBβ or FLIP LOCK STYLE FRAMES (uses punched hole accessories)
βFlip Lockβ Lock example
1-5/8β tubing:
Holes are at a 90 degree angle. Hole spacing is at 2.5β
Coupling Pins come installed
with Spring Retainers.
Standard Color of Frames: Green 1st Lock is 7β from top of leg.
3β x 6β7β Walk Thru Frame
(specify long or short hockey)
5β x 6β7β Walk Thru Frame
3β x 6β7β Ladder Frame
5β x 5β1β SL Box Frame
5β x 6β7β SL Box Frame
6β x 7β6β Canopy Frame
10
Short Hockey
βWBβ or FLIP LOCK STYLE ACCESSORIES
Punched Hole Cross Brace
βPunched Holeβ End Accessory
Example
11
Punched Hole Guard Rail
βWβ or Flip Lock Style Saddle Pin
(Spring Retainer sold separately)
1-5/16β Coupling Pin w/ No Collar
Guard Rail Post w/ Flip Locks
(corner posts available too!)
Half Rung w/ U-Hooks
(ledger/cheater bar)
Side and End Brackets
(Asstd. Sizes available)
Double Punched Hole
Single Punched Hole
For use on Walk Thru frames
βWBβ or FLIP LOCK STYLE
βWBβ or Drop Lock Style (width x height) CJ321BO - 3β x 2β1β Box Frame - Flip Lock CJ331BO - 3β x 3β1β Box Frame - Flip Lock CJ341BO - 3β x 4β1β Box Frame - Flip Lock CJ351LF - 3β x 5β1β Ladder Frame - Flip Lock CJ367LF - 3β x 6β7β Ladder Frame - Flip Lock CJ341WT - 3β x 4β1β Walk Thru Frame - Flip Lock CJ351WT - 3β x 5β1β Walk Thru Frame - Flip Lock CJ367WT - 3β x 6β7β Walk Thru Frame - Flip Lock CH367LH - 3β x 6β7β Walk Thru Frame - Long Hockey (Flip Lock) CJ521BO - 5β x 2β1β SL Box Frame - Flip Lock CJ531BO - 5β x 3β1β SL Box Frame - Flip Lock CJ541BO - 5β x 4β1β SL Box Frame - Flip Lock CJ551BO - 5β x 5β1β SL Box Frame - Flip Lock CJ567BO - 5β x 6β7β SL Box Frame - Flip Lock CJ551DB - 5β x 5β1β DL Box Frame - Flip Lock CJ567DB - 5β x 6β7β DL Box Frame - Flip Lock CJ567WT - 5β x 6β7β Walk Thru Frame - Flip Lock CJ576FL - 5β x 7β6β Canopy Frame - Flip Lock CJ676FL - 6β x 7β6β Canopy Frame - Flip Lock Accessories Uses Punched Hole Cross Braces & Guard Rail - (see Accessories section also). CJGRPFL - Guard Rail Post - 2 Flip Lock CJCPFL - Corner Post - 3 Flip Lock CJHBFL - Hoist & Bracket - Flip Lock (see section accessories for wheel) CJ75ST - 7β x 5β Stair Tower w/ Hand Rails CJ767ST - 7β x 6β7β Stair Tower w/ Hand Rails CJSTEB - Stair Tower Entry Bar CJ3HU - 3β Half Rung w/ U-Hook CJ5HU - 5β Half Rung w/ U-Hook CJ20CP - 1-5/16β Coupling Pin - No Collar CJ25SP - 2-1/2β Hole Saddle Pin / 90 degree CJ21ST - 21β Angle Iron Side Bracket w/ Stud CJ21SO - 21β Angle Iron Side Bracket w/ Socket
12
βSWβ or DROP LOCK STYLE FRAMES (uses punched hole accessories)
Drop Lock -
Lock example
5β x 3β Box Frame
5β x 4β Box Frame
5β x 5β Box Frame
5β x 6β4β Box Frame
3β x 6β4β Walk Thru Frame
5β x 6β4β Walk Thru Frame
1.69 tubing -
Holes are at a 45 degree angle. Hole
spacing is 2.5β.
13
This style frame comes priced with Coupling
Pins INCLUDED
Standard Color of Frames: Green 1st Lock is 6β from top of leg.
Coupling Pins come installed
with Spring Retainers.
βSWβ or DROP LOCK STYLE ACCESSORIES
14
Coupling Pin and Spring Retainer
sold separately
βPunched holeβ End accessory
example
Guard Rail Post (Male & Female)
Half Rung w/ U-Hooks
(ledger/cheater bar)
Side Brackets
Female
βSWβ or Drop Lock Style Saddle Pin
1-7/16β Coupling Pin w/ 1β Collar
(Spring Retainer sold separately)
Triple Hook Style
Punched Hole Cross Brace
Punched Hole Cross Brace
Double Punched Hole
Single Punched Hole
Male
For use on Walk Thru frames
15
Frames - βSWβ or Drop Lock Style (width x height) CJ303BO - 3β x 3β Box Frame - Drop Lock CJ304BO - 3β x 4β Box Frame - Drop Lock CJ305BO - 3β x 5β Box Frame - Drop Lock CJ304WT - 3β x 4β Walk Thru Frame - Drop Lock CJ305WT - 3β x 5β Walk Thru Frame - Drop Lock CJ364LF - 3β x 6β4β Ladder Frame - Drop Lock CJ364WT - 3β x 6β4β Walk Thru Frame - Drop Lock CJ403BO - 4β x 3β Box Frame - Drop Lock CJ404BO - 4β x 4β Box Frame - Drop Lock CJ464BO - 4β x 6β4β Box Frame - Drop Lock CJ464WT - 4β x 6β4β Walk Thru Frame - Drop Lock CJ502BO - 5β x 2β Box Frame - Drop Lock CJ503BO - 5β x 3β Box Frame - Drop Lock CJ504BO - 5β x 4β Box Frame - Drop Lock CJ505BO - 5β x 5β Box Frame - Drop Lock CJ564BO - 5β x 6β4β Box Frame - Drop Lock CJ564WT - 5β x 6β4β Walk Thru Frame - Drop Lock CJ576DL - 5β x 7β6β Canopy Frame - Drop Lock CJ676DL - 6β x 7β6β Canopy Frame - Drop Lock Frames can be stocked in 3β, 42β, 48β, or 5β widths upon request. Accessories CJMGRPDL - Male Guard Rail Post 1.69 CJFGRPDL - Female Guard Rail Post 1.69 CJCPDL - Female Corner Post 1.69 CJHBDL - Hoist & Bracket - Drop Lock (see accessories section for wheel) CJ75ST - 7β x 5β Stair Tower w/ Hand Rails CJ764ST - 7β x 6β4β Stair Tower w/ Hand Rails CJSTEB - Stair Tower Entry Bar CJ3UH - 3β Half Rung w/ U-Hook CJ5UH - 5β Half Rung w/ U-Hook CJ40CP - 1-7/16β Coupling Pin w/ 1β Collar CJ25SP45 - 2-1/2 Hole Saddle Pin / 45 degree
βSWβ or DROP LOCK STYLE PARTS LIST
SCAFFOLD ACCESSORIES
Page 1
1 5/16β diameter
Spring Retainer
Sellock (Roll) Pin
Rivet & Cotter/Hitch
Pin Set
Toggle Pin Snap Pin Gravity Lock Pin
βWBβ Coupling
Pin
βSWβ Coupling
Pin
βBJβ Coupling
Pin
βWBβ Coupling
Pin Standard
Snap-On Coupling
Pin
1 3/8β diameter
1 7/16β diameter
1 5/16β diameter
Speed Lock
βCβ Lock
βVβ Lock
Drop Lock
Flip Lock
Button Head Rivet
( Snap On )
w/ 2β hole spacing
Wood Pad
( Mud sill )
1 5/16β diameter
w/ 2-1/2β
hole spacing
w/ 2-1/2β
hole spacing
w/ 2-1/2β
hole spacing
w/ 2-1/2β
hole spacing
Hook Deck Hooks
Specify
Plank Tie
100/Box
Plank Hanger
Saddle Pin
Specify
βSnap Onβ Rivet
βSnap Onβ Clip
Rail/Cross
Thumb Screw
Wing Nut
Plow Bolt
Hitch Pin
Cotter Pin
Clevis/Rivet
16
SCAFFOLD ACCESSORIES Page 2
12β Pneumatic Scaffold Caster
(for frame scaffold)
8β Scaffold Caster
(for frame scaffold)
Wall Bumper w/ Plate
Sticker Bar w/ 3/8β Lag Bolt
17
Stud Clamp
(available with wing nuts, flip/drop
locks)
Right Angle Beam Clamp
Swivel Beam Clamp
Side by Side Clamp
Right Angle Clamp
Swivel Clamp
24β Screw Jack w/ Socket
24β Screw Jack w/ Swivel
Base Plate
24β Extension Base Plate
β fixed β
Base Plate
β swivel β
Standard Base Plate
β fixed β
24β Screw Jack w/ Base
Plate β fixed β
Internal joint Coupler
5β Scaffold Caster
Square stem (for MFS)
5β Scaffold Caster
Round stem (for Roll & Fold)
External Sleeve
Coupler
Half Clamp Single Coupler βPigs Earβ
Cross Brace ( Punched Hole )
1β tubing
Cross Brace ( Snap On )
1β tubing
Guard Rail ( Punched Hole )
1-1/4β tubing
Goosers
( Horizontal & Diagonal )
Scaffold Wire
(12 ga. Black or Galvanized - 100 lb. roll)
Straight Putlogs and Putlogs w/ Belly ( available in either 6β or 12β deep sizes )
18
SCAFFOLD ACCESSORIES Page 3
Guard Rail ( Snap On )
1-1/4β tubing
Parallel Hanger
Right Angle Hanger
Side Bracket w/ Rod
(angle iron)
Side Bracket w/ Coupling Pin
(angle Iron)
Tubular Side Bracket w/
Socket
End Bracket w/ Socket
(tubular)
Hook Triple Bell Hanger Bell Hanger
For use w/ Snap-On and βWBβ / Flip Lock βSWβ / Drop Lock Use w/ all
SCAFFOLD ACCESSORIES
Page 4
Cup Rack
Cup Rack w/ Basket
Guard Gate
(adjusts from 3β to 5β)
19
Drywall Cart Hoisting Rope with Hook
(3/4β x 75β or 150β lengths)
Hoist Arm & Bracket (wheel not included)
(Specify style of frame)
12β Well Wheel
(Steel frame w/ Alum. Wheel)
Hoist Bracket only
SCAFFOLD ACCESSORIES Page 5
Scaffold Access Ladders & Brackets
(sold separately) 1β Tube diameter
Hook on Ledger with U Hook/Blade
(for use with Walk thru frames)
7β Stair Way w/ Hand Rails
(Starter bar sold separately)
20
Starter Bar
(sold separate from Stair Way)
Scaffold Debris Netting/Tarps
(20β x 50β Rolls)
Hod Stand
Custom sizes/ colors can be ordered upon
request
For use on Walk Thru frames
60% Dark Green Knit
Legs of frame slide into tube ends to space
and support the landing of the Stair Way Unit
SCAFFOLD ACCESSORIES Page 6
21
SCAFFOLD SAFETY SIGNAGE
Narrow Tag Holder
CJSTN
Narrow Green Insert
CJGN
Narrow Red Insert
CJRN
Narrow Yellow Insert
CJYN
3-1/2β x 12β
Bi-Lingual
ESPANOL! Or any language.
We can customize!
Wide Tag Holder
CJSTWH
Wide Green Insert
CJWG
Wide Red Insert
CJWR
Wide Yellow Insert
CJWY
5-1/4β x 9-
1/2β
Bi-Lingual
Warning Sign Bi-lingual
CJWS
Danger Sign Bi-lingual
CJDS
Large, hard, plastic signs, 12β x 18β
Front and
Back Views
SCAFFOLD ACCESSORIES PARTS LIST
Page 1
Pins & Locking Devices CJGLP - Gravity Lock Pin βPig Tailβ CJSP - Snap Pin CJTP - Toggle Pin CJSR - Spring Retainer CJRP - Sellock βRollβ Pin CJRC - Rivet & Cotter Pin CJWN - Wing Nut CJ10CP - 1-5/16β Coupling Pin w/ 1/8β Collar ( 2β hole spacing) CJ20CP - 1-5/16β Coupling Pin w/ No Collar (2-1/2β hole spacing) CJ201CP - 1-5/16β Coupling Pin w/ 1/8β Collar (2-1/2β hole spacing) CJ30CP - 1-7/16β Coupling Pin w/ 1β Collar (2-1/2β hole spacing) CJ40CP - 1-3/8β Coupling Pin w/ 1β Collar (2-1/2β hole spacing) CJSL - Speed Lock CJFL - Flip Lock CJDL - Drop Lock CJBR - Button-Head Rivet CJPB - Plow Bolt w/ Nut CJCL - βCβ Lock (includes 2 holding pins) CJPB - Plow Bolt (includes wing nut) CJVL - βVβ Lock CJCRP - Clevis/Rivet Pin - specify size CJCP - Cotter Pin - specify size CJHP - Hitch Pin - specify size CJTS - Thumb Screw Casters CJ5CA - 5β Scaffold Caster CJ8CA - 8β Scaffold Caster CJ12CA - 12β Scaffold Caster (pneumatic) Cross Braces & Guard Rail CJ532SG - 5β x 32β Cross Brace - Snap On CJ54SG - 5β x 48β Cross Brace - Snap On CJ732SG - 7β x 32β Cross Brace - Snap On CJ74SG - 7β x 48β Cross Brace - Snap On CJ1032SG - 10β x 32β Cross Brace - Snap On CJ104SG - 10β x 48β Cross Brace - Snap On CJ2SG - 2β Guard Rail - Snap On CJ3SG - 3β Guard Rail - Snap On CJ5SG - 5β Guard Rail - Snap On CJ7SG - 7β Guard Rail - Snap On CJ10SG - 10β Guard Rail - Snap On CJ71PG - 7β x 1β Punched Hole Cross Brace CJ72PG - 7β x 2β Punched Hole Cross Brace CJ73PG - 7β x 3β Punched Hole Cross Brace CJ74PG - 7β x 4β Punched Hole Cross Brace CJ712PG - 7β x 1β x 2β Dbl. Punched Hole Cross Brace CJ734PG - 7β x 3β x 4β Dbl. Punched Hole Cross Brace CJ101PG - 10β x 1β Punched Hole Cross Brace CJ102PG - 10β x 2β Punched Hole Cross Brace CJ103PG - 10β x 3β Punched Hole Cross Brace CJ104PG - 10β x 4β Punched Hole Cross Brace CJ1012PG - 10β x 1β x 2β Dbl. Punched Hole Cross Brace CJ1034PG - 10β x 3β x 4β Dbl. Punched Hole Cross Brace CJ2PG - 2β Guard Rail - Punched Hole CJ3PG - 3β Guard Rail - Punched Hole CJ4PG - 4β Guard Rail - Punched Hole CJ5PG - 5β Guard Rail - Punched Hole CJ7PG - 7β Guard Rail - Punched Hole CJ10PG - 10β Guard Rail - Punched Hole
Base Plates, Screw Jacks, Etc. CJ55BP - 5β x 5β Base Plate βfixedβ CJ55SP - 5β x 5β Base Plate βswivelβ CJ24EB - 24β Ext. Base Plate βfixedβ CJ24SP - 24β Swivel Ext. Base Plate CJ24SB - 24β Adj. Screw Jack w/ Base Plate CJ24SJ - 24β Adj. Swivel Screw Jack w/ Base Plate CJ24SO - 24β Adj. Screw Jack w/ Socket CJ1010WP - Wood Pad (mudsill)
Half Rungs CJ2HR - 2β Half Rung S.O. CJ3HR - 3β Half Rung S.O. CJ5HR - 5β Half Rung S.O. CJ3HU - 3β Half Rung w/ U-hook CJ5HU - 5β Half Rung w/ U-hook
Miscellaneous Accessories CJWB - Wall Bumper w/ Plate 16β (clamp not included) CJ3LB - 16β Sticker w/ 3/8β Lag Bolt (clamp not included) CJRAC - Right Angle Clamp CJSC - Swivel Clamp CJSSC - Side by Side Clamp CJSTC - Stud Clamp CJRABC - Right Angle Beam Clamp CJSBC - Swivel Beam Clamp CJPE - Single Coupler βPigs Earβ
CJHC - Half Clamp CJESC - External Sleeve Coupler CJISC - Internal Sleeve Coupler CJZSSC - Stamped Swivel Clamp (1-1/2β x 2β) CJ1922SR - Scaffold Ratchet 19mm/22mm CJ2050DN - Debris Netting - 20β X 50β Roll (60%) CJ12TBW - 12 ga. Black Tie Wire (100# roll) CJ12TWG - 12 ga. Galv. Tie Wire (100# roll) CJRTO - Rolling Tower Outrigger (for Frame scaffold) CJ75HR - Manilla Hoisting Rope w/ Hook 3/4β x 75β CJ150HR - Manilla Hoisting Rope w/ Hook 3/4β x 150β CJHBO - Hoist Bracket only (universal to all styles) CJHBSO - Hoist & Bracket S.O. CJHBFL - Hoist & Bracket - Flip Lock CJHBDL - Hoist & Bracket - Drop Lock CJ12WW - 12β Well Wheel CJHBO - Hoist Bracket Only CJ35GG - 3β-5β Adj. Guard Gate CJHS - Hod Stand CJDD - Drywall Dolly
22
SCAFFOLD ACCESSORIES PARTS LIST
Page 2
Goosers CJ2GO - 2β Horizontal Gooser Galv. CJ3GO - 3β Horizontal Gooser Galv. CJ4GO - 4β Horizontal Gooser Galv. CJ5GO - 5β Horizontal Gooser Galv. CJ6GO - 6β Horizontal Gooser Galv. CJ7GO - 7β Horizontal Gooser Galv. CJ8GO - 8β Horizontal Gooser Galv. CJ10GO - 10β Horizontal Gooser Galv. CJ73GO - 7β x 3β Diagonal Gooser Galv. CJ75GO - 7β x 5β Diagonal Gooser Galv. CJ103GO - 10β x 3β Diagonal Gooser Galv. CJ105GO - 10β x 5β Diagonal Gooser Galv.
Putlogs CJ8PL - 8β x 12β Putlog CJ10PL - 10β x 12β Putlog CJ12PL - 12β x 12β Putlog CJ16PL - 16β x 12β Putlog CJ20PL - 20β x 12β Putlog CJ22PL - 22β x 12β Putlog CJ12PH - 12β S Type Putlog Hanger
Scaffold Access Ladders CJ3AL - 3β Access Ladder (1β) CJ4AL - 4β Access Ladder (1β) CJ5AL - 5β Access Ladder (1β) CJ6AL - 6β Access Ladder (1β) CJALB - Access Ladder Bracket (1β) CJ1842AL - 18β x 42β Access Ladder w/ Clamp (1-5/8β O.D.) CJ186AL - 18β x 6β Access Ladder w/ Clamps ( 1-5/8β O.D.) CJ1868AL - 18β x 6β8β Access Ladder w/ Clamps (1-5/8β O.D.)
Steel Tubing Please call with your specifications.
23
Scaffold Safety Signage (all signage is bi-lingual)
CJSTWH - Wide Tag Holder CJWG - Wide Green Insert CJWY - Wide Yellow Insert CJWR - Wide Red Insert CJSTN - Narrow Tag Holder CJGN - Narrow Insert Green CJYN - Narrow Insert Yellow CJRN - Narrow Insert Red CJWS - Large Plastic Safety Sign 12β x 18β WARNING SIGN CJDS - Large Plastic Safety Sign 12β x 18β DANGER SIGN
MISCELLANEOUS SCAFFOLDING
Mortar Board Stand
(Dbl. Chain)
Folding Trestle Folding Trestle Extension
24β Tuffy Jacks
(sold per pair)
Flat Backs
(Sold per pair)
Veneer Frame w/ Legs
24
Example of Extension being properly used with a folding trestle.
MISCELLANEOUS SCAFFOLD PARTS LIST
Folding Trestles & Extensions CJ2FT - 2β Folding Trestle CJ3FT - 3β Folding Trestle CJ4FT - 4β Folding Trestle CJ6FT - 6β Folding Trestle CJ8FT - 8β Folding Trestle (not for sale to California customers) CJ2EX - 2β Extension (for folding trestle) CJ2EX - 3β Extension (for folding trestle) Mortar Board Stands CJ2030MS - 20β x 30β Mortar Board Stand CJ23MS - 3β Mortar Board Stand CJ4MS - 4β Mortar Board Stand CJ5MS - 5β Mortar Board Stand CJ5MS - 6β Mortar Board Stand Flat Backs & Tuffy Jacks CJ1210FB - 12β x 10β Flat Back (sold per pair) CJ1810FB - 18β x 10β Flat Back (sold per pair) CJ2410FB - 24β x 10β Flat Back (sold per pair) CJ3010FB - 30β x 10β Flat Back (sold per pair) CJ3610FB - 36β x 10β Flat Back (sold per pair) CJ24TJ - 24β Tuffy Jack (sold per pair) Misc. Items CJVF - Veneer Frame w/ 42β Legs
25
ROLLING SCAFFOLD
6β Steel Multi-Function
Scaffold
6β Steel MFS Guard Rail System
Steel MFS Large Outrigger (includes caster)
Steel MFS Small Outrigger (includes caster)
26
6β Aluminum Multi-Function
Scaffold
6β Aluminum MFS Guard Rail
System
Aluminum MFS Large Outrigger (includes caster)
Aluminum MFS Small Outrigger (includes caster)
4β Steel Roll & Fold Unit
(Compact)
4β and 6β Steel Baby Tower (with wood plank)
6β Steel Roll & Fold Unit
(Compact)
Steel Extension Base Plate
(for MFS units only)
Separate parts / Replacement Parts Available!
While quantities last !!!
ROLLING SCAFFOLD PARTS LIST
Multi-FunctionScaffolds & Accessories CJ6MFS - 6β Steel Multi-Function Scaffold CJMFGR - 6β Steel Multi-Function Guard Rail System CJMFSO - Steel MFS Small Outrigger (4 per box) INCLUDES CASTERS CJMFLO - Steel MFS Large Outrigger (4 per box) INCLUDES CASTERS CJ6MFSAL - 6β Aluminum Multi-Function Scaffold CJMFGRAL - 6β Aluminum MFS Guard Rail System CJMFSOAL - Aluminum MFS Small Outrigger (4 per box) INCLUDES CASTERS CJMFLOAL - Aluminum MFS Large Outrigger (4 per box) INCLUDES CASTERS CJ5CA - 5β Scaffold Caster (Square stem - for MFS Units) CJFMEB - Extension Base Plate (for MFS Units) CJ3MFS - 3β Steel Multi-Function Extension Frame CJ6MFLF - 6β Steel MFS Ladder Frame CJMFPL - MFS Wood Replacement Deck CJMFTA - Steel Truss Arm Roll and Fold Scaffold CJ4RF - 4β Steel Roll & Fold CJ6RF - 6β Steel Roll & Fold CJ05CA - 5β Scaffold Caster (Round stem - for Roll & Fold Units) CJ4BT - 4β Steel Baby Tower w/ Wood Plank CJ6BT - 6β Steel Baby Tower w/ Wood Plank *** REPLACEMENT PARTS AVAILBABLE FOR MOST PRODUCTS !!!!!!
27
SCAFFOLD PLANK
Aluminum w/ Plywood Hook Plank
All Aluminum Hook Plank
Laminated Wood Scaffold Plank
Southern Yellow Pine Wood Scaffold Plank (Ends clipped/Rodded)
ask about availability
All Aluminum Pick
specify size
(width x length)
28
Aluminum w/ Plywood Pick/Stage/Deck
All Aluminum Telescoping Plank
Aluminum w/ Plywood Hatch Door Hook Plank
w/ Steel Ladder
Wood planks can be
branded/embossed w/ your company
name, etc.
*ask for details!
Plank Tie Also in scaffold accessories section
Replacement Hooks (For Hook Plank)
SCAFFOLD PLANK PARTS LIST
Aluminum w/ Plywood Hook Plank CJ1015PA - 10β x 15β Aluminum w/ Plywood Hook Plank (use 2 plank with 3β wide frames ) CJ5PA - 5β x 19β Aluminum w/ Plywood Hook Plank CJ7PA - 7β x 19β Aluminum w/ Plywood Hook Plank CJ10PA - 10β x 19β Aluminum w/ Plywood Hook Plank CJPARH - Replacement Hook for Aluminum Plywood Hook Plank All Aluminum Hook Plank CJ5AA - 5β x 19β All Aluminum Hook Plank CJ7AA - 7β x 19β All Aluminum Hook Plank CJ10AA - 10β x 19β All Aluminum Hook Plank Aluminum w/ Plywood Hatch Door Hook Deck w/ Ladder CJ247HP - 7β x 24β Hatch Plank w/ Ladder CJ2410HP - 10β x 24β Hatch Plank w/ Ladder CJ287HP - 7β x 28β Hatch Plank w/ Ladder CJ2810HP - 10β x 28β Hatch Plank w/ Ladder Southern Yellow Pine Wood Scaffold Plank CALL FOR PRICE AND AVAILABILITY CJ9DI - 9β DI-65 Southern Yellow Pine / Rodded Scaffold Plank CJ12DI - 12β DI-65 Southern Yellow Pine / Rodded Scaffold Plank CJ16DI - 16β DI-65 Southern Yellow Pine / Rodded Scaffold Plank Laminated Wood Scaffold Plank Normal Stocked Type CJ9LP - 9β Laminated Wood Scaffold Plank CJ12LP - 12β Laminated Wood Scaffold Plank CJ16LP - 16β Laminated Wood Scaffold Plank All Aluminum Picks/Stages Inquire about sizes/quantities Aluminum w/ Plywood Pick/Stage - βSTINSONβ Brand Inquire about sizes/quantities
29
POST SHORES
30
Part #
SH1000PS
SH2000PS
SH3000PS
SH5000PS
SH4000PS
4β
6800
5β
6650
6β
6500
6500
7β
6070
6070
8β
5650
5650
9β
5230
5230
5230
10β
4810
4810
4810
11β
4390
4390
4390
14β
3270
13β
3550
3550
15β
3000
12β
3970
3970
Allowable loads in lbs.
Part #
SH1000PS
SH2000PS
SH3000PS
SH5000PS
SH4000PS
Length
3β6β - 6β
5β7β - 10β3β
6β6β - 11β
8β8β - 13β3β
10β8β - 16β5β
Specification
External Tube
Internal Tube
Weight Qty per Container
2.38βx0.09βx32.17β 1.91βx0.126βx41.65β 28 2200
2.38βx0.09x50.94β
2.38βx0.09βx52.28β
2.38βx0.09βx62.28β
2.38βx0.09βx68.62β
2.38βx0.09βx66.73β
2.38βx0.09βx77.48β
2.38βx0.09βx101.5β
2.38βx0.09βx125.5β
39
41
47
54
1300
1100
900
400
31
TECHNICAL / INFORMATIONAL A Planks / Decks
INGENUITY
PRODUCTIVITY
RELIABILITY
DURABILITY
SAFETY
STRENGTH
SUSTAINABILITY
Advances in American wood science and manufacturing technology contribute to the A PLANK advantage. Douglas-fir, a native species of north America was selected for its superior strength-to-weight ratio. Logs are peeled to yield thin sheets of veneer. Each A PLANK Consist of multiple layers of veneer graded by strength and density. Naturally occurring wood defects such as knots and slope of grain are dispersed during the lay-up and lamination process for greater consistency and strength compared to solid lumber planks. The multiple layers of thin DF veneer enhances the structural uniformity and increases the strength and reliability of our American made A PLANK. Strength and Stiffness Verification
Every A Plank is individually proof tested to insure that each plank meets OSHA deflection limits before
being branded as a scaffold plank.
Modulus of Rupture and Modulus of Elasticity are frequently tested throughout the LVL production process
in accordance with the requirements of APA-EWS and independent third party inspection agency.
A PLANK is designed to conform to ANSI A10.8-2001 Loading Requirements.
Applicable Design Standards
ICBO 1997 Uniform Building Code Structural Laminated Veneer Lumber.
U.S. Occupational Safety and Health Administration, OSHA Scaffold Standards (29 CFR 1910 and 1929)
ANSI A10.8-2001, Safety Requirements for Scaffolding.
Plank Embossing
Each plank is permanently embossed with the following:
A PLANK MADE IN USA OSHA APA-EWS 1081 β Production Dateβ PROOF TESTED SCAFFOLD PLANK.
Scarfed face joints for a smooth flat working surface.
Erased edges for splinter free handling.
Lightweight, yet stronger than wood, are easier to move, up or down.
Offset hoods allow for continuous run.
Plywood is held in place and edges protected by extruded aluminum side channels.
Aluminum cross channels provide additional support for plywood deck, have less flexing.
PLATFORMS FOR STEEL & ALUMINUM SCAFFOLDS, 7β & 10β
COMPLIES WITH
REQUIREMENTS
OSHA
PLYWOOD / ALUMINUM DECKS
ALL ALUMINUM DECKS
32
TECHNICAL / INFORMATIONAL
Load Chart
2300 LBS. ON HEADER
5 FT.
5 FT.
6000 LBS. EQUALLY ON LEGS
6000 LBS. EQUALLY ON LEGS
2300 LBS. ON HEADER
2300 LBS. ON HEADER
6000 LBS. EQUALLY ON LEGS
6β4β FT. .
4 FT or 5 FT. 3 FT. - 4 FT. - 5 FT.
6β8β FT. .
Folding Trestle
Extension Base Plate
20β Side Bracket
Screw Jack
33
TECHNICAL / INFORMATIONAL
Tips on Scaffold Safety
These tips and suggestions are designed to promote safety in the use of steel scaffolding. They are intended to deal only with some of the many practices and conditions encountered in the use of scaffolding. They do not purport to be all inclusive or to replace other additional safety and precautionary measures to cover usual or unusual conditions. They are not intended to conflict with, or supersede any OSHA, federal, state, local statutes or regulations.
Check Safety Codes
Check frequently with your local OSHA, state and local offices for the latest safety code updates.
Bent or otherwise damaged frames or braces should not be used. Put them aside for replacement or repair.
Inclement Weather
Donβt work on scaffolds in bad weather or high winds unless the Competent Person decides it is OK to do so. Platforms should be cleared of ice and or snow before being used.
Tie Scaffold to the Building
Scaffolding should be tied to the structure using #9 wire or tie-in devices. The first vertical tie should be at the maxi-mum height of 4 times the narrowest base dimension. Additional ties are not to exceed 26β vertically. Maximum horizontal distance between ties is not to exceed 30β.
Intermixing of Components
Scaffold frames and their components manufactured by different companies shall not be intermixed, unless the component parts readily fit together without force and the Competent Person determines the resulting scaffold is structurally sound.
Personal Safety Equipment
Anyone working on a scaffold must wear a hard hat and steel toed work boots. Additionally, fall protection systems must be used when requested by the proper authorities. Scaffolding is not designed as an anchor point for fall arrest.
Donβt Ride a Rolling Scaffold
The platform height of a Rolling Scaffold must not exceed four (4) times the smallest base dimension (Cal/OSHA and some Government agencies require a stricter ratio of 3 to 1) Always keep casters locked while on scaffold
Begin with Good Footings
Scaffolds must bear on base plates or screw jacks on a mud sill or other adequate firm foundation.
Work Practices
Safe work practice training by a Competent Person must be given to workers who erect, dismantle, move, operate, repair, maintain, inspect, and use scaffolding
Donβt Short Change Bracing
Use bracing at all points provided. Add extra braces if needed to insure stability.
Reject Damaged Parts
Guard Rails
Top Guard Rails must be installed between 36β and 45β (if manufactured and placed into service after Jan. 1, 2000, between 38β and 45β). Mid rail is placed halfway in be-tween.
Cross Braces
Cross braces should not be used as a way to climb the scaffold. All braces must be checked for proper engage-ment onto locks. Cross bracing is acceptable for mid rail if cross point is between 20β and 30β above the work plat-form. Cross bracing is acceptable for top rail if cross point is between 38β and 45β above the work platform. Cross bracing cannot serve as both.
Toe Boards
Debris and rubble should not be allowed to accumulate on the work platform and should be removed as quickly as possible. Additionally, tools and other materials should not be allowed to accumulate. Toe boards should be used to prevent tools and materials from being knocked off the work platform.
Work Platforms
Use metal catwalks or platforms where available. If wood plank is used, it must be scaffold grade or better. Inspect thoroughly before each and every job to make sure it is free from breaks, knots, cracks, or warpage. Deckage should be full width.
Plank Overlapping
Planks 10β long or less require a 6β minimum and a 12β maximum overlap. Planks greater than 10β long require a 6β minimum and an 18β maximum overlap.
Protect Working Levels
Use overhead canopies to protect workers on lower work levels when work is being done overhead. Rope off unsafe areas underneath scaffold or provide wire mesh around work area.
Scaffold Training
Re-training is necessary when workers are exposed to new hazards or conditions on the job or when workers show signs of unsafe work practices
Donβt Overload Scaffolding
Follow the safe load capacities as provided by the manu-facturer...thereβs a limit even to what steel can support. A 4 to 1 safety factor must be calculated and maintained at times on scaffolding.
Power Lines
DO NOT use scaffolding where the user can come into contact with live power lines.
Inspect & Check
Take no chances. Inspect the scaffold setup after erection and daily when in use. Donβt remove or allow removal of any parts without the OK from the Competent Person. When wire rope is used, inspect it on each job.
Inspect and Check
SAFETY
1
34
TECHNICAL / INFORMATIONAL
New OSHA Rules for Scaffolding
A) Reasons for New Rules
1. 9% of all construction fatalities occurred Scaffolding 2. There have been 510,500 injuries and 9,750 reported
deaths. 3. 72% of injuries involved planking and supports. 4. 25% of people on jobs received no training on Scaffolding. 5. Only 33% of inspected Scaffolding have guard rails.
C) Key Definitions
B) Objectives
1. Donβt let the scaffold fall. 2. Donβt fall off the scaffold. 3. Donβt let the material fall off the scaffold.
1. Competent Person: means one who is capable of indentifying existing and predictable hazards in the surroundings or working conditions which are unsanitary, hazardous or dangerous to employees, and who has authorization to take prompt corrective measures to eliminate them. 2. Qualified Person: means one who, by possession of a recognized
degree, certificate, or professional standing, or who by extensive knowledge, training, and experience, has successfully demonstrated His/her ability to solve or resolve problems related to the subject mater, the work or the project.
Name of Competent Person
Name of Qualified Person
D) Significant Changes to Subpart L
1. Fall protection for Erectors and Dismantlers: The new standard now requires employees be protected from falls while erecting (including increasing the height of the scaffold as the work progresses). The employers must conduct a feasibil-ity study to determine when fall protection, such as personal fall protection systems, are feasible and do not create a greater hazard. (Scaffolding is not designed as an anchor point for fall arrest).
2. Electrical Shock Protection: The new standard requires safe distance from power lines be maintained as outlined in the standard.
3. Employee Training: The new standard now specifically requires all employees who work on, erect or dismantle, repair, operate, maintain or inspect scaffolding be trained in specific areas related to the safe use of the scaffold.
4. Daily Inspections: The new standard requires the scaffold be inspected before each use, daily or before each work shift by a competent person.
5. Welding from a Suspended Scaffold: The new standard requires specific precaution be taken when welding from a suspended scaffold to prevent current travel and/or arcing in the scaffold components.
6. Cross Braces as Railings: The new standard specifically addresses under what circumstances a cross brace can sub-stitute as a top or mid rail (not both).
7. Access: The standard now defines how and under what circumstances a ladder or steps will be used.
Load Chart
Frame Tier 1 Tier 2 Tier 3 Tier 4
(all weights are in lbs. per leg)
5β x 3β SLB 4200 3465 3360 2993
5β x 4β SLB 4200 3465 3360 2993
5β x 5β SLB 4043 3360 3213 2835
5β x 6β6β SLB 2441 2240 2048 1785
5β x 6β6β WT 3434 3045 2646 2373
5β x 6β4β WT 3434 3045 2646 2373
Load (all weights are in lbs.)
Screw Jack 11,000 at top of jack
Ext. Base Plate 1,000 at top of extension
20β Side Bracket 500 personnel only
Plywood Decks 75 per sq. ft. with 1/2β decking
Folding Trestle 1,000 on top cross member
For towers exceeding four (4) tiers high, subtract dead load weight/leg of frames, cross braces, and brackets above the 4th tier to obtain an allow-able load/leg for workman, materials, and planking. All values are based upon 12β maximum screw extension at the base of the scaffold.
35
TECHNICAL / INFORMATIONAL
Codes of Safe Practices For Frame Scaffolds, System Scaffolds, Tube and Clamp Scaffolds, and Rolling Towers
1. General Guidelines a) Post this Scaffolding Safety Guidelines in a conspicuous place and be sure that all persons who erect, dismantle or use scaffolding are aware of them. b) Follow all state, local and federal codes, ordinances and regulations pertaining to scaffolding. c) Survey the job site. A survey shall be made of the job site for hazards, such as untamped earth fills, ditches, debris, high tension wires, unguarded openings, and other hazardous conditions created by other trades. These conditions shall be corrected or avoided as noted in the following sections. d) Inspect all equipment before using. Never use any equipment that is damaged or defective in anyway. Remove it from the job site. e) Scaffolds must be erected in accordance with design and or manufacturerβs recommendations. f) Do not erect, dismantle or alter a scaffold unless under the supervision of a qualified person. g) Do not abuse or misuse the scaffold equipment. h) Erected scaffolds should be continually inspected by users to be sure that they are maintained in a safe condition. Report any unsafe condition to your supervisor. i) Never take chances! If in doubt regarding the safety or use of scaffold, consult your scaffold supplier. j) Never use equipment for purposes or in ways for which it was not intended. k) Do not work on scaffolds if your physical condition is such that you feel dizzy or unsteady in any way.
2. Guidelines for Erection and Use of Scaffolds a) Scaffoldsβ base must be set on adequate sill or pad to prevent slipping or sinking and fixed thereto where required. Any part of a building or structure used to support the scaffold shall be capable of supporting the maximum load to be applied. b) Use adjusting screws or other approved methods instead of blocking to adjust to uneven grade conditions. c) Bracing, Leveling & Plumbing of Frame Scaffolds. 1. Plumb and level all scaffolds as the erection proceeds. Do not force frames or braces to fit. Level the scaffold until proper fit can easily be made. 2. Each frame or panel shall be braced by horizontal bracing, cross bracing, cross bracing diagonal bracing or any combination thereof for securing vertical members together laterally. All brace connections shall be made secure, in accordance with the manufacturerβs recommendations. d) Bracing, Leveling & Plumbing of Tube & Clamp and Systems Scaffolds. 1. Posts shall be erected plumb in all directions, with the first level of runners and bearers positioned as close to the base as feasible. The distance between bearers and runners shall not exceed manufacturerβs recommended procedures. 2. Plumb, level and tie all scaffolds as erection proceeds. 3. Fasten all Couplers and/or connections securely before assembly of next level. 4. Vertical and/or horizontal diagonal bracing must be installed according to manufacturerβs recommendations. e) Tie continuous (running) scaffold to the wall or structure at each end and at least every 30β of length when scaffold height exceeds the maximum allowable free standing dimension. Begin ties or stabilizers when the scaffold height exceeds that dimension and repeat at vertical intervals not greater than 26β. The top anchor shall be placed not lower than four (4) times the base dimension from the top of the completed scaffold. Anchors must prevent scaffold from tipping into or away from wall or structure. Stabilize circular or irregular scaffolds in such a manner that completed scaffold is secure and restrained from tipping. When scaffolds are partially or fully enclosed or subjected to overturning loads, specific precautions shall be taken to insure the frequency and accuracy of ties to the wall and structure. Due to increased loads resulting from wind or overturning loads the scaffolding component to which ties are subject shall be checked for additional loads. f) When free standing scaffold towers exceed four (4) times their minimum base dimension
vertically, they must be sustained from tipping (CAL OSHA and some government agencies require stricter ratio of 3 to 1. g) Do not erect scaffold near electrical power lines unless proper precautions are taken. Consult the power service company for advise. h) A means of access to all platforms shall be provided. i) Do not use ladders or makeshift devices on top of scaffolds to increase the height. j) Provide guard rails and mid rails at each working platform level where open sides and
ends exist, and toe boards where required by code. k) Brackets and Cantilevered Platforms 1. Brackets for System Scaffold shall be installed and used in accordance with manufacturerβs recommendations. 2. Brackets for Frame Scaffolds shall be seated correctly with side bracket parallel to the frames and end brackets at 90 degrees to the frames. Brackets shall not be bent or twisted from normal position. Brackets (except mobile brackets designed to carry materials) are to be used as work platforms only and shall not be used for storage of material or equipment.
3. Cantilevered platforms shall be designed, installed and used in accordance with manufacturerβs recommendations. l) All scaffolding components shall be installed and used in accordance with the manu- facturerβs recommended procedure. Components shall not be altered in the field. Scaffold frames and their components manufactured by different companies shall not be intermixed, unless the component parts readily fit together and the resulting scaffoldβs structural integrity is maintained by the user. m) Planking 1. Work platforms shall cover scaffold bearer as completely as possible. Only scaffold grade wood planking, or fabricated planking and decking meeting scaffold use requirements shall be used. 2. Check each plank prior to use to be sure plank is not warped, damaged, or otherwise unsafe. 3. Planking shall have at least 12β overlap and extend 6β beyond center of support, or be cleated or restrained at both ends to prevent sliding off supports. 4. Solid sawn lumber, LVL (laminated veneer lumber) or fabricated scaffold planks and platforms (unless cleated or restrained) shall extend over their end supports not less than 6β nor more than 18β. This overhang should not be used as a work platform. n) For Putlogs and Trusses, the following additional guidelines apply. 1. Do not cantilever or extend putlogs/trusses as side brackets without thorough consideration for loads to be applied. 2. Putlogs/Trusses should extend at least 6β beyond the point of support. 3. Place proper bracing between putlog/truss when the span of the putlog/truss is more than 12β. o) For Rolling Scaffolds, the following additional guidelines apply. 1. Riding the rolling tower is very hazardous. THE SCAFFOLD INDUSTRY ASSOCIATION DOES NOT RECOMMEND NOR ENCOURAGE THIS PRACTICE. However, if you choose to do so, be sure to follow all state, federal or other governmental guidelines. 2. Casters with plain stems shall be attached to the panel or adjusting screw by pins or other suitable means. 3. No more than 12β of the screw jack shall extend between the bottom of the adjusting nut and the top of the caster. 4. Wheels or casters shall be provided with the locking means to prevent caster rotation and scaffold movement and kept locked. 5. Joints shall be restrained from separation. 6. Use horizontal, diagonal bracing near the bottom and at 20β intervals measured from the rolling surface. 7. Do not use brackets or other platform extensions without compensating for the the overturning effect. 8. The platform height of a rolling scaffold must not exceed 4 times the smallest base dimension. (CAL OSHA and some government agencies require a ratio of 3 to 1). 9. Cleat or secure all planks. 10. Secure or remove all materials and equipment from platform before moving. 11. Do not attempt to move a rolling scaffold without sufficient helpβ watch out for holes in the floor or overhead obstructionsβ stabilize against tipping. p) Safe use of scaffold 1. Prior to use, inspect scaffold to insure it has not been altered and is in safe working condition. 2. Erected scaffolds and platforms should be inspected continuously by those using them. 3. Exercise caution when entering or leaving work platform. 4. Do not overload scaffold. Follow manufacturerβs safe working load recommend- ations. 5. Do not jump on to planks or platforms. 6. Do not use ladders or make shift devices on top of working platforms to increase the height or to provide access from above. 7. Climb in access areas only and use both hands. 3. When Dismantling Scaffolding the Following Additional Guidelines Apply: a) Check to insure that the scaffolding has not be structurally altered in a way in which
would make it unsafe, and if it has, reconstruct where necessary before commencing with dismantling procedures. This includes all scaffold types. b) Visually inspect plank prior to dismantling to be sure they are safe. c) Consideration must be given as to the effect removal of a component with have on the
rest of the scaffold prior to that components removal. d) Do not accumulate excess components or equipment on the level being dismantled. e) Do not remove ties until scaffold above has been removed (dismantled). f) Lower dismantled components in an orderly manner. Do not throw off of the scaffold. g) Dismantled equipment should be stock piled in an orderly manner. h) Follow erection procedures and use manuals.
These safety guidelines (Code of Safe Practice) set forth common sense procedures for safely erecting, dismantling and using scaffold equipment. However, equipment and scaffolding systems differ, and accordingly, reference must always be made to the instructions and procedures of the supplier and or manufacturer of the equipment. Since field conditions vary and are beyond the control of the Scaffold Industry Association, safe and proper use of scaffolding is the sole responsibility of the user.
Scaffolding * Accessories * Plank Components
industrialmanlifts.com